Loading...
Agenda 04/10/2012 Item #16A 34/10/2012 Item 16.A.3. EXECUTIVE SUMMARY Recommendation to approve final acceptance of the water utility facility for Collections at Vanderbilt, Phase One and to authorize the County Manager, or his designee, to release any Utilities Performance Security to the Project Engineer or the Developer's designated agent. OBJECTIVE: The Board of County Commissioners, Ex- Officio the Governing Board of the Collier County Water -Sewer District, to accept final and unconditional conveyance of the water facility. CONSIDERATIONS: 1) The Developer of Collections at Vanderbilt, Phase One has constructed the water facility within dedicated easements to serve this development. See attached location map. 2) Preliminary acceptance of this water utility facility was approved by the Land Development Services staff on January 4, 2008. At that time, the value of this utility facility (assets) was $20,631.39 (see attachment[s]). Final Acceptance is in accordance with Ordinance 2004 -31, as amended. 3) Staff has recorded all preliminary acceptance documents in the public records of Collier County, which have been reviewed and approved by the County Attorney's office as to form and legal sufficiency. 4) The water facility has been operated and maintained by the Collier County Water - Sewer District during, not less than, the required one (1) year warranty period. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Land Development Services staff in coordination with Public Utilities and this facility has been found to be satisfactory and acceptable. 6) The water utility infrastructure connected beyond the master meter is owned and maintained by the owner. 7) The PUD Monitoring staff has reviewed this request in relation to possible issues raised by the applicable Property Owners Association (POA). Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. However, approval of this Executive Summary will result in the Collier County Water -Sewer District receiving unconditional title to the utility facility, which at the time of preliminary acceptance, had a total gross value of $20,631.39 (no depreciation applied). Packet Page -740- 4/10/2012 Item 16.A.3. GROWTH MANAGEMENT IMPACT: Approval of this Executive Summary will have no growth management impact. LEGAL CONSIDERATIONS: This item is legally sufficient and requires a majority vote. — JBW. RECOMMENDATION: That the Board of County Commissioners, Ex- Officio the Governing Board of the Collier County Water -Sewer District, authorize final acceptance of the water utility facility for Collections at Vanderbilt, Phase One, and authorize the County Manager, or his designee, to release any Utilities Performance Security (UPS) to the Project Engineer or the Developer's designated agent. PREPARED BY: Jodi Hughes, Technician, Land Development Services /Engineering Services, Growth Management Division, Planning and Regulation Attached Documents: 1. Location Map 2. Asset Sheet Packet Page -741- 4/10/2012 Item 16.A.3. COLLIER COUNTY Board of County Commissioners Item Number: 16.A.3. Item Summary: Recommendation to approve final acceptance of the water utility facility for Collections at Vanderbilt, Phase One and to authorize the County Manager, or his designee, to release any Utilities Performance Security to the Project Engineer or the Developer's designated agent. Meeting Date: 4/10/2012 Prepared By Name: HughesJodi Title: Technician,Engineering & Environmental Services 3/7/2012 2:27:42 PM Approved By Name: BeardLaurie Title: Planner,Transportation Planning Date: 3/8/2012 7:26:53 AM Name: PuigJudy Title: Operations Analyst, GMD P &R Date: 3/12/2012 4:18:57 PM Name: McKennaJack Title: Manager - Engineering Review Services,Engineering & Environmental Services Date: 3/13/2012 10:41:20 AM Name: LorenzWilliam Title: Director - CDES Engineering Services,Comprehensive Date: 3/15/2012 8:12:44 AM Name: Pam Libby Title: Manager - Operations - Water /WW,Water Date: 3/15/2012 1:36:42 PM Name: Paul Mattausch Title: Director - Water,Water Packet Page -742- Date: 3/15/2012 3:36:24 PM Name: SunyakMark Title: Project Manager, Principal,Public Utilities Engineering Date: 3/21/2012 2:16:56 PM Name: WhiteJennifer Title: Assistant County Attorney,County Attorney Date: 3/22/2012 11:09:21 AM Name: MarcellaJeanne Title: Executive Secretary,Transportation Planning Date: 3/28/2012 5:04:53 PM Name: IsacksonMark Title: Director -Corp Financial and Mgmt Svs,CMO Date: 3/29/2012 10:07:46 AM Name: KlatzkowJeff Title: County Attorney Date: 3/29/2012 4:28:12 PM Name: IsacksonMark Title: Director -Corp Financial and Mgmt Svs,CMO Date: 3/30/2012 10:59:09 AM Packet Page -743- 4/10/2012 Item 16.A.3. r � 0 r m C) 0 z D D Z O m m 1 u D N m Z m r O D 0 Z Z D m TD V 4/10/2012 Item 16.A.3. NDT W WWE _ -- N e 8 VANDEg9LT I DRIVE ' �� � lOA 9011 p g � n s 9 � E lit - a r : TANUNI TRAIL NS.It) yy 6 1� ~ Ail TANUTA TRA4 N.s.I',I ]] - I'iri ZZqq yyi8 '� � •rn lu S �y � z �� � VL''e S� �� �/ /GI O SuR R.y Afi OOODLETTEFRANK ROAD .R. 851 + O O O m n • lP+ L ` ~ yF - u of ]OD 4LDoLCTII9DAORD , yQy y o� D g yyya e ar r4 �R Vol EGa cAR9Lax � G RG Jill NRPORTPNUINO ROW M fl ! $ QS JJJJ�y � a �g y T Ba Y1 9S SYOS Fj L A N$ E ppy tgL4DMM �tl9) Y LMNOSTON ROAD tl g NI MTS ZTE.T5 e j 3 9 A pDli � m91111Y Q1N 3 � � 9..0 ~ D19RE59 �Om.4 �Lj Y { I a NDT W WWE Packet Page -744- _ -- }y�,, B Y Y RNOVA DNI g Y a a aY r : S � �� � '� � •rn Y sG a n BAT LAUREL DRIVE D g yyya e ar EGa Y RG JJJJ�y � T Ba Y1 9S SYOS Fj g e � 9 A � �Lj Y { N � ARPORT -PUWNG ROM N V' N W AMPORT -PULLING ROAD CANAL r (7 W CANAL rn — m O y Packet Page -744- 0 4/10/2012 Item 16.A.3. CERTIFICATION OF CONTRIBUTORY ASSETS - COUNTY PROJECT NAME: THE COLLECTION AT VANDERBILT - PHASE ONE LOCATION: SECTION 35, TOWNSHIP 48,RANGE 25 EAST, COLLIER COUNTY FLORIDA NAME & ADDRESS OF OWNER: WOOLBRIGHT VANDERBILT, LLC 3200 N. MILITARY TRAIL, 4TH FLOOR BOCA RATON, FLORIDA 33431 TYPE OF UTILITY SYSTEM: POTABLE WATER (MATERIALS ONLY) ITEM SIZE QUAN. UNIT COST TOTAL TAPPING SLEEVE WNALVE 10" X 6" 1 EA $1,303.00 $1,303.00 Potable water meter assembly 6" 1 EA $16,543.00 $16,543.00 PVC DR -14 4" 12 LF $2.40 $28.80 TAPPING SLEEVE WNALVE 10" X 10" 1 EA $2,536.00 $2,536.00 PVC DR -14 10" 19 LF $11.61 $220.59 TOTAL COST I do hereby certify that the quantities of materials described above are a true and accurate representation of the system. CERTIFYINGG: V David Miller Authorized Agent OF: RDMC, Inc. 7676 Jean Blvd Ft. Myers, Florida 33912 STATE OF FLORIDA ) ) SS: COUNTY OF LEE ) $20,631.39 The foregoing instrument was signed and acknowledged before me this 8th day of June,) 2007 David Miller who is personally known to me and who did not take an oath. ./667L Z�_ SALLY M. ROONEY SEAL: : ' ' • MY COMMISSION t DD 607718 Sally R ey * " EXPIRES: November 13, 2010 D D fi07 718 �l�rFOF F Bonded ThrU BOOM Notary 3ervxes L J Packet Page -745-