Agenda 04/24/2012 Item # 9A4/24/2012 Item 9.A. EXECUTIVE SUMMARY Recommendation to approve a Proposed Small -Scale Amendment to the Collier County Growth Management Plan, Ordinance 89 -05, as Amended, related to the Orange Blossom /Airport Crossroads Commercial Subdistrict, for transmittal to the Florida Department of Economic Opportunity (DEO). [Adoption Hearing] OBJECTIVE: For the Board of County Commissioners (BCC) to review the proposed small -scale Growth Management Plan amendment and consider adoption and transmittal to the Florida Department of Economic Opportunity. CONSIDERATIONS: The subject petition is submitted as a "small scale" plan amendment. As such, per Florida Statutes, the request is only heard once by the Collier County Planning Commission (CCPC) and the BCC. If approved by the BCC, the petition is transmitted to the Department of Economic Opportunity (DEO). Per Chapter 163.3187, Florida Statutes, there are limitations for this type of amendment, as identified below, followed by staff comments in [brackets]. 1. Parcel is 10 acres or less in size [subject site is t10 acres]. 2. Property was not granted a land use change within prior 12 months [no land use change has been requested or granted within this time]. 3. Proposed amendment does not involve the same owner's property within 200 feet of property granted a change within last 12 months [no such change has taken place within 200 feet]. 4. No text change to the goals, objectives and policies is involved, only a site specific land use amendment [petitioner only requests changes to provisions of the Orange Blossom /Airport Crossroads Commercial Subdistrict]. 5. Site is not within an Area of Critical State Concern (ACSC) for residential land use, density limit of 10 units or less per acre except for small scale amendments that are designated in the local comprehensive plan for urban infill, urban redevelopment, downtown revitalization, transportation concurrency exception areas, or regional activity center and urban central business district [the site is not in the ACSC, residential uses are not proposed and no change in density is requested]. 6. Site is not located within the coastal high hazard area (CHHA) as identified in the local comprehensive plan (Growth Management Plan) [the subject site is not in the CHHAJ. This petition seeks to amend the Future Land Use Element (FLUE) of the Collier County Growth Management Plan to remove transportation commitments relating to intersection improvements, and a related provision, from the Orange Blossom/Airport Crossroads Commercial Subdistrict language in the Urban Mixed Use District. FINDINGS AND CONCLUSIONS: Based upon review of this petition, including the supporting data and analysis, staff makes the following findings and conclusions. Transportation Planning staff has reviewed the available traffic data in the vicinity of this petition, and has determined that the adjacent roadway network will have sufficient capacity to accommodate this project within the five year planning period. As a result of this analysis, Transportation Planning staff finds that this amendment can be deemed consistent with Policy 5.1 of the Transportation Element of the Growth Management Plan without the need for additional mitigation. CPSS- 2011 -1, Small -Scale GMP Amendment Page 1 of 2 Packet Page -91- 4/24/2012 Item 9.A. While this amendment proposes to remove certain transportation commitments, it does not have the effect of removing them in their entirety. Rather than Orange Blossom Drive — Airport Road intersection improvement plans that are now required to: 1) be approved prior to any development order approval; with construction per the approved improvement plans required to 2) commence prior to the issuance of building_ permits; and, for improvements to 3) be completed prior to the issuance of a certificate of occupancy on a parcel — transportation commitments will be met along another timeline. The removal of the commitments for intersection improvements from the GMP does not exempt the parcel from satisfying the requirements of concurrency during development order (DO) approval. Those intersection improvements, if warranted, may be needed as associated with development phases of the parcel, which will be determined at the time of site development plan (SDP) or plat (PPL) submittal. FISCAL IMPACT: The cost to process, review, advertise, etc. a private sector petition is typically borne by the petitioner via the application fee. In an October 25, 2011 decision, the Board of County Commissioners agreed to process the Orange Blossom/Airport Crossroads Commercial Subdistrict small -scale GMP amendment with no application fee to the petitioner. In doing so, the County defrays the nine thousand dollar cost of this application. The fiscal impact to Collier County consists of devoting staff time and departmental resources to review the amendments and prepare materials for the CCPC and BCC hearings. The expenses of constructing notification signs, advertising for public hearings, and so forth have been covered by the petitioner. LEGAL CONSIDERATIONS: This Growth Management Plan amendment is authorized by, and subject to the procedures established in, Chapter 163, Part II, Florida Statutes, The Community Planning Act, and by Collier County Resolution No. 97 -431, as amended. Per Resolution No. 97 -431, four affirmative votes of the Board are necessary for approval at the Adoption hearing of a Growth Management Plan amendment. This item is ready for Board consideration and approval. [HFAC] COLLIER COUNTY PLANNING COMMISSION (CCPC) RECOMMENDATION: The CCPC heard CPSS- 2011 -1 at their March 6, 2012 meeting. The CCPC voted 5 -0 to forward the subject petition to the BCC with a recommendation to adopt as presented in the Ordinance Exhibit "A" and transmit to the Florida Department of Economic Opportunity. Speakers: There was one speaker at the CCPC meeting expressing concerns about traffic issues tangentially related to this proposal. The speaker asked for confirmation that the proposed amendments did not affect provisions for interconnection between the two parts of the subject site. STAFF RECOMMENDATION: That the Board of County Commissioners (BCC) adopts this small -scale GMP amendment and transmits petition CPSS- 2011 -1 to the Florida Department of Economic Opportunity (DEO) with the changes shown in strike through/underline format on Exhibit "A" to the Ordinance (attached). Prepared by: Corby Schmidt, AICP, Principal Planner Comprehensive Planning Section, Land Development Services Department, Growth Management Division/Planning and Regulation Attachments: 1) Adoption Ordinance with Exhibit "A " text; 2) Adoption Staff Report to the CCPC; 3) Project /Petition; Letter of No Objection (Naples Italian American Club); Transportation Analysis; 4) BCC and CCPC Legal Advertising; CPSS - 2011 -1, Small -Scale GMP Amendment Page 2 of 2 Packet Page -92- COLLIER COUNTY Board of County Commissioners Item Number: 9.A. 4/24/2012 Item 9.A. Item Summary: Recommendation to approve a Proposed Small -Scale Amendment to the Collier County Growth Management Plan, Ordinance 89 -05, as Amended, related to the Orange Blossom /Airport Crossroads Commercial Subdistrict, for transmittal to the Florida Department of Economic Opportunity (DEO). [Adoption Hearing] (Corby Schmidt, Principal Planner, Comprehensive Planning /Growth Management Division) Meeting Date: 4/24/2012 Prepared By Name: SchmidtCorby Title: Planner, Principal,Comprehensive Planning 3/12/2012 1:04:33 PM Submitted by Title: Planner, Principal,Comprehensive Planning Name: SchmidtCorby 3/12/2012 1:04:34 PM Approved By Name: BosiMichael Title: Manager - Planning,Comprehensive Planning Date: 3/29/2012 8:26:34 AM Name: LorenzWilliam Title: Director - CDES Engineering Services,Comprehensive Date: 3/30/2012 9:05:35 AM Name: PuigJudy Packet Page -93- Title: Operations Analyst, GMD P &R Date: 3/30/2012 10:53:23 AM Name: WeeksDavid Title: Manager - Planning,Comprehensive Planning Date: 3/30/2012 1:46:57 PM Name: AshtonHeidi Title: Section Chief /Land Use- Transportation,County Attor Date: 4/2/2012 11:32:46 AM Name: MarcellaJeanne Title: Executive Secretary,Transportation Planning Date: 4/11/2012 12:48:14 PM Name: AshtonHeidi Title: Section Chief/Land Use- Transportation,County Attor Date: 4/13/2012 5:02:34 PM Name: IsacksonMark Title: Director -Corp Financial and Mgmt Svs,CMO Date: 4/16/2012 10:00:11 AM Name: KlatzkowJeff Title: County Attorney Date: 4/17/2012 9:45:43 AM Name: OchsLeo Title: County Manager Date: 4/17/2012 11:02:25 AM Packet Page -94- 4/24/2012 Item 9.A. 4/24/2012 Item 9.A. ORDINANCE NO. 12- AN ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA AMENDING ORDINANCE NO. 89 -05, AS AMENDED, THE COLLIER COUNTY GROWTH MANAGEMENT PLAN FOR THE UNINCORPORATED AREA OF COLLIER COUNTY, FLORIDA SPECIFICALLY AMENDING THE FUTURE LAND USE ELEMENT, BY REMOVING TRANSPORTATION COMMITMENTS FROM THE ORANGE BLOSSOM/AIRPORT CROSSROADS COMMERCIAL SUB- DISTRICT, LOCATED AT THE SOUTHWEST CORNER OF THE INTERSECTON OF ORANGE BLOSSOM DRIVE AND AIRPORT ROAD IN SECTION 2, TOWNSHIP 49 SOUTH, RANGE 25 EAST; AND FURTHERMORE RECOMMENDING TRANSMITTAL OF THE ADOPTED AMENDMENTS TO THE FLORIDA DEPARTMENT OF ECONOMIC OPPORTUNITY; PROVIDING FOR SEVERABILITY AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, Collier County, pursuant to Section 163.3161, et. seq. , Florida Statutes, the Florida Local Government Comprehensive Planning and Land Development Regulation Act, was required to prepare and adopt a comprehensive plan; and WHEREAS, the Collier County Board of County Commissioners adopted the Collier County Growth Management Plan on January 10, 1989; and WHEREAS, the Community Planning Act of 2011 provides authority for local governments to amend their respective comprehensive plans and outlines certain procedures to amend adopted comprehensive plans; and WHEREAS, Collier County staff requested amendments to the Future Land Use Element to modify the Orange Blossom/Airport Crossroads Commercial Subdistrict; and WHEREAS, pursuant to Subsection 163.3187(1), Florida Statutes, this amendment is considered a Small Scale Amendment; and WHEREAS, the Subdistrict property is not located in an area of critical state concern or an area of critical economic concern; and WHEREAS, the Collier County Planning Commission (CCPC) on considered the proposed amendment to the Growth Management Plan and recommended approval of said amendment to the Board of County Commissioners; and Page 1 of 3 CPSS -201 I- 1\Orange Blossom /Airport Crossroads Commercial Subdistrict Small Scale Adoption Amendment Rev. 01/20/12 Words underlined are added; words stF:Hs1E gweegh have been deleted; * * * indicates break in pages Packet Page -95- 4/24/2012 Item 9.A. WHEREAS, the Board of County Commissioners of Collier County did take action in the manner prescribed by law and held public hearings concerning the proposed adoption of the amendments to the Future Land Use Element of the Growth Management Plan on , 2012; and WHEREAS, all applicable substantive and procedural requirements of law have been met. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that: SECTION ONE: ADOPTION OF AMENDMENTS TO THE GROWTH MANAGEMENT PLAN The Board of County Commissioners hereby adopts this small scale amendment to the Future Land Use Element in accordance with Section 163.3184, Florida Statutes. The text amendment is attached hereto as Exhibit "A" and incorporated herein by reference. SECTION TWO: SEVERABILITY. If any phrase or portion of this Ordinance.is held invalid or unconstitutional by any court of competent jurisdiction, such portion shall be deemed a separate, distinct and independent provision and such holding shall not affect the validity of the remaining portion. SECTION THREE: EFFECTIVE DATE. The effective date of this plan amendment, if the amendment is not timely challenged, shall be 31 days after the state land planning agency notifies the local government that the plan amendment package is complete. If timely challenged, this amendment shall become effective on the date the state land planning agency or the Administration Commission enters a final order determining this adopted amendment to be in compliance. No development orders, development permits, or land uses dependent on this amendment may be issued or commence before it has become effective. If a final order of noncompliance is issued by the Administration Commission, this amendment may nevertheless be made effective by adoption of a resolution affirming its effective status, a copy of which resolution shall be sent to the state land planning agency. PASSED AND DULY ADOPTED by the Board of County Commissioners of Collier County, Florida this day of , 2012. Page 2 of 3 CPSS- 2011- 1\Orange Blossom/Airport Crossroads Commercial Subdistrict Small Scale Adoption Amendment Rev. 01/20/12 Words underlined are added; words Am& threugh have been deleted; * * * indicates break in pages Packet Page -96- ATTEST: DWIGHT E. BROCK, CLERK 4/24/2012 Item 9.A. BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA BY: Deputy Clerk. FRED W. COYLE, Chairman Approved as to form and legal sufficiency: Heidi Ashton- Cicko, Assistant County Attorney Section Chief, Land Use /Transportation Attachment: Exhibit A — Proposed Text Amendment CPt l 2 -CMP- 130$1614 Page a of 3 CPSS -201 I -]' \Orange Blossom /Airport Crossroads Commercial Subdistrict Small Scale Adoption Amendment Rev. 01/20/1' Words underlined are added; words sti-aek thFGugh have been deleted; * * indicates break in pages Packet Page -97- 4/24/2012 Item 9.A. Exhibit A CPSS -2011 -1 Future Land Use Element [Page 621 C. Urban Commercial District 11. Oranne Blossom/Airport Crossroads Commercial Subdistrict This Subdistrict consists of two parcels comprising approximately 10 acres and is located on the southwest comer of the intersection of Orange Blossom Drive and Airport Road. This Subdistrict allows for existing institutional uses, such as the Italian American Club clubhouse or another social or fraternal organization, future institutional uses for a school, and limited commercial, professional and general offices, and similar uses to serve the nearby community, along with senior housing in the form of an assisted living facility, continuing care retirement center, or other similar housing for the elderly. Development intensity for this Subdistrict shall be limited to a maximum of 74,000 square feet of gross leasable area for financial institutions, schools, professional, medical and general offices, adult and child day care, personal and business services, and a maximum of 20,000 square feet for the clubhouse facility, all of which uses are allowed by right or by conditional use in the C -1 Zoning District, as identified in the Collier County Land Development Code, Ordinance No. 04- 41, as amended. Uses will be further evaluated at the time of rezoning of each parcel to ensure compatibility with surrounding properties. Any senior housing facility is not subject to this square footage limitation but must meet all other provisions in the Collier County Land Development Code, Ordinance No. 04-41, in effect as of the effective date of this amendment. The development of this Subdistrict shall be governed by the following criteria: a. Rezones are encouraged to be in the form of a Planned Unit Development and must contain development standards to ensure that all uses will be compatible with neighboring residential and institutional uses. s. b. Parcel 1 This approximately 5 -acre parcel is located on the southwest comer of the intersection of Orange Blossom Drive and Airport Road. This parcel is limited to a maximum of 34,000 square feet of gross leasable area for financial institutions, schools, professional, medical and general offices, and personal and business services, in addition to a maximum of 20,000 square feet for the clubhouse facility. Parcel 1 is governed by the additional, following requirements: Words underlined are added; words sVuok- t#rrew9h are deleted Packet Page -98- Exhibit A 4/24/2012 Item 9.A. CPSS - 2011 -1 i. Pedestrian interconnection to access Parcel 2 and property immediately to the west must be pursued by the property owner, and incorporated into the overall site design. ii. Vehicular interconnection with Parcel 2 is required, particularly to provide southbound traffic direct egress onto Airport Road. Vehicular use areas, buildings and structures, landscape buffering and open space, and other uses shall be designed in such a manner that does not impede or interfere with access to or from the adjacent parcel to the south. iii. The existing easternmost vehicular access drive onto Orange Blossom Drive shall be removed or permanently closed -off by the property owner prior to the issuance of a certificate of occupancy for any further development or redevelopment of the site. iv. Development within Parcel 1 shall have common site, signage and building architectural elements, including on -site signs directing motorists toward southbound egress through Parcel 2 onto Airport Road. "b" above if It san be demonstrated that the tFaR6PGFtatlQA imparts of the faGility do A ,•, P v-v d- c. Parcel 2 This approximately 5 -acre parcel is located on the west side of Airport Road, approximately 330 feet south of the intersection of Airport Road and Orange Blossom Drive. This parcel is limited to a maximum of 40,000 square feet of gross leasable area for financial institutions, professional, medical and general offices, adult and child day care, personal and business services, and an assisted living facility, continuing care retirement center, or other similar housing for the elderly. Parcel 2 is governed by the additional, following requirements: i. Pedestrian interconnection to access Parcel 1 and properties immediately to the south and to the west must be pursued by the property owner, and incorporated into the overall site design. U. Vehicular interconnection with Parcel 1 is required, particularly to provide eastbound traffic direct egress onto Orange Blossom Drive. Vehicular use areas, buildings and structures, landscape buffering and open space, and other uses shall be designed in such a manner that does not impede or interfere with access to or from the adjacent parcel to the north. iii. Development within Parcel 2 shall have common site, signage and building architectural elements, including on -site signs directing motorists toward northbound egress through Parcel 1 onto Orange Blossom Drive. Words underlined are added; words siFaek through are deleted Packet Page -99- 4/24/2012 Item 9.A. C.q e-r C i ty Growth Management Division Planning & Regulation A*0k GMP Application CPSS- 2011 -01 Corradi Airport GMPA Re: Analysis of Growth at Orange Blossom Drive and Airport Pulling Road To whom it may concern, Transportation Planning staff has reviewed the available traffic data in the vicinity of this petition, and has determined that the adjacent roadway network will have sufficient capacity to accommodate this project within the 5 year planning period. Concurrency values were analyzed consistently with Policy 5.1 of the Transportation Element of the Growth Management Plan. An estimated [positive] growth rate of 1.5% annually was assumed in background traffic volumes in order to analyze the projected 2016 scenario in terms of intersection approach traffic volumes. Please see Exhibit A, attached. As a result of this analysis, Staff recommends that this amendment can be deemed consistent with Policy 5.1 of the Transportation Element of the Growth Management Plan (GMP) without the need for additional mitigation. Orange Blossom Drive Impacts: Staff analyzed the Orange Blossom Drive concurrency links that are impacted by this project. A nominal growth rate of 1.5% was applied to Link 142, Orange Blossom Drive from Goodlette Road to Airport Road; and link 143 from Airport Road to Livingston. These segments of Orange Blossom Drive currently have a remaining capacity of 275 trips, and 345 trips (respectively); and are both currently operating at LOS "C" as reflected by the adopted 2011 AUIR. Staff has determined that this segment will continue to operate at LOS "C" during the five year planning period. Airport Road Impacts: Staff analyzed the Airport Road concurrency links that are impacted by this project. A nominal growth rate of 1.5% was applied to Link 2.1 from Vanderbilt Beach Road to Orange Blossom Drive; and link 2.2 from Orange Blossom Drive to Pine Ridge. These segments of Airport Road currently have a remaining capacity of 1,879 trips, and 1,880 trips (respectively); and are both currently operating at LOS "C" as reflected by the adopted 2011 AUIR. Staff has determined that these segments will continue to operate at LOS "C" during the five year planning period. 