Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Backup Documents 04/24/2018 Item #11E
ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO 1 1 E THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. Risk Risk Management 2. County Attorney Office County Attorney Office 5)/A 4. BCC Office Board of County PS Commissioners J 5j-1' 4. Minutes and Records Clerk of Court's Office 513/1B 446411 5. Procurement Services Procurement Services The\ PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Barbara Lance Contact Information 239-252-8998 Contact/ Department Agenda Date Item was April 24,2018 Agenda Item Number 11.E. Approved by the BCC Type of Document Contract Number of Original le" a Attached Documents Attached PO number or account N/A 18-7276 CC Landscape Hannula Landscap' number if document is Beautification Mstr &Irrigation,Inc. to be recorded Plan. INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) •iJ1 1. Does the document require the chairman's original signature STAMP OK 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be BL signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the BL document or the fmal negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's BL signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip N/A should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 04/24/2018 and all changes made during the meeting have been incorporated in the attached document. The County Attorne 's Office has reviewed the chan•es,if a• s licable. 9. Initials of attorney verifying that the attached document is the version approved by the BCC,all changes directed by the BCC have been made,and the document is ready for th / �. Chairman's si:nature. / ; t'ElVED APR 24 2018 Risk Management 1 lE MEMORANDUM Date: May 3, 2018 To: Barbara Lance, Purchasing Tech Procurement Services From: Ann Jennejohn, Deputy Clerk Minutes & Records Department Re: Contract #18-7276, Landscape Beautification Master Plan Contractor: Hannula Landscaping & Irrigation, Inc. Attached, is an original copy of the contract referenced above, (Item #11E) approved by the Board of County Commissioners on Tuesday, April 24, 2018. The second original contract has been held in the Minutes and Records Department for the Board's Official Record. If you have any questions, please contact me at 252-8406. Thank you. Attachment Detail by Entity Name Page 1 of 2 11E Florida Department of State DIVISION OF CORPORATIONS kij A0,14 DIVOIDP of fut official ate of FYothitt weluite Department of State / Division of Corporations / Search Records / Detail By Document Number/ Detail by Entity Name Florida Profit Corporation HANNULA LANDSCAPING AND IRRIGATION, INC. Filing Information Document Number P92000010592 FEI/EIN Number 65-0375795 Date Filed 12/08/1992 State FL Status ACTIVE Last Event NAME CHANGE AMENDMENT Event Date Filed 07/18/2008 Event Effective Date NONE Principal Address 7050 Pennsylvania St. Fort Myers, FL 33912 Changed: 01/30/2017 Mailing Address 7050 Pennsylvania St. Fort Myers, FL 33919 Changed:01/30/2017 Registered Agent Name&Address HANNULA, DALE F 7050 Pennsylvania St. Fort Myers, FL 33912 Name Changed:01/30/2017 Address Changed: 01/30/2017 Officer/Director Detail Name&Address Title PST HANNULA, DALE F 7020 Pennsylvania St. Fort Myers, FL 33912 http://search.sunbiz.org/Inquiry/CorporationSearch/SearchResultDetail?inquirytype=Entity... 3/1/201 8 Detail by Entity Name Page 2 of 2 11E Annual Reports Report Year Filed Date 2016 04/19/2016 2017 01/30/2017 2018 01/17/2018 Document Images 01/17/2018--ANNUAL REPORT View image in PDF format 01/30/2017--ANNUAL REPORT View image in PDF format 04/19/2016--ANNUAL REPORT View image in PDF format 04/20/2015--ANNUAL REPORT View image in PDF format 04/17/2014--ANNUAL REPORT View image in PDF format 04/19/2013--ANNUAL REPORT View image in PDF format 04/09/2012--ANNUAL REPORT View image in PDF format 04/26/2011--ANNUAL REPORT View image in PDF format 04/28/2010--ANNUAL REPORT View image in PDF format 04/14/2009--ANNUAL REPORT View image in PDF format 07/18/2008--Name Change View image in PDF format 04/28/2008--ANNUAL REPORT View image in PDF format 04/30/2007--ANNUAL REPORT View image in PDF format 04/17/2006--ANNUAL REPORT View image in PDF format 04/29/2005--ANNUAL REPORT View image in PDF format 04/28/2004--ANNUAL REPORT View image in PDF format 04/25/2003--ANNUAL REPORT View image in PDF format 05/15/2002--ANNUAL REPORT View image in PDF format 05/02/2001--ANNUAL REPORT View image in PDF format 05/16/2000--ANNUAL REPORT View image in PDF format 05/03/1999--ANNUAL REPORT View image in PDF format 05/06/1998--ANNUAL REPORT View image in PDF format 04/29/1997--ANNUAL REPORT View image in PDF format 05/01/1996--ANNUAL REPORT View image in PDF format 05/01/1995--ANNUAL REPORT View image in PDF format Florida Department of State,Division of Corporations http://search.sunbiz.org/Inquiry/CorporationSearch/SearchResultDetail?inquirytype=Entity... 3/1/2018 111. E CONSTRUCTION AGREEMENT THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, ("Owner") hereby contracts with Hannula Landscaping and Irrigation, Inc. ("Contractor") of 7050 Pennsylvania Street, Fort Myers, Florida 33912, a Corporation, authorized to do business in the State of Florida, to perform all work ("Work") in connection with Immokalee Road (Collier Blvd to Wilson Blvd) Landscape and Irrigation, Invitation to Bid No. 18-7276 ("Project"), as said Work is set forth in the Plans and Specifications prepared by Goetz + Stropes Landscape Architects Inc., the Engineer and/or Architect of Record ("Design Professional") and other Contract Documents hereafter specified. Owner and Contractor, for the consideration herein set forth, agree as follows: Section 1. Contract Documents. A. The Contract Documents consist of this Agreement, the Exhibits described in Section 6 hereof, the Legal Advertisement, the Bidding Documents and any duly executed and issued addenda, Change Orders, Work Directive Changes, Field Orders and amendments relating thereto. All of the foregoing Contract Documents are incorporated by reference and made a part of this Agreement (all of said documents including the Agreement sometimes being referred to herein as the "Contract Documents" and sometimes as the "Agreement" and sometimes as the "Contract"). A copy of the Contract Documents shall be maintained by Contractor at the Project site at all times during the performance of the Work. B. Owner shall furnish