Loading...
Agenda 03/27/2012 Item #16A 63/27/2012 Item 16.A.6. EXECUTIVE SUMMA&Y Reconunendation to grant final approval of the roadway (privy) and- drainage improvements for the final plat of Sterling Oaks with the roadway and drainage improvements being privately maintained and authorizing the release of the maintenance security and acceptance of the plat dedications. OBACTIVE: To grant final approval of the infrastructure improvements associated with that subdivision known as Sterling Oaks. CONSIDERATIONS: 1. On July 15, 1994, the Land Development Services Department granted preliminary acceptance of the roadway and drainage improvements in Sterling Oaks. 2. The roadway and drainage improvements will be maintained by the project's homeowners association. 3. The required improvements have been constructed in accordance with the Land Development Code. The . Land Development Services Department has inspected the improvements and is recommending final acceptance of the improvements. 4. A resolution for final acceptance has been prepared and approved by the County Attorney's Office. The resolution is a requirement of Section 10.02.05 C.3 of the Land Development Code. A copy of the document,:is attached. 5. This PUD has been found to be in substantial compliance. F_, IMPACT: The roadway and drainage improvements will be maintained by the project's homeowners association. The existing security in the amount of $56,307.79 will be released upon Board approval. The original security in the amount of $1,642,740.18 has been reduced to the current amount based on the previous work performed and completed and pursuant to the terns of the Construction and Maintenance Agreement dated April 28, 1994. GROWTH MANAGEMENT WACT: There is no growth management impact. Packet Page -685- AtWx tm : 1) Locabon Map 2) Bond Bad 3) Resolutim Packet Page X686- _ _ f COLLIER COUNTY Board of County Commissioners Item Number: 16.A.6. 3/27/2012 Item 16.A.6. Item Summary: Recommendation to grant final approval of the roadway (private) and drainage improvements for the final plat of Sterling Oaks with the roadway and drainage improvements being privately maintained and authorizing the release of the maintenance security and acceptance of the plat dedications. Meeting Date: 3/27/2012 Prepared By Name: HouldsworthJohn Title: Site Plans Reviewer, Senior,Engineering & Environm 2/23/2012 12:42:03 PM Approved By Name: BeardLaurie Title: Planner,Transportation Planning Date: 2/23/2012 2:59:26 PM Name: PuigJudy Title: Operations Analyst, GMD P &R Date: 2/24/2012 3:16:20 PM Name: LorenzWilliam Title: Director - CDES Engineering Services,Comprehensive Date: 2/25/2012 10:57:33 AM Name: McKennaJack Title: Manager - Engineering Review Services,Engineering & Environmental Services Date: 3/2/2012 3:14:49 PM Name: MarcellaJeanne Title: Executive Secretary,Transportation Planning Date: 3/5/2012 8:28:41 AM Name: FederNorman ^ Title: Administrator - Growth Management Div,Transportati Packet Page -687- Date: 3/5/2012 9:51:02 AM 3/27/2012 Item 16.A.6. Name: WilliamsSteven Title: Assistant County Attorney,County Attorney Date: 3/12/2012 9:45:17 AM Name: KlatzkowJeff Title: County Attorney Date: 3/14/2012 4:27:05 PM Name: IsacksonMark Title: Director -Corp Financial and Mgmt Svs,CMO Date: 3/16/2012 11:39:03 AM Name: IsacksonMark Title: Director -Corp Financial and Mgmt Svs,CMO Date: 