7Fiank you, John M. Podczerwinsky Development Review Project Manager, Transportation Planning Section Growth Management Division Land Development Services Department M Packet Page 100 .., � ..w'�'"- �%�'#✓�`CR'�� '�',;? .,, F's„ o �. .... z�..,., arvr., .��:, �ca:..,� a =. :�. �rpV•_., n::. r..,. ,x..,x. ���° .,,�.. F'ir.. ' fii�tid_� :� r.F,'i$ C Lq C14 0 '7, W W Co -2 Co ui ui 0 M 5 C7C Y' 99 AL - co lz zz Packet Page -101- 4/24/2012 Item 9.A. I— CO Co Co Co U-) — r NC Ul) A CN E LLI ;a„, -2 Co ui ui 0 M 5 C7C Y' 99 AL - co lz zz Packet Page -101- 4/24/2012 Item 9.A. 4/24/2012 Item 9.A. Orange Blossom /Airport Crossroads Commercial Subdistrict Agenda Item; 4C STAFF REPORT COLLIER COUNTY PLANNING COMMISSION TO: COLLIER COUNTY PLANNING COMMISSION FROM: GROWTH MANAGEMENT DIVISION, PLANNING AND REGULATION, LAND DEVELOPMENT SERVICES, COMPREHENSIVE PLANNING SECTION HEARING DATE: MARCH 1, 2012 RE: PETITION NO, CPSS- 2011 -1, ORANGE BLOSSOM /AIRPORT CROSSROADS COMMERCIAL SUBDISTRICT SMALL SCALE GROWTH MANAGEMENT PLAN AMENDMENT (ADOPTION HEAR/NGI APPLICANT /OWNERS: Applicant and Owner: Michael Corradi, for Corradi Airport Road, Inc, Ask 40 Seagate Drive, #904, Naples, FL 34103 Owner: Naples Italian American Club Foundation, Inc. 7035 Airport Road North Naples, FL 34107 GEOGRAPHIC LOCATION: The subject property contains approximately 10 acres and is located at the southwest corner of the intersection of Airport Road (CR 31) and Orange Blossom Drive. The property has approximately 660 feet of frontage on Orange Blossom Drive and 660 feet of frontage on Airport Road North (a.k.a., Airport- Pulling Road). The property lies within the North Naples Planning Community in Section 2, Township 49 South, Range 25 East. REQUESTED ACTION: This petition seeks to amend the Future Land Use Element (FLUE) of the Collier County Growth Management Plan to remove transportation commitments relating to intersection improvements, and a related provision, from the Orange Blossom /Airport Crossroads Commercial Subdistrict language in the Urban Mixed Use District. -1- Packet Page -102- 4/24/2012 Item 9.A. Orange Blossom /Airport Crossroads Commercial Subdistrict Agenda Item 4C C. Urban Commercial District 11. Orange Blossom /Airport Crossroads Commercial Subdistrict Proposed Future Land Use Element Text Amendment [removing that part of the Subdistrict language applicable to the entire 10 acres]: [and, as a consequence of deleting provision "b" above, staff recommends removing that part of the Subdistrict language that serves as an exception from the provision, applicable to an existing use located on a five acre portion of the Subdistrict]: (c) faGility "b" exroepted Both of these proposed text amendments are reflected in the Ordinance Exhibit "A" prepared for this small -scale amendment. STAFF ANALYSIS: In October of 2008, Collier County Board of County Commissioners (BCC) adopted an amendment to the County's Future Land Use Element (FLUE) and Future Land Use Map (FLUM) establishing the Orange Blossom /Airport Crossroads Commercial Subdistrict (Crossroads Subdistrict). The Crossroads Subdistrict consists of approximately ten acres, unifying two neighboring five -acre tracts, and limits their development intensity to uses found in the C -1, Commercial Professional and General Office Zoning District.. The northerly five acres includes as allowable uses, up to 34,000 sq. ft. of financial institutions, schools, professional, medical and general offices, and personal and business services — in addition to the 20,000 sq. ft. for the clubhouse facility. The southerly five acres includes as allowable uses, up to 40,000 sq. ft. of financial institutions, professional, medical and general offices, adult and child day care, personal and business services, and an assisted living facility, continuing care retirement center or other similar senior housing. In September of 2009, the Naples Italian American Club obtained a Commercial Planned Unit Development (CPUD) rezone for the northerly portion of the Subdistrict. No development has occurred, other than that related to the clubhouse facility, in accordance with the provisions of the Subdistrict. In a presentation to the BCC in October of 2011, the applicant explained how the Subdistrict's transportation commitments relating to intersection improvements "inhibit positive progress, job creation, and an easier flow of impact fees "; going on to say, how these commitments had been -2- Packet Page -103- _ [and, as a consequence of deleting provision "b" above, staff recommends removing that part of the Subdistrict language that serves as an exception from the provision, applicable to an existing use located on a five acre portion of the Subdistrict]: (c) faGility "b" exroepted Both of these proposed text amendments are reflected in the Ordinance Exhibit "A" prepared for this small -scale amendment. STAFF ANALYSIS: In October of 2008, Collier County Board of County Commissioners (BCC) adopted an amendment to the County's Future Land Use Element (FLUE) and Future Land Use Map (FLUM) establishing the Orange Blossom /Airport Crossroads Commercial Subdistrict (Crossroads Subdistrict). The Crossroads Subdistrict consists of approximately ten acres, unifying two neighboring five -acre tracts, and limits their development intensity to uses found in the C -1, Commercial Professional and General Office Zoning District.. The northerly five acres includes as allowable uses, up to 34,000 sq. ft. of financial institutions, schools, professional, medical and general offices, and personal and business services — in addition to the 20,000 sq. ft. for the clubhouse facility. The southerly five acres includes as allowable uses, up to 40,000 sq. ft. of financial institutions, professional, medical and general offices, adult and child day care, personal and business services, and an assisted living facility, continuing care retirement center or other similar senior housing. In September of 2009, the Naples Italian American Club obtained a Commercial Planned Unit Development (CPUD) rezone for the northerly portion of the Subdistrict. No development has occurred, other than that related to the clubhouse facility, in accordance with the provisions of the Subdistrict. In a presentation to the BCC in October of 2011, the applicant explained how the Subdistrict's transportation commitments relating to intersection improvements "inhibit positive progress, job creation, and an easier flow of impact fees "; going on to say, how these commitments had been -2- Packet Page -103- 4/24/2012 Item 9.A. Orange Blossom /Airport Crossroads Commercial Subdistrict Agenda item 4C "introduced during a period of heightened caution over traffic congestion [at] the peak of development. The circumstances that warranted this language no longer exist ". Transportation Analysis Transportation Planning staff has reviewed the available traffic data in the vicinity of this petition, and has determined that the adjacent roadway network will have sufficient capacity to accommodate this project within the five year planning period. Concurrency values were analyzed consistently with Policy 5.1 of the Transportation Element of the Growth Management Plan. An estimated [positive] growth rate of 1.5% annually was assumed in background traffic volumes in order to analyze the projected 2016 scenario in terms of intersection approach traffic volumes. See the table provided in the exhibit below. ;+KDW Fak ft= 4'8Oesbfl: 8660 RDW to UMi . V a ad Roam f m or S fir. ao PW* f Rd Orm flbwfft ftm Gw** Frank Rd: w 0=4Utg Rd otaVe -Rwwm frsrm Ampot -+°ft ma, to UMOMRI. Exhlblt A Site 2011 Ad Vole Teal Remwq LOS fcaaap VOww Ca is Std Vft 2011 Vf &d 2.016 Ratio LOS 2018 R20 LOS - 2M 1679 €x.53 C ?111' 0.3 C 2Ct E 0.53 C 0.56 C D A92D 576 276 C 0.68 C 619 G.73 C 575 U51 D 1 0.63 1 C 1 6191 G.671 C Orange Blossom Drive Impacts: Staff analyzed the Orange Blossom Drive concurrency links that are impacted by this project. A nominal growth rate of 1.5% was applied to Link 142, Orange Blossom Drive from Good /ette Road to Airport Road, and link 143 from Airport Road to Livingston. These segments of Orange Blossom Drive currently have a remaining capacity of 275 trips, and 345 trips (respectively); and are both currently operating at LOS "C" as reflected by the adopted 2011 AUIR. Staff has determined that this segment will continue to operate at LOS "C" during the five year planning period. Airport Road Impacts: Staff analyzed the Airport Road concurrency links that are impacted by this project. A nominal growth rate of 1.5% was applied to Link 2.1 from Vanderbilt Beach Road to Orange Blossom Drive; and link 2.2 from Orange Blossom Drive to Pine Ridge. These segments of Airport Road currently have a remaining capacity of 1,879 trips, and 1,880 trips (respectively); and are both currently operating at LOS "C" as reflected by the adopted 2011 AUIR. Staff has determined that these segments will continue to operate at LOS "C" during the five year planning period. As a result of this analysis, Transportation Planning staff recommends that this amendment can be deemed consistent with Policy 5.1 of the Transportation Element of the Growth Management Plan without the need for additional mitigation. While this amendment proposes to remove certain transportation commitments, it does not have the effect of removing them in their entirety. Rather, Orange Blossom Drive — Airport Road intersection improvement plans that are now required to: 1) be approved prior to any development order approval; with construction per the approved improvement plans required to 2) commence prior to the issuance of building permits; and, for improvements to 3) be completed prior to the issuance of a certificate of occupancy on a parcel, will take place along another timeline. -3- Packet Page -104- 4/24/2012 Item 9.A. Orange Blossom /Airport Crossroads Commercial Subdistrict Agenda Item 4C Improvements will be planned and constructed concurrent with the demand for said improvements, ensuring that the transportation facilities necessary to maintain the adopted level of service standards are available when the impacts of development occur. The process for adoption of small -scale plan amendments is described in subsection 163.3187, Florida Statutes. NEIGHBORHOOD INFORMATION MEETING SYNOPSIS: The Neighborhood Information Meeting (NIM) required by LDC Section 10.03.05.E was conducted January 19, 2012. Approximately twenty -four people other than the applicant and County staff attended the NIM, held in the North Collier Government Services Center, 6825 Orange Blossom Drive, Naples and heard the following information: The applicant, Michael Corradi, introduced his request for the small -scale Plan amendment and reviewed the specific provision proposed for removal. Mr. Corradi explained how the original Subdistrict provisions were based on the traffic conditions at that time — in a good economy. Also present at that time was a group of property owners of other land surrounding this intersection who would be financially responsible for the cost of their share of these intersection improvements. Since then, the economy has declined into recession, the property owner group is no longer able to meet financial commitments, and traffic on the roads this development impacts has decreased to a level that intersection improvements are no longer needed to accommodate traffic conditions — and requirements for such are not necessary. Discussion surrounded the preliminary improvement plans for the Airport — Orange Blossom intersection, and how this proposed amendment changes those improvements. Mr. Corradi explained that his proposal does not affect the improvement plans or improvements themselves. The effect from changing the Subdistrict provisions would allow those improvements to take place at another time — when development itself is proposed and traffic impacts would be realized. The impact fees paid by the developer would cover the costs of a share of the intersection improvements. An attendee asked about what Mr. Corradi has planned for development of the subject property. Mr. Corradi indicated he has no immediate plans to plat or develop the property for any specific uses. He explained how the required transportation commitments have had a negative effect on his ability to market and develop the property. Removing the specific provision will ease these restraints and allow the property to be successfully marketed and developed. Discussion surrounded how the roadway improvements would take place, if no longer required by the provisions proposed for removal. Mr. Corradi explained how they would be planned and constructed in conformance with the County's standards — when demand is evident and improvements are necessary — in the same manner as other landowners and developers meet their requirements. A representative of the Naples Italian American Club spoke, affirming much of what Mr. Corradi had explained. The same provisions requiring intersection improvements to be completed before new development could take place apply to their half of the Subdistrict, and also negatively affected the developable portions of their property. They would benefit from the proposed small -scale amendment as much as would Mr. Corradi. He affirmed the Club's position of no objection to Mr. Corradi's proposal. No one in attendance expressed opposition to the proposal. No major issues or contentions were raised or discussed. No statements of commitment were made by the applicant. [Synopsis prepared by C. Schmidt, AICP, Principal Planner] -4- Packet Page -105- 4/24/2012 Item 9.A. Orange Blossom /Airport Crossroads Commercial Subdistrict Agenda Item 8C LEGAL CONSIDERATIONS: This Staff Report has been reviewed by the County Attorney's Office and is legally sufficient. [STVVJ STAFF RECOMMENDATION: That the Collier County Planning Commission forward Petition CPSS- 2011 -1 to the Board of County Commissioners with a recommendation to transmit to the Florida Department of Economic Opportunity. PREPARED BY: DATE: Corby L. Schmidt, AICP, Principal Planner Comprehensive Planning Section Land Development Services Department r�^+t — rr` �-� --�'�r �k( �2 REVIEWED BY: DATE: David C. Weeks, AICP, GMP Manager Comprehensive Planning Section Land Development Services Department REVIEWED BY: t 1 DATE: VVOIiam Lorenz, P. E., tirector ,"' Lan".evelopment Services Department f ; i ' , ''- APPROVED BY� �' DATE: NICK C;asalanguida, DX:�"puty Administrator Growth Management Division /Planning and Regulation PETITION NO.: CPSS- 2011 -1 Staff Report for the March 1, 2012 CCPC Meeting. NOTE: This petition has been scheduled for the April 24, 2011 BCC Meeting. COLLIER COUNTY PLANNING COMMISSION: Mark P. Strain, Chairman GAMES Planning ServiceslComprehensivelCOMP PLANNING GMP DATA1Comp Plan Amendments12011 Small Scale Amendments\CPSS- 2011 -1, Crossroads Commercial Subdistrict\CPSS- 2011 -1 DRAFT Staff Report_3.doc -5- Packet Page -106- 4 4/24/2012 Item 9.A. Fr o jec- P L LO 11000'U. 0 t APPLICATION FOR A REQUEST TO AMEND THE COLLIER COUNTY GROWTH MANAGEMENT PLAN APPLICATe+4 NUMBER C �P`J`J� 2-01 i DATE RECEIVED i i IT i i zoi t PRE - APPLICATION CONFERENCE DATE NIA T DATE SUFFICIENT rs/ A This application, with ail required supplemental data and information, must be completed and accompanied by the appropriate fee, and returned to the Comprehensive Planning Department, Suite 400, 2800 North Horseshoe Drive, Naples, Florida 34104. 239 - 252 -2400 (Fax 239 - 252 - 2946). The application must be reviewed by staff for sufficiency within 30 calendar days following the filing deadline before it will be processed and advertised for public hearing. The applicant will be notified in writing, of the sufficiency determination. If insufficient, the applicant will have 30 days to remedy the deficiencies. For additional information on the processing of the application, see Resolution 97 -431 as amended by Resolution 98 -18 (both attached). If you have any questions, please contact the Comprehensive Planning Section at 239 - 252 -2400. SUBMISSION REQUIREMENTS I. GENERAL INFOMRATION A. Name of Applicant 'M I t— A aC—L k. L.._ Crl 9z a l> Company r�C_C�1111AD AIAI -11"L =1VC..A Address C f ar' iJ Z° tf 9cc ' City IVA r `1 eS State FZv12L1Pf'1' Zip Code a3 ` lc 3 Phone Number (97 1) o? ?�'_S(Xb Fax Number __1 /M B. Name of Agent * M iLhAV_L_ L . Zr_rZi1i1'rD4 mKr- ax'vg&cS . • THIS WILL BE THE PERSON CONTACTED FOR ALL BUSINESS RELATED TO THE PETITION. Company Address City State Zip Code Phone Number Fax Number C. Name of Owner (s) of Record 011 R.A D ► A) ill- kILT e : -`Ate- •� Address �"�% City kJ A PLes State �L s �� e �'�t Zip Code 3410-3 Phone Number (9, N ) a ES S cft Fax Number D. Name, Address and Qualifications of additional planners, architects, engineers, environmental consultants and other professionals providing information contained in this application. II. Disclosure of Interest Information: A. If the property is owned fee simple by an INDIVIDUAL, Tenancy by the entirety, tenancy in common, or joint tenancy, list all parties with an ownership interest as well as the percentage of such interest. (Use additional sheets if necessary). Packet Page -107- 4/24/2012 Item 9.A. Name and Address Percentage of Ownership B. If the property is owned by a CORPORATION, list the officers and stockholders and the percentage of stock owned by each. Name and Address Percentage of Stock IC.