to the Contractor one reproducible set of the Contract Documents and 4 the appropriate number of sets of the Construction Documents, signed and sealed by the Design Professional, as are reasonably necessary for permitting. Section 2. Scope of Work. Contractor agrees to furnish and pay for all management, supervision,financing, labor, materials, tools, fuel, supplies, utilities, equipment and services of every kind and type necessary to diligently, timely, and fully perform and complete in a good and workmanlike manner the Work required by the Contract Documents. Section 3. Contract Amount. In consideration of the faithful performance by Contractor of the covenants in this Agreement to the full satisfaction and acceptance of Owner, Owner agrees to pay, or cause to be paid, to Contractor the following amount (herein "Contract Amount"), in accordance with the terms of this Agreement:One Million Five Hundred Twelve Thousand Two Hundred Seventy-Four Dollars and Eight-Seven Cents ($1,512,274.87) Section 4. Bonds. A. Contractor shall provide Performance and Payment Bonds, in the form prescribed in Exhibit B-1 and B-2, in the amount of 100% of the Contract Amount, the costs of which are to be paid by Contractor. The Performance and Payment Bonds shall be underwritten by a surety authorized to do business in the State of Florida and otherwise acceptable to Owner; provided, however, the surety shall meet the requirements of the Department of the Treasury Fiscal Service, "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsurance Companies" circular. This circular may be accessed via the web at www.fms.treas.qov/c570/c570.html#certified. Should the Contract Amount be less than 1 Construction Services Agreement:Revised 022018 l iE $500,000,the requirements of Section 287.0935, F.S. shall govern the rating and classification of the surety. B. If the surety for any bond furnished by Contractor is declared bankrupt, becomes insolvent, its right to do business is terminated in the State of Florida, or it ceases to meet the requirements imposed by the Contract Documents, the Contractor shall,within five(5)calendar days thereafter, substitute at its cost and expense another bond and surety, both of which shall be subject to the Owner's approval. Section 5. Contract Time and Liquidated Damages. A. Time of Performance. Time is of the essence in the performance of the Work under this Agreement. The "Commencement Date" shall be established in the written Notice to Proceed to be issued by the Project Manager, as hereinafter defined. Contractor shall commence the Work within five (5) calendar days from the Commencement Date. No Work shall be performed at the Project site prior to the Commencement Date. Any Work performed by Contractor prior to the Commencement Date shall be at the sole risk of Contractor. Contractor shall achieve Substantial Completion within one hundred and eighty (180) calendar days from the Commencement Date (herein"Contract Time"). The date of Substantial Completion of the Work(or designated portions thereof) is the date certified by the Design Professional when construction is sufficiently complete, in accordance with the Contract Documents, so Owner can occupy or utilize the Work (or designated portions thereof) for the use for which it is intended. Contractor shall achieve Final Completion within thirty (30) calendar days after the date of Substantial Completion. Final Completion shall occur when the Agreement is completed in its entirety, is accepted by the Owner as complete and is so stated by the Owner as completed. As used herein and throughout the Contract Documents, the phrase "Project Manager" refers to the Owner's duly authorized representative and shall mean the Division Administrator or Department Director, as applicable, acting directly or through duly authorized representatives. B. Liquidated Damages in General. Owner and Contractor recognize that, since time is of the essence for this Agreement, Owner will suffer financial loss if Contractor fails to achieve Substantial Completion within the time specified above, as said time may be adjusted as provided for herein. In such event, the total amount of Owner's damages, will be difficult, if not impossible, to definitely ascertain and quantify. Should Contractor fail to achieve Substantial Completion within the number of calendar days established herein, Owner shall be entitled to assess, as liquidated damages, but not as a penalty, one thousand five hundred and eighty-four dollars ($1,584.00) for each calendar day thereafter until Substantial Completion is achieved. Further, in the event Substantial Completion is reached, but the Contractor fails to reach Final Completion within the required time period, Owner shall also be entitled to assess and Contractor shall be liable for all actual damages incurred by Owner as a result of Contractor failing to timely achieve Final Completion. The Project shall be deemed to be substantially completed on the date the Project Manager (or at his/her direction, the Design Professional) issues a Certificate of Substantial Completion pursuant to the terms hereof. Contractor hereby expressly waives and relinquishes any right which it may have to seek to characterize the above noted liquidated damages as a penalty, which the parties agree represents a fair and reasonable estimate of the Owner's actual damages at the time of contracting if Contractor fails to Substantially or Finally Complete the Work within the required time periods. C. Computation of Time Periods. When any period of time is referenced by days herein, it shall be computed to exclude the first day and include the last day of such period. If the last day of any such period falls on a Saturday 2 Construction Services Agreement:Revised 022018 1 1 or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day shall be omitted from the computation, and the last day shall become the next succeeding day which is not a Saturday, Sunday or legal holiday. D. Determination of Number of Days of Default. For all contracts, regardless of whether the Contract Time is stipulated in calendar days or working days, the Owner will count default days in calendar days. E. Right of Collection. The Owner has the right to apply any amounts due Contractor under this Agreement or any other agreement between Owner and Contractor, as payment on such liquidated damages due under this Agreement in Owner's sole discretion. Notwithstanding