Agenda 02/14/2012 Item #10B Proposed Agenda Changes Board of County Commissioners Meeting February 14,2012 Withdraw Item 10A: Recommendation to award Contract#12-5801R for the construction of the Collier Area Transit Intermodal Transfer station at the Government Center to Lodge Construction, Inc.,in the amount of$3,697,475. (Staff's request due to intent to protest the award of the contract) Withdraw Item 10B: This item continued from the January 10, 2012 BCC Meeting. Recommendation to approve Change Order No. 2 to Contract # 10-5206, with Atkins North America, Inc., for Design Services for Collier Area Transit Transfer Station, in the amount of$99,900 for redesign and post design services, and to extend the contract by six hundred seventy seven (677) days to account for the inclusion of construction and the completion schedule; and to authorize the Chairman to execute the change order. (Staff's request in conjunction with Item 10A) Continue Item 13B1 to the February 28.2012 BCC Meeting:Recommendation to award Contract No. 11-5705 -Gateway Triangle Residential Area Tertiary Stormwater System Improvements to Douglas N.Higgins,Inc.in the amount of$1,731,977,to approve all necessary budget amendments and authorize the Chairman to sign the standard Board approved contracts after legal review by the Office of the County Attorney. (Fiscal Impact to CRA: $219,500) (Staff's request due to delay in extension letter arrival from Department of Economic Opportunity-Tallahassee) Continue Item 16A8 to the February 28.2012 BCC Meeting: This item requires that ex parte disclosure be provided by Commission members.Should a hearing be held on this item,all participants are required to be sworn in. Recommendation to approve for recording the final plat of Arthrex Commerce Park, which has been revised from the plat which was approved by the Board of County Commissioners on December 13,2011,approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. (Staff's request to continue working with applicant to address staff comments on the plat and construction plans) Continue Item 16B1 to the February 28.2012 BCC Meeting:Recommendation for the Community Redevelopment Agency(CRA)to approve and execute a Site Improvement Grant Agreement between the CRA and a Grant Applicant within the Bayshore Gateway Triangle area.(3042 Cottage Grove Avenue-Fiscal Impact: $2,258.33) (Staff's request after discussion with Clerk's auditor) Continue Item 16B2 to the February 28.2012 BCC Meeting:Recommendation for the Community Redevelopment Agency(CRA)to approve and execute a Site Improvement Grant Agreement between the CRA and a Grant Applicant within the Bayshore Gateway Triangle area. (2718 Gulfview Drive- Fiscal Impact: $8,000) (Staffs request after discussion with Clerk's auditor) Move Item 16B3 to Item 13B2: Recommendation for the Community Redevelopment Agency(CRA) to approve and execute a Commercial Building Improvement Grant Agreement between the CRA and a Grant Applicant within the Bayshore Gateway Triangle area. (2464 Kirkwood Avenue-Fiscal Impact $7,787.50) (Commissioner Hiller's request) Move Item 16B4 to Item 13B3: Recommendation for the Community Redevelopment Agency(CRA)to approve and execute a Landscape Improvement Grant Agreement between the CRA and a Grant Applicant within the Bayshore Gateway Triangle area. (2416 Florida Avenue-Fiscal Impact: $987.05) (Commissioner Hiller's request) Proposed Agenda Changes Board of County Commissioners Meeting February 14,2012 Page 2 Move Item 16D4 to Item 10I: Recommendation to approve a time extension amendment to an existing Subrecipient Agreement with Goodwill Industries of SW Florida,Inc.in order to complete renovations at the Roberts Ranch-Center in Immokalee. (Commissioner Hiller's request to move item/Commissioner Coletta and Commissioner Coyle's request to show corrected name) Move Item 16D5 to Item 10J: Recommendation to approve a change in Project Scope and a time extension to an existing Subrecipient Agreement with Big Cypress Housing Corporation in order to complete upgrades at Main Street Village in Immokalee,Florida. (Commissioner Hiller's request) Move Item 16E3 to Item 10K: Recommendation to approve a Resolution authorizing the Commission Chairman to execute Deed Certificates for the sale of burial plots at Lake Trafford Memorial Gardens Cemetery during the 2012 calendar year. (Commissioner Hiller's request) Move Item 16F1 to Item 10L: Recommendation to approve revisions to the Tourist Development Council(TDC)guidelines for payment or reimbursement of expenses related to attracting group meetings to Collier County,and for County Finance to pay expenses covered by these guidelines up to an annual total program cost of$150,000. (Commissioner Hiller's request) Move Item 16G2 to Item 13A1: Recommendation that the Board of County Commissioners,acting as the Airport Authority,award Bid No.12-5824 Immokalee Runway 18-36 Lighting Rehabilitation in the amount of$148,341 to Airfield Western,LLC. (Commissioner Hiller's request) Time Certain Items: Item 12A to be heard at 10:00 a.m. Item 9K to be heard at 1:30 p.m. Note: Item 9D: Alice J.Carlson,Appointment of member to the Industrial Development Authority, should be listed as living in District 4,not District 3 as indicated in the Executive Summary. 