� loo °fJ C. If the property is in the name of a TRUSTEE, list the beneficiaries of the trust with the percentage of interest. Name and Address Percentage of Interest D. If the property is in the name of a GENERAL or LIMITED PARTNERSHIP, list the name of the general and /or limited partners. Nome and Address Percentage of Ownership E. If there is a CONTRACT FOR PURCHASE, with an individual or individuals, a Corporation, Trustee, or a Partnership, list the names of the contract purchasers below, including the officers, stockholders, beneficiaries, or partners. Name and Address Percentage of Ownership 2 Packet Page -108- 4/24/2012 Item 9.A. Date of Contract: F. If any contingency clause or contract terms involve additional parties, list all individuals or officers, if a corporation, partnership, or trust. Name and Address G. Date subject property acquired () leased ():-Term of lease yrs. /mos. If, Petitioner has option to buy, indicate date of option: and date option terminates: , or anticipated closing: H. Should any changes of ownership or changes in contracts for purchase occur subsequent to the date of application, but prior to the date of the final public hearing, it is the responsibility of the applicant, or agent on his behalf, to submit a supplemental disclosure of interest form. III. DESCRIPTION OF PROPERTY: A. LEGAL DESCRIPTION RASc1 =L No- ' go M o o cc o S A/ 1 ,DG& Lj f`7f%rJ.10 F4 S Sq ­Ds& W i00,0 17'r Kf Qld SP-31 B. GENERAL LOCATION WID LcUS Y �C��iii A� . !v A X--,S. T-L 34kL5 C. PLANNING COMMUNITY D. TAZ E. SIZE IN ACRES F. ZONING _ G. SURROUNDING LAND USE PATTERN H. FUTURE LAND USE MAP DESIGNATION(S) IV. TYPE OF REQUEST: A. GROWTH MANAGEMENT PLAN ELEMENT (S) TO BE AMENDED: Housing Element Traffic Circulation Sub - Element Aviation Sub- Element Sanitary Sewer Sub - Element Solid Waste Sub - Element Capital Improvement Element Future Land Use Element Recreation /Open Space Mass Transit Sub - Element Potable Water Sub - Element NGWAR Sub - Element Drainage Sub - Element CCME Element Golden Gate Master Plan Packet Page -109- 4/24/2012 Item 9.A. Immokalee Master Plan B. AMEND PAGE (S) Co OFTHE L&_kw -4 ELEMENT AS FOLLOWS: (Use 9#r eegh -to identify language to be deleted; Use Underline to identify language to be added). Attach additional pages if necessary: C. AMEND FUTURE LAND USE MAP(S) DESIGNATION FROM 141 TO D. AMEND OTHER MAP(S) AND EXHIBITS AS FOLLOWS: (Name & Page #) d1k E. DESCRIBE ADDITINAL CHANGES REQUESTED: V. REQUIRED INFORMATION: NOTE: ALL AERIALS MUST BE AT A SCALE OF NO SMALLER THAN I" =400'. At least one copy reduced to 8- 1 /2 x 1 1 shall be provided of all aerials and /or maps. A. LAND USE Provide general location map showing surrounding developments (PUD, DRI's, existing zoning) with subject property outlined. Provide most recent aerial of site showing subject boundaries, source, and date. Provide a map and summary table of existing land use and zoning within a radius of 300 feet from boundaries of subject property. B. FUTURE LAND USE AND DESIGNATION Provide map of existing Future Land Use Designation(s) of subject property and adjacent lands, with acreage totals for each land use designation on the subject property. C. ENVIRONMENTAL Provide most recent aerial and summary table of acreage of native habitats and soils occurring on site. HABITAT IDENTIFICATION MUST BE CONSISTENT WITH THE FDOT- FLORIDA LAND USE, COVER AND FORMS CLASSIFICATION SYSTEM (FLUCCS CODE). NOTE: THIS MAY BE INDICATED ON SAME AERIAL AS THE LAND USE AERIAL IN "A" ABOVE. Provide a summary table of Federal (US Fish & Wildlife Service) and State (Florida Game & Freshwater Fish Commission) listed plant and animal species known to occur on the site and /or known to inhabit biological communities similar to the site (e.g. panther or black bear range, avian rookery, bird migratory route, etc.),Identify historic and /or archaeological sites on the subject property. Packet Page -110- 1161). O F e_' i2.OSS I7A Pr "US CG "'n/77e_ c r,.e} L SJ 6 IDJ S i i ! e- C. AMEND FUTURE LAND USE MAP(S) DESIGNATION FROM 141 TO D. AMEND OTHER MAP(S) AND EXHIBITS AS FOLLOWS: (Name & Page #) d1k E. DESCRIBE ADDITINAL CHANGES REQUESTED: V. REQUIRED INFORMATION: NOTE: ALL AERIALS MUST BE AT A SCALE OF NO SMALLER THAN I" =400'. At least one copy reduced to 8- 1 /2 x 1 1 shall be provided of all aerials and /or maps. A. LAND USE Provide general location map showing surrounding developments (PUD, DRI's, existing zoning) with subject property outlined. Provide most recent aerial of site showing subject boundaries, source, and date. Provide a map and summary table of existing land use and zoning within a radius of 300 feet from boundaries of subject property. B. FUTURE LAND USE AND DESIGNATION Provide map of existing Future Land Use Designation(s) of subject property and adjacent lands, with acreage totals for each land use designation on the subject property. C. ENVIRONMENTAL Provide most recent aerial and summary table of acreage of native habitats and soils occurring on site. HABITAT IDENTIFICATION MUST BE CONSISTENT WITH THE FDOT- FLORIDA LAND USE, COVER AND FORMS CLASSIFICATION SYSTEM (FLUCCS CODE). NOTE: THIS MAY BE INDICATED ON SAME AERIAL AS THE LAND USE AERIAL IN "A" ABOVE. Provide a summary table of Federal (US Fish & Wildlife Service) and State (Florida Game & Freshwater Fish Commission) listed plant and animal species known to occur on the site and /or known to inhabit biological communities similar to the site (e.g. panther or black bear range, avian rookery, bird migratory route, etc.),Identify historic and /or archaeological sites on the subject property. Packet Page -110- 4/24/2012 Item 9.A. D. GROWTH MANAGEMENT Reference 9.1- 11.006, F.A.C. and Collier County's Capital Improvements Element Policy 1.1.2 (Copies attached). 1. ` ' INSERT "Y" FOR YES OR "N" FOR NO IN RESPONSE TO THE FOLLOWING: �J Is the proposed amendment located in an Area of Critical State Concern? (Reference 9J- 11.006(1) (a) (5), F.A.C.). IF so, identify area located in ACSC. Is the proposed amendment directly related to a proposed Development of Regional Impact pursuant to Chapter 380 F.S. ? t (Reference 9J- 11.006(1)(a)7.a, F.A.C.) 'V Is the proposed amendment directly related to a proposed Small Scale Development Activity pursuant to Subsection 163.3187 (1) (c), F.S. ? (Reference 9J -1 1.006(1)(a)7.b, F.A.C.) Does the proposed amendment create a significant impact in population which is defined as a potential increase in County -wide population by more than 5% of population projections? (Reference Capital Improvement Element Policy 1.1.2). If yes, indicate mitigation measures being proposed in conjunction with the proposed amendment. Does the proposed land use cause an increase in density and /or intensity to the uses permitted in a specific land use designation and district identified (commercial, industrial, etc.) or is the proposed land use a new land use designation or district? (Reference Rule 9J- 5.006(5) F.A.C.). If so, provide data and analysis to support the suitability of land for the proposed use, and of environmentally sensitive land, ground water and natural resources. (Reference Rule 9J- 11.007, F.A.C.) E. PUBLIC FACILITIES 1. Provide the existing Level of Service Standard (LOS) and document the 1 impact the proposed change will have on the following public facilities: Potable Water Sanitary Sewer Arterial & Collector Roads; Name specific road and LOS Drainage Solid Waste Parks: Community and Regional If the proposed amendment involves an increase in residential density, or an increase in intensity for commercial and /or industrial development that would cause the LOS for public facilities to fall below the adopted LOS, indicate mitigation measures being proposed in conjunction with the proposed amendment. (Reference Capital Improvement Element Objective 1 and Policies) 2. N/q Provide a map showing the location of existing services and public facilities that will serve the subject property (i.e. water, sewer, fire protection, police protection, schools and emergency medical services. 3. Document proposed services and public facilities, identify provider, and describe the effect the proposed change will have on schools, fire protection and emergency medical services. Packet Page -111- Print Map 4/24/2012 Item 9.A. Properties with -in 300' Feet of 6925 Fairport rd. tFbe, ber: 00238000005 ORRADI AIRPORT INC Name: 6925 AIRPORT RD scription: 2 49 25 COMM AT F SEC 2, N 2DEG W T, S 89DEG W 100.07FT W 1 AND POB, S 89DEG W ® 2004. Collier County Property Appraiser. While the Collier County Properly Appraiser Is committed to providing the most accurate and up-to -date information, no warranties expressed or implied are provided for the date herein, its use, or its interpretation. Are T'Brwe R t ► s �: �ot�ni �'�i.L�n�i� ���'I✓��y - C��.R,�.n�� �sS� A�(��C�s`L`����1.����® . 1�3 �_ C 13 V14 M tpc,' L A L L o R D ✓� ; 1Oet�� t f L ..) - ovnmCa-LAL 1 off. � � C http:// www .collierappraiser.com/webmap /n Packet Page - 112 -= properties %20with- in %20... 11/14/2011 4/24/2012 Item 9.%. Packet Page -113- a !z Ir V) b 10Sb - � p m N f N O Ln ol ItlNYJ = � Z IA (lf :1'O) Otl0a ORf1lf1C- laDdtllV ° I, 4 1 Z O V1 ty o � ,ter qq a a b p nR o ^ n "IL S^ REGALO CIR L W C 3 9 rL .. Q „ • IL REGALOCIRCLEA C oul n II 3-1 AbOUv. _ • �i W. a 5g g tg F MNOROI s 0 ^ - r ^MILL aUM Lha�E " " n ~ Z no I- a Jy Y . W . "3nlaG 3Ltl03Npls 3nlaa 3LVD3rvGis TI 2=.= jo ... spa«.. _.. SCOS6 uuva.Y Packet Page -113- 4/24/2012 Item 9.A. (XIX) 11. Orange Blossom /Airport Crossroads Commercial Subdistrict This Subdistrict consists of two parcels comprising approximately 10 acres and is located on the southwest corner of the intersection of Orange Blossom Drive and Airport Road. This Subdistrict allows for existing institutional uses, such as the Italian American Club clubhouse or another social or fraternal organization, future institutional uses for a school, and limited commercial, professional and general offices, and similar uses to serve the nearby community, along with senior housing in the form of an assisted living facility, continuing care retirement center, or other similar housing for the elderly. Development intensity for this Subdistrict shall be limited to a maximum of 74,000 square feet of gross leasable area for financial institutions, schools, professional, medical and general offices, adult and child day care, personal and business services, and a maximum of 20,000 square feet for the clubhouse facility, all of which uses are allowed by right or by conditional use in the C -1 Zoning District, as identified in the Collier County Land Development Code, Ordinance No. 04-41, as amended. Uses will be further evaluated at the time of rezoning of each parcel to ensure compatibility with surrounding properties. Any senior housing facility is not subject to this square footage limitation but is subject to equivalency limitations specific to Parcel 2, and must meet all other provisions in the Collier County Land Development Code, Ordinance No. 04-41, in effect as of the effective date of this amendment. The development of this Subdistrict shall be governed by the following criteria: a. Rezones are encouraged to be in the form of a Planned Unit Development and must contain development standards to ensure that all uses will be compatible with neighboring residential and institutional uses. c. Parcel This approximately 5 -acre parcel is located on the southwest corner of the intersection of Orange Blossom Drive and Airport Road. This parcel is limited to a maximum of 34,000 square feet of gross leasable area for financial institutions, schools, professional, medical and general offices, and personal and business services, in addition to a maximum of 20,000 square feet for the clubhouse facility. Parcel 1 is governed by the additional, following requirements: i. Pedestrian interconnection to access Parcel 2 and property immediately to the west must be pursued by the property owner, and incorporated into the overall site design. (XIX) = Plan Amendment by Ordinance No. 2008 -57 on October 14, 2008 63 Packet Page -114- N T_ 0 N N 1XV) 8. Commercial Mixed Use Subdistrict: The purpose of this Subdistrict is to encourage the development and re- development of commercially zoned properties with a mix of residential and commercial uses. The residential uses may be located above commercial uses, in an attached building, or in a freestanding building. Such mixed -use projects are intended to be developmend at a human - scale, pedestrian- oriented, and interconnected with abutting projects — whether commercial or residential. This Subdistrict is allowed in the Urban Commercial District subject to the standards and criteria set forth under the Commercial Mixed Use Subdistrict in the Urban Mixed Use District. (X111) 9.Livingston Road/Veterans Memorial Boulevard Commercial Infill Subdistict This Subdistrict consists of + 2.25 acres and is located at the southeast corner of the intersection of Livingston Road and Livingston Road /East — West to be known as Veterans' Memorial Boulevard. The Subdistrict allows those office uses, medical uses and financial institutions permitted by right and by conditional use within the C -1 Zoning District of the Collier County Land Development Code, as of the effective date of adoption of this Subdistrict. (Adopted October 26, 2004 by Ordinance No. 2004 -71) This Subdistrict is designed to serve the surrounding residential uses within a convenient travel distance to the subject property. It is further designed to be compatible with the neighboring residential uses through the development standards provided herein, along with other planning considerations. The maximum development intensity allowed is 50,000 square feet of building area with a maximum height of 3 stories, not to exceed 35 feet. Access to the property within the Subdistrict shall only be permitted from Veterans Memorial Boulevard. There shall be no access permitted directly to or from Livingston Road. (XV) 10. Goodlette /Pine Ridge Commercial Infill Subdistrict: This Subdistrict consists of 31 acres and is located at the northeast quadrant of two major arterial roadways, Pine Ridge Road and Goodlette -Frank Road. In addition to uses generally allowed in the Urban designation, the intent of the Goodlette /Pine Ridge Commercial Infill Subdistrict is to provide shopping, person services and employment for the surrounding residential areas within a convenient travel distance. The Subdistrict is intended to be compatible with the neighboring Pine Ridge Middle School and nearby residential development and therefore, emphasis will be placed on common building architecture, signage, landscape design and site accessibility for pedestrians and bicyclists, as well as motor vehicles. Access to the Goodlette /Pine Ridge Commercial Infill Subdistrict may feature a signalized traffic access point on Goodlette -Frank Road, which may provide for access to the neighboring Pine Ridge Middle School. Other site access locations will be designed consistent with the Collier County access management criteria. Development intensity within the Subdistrict will be limited to single -story retail commercial uses, while professional or medical related offices, including financial institutions, may occur in three -story buildings. A maximum of 275,000 square feet of gross leasable area for retail commercial and office and financial institution development may occur within this Subdistrict. Retail commercial uses shall be limited to a maximum of 125,000 square feet of gross leasable area on the south +/- 23 acres. No individual retail commercial use may exceed 65,000 square feet of gross leasable area. Unless otherwise required by the South Florida Water Management District, the .87 ± acre wetland area located on the northeastern portion of the site will be preserved. (XV) = Plan Amendment by Ordinance No. 2007 -18 on January 25, 2007 W 4/24/2012 Item 9.A. EXHIBIT A PETITION CP- 2068 -07 /CP- 2006 -08 ORANGE BLOSSOWAIRPORT CROSSROADS COMMERCIAL SUBDISTRICT DT. COLLIER COUNTY, FLORIDA vaMOCFiFIL 88FACH knAC, _. Packet Page -116- �I T LEGEND ^� F .CF'AREC C7 r,APMC= AND + HWICAi if 7' V'cTiON, 1 r UhA4J1+IR - Q CL(??= "r.`CNTI AND EIiw F'J+.° \IFS. ,,..P: PC (b4 _:1.Ity Packet Page -116- 4/24/2012 Item 9.A. F. OTHER Identify the following areas relating to the subject property: Flood zone based on Flood Insurance Rate Map data (FIRM). -dj& Location of wellfields and cones of influence, if applicable. (Identified on Collier County Zoning Maps) x6r Traffic Congestion Boundary, if applicable tit_'" Coastal Management Boundary, if applicable —h _ High Noise Contours (65 LDN or higher) surrounding the Naples Airport, if applicable (identified on Collier County Zoning Maps). G. SUPPLEMENTAL INFORMATION $16,700.00 non - refundable filing fee made payable to the Board of County Commissioners due at time of submittal. (Plus proportionate share of advertising costs) $9,000.00 non - refundable filing fee for a Small Scale Amendment made payable to the Board of County Commissioners due at time of submittal. (Plus proportionate share of advertising costs) Proof of ownership (copy of deed) Notarized Letter of Authorization if Agent is not the Owner (See attached form) 1 Original and 5 complete, signed applications with all attachments including maps, at time of submittal. After sufficiency is completed, 25 copies of the complete application will be required. * Maps shall include: North arrow, name and location of principal roadways and shall be at a scale of 1 " =400' or at a scale as determined during the pre - application meeting. Packet Page -117- 4/24/2012 Item 9.A. LETTER OF AUTHORIZATION TO WHOM IT MAY CONCERN /t/� ,/ I hereby authorize , + i <- � ft E L � , - (Name of Agent) to serve as my Agent in a request to amend the Collier County Growth Management Plan affecting property identified in this Application. Signed: C ap a p pi /1 ,4/90 ZT EOQC • , Date: 1 2- ( I (Name of Owner(s) of Record) I hereby certify that I have the authority to make the foregoing application, and that the application is true, correct and complete to the best of my knowledge. NI$TORdiUERRIERI NMMy PAk - 800 of FbOds Signature of Applicant • WC, 11 Eapint Apr 22, 201 ,1 Co ion # DO 781i34 C- I ,4,�FL �• L�O/Z IZ lam ( 0 AM. Name -Typed or Printed STATE OF ('-bra Q 0- COUNTY OF ( 101`1 -0 ;C - Sworn to and subscribed before me this 1'�C-11r� day of� �Zl�� *9QDA1 b �N �' �(����� MY COMMISSION EXPIRES: 1i Nota Pubic CH" SE ONE HtF 1JV w� �� who is personally known to me, who has produced as identification and did take an Oath did not take and Oath NOTICE - BE AWARE THAT: Florida Statute Section 837.06 - False Official Law states that: "Whoever knowingly makes a false statement in writing with the intent to mislead a public servant in the performance of his official duty shall be guilty of a misdemeanor of the second degree, punishable as provided by a fine to a maximum of %500.00 and /or maximum of a sixty day jail term." Packet Page -118- Print Map 4/24/2012 Item 9.A. Orange B l 1' R Commercial Subdistrict ® 2004, Collier County Property Appraiser. While the Collier County Property Appraiser is committed to providing the most accurate and up-to -date information, no warranties expressed or implied are provided for the data herein, its use, or as imerpretation. http:// www .collierappraiser.com/webmap /n Packet Page - 119 - 0range %20B1ossom /Airp... 11/14/2011 Exhibit A 4/24/2012 Item 9.A. CP- 2006 -7 /CP- 2006 -8 C. Urban Commercial District II. Orange BlossomJAirport Crossroads Commercial Subdistrict (:[Page 63] This Subdistrict consists of two parcels comprising approximately 10 acres and is located on the southwest comer of the intersection of Orange Blossom Drive and Aimort Road This Subdistrict allows for existing institutional uses such as the Italian American Club clubhouse or another social or of assisted living facility, continuing care retirement center, or other similar housing for the elderi_.I Development intensity for this Subdistrict shall be limited to a maximum of 74,000 sauare feet of Bros• s leasable area for financial institutions schools professional medical and general offices adult and child day care. personal and business services and a maximum of 20,000 square feet for the clubhouse facility, all of which uses are allowed by right or by conditional use in the C-1 Zoning District, as identified in the Collier County Land Development Code Ordinance No. 0441, as amended. Uses will be further evaluated at the time of rezoning of each parcel to ensure compatibility ...lib. _..