anything herein to the contrary, Owner retains its right to liquidated damages due under this Agreement even if Contractor, at Owner's election and in its sole discretion, is allowed to continue and to finish the Work, or any part of it, after the expiration of the Contract Time including granted time extensions. F. Completion of Work by Owner. In the event Contractor defaults on any of its obligations under the Agreement and Owner elects to complete the Work, in whole or in part, through another contractor or its own forces, the Contractor and its surety shall continue to be liable for the liquidated damages under the Agreement until Owner achieves Substantial and Final Completion of the Work. Owner will not charge liquidated damages for any delay in achieving Substantial or Final Completion as a result of any unreasonable action or delay on the part of the Owner. G. Final Acceptance by Owner. The Owner shall consider the Agreement complete when the Contractor has completed in its entirety all of the Work and the Owner has accepted all of the Work and notified the Contractor in writing that the Work is complete. Once the Owner has approved and accepted the Work, Contractor shall be entitled to final payment in accordance with the terms of the Contract Documents. H. Recovery of Damages Suffered by Third Parties. Contractor shall be liable to Owner to the extent Owner incurs damages from a third party as a result of Contractor's failure to fulfill all of its obligations under the Contract Documents. Owner's recovery of any delay related damages under this Agreement through the liquidated damages does not preclude Owner from recovering from Contractor any other non-delay related damages that may be owed to it arising out of or relating to this Agreement. Section 6. Exhibits Incorporated. Exhibits Incorporated: The following documents are expressly agreed upon, attached hereto and made a part of this Agreement for Solicitation 18-7276 Immokalee Road (Collier Blvd to Wilson Blvd) Landscape &Irrigation. Exhibit A-1: Contractor's Bid Schedule Exhibit A-2: Contractor's Bid Submittal Forms and Addendums Exhibit A-3: Contractor's List of Key Personnel Exhibit B-1: Payment Bond Forms Exhibit B-2: Performance Bond Forms Exhibit B-3: Insurance Requirements Exhibit C: Release and Affidavit Form Exhibit D: Contractor Application for Payment Form 3 Construction Services Agreement:Revised 022018 i lE Exhibit E: Change Order Form Exhibit F: Certificate of Substantial Completion Form Exhibit G: Final Payment Checklist Exhibit H: General Terms and Conditions Exhibit I: Supplemental Terms and Conditions The following documents are expressly agreed to be incorporated by reference and made a part of this Agreement for Solicitation 18-7276 Immokalee Road (Collier Blvd to Wilson Blvd) Landscape & Irrigation. The complete contract documents, including Addendum with attachments, are available on the County's on-line bidding system: https://vwvw.bidsync.com/bidsync-cast, which the parties agree comprise the final integrated agreement executed by the parties. Sections corresponding to any checked box ( ® ) expressly apply to the terms of this Agreement and are available through the County's on-line bidding system. ®Exhibit J: Technical Specifications ElExhibit K: Permits ®Exhibit L: Standard Details ®Exhibit M: Plans and Specifications prepared by Goetz and Stropes Landscape Architects Inc. and identified as follows: Immokalee Rd Irrigation Plans and Immokalee Rd Landscaping Plans as shown on Plan Sheets 1 through 55. Section 7. Notices A. All notices required or made pursuant to this Agreement by the Contractor to the Owner shall be shall be deemed duly served if delivered by U.S. Mail, E-mail or Facsimile, addressed to the following: Collier County Board of County Commissioners, Florida do Road Maintenance-Landscape Operations Division 4800 Davis Boulevard Naples, Florida 34104 Attention: Pamela Lulich, Manager-Landscape Operations Telephone: (239) 252-6291 Email: Pamela.Lulich(acolliercountyfl.gov B. All notices required or made pursuant to this Agreement by Owner to Contractor shall be made in writing and shall be deemed duly served if delivered by U.S. Mail, E-mail or Facsimile, addressed to the following: Hannula Landscaping and Irrigation, Inc. 7050 Pennsylvania Street Fort Myers, Florida 33912 Attention: Dale Hannula, President Telephone: (239)437-9666 Email: Dhannulahannulalandscapinq.com 4 Construction Services Agreement:Revised 022018 11E C. Either party may change its above noted address by giving written notice to the other party in accordance with the requirements of this Section. Section 8. PUBLIC ENTITY CRIMES. 8.1 By its execution of this Contract, Construction Contractor acknowledges that it has been informed by Owner of the terms of Section 287.133(2)(a) of the Florida Statutes which read as follows: "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity in excess of the threshold amount provided in s. 287.017 for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted vendor list." Section 9. Modification. No modification or change to the Agreement shall be valid or binding upon the parties unless in writing and executed by the party or parties intended to be bound by it. Section 10. Successors and Assigns. Subject to other provisions hereof, the Agreement shall be binding upon and shall inure to the benefit of the successors and assigns of the parties to the Agreement. Section 11. Governing Law. The Agreement shall be interpreted under and its performance governed by the laws of the State of Florida. Section 12. No Waiver. The failure of the Owner to enforce at any time or for any period of time any one or more of the provisions of the Agreement shall not be construed to be and shall not be a waiver of any such provision or provisions or of its right thereafter to enforce each and every such provision. Section 13. Entire Agreement. Each of the parties hereto agrees and represents that the Agreement comprises the full and entire agreement between the parties affecting the Work contemplated, and no other agreement or understanding of any nature concerning the same has been entered into or will be recognized, and that all negotiations, acts, work performed, or payments made prior to the execution hereof shall be deemed merged in, integrated and superseded by the Agreement. Section 14. Severability. Should any provision of the Agreement be determined by a court to be unenforceable, such a determination shall not affect the validity or enforceability of any other section or part thereof. 