2/14/2012 2:10 PM 2/14/2012 Item 10.13. EXECUTIVE SUMMARY Recommendation to approve Change Order No. 2 to Contract 9.10-5206, with Atkins North America, Inc., for Design Services for Collier Area Transit Transfer Station, in the. amount of $99,900 for redesign and post design services, and to extend the contract by six hundred seventy seven (677) days to account for the inclusion of construction and the completion schedule; and to authorize the Chairman to execute the change order. OBJECTIVE: To obtain Board approval of Change Order No. 2 to Contract # 10 -5206 in the amount of $99,900 and extend the contract by six hundred seventy seven (677) days. CONSIDERATIONS: In February 2010, the BCC approved contract 10 -5206 with Post, Buckley, Schuh, & Jernigan, Inc. (now known as Atkins North America, Inc.) to design the transfer station located at the Government complex. At the time of the agreement, there was not sufficient funding to complete construction of the project therefore, the cost for post design services were not included in the initial fees and timeline negotiated for the project. It was determined that the project would consist of design services only until such time that funding was obtained to complete construction. In October 2010, the Florida Department of Transportation (FDOT) advised the County that Transportation Regional Incentive Program (TRIP) funding in the amount of $1,400,000 was available and would be allocated in FDOT's five -year work program for the State FY 2011/12 for the construction of the CAT Intermodal Transfer Facility. Collier County entered into an agreement with FDOT to secure the funding on July 26, 2011. This was the additional funding needed to complete construction of the project. In addition to entering into the agreement with FDOT, the Board directed the County Manager to split the project into two parts, bidding the base facility (ground floor) as the primary project and the second floor addition as an alternate that would be constructed only if the bids received are favorable and the Board authorizes its inclusion in the construction contract. As a result of this direction, the design professional was required to revise several aspects of the plans, including changes to site, architectural, mechanical, fire protection, plumbing, and structural. The modifications to the plans also required changes to the building permit and to the final bid documents. Design for the project is now complete and the project has been advertised. With sufficient funding to complete the project it is essential that the contract be revised to include post design services such as: review and approval of shop drawings; responding to requests for information; participation in project meetings; and certification of the project once completed. Change Order No. 2 allows the additional time and funding ($79,900) for post design and construction services. The physical construction and commissioning for the project is estimated to be approximately twenty four months, and to be completed by year end 2013. This change order also includes an increase of twenty thousand dollars ($20,000) for the services required to make modification to the plans based on Board direction. Packet Page -810- 2/14/2012 Item 10.13. The project was advertised for bidding on October 23, 2011. The construction cost for the project is estimated at $4,005,419. Change order #1 was issued June 2010 to allow the consultant to assist with grant application preparation in order to solicit construction funding. A zero dollar change letter was issued on October 28, 2011 to extend the contract by 45 days to allow sufficient time to go through the bidding process. FISCAL IMPACT: Funding in the amount of $99,900 for this change order is available in Collier Area Transit Enhancement Fund 426, Grant Project No. 33037. LEGAL CONSIDERATIONS: This item has been reviewed and approved by the County Attorney's Office, is legally sufficient for Board action and only requires a majority vote for approval —SRT. GROWTH MANAGEMENT IMPACT: Consistent with Objectives 10 and 12 in the Transportation Element of the Growth Management Plan. RECOMMENDATION: That the Board approve Change Order No. 2 and authorize its Chairman to execute the Change Order. Prepared By: Brandy Otero, Associate Project Manager, Alternative Transportation Modes Dept. Attachment: 1) Contract Modification Form; 2) Change Order; 3) Change Order. Scope Packet Page -811- COLLIER COUNTY Board of County Commissioners Item Number: 10.6. 