-- .. --a -__ - --- ---`--_ .. -- - - - - .... - - - a, Rezones are encouraged to be in the form of a Planned• Unit Development and must contain development standards to ensure that all uses will be compatible with neighboring residential and institutional uses. D_ -_- -_ nad into GOWGA IMr1MUSMO is cho" FIn do -1 to be - - '!LL•�•i Lll'1'- I.'1•t�•. - 'lll�•t:iJ' - _ _ -� - - - -- _ — _ �1'��- 1 \- l•�•1�l•J � ;•i1• \9 C`„1•{ +1 ■L��i• �I• \L� 1111 .'��Ii - 12.1:,) l +l.l•'1 ..� c. Parcel 1 This approximately 5 -acre parcel is located on the southwest comer of the intersection of Orange and personal and business services in addition to a maximum of 20-000 square feet for the clubhouse facility. Parcel 1 is govemed by the additional following requirements: i. Pedestrian interconnection to access Parcel 2 and property immediately to the west must be pursued by the property owner, and incoroorated into the overall site design ii. Vehicular interconnection with Parcel 2 is reguired. particularly to provide southbound traffic direct egress onto Airport Road Vehicular use areas buildings and structures landscape buffering and open space, and other uses shall be desioned in such a manner that does not impede or interfere with access to or from the adiacent parcel to the south [words underlined have been addediwords st% gh have been deleted] Packet Page -120- 4/24/2012 Item 9.A. EXECUTIVE SUMMARY Recommendation to direct the County Manager, or his designee, to waive the fee for processing a small scale amendment for the Orange Blossom/Airport Crossroads Commercial Sub District as presented during item 6A of the BCC October 25, 2011 Public Hearing by Mr. Michael Corradi, with the applicant paying only those costs actually incurred, including application and advertising costs. OBJECTIVE: For the Board of County Commissioners (BCC) to direct staff to process the Orange Blossom/Airport Crossroads Commercial Sub District small scale amendment with no application fee to the applicant. CONSIDERATIONS: At the October 25, 2011 BCC Public Hearing, under agenda item 6A, the BCC heard a public petition brought forth by Mr. Michael Corradi requesting the BCC to waive the application fee ($9,000) for a small scale amendment to the Orange Blossom/Airport Crossroads Commercial Sub District. As part of the discussion with the BCC, Mr. Cormdi agreed to satisfy the cost for the preparation of the amendment package as well as the advertising for the item before the Collier County Planning Commission (CCPC) and the BCC. This Executive Summary is to formalize that verbal agreement. FISCAL EMPACT: The fiscal impact to Collier County will consist of existing staff time to review the amendments, and staff time for preparation of materials for the CCPC and the BCC hearings. LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, is legally sufficient, and requires majority vote for approval. - JAK GROWTH MANAGEMENT IMPACT: The removal of the specified paragraph within the Orange Blossom/Airport Crossroads Commercial Sub District meets the definition of the new procedures for a small scale amendment and will count against the 120 acre per year limit for small scale amendments. The amendment will not alter the density or intensity of use allowed within the Sub District. RECOMMENDATION: That the BCC direct the County Manager, or designee to waive the small scale amendment fee for the Orange Blossom/Airport Crossroads Commercial Sub District, with the applicant paying only those costs actually incurred, including application and advertising costs. Prepared By: Mike Bosi, AICP, Manager, Comprehensive Planning Section, Land Development Services Department, Growth Management vision/Planning and Regulation Attachments: None. Packet Page -121- G�. Y d i 3 " � M R 6 Fi 7 �O F .r 6 N F i ++ a GS a 3, yYZ m � � a U w 4/24/2012 Item 9.A. Packet Page -122- N 'o O N W •.� z U FFFFE" U� u ri. >> o p. -9 -9 V u ffi� ffi ffi r� w':wm> w zz°u'3u�zz rr� rr u7 15. 5'. r °a m v�zzz o m Ua�AmUmumUUUuwwwvuuuuuuumu Ulm mUU0oWi wwUCSowc>m,!MMa VI S h OD R h 'N O O\Or01 .mib W'. 10' aD 'h' O; O O a R N RHirNh np' 01 n r 1D O. r00 rd y n r `-r.; hNe9 00 �t'1: cn O h a0 oD oo N aDhofN.N•1 of .O O .hrRen R Q DN.i t�f RR...N T r h' rd v_ •.,. ao .•... Nri N O O«C04 N CT. r N hm � Q- �I' b h O ^ R h R NI b N R N h h R 1D y 1D O N h N a0 O t� h t�f O� to N 1G n h 1D r r r O r N r r R R O h h 10 h h a0 vl 00 R v� O� p Yp N D� V� O O N p,.. N Vi n �f9 e�p CO O.N O. •-f `•" N N .-. .+: N; N N .•+ .+ N N "+ N N N N N e+I N .� N N .-� N h Sim S N o m h O^ r N N� r M 0 0:�' W s •�f p O M.. �p 1� 0 M O� b O to N 4 'N LD:: n'R ao H1:.••�: R- �+1 V� R PI �O O wl IV: Rr O� R b Cr, _ n t�1 ^" Af O n-no0 r R N N O 00 O_ Vt N Na . a0 try to oo 10 T O\ r Vf �Q Off. IT 11,T IT . O o Neo Rom'nna o h enrRhr o -11-A 0 0 0 0 0� R r N R g o �{ h0 0 0 mrnlw hN o a 0 0 o a Mahe Ref M: N N: N ..... -i. N; eq aY: R R H1 ...� .r N e�1 ey .•. M1 tR. ar TomM= a. v�N:.•" Af N N n N r N. zmwz��wwwwwwwwwwwwwzzzzwzzzzzzzz .zzzz.Zw q L1 o O G1 N i0mDN O O ab R N QORmhoD0o110 110 A QQgpAQ�a :�.CgL1O5 >OQ:QAQgQ�Ca�Q55OgQt1 Q�OA <: +0:10.10 10 R!R'N N'N1DR R: Q'N R4;1D: b'b b1oRN�1D 10 NN1010 �.�LRin4 •� � � p m '� � � m 2 � m 3 •� •� 9 M o � s x 0. � °vim Ll x ,,�:a,mSS ,a ° WQ u -3'�w•q°m,a u � •d S S ma.L� o a > °mm a� �i m o k. ox y > °aDi° 'v�'av °3v >a^ �v wv° �v 9 >v°�c`��`:ca°w`� a pS •q R- m 9 9 � O. O° 'a9 $ m9 o3 '° F'.��,, F ' F`' 3 q1 Y. L� �.>p � p ID . p RaOo��r 'A m 'U>a9 i �� ° '�ad: ° w� °• ao�u m � — m F s°t r� � ' C9 m �a . o 5% rffiO . t.4, h 9 � Sri i � �>. v Fi d v2a r'�Amo"'•aY�®o 3t>L'i Go 77 7 E� � a. C da p b 79"10 79 9 'a 9 9 m � 0z° o zoom C° G x xax °mc°am°m° $:�D. omaDpm m°m d Ovvov � m omaaaegomM�eSa°eo°sMmMaga a O O:O; mmUUUCacaoaaa�oovvSvvvvvovUUUuUUuUUUUVU d a>R ! �m m e�0 D' ^O D O D O O �pppoMaa��� O D D °. O O O O O O O' D O O O O O ...� .... ... OPP,n h h Q1 o,: o, 00UUU V Uv�wv�mUUUUUUUU UU UUUUUCYa Cj���U O . O C: O 0 O O O O. O' O Q O: O +- N O O: D .. N O O O: O O O O: O.-! N.••� N•• -1 N O O O• -. N O O O o.• -: e�1 < VY 1G t+ OD O� C' .•-: N 1�i 1D' 1D n 00 D1 N N N N N N N N N N m ROt �+1 AY eNR tN�i eR+i e�1.t��M1 e�6 � .0 tM C < Packet Page -122- 4/24/2012 Item 9.A. Packet Page -123- 0 U � U� �•F�+aF UUU UU U�� UU� •F� UUU�F•F�F Fqq •F�F •F� FF '°' $ F Fw F iy " Fq. �t t� t. F' t� 37. bq bC x�n V� yb+ 'S U U UUU U UUU o o @@ > 8 m m :ZZZ. : w ,ZiZZWm zi Z:zzZ,;W www UUFF n W q q L1 U U U ¢t ¢1 U U W R1 U V U U 00 W Gi U W g q U q q U ¢1 W fA q R7 W R1 U U W W W W Ri W C1 E4 PR RS W �,,:• „_.,;, A g V U V .!` a h d•. r b O ._rt N *n O; 01 N' Vl hi. Q M a m h 1D Se w:'O O N N O Q N fV N Dv Vl N 'M 1'0 10 1D 1/1 'N: Vl h O, n N W N m w: h:' ! n+' N m N 0 W N 10 O m, ri Q h N^ ..•�..�' N� O N, h m ^ N N O o a N N M M !e b Q h N Q h .. N Q W o Mf m h N o N of h N N� h h Q W o, N. h � �:; a, v1. �. Q. M -, h 1D 1D. �? #., W 10 h O+ N N h N i� k• O h O. M 10 1D ° O five t+f O h m m 00 h O m N m Q tO M 01 N N N N QQ 01 t�l O Vt O m 0�0 h h Q h O p M 01 M Yl M 01 Hf h O [+ '/t m 01 h h M 1A Vl m V1 w N O ID N 1D ti b M N N O� h M^ V1 M O 1D ti Vf t� 1p M ID �” i1 :` Vf h 10 N N 61 O> 10 M m N m 1D 1�v1 .-.W hc+IQ VtMQ n1�MV M Inc -hWO N N. N, N. N •-+ ' .••� N N -7 C, O Y�ID'O..N h cO'.m Co OJ 0110 01,0 +m.W m o 0tr x.40 Oh.'lgh Of 1i0: r N10 P10m QOl�'f'.ID OQ W 10 IDN'O 10OIII O. Olh Lh D1 N rN 0010000 �110C N� O O4 ^0 d' Go ml9 l�OI IAN 0 N'. mq CNom. i'7'. if W. -'N N; �� �I ID 'w N� r l7 t0"/ 4 ° '•�t 10 Vl Vf O N Q 01 �: t0 N @� 4r� 'N 1D' pp 01 M T`; N �1pp 1D M O Q ! N 01 10 1D N N N T N N .+ N •-+ I 1 O O O O T 0 0 h 1D 0 1D W O ---1 O O O 1D N p O m 0 O1p 0 N 0 0 ('� O O O R D\ O O O O Q O M NN O O O Vt O h V1 h m N V1 h h t, m W N O 2 mm N h h 1R O O O `- W mwID[� M. TI'D .... M. M M .- 10T 1�1, Tl 1010 N.N . -� .r N M .r t.1 M 1+l 1_1 N e.i tai AW:W W.m G7:. w: W.W WZm.,z'z;."z:Zz,z,z'.WZz. w. W'.W W W W7x1W W, $:$w W w z z z ZZz z h ..,; W W www wwwwgwwgqqqqqwwwwqqqqqwwwwwwqq000QQ0w III wuuuuIuUesUUwwwwwwU N, p� h. IDM :: 10 Vf O h a n'I ...�: N +:.-�! Q� N 4D N: O N b O:'.' i•' N. M: b W' Q m m 1D' Y1' 10 wl. 1D 1p i't; i+� 1D 1D R�� 10 a� SD 1D �n .0 w1 ate: r: Z 10 .n n v1 O 50,.:04 10 10 1n .Ni w 1D N �, .- V1 •u v1 v1 ..i: v1 v1 vl 1D 1D +n' v1 10 .+ v1 n M v1 vl .n n +n h 1p b 1p 1p 10 1D 1D u1 1D Zk, viM h 10 1[f �n 10 + AgGGQgq; MaA] •N. Q: n .ClL1Q���7taQAgCgg:nqO�mlan1nrg N, �: 1D. 10110 b:. N'.:N' N' Ni �: 1D- 1p: 1D� tD 1D: O: Q' �' Q Q Q Q 1D Ir 10 aD n::)a5L100a0gCG1gqq0 W N N N IN Q N N N N 1D m 1D. 1D 10 1p N I � beyq 'd •Y�i -6 � � O ['� 'q v y' 'd 2 � d•D m b O � >••qC} � O � A � O � P. a O � u 'g 'O S f�-0 8 m '1ym �m ° c 0.i >$ � 3 FS � � � � > . ° >F o •3 mw b °b: nS: Phi D v 9 D4 !7G Qa fo :m, OG o m •m .p m �+ isy m q:.d og D4 ° �' a `m a: a'�. i1 ° p a No" 7 •� p =-i m m >.S N it z > GO W Y a"6C p ° Li z: g N N� 1 ' a y S —.a U3 0 mdm c � v O UKnSL Uai b V � w ti a > pa o 'S'i g o Y � � �_ o: O ° '� 'a 0 .... m ]7 ., .p: a y m: «. Y ,i Y m•' .b >n 'O tY. L'•' 7zr b,. L, �l m D p � m. nG O F J° � �' � `• v mq � F o o O. A w m Y. o rn u z ° '� ° Pi.� IM P1.] CA w. a �„ .° b a A b �p+ 7 eo m C ,Y 1'" O d W N l� M W M O� •S A ®� r n6 co 3.;a15 3�3 >D > � Aa.OZwv FC7v1 a.; .amFUVwOOaSgt- UaUUZU ..4u400 t»ig m m m m °�sx °4aaa4b •e •e .?x o a •o m m •o •D m m •a •D m m •e •e m ° moG � � 3 •o m •� •o v m m v m m D �o m •e •o m m •e •e v m m m � � � � 0 PatAw 0 0 0 W o �C � m e�wwu5www : D� a••��� aO D CC 18 DC 1 Z A'Y? � Y 0°1 Y° D.o :a iag � L' � ID- _h 0.b � av nb . w•aso '� L+1 x•r `P�0 �� 7YCi x `� "'�' ' 4 F 1H 1•F� HF Ln ' 11+•1�ma O d O 1 XO � O fY -0 0.a fa -0 h � � � �r a•Y a; a C �L � i m� oa. a.°. a1aa+.a oN e Nm �•EN � � C � . agm q ZUhDw . '� 'a•ae Y -aab a Y Y ,zm�S : . .^a cq C � : „�.'.1 w L�.. ae4 S '3 i N N N oM N N N •� �• i•- tl Rt M-- M.FF a :° :a a� z O a Fr t4 FF ! •a q b b 7 � E b 0 � Q'Q: W; 10 b !r'. a0. 00 b Q, m'. 10 !p. D0 CO m m'. m. m- W W: h -. b 10 m. D1 01 W: W W; 1D b Oi O1''Q', W W, 10 1D 1D Q L�. m.. LD: m' 1D 1D V1: V1. m 1D Q v1 1D - m W st 40 W Q Q 4D 10 m W 01 01 01 ���E' O. 01 Ot D\ T N .� •• •• �0 Q Q Q Q Q Q Q �RPAA-- I n» =xxxaD aUVUUUUUU axa xx�Dsxx U UUU o:aDeD:aaxxx vUUUUUUUw xaxxa UuUUU ����,�,���mm��Da�Daa :ry.•- �e.1.•,ryao.ocao- aec.�a a< av1°n1nvNivMi q,o000 oaao.o;oalo�o.- vet sv'^ ir0v1i101ND1MD1QD1 '^0- ..v,'ooc -1h01^D'0110� 0000000000000000000 n 1, °h°ae°o0oaNOm0 0 0 0 n'oomohoamo°w a1(AaM1arn 00:0 Packet Page -123- 4/24/2012 Item 9.A. Packet Page -124- N w >. 4444 a CC 4a g g�� y�y���yy- FFFF+F ^^ FFFFF FF F �z,zzzz'affi'aaa a� $� ggaga;�5a;ggawwwww zzzz,z .&M IN III +� z � rr ta:i�uv�MIN 3t�a:ui �R1 W qw W qq ,'� "::. rAQQVUUUtA rA GC Cl cOUCC CC W gQa1Q ❑CI CC RI CC Cq ;; 6i Yl r4 E N OD b b ebN NOM \ ' eeF :'n h O � N n' b N m N m V@ ^ 01 •.• .m ■ a O+ 1%oloolm N M m m N O E N M n N O N ��1pOp �N1ppf .N.� Ol Q 01 .�.i \ �~eyyf Ol N h N••� n M 00 �O Ono 00 �O n O ^ 7 7 N 1N0 eel {F n .mn �N1pp O+ n Mn D > N eel, N- r4 9 ' f, ; er .°-, N .bn .M+ t°ry M e x 17Nh.m m 0 oo �l7 CO 9) tbO 111 'C W N WOOOO N N. e0. Co NO'+ W N 1D0(p V1 W N N A 17171 : N; OOY.. N! 710 w m N: O b , ' — , '. N , 0 M , N b On ; ,n NN a0 N z M MMN O N M N b n N N N C N n N �O0 01 N N n M eG N Ory 1101112 M M N N S n N n o 0 0 N 0 0 n� 0 N 0 0 0 o N o 0 0 0 0 0 0 0 0 b 0 0 0 0 O pp O pp 'Ho NM M M te1. <' f7. M en , .-� I - M M - .+ O m 01 O. .-. N O� TM O� n o zzz;zzz w wwww.z.z.wzwww wwwwwhzz -z U v w w w w w C�. 3 m 'o o Y o •� CA xm- �D; 'Q�aaa�3..mt- •5_ o o - -. ': d OR m vwavm'wgvwr�$ovo., a f b ey � Y O � � U 'O .50 U Y D: � -UUg p i x b � �y •D q b �, l; a°�� o � o 3a °.b•��� u �� o a •� B:IO• �� � � ���� � u m � �� NU• ��aa�� °'e,,, u � .�,�'� w. $Q .9 G�� �� a v °'O o ° mw ° e3 v � �y3 >vo'�$�aa�Fv °: w'ov�3'w3w"�$o`o mm.,mmm 79 79 bb atl� zzzzzzzzzz.> ... aaaaaa�.•' m :�mmm�mo 'O, D D. D: O Y Y C+ .p •p � •� ; qq CQp� C7 C7 pa ¢1 Rd- a� av� Co o p•333'3,bvlvgbg dLD b m sbR7 o A o o- ;°e mill X999 333o'booc�ciaa >' aw'w'woq p ..., <: et Vl r„ ,., < h m t ,,. •„ <, Q: o In 'Go' �, C s} VI „� ,�. �7, e1 w Ma ^, ,� <. <- v ^. <: m d) N b N b'. %0 00..00 N N 10 1D. N N b m m' -+ -� m m m m t0 aooaao�oaaao� uuuuuU u uuu � O. O O 0 0 O O' O O' O O. 0 0 O. • •+ N +- � O O O' O' 0 0 0 0 T T T 01 Cif .0., O N M i R' h 4D �.Nr Z SOD Cl O. C.r � G �-5 N. .Mr Packet Page -124- Al W 8 i Q > � U $ Y t � E .ao. �z L H.' s s =eQ W �M� eAis,� as A In A Inn An Id........, n A . . . . . . . . . . . . . ..... Packet Page -125- s s 0 1 tS' F �r . . . . . . . . . . . . . ..... Packet Page -125- s s 0 W U Q E o r f E I I I F r; 0 �F Item 9.A. Packet Page -127- a 4 a i I I � �IIYII■1 ■1 1 �Ild� gym.... ■ Packet Page -127- a 4 a woll TWIA 4/24/2012 Item 9 s AI�'ORT PULLINO�RD z�z x LIVINGSTONRD 1 , ,{ 0 3 _ m m m NAOMIST G f BAAA BLVD aiL OAN BLVD in D v n ° m o (� -- COLLIER BLVDm O a ; cn 5TH ST NW < p m V CA `yam D SMITH RD V M m 0 3 _ m m m NAOMIST Ch f M M co M m.,;; in n ° m o �n to a xy cn 5TH ST NW < p m V CA `yam D z V M m o : o \�a mac WILSON BLVD ° G a 5� A N O o m CD � m 'n, o CAMP DAIS RD - IVY WAY o CD 0 a 0) 3 m co ( m <�r o m cD I to MILLER BLVD Co m 0 < < n N CD ri rt -n w -n :7 M Nq N r N rn °" M m m 3 0- O z v= EVERGLADES BLVD S 2 2 -n m m o N 3 v n O_ O O0 C) D 3 EVERGLADES BLVD, N m. O O _¢< mrn N O 0 3 _ m m m NAOMIST Ch f M M co M m.,;; - 6 sDTO BLVD � ° MERRITT BLVD _ �n a i PATTERSON BLVD m CD V CA A z V M m : o m mac A ° � _ v 5� A N O o m CD � m m CAMP DAIS RD - ^� o CD F.. a 0) 3 m co ( m <�r o m cD I to 0 Co m 0 l w- n s M z n .A. � CD V A z V : o ° A ° � _ v M 0 =3 A N O o m CD � m m CD @ o CD a 0) 3 m co ( m <�r o m cD I to 0 Co . ► n N CD = (D c0 (D rt -n w -n :7 M CD N N M 3 3 0- O 0 O -n N M O N 3 v n O_ O N T C) N® 3 O N O O O N O 0 O O O O l w- n s M z n .A. `1_1 TRANSPORTATION CONSULTANTS, INC. 4/24/2012 Item 9.A. 13881 PLANTATION ROAD, SUITE 11 FORT MYERS, FL 339124339 OFFICE 239278.3090 FAX 239.278.1906 TRAFFIC ENGINEERING TRANSPORTATION PLANNING SIGNAL SYSTEMSIDESIGN TO: Mr. Michael Greene Collier County Transportation Planning FROM: Robert L. Price, PE Senior Transportation Consultant Ted B. Treesh President DATE: September 9, 2008 RE: Airport- Pulling Rd @ Orange Blossom Dr Intersection Improvements Traffic Projections Collier County, Florida TR Transportation Consultants, Inc. has been retained by the Developers of the Italian American Club Comprehensive Plan and the Westminster PUD to assess the necessary future lane arrangements at the intersection of Airport- Pulling Road/Orange Blossom Drive to accommodate future growth, specifically planned and/or approved projects that are in the general vicinity of the subject intersection. Figure 1 indicates the location of the subject intersection as well as the developments that were accounted for as a part of this analysis. Also indicated within Figure 1 are the intensities of each development. In order to perform the requested analysis, TR Transportation has completed a 2013 analysis at this location. The traffic projections in this memorandum will be utilized to perform the needs analysis for the intersection. The 2013 traffic projections are based on A.M. and P.M. peak hour turning movement counts performed by TR Transportation. Existing Traffic Data A turning movement count was conducted at the intersection of Airport Pulling Road/Orange Blossom Drive during the A.M. and P.M. peak hours (7AM -9AM & 4PM- 6PM) on January 8, 2008. Furthermore, upon the request of the Collier County Transportation Planning Department, turning movement counts were also performed at the nearest signalized intersection to the north (Emerald Lakes Drive /Old Groves Road) Packet Page -130- R--- N O N N Mr. Michael Greene TRANSPORTATION Collier County Transportation Planning Airport Pulling Rd @ Orange Blossom Dr Improvements CONSULTANTS, INC. September 10, 2008 Page 3 and south (J & C Boulevard/Fountain View Circle) of Orange Blossom Drive on Airport Pulling Road on May 7, 2008 and May 8, 2008. These turning movement counts were adjusted for peak season traffic conditions based on the information contained within the 2007 Peak Season Factor Category spreadsheet within the 2007 FDOT Traffic Information CD as can be found in the Appendix of this document. The January 8, 2008 count was adjusted by a peak season correction factor of 1.12 while the May 7th and May 8th counts were adjusted by a peak season correction factor of 1.17. The turning movement count results can be found within the Appendix of this document for reference. Additionally, a graphical representation of the 2008 peak season turning movement counts is shown in Figure 2. A peak hour factor (PHF) was calculated based on the results of the turning movement counts performed at the various intersections. The appropriate PHF's will be utilized throughout the remainder of the intersection analysis. A separate PHF was calculated for each intersection based on both the AM and PM peak hours in accordance with the calculation indicated below for Airport Pulling Road and Orange Blossom Road in the AM peak hour. PHF = Highest Hourly Volume 4 *Highest 15 Minute Volume PHFAM = 2,999 vehicles 2,999 vehicles 4 * 790 vehicles PHF9e1•f = 0.949 3,160 vehicles In addition to the peak hour factor, a 2% truck percentage was assumed in order to account for heavy vehicles at the intersection. Table 