5 Construction Services Agreement: Revised 022018 i lE Section 15. Change Order Authorization. The Project Manager shall have the authority on behalf of the Owner to execute all Change Orders and Work Directive Changes to the Agreement to the extent provided for under the Owner's procurement ordinance and polices and accompanying administrative procedures. Section 16. Construction. Any doubtful or ambiguous language contained in this Agreement shall not be construed against the party who physically prepared this Agreement. The rule sometimes referred to as "fortius contra proferentum" (pursuant to which ambiguities in a contractual term which appears on its face to have been inserted for the benefit of one of the parties shall be construed against the benefited party) shall not be applied to the construction of this Agreement. Section 17. Order of Precedence In the event of any conflict between or among the terms of any of the Contract Documents, the terms of the Construction Agreement and the General Terms and Conditions shall take precedence over the terms of all other Contract Documents, except the terms of any Supplemental Conditions shall take precedence over the Construction Agreement and the General Terms and Conditions. To the extent any conflict in the terms of the Contract Documents including the Owner's Board approved Executive Summary cannot be resolved by application of the Supplemental Conditions, if any, or the Construction Agreement and the General Terms and Conditions, the conflict shall be resolved by imposing the more strict or costly obligation under the Contract Documents upon the Contractor at Owner's discretion. 6 Construction Services Agreement:Revised 022018 1 1 E IN WITNESS WHEREOF, the parties have executed this Agreement on the date(s) indicated below. CONTRACTOR: TWO Wo ESSE& Hannula ndscaping and Irrigation, Inc. ‘4•( �_,� i By: ,miff,f�--y►,0 FI: T ITN SS `Ja F l-tRn1lJ�1,�U� �2e>��rti-1 r S r . a : J _ Print Name and Title Date Print a - SECOND r ITNE•S z 1\1 Print Name Date: Mal 3 j OWNER: ATTEST: BOARD OF Co • TY OMMISSI• OF COLLIE- OW Y FLORI' Dwight E. Brock, Clerk. BY: 15LI • BY.. -�. BY: t ••• Attest as to Ch all's r'n•y Solis, Esq Date .zy.lg • =nature'• i` Chairman Appr•vee, as %1%.ran Legality: ift • NAIL "G 74•47-County Attorney Ocp ---� �ca lGa i� Print Name Item# IW v, - . Date Agenda `-lik tit °ecdS~3 -. ty Ierk Agg.r *10 7 Construction Services Agreement:Revised 022018 11E EXHIBIT A-1: CONTRACTOR'S BID SCHEDULE (FOLLOWING THIS PAGE) 8 Construction Services Agreement:Revised 022018 1r W 0 0 0 0 N ‘0, 000000 0 0 0 0 0 0 0 0 0 0 0 0 O O O tO 0 0 N 0 (0i o O O 0 0 N N O O co. to O .- O O O O O O O O O O O O tD O O O O 1n V O 01 co. O O O W co N O V m O O M to In O O (0 tO CD T V m t0 m V 0 0 O,OD O O O G O .-- m m 0) to CD O M 1` 1- N. N-- O .- N N O CO CO 0) O N 0) 0 N m t0 0) C C N tO O to O M N aD a n n n N CO C •- O V 0) m O M .- I y v L6 CO .- tO C. at I-M .- 0i l'-__... M O N M N II.-- 0) CO 01 O v tD (D O N M C CO to m M N M M .- N W M N ,- .- V ,- •7 VN N '- 4') .- CO vm e- 0 M C- a ivv r d n a C (d C C C C o o O 0 0 U 0 0 0 c C 37:=P; 0 C C CO 2 FO- FO- F (» to tr, w 69 e't vi«s•f»f»v,•n 0,0v09C9Cg69(9„ (19(»,A69 19e969v969e1696969 y, O O O M O 0) O O 0 0 0 0 0 0 0 0 0 0 0 0 000 .-000 ,10 ,- 0 O C. 0 V O 0) . O 9 .9t9999999009 C) (O O fD O In N O .- C O O O to N a) 0) t°( D Q) O O 0) N N- V to CO CO r to M M M m O V' O v co O 0) O N N- V CO N t0 C) to to M M C a M a O V N CD to to V .- M II O .- M .- C m M o o 0 0 U 0 (0 0 C C c C Vi (9 69 69 W)d)69 19 CA CA 69 CA 69 fA(A 69 to,V)V!69(9 as N EA C9 C9 fA t9 V)Cfl C w (n to c W e Y QQ > aQ c m m co m m co m m m co co co m m m m m m m (13 m co 0 J J J 0 co 0 0 W U(n W 0 W W W W W W W W W W W W LULULULULULULLLULLILU .- .- ,- N O a0 0 N CO D)N N CD n n U)to mr CD CD CO NC ON- O) ,- N- On O ON V N- NN N M tf)CD.-CD CD (D CO _CD N-CD CD r M 0) r•-•c...) co.M MM 1-M CDC C V N MM Z` Ofi M U a O N� - C7 CJ J N N N W W W W 0 J O CD Z J 0W (n to Lu W O O 0 ix 2 O O O Oi LL a a Q w N C = 0 W W a x o o W O a Q n UO WO ~ tp O CO g U o ce z Cr) (n a a O m N UO 2 w J_¢ O a z_ 2M ”, _j d F-- Z< z a m re 7.. O 0) O> w<Z0aQQdaY 2W C7Q (nc W LL W W t5 « n _, ,_0>- i8O¢ ¢ o NO�zw0ozQZ oa R '1'1,,.,1"11" III ° OC°3ii!!' QQQ o2odwo03 °o U O m LL �N a(n_ J CO(n m S J 2 ll (n } U O O U 0 111 g g i w U W m _FQQdF- a) J =VO _ c O a)2- Cn.+C to co N- .. U 03 JN A 0a v 0o coli c 0 o) O Z E m> 0 O ac ' o v �o d ' c $ ° mN - o 0 - O Q Eav H P CO ° ✓ > g i ti C AE 'E m 2mW CC) W ° m ° vm NLL a c m E $ m °,7 c m E O F - mU yE m m :- m m m Lu .6_ m m` cN ` am 2 d o c m iNJ o ' m3 ` m u y 9. > o a Zo m > O a) > c C O o I .cNcoaC m O m 5 Z ti Z ° dvn m o) m mc u 7 F °_ 2 g am m_c Wm .5 m wmao :o ' > E E jmEd o3 E ao o p 0 = , Y T O 0 m m;n E 'E' 2 2 n 0II y c 2 2 C '2 c JOc tWomo ° 32 ooE ascNo.ocommm C m ) m O c 0C) a) x 2 n a E > a) O. m m 0 0 0 L _1T L 5 > > co co N .c:= = aao Cl«WI- m c CO3 N inLcgu) co 0UU2a a00(n(n - USI 2a w (n (n coN Y m c a W a l< 3 a• d gt' aJ ° N c a li o m 1- u m -s d aIU)•• 1111111111111111111111111Ez0m .• Q — 0 U) — O - 0 COJaE� M�.eee���=ems=M�MM. • S _ E. d IIIIIINIIiIIuhIIIII r g o0 r2 g Z .- N M V Z ID CD Z n co a)'4,2 N Z coW C�ID O n COCD W 0 N M R D U)CD N- CO 0) 0 N M V' N N N N N N ixN N N N N M M M M M \ 2 2 m m m o IXI as CO talLi C) o O o CO O C) OD 0 0 0o O O O O O o O O O O O'OO V 0 0 0 0 CO 0 0 0 0 0 0 4) CO 0 0 0 CO V 0 V OA M m m U) W V O O O O O O O O O O N In 47 O 41 1n d; N 0 0 0 0 0 0 0 0 0 0 0 N O 0 0 0 0 V; 0 M N-a V' M r N O U) u- O O O O O O N n O CD CD m M 0 V CO CO N 00 0 O OO O O0 4) O I- N V O) N N O O O V O O O N O) N CO 1- IO n M I,. O V O N-41 41 N O O OO V V CO N N- CD CO O CD NWMOWNV M r .- 0 V 4- x 0 N U) O N OO I.. m OD 0 V O 0 N O V V 0?M V 0 4- N U) V N OO M h 4,14 .- m M 1- O) M n N W W m m -M- O , UI Oi V - I:V' , , O M V N U)U) V' m M- Ni i.m P N O O W O O') M41 V C) .- M M 0n m.0 a U) 0 0 SLA- .0 c° Lam V N- 0 z> N gm i. O. y O 1-4 O U E m o O F 4444444 - 444 f9 d) M N 44 4 444't 4 f9 f"49th di fAfA fA EA 69 EA 6-44 4 f9 d9!9 474 6949!9 f9 4 OA sA 49 H69 0_ 0 O_ O_ O CO CD O 0 0 0 0 0 0 0 U) 0 0 0 0 0 0 CO V O) O N-,C0 M N N N O 41 On 0 0 0 CO O CO O N 0 0 0 0 0 0 0 0 O N tO On 41 41 41 4- OR N N OO On M M N N N m O) 14 O O O O O (O O V V 6 V V O O _ O N N 6 O i m m M O m 6 oi N M O o 0 0 0 0 0 0 o O N N m N O M O M O) Y. m 0)U) CO N 4) U) OO 064- oo U 0 c c 69 N to fA f9 fA Mu » 06� J6 ` 6H9 6 969 V99» 9 in 44 d9 N 69 6 69 69 64 E9 v. .M 64 to 6,6 4 4 9 ,6, WWWWWW QW QQ6 6 6 6 QJJ J J J J J J J J JJJ J J J J J J J J 6 QW W W W V W M CO 0 OO U) U) O U)U)O O U)sr V M .