3/16/2012 11:52:20 AM Packet Page -688- 9 3/27/2012 Item 16.A.6. for Sterling Oaks Joint Venture Prepared by: Q. Grady Minor & Associates, P.A. Civil Engineers ■ Land Surveyors ■ Planners 3800 Via Del Rey Bonita Springs, Florida 33923 (813) 947 -1144 SEPTEMBER, 1993 Packet Page -690- 0 10 3/27/2012 Item 16.A.6. BID SCHEDULE "A" CLEARING AND EARTHWORK A -1. Clearing, grubbing and preparation of lake areas, berm areas, roadways, easements, swale areas, fill areas adjacent to right -of -way and sewage pumping station sites as designated by the Engineer in the field including permits for burning, complete burning of all materials on the Owner's property, all as specified, per acre complete. Unit Quantity Unit Price Total Price Ov d0 Acre 16 $ k000 ' $ A -2. Excavation of lakes and placement and compaction of excavated material to construct the lake, banks, roadways, easements, sewage pumping station sites, berm and other areas designated by the Engineer in the field. Compaction testing in roadway areas. Removal off the Owner's property of any excavated material deemed unusable, all as specified, per cubic yard excavated determined by pre - construction survey vs. post construction survey. Unit Quantity Unit Price S's Cubic. Yard 49,800 $ N Total Price $ A -3. Off -site fill including placement and compaction of fill to construct the lake, banks, roadways, easements, sewage pumping station sites, berm and other areas designated by the Engineer in the field and to the elevations shown on the plans. Compaction testing in roadway areas. Lump Sum price (estimate 50,000 cu. yd. truck measure, contractor verify). Unit Quantity Unit Price L.S. $ q4-0 Packet Page -691- Total Price CPO $ ZZ0: coa • 3/27/2012 Item 16.A.6. A -4. Removal of muck and any unsuitable material in roadway and easement areas as encountered during construction and placement in berm areas and other areas as designated in the field by the engineer. Per cubic yard of excavated material. Unit Quantity Unit Price Total Price Cubic Yard 0 $ $ O A -5. Construction of silt fence barrier along the limits of clearing as specified on the plans. Fence must be in place prior to commencement of construction, per lineal foot installed. Unit Quantity Unit Price Total Price L.F. 0 $ $ O A -6. Blasting in lake areas (if necessary). Per acre of rock blasted. Unit Quantity Unit Price Total Price Acre 0 $ $ 0 A -7. Blasting in trench areas per linear foot of trench (if necessary). Unit Quantity Unit Price Total Price L.F. 0 $ $ M A -8. Cut and bury blasted rock along perimeter berm per cubic yard of buried rock (if necessary). Unit Quantity Unit Price Cubic Yard 0 $ c_a Total Bid Schedule "A" $ \ S , `1 Packet Page -692- Total Price $ O BID SCHEDULE "B" DRAINAGE IMPROVEMENTS 3/27/2012 Item 16.A.6. Furnishing and handling of all required materials, all excavation (including rock over excavation and/or demucking if necessary), dewatering, bedding material (if necessary), rock removal and disposal off -site (if necessary), installation, back5lling, compaction, compaction testing in roadway areas, final grading, coordinating with other contractors and utility companies, flushing, clean -up, repair of any damage caused by construction and other items necessary to complete the system and provide the owner with a complete worldng drainage system as shown on the drawings and specified on these contract documents. Pipe measurement is to outside of structures. ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE B-1 15" RCP LF. 333 $ 12 �k,-O B -2 18" RCP LF. 2,182 $ \3 G� B -3 24" RCP LF. 685 $ M ZS B-4 30" RCP LF. 515 $ 7-6 ,--� B -5 36" RCP LF. 519 $ 37- B-6 42" RCP LF. 296 $ 4e �s B-7 'C' &'C' Mod. Catch Basin EA. 39 $ 7 .Z -.l 4-t3 B-8 'E' &'E' Mod. Catch Basin EA. 10 B -9 18" Endwall EA. 2 $ Sa0 uO B -10 36' Endwall EA. 1 $ B -11 42" Double Endwall EA. 2 $ B -12 30" Mitre End Section EA. 4 $ som) B -13 Interior Swale including �v Rip -Rap Sumps L.S. 4% 1 $ SA-00 .� Packet Page -693- TOTAL PRICE $ 41sz 3 $ t 43 $ _.. $ $ ► to�41 � , $ Z.�`3` -T b t $ 1t3o� $ - 04 $ '3Z3�1 vc $ 3400 — 3/27/2012 Item 16.A.6. BID SCHEDULE "B" continued Imo[ DESCRIPTION UNIT OUANM Y UNTT PRICE MMAL PRICE B-14 Spreader Swale LF. 400 $ IZ so $ Stx: cO 00 B-15 North Property Line 00 Swale F. I.F. 3,270 $ 1 $ 3Z o B-16 Old 41 Swale and Ditch Cleaning LS. 1 $ 1s0o oa $ %1 i00 — B-17 Water Quality Areas LS. 2 $ i C-40 1 B -18 Control Structure LS. 1 $ Z3°P+�g' $ Z7.,Cjn �4 �s Total Bid Schedule "B" $ S S Packet Page -694- 0 BID SCHEDULE "C" 1* 3/27/2012 Item 16.A.6. SANITARY SEWAGE COLLECTION AND TRANSMISSION SYSTEM Includes furnishing and handling of all required materials, connection to other pipelines, all excavation (including rock and over - excavation if necessary), de- watering, bedding material (if necessary), pipeline installation, back filling (imported fill if necessary), compaction, compaction testing in roadway areas, televised tape, infiltration and enfiltration testing, flushing, grouting, clean -up including resodding areas previously sodded, providing complete as -built drawings and other items necessary to complete the system and provide Owner, DER and Collier County with a complete working sewage and transmission collection system as shown on the drawings and specified in these contract documents. (Cut is based from elevation 10.5' NGVD for sewer main and rim elevation for manholes). ITEM DESCRIPTION C -1 8" Gravity Sewer 0' -6'Cut C -2 8" Gravity Sewer 6' -8'Cut C -3 8" Gravity Sewer 8' - 10' Cut C-4 8" Gravity Sewer 10'- 12'Cut C -5 C-6 C -7 C -8 C -9 C -10 Manhole 0' - 6' Cut Manhole 6' - 8' Cut Manhole 8'- 10' Cut Manhole 10'- 12' Cut Manhole 16'- 18' Cut V PVC Force Main UNIT QUANTITY UNIT PRICE 3430 L.F. jXr L.F. 2,730 L-F. 1,078 L.F. 382 EA. 9 EA, 9-7 EA- Xj 9 EA. z 10 EA. 1 L.F. 1,953 Packet Page -695- i" : .: M it 10 $ 1'1 4c,11 so ZZ fci $ co` $ z� $ � S 4 $ 3S $ �cS -3LI o?� $ so ZZ fci $ co` $ z� $ � S M 3/27/2012 Item 16.A.6. BID SCHEDULE "C" continued ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE C -11 6" PVC Force Main LF. C -12 6" PVC Force Main (=oo) L.F. C -13 4" Bends EA. C -14 6" Bends EA. C -15 4" Plug EA. C -16 8" Plug EA. C -17 Air Release Valve EA. C -18 Vertical Deflection (4") EA. C -19 Vertical Deflection (6') EA. C -20 Deflect existing 12" tS 5 Forcemain EA. C -21 Outside Manhole Drop EA. C -22 Lift Station EA. C -23 6" Lateral, (8" x 6" wye /cleanout) EA. C -24 12" Jack & Bore LF. C -25 6" x 12" Hot Tap EA. 3,083 $ Sts zz 1 165 $ 4 $ �� 1 $ 4 $ Z1 (o 1 $ 1-71 q.Z 2 4 $ 8 Sib 3 $ tS 5 �Z Total Bid Schedule "C" $ 30 (� CAAL- Packet Page -696- TOTAL PRICE �u 48 $ $ S66 duo s. i $�3.. $ S Loo 4- $ 't S $g o $ - '13 $ X33 — 24 $ °R $ x%12 c°! $ 1-7 tv& zz 1 $ 1 $ L33 2 Sib 234 $ �Z 40 $ c� Total