1 indicates the resultant peak hour factors and the truck percentage utilized at each intersection as a part of the proposed analysis. Table 1 PHF & Truck % Airport Pulling Road Orange Blossom Drive Intersection Improve ents Airport Pulling Rd @ Old Groves Rd/Emerald Lakes Dr 0,926 0.893 2% Airport Pulling Rd @ Orange Blossom Dr 0.949 0.979 a 2 /o Airport Pulling Rd @ J &C Blvd/Fountain View Cir 0.962 0.861 2% 4/24/2012 Item 9.A. Mr. Michael Greene TRANSPORTATION Collier County Transportation Planning Airport Pulling Rd @ Orange Blossom Dr Improvements CONSULTANTS, INC. September 10, 2008. Page 5 Future Development Traffic In order to determine the 2013 buildout turning movements at the subject intersection, the projected traffic to be generated as a part of the various developments in the vicinity of the Airport- Pulling Road/Orange Blossom Drive intersection was combined based on the information contained within the Traffic Impact Studies obtained for each project. The various projects for which the traffic was accounted can be found within Figure l contained previously in this document. A brief description of each development and the approved parameters associated with those developments are included below, listed from west to east. Savannah Place RPUD is a 6.82 -acre parcel located on the south side of Orange Blossom Drive approximately 1/2 mile to the west of Airport Pulling Road. This development is currently being reviewed for a potential re- zoning that would allow for up to 20 single family dwelling units. The TIS performed for this re- zoning application by Q. Grady Minor & Associates, PA was obtained in order to account for the traffic generated as a result of this development. Attached in the Appendix of this document is supporting documentation such as the trip generation and traffic distribution contained within the re- zoning TIS for the Savannah Place RPUD. This information was utilized in order to perform an assignment of the Savannah Place RPUD trips to the subject intersection as well as the signalized intersection on Airport Pulling Road to the north and south of Orange Blossom Drive. Access to Orange Blossom Drive was shown via a �-- single, full access location along the frontage of the Savannah Place RPUD. Figure 3 was created to illustrate the Savannah Place RPUD traffic accounted for at the area intersections as a part of the proposed needs analysis at the Airport Pulling Road/Orange Blossom Drive intersection. Italian American Plaza & Clubhouse District is a 5 -acre parcel located in the southwest comer of the intersection of Airport Pulling Road and Orange Blossom Drive. This development is currently, being reviewed for a potential Comprehensive Plan Amendment that would allow for a 20,000 square foot fraternal lodge /organization, 22,500 square feet of general office space, 7,500 square feet of medical office space, and a 4,000 square foot drive -in bank. TR Transportation Consultants performed the TIS for this Comprehensive Plan Amendment. As such, the trip generation projections from the TIS for the Italian American Plaza & Clubhouse District have been attached in the Appendix of this document for reference. Access to the subject property was proposed via two (2) locations. An existing full access to Orange Blossom Drive was shown in addition to a right - in/right -out access to Airport Pulling Road via a cross access through a neighboring parcel to the south of the subject site. Figure 4 has been created to illustrate the Italian American Plaza & Clubhouse District traffic at the area intersections analyzed as a part of this needs analysis Airport Road /Orange Blossom Commercial Subdistrict is a 5 -acre parcel located on the west side of Airport Pulling Road to the south of the Italian American Plaza & �— Clubhouse District. This development is currently being reviewed for a potential Packet Page -132- N r N N 4o O J O - -20% -4- 5% -♦ 0 Z J CL w CL CL Q o t � 355% 1 o �o k0 (0) j +y-4-010, (0) 01''� t r (0) 0-10. oaoo (0) ON ocvao t 355% T- o -4-0 (0) (4)4�'h t r (0)0♦ ONO vN v t V 300% 1 CO `mod k0 (0) -0-0(0) O cNV a 4-4(3) r41 (33)4,/ 1, j 5 (3) 0)��► (36) 8 6 k14) 1N r (10)3 Noo .-� (0)0 Boa L -moo NO _� (36) 8� t rn N ORANGE BLOSSOM J^ ROAD x-10 %♦ FOUNTAIN VIEW CIRCLE LEGEND 4-20 %—► PERCENT DISTRIBUTION A— 000 WEEKDAY AM PEAK HOUR TRAFFIC f —(000) WEEKDAY PM PEAK HOUR TRAFFIC ITALIAN AMERICAN PLAZA AND CLUBHOUSE DISTRICT TRANSPORTATION NET NEW SITE TRAFFIC ASSIGNMENT CONSULTANTS, INC. ORANGE BLOSSOM ROAD INTERSECTION IMPROVEMENTS Figure 4 O Q 417� ♦15 %♦ cD z J d � *{L Q l 0: 35% i::-+ oNo ko(0) OcNOO 4- 0 (0) (0) 0-► (0) ON 0Lo0 l 3ia ,C t 300% o A k. o (o) 0 Co o 4-0(0) ARD 4.1 + j' 0 (0) (0) o •�' h + t* (0) 0 o .10 I vN v 4/24/2012 Item 9.A. o ko (0) v`2' 4-D (0) c o N 4-8(7) r41 (36) r + 4-11(8) (11) 14♦ITN fr (45) 9 � f i '► v Lo (26) 6 N o 0 I a, �- (0) 0 N O 0 — — —NO no 4i ..-. (38 ) 8 N ORANGE f- 20 %♦ FOUNTAIN VIEW CIRCLE ROAD LEGEND 4-20 %-► PERCENT DISTRIBUTION f— 000 WEEKDAY AM PEAK HOUR TRAFFIC - ♦ (000) WEEKDAY PM PEAK HOUR TRAFFIC JAW AIRPORT ROAD/ ORANGE BLOSSOM COMMERCIAL SUBDISTRICT TRANSPORTATION NET NEW SITE TRAFFIC ASSIGNMENT CONSULTANTS, INC. ORANGE BLOSSOM ROAD INTERSECTION IMPROVEMENTS Figure 5 Packet Page -134- R a� N r O N N d' cm �i 0 vIT' O *- 10 %-o. BOULEVARD ♦ 5% 0 Z_ J J D CL ry 00 a �o 40% J o vo k0 (0) oNO A-0(0) .,1 i �, r (0)0.... a °o (o) 0.� -E 0 0 40% t 400% N.T.S. cocv �3(4) r1� ♦0 (0) r ♦ r 0 (a) f 5% (5)41 (0� 0♦ o �o 300% ORANGE 4-10 %-00. ROAD FOUNTAIN VIEW CIRCLE LEGEND ♦20 %-0- PERCENT DISTRIBUTION -4- 000 WEEKDAY AM PEAK HOUR TRAFFIC ♦(000) WEEKDAY PM PEAK HOUR TRAFFIC LONGVIEW CENTER PUD NORTH PARCEL TRANSPORTATION SITE TRAFFIC ASSIGNMENT CONSULTANTS, INC. ORANGE BLOSSOM ROAD INTERSECTION IMPROVEMENTS Figure 7 cn 1 G oa6c g (50) o1aco" ♦2 (12) N M 1 8 (12) (0) 0.? t ? (10 5) 721 )ON oa �m cocv �3(4) r1� ♦0 (0) r ♦ r 0 (a) f 5% (5)41 (0� 0♦ o �o 300% ORANGE 4-10 %-00. ROAD FOUNTAIN VIEW CIRCLE LEGEND ♦20 %-0- PERCENT DISTRIBUTION -4- 000 WEEKDAY AM PEAK HOUR TRAFFIC ♦(000) WEEKDAY PM PEAK HOUR TRAFFIC LONGVIEW CENTER PUD NORTH PARCEL TRANSPORTATION SITE TRAFFIC ASSIGNMENT CONSULTANTS, INC. ORANGE BLOSSOM ROAD INTERSECTION IMPROVEMENTS Figure 7 4/24/2012 Item 9.A. Mr. Michael Greene TRANSPORTATION Collier County Transportation Planning Airport Pulling Rd @ Orange Blossom Dr Improvements CONSULTANTS, INC. September 10, 2008 Page 13 Greek Orthodox Church is a vacant_parcel on the north side of Orange Blossom Drive on the eastern boundary of the Longview Center development previously discussed within this document. Based on potential development parameters for the site, it was assumed to consist of a maximum of 20 multi - family dwelling units. Currently, a TIS has not been performed for this future development. As such, trip generation calculations were performed based on Land Use Code 230 (Residential Condominium/Townhouse) within the ITE Trip Generation Report, 7`h Edition. Table 2 reflects the trip generation of the potential development. Table 2 Trip Generation Greek Orthodox Church Parcel K !3 �� t "�kff;� \4„s�•.�`�.r� —.--" .-, .� _. 2i wit ��` tl��' if,d�+ u� ,,�g� �. � ���_ 1n.. ' �..zyt C Eh� 3iEii+ . psi (20 -dwelling Access to the site was assumed via a single location to Orange Blossom Drive. Figure 9 reflects the distribution utilized for the analysis as well as the site traffic assignment to the various intersections studied as a part of this document. Westminster is a currently vacant parcel on the north side of Orange Blossom Drive on the eastern boundary of the Greek Orthodox Church parcel previously discussed within this document. The Developer of the Westminster development is currently in the process of gathering the necessary data to submit a PUD re- zoning application on the site. The PUD re- zoning will propose a 415 unit Continuing Care Retirement Community (CCRC) on the subject site. Currently, a TIS has not been performed for this future development. As such, trip generation calculations were performed based on Land Use Code 255 (CCRC) within the ITE Trip Generation Report, 7th Edition. Table 3 reflects the trip generation of the potential development. Table 3 Trip Generation Westminster PUD d �(i � Y.I Ft'I b— �I ry i 5 It' ir6? j, CY 1:� ?CJ f G � C1 1S 415' ;7�6 �111 1...e.� B ',Y`a r... ' �� CCRC (415 units) Access to the site was assumed via a single location to Orange Blossom Drive. Figure 10 reflects the distribution utilized for the analysis as well as the site traffic assignment to the various intersections studied as a part of this document. Packet Page -136- C� m N T- CD N N 0 4 �v ♦20% &C BOULEVARD L9 Z J CL H !Y 00 L Q CL � 4Q ry 30% o=o k0(0) ♦ (o) QIr 0 (0) 0 J fl� (o) 0-ON. ° (a) o, * s� o zlv 300 cfl oo= k8 (17) 0 o r -4-5(12) 7 409 (18) (a) o1► h !� (11) 10♦ cl T (0)0. oo- 1 300% _a o rn o ♦0 (0) i 1'r 0 (0) (0) o f (0) 0♦ o v o (o)a� o�o OPO O� Ge` �vC-4 �, 7 �cN Lo ��.1a (11 ORANGE �*--o tc (44) 381 -4-20%-* (0)0-10. FOUNTAIN VIEW CIRCLE ROAD LEGEND ♦20°/Q- - PERCENT DISTRIBUTION 4- 000 WEEKDAY AM PEAK HOUR TRAFFIC 4-(000) WEEKDAY PM PEAK HOUR TRAFFIC WESTMINSTER TRANSPORTATION SITE TRAFFIC ASSIGNMENT CONSULTANTS, INC. ORANGE BLOSSOM ROAD INTERSECTION IMPROVEMENTS Figure 10 I--- ll�. J &C BOULEVARD st� Q �V 0 z J J a Q 0 ¢ I fr- v I -o ((D)) ONO O / I* r (0) (0) 0 f r \(0) o_ 0 O'T'C O 4-27 63 .-.CD "1 T f (77) 45♦ o_ =o 84 (203) 4-27 63 (176) L �J 160 (110) 41 -- 1 "1 T f (77) 45♦ o_ (1) 31 v °co ..N ANN 12(18) + `►r0(0) (33) 21 - (0) 0♦- o o (0) ON OPO 4/24/2012 Item 9.A. ORANGE BLOSSOM ROAD FOUNTAIN VIEW CIRCLE LEGEND i- 000 WEEKDAY AM PEAK HOUR TRAFFIC L ♦(000) WEEKDAY PM PEAK HOUR TRAFFIC �j TRANSPORTATION DEVELOPMENT TRAFFIC SUMMARY [l CONSULTANTS INC. ORANGE BLOSSOM ROAD INTERSECTION IMPROVEMENTS Fl 9 ure 11 Packet Page -138- N N O N N c� z N J a W E 0 0 a- Q o S M N.T.S. N O N m 04 ,� OP 34 (32) c 14 t , 107 (117) ` O GQ�O� `► (78) fit 0 (8) 2. a o (57) 71 E �Q r rn O v� fD N v�N o 103 (133) �. ♦220 (146) ORANGE BLOSSOM r `, 371 (186) ROAD (220)l i 611 (490) 310♦ r (354) 251 C) Lo ..ter N N M G coin t— k43 (38) ♦8 (4) J &C BOULEVARD + * j' 5`4 (42) FOUNTAIN VIEW CIRCLE (338) 1591 4 +\ t* (226) 120 cLa rn�v 00 rn LEGEND ♦ 000 WEEKDAY AM PEAK HOUR TRAFFIC �. ♦ (000) WEEKDAY PM PEAK HOUR TRAFFIC TRANSPORTATION 2013 BACKGROUND TURNING MOVEMENTS CONSULTANTS INC.ORANGE BLOSSOM ROAD INTERSECTION IMPROVEMENTS Figure 12 4/24/2012 Item 9.A. Mr. Michael Greene TRANSPORTATION Collier County Transportation Planning Airport Pulling Rd @ Orange Blossom Dr Improvements CONSULTANTS, INC. September 10, 2008 Page 21 Based on the attached plan, both the eastbound approach and the westbound approach to Airport Pulling Road on Orange Blossom Drive will consist of dual left turn lanes, a single through lane, and a separate right turn lane. A preliminary cost estimate was also created in order to reflect the potential costs necessary to perform the intersection improvements currently projected as a part of this analysis. This cost estimate has been attached to the end of this document for reference. Upon Staff approval of the projections contained within this document, the SYNCHRO files will be finalized, and a final report will be completed. At such time, another meeting will be held with Staff to go through the finalized SYNCHRO model in order to discuss the necessary improvements. Should you have any questions or concerns about the data contained within this document, please do not hesitate to contact me. Appendix /Attachments Packet Page -140- wR L N r O N N d' APPENDIX TRANSPORTATION CONSULTANTS, INC. 4/24/2012 Item 9.A. DATE: May 7, 2006 DAY: WEDNESDAY COUNT TIME: 7:00 AM -9:00 AM 15 MINUTE SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT PULLING ROAD & OLD GROVES ROAD 1 EMERALD LAKE DRIVE AIRPORT PULLING ROAD OLD GROVES ROAD 1 EMERALD LAKE DRIVE INTER. BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION BEGIN LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 7:00 AM 13 125 1 139 D 232 2 234 4 1 18 23 7 3 2 12 408 7:15 AM 5 168 6 179 1 198 1 200 6 0 5 11 19 1 6 26 416 7:30 AM 9 165 7 161 1 246 5 252 9 0 7 16 24 2 5 31 480 7:45 AM 21 225 8 254 3 321 3 327 13 2 10 25 29 2 9 40 646 8:00 AM 25 206 7 236 0 234 5 239 17 0 4 21 30 4 9 43 541 8:15 AM 22 231 6 259 3 279 14 296 1 8 0 28 35 11 3 2 16 606 8:30 AM 24 208 5 237 2 295 11 308 11 0 17 28 17 3 8 28 601 8:45 AM 27 210 13 250 4 302 10 316 13 1 20 34 30 4 6 40 640 TOTAL: 146 1,538 53 1,737 14 2,107 51 2,172 62 4 107 193 167 22 47 Z36 4,338 HOURLY SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT PULLING ROAD & OLD GROVES ROAD / EMERALD LAKE DRIVE PEAK HOUR SUMMARY HOUR BEGIN 127 SECTION TOTAL PEAK SEASON, PEAK HOUR SUMMARY (PSCF =1.12 ) NORTHBOUND INTER. HOUR BEGIN SOUTHBOUND SOUTHBOUND EASTBOUND WESTBOUND EASTBOUND LEFT THRU RIGHT WESTBOUND LEFT THRU RIGHT SECTION TOTAL LEFT THRU RIGHT LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 48 683 22 753 5 997 11 1,013 32 3 40 75 79 8 22 109 1,950 HT:15AM 80 76428 952 5 999 14 1,018 45 2 26 73 102 B 29 140 2,083 77 827 28 932 7 1.050 27 1,114 46 2 47 97 94 11 25 130 2,273 92 870 26 988 6 1,129 33 1,170 50 2 57 109 87 12 28 127 2,394 98 855 31 984 9 1.110 40 1.159 50 1 67 118 _ B8 14 _ 25 127 PEAK HOUR SUMMARY HOUR BEGIN 127 SECTION TOTAL PEAK SEASON, PEAK HOUR SUMMARY (PSCF =1.12 ) AIRPORT PULLING ROAD OLD GROVES ROAD) EMERALD LAKE DRIVE INTER. HOUR BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 7:45 AM 103 974 29 1,107 9 1,264 37 1,310 56 2 64 122 97 13 3f 142 2,681 li Packet Page -142- P.. Q� N r N d' N I--. DATE: May 7, 2008 TRANSPORTATION DAY: WEDNESDAY CONSULTANTS, INC. COUNT TIME: 4:00 PM •6 :00 PM 15 MINUTE SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT PULLING ROAD & OLD GROVES ROAD / EMERALD LAKE DRIVE HOURLY SUMMARY OF INDIVIDUAL MOVEMENTS OLD GROVES ROAD I EMERALD LAKE DRIVE INTER - INTER- AIRPORT PULLING ROAD NORTHBOUND NORTHBOUND 15MIN AIRPORT PULLING ROAD & OLD GROVES ROAD / EMERALD LAKE DRIVE WESTBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION BEGIN NORTHBOUND TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL EASTBO!36 LEFT THRU RIGHT TOTAL SECTION BEGIN LEFT 23 4 4 31 719 4:00 PM 17 335 19 371 7 262 11 280 20 1 16 37 6 51 733 4:16 PM 14 334 26 374 9 267 2 270 1B 3 9 30 36 9 661 4�0 PM 14 334 20 35B 11 229 10 250 19 4 11 34 22 1 6 d 39 662 4:45 PM 17 31D 14 341 22 218 10 250 20 6 6 32 30 5 9 24 721 5:00 PM 9 361 22 392 3 258 11 272 20 1 12 33 14 1 4 30 814 5:15 PM 26 419 18 483 17 267 8 292 16 Z 11 29 24 2 667 5:30 PM 23 332 1D 355 � 6 223 6 235 12 1 10 23 30 3 9 44 35 5:45 PM 23 339 14 143 2,764 143 376 3,050 B 249 9 83 1,973 67 266 2,123 15 2 13 140 20 BB 30 27 4 4 248 206 31 46 ,70 263 5,704 TOTAL: PEAK HOUR SUMMARY AIRPORT PULLINC ROAD OLD GROVES ROAD! EMERALD LAKE DRIVE INTER - HOUR NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION BEGIN LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL '700 PM 81 1 451 04 1,596 34 997 34 1,065 63 6 46 115 95 12 26 133 2,909 PEAK SEASON, PEAK HOUR SUMMARY (PSCF =1.12 ) HOURLY SUMMARY OF INDIVIDUAL MOVEMENTS OLD GROVES ROAD I EMERALD LAKE DRIVE INTER- HOUR NORTHBOUND NORTHBOUND SOUTHBOUND AIRPORT PULLING ROAD & OLD GROVES ROAD / EMERALD LAKE DRIVE WESTBOUND SECTION LEFT THRU RIGHT TOTAL AIRPORT PULLING ROAD OLD GROVES ROAD I EMERALD LAKE DRIVE TOTAL INTER - HOUR TOTAL NORTHBOUND SOUTHBOUND EASTBO!36 WESTBOUND 1,193 SECTION BEGIN LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU T TOTAL LEFT THRU RIGHT TOTAL TOTAL 62 1,313 79 1,454 49 976 33 1,058 77 14 133 111 19 20 150 2,795 2,797 PM 4:15 PM 54 1,339 82 1,475 45 972 33 1,050 77 14 129 102 16 25 143 14:00 4:30 PM 66 1,424 74 1,564 53 972 39 1,064 75 13 128 90 9 23 122 2,878 4:45 PM 75 1,412 64 1.561 4B 966 35 1,049 68 10 39 117 98 13 26 137 2,864 5.100 PM B1 1,451 64 1,598 34 997 34 1,065 63 6 46 115 95 t2 26 733 2,909 PEAK HOUR SUMMARY AIRPORT PULLINC ROAD OLD GROVES ROAD! EMERALD LAKE DRIVE INTER - HOUR NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION BEGIN LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL '700 PM 81 1 451 04 1,596 34 997 34 1,065 63 6 46 115 95 12 26 133 2,909 PEAK SEASON, PEAK HOUR SUMMARY (PSCF =1.12 ) AIRPORT PULLING ROAD OLD GROVES ROAD I EMERALD LAKE DRIVE INTER- HOUR NORTHBOUND NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 5.U0 91 1,625 72 1,788 38 1,117 38 1,193 71 7 52 129 106 13 29 149 3,258 TRANSPORTATION CONSULTANTS, INC. 4/24/2012 Item 9.A. DATE: January 8, 2008 DAY: TUESDAY COUNT TIME: 7:00 AM - 9:00 AM HOURLY SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT ROAD & ORANGE BLOSSOM ROAD HOUR AIRPORT ROAD ORANGE BLOSSOM ROAD 16 MfNUTE SUMMARY OF INDIVIDUAL MOVEMENTS INTER - WFLAIRPORT NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION ORANGE BLOSSOM ROAD THRU RIGHT TOTAL LEFT THRU RIGHT AIRPORT ROAD & ORANGE BLOSSOM ROAD HOUR TOTAL NORTHBOUND 662 72 822 31 1,065 124 SOUTHBOUND 472 259 154 72 485 1 2,999 AIRPORT ROAD ORANGE BLOSSOM ROAD SECTION INTER - LEFT THRU NORTHBOUND TOTAL SOUTHBOUND THRU RIGHT EASTBOUND LEFT WESTBOUND RIGHT SECTION LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL F7:00 37 146 28 209 6 248 14 25B 9 23 102 134 52 16 11 79 69D 102 23 t49 17 169 4 236 18 258 10 43 39 92 63 25 15 103 642 922 19 150 22 191 11 265 28 304 16 75 43 134 61 28 11 100 729 7:45 AM 15 153 15 183 11 292 23 326 13 74 35 122 75 38 22 135 766 8:00 AM 24 196 17 237 7 251 33 291 34 42 43 119 1 70 49 24 143 790 8:15 AM 30 163 18 211 2 257 40 299 18 25 54 97 63 39 15 107 714 8:30 AM 27 155 13 195 15 282 37 334 21 31 33 85 38 50 I1 99 713 8:45 AM 33 142 5 180 8 259 34 301 27 30 51 106 41 24 11 76 665 TOTAL: 208 1.254 133 1,595 64 2,090 227 1 2,381 L148 343 400 1 891 d53 289 120 842 5.709 HOURLY SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT ROAD & ORANGE BLOSSOM ROAD PEAK HOUR SUMMARY HOUR AIRPORT ROAD ORANGE BLOSSOM ROAD AIRPORT ROAD INTER - WFLAIRPORT NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION ORANGE BLOSSOM ROAD THRU RIGHT TOTAL LEFT THRU RIGHT INTER- HOUR TOTAL NORTHBOUND 662 72 822 31 1,065 124 SOUTHBOUND 472 259 154 72 485 1 2,999 EASTBOUND WESTBOUND SECTION BEGIN LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT I TOTAL LEFT THRU RIG TOTAL TOTAL 7:00 AM 94 598 80 7T2 32 1,041 83 1,158 48 215 219 482 251 107 59 417 2,82T 7:15 AM 81 848 71 a00 33 1,D44 102 1,179 73 234 160 467 269 140 T2 481 2,927 7:30 AM Be 662 72 922 31 1,065 124 1,220 81 216 175 472 259 1 154 T2 495 2,999 7:45 AM 96 667 63 826 35 1,082 133 1,250 Be 172 165 423 235 176 72 484 2,983 9•nn AM 114 856 53 823 32 1.D49 144 1.725 t00 128 181 409 202 162 B1 425 2,882 PEAK HOUR SUMMARY HOUR AIRPORT ROAD ORANGE BLOSSOM ROAD ROAD ORANGE BLOSSOM ROAD INTER - WFLAIRPORT NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION TOTAL LEFT THRU RIGHT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 103 775 84 662 72 822 31 1,065 124 1,220 81 216 175 472 259 154 72 485 1 2,999 PEAK SEASON, PEAK HOUR SUMMARY (PSCF = 1.17 ) HOUR AIRPORT ROAD ORANGE BLOSSOM ROAD INTER - BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION I LEFT THRU RIGHT TOTAL LEFT THRU RIGHT 70TAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 7:30 AM 103 775 84 962 36 1,246 145 1,427 95 253 205 552 303 180 84 567 3,SD9 Packet Page -144- a� N V_ O CV d CV d' DATE: January 8, 2008 TRANSPORTATION DAY: TUESDAY CONSULTANTS, INC. COUNT TIME: 4:00 PM -6:00 PM ."I— . PEAK HOUR SUMMARY AIRPORT ROAD ORANGE BLOSSOM ROAD 0 INTER - HOURLY SUMMARY OF INDIVIDUAL MOVEMENTS SOUTHBOUND EASTBOUND WESTBOUND SECTION E4--45 LEFT THRU RIGHT TOTAL LEFT 7HRU RIGHT TOTAL LEFT THRU RIGNT TOTAL LEFT THRU RIGHT TOTAL TOTAL 235 t.a82 406 AIRPORT ROAD & ORANGE BLOSSOM ROAD 71 975 107 1,153 154 362 247 743 130 102 93 325 1 4,344 ORANGE BLOSSOM ROAD INTER - HOUR AIRPORT ROAD SOUTHBOUND EASTBOUND WESTBOUND SECTION BEGIN LEFT THRU NO RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL '�.. 