-M O M O 0 O O O O O 0 0 0 0 U)O m M U)U)V CO N.. OO N.NOO v-v- M_vMU)M N OAF-00000000000MOO M Cr CO0 .- OO CO 1`M OO - v- 0 MfO.- v-Nn ONm tO� OO�NN<O V We- .-OV 6— M f` O O OO M V N N sr OO N N N V) N W w 6 > J m LL Z ce ON Q w V O 0 W O -J 0 W 0) W co OF N I- pc; Z WI- N N a � a - U)iZ Z O 7;. IyQQ] C4111 -.ww Ci) � a� � W J• OD J W CL •10 V F F:4410 j �1 Z O MN w m c a W U U O0 d v O z 7 a O ¢ > ¢ 0 O o z LLz co a Z Oz 1- ZCnOU > o > >w W � y wDZ-Dmov~-iQ ° Q zaa °- U0 000 Um J J Z CO Q Z a Z m O m LL O O W 7 O W Q L Z a < Q W m 0 Z W Z ti ,amO��nm m Ow LU a2 • F N a CO J O J • Z. N - w o 0 a W 0 U 0 0 m m Z3 m N L ¢ a s WO o a z ¢U Q O w W ._• V N Jp of 000 ,,oNo0 -i- -- 0= 0 w2ma W 0) Q F- LL LL LL m N O N n < m 1- aa J a x YU 'O 2 S O0o 0 YYY gN _lNSOU 1- WJW ES c, �i FZ-- Y woo U �U V� YQ ww �1- WuwiW W -- y 0 N Q m W = 000 j a j Z Z m 0 Z O O N K w ZO§a co = 0- re n 0o V zzz xxx � a '� a33 � Q3QQQ Joxx * °°g � 1-a I,- d 2 Z W W W W M .- N a Q Q (�C7 Q J 1- 1- m.m Q Z OR N N U COm OE WO D mmm wLil LlI LLI U' U' O, U Q U' O W Woa WN co N O N 0Z Z 03 > (n W'bbio W, ZZZZ0O �� rm0ZZ - " ,,2 n Q H w W W m W m W N O LU Q �� 0 wUW ga' mgQQQQQOJy)WmOONOOaO H N 0 _ J J J W W W �U J J J J m N ° N[n O 4 Q = OJJ Z fn fo <o ( rF- FZZ UW W � J JUQ W W 0 0 0 OOOUO U N > 1'- adi vi- 1- » Vvv gggo. ggH1- 1 >c7)c7) o�QQ -' wcc Z W o N Z � Z O z < <j 000uiui 000000000 VgJJNNNwwN c 2 Z a rn Wmz Pww wwrnzzi=PPPoo°00 ± 006 ,661•- wl2 O� J W WO Q1- F 000mm < QQQW W W Wµ� 0± NNNOmU) coE r J W W q > F-V C7QQ W > ZZUC7C7C7mU NNN 32 p - Q a s 0' UWIjm � C7Q >jo� >aaQ �¢ ¢ Q¢ ¢ � m�xr000W w¢ N Uco I W OxJ • f7 `vamxNf0SO22 - mm -> > >> > .- N Wx000�mm • E {h 2 F- On U Q Z J J J J J J W W W J J J J J J J J J J J J J J -.I J W F- F'-1-' x (� • lL y) •V 0 m OF - 1- 1-1- 1- 0001- 1- 1- 1- 1- 1-h1- F- 1- 1- 1-1•- hf- � � � JJJm _Ju) $ CI, d W W W N • F- o� mNyymmmrn UJOn On UltntA<Owww Ontn(ofo UJmmQQQOQl11 P m - y l0 E E N W Q Q E W �i Z - Z Z z Z J J Z Z Z Z Z Z z z Z Z Z Z Z z Z z 0 O H F H m~ W ul ¢ ¢ w U U M U U c r %0 Z = 1- m 0 0 0 O O O Z z O 0 O 0 0 0 0 O 0 0 O 0 O 0 O 0 O o z z z z w ii $2 ,02 ,. Z > o Z c Z 0 > • cgQz ¢ ¢ ¢ ¢ 000a < aaa < < a << a < aaaa - `° rodS0 "' a)N - 2 = y E c Q o O 0 c ..,.>- 0 m-x x x x 0 0 U x x x x x x x x x x x x x x x x m m x x x z x F - ' m co A O p = o. GQ Q O 2 GZ nQ by wn W W W GO CO OD CO CO fO to co co co to co(n m m cn m m NNn J hU) Lo cectx c a o _ CO V W M 2 (7 C7 V O N m m 2 m m m m 0 0 0 m m m m m m m m m m m m m m m m U U m m m x m m zo 0 D 0 E ._ m ) O. 7 N m m ) -- 0 >< D mUUUU. 7777777777777777 777 - 70 Qm0W � a u7 Q 11• 0 O T. N 0 W LL � LLLLLLLLNfafoLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLM� LLLLLLSLL♦- C) .st2 N IINIII DWaa M JO > Cl) > to )` mw <a00000U)U) n22JJJJ3 s3 � 33: zzco p0-)mU) m • 8,< 0 Z o 3gM U) UN-CO)O N Z M V U) Z OO1-ED CO O NM V 4)OOh m W O N MvhOOnm W 0 N Mv4)OOI, COMQ ,. u O M MMMM V V V V Cr V V V V V N N CO N 0 U)U)U)U)U) OD OD CO CO 0 OO OD CO O001`N)-n n n N N r-r-,,, v 'u CC E E _ '0 0 0 41.2 - a`a` O N 0 0 V 0 0a) a) 0000 M a') co ...lN W3 N C )0 N N cD N. aa s Il') J co co M M 0) O O C) I-: cd O 0 ' N )D n u) co moo 1. co r ,- N. Li- ti III mN N U) h N CO N H N CO N N l0 0 4) N4) 4) d 4) N N 4) 4) 4) 4) N Y >- >- >- Yrry>y>-y> N a N 0) 0 0 m 0 F- 44fAfAistoUNt9 » d) » 40)CO w 0W00 ,700 CO) O O N O O O 0 W coi n uni O)C)O) .- 0- 01 v a N O U C 0000000 tg 00 W W W W W W W 7 W Li. 0 0) CC) D OW 4D (0 O O N M r O N W aa J QJ z Z 1... CO z J J V) LL 1.L O W N J mF-O NO < Z ZW<CO O N Z W F- F- C Q j W H 40 >. O W W 0 Z¢Z¢< C. > 0 g Z Z 8 W I-w o -J )4 D_ Cl) 00 w JaW ° CO 0I w HCDUU ami ¢¢� y � �C U) OZmo: 0. Y-¢ E Cu W Viz a z -, F- F- - _ - Ozx � ;=° gYZZ E WMJ 3 O . z a.CO 000 U -J a. N a O to 0) aWFm-- II-- °) o. 47.01 U W wwww O ur c- 0 . ccU cc a.Ju-0)to y o a MI▪ m F �a2O J E °) ra $ E m c E° p � W Wfoazz C c X J Z < c o C e OV W mOLLZ �� ma) 5 o a 7ZLL rnm s o a 4) ypaOUzz of O 'E E d N ��wOXV- I- 2 § u) 'a 2 0. o `o II. N LL x m~ O. 3 CO CO .� T L0 co N Jp]m CO CO Z C a 0 C) Q W ¢ 0 -1j ? -) 1 c N) v ,'m a c O a a m e 0 V al - LL 77 C fo d g7�Za 00 °w' .9 y Y o 0 IS) 0 0 7 < , 0 it C 0 8 .0 7 L NJaZJJ N , C S.' N we`D0z ¢ ¢ r > a O O . E - } UZ ` LL ' 2 E,tZOzz Colo � � o dym F- y - O mco UU v O oD CO U) O J -/o. 101 (I) a d y yJI_ 22N 00 Wa tO 1.14 V C 2 c p = ca 0Q 0) :13 wN U Q wJO m tC F- F- H Z U U to r 1 o. a) m u)c0 co c0 Z _ v m . ` O 4) ZZZN p cTv u) o4) CO N a 0 .5500 > Ow m z• Z O1-0U ZLy '5„, T., 8 O E X5m =� =y CW ° .12 C$cI ° d H� rVW W c � mF .2 ,e2 L F. 2H Uv1 : m T � XQ¢ rn OZZZZOOvNLU Q cm c Lo zr:alzczzim ZN Z ° p Yc , 3 07777is 4) Y„5VW�J I- LLu. u_LLivv en0mWQm Ohm a > > m `°« — J 2.„1-11 c._ _ OaJ J a > > > mc70mM ° 2Z`2ra 2 Q _ � . 0T` -0 ix I- c • , T T '0.yO yl C y>m E z 2 co co 0 M 0 0 = O = V)LLD. CO0 o F ▪ o o o 0 0 o w m d > OOOO mM7iF--Womi E 72 a . . . . 2 t g t O 0401`4.cf) CD I. CO 0) Z 00.-04 CO 3 Pa 8 T Q m CO CO 40 4D W 4D CO . . . Cu O)W O) O) v u N F o T- a`0. l iE COMMERCIAL GENERAL LIABILITY 55091 (10-08) THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. COMMERCIAL GENERAL LIABILITY PLUS ENDORSEMENT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART. 1. EXTENDED WATERCRAFT LIABILITY Exclusions Under SECTION I - COVERAGES, COVERAGE A. With respect to only HIRED AUTO AND NON- BODILY INJURY AND PROPERTY DAMAGE OWNED AUTO LIABILITY, the exclusions which LIABILITY, 2. Exclusions, g., exclusion (2) is de- apply to SECTION I - COVERAGES, COVERAGE A. leted and is replaced by the following: BODILY INJURY AND PROPERTY DAMAGE LIABILITY, other than the Nuclear Energy Liability (2) A watercraft you do not own that is: Exclusion Endorsement, do not apply. The fol- lowing exclusions apply to this coverage: (a) Less than 50 feet long; and (b) Not being used to carry persons or This coverage does not apply to: property for a charge; a. "Bodily injury" or "property damage" expected 2. HIRED AUTO AND NON-OWNED AUTO LIABILITY or intended from the standpoint of the insured. This exclusion does not apply to "bodily in- Coverage for "bodily injury" and "property dam- jury" resulting from the use of reasonable age" liability provided under SECTION I force to protect persons or