Bid Schedule "C" $ 30 (� CAAL- Packet Page -696- TOTAL PRICE �u 48 $ $ S66 duo s. i $�3.. $ S Loo 4- $ 't S $g o $ - '13 $ X33 — 24 $ °R $ x%12 c°! $ 1-7 tv& M 3/27/2012 Item 16.A.6. BID SCHEDULE "D" WATER DISTRIBUTION SYSTEM Includes furnishing and handling of all required materials, joint restraint, thrust blocks, connection to other pipelines, all excavation (including rock and over - excavation if necessary), de- watering, bedding material (if necessary), pipeline installation, back filling (imported fill if necessary), compaction, compaction testing in roadway areas, pressure testing, disinfecting pipelines, flushing, clean -up including resodding areas previously sodded, providing complete as -built drawings and other items necessary to complete the system and provide the Owner and Collier County with a complete working water distribution system as shown on the drawings and specified in these contract documents. ITEM DESCRIPTION D -1 16' DIP Water Main D -2 10" PVC Water Main EA. (CL200) D -3 10" PVC Water Main EA. (CL150) D-4 8" PVC Water Main EA. (CL200) D -5 8" PVC Water Main (CL150) D -6 8" x 16' & 16" Tee D -7 16' Bends D -8 16" x 8" Cross D -9 16'x 10" Reducer D -10 16" Joint Deflection W/Mega -Lug D -11 19'x 8" Tee UNIT QUANTITY UNIT PRICE L.F. IyOW 45W L.F. 40 L.F. 985 L.F. 1,000 L.F. 5,140 EA. 6 EA. 47 EA. 2 EA. 1 EA. 19 EA. 1 Packet Page -697- $ ZS -& r $ ell $ 1Z74 t io $ q1 $ iylt $ acs 4rS $ t o-1 TOT AL PRICE ou $ tZ1 to Z $ X3'2.40 $ C�A�S $ �S� $c $ s57--s\ t $ -7(a44' X16 $ ZS 43 $ BID SCE[EDULE "D" continued ITEM DESCRIMoN UNIT MAN= UNIT PRICE D -12 10" Bends F, k D -13 19'x 8" Reducer EA. D -14 8" Tee F.A. D -15 8" Bends F.A. D -16 16" Gate Valve EA. D -17 10" Gate Valve EA. D -18 8" Gate Valve EA. D -19 8" Temporary Blow -off EA. D -20 Permanent Sample Point EA. D -21 Air Release Valve EA. D -22 10" Vertical Deflection EA, -D-Z3 16" Vertical Deflection EA. D -24 Fire Hydrant Assembly EA. D -25 Water Service Sleeves EA. D -26 8" Temporary Back Flow EA. D -27 16" x 16" Hot tap EA. D -28 24" Steel Casing 2 1 4 44 5 1 18 9 2 3 1 1 24 79 /Y` 0 9 Jack &Bore L..F. 40 4-5- Total Bid Schedule "D"$_ 34O ) 31 O Packet Page -698- 3/27/2012 Item 16.A.6. $ 4aZ%4 (08 $ 30+ IT $ ZS� $ S $ 4t I" 11 $ 1 lctoZ —' $ Zeo!'-' $ 1 O4-5 �7 5 $ 'lg $ era s-� $ � 34 $ -I 14-�� $ 2143 �o $ 1 `�04- —" $ ..- $ 3131 -76 $ '51, $ -- $ $ 10.54116 $ -EGA' $ 03 n3 0 BID SCHEDULE "E" ROADWAY CONSTRUCTION 3/27/2012 Item 16.A.6. Roadway construction complete per the plans and specifications including stabilized subgrade, stabilized shoulder, limerock base, tack coat, asphaltic concrete, required testing by an independent laboratory, finish grading, seeding, mulch and 1 foot strip of St. Augustine sod at edge of all hard surfaces, etc. The asphalt shall be laid in two (2) lifts and should be calculated that 2 mobilizations shall be required. ITEM DESCRIPTION i i E -1 1W Asphalt j E -2 2" Asphalt E -3 3" Asphalt. E -4 8" Limerock Base .-. E -5 12" Stabilized Subgrade E-6 Valley Gutter & Type 'E' Mod. Curb E -7 Type "A" Curb E -8 3' Mod. Valley Gutter E -9 Type "F' Curb E -10 Concrete Sidewalk E -11 Seed & Mulch E -12 16" Stop Bar E -13 Stop Sign w/Street Sign E -14 Regulatory Signs E -15 4" Solid Stripe UNIT OUANTiTY UNIT PRICE S.Y. 16,406 $ Z � 5 S.Y. 8,218 675 S.F. ZS -1 S S.Y. 3,913 $ ;L S.Y. 28,537 $ 4 -" S.Y. 41,387 $ L.F. 17,313 L.F. 5,768 L.F. 180 LF. 675 S.F. 54,388 AC 35 L.F. 135 EA. 6 EA. 33 L.F. 250 Packet Page -699- is $ S — ZV $ $ 3 a= w $ oa 40 OrfAL PRICE 90 $-7 ,ICS '►S $ fe 4 $ $ 33 , 109 too )5=4,74r6 ao $ a ao $ - 't5 $ Aso so o� $ ?