4:00 PM 194 1,398 336 1,928 64 1,053 103 1 220 149 270 225 644 137 8D 89 82 86 299 299 4,180 4:15 PM 202 1,145 3B9 2,036 69 1,006 92 1,187 155 308 215 fi78 698 124 713 84 95 292 4,251 4:30 PM 211 1,500 387 2,098 73 990 100 1,163 159 311 228 107 1,153 154 342 247 743 130 102 93 325 4,344 4:46 PM 235 1,482 406 2 123 71 975 1,122 151 365 264 780 137 111 87 335 4,323 5:00 PM 229 1,141 a16 2,066 60 959 103 ."I— . PEAK HOUR SUMMARY HOUR BEGIN PEAK SEASON, PEAK HOUR SUMMARY (PSCF =1.17 ) SECTION r AIRPORT ROAD ORANGE BLOSSOM ROAD 0 INTER - NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION E4--45 LEFT THRU RIGHT TOTAL LEFT 7HRU RIGHT TOTAL LEFT THRU RIGNT TOTAL LEFT THRU RIGHT TOTAL TOTAL 235 t.a82 406 2,123 71 975 107 1,153 154 362 247 743 130 102 93 325 1 4,344 HOUR BEGIN PEAK SEASON, PEAK HOUR SUMMARY (PSCF =1.17 ) SECTION r TRANSPORTATION �-- CONSULTANTS, INC. 4/24/2012 Item 9.A. DATE: May 8, 2008 DAY: THURSDAY COUNT TIME: 7:00 AM • 9:00 AM HOURLY SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT PULLING ROAD & FOUNTAIN VIEW CIRCLE I J AND C BOULEVARD HOUR HOUR NORTHBOUND 15 MINUTE SUMMARY OF INDIVIDUAL MOVEMENTS INTER - SDUTHBOUND NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND EASTBOUND TOTAL LEFT THRU RIGHT AIRPORT PULLING ROAD & FOUNTAIN VIEW CIRCLE I J AND C BOULEVARD WESTBOUND TOTAL SECTION TOTAL BEGIN AIRPORT PULLING ROAD THRU RIGHT FOUNTAIN VIEW CIRCLE I J AND C BOULEVARD LEFT INTER - 15 MW TOTAL NORTHBOUND SOUTHBOUND RIGHT TOTAL EASTBOUND WESTBOUND THRU SECTION BEGIN LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 7:00 AM 25 198 7 230 0 294 35 329 28 2 12 42 7 1 11 19 620 7:15 AM 21 155 0 176 2 276 19 297 27 0 17 44 6 0 7 13 530 7:30 AM 44 184 3 231 2 218 51 281 38 1 15 54 8 3 10 21 587 7:45 AM 32 202 6 240 1 252 39 292 29 0 19 46 11 5 7 23 603 8 :00 AM 25 203 4 232 5 233 43 281 31 2 20 53 10 1 8 19 585 8:16 AM 39 228 8 275 219 38 259 31 1 18 50 11 0 9 20 604 8:30 AM 27 224 6 257 3 230 37 270 38 1 40 79 12 0 11 23 629 8:45 AM 43 214 5 262 2 206 42 L12 250 30 2 37 59 13 1 4 18 TOTAL: 256 IIAW 38 1,903 7 1828 314 2,259 252 B 176 439 78 11 67 156 4,757 HOURLY SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT PULLING ROAD & FOUNTAIN VIEW CIRCLE I J AND C BOULEVARD PEAK HOUR SUMMARY HOUR HOUR NORTHBOUND FOUNTAIN VIEW CIRCLE I J AND C BOULEVARD INTER - SDUTHBOUND NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND EASTBOUND TOTAL LEFT THRU RIGHT LEFT THRU RIGHT WESTBOUND TOTAL SECTION TOTAL BEGIN LEFT THRU RIGHT TOTAL LEFT THRU _MRtE_j TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT I TOTAL TOTAL 7:00 AM 122 739 16 877 5 1,040 154 1,199 122 3 63 188 32 9 35 76 2,340 7:15 AM 122 744 13 879 10 979 162 t,tSt 125 3 Ti 199 35 9 32 76 2.305 Iftow 7:30 AM 140 81T 21 978 10 922 181 1,113 128 4 72 205 40 B 34 B3 2,379 7-ASAM 123 B57 24 1,004 11 834 157 1,102 i29 4 97 230 44 6 35 BS 2,421 8:00 AM 134 869 23 1.026 12 888 160 1.060 130 6 115 251 46 2 32 80 2.417 PEAK HOUR SUMMARY HOUR AIRPORT PULLING ROAD FOUNTAIN VIEW CIRCLE I J AND C BOULEVARD INTER - BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION TOTAL LEFT THRU RIGHT LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 7:45 AM 123 857 24 1,004 1 11 934 157 1 1,102 129 4 97 230 1 44 6 35 85 2,421 PEAK SEASON, PEAK HOUR SUMMARY (PSCF =1.12 ) HOUR AIRPORT PULLING ROAD FOUNTAIN VIEW CIRCLE 1 J AND C BOULEVARD INTER - BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 7:45 AM 136 980 27 1,124 12 1,046 176 1,234 144 4 109 258 49 7 39 95 1 2,712 Packet Page -146- Q� N T_ N It N Ift "I-. TRANSPORTATION CONSULTANTS, INC. DATE: May 8, 2008 DAY: THURSDAY COUNT TIME: 4:00 PM - 6:00 PM 15 MINUTE SUMMARY OF INDIVIDUAL MOVEMENTS AIRPORT PULLING ROAD & FOUNTAIN VIEW CIRCLE I J AND C BOULEVARD FOUNTAIN VIEW CIRCLEIJ AND C BOULEVARD INTER- AIRPORT PULLING ROAD 15 NORTHBOUND NORTHBOUND SOUTHBOUND EASTBOUND SOUTHB�Rl�LE�FT SECTION EASTBOUND LEFT THRU RIGHT WESTBOUND TOTAL LEFT THRU RIGHT TOTAL SECTION THRU RIGHT TOTAL LEFT THRU 1,682 46 7069 72 THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL EASTBOUND WESTBOUND LEFT 24 3T2 10 406 1/ 285 38 314 69 0 49 118 8 2 5 15 B53 TOTAL 15 328 16 359 8 219 23 250 70 1 47 t1B 9 1 8 18 745 58 18 370 7 395 10 239 10 259 80 2 52 134 B 1 4 13 801 4:45 PM 14 368 7 389 7 246 20 273 74 1 49 124 6 3 7 16 802 5:00 PM 11 331 9 351 10 225 9 244 67 3 48 116 10 0 6 16 727 5:15 PM 10 480 12 502 11 331 24 366 57 3 45 105 6 1 8 15 988 5:30 PM 4 427 9 440 18 267 19 3D4 75 1 43 119 12 0 9 21 884 5:45 PM 8 345 18 371 13 259 23 295 68 2 44 114 4 0 4 8 788 TOTAL: 104 3,021 88 3,213 88 2,051 16fi 2.305 560 13 375 948 8 63 51 i22 6,588 PEAK HOUR SUMMARY PEAK SEASON, PEAK HOUR SUMMARY (PSCF = 1.12 ) HOURLY SUMMARY OF INDIVIDUAL MOVEMENTS INTER. HOUR NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION AIRPORT PULLING ROAD & FOUNTAIN VIEW CIRCLE / J AND C BOULEVARD LEFT THRU RIGHT I TOTALI LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL AIRPORT PULLING ROAD FOUNTAIN VIEW CIRCLE! J AND C BOULEVARD 1,682 46 7069 72 INTER - HOUR 68 NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND 44 SECTION BEGIN LEFT THRU RIGHT I TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 4:00 PM 11 1,438 40 1,549 36 969 91 1,096 293 4 197 494 31 7 24 82 3,201 4:15 PM 58 1,397 39 1,494 35 929 62 1,026 291 7 194 492 33 5 25 63 3,075 4:30 PM 53 t,549 35 1,637 38 1,041 63 1,142 278 9 192 479 30 5 25 60 3,318 4:45 PM 39 1,606 37 1,682 46 1.069 72 1,187 273 8 183 464 34 4 30 68 3,401 5:00 PM 33 1,583 48 1,864 52 1,082 75 1,209 267 9 178 454 32 1 27 80 3,387 PEAK HOUR SUMMARY PEAK SEASON, PEAK HOUR SUMMARY (PSCF = 1.12 ) MP ORT PULLING ROAD FOUNTAIN VIEW CIRCLEIJ AND C BOULEVARD INTER. HOUR NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION BEGIN LEFT THRU RIGHT I TOTALI LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 4:45 PM 39 1.606 37 1,682 46 7069 72 1,187 1 273 8 183 464 H 34 4 30 68 1 3,401 PEAK SEASON, PEAK HOUR SUMMARY (PSCF = 1.12 ) AIRPORT PULLING ROAD FOUNTAIN VIEW CIRCLE I J AND C BOULEVARD INTER - HOUR BEGIN NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND SECTION LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL LEFT THRU RIGHT TOTAL TOTAL 4:4 M 44 1,799 41 1,884 52 1,197 81 1,329 306 9 205 520 38 4 34 76 3,609 4/24/2012 Item 9.A 2007 FDOT TRAFFIC INFORMATION CD - PEAK SEASON CORRECTION FACTORS Packet Page -148- N N r O N It N 11 SUPPORTING DOCUMENTS FOR PLANNED DEVELOPMENTS TAKEN INTO ACCOUNT �1— 4124/2012 Item 9.A. 1.0 INTRODUCTION The proposed Savannah Place RPUD is a request for Residential PUD zoning approval of approximately 6.82± acres for up to 20 Singie Family dwelling units. The project site is located on the south side of Orange Blossom Drive approximately 1/Z mile west of Airport Road in Section 2, Township 49 South, Range 25 East, Collier County, Florida. For proj ect location please refer to Figure 1, Location Map. The project will have a single entrance to be located on Orange Blossom Drive. Project build out is projected to be 2010. 2.0 SCOPE The following analyses are included in this report: 1. Trip Generation Calculations (at build out) presented For Peak Season Daily Traffic (PSDT) including the Respective Peak Hour Volumes. 2. Trip Assignment within the Radius of Development Influence (RDI). 3. Discussion of Impacts to Roadwa n within the RDL 3.0 TRIP GENERATION The 7th Edition Trip Generation published by the Institute of Transportation Engineers (ITE) is used for trip generation calculations provided in this report. Please refer to Tables 1 through 12. The trip generation for the previously approved use is estimated to be 87 trip ends for daily traffic volume, 12 trip ends during the AM peak hour and 12 trip ends for the PM peak hour. The trip generation for the proposed use is estimated to be 237 trip ends for daily traffic volume, 23 trip ends during the AM peak hour and 25 trip ends for the PM peak hour. This results in a net increase in trip generation of 150 trip ends for daily traffic volume, 11 trip ends during the AM peak hour and 13 trip ends for the PM peak hour. Please refer to the DISCUSSION section for details concerning the effects of these traffic volumes on the level of service for roadway links within the RDI. 4.0 TRIP ASSIGNMENT AND SIGNIFICANCE TEST The project directional distribution of traffic to and from Savannah Place RPUD is presented on Figure 2 and Table 13. When traffic is distributed to the accessed, adjacent and subsequent links, trip generation volumes are below 2% of the service capacity of the surrounding roadways (see Table 14). No roads meet the significance test. F:IPROJ - PLANNING DOMSavw mah Place P U D \ . S P 1JD R \ D r a ft 9 \ T R A F F I C IMPACT STATEMENT.doc - 2 - Packet Page -150- N T- 0 N N FIGURE 3 AM & PM Peak Hour Flow by Direction F:\PROJ - PLANNING DOCS\Savannah Place PUD\SPUDR\Draft \TRAFFIC IMPACT STATFMENT•doc -6- I--, 4/24/2012 Item 9.A. TRANSPORTATION CONSULTANTS, INC. Table 1 Existing Allowable Use Italian American Plaza and Clubhouse District & Airport Road/Orange Blossom Commercial Subdistrict Multi- Family 30 total d" welling As a part of this submittal, the Growth Management Plan Amendment for the 5 -acre Italian American Club site will approve a maximum of 54,000 square feet of floor area. More specifically, the site will consist of a 20,000 square foot Italian American Club Chapter in addition to 34,000 square feet of commercial uses. The proposed Growth Management Plan Amendment on the Airport Road/Orange Blossom Commercial Subdistrict will allow a maximum of 40,000 square feet of commercial floor area on the 5 -acre subject site. In order to perform a worst case analysis in relation to the proposed Growth Management Plan Amendments, the subject parcels were analyzed based on the uses indicated within Table 2. Table 2 Proposed Maximum Intensities Italian American Plaza and Clubhouse District & Airnnrt Rnad/0ranue Rlossom Commercial Subdistrict R4. V .,, tr.. .3 Italian American Plaza and Clubhouse District Italian American Club 20,000 square feet General Office 22,500 square feet Medical Office 7,500 square feet Drive -In Bank 4,000 square feet Total Floor Area 54,000 s care feet Airport Orange Commercial Blossom Commercial Subdistrict General Office 6,000 square feet Medical Office 30,000 square feet Drive -In Bank 4,000 square feet Total Floor Area 40,000 s uare feet The Developer's of both subject parcels have agreed to provide vehicular interconnection between the two (2) sites in order to limit the required access points and provide better on -site traffic circulation. As such, a full site access driveway is shown to Orange Blossom Road along the western boundary of the Italian American Club site, and a right Page 5 Packet Page -152- P= N N r O N NT N I--. TRANSPORTATION CONSULTANTS, INC. Table 3 Existing Allowable Trip Generation Italian American Plaza and Clubhouse District & Airoort Road /Orange Blossom Commerciai buoaisrrici Table 4 indicates the trip generation of the proposed Italian American Plaza and Clubhouse District based on the uses listed within Table 2. It should be noted that the average rate was utilized for the PM peak hour calculation for the General Office use and the daily calculation for the Medical Office use. Table 4 Italian American Plaza and Clubhouse District Proposed Maximum Trip Generation TTY wp a.Iixl� V ���.� ro r i �4i 31 _ FE��..i Fu �H��Kq��;F ��yc�C.lk �1-N •, � / 51 •� I �� �Y•N� V ._. n,� +! Lodge/Fraternal Organization General Office Medical Office Drive-In Bank ����� ' • i Table 5 indicates the trip generation of the proposed Airport Road/Orange Blossom Commercial Subdistrict in accordance with the uses listed within Table 2. It should be noted that the average rate was utilized for the PM peak hour trip generation calculation of the General Office use and the daily calculation of the Medical Office use. Page 7 4/24/2012 Item 9.A. TRANSPORTATION CONSULTANTS, INC. Table 7 Trip Generation — New Trips Tt91ian emP»ran Plaza and Clubhouse District Table 8 Trip Generation — New Trips Road/Oranee Blossom Commercial Subdistrict Total Trips 104 39 143 1 121 174 1 95 2,222 Less Bank Pass -by -12 -12 -24 -46 -46 -92 -493 (50'/0 of Bank Trips) �-- New Traffic (Tntal Trim —PaSS . hvTmffir) 92 27 119 75 12S 2Q3 1,729 V. TRIP DISTRIBUTION The total trips generated as a result of the proposed Growth Management Plan Amendments indicated within Tables 4 & 5 were then assigned to the surrounding roadway system based on the anticipated routes the drivers will utilize to approach the site. Additionally, these trips were assigned to the site access driveways and the Airport - Pulling Road/Orange Blossom Drive intersection based on the anticipated traffic patterns available as a result of the proposed access configuration. The resultant site traffic assignment and distribution of the Italian American Plaza and Clubhouse District is indicated in Figure 3. Additionally, Figure 4 reflects the site traffic assignment and distribution of the Airport Road/Orange Blossom Commercial Subdistrict. Page 9 Packet Page -154- Q di N N r O N N AIRPORT ROAD /ORANGE BLOSSOM DRIVE COMMERCIAL SUBDISTRICT 4/24/2012 Item 9.A. TRANSPORTATION CONSULTANTS, INC. in/right -out access driveway is shown to Airport Pulling Road on the Airport Road/Orange Blossom Commercial Subdistrict site. IV. TRIP GENERATION Trip generation calculations were performed for the existing allowable uses in addition to the proposed uses as a part of the Growth Management Plan Amendments on the site. The resultant trip generation for each use was determined by referencing the Institute of Transportation Engineer's (ITE) report, titled Trip Generation, 70' Edition. , Land Use Code 230 (Residential Condominium/Townhouse) was utilized for trip generation of the existing allowable uses on the subject parcels. For the Italian American Club site, Land Use Code 591 (Lodge /Fraternal Organization), Land Use Code 710 (General Office Building), Land Use Code 720 (Medical/Dental Office Building), and Land Use Code 912 (Drive -in Bank) were utilized for trip generation purposes. For the Airport Road/Orange Blossom Commercial Subdistrict, Land Use Code 710 (General Office Building), Land Use Code 720 (Medical/Dental Office Building), and Land Use Code 9I2 (Drive -in Bank) were utilized in order to perform the trip generation calculations. Table 3 indicates the trip generation of the permitted residential uses on the subject parcels in accordance with the existing Growth Management Plan designation. As the sites are two separate parcels, it was assumed that they could develop as separate residential projects, so trip generation was calculated separately for each parcel based on 15 dwelling units rather than a combined 30 dwelling units. Page 6 Packet Page -156- Q) N 0 N d' N TRANSPORTATION CONSULTANTS, INC. Table 5 Airport Road /Orange Blossom Commercial Subdistrict General Office 17 3 20 2 7 9 152 6,000 s . ft.) Medical Office 59 15 74 28 75 103 1,084 30,000 s . ft.) Drive -In Bank 28 21 49 91 1 92 183 1 986 (4,000 sq. ft.) 1 Total Trips 104 39 143 1 121 J 174 295 1 2,222 ITE estimates that a comparable Drive -in Bank use, such as those proposed on the two subject sites, may attract a significant amount of its traffic from vehicles already traveling the adjoining roadway system. This tragic, called "pass -by" tramc, reauces me development's overall impact on the surrounding roadway system but does not decrease the actual driveway volumes. Collier County allows a maximum "pass -by" traffic reduction of 50% for bank uses. Table 6 summarizes the pass -by reduction. Table 7 summarizes the Italian American Club development traffic and the breakdown between the total project trips and the net new trips the development is anticipated to generate after the pass -by reduction is applied. It should be noted that the driveway volumes are not reduced as a result of the "pass -by" reduction, only the traffic added to the surrounding streets and intersections. Table 8 reflects the 50% pass -by reduction for the Airport Road/Orange Blossom Commercial Subdistrict. Page 8 4/24/2012 Item 9.A. O 3b /° CW+ (D Z D d aN.T.S. d 0 (0) ORANGE BLOSSOM DRIVE ,(' 46 (55) f-15 %♦ (0) 0 — (61)13 '1 x"'20 %♦ (18) 16 (35) 8 0 0 N gas rn N ITALIAN AMERICAN CLUB SITE 1 PROPOSED INTERCtONNECTION AIRPORT ROAD/ ORANGE BLOSSOM c o COMMERCIAL SUBDISTRICT 4/ ,� (52) 12�I M 301% LEGEND �- ♦20 %♦ PERCENT DISTRIBUTION A- 000 WEEKDAY AM PEAK HOUR TRAFFIC ♦(000) WEEKDAY PM PEAK HOUR TRAFFIC SITE TRAFFIC ASSIGNMENT TRANSPORTATION AIRPORT ROAD/ ORANGE BLOSSOM DRIVE COMMERCIAL SUBDISTRICT CONSULTANTS, INC. Packet Page -158- Figure 4 N N V_ O N d' N It PROJECTED TRAFFIC TRIP GENERATION Site- generated trips were estimated using Institute of Transportation Lngineers (ITE) Triy Generation (7 ".' Edition); in accordance with current Collier County policy. The following trip generation formulas were used: Multi - family (LU 230): ADT: Ln (T) = 0.85 Ln (X) + 2.55 AM Peak Hour: Ln (T) = 0.80 Ln (X) + 0.26 PM Peak Hour. Ln (i') = 0.82 Ln (X) + 0.32 Shopping Center (LU 824 ADT: Ln(T) = 4.65 Ln(X) + 5.83 AM Peak Hour. Ln(i) = 0.60 Ln(X) + 2.29 PM Peak Hour: Ln(T) = 0.66 Ln(X) + 3.40 PASS -BY T= Ln (T) = -4.291 Ln (X) + 5.001 General Office Building (LU 710) ADT: Ln (r) = 0.77 Ln (X) + 3.65 AM Peak }-lour. Ln Co = 0.80 Ln (X) + 1.55 PM Peak Hour: (T) = 1.12 (X) + 78.81 Medical Office (LU 720): ADT: T = 40.89(X) — 214.97 AM Peak Hour T = 2.48(X) PM Peak Hour. Ln(T) = 0.93 Ln(X) + 1.47 Since the proposed development will have dissimilar land uses, a percentage of the site - generated traffic will be captured by the land uses inside the development and not he introduced to the external roadway network. Internal capture trips were estimated using rate and summary sheets shown in the ITE Trip Generation Handbook An ITE Recommended Practice (see Appendix). In addition, the retail land use will capture pass -by from the adjacent traffic stream on Airport- Pulling Road. The ITE Trip. Generation Handbook An ITE Recommended Practice was used to determine a 43% Pass -By Capture reduction (see Appendix). 