property. COVERAGES, COVERAGE A. BODILY INJURY AND PROPERTY DAMAGE LIABILITY, is extended b. Any obligation of the insured under a workers as follows under this item, but only if you do not compensation, disability benefits or unem- have any other insurance available to you which ployment compensation law or any similar affords the same or similar coverage. law. Coverage c. (1) "Bodily injury" or "property damage" arising out of the actual, alleged or We will pay those sums the insured becomes le- threatened discharge, dispersal, seepage, gaily obligated to pay as damages because of migration, release or escape of "pollut- "bodily injury" or "property damage" arising out of ants": the maintenance or use of an "auto": (a) That are, or are contained in any a. You do not own; property that is: b. Which is not registered in your name; or c. Which is not leased or rented to you for more 1) Being transported or towed by, than ninety consecutive days handled or prepared for placement into or upon, or taken from the and which is used in your business. "auto"; Includes copyrighted material of Insurance Services Office, Inc., with its permission. Copyright Insurance Services Office, Inc., 1982, 1988, 2002, 2004 Page 1 of 8 . 1 1E 2) Otherwise in the course of transit (b) Claim or "suit" by or on behalf of a by you or on your behalf; or governmental authority for damages because of testing for, monitoring, 3) Being disposed of, stored, treated cleaning up, removing, containing, or processed into or upon the treating, detoxifying or neutralizing, or "auto"; in any way responding to, or assess- ing the effects of"pollutants". (b) Before such "pollutants" or property containing "pollutants" are moved d. "Bodily injury" or "property damage" however from the place they are accepted by caused, arising directly or indirectly, out of: you or anyone acting on your behalf for placement into or onto the "auto"; (1) War, including undeclared or civil war; or (2) Warlike action by a military force, includ- (c) After such "pollutants" or property ing action in hindering or defending containing "pollutants" are removed against an actual or expected attack, by from the "auto" to where they are de- any government, sovereign or other livered, disposed of or abandoned by authority using military personnel or other you or anyone acting in your behalf. agents; or c. (1) (a) above does not apply to "pollut- (3) Insurrection, rebellion, revolution, usurped ants" that are needed or result from the power, or action taken by governmental normal mechanical, electrical or hydraulic authority in hindering or defending against functioning of the "auto" or its parts, if the any of these. discharge, release, escape, seepage, mi- gration or dispersal of such "pollutants" is e. "Bodily injury" or "property damage" for which directly from a part of the "auto" designed the insured is obligated to pay damages by to hold, store, receive or dispose of such reason of the assumption of liability in a con- "pollutants" by the "auto" manufacturer. tract or agreement. This exclusion does not apply to liability for damages: c. (1) (b) and c. (1) (c) above do not apply, if as a direct result of maintenance or use (1) Assumed in a contract or agreement that of the "auto", "pollutants" or property is an "insured contract", provided the containing "pollutants" which are not in or "bodily injury" or "property damage" oc- upon the "auto", are upset, overturned or curs subsequent to the execution of the damaged at any premises not owned by contract or agreement. However, if the or leased to you. The discharge, release, insurance under this policy does not apply escape, seepage, migration or dispersal to the liability of the insured, it also does of the "pollutants" must be directly caused not apply to such liability assumed by the by such upset, overturn or damage. insured under an "insured contract". (2) Any loss, cost or expense arising out of (2) That the insured would have in the ab- any: sence of the contract or agreement. (a) Request, demand or order that any in- f. "Property damage" to: sured or others test for, monitor, clean up, remove, contain, treat, detoxify or (1) Property owned or being transported by, neutralize, or in any way respond to, or rented or loaned to any insured; or or assess the effects of"pollutants"; or (2) Property in the care, custody or control of any insured Includes copyrighted material of Insurance Services Office, Inc., with its permission. Copyright Insurance Services Office, Inc., 1982, 1988, 2002, 2004 Page 2 of 8 i lE other than "property damage" to a residence b. Your partners if you are designated in the or a private garage by a private passenger Declarations as a partnership or a joint ven- "auto" covered by this coverage. ture. g. "Bodily injury" to: c. Your members if you are designated in the Declarations as a limited liability company. (1) An "employee" of the insured arising out of and in the course of employment by the d. Your "executive officers" if you are designated insured; or in the Declarations as an organization other than a partnership, joint venture or limited li- (2) The spouse, child, parent, brother or sis- ability company. ter of that "employee" as a consequence of Paragraph (1) above. e. Any person using the "auto" and any person or organization legally responsible for the use This exclusion applies: of an "auto" not owned by such person or or- ganization, provided the actual use is with (1) Whether the insured may be liable as an your permission. employer or in any other capacity; and None of the following is an insured: (2) To any obligation to share damages with or repay someone else who must pay a. Any person engaged in the business of his or damages because of the injury. her employer with respect to "bodily injury" to any co-"employee" of such person injured in This exclusion does not apply to: the course of employment. (1) Liability assumed by the insured under an b. Any person using the "auto" and any person "insured contract". other than you, legally responsible for its use with respect to an "auto" owned or registered (2) "Bodily injury" to any "employee" of the in the name of: insured arising out of and in the course of his domestic employment by the insured (1) Such person; or unless benefits for such injury are in whole or in part either payable or re- (2) Any partner or "executive officer" of yours quired to be provided under any workers or a member of his or