2/14/2012 Item 10.B. Item Summary: Recommendation to approve Change Order No. 2 to Contract# 10 -5206, with Atkins North America, Inc., for Design Services for Collier Area Transit Transfer Station, in the amount of $99,900 for redesign and post design services, and to extend the contract by six hundred seventy seven (677) days to account for the inclusion of construction and the completion schedule; and to authorize the Chairman to execute the change order. Meeting Date: 12/13/2011 Prepared By Name: OteroBrandy Title: Project Manager, Associate,Transportation Engineer 10/19/2011 11:58:45 AM Submitted by Title: Project Manager, Associate,Transportation Engineer Name: OteroBrandy 10/19/2011 11:58:47 AM Approved By Name: BetancurNatali Title: Executive Secretary,Transportation Engineering & C Date: 10/24/2011 11:24:58 AM Name: CarterGlama Title: Manager - Public Transit,Altemative Transportation Modes Date: 10/24/2011 12:10:38 PM Name: OberrathKaren Date: 10/25/2011 10:09:43 AM Name: SotoCaroline Title: Management/Budget Analyst,Transportation Administr Date: 10/25/2011 10:13:13 AM Packet Page -812- Name: ArnoldMichelle Title: Director - Alt Transportation Modes,Alternative Tr Date: 10/25/2011 10:30:34 AM Name: CummingsRhonda Title: Contracts Specialist,Purchasing & General Services Date: 10/25/2011 10:37:57 AM Name: CarnellSteve Title: Director - Purchasing/General Services,Purchasing Date: 10/27/20112:18:27 PM Name: FederNorman Title: Administrator - Growth Management Div,Transportati Date: 11/15/2011 1:21:50 PM Name: FoordMarlene Title: Grant Development & Mgmt Coordinator, Grants Date: 11/16/2011 10:29:54 AM Name: CasalanguidaNick Title: Deputy Administrator - GMD,Business Management & Budget Office Date: 11/21/2011 10:13:49 AM Name: TeachScott Title: Deputy County Attorney,County Attorney Date: 11/23/2011 10:08:30 AM Name: KlatzkowJeff Title: County Attorney, Date: 11/23/20112:43:58 PM Name: StanleyTherese Title: Management/Budget Analyst, Senior,Office of Management & Budget Date: 11/30/20119:41:51 AM Name: KlatzkowJeff Title: County Attorney, Date: 12/1/20119:34:53 AM Name: OchsLeo Title: County Manager Date: 12/1/2011 5:35:57 PM Packet Page -813- 2/14/2012 Item 10. B. 2/14/2012 Item 10.B. Packet Page -814- CHANGE ORDER CHANGE ORDER NO. off.. TO: Gary T. Winao. R.A. LEED AP DATE: 11 /10 /11 2/14/2012 Item 10.B. CONTRACT NO. 10 -5206 BCC Date: 2/23/10 Agenda Item: 16136 PROJECT NAME: Design Services for Collier Area Transit Transfer Station PROJECT NO.: 33037.1 Under our AGREEMENT dated February 23, 2010 You hereby are authorized and directed to make the following change(s) in accordance with temis and conditions of the Agreement: Add funding to Task III and Task IV See attached scope. FOR THE Additive Sum of: Ninety nine thousand nine hundred dollars (99,900); Original Agreement Amount $305.495 Sum of Previous Changes $26.200 This Change Order add $99.900 Present Agreement Amount $431,595 The time for completion shall be increased by six hundred seventy seven (677) calendar days due to this Change Order. Accordingly, the Contract Time is now 13194 calendar days. The final completion date is December 31, 2013. Your acceptance of this Change Order shall constitute a modification to our Agreement and will be performed subject to all the same terms and conditions as contained in our Agreement indicated above, as fully as if the same were repeated in this acceptance. The adjustment, if any, to the Agreement shall constitute a full and final settlement of any and all claims of the Contractor arising out of or related to the change set forth herein, including claims for impact and delay costs. Prepared by: Approved Bv`" Hank J r. — Facilities Associate Project Manager °a taortation Modes anager Date: I �) A --�l I Date: 11 % W Accepted by. � Date: J�avid E. Long�P.E, Senior Program Manager, Assoc. Vice Presid nt Atkins North America, Inc. Packet Page -815- Appro,wed hy: Michelle Arnold. Director. Alternamc, I ransportation Modes ,Nprroved hy: Date: Norman E- Feder. Adininistraim, OroA%th Management Division Approxed by: Dale, kh'Xinda ("«nirnin2s. Pr(;cure'nient Siike(Vlst i Date: A, I[ ­ V fL S'l l)\. ieht L. Brock. Cierk B Y: Appro,.ed As To Form and Le-al Sufficienc\ - Print Nanic: :'assistant Counm Arkorne\ 2/14/2012 Item 10.13. ROARD OF COt , �OWMISSIONERS (A- COUNFIN FL-ORIDA BY: Fred W. Coyle. Chairi-nan Packet Page -816- Coles County AcIrrinistative Services Division Purchasing ® Contract Change Request 2/14/2012 Item 10.B. Purchasing Department Change Modification Form ❑ Work Order Modification Contract* 10 -5206 Mod #: 3 PO/Work Order M Project Name: Design Services for Current BCC Approved Amount 2/23/2012 450011693 Collier Area Transit Transfer Station Project M 33037.1 Project Manager: Department: ATM Contractor /Firm Name: Atkins Dollar Amount of this Change Brandy Otero 41.28% Total Change from Original Amount Original Contract/Work Order Amount 3fla; 95:013 M 2231 606° Original BCC Approval Date; Agenda Item # Current BCC Approved Amount 2/23/2012 .,2123/ X686 Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount ..$ ;a3:31;695100 The original contract listed several tasks to be performed during construction as SAP Contract Expiration Date (Master) Dollar Amount of this Change or obtain from vendor): 677 41.28% Total Change from Original Amount Revised Contract/Work Order Total $431,595.00 41.28% Change from Current BCC Approved Amount Cumulative Changes $126,100.00 30.12% Change from Current Amount iCcarr:pTetion gate, Description .of the Taskijs) cage; and ic+nale for`the Cfiagp'; , Original notice to proceed Last approved completion date: Revised completion date (includes this completion date: 1/9/2012 2/23/2012 change): 12/31/2013 Number of days added (if Explain why additional days are needed (detailed /specific): extension, must attach current The original contract listed several tasks to be performed during construction as insurance certificate(s) from SIRE optional, to be negotiated. This change order adds time and funding for all optional or obtain from vendor): 677 tasks in the contract and for the redesign efforts. ❑ Add new task(s) Change task(s) Delete task(s) Other (specify): 1. Provide a detailed and specific explanation of the requested change(s) to the task(s): Add time to contract and add funding to Task 3 and Task 4. Task 3 will be paid as lump sum. The added funding to Task 4 will be based on time and materials. 2. Provide detailed rationale for the requested change: Task Ill - The consultant was required to revise plans to accommodate changes based on Board direction. The changes include splitting the two story addition apart from the base project. This required additional work related to all elements, including site, architectural, mechanical, fire protection/ plumbing, structural. Task IV — The original contract included the following tasks as optional: Task 4.1 C (Change order preparation/ evaluation/ estimates; Task 4.1 D (Shop Drawing Review and Material Approvals); Task 4.2A (Test Operational Systems /Corrective Actions); Task 4.213 Final Punch list; and Task 4.2C (Final Inspection /Project Acceptance). The change order recognizes these tasks as necessary and adds funding and time for them. Provide explanation why change was not anticipated in original scope of work: The original contract anticipated these tasks, but did not assign funding due to the fact that there was limited funding available for design and construction when the original contract was negotiated. During design, Collier County was awarded a TRIP grant for construction. The award of the TRIP grant for construction allows us to utilize local and Intermodal funding to fund the remaining design tasks. 4. Describe the impact if this change is not processed: The consultant will not be able to perform necessary tasks during construction. The project may not meet grant deadlines or requirements which could require the County to return grant funding utilized for the project. Type of Change / Modification 1. Planned / Elective El 2. Unforeseen conditions /circumstance 3. Quantity or price adjustment ❑ 4. Correction of errors 5. Value added I N 6. Schedule adjustment Packet Page -817- a W, Revised: 7/27/11 1 change Requested.By 2/14/2012 Item 10.13. ❑ Contractor /Consultant ® Owner H Using Department -ffDesign Professional I El Re ulator A enc y (specify): ❑ Other(specify): Purchasing Professional Participated in Negotiation of Change / Modification: LJ Yes ❑ No proved by . Date: } Name and Title:• f Reviewed by: Date: Procurement Strategist's 1171--7 Revised: 7/27/11 2 Packet Page -818- w 2/14/2012 Item 10.13. Atkins North America, inc. 1514 Broadway, Suite 203 Ft. Myers, Florida 33901 -3015 Telephone: +1.239.334.7275 Oak Fax: +1.239.334.7277 www .atkinsgiobal.com /northamerica CHANGE ORDER SCOPE Contract # 10 -5206 Design Services for Collier Area Transit (CAT) Transfer Station This work order is for supplemental professional engineering services on behalf of Collier County (Contract # 10- 5206), for work known as Design Services for Collier Area Transit (CAT) Transfer Station The work was submitted dated October 3, 2011, which is hereto attached and made a part of this contract. In accordance with the "Terms and Conditions" within the Original Agreement for Design Service for Collier Area Transit (CAT) Transfer Station (hereafter, Agreement) referenced above. Scope of Work: Task 3.4: Redesign Efforts The consultant will revise plans to accommodate changes based on request for Bid Alternatives to Design Plans and requested changes to internal layout of facilities from County staff. This will include all required site, architectural, mechanical, Fire Protection/ Plumping, structural, and permit changes required for final Bid Documents. Task 4.1 C: Review of Change Orders The consultant will review, analyze, and