77i.e increase in through traffic on Airport - Pulling Road using 25% Pass -By reduction is marginal compared to its high Remaining Capacity (1103). A 43% Pass -By Capture reduction was used in the analyses of this report as supported by The ITE Trip Generation Handbook An ITE Recommended Practice. Table I. summarizes the trip generation estimates for this development. Sao Grato SDP TIS 6 l: \Proiects1806\80685 \Tr2Htc \Update Sep 0510066STA1006* a-- TABLE 2 Site generated Trip 1 Link Orange Blossom Drive Orange Blossom Drive Orange Blossom Drive Airport - Pulling Road Airport - Pulling Road Airport - Pulling Road Airport- Pulling Road Airport- Pulling Road Airport - Pulling Road Airport- Pulling Road Goodlette -Frank Rd Goodlette -Frank Rd Livingston Rd Livingston Rd Vanderbilt Beach Rd Vanderbilt Beach Rd Pine Ridge Road Pine Ridge Road Nstribution From Goodlette -Frank Rd Airporr Pulling Road Bridgewater Bay Blvd Vanderbilt Beach Rd Project Access Orange Blossom Drive Immokalee Rd l &C Blvd Naples Blvd Pine Ridge Rd Orange Blossom Drive Vanderbilt Beach Rd Orange Blossom Drive Vanderbilt Beach Rd US 41 Airport - Pulling Road Shirley Street Airport- Pulling Road To Airport - Pulling Road Bridgewater Bay Blvd Livingston Rd Project Access Orange Blossom Drive AC Blvd Vanderbilt Beach Rd Naples Blvd Pine Ridge Rd Golden Gate Pkwy Pine Ridge Rd Orange Blossom Drive Pine Ridge Rd Orange Blossom Drive Airport- Pulling Road Logan Boulevard Airport- Pulling Road 1 -75 4/24/2012 Item 9.A. Traffic Distribution Residential Commerc. Office 15% 10% 10% 10% 20% 20% 10% 20% 20°% 40% 40% 50% 60% 60% 50% 350/. 30% 20% 10% 15% 20% 30% 15% 20% 25°% 07. 20% 15% 0% 10% 10% 0% 5% 5% 0% 5% 5% 10% 10% 5% 10% 10% 15% 10% 10% 15% 5% 20% 5% 0°% 5% 5% 0% 5% The trip distribution percentages of each land use were applied to the site - generated traffic volumes to detennine the site - generated vehicle trip assignment. The proposed commercial retail use is of a "neighborhood" nature rather than "regional' in scope. For this reason, the area of influences will likely be confined to residential developments along Orange Blossom east and west of Airport- Pulling Road. The radius of influence was assumed to be not higher than 1.5 miles from the site. Exhibits 6 and 7 presents the proposed entering and exiting traffic of AM & PM peak Hours respectively. Pass -by deductions are shown in Exhibit 8. Net entering and exiting traffic in the PM. Peak Hours, including Pass -By trips at the Project Access points on Airport Pulling Road are presented in Exhibit 9. These exhibits also include the Vandeibilt Beach Road & Airport- Pulling Road intersection as well as the Airport- Pulling Road & Orange Blossom Drive intersection, arnong other intersections near the proj ect site. The PM Peak Hour traffic. characteristics were studied because the site - related land use peak hour typically occurs in the PM Peak Bour of the adjacent street traffic. Sao Gnto SDP TIS B 1: Vroiecn\806\B0665\TrafficXUpdaic Sep OSWO5TA1006.doc Packet Page -160- 1 1 INTRODUCTION The Longview Center Parcel is located on the east side of the Airport Pulling Road/Orange Blossom Drive intersection in Collier County (see Exhibit 1 Location Map). The site is approximately 15 acres in size with approximately 5 acres on the Q northeast corner of the intersection and approximately 10 acres on the southeast corner of 6 6 the intersection. There is an existing single access point onto Orange Blossom Drive from each parcel. Currently, the 5 and 10 -acre parcels are being used as plant nurseries. N The current Future Land Use for the site is Orange Blossom Mixed Use Sub District and Nthe site is within the Traffic Congestion Zone. d' N The project will contain two phases. Phase I will include 22,150 square foot of retail shops and 19,000 square foot of office space. Phase I is projected to be complete prior to the 2005 Peak Season. Phase lI (the south parcel) will include 50,000 square foot of retail shops, 51,000 square foot office space and 15 multi - family dwelling units. Phase lI is projected to be complete prior to the 2008 Peak Season. The purpose of this study is to provide the technical traffic analysis in support of the Rezone. Both AM and PM Peak Hour Volumes were analyzed. \:\Projects \Archive \DocslProjects1804 \80478 - Pulling \Orange Blossom \Traffic \80478- TIS.d0c 2 4/24/2012 Item 9.A. shown in Table 1B. See Appendix A for the Internal Capture Summary worksheet, which was used to determine the internal capture rate. Table 1A PROJECT TRIP GENERATION- (PHASE I ONLY) 2005 J TOTAL OF PHASE I & 9 443 182 260 (:\Projects \Archive \Docs\Projects \8D4 \80478- Putring \Orange Blossom \Traffic\80478- TIS.doc Packet Page -162- 4 AM PM Land Use ADT Peak Enter Fxi_t Peak Enter Exit Office (LU 710): 19,000 SF 371 50 44 6 28 5 23 Retail (LU 820): 22,150 SF 2,556 65 4D 25 232 111 121 Totals 2,957 115 83 31 261 Its 144 PROJECT TRIP GENERATION- (PHASE 11 ONLY) 2008 AM PM Land Use ADI Peak Enter Exit Pic Enter Exit Multi- Family (LU 230): 15 DU 130 11 2 9 13 9 4 Office (LU 710): 51.000 SF 791 109 96 13 76 13 63 Retail (LU 820): 50,000 SF 4,365 106 64 41 397 191 207 Totals 5,286 226 162 64 486 212 274 TOTAL OF PHASE 13 It 8,243 341 246 95 747 329 418 Table 1B PROJECT PM PEAK HOUR TRIP GENERATION WITH ADJUSTMENTS (PHASE I ONLY) 2005 PM Land Use Peak Enter Exit Office (LU 710): 19,000 SF 28 5 23 Mixed Use Internal Capture -4 -2 -2 Retail (LU 820): 22,150 SF 232 111 121 Mixed Use internal Capture -4 -2 -2 Passby Capture 43! -98 -47 -51 Totals 154 65 69 PROJECT PM PEAK HOUR TRIP GENERATION WITH ADJUSTMENTS (PHASE If ONLY) 2008 PM Land Use Peak Enter Exit Multi - Family (LU 230): 15 DU 13 9 4 Mixed Use Internal Capture -5 -3 -2 Office (LU 710): 51,ODD SF 76 13 63 Mixed Use Internal Capture -9 .4 -5 Retail (LU 820): 50,000 SF 397 191 207 Mixed Use Internal Capture -23 -11 -12 Passby Capture 430/. -161 -77 -84 Totals 288 117 171 J TOTAL OF PHASE I & 9 443 182 260 (:\Projects \Archive \Docs\Projects \8D4 \80478- Putring \Orange Blossom \Traffic\80478- TIS.doc Packet Page -162- 4 *. year 2004; B) the construction of Livingston Road from Radio Road to Immokalee Road as a six -lane arterial and from Immokalee Road into Lee County as a four -lane arterial during year 2003; C) the six -lane expansion of Pine Ridge Road from Airport Pulling Road past I -75 which is currently under construction; and D) the four -lane expansion of Vanderbilt Beach Road from Airport Pulling Road to Logan Boulevard in year 2002. Q TRIP DISTRIBUTION AND ASSIGNMENT N The pattern of site traffic distribution is based upon locations of generators and attractors � N in the area of the project. The traffic distribution for the project was discussed and Napproved in a methodology meeting with Collier County Transportation Planning and is 't shown in Table 2. Table 2 TRAFFIC DISTRIBUTION -PM PEAK HOUR (NEW TRIPS) Land Use Traffic Distrib t� ion Orange Blossom east of Project 10% Orange Blossom west of Project 10% Airport north of Orange Blossom 40% Airport south of Orange Blossom 40% I:lProjects\Archive \00es\ Projects \804180478- Pulling \Orange Bl05som \Traffic \80478- TtS.d0c 6 4/24/2012 Item 9.A. ANNUAL GROWTH RATE CALCULATIONS AGR (Orange Blossom Dr) = 4.13% Packet Page -164- 2002 2007 ANNUAL COUNT BASE YR TRAFFIC YRS OF GROWTH ROADWAY SEGMENT STA* TRAFFIC VOLUME GROWTH RATE Airport Pulling Road N. of Orange Blossom Dr. 599 45664 36027 5 2.00% S. of Orange Blossom Dr 503 44288 39679 5 2.00% J & C Btvd W. of Airport Rd 631 12040 10222 5 2.00% Orange Blossom Dr W. of Airport Rd 647 9348 11446 5 4.13% E. of Airport Rd 647 9348 11446 5 4.13% W. of Livingston Rd 647 9348 11446 5 4.13% Side Street Approaches — -- — — 2.00% All traffic volumes were taken from the 2007 Collier County Average Daily Traffic Report Z In instances where the historical data indicates a reduction in traffic, a minimum annual growth rate of 2.0% was assumed. SAMPLE GROWTH RATE CALCULATION Amok 2007 ADT ^(I[Yrs of Growth) Annual Growth Rate (AGR) _ -1 Base Year ADT 11446 'Yt15) AGR (Orange Blossom Dr) = 1 9348 AGR (Orange Blossom Dr) = 4.13% Packet Page -164- > 0 11 I gg II ry --- --------- NRPORT—PUUING -ROAD mn- it 2sx Zia, V)SM =I- 1, 0 Z-0 P i'� z C) rl 0 CP V zo 10F M2?v m U) rn .0w m a X 0 = E! z.;j Z. Z— Z rn In mm C) rl V -4. rlj -01 N) O N) CD it cD . ........ . .... : .... ..... ...... ---------- ----------- lij m - - m ... . .......... .. ............... - -- -- ------------ ........... cn Oro 0 3.1 > gm 0, V > 0 11 I gg II ry --- --------- NRPORT—PUUING -ROAD mn- it 2sx Zia, V)SM =I- 1, 0 Z-0 P i'� z C) rl 0 CP V zo 10F M2?v m U) rn .0w m a X 0 = E! z.;j Z. Z— Z rn In mm C) rl V -4. rlj -01 N) O N) CD Z O U w L O UJ U- U >O 00 M z YI C) U 0 ma O M 0 N a} O J as 0 Z a O Z U J� a dCC a O 4. 4 4/24/2012 Item 9.A. 8.0j $.$ ° -1 o!S; o!. Sl ol: a, 8�$ g'N. Si S:� 8 gig °$I �I� gI 8I p0!C'i GIC 0', Ol, ml O p' p pI [Qi N,I of of i C' gj O; OI of v.' O m' ?' r:- o�' vil of 'j vii mI gI o, g •1 0' o C' C 8 p g �: gyp' 1 i! O' v1. Vl. � I n } I O N O O' N 8 P n, v1 OI O cl aj Nj MI O.I �O nl NI Off, N: •�+� W: OI WI OI W OI h W N pOp �n NI O p OI M: M .Pe M' lD, .Y-.: M: "� M• Vi. NI .•iI n W� Vli Yl n, h: vi' b: Nj Hf r�1I N I I°tI tmp Ihl Y N N N' NI I __ pp ppjpo . ON'I .• O8OI j 8O O p No'I opppOw�• l M NiI 8g �Ot7 : ( ON1 I MI I NI N `N'I o » . V N . NI NI aN N �H! N ] 1 Nf : N� pp ON , . w�n ', w i I I»'� p N • I MI oM;' g N gH, N: $I pp 81 8' p 81 pi OI oOI n O 4 O -: fR. D � N ppp O J! wj NI I I I 1 1- I CY N! W WI °I �i ygi $! °o•! $ v°i' g � ' Q M: gi o! o; ° 8, D zI 1D Z i j l l j l NI II i I V/I rl I OI , . . ^! <) ^ , m. . . . .. ., D 0 Co m n j m, I ^v' Y. Y i r i j I m� I ' i � '� r n• ^ n: � Y � m .I . t7 _ rj �, I f NJ' < V, pl Y O, Y• N �! . t� p Yi N. OY zI I rl p. I � I m I '! ' i mI O� RI vi .-1 ' /^yl Oi ' j �i ' `f. r' AI h nI . i Y mi I N mi 81 , i , � LL' m' m' LLI U. } }' QI Q Y' LL LLI LL`. Ill Y! T' Y• }I T TI } } ti.; 7 N J JI J Qi m� fnI lUI W Uj J; _�! Jj J. U N W NI InI rnl Yn y J J J W, J I J; W; CL I! LL) I I' Ii ! Y. I - a' j l 1 w _j > In j I wl 5 > w w w U. U . - t _ x¢LL ' ! O-xV l. I w I I . w3vgai•: : l W3 �vai ' I I , l m 2o O 1 1 < z2�•wz � : • . I t xzl a 9. W OR ; w QI m! O. aw• WW WO Q 2I I ¢ TO w uiI Z m, �f OI ` W. z of ol P'¢1 ! ' m tL z. wi aj c r7'o a U F Wt ml v; I 9 z j U O j , w w 'i R! z za' wt mw a z wLLU O al o zj Ql z z I . a • � I l ! I I ' ,m Z a, U O Co w to Z I f ¢, CX O ¢ OV. U ( O' rwW. oI ❑w K wO 2j . Z: wWI : j ¢ NW. Oz' >> >�> O ow: K ol¢a uj ¢ I i! �I f�' �' ¢ Q zZ > i ra a v W: w I w z I I I ¢ � O l I �o O , O i r In Q of u u. N vma m ¢ a: I I , I I : Packet Page -166- R D m rn °a S O e a m 0 0 LL d d A E c In } m m m E 0 g c CD F. Im > ID Ch 0 5i m O z 0 0 c z z m 0 c z V, 0 0 c z cn 0 z 0. Z c 0 --q c Z 0 0 O O O O z G) m m r; O > M 22 0 < m z I > m Z m 0 z0 0 > > z rl Na ) z -00 :u ;a > 0 Cl) 0 cri 0 0 z ;o 0 < n MN) 0 0 in M K) 4 ;a C) Cf) -- n N C CD Z3 p rn Dz O ul lz Z -j C10 ;tn Ifn 10 4 ly lo Z C :> 'r7 ', .m T n r IN P 9 7 F 0 5i m O z 0 0 c z z m 0 c z V, 0 0 c z cn 0 z 0. Z c 0 --q c Z 0 0 O O O O z G) m m r; O > M 22 0 < m z I > m Z m 0 z0 0 > > z rl Na ) z -00 :u ;a > 0 Cl) 0 cri 0 0 z ;o 0 < n MN) 0 0 in M K) 4 ;a C) Cf) -- n N C CD Z3 p 4/24/2012 Item 9.A. TRIP GENERATION EQUATIONS AIRPORT ROAD /ORANGE BLOSSOM DRIVE INTERSECTION IMPROVEMENTS ITE TRIP GENERATION REPORT, 7t'' EDITION Land Use Weekday AM Peak Hour Weekday PM Peak Hour Residential Condo/Townhouse (LUC 230) Ln (T) = 0.80 Ln (X) + 0.26 Ln (T) = 0.82 Ln (X) + 0.32 17% in 83% out 33% in 67% out T = Trips, X = dwelling units CCRC (LUC 255) T = 0.18 (X) T = 0,18 (X) + 39.13 1 64% in 34% out 48% in 52% out T = Trips, X = dwelling units Packet Page -168- 4/24/2012 Item 9.A. Co -Ie-r County Growth Management Division Planning & Regulation December 15, 2011 Ren Mora I, Naples Itali arerican Club Foundat ion, Inc. 7035 Airpo Naples, FL 34109 Subject: Request t Letter Objection Growth Management Plan mndmenCPSS -2011 for he Orrange Blossom/Airport A rpotCrrossroads Commercial Mr. Morani j Please be advised that Michael Corradi has filed an application with the County to amend the Future Land Use Element (FLUE) of the Growth Management Plan (GMP) to remove certain intersection improverni pt requirements from the provisions of the Orange Blossom /Airport Crossroads Commerci I Subdistrict. Mr. Corradi is the property owner of the land making up the southern portion of the are !' comprising this Subdistrict, while the Italian American Club Foundation owns the northern portion. the removal of the referenced requirements affects the entire Subdistrict acreage. The specific arpendments to the Subdistrict provisions are identified in the attached exhibit. As part o f' ner of Subdistrict acreage, it is not necessary to become a co- applicant in the present request. kn alternative arrangement does not necessitate your active participation in the current amendme it process. Please re ,iew this request and indicate your consent to these amendments by means of signing the "Letter of 14o Objection" and return same to me at your earliest convenience. Should y, a have any questions, contact me at 239.252.2944. Thank you in advance to your prompt attention1p this matter. [signed] 1, Corby Sc �midt, AICP Principal' tanner Compreh 'nsive Planning Section Land Dev ilopment Services GZDES Plagn Services \Comprehensive \COMP PLANNING GMP DATA \Comp Plan Amendments\2011 Small Scale Amendments \Orange Blossom Crossroads - Comadi Req 6PSS- 2011 -1 Request for Letter of No Objedlon.docx Growth Man�gementDivision - Planning & Regulation • 28( - Naples, Florida 34104.239- 252 -2400 • www.coliiergov.net Packet Page -169- Corby Sch Principal F Comprehe Land Deve 2800 Nortl Naples, FI Subject: 4/24/2012 Item 9.A. AICP Planning Section :nt Services eshoe Drive i 34104 Letter of No Objection — Collier County Growth Management Plan Amendment CPSS - 2011 -1, for the Orange Blossom/Airport Crossroads Commercial Subdistrict Mr. Schmidt, On behalf of the Naples Italian American Club Foundation, I have reviewed your request fora 4Letter of No Obj 'on" for the removal of certain intersection improvement requirements from the provisions pertaining ,o the above mentioned Subdistrict. The Naples Italian American Club Foundation has no objection to the amendment of these provisions. Should yo J have any questions, contact me at 239.594.8480. Sincerely, By. f% Print N -` ,+,/!d/ Date: i / Packet Page -170- C. Urban This Subdi: comer of t institutional institutional serve the n retirement c area for personal uses are of each pai this square Ordinance shall be go, BRA c Exhibit A DRS District 4/24/2012 Item 9.A. CPSS - 20414 Future Land Use Element [Page 62] roximately 10 acres and is located on the southwest ,t consists of two parcels comprising app intersection of Orange Blossom Drive and Airport Road. This Subdistrict allows for existing es, such as the Italian American Club clubhouse or another social or fraternal organization, future :es for a school, and limited commercial, professional and general offices, and similar uses to rby community, along with senior housing in the fort of an assisted living facility, continuing care Ater, or other similar housing for the elderly. intensity for this Subdistrict shall be limited to a maximum of 74,000 square feet of gross leasable icial institutions, schools, professional, medical and general offices, adult and child day care, business services, and a maximum of 20,000 square feet for the clubhouse facility, all of which red by right or by conditional use in the C -1 Zoning District, as identified in the Collier County Land Code, Ordinance No. 04-41, as amended. Uses will be further evaluated at the time of rezoning I to ensure compatibility with surrounding properties. Any senior housing facility is not subject to otage limitation but must meet all other provisions in the Collier County Land Development Code, 1. 04-41, in effect as of the effective date of this amendment. The development of this Subdistrict -ned by the following criteria: a. Re ones are encouraged to be in the form of a Planned Unit Development and must contain dei ilopment standards to ensure that all uses will be compatible with neighboring residential and fns itutional uses. G. b. Parcel 1 This approximately 5 -acre parcel is located on the southwest corner of the intersection of Orange Blossom Drive a nd Airport Road_ This parcel is limited to a maximum of 34,000 square feet of gross leasable area for financi :l institutions, schools, professional, medical and general offices, and personal and business services, in addition to a maximum of 20,000 square feet for the clubhouse facility. Parcel 1 is governed by the ad itional, following requirements: i. edestrian interconnection to access Parcel 2 and property immediately to the west must be pursued by the property owner, and incorporated into the overall site design. ii. ,' ehicular interconnection with Parcel 2 is required, particularly to provide southbound traffic direct egress onto Airport Road. Vehicular use areas, buildings and structures, landscape buffering and open space, and other uses shall be designed in such a manner that does not impede or interfere with access to or from the adjacent parcel to the south. Words underlined are added; words stush -i#re# are deleted. I Packet Page -171- 4/24/2012 Item 9.A. iii. 1 he existing easternmost vehicular access drive onto Orange Blossom Drive shall be removed or perr ianently closed -off by the property owner prior to the issuance of a certificate of occupancy for any furtt er development or redevelopment of the site. F, iv. C evelopment within Parcel 1 shall have common site, signage and building architectural elements, incl ding on -site signs directing motorists toward southbound egress through Parcel 2 onto Airport d: c. Patel 2 This ap proximately 5 -acre parcel is located on the west side of Airport Road, approximately 330 feet south of the i itersection of Airport Road and Orange Blossom Drive. This parcel is limited to a maximum of 40,000 uare feet of gross leasable area for financial institutions, professional, medical and general offices, adult al child day care, personal and business services, and an assisted living facility, continuing care retire jet center, or other similar housing for the elderly. Parcel 2 is governed by the additional, following L P estrian interconnection to access Parcel 1 and properties immediately to the south and to the west mu t be pursued by the property owner, and incorporated into the overall site design. ii. ehicular interconnection with Parcel 1 is required, particularly to provide eastbound traffic direct egr 'ss onto Orange Blossom Drive. Vehicular use areas, buildings and structures, landscape buffering an ;:open space, and other uses shall be designed in such a manner that does not impede or interfere witl ; access to or from the adjacent panel to the north. iii. evelopment within Parcel 2 shall have common site, signage and building architectural elements, incl! ding on -site signs directing motorists toward northbound egress through Parcel 1 onto Orange Blo 'som Drive. —2— Words underlined are added; words s#uek- thfeugh are deleted. Packet Page -172- AC: NU'1'1C E PUBLIC NOTICE YUBillu NUlll:r; NOTICE OF PUBLIj 4/24/2012 Item 9.A. NOTICE OF INTENT TO CONSIDER AN ORDINANCE Notice is hereby given that the Collier County Planning Commission (CCPC) will hold a public meeting on Thursday, March 01, 2012 at 9:00 A.M. in the Board of County Commissioner's Chamber, Third Floor, County Government Center, 3299 East Tamiami Trail, Naples, FL. The. purpose of the hearing is to consider recommendation to the Board of County Commissioners to transmit to the Florida Department of Economic Opportunity (DEO) the adoption of a Small Scale Growth Management Plan amendment to the Future Land Use Element. The ordinance title is as follows: ORDINANCE NO. 12- AN ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, AMENDING ORDINANCE NO. 89 -05, AS AMENDED, THE COLLIER COUNTY GROWTH MAN- AGEMENT PLAN FOR THE UNINCORPORATED AREA OF COLLIER COUNTY, SPECIFICALLY AMENDING THE FUTURE LAND USE ELEMENT, BY REMOVING TRANSPORTATION COMMIT- MENTS FROM THE ORANGE BLOSSOM /AIRPORT CROSSROADS COMMERCIAL SUBDIS- TRICT, LOCATED AT THE SOUTHWEST CORNER OF THE INTERSECTON OF ORANGE BLOS- SOM DRIVE AND AIRPORT ROAD, IN SECTION 2 TOWNSHIP 49 SOUTH, RANGE 25 EAST; AND FURTHERMORE RECOMMENDING TRANSMITTAL OF THE ADOPTED AMENDMENTS TO THE FLORIDA DEPARTMENT OF ECONOMIC OPPORTUNITY; PROVIDING FOR SEVERABILITY AND PROVIDING FOR AN EFFECTIVE DATE. n C.R. 858 n I C.R. 848 q CPSS- 2011 -1 9 W N 8 G.G. BLVD. , PINE RIDfB RD. of n a I IPKWYL GATE U S.R.