her household; or compensation law. (3) Any "employee" or agent of yours who is Who Is An Insured granted an operating allowance of any sort for the use of such "auto". With respect to only this coverage, SECTION II - WHO IS AN INSURED, is deleted and replaced by c. Any person while employed in or otherwise the following: engaged in duties in connection with an "auto business", other than an "auto business" you SECTION II - WHO IS AN INSURED operate. Each of the following is an insured with respect to d. The owner or lessee (of whom you are a this coverage: sublessee) of a hired "auto" or the owner of an "auto" you do not own or which is not reg- a. You. istered in your name which is used in your business or any agent or employee of any such owner or lessee. Includes copyrighted material of Insurance Services Office, Inc., with its permission. Copyright Insurance Services Office, Inc., 1982, 1988, 2002, 2004 Page 3 of 8 1 1 E e. Any person or organization with respect to the (a) The limit shown for Bodily Injury Hired conduct of any current or past partnership or Auto and Non-Owned Auto Each Oc- joint venture that is not shown as a Named currence is the total amount of cover- Insured in the Declarations. age and the most we will pay for all damages because of or arising out of Additional Definitions all "bodily injury" in any one "occur- rence". The following definition applies to only this cover- age: (b) The limit shown for Property Damage Hired Auto and Non-Owned Auto Each "Auto business" means the business or occupa- Occurrence is the total amount of cov- tion of selling, repairing, servicing, storing or erage and the most we will pay for all parking "autos". damages because of or arising out of all "property damage" in any one "oc- Limits of Insurance currence". With respect to only this coverage, SECTION III - 3. BROADENED SUPPLEMENTARY PAYMENTS LIMITS OF INSURANCE, is deleted and replaced by the following: Under SECTION I - COVERAGES, COVERAGE A. BODILY INJURY AND PROPERTY DAMAGE SECTION III - LIMITS OF INSURANCE LIABILITY, COVERAGE B. PERSONAL INJURY AND ADVERTISING INJURY LIABILITY and a. The Limits of Insurance shown in the Declara- SUPPLEMENTARY PAYMENTS - COVERAGES A tions and the rules below fix the most we will AND B: pay regardless of the number of: Paragraph 4., the amount we will pay for the ac- (1) Insureds; tual loss of earnings is increased from $250 per day to $400 per day. (2) Claims made or "suits" brought; or 4. ADDITIONAL PRODUCTS-COMPLETED (3) Persons or organizations making claims OPERATIONS AGGREGATE LIMIT or bringing "suits". If the endorsement, EXCLUSION - PRODUCTS b. We will pay damages for "bodily injury" or COMPLETED OPERATIONS HAZARD, CG 21 04, is "property damage" up to the limits of liability not attached to this policy, then the following is stated in the Declarations for this coverage. added to SECTION III - LIMITS OF INSURANCE: Such damages shall be paid as follows: Commencing with the effective date of this policy, (1) When Hired Auto and Non-Owned Auto we will provide one additional Products- Each Occurrence Limit is shown in the Completed Operations Aggregate Limit, for each Declarations, such limit is the total annual period, equal to the amount of the Prod- amount of coverage and the most we will ucts-Completed Operations Aggregate Limit pay for all damages because of or arising shown in the Declarations. The maximum Prod- out of all "bodily injury" and "property ucts-Completed Operations Aggregate Limit for damage" in any one "occurrence". any annual period will be no more than two times the original Products-Completed Operations Ag- (2) When Bodily Injury Hired Auto and Non- gregate Limit. Owned Auto Each Occurrence Limit and Property Damage Hired Auto and Non- Owned Auto Each Occurrence Limit are shown in the Declarations: Includes copyrighted material of Insurance Services Office, Inc., with its permission. Copyright Insurance Services Office, Inc., 1982, 1988, 2002, 2004 Page 4 of 8 l iE 5. PERSONAL INJURY EXTENSION Occurrence, Offense, Claim Or Suit, the following paragraph is added: a. If the endorsement EXCLUSION - PERSONAL INJURY AND ADVERTISING INJURY, 55350, is Paragraphs a. and b. of this condition will not attached to this policy, then this provision, 5. serve to deny any claim for failure to provide us PERSONAL INJURY EXTENSION, does not ap- with notice as soon as practicable after an "occur- ply. rence" or an offense which may result in a claim: b. If the endorsement EXCLUSION - PERSONAL a. If the notice of a new claim is given to your INJURY AND ADVERTISING INJURY, 55350, is "employee"; and not attached to this policy, then under SECTION V - DEFINITIONS, 15. "Personal in- b. That "employee" fails to provide us with no- jury" is deleted and replaced by the following: tice as soon as practicable. 15. "Personal injury" means, other than "bod- This exception shall not apply: ily injury", arising out of one or more of the following offenses: a. To you; or a. False arrest, detention or imprison- b. To any officer, director, partner, risk manager ment; or insurance manager of yours. b. Malicious prosecution; 7. DAMAGE TO PREMISES RENTED TO YOU c. The wrongful eviction from, wrongful Under SECTION I - COVERAGES, COVERAGE A. entry into, or invasion of the right of BODILY INJURY AND PROPERTY DAMAGE private occupancy of a room, dwelling LIABILITY, the last paragraph is deleted and re- or premises that a person occupies by placed by the following: or on behalf of its owner, landlord or lessor; Exclusions c. through n. do not apply to damage by fire, lightning, explosion, smoke or water dam- d. Oral or written publication of material age to premises rented to you or temporarily oc- that slanders or libels a person or or- cupied by you with permission of the owner. A ganization or disparages a person's or separate limit of insurance applies to this cover- organization's goods, products or age as described in 7. DAMAGE TO PREMISES services; RENTED TO YOU, a. Limits of Insurance. e. Oral or written publication of material The following additional exclusions apply to that violates a person's right of pri- "property damage" arising out of Water Damage vacy; or to premises rented to you or temporarily occupied by you with permission of the owner: f. Discrimination, humiliation, sexual harassment and any violation of civil (1) "Property damage" to: rights caused by such discrimination, humiliation or sexual harassment. (a) The