provide recommendations on contractor requests for change and Change Orders prepared for a provided by Collier County Staff. Change Orders shall include material quantities and cost, labor quantities and all direct and indirect costs, and an analysis of the contractor's proposal for alternate methods and materials. In addition, the consultant will prepare all necessary change order documents (designs, specifications, cost estimates, schedule analysis, etc.) as required by COLLIER AREA TRANSIT (CAT) for effective change order evaluation, negotiation and construction. All Change Orders of $25,000 or greater will require prior approval by FDOT. Task 4.1 D: Shop Drawing Reviews The consultant shall review and approve all project design related shop drawings and material submittals as designer -of- record. These reviews and approvals shall be completed and returned no more than ten (10) working days after receipt from the construction manager /contractor. No site visit by CONSULTANT outside of bi- weekly meeting will be expected for Shop Drawing Reviews. In addition CONSULTANT representative may attend bi- weekly construction meetings, on an as- needed basis. Assumed maximum 26 meetings (3 hours per meeting) Packet Page -819- 2/14/2012 Item 10.13. Task 4.213: Preparation of Design Professionals Punch List The consultant will participate in the inspection and development of the final punch list to be received by the contractor prior to final acceptance. The consultant will provide the necessary services to qualify or not quality the project as "substantially complete" and offer documented notification of the same. (Assume One Site Visit necessary per discipline for site review and preparation of Punch List, County Staff to verify completion of Punch List Items) Task 4.2C: Final Project Acceptance/LEED Construction Certification As the designer of record, the consultant will participate in the final project inspection following completion of punch list activities, and provide COLLIER AREA TRANSIT (CAT) with formal written notification of project acceptance. Provide LEED Construction Support for Gold Certification, these services are in addition to the LEED checklist and application provided in the initial agreement: • Prepare LEED Gold Plan & client/sub consultant review • Assist Contractor with Construction Site Pollution Prevention Plan and review LEED documentation • Assist with Construction Waste Management plan along with documentation and record keeping procedures • Review Indoor Air Quality (IAQ) Plan during construction • Review procedures for the acquisition and documentation of all Material & Resources (MR) credits • Review procedures for the acquisition and documentation of all Low Emitting Materials (EQ) credits • Assist with construction related Exemplary Performance credits • Assist in construction related documentation required for LEED Exclusions This scope does not include any effort required for building commissioning or Measurement & Verification. This scope does not include contacting any subcontractors working under the General Contractor and assumes General Contractor will take responsibility for collecting any documentation requested by ATKINS in order to fulfill LEED Credit Requirements. This scope does not include maintaining staff on -site for collecting documentation required for LEED submittals. The consultant will participate in the inspection and development of the final punch list to be received by the contractor prior to final acceptance. The consultant will provide the necessary services to qualify or not quality the project as "substantially complete" and offer documented notification of the same. (Assume One Site Visit necessary per discipline for site review and preparation of Punch List, County Staff to verify completion of Punch List Items) More detail and explanation can be found in the attached proposal. Packet Page -820- 2/14/2012 Item 10.B. Schedule of Work: Complete all work as directed by December 31, 2013. Compensation: In accordance with "Article Five" of the Agreement, the County``' will compensate the designated firm in accordance with the negotiated Lump Sum amount provided below (use the established hourly rate(s) as enumerated in "Schedule A" of the Agreement). Task 3.4: Redesign Efforts (LUMP SUM) $20,000.00 Task 4.1C: Review of Change Orders (Time & Materials, Not To Exceed) $14,300.00 Task 4.1D: Shop Drawing Reviews (Time & Materials, Not To Exceed $20,800.00 Task 4.213: Preparation of Design Professionals Punch List $15,300.00 (Time & Materials, Not To Exceed) Task 4.2C: Final Project Acceptance/LEED Construction $29,500.00 Certification (Time & Materials, Not To Exceed) TOTAL $99,900.00 Any change within monetary authority of this work order made subsequent to final department approval will be considered an additional service and charged according to "Schedule A" of the Agreement. Packet Page -821-