�=►Ca0 $ c�� 0 BID SCHEDULE "E" continued Now «� 1 it 3/27/2012 Item 16.A.6. UNIT QUANTITY UNIT PRICE E -16 4" Skip Stripe L.F. 7,000 E -17 12" Solid White Stripe L.F. 620 E -18 Reflective Pavement $ $ t �" $ 87L� Markers Z„ S. 1 E -19 Remove 6' Wide Asphalt at Sales Facility Entrance for Sidewalk L.S. 1 E -20 Stabilize Construction Access S.Y. 5,000 E -21 Install FPL, UTS and Cable utility casings L.F.. 2,200 Total Bid Schedule "E" $ 144- Z 23 Packet Page -700- • Zs SL $ l cS $ fc�51 $ °-- $ w $ $ t �" $ 87L� $ 2 so $ s � BID SCHEDULE "F" ST'RE>✓'T LIGHTS AND LANDSCAPING F -1. Street lights 3127/2012 Item 16.A.6. Unit Quantity Unit Price Total Price each 45 $ %-10(--1 C.X $ —t (o �o `x= F -2. Landscape buffers. okz Lump Sum Price $ _ - S 00 _ Total Bid Schedule "F" $ —I °1 , S-1 S Packet Page -701- 3/27/2012 Item 16.A.6. BID SCHEDULE SUMD2A y SCHEDULE "N, Clearing and Earthwork $ 0:5\1, 1�1 O 00 SCHEDULE "B ", Drainage Improvements $ b S , S-9 (a t s SCHEDULE "C', Sanitary Sewage Collection System $ �g SCHEDULE "D ", Water Distnbution System $ 34.0 , 3t 0 4S SCHEDULE "E ", Roadway Construction $ (0=% A4 -L,-TL1 SCHEDULE "F', Street Lights & Landscaping $ 00 -1101, $'1 S I$ TOTAL BID $'Z ,i 4 u Packet Page -702- Packet Page -703- 3/27/2012 Item 16.A.6. °IM ^NI '.tltl4u RESOLUTION NO. 12- A..-RESOLUTION OF TME BOARD OF COQ M1VI�w 110MRS ' OF COLLIER COUNTY, 3 _j A A'UTRtI►�E�G AL ACCEPTANCE OF CERTAIN ROADWAY " AND Ni DRAINAGE MRRIO + MENTS IN STERLING p�. `C AKSv ACCt R I #G TO THE PLAT TIEREOF y RECORDED IN FLAT .BOOK 231, PAGES 5 • '� TLRtOUGH 20; RELEASE OF TRE _ . N .. .. p1b .:, MWTENA ��TT CE C UNT'; A� WI :A . PZA� `N CA�aivS' -, 205- A V"' � V �� - . Baard,of Gouaty Commissi rs caf•Call er Cow; Flog, y °`•, Jana y 11, 1994,-qvmed the plat ""o€ S*tmft Oaks for w= ding; and x _ M. ER iAS, the �l y�. ,., VIWW Yi� IL1iLL I 1w- has c�nstr� tatau3cd �y I '' ' 119"'m4mvements is accordawe with the anwvod plans and sped -fi m -$$ , by °.fie Land DOV&QPMent Code (Collier ',County Orcitnaatce Ito. d _ ETAS, the Developer is requesting final acceptance- of the ro y Aod drni=90 irnprov nw- is and release of his maintenanee security; and: V S, the -Land Development SeMwsr DoVartment has inWeoW ft d drain e : sgrovenxants, and rccc�rnM6nd 's9 APprovaln.f said ,7 ow RDFt7RE, BE r r RESOLVED By Tj E BOAS 'OF COQ Ai COIMSSHMERS OF COLLIER COUNTY, FLORID ,�1, �tla/�'�a�:II�,Y Ia , y��p rtw msy��. �iily�`3t se' % atit� dra�rtap nlMovMents in_Stmixgg Oaks, �r 1 in Flat Book 23, pafges .5 through 20y arntl =tie � is, m, • • ���,to tie tlae�tatce �secnrit3r. , c. .. _ u Packet Page -703- Packet Page -704- _ 3/27/2012 Item 16.A.6. F vXl 'r BE F'r TURTHERp�RESOLVED AND QR ERED ffiw the t<sa� :. F�v.:- -4F tiY P'Vi A Q .vy, f fin by, r /'5 / S M o C asod Club. :Ll'li i., and -� lH not -be tlw CCg i A D�j�� iCI and Coiner County ,%e � tine easement dedlCf� ions made on,; v O .: • r � T p ` n T 7Ws Resolution In adopted fitter moon, end and majority vote fiVoring 8Alm %. ,.. -this day of 2012 r Coll AT T: C(3l=R COUNTY, FLORMDA DVAG IT E .BR9CK, CLERK DOPWICICA MD W. .MIX arm an& I „ - T. Wiffiam a }z r } . r gi Fi- Packet Page -704-