interior of the premises caused by or resulting from rain or snow, whether driven by wind or not; or 6. BROADENED KNOWLEDGE OF OCCURRENCE (b) Heating, air conditioning, plumbing or Under SECTION IV - COMMERCIAL GENERAL fire protection systems, or other LIABILITY CONDITIONS, 2. Duties In The Event Of equipment or appliances. Includes copyrighted material of Insurance Services Office, Inc., with its permission. Copyright Insurance Services Office, Inc., 1982, 1988, 2002, 2004 Page 5 of 8 11E (2) "Property damage" caused by or resulting (e) Regardless of the cause, flood, sur- from any of the following: face water, waves, tides, tidal waves, storm surge, overflow of any body of (a) Mechanical breakdown, including water, or their spray, all whether wind bursting or rupture caused by cen- driven or not; trifugal force; (f) Water under the ground surface (b) Cracking, settling, expansion or pressing on, or seeping or flowing shrinking; through: (c) Smoke or smog; 1) Walls, foundations, floors or paved surfaces; (d) Birds, insects, rodents or other ani- 2) Basements, whether paved or not; mals; or 3) Doors, windows or other openings. (e) Wear and tear; (4) "Property damage" for which the insured (f) Corrosion, rust, decay, fungus, dete- is obligated to pay as damages by reason rioration, hidden or latent defect or of the assumption of liability in a contract any quality in property that causes or agreement. This exclusion does not such property to destroy or damage apply to liability for damages that the in- itself; or sured would have in the absence of this contract or agreement. (g) Water that flows or leaks from any heating, air conditioning, plumbing or a. Limits of Insurance fire protection system caused by or resulting from freezing, unless: With respect to this coverage only, under SECTION III - LIMITS OF INSURANCE, para- 1) You make a reasonable effort to graph 6. is deleted and replaced by the fol- maintain heat in the building or lowing: structure; or 6. The most we will pay under Coverage A 2) You drain the equipment and shut for damages because of "property dam- off the water supply if the heat is age" to premises rented to you or tempo- not maintained. rarily occupied by you with permission of the owner arising out of or caused by fire, (3) "Property damage" caused directly or in- lightning, explosion, smoke and water directly by any of the following: damage is the amount shown in the Dec- larations under Damage to Premises (a) Water that backs up from a drain or Rented to You. sewer; b. Under SECTION IV - COMMERCIAL GENERAL (b) Mud flow or mudslide; LIABILITY CONDITIONS, 4. Other Insurance, paragraph b., the word fire is amended to in- (c) Volcanic eruption, explosion or effu- clude fire, lightning, explosion, smoke or wa- sion; ter damage. (d) Any earth movement, such as earth- 8. BLANKET ADDITIONAL INSURED - LESSOR OF quake, landslide, mine subsidence, LEASED EQUIPMENT earth sinking, earth rising or earth shifting; Includes copyrighted material of Insurance Services Office, Inc., with its permission. Copyright Insurance Services Office, Inc., 1982, 1988, 2002, 2004 Page 6 of 8 l iE a. SECTION II - WHO IS AN INSURED is (1) In a written contract or agreement, exe- amended to include as an additional insured cuted prior to loss, to name as an addi- any person or organization with whom you tional insured; or have agreed: (2) In an oral contract or agreement, exe- (1) In a written contract or agreement, exe- cuted prior to loss, to name as an addi- cuted prior to loss, to name as an addi- tional insured only if a Certificate of Insur- tional insured; or ance was issued prior to loss indicating that the person or organization was an (2) In an oral contract or agreement, exe- additional insured cuted prior to loss, to name as an addi- tional insured only if a Certificate of Insur- but only with respect to liability arising out of ance was issued prior to loss indicating the ownership, maintenance or use of that that the person or organization was an part of the premises leased to you. additional insured b. This provision is subject to the following addi- but only with respect to liability for: tional exclusions, applicable to this provision only: (1) "Bodily injury"; (2) "Property damage"; (1) Any "occurrence" which takes place after (3) "Personal injury"; or you cease to be a tenant in that premises. (4) "Advertising injury" (2) Structural alterations, new constructions caused in whole or in part, by your mainte- or demolition operations performed by or nance, operation or use of equipment leased on behalf of the additional insured. to you by such person or organization. c. The following is added to SECTION III - b. With respect to the insurance afforded to an LIMITS OF INSURANCE: additional insured, this insurance does not apply to any "occurrence" which takes place The Limits of Insurance for the additional in- after the equipment lease expires. sured are those specified in the written con- tract or agreement between the insured and c. The following is added to SECTION III - the manager or lessor of the premises, not to LIMITS OF INSURANCE: exceed the limits provided in this policy. These limits are inclusive of and not in addi- The Limits of Insurance for the additional in- tion to the Limits of Insurance shown in the sured are those specified in the written con- Declarations. tract or agreement between the insured and the lessor, not to exceed the limits provided in 10. NEWLY FORMED OR ACQUIRED this policy. These limits are inclusive of and ORGANIZATIONS not in addition to the Limits of Insurance shown in the Declarations. Under SECTION II - WHO IS AN INSURED, Para- graph 4. is deleted and replaced by the following: 9. BLANKET ADDITIONAL INSURED - MANAGERS OR LESSORS OF PREMISES 4. Any organization you newly acquire or form, other than a partnership, joint venture or lim- a. SECTION II - WHO IS AN INSURED is ited liability company, and over which you amended to include as an additional insured maintain ownership or majority interest, will any person or organization with whom you qualify as a Named Insured if there is no have agreed: other similar insurance available to that or- ganization. However: Includes copyrighted material of Insurance Services Office, Inc., with its permission. Copyright Insurance Services Office, Inc., 1982, 1988, 2002, 2004 Page 7 of 8 11E a. Coverage under this provision is afforded 11. BLANKET WAIVER OF SUBROGATION only