- 84 h75 DAMS BLVD. / I - i PL20110002601 /Petition CPSS- 2011 -1, A petition requesting a small scale Growth Management Plan amendment to the "Orange Blossom /Airport Crossroads Commercial Sub - district ", to remove para- graph b., relating to transportation intersection improvements, and to remove related paragraph c.v., for property located at the southwest corner of the intersection of Airport Road and Orange Blossom Drive, in Section 2, Township 49 South, Range 25 East (t 10 acres). [Coordinator. Corby Schmidt, AICP, Principal Planner.] ADOPTION HEARING All interested parties are invited to appear and be heard. Copies of the proposed Growth Management Plan Amendment will be made available for inspection at the Land Development Services Department, Comprehensive Planning Section, 2800 N. Horseshoe Dr., Naples, between the hours of 8:00 A.M. and 5:00 P.M., Monday through Friday. Furthermore the materials will be made available for inspection at the Collier County Clerk's Office, Fourth floor, Collier County Government Center, 3299 East Tamiami Trail, suite 401 Naples, one week prior to the scheduled hearing. Any questions pertaining to the documents should be di- rected to the Comprehensive Planning Section. Written comments filed with the Clerk to the Board's Office prior to Thursday, March 01, 2012, will be read and considered at the public hearing. If a person decides to appeal any decision made by the CCPC with respect to any matter considered at such meeting or hearing, he will need a record of that proceeding, and for such purpose he may need to en- sure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. If you are a person with a disability who needs any accommodation in orderto participate in this proceeding, you are entitled, at no cost to you, to the provision of certain assistance. Please contact the Collier County Facilities Management Department, located at 3335 Tamiami Trail East, Suite 101, Naples, FL 34112 -5356, (239) 252 =8380, at least two days prior to the meeting. Assisted listening devices for the hearing impaired are available in the Board of County Commissioners Office. Collier County Planning Commission Mark P. Strain, Chairman Naples, FL Packet Page -173 - No. 240173987 February 10. 2012 PUBLIC NOTICE PUBLIC NOTICE PUBLIC NOTICE NOTICE OF PUBLIC 4/24/2012 Item 9.A. NOTICE OF INTENT TO CONSIDER ORDINANCE Notice is hereby given that the Collier County Board of County Commissioners will hold a public hear- ing on Tuesday, April 24, 2012 in the Board of County Commissioners Chamber, third floor, Collier County Government Center, 3299 E. Tamiami Trail, Naples, FL. The meeting will commence at 9:00 A.M. The purpose of the hearing is to consider a recommendation regarding CPSS- 2011 -1, a Small Scale Growth Management Plan amendment to the Future Lane Use Element; for transmittal of the adoption amendment to the Florida Department of Economic Opportunity. The ORDINANCE title is as follows: ORDINANCE NO. 12- AN ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, AMEND- ING ORDINANCE NO. 89 -05, AS AMENDED, THE COLLIER COUNTY GROWTH MANAGEMENT PLAN FOR THE UNINCORPORATED AREA OF COLLIER COUNTY, SPECIFICALLY AMENDING THE FUTURE LAND USE ELEMENT, FOR AMENDMENTS TO THE ORANGE BLOSSOM /AIRPORT CROSSROADS COMMERCIAL SUBDISTRICT, LOCATED AT THE SOUTHWEST CORNER OF THE INTERSECTON OF ORANGE BLOSSOM DRIVE AND AIRPORT ROAD, IN SECTION 2, TOWN- SHIP 49 SOUTH, RANGE 25 EAST; AND FURTHERMORE RECOMMENDING TRANSMITTAL OF THE ADOPTED AMENDMENTS TO THE FLORIDA DEPARTMENT OF ECONOMIC OPPORTUNITY; PROVIDING FOR SEVERABILITY AND PROVIDING FOR AN EFFECTIVE DATE. PL20110002601/CPSS-201 1 -1 —A petition requesting a small scale Growth Management Plan amendment to the "Orange Blossom Drive /Airport Crossroads Commercial Subdistrict ", to remove paragraph b. relating to transportation intersection improvements, and to remove related paragraph c.v. , for property located at the southwest corner of Airport Road and Orange Blossom Drive, in Section 2, Township 49 South, Range 25 East (t 10 acres). [Coordinator. Corby Schmidt, AICP, Principal Planner.] ADOPTION HEARINGS Collier County Plorlds �8t � All interested parties are invited to appear and be heard. Copies of the proposed Growth Management Plan Amendment will be made available for inspection at the Land Development Services Dept., Comprehensive Planning Section, 2800 N. Horseshoe Dr., Naples, FL. between the hours of 8:00 A.M. and 5:00 P.M., Mon- day through Friday. Furthermore the materials will be made available for inspection at the Collier County Clerk's Office, fourth floor, suite 401, Collier County Government Center, East Naples, one week prior to the scheduled hearing. Any questions pertaining to the documents should be directed to the Comprehensive Planning Section. Written comments filed with the Clerk to the Board's Office prior to Tuesday, April 24, 2012, will be read and considered at the public hearing. If a person decides to appeal any decision made by the Collier County Board of County Commissioners with respect to any matter considered at such meeting or hearing, he will need a record of that proceeding, and for such purpose he may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. If you are a person with a disability who needs any accommodation in order to participate in this pro- ceeding, you are entitled, at no cost to you, to the provision of certain assistance. Please contact the Collier County Facilities Management Department, located at 3335 Tamiami Trail East, Suite 101, Naples, FL 34112 -5356, (239) 252 -8380, at least two days prior to the meeting. Assisted listening devices for the hearing impaired are available in the Board of County Commissioners Office. BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FL FRED W. COYLE, CHAIRMAN DWIGHT E. BROCK, CLERK By: Ann Jennejohn, Deputy Clerk (; Packet Page -174 - No. 240163168 April 4. 2012 NAPLES DAILY NEWS Published Daih• Naples, FL 34110 idavit of Publication State of Florida Counties of Collier and Lee Before the undersigned they serve as the authority. personal] }, appeared Debbie Landreth. who on oath says that she serves as the Controller of the Naples Daily News, a daily newspaper published m Naples. in Collier Comas,. Florida: distributed in Collier and Lee counties of Florida: that the attached coPy of the advertisin; being a PUBLIC NOTICE in the matter of PUBLIC NOTiCH was published in said newspaper 1 time in the issue on February 10. 2012 Affian firrtber says that the said Naples Daily News is a newspape published at Naples. in said Collier Count-). Florida and that the said newspaper has hermfore been continuously published in said Collt. County, Florids; citstributed in Collier and Lee counties of Florida each da;, and his been entered as second class mail matter ai the pos office in Naples, in said Collier Coura . Floridzv for x period of 1 yea: trots. prexdin5 the first publization of the attached calm of advertise =L and &hunt fivther says that he has neither paid nor promised any person, firm or eotportsion any discount. abate, commission orrefimd for the purpose of secutmr this advertisement for publication in fie said newspaper. ( Signature of affiant) Sworn to and subscribed before me This 15th day of February.30I2 1 ( Signature of notary public) KAROL E KANGAS Notary Public - State of Florid2 My Comm. Expires Jul 29, 2013 C. �,NC(. Commission # DD 912237 4/24/2012 Item 9.A. HEARING ENT �DINANCE Ion (MPG) will hold a public meeting Commissfonera Chamber, Third Floor, ► f3oand of County Cammlefdoners >o tits adoption of a smart scale Growrth i ad mace, title is as follows: VERS OF COLLIER COUNTY, IER COUNTY.GROWTH MAN- ! !ER COUNTY, SPECIFICALLY TRANSPORTATION COMMIT- ADS COMMERCIAL SUBDIS- BECTON OF ORANGE BLOS- 49 SOUTH, RANGE 25 EAST ADOPTED AMENDMENTS TO tOVIDING FOR•SEVERABMY ant scale Growth Management Plan VW Btlb d4s611CC, to remove pana- remove related.paragraph ", for Road and Orange Biossom Drive, in or Corby atdat W AMR Prkrbpei the proposed Growth Management Development Services Depettrnerrt, wean the hoes of 8:00 A.M. and 5.'00 available for inspection at the Collier r 3299-East Tkniaml Trail, atdte 401 tamp to the documents should be di- d with the Clerk to the Board's Office n public hearing. ' r85P9t to any matter condldered at fionlilly iltxtxleiftled alto 68x. player I for such purpose he may need to en- CHARM MCPHERSON I kwiudee Me testimony and evidence Y .FEB.16, 6 & 8:30 p.m. i wftg of Denials Pavilion at the'�F Participate � proceeding, THEARMONI L Stilts 101, Naples, FL 38112541W, Collier County R frvr the ARTS ling devious torthe hearing impaired ® W - BUY NOW at ThdWAM 597.19DO or visit our Box Office at 5833 Pelican Bay Boulevard +r WAW, to WL-5 p.m; sift, iw i-5 P.M Fehrtnny t_ n�s'_'s Packet Page -175- 4/24/2012 Item 9.A. NAPLES DAILY n"WS NOTICE OF PUBLIC HEAFUNC Published Daily NOTICE OF INTENT Naples, FL 34110 TO CONSIDER AN ORDINANCE I ��i lE a�IT�$ � i Ca bl Nodoe is.hereby given that the cow Covngr Plan"Cone�wion mom will hold a public vow ft an Tlmrsdq, March 01, 2012 at 9W A.M. In the Board of County CoMmInioneraa Chamber, Turd Roor, State of Florida County Gover'wad Cen1ef, 3M East Tamierni Tm% Naples' R., Trite purpose of the' hearing is. to consider recommendation to the Board of County Commissioners to Counties of Collier and Lee trarismlt toltne Raids Depertmeritof Economic Opportunity (DEO) the adoption of a Small Scale Growth Martegentertt Mee amendment to theFuhn fond Ilse Elerriam The ordinance-tttb is as follows Before the undersigned they serve as the au appeared_ Debbie Landreth. who on oath ra the Controller of the Naples Daily News, a published at Naples. in Collie: Cou m. FI in Collier and Leo counties of Florida, that of, the advertising, being a PUBLIC NOTICE in the matter of PUBLIC NOTICE was published in said newspaper 1 time on February 10. 2012 Affiant iurtlter says that the said Napier Laity News u published atNsplea. in said Collier County. Florida m newspaper has herewforc been comintnwsly published i C onmq'. Florida: distributed in Collier and Lee counties each day and has been entered as second class mail mat office in Napias, in said Collier County. Florida fa a year next preceding the first publication oftheansa advarnsement: and sffient fiuther says that he has neiU promised any persm firm or conporotron any disco commission or mf had for the purpose of securing this at [pubitwnim in the said newspaper`. ( Sittnatum of afrapt) Swom to and subscribed before me This 15th day ofFebruan ,, 2013 (Signature of notary, public) / �I�Y A IV KAROL E KANSAS x Notary Public -Stair of Florida My Comm. Exi nres Jul 29. 2013 Commission * DD 412237 0RD9ffiNCEJ*0.12 -_ AN ORDNANCE OF THE BOARD OF:COUNTY COMMISSIONERS OF COLDER COUNTY, AM89PMAG ORDINANCE NO. 0-05, AS AMENDED, THE COLLIER COUNTY GROWTH MAN - AGWE NT. PLAN FOR THE UNINCTDRPORATED AREA OF COLLIER COUNTY, SPE ARCALLY AMENDING THENVnJFIE LAND USE ELEMENT, BY REMOVING TRANSPORTATION COMMIT KENTS•FROM THE ORANGE BCOSBOMVAIRIKw CROSSROADS COMMERCIAL SUBDIS- TRICT, LOCATED AT THESOU DWEST CORNER OF THE INTERSEC .'TON OF ORANGE BLOS- SOM DRIVE AND AIRPORT ROAWIN SECTION 2 TOWNSKP 49 SOUTH, RANGE 26-EAST, AND FURTHERMORE RECOMMENDINC+TRANSMrnAL OF THE ADOPTED AMENDMENTS TO THE FLORIDA DEPARIMENTOF ECONOMIC OPPORTUNITY; PROVIDING FDR-SEVEIWILITY AND'PROVIDING FOR AN EFFECTIVE DATE. , CPSS- 2011.1 u u-7e G& so P1. 011000ES0UPaMtfon CPSB- 2011 -t, A petition requesting a small scale Growth Management Plan ertrendmatt to the ' Orange BinsonitAkwn Ctaasroada commercial, &rt)4drW, to remove para- graph b.. retorting to transportation Intersection improvements, end 10 remove r0etad.peretlr1ph C.V., for Property located at the southwest comer of the intersection of Airport Road and Orange Blossom Drive, In Section 2, TmT strip 49 South, Range 26 East (t 10 acreal. [Coordinator. Garby s lunicK, AMR Prhrcipaf Pkivwj ADOPTION HEWING5 AD IntereeM parties am Wted to appear and be heard. Capin at Plan Amendment will be Made evaN for inspection at the Land tits � nt Gr0ice MarertinaM Denrelopnrmnt Services DeparVrretrt, Comprehensive Planning Section, 28D0 N. Horseshoe Dr., Naples. between the hours of 0:00 A.M. and 5:00 P.M.; Monday through PrWay. Furthermore the materials will bevw* waliabie for inspection ad the Cosier • Oounty Cimk's Olfioe, Fourth floe; Coffer COMP Govemrrta d Center, 3299 fast Tmrtfaft TWIL ante 401 Napba, one week prior to the scheduled hearing.My questions pertaining to the doasnanh,'sbuld be di- rected to tba Comprehensive Ptmw t0 Section. Wrlftenixrnmends nod with the Clerk to the Bowd`a office 9dor to TO" March 01, 2012; will be read and oonsiderad at the public hearing. it a person decidee to appeal any decision rrmde by the 00ft with respect to any matter crorsldwo at such meeting or hearing, he w@ need a record oftinat prdesedkig. and for such purpose he rnayneed to m- anse that a veibsthn record of the proceedings is made, which record includes the testimony, and evidence upon which the appeal is to be based. if you area person with a dsabiity who needs any accommodation in ader to participate in this P=wdktg, you are entitled, at no cost to you,' to the provision of certain assistance. Pftw contact the Collier County Facilities Manrtgemarrt Depaitment, located at 3335 Tamiarni Trati East, Sufte t01, Naples, FL.34112 -5356, . ( 239) 2524380, at least two days prior to the meeting. Assisted listening de jan for the hearing impahed are available in the Board of County Commissioners 011im Collier C unb' Planning Commission Mark R Straln,Chalmhan Naples, FL Packet Page -176- NAPLES DAILY NEWS K Wedrlesday,Apl 4124/2012 Item 9.A. PUBLIC NOTICE PUBLIC NOTICE PUBLIC NOTICE NOTICE OF PUBLIC HEARING NOTICE OF INTENT TO CONSIDER ORDINANCE`` Notice is hereby given'that the Collier County Board of County Commissioners will hold a.public, hear- ing on Tuesday, April 24, 2012 in the Board of County Commissioners Chamber, third floor, Collier County Government Center, 3299 E. Tamiami.Trail, Naples,.FL,. The-meeting will, commence at 9:00 A.M. The purpose of the gearing is to consider a recommendation regarding CPSS- 2011 -1, a Small Scale Growth Management Plan amendment to the Future Lane Use Element; for transmittal of the adoption amendment to the Florida Department of Economic Opportunity. The'ORDINANCE title is as follows: ORDINANCE NO. 12- AN ORDINANCE OFTHE BOARD OFCOUNTY COMMISSIONERS OF COLLIER COUNTY, AMEND- ING ORDINANCE NO: 69 -05, AS AMENDED, THE COLLIER COUNTY GROWTH MANAGEMENT PLAN FOR THE UNINCORPORATED AREA OF COLLIER COUNTY, SPECIFICALLY AMENDING THE FUTURE LAND USE ELEMENT, FOR AMENDMENTS TO THE ORANGE BLOSSOM /AIRPORT CROSSROADS COMMERCIAL SUBDISTRICT, LOCATED AT THE SOUTHWEST CORNER OF THE INTERSECTON OF ORANGE BLOSSOM DRIVE AND AIRPORT ROAD, IN SECTION 2, TOWN -: SHIP 49 SOUTH, RANGE 25 EAST; AND FURTHERMORE RECOMMENDING TRANSMITTAL OF THE ADOPTED AMENDMENTS TO THE FLORIDA DEPARTMENT OF ECONOMIC OPPORTUNITY; PROVIDING FOR SEVERABILITY AND PROVIDING FOR AN EFFECTIVE DATE. PL20110002601 /CPSS- 2011 -1 —A petition requesting a small scale Growth Management Plan amendment to the "Orange Blossom Drive/Airport Crossroads Commercial Subdistrict", to remove paragraph b. relating to transportation Intersection improvements, and to remove related paragraph c.v. ; for property located at the southwest corner of Airport Road and Orange Blossom Drive, in Section 2, Township 49 South, Range 25 East - (t 10 acres). [Coordinator. Corby Schmidt, AICP, Principal Plarinerj ADOPTION HEARINGS . Collier Count{[ Olorldn l ,.x.. > All interested parties are invited to appear.and be heard. Copies of the proposed Growth Management Plan Amendment will be made available for inspection at the Land. Development Services Dept.; Comprehensive Planning Section, 2800 N. Horseshoe Dr.; Naples, FL. between the hours of 8:00 A.M. and 5:00 P.M., Mon- day through Friday. Furthermore the materials will be made available for inspection at the Collier County Clerk's Office, fourth floor, suite 401, Collier County GovernmentCenter, East Naples, one week prior to the scheduled hearing. Any questions pertaining to the documents should be directed to the Comprehensive Planning Section. Written comments filed with the Clerk to the Board's Office•.prior to Tuesday, April 24; 2012, will be read and considered at the public healing. If a person decides to appeal any decision made by the Collier County Board of County Commissioners with respect to any matter considered at such meeting or hearing, he will need a record of that proceeding, and for such purpose he may need to ensure that a verbatim record of the proceedings is. made, which record includes the testimony and evidence upon which the appeal is to be based. If you are.a person with a disability who needs. any accommodation in'orderAo participate in this pro:. ceeding, you are entitled, at no cost.to you, to the provision of certain assistance.. Please contact the Collier County' Facilities Management Department, located at 3335 Tamiarni trail East, Suite 101, Naples,. . FL 34112 -5356, (239) 252 -8380, at least two days prior to the meeting. Assisted listening devices for the hearing impaired are available in the Board of County Commissioners Office. BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FL FRED W. COYLE, CHAIRMAN DWIGHT E. BROCK, CLERK By: Ann Jennejohn, Deputy 01 -A, MPAI i No. 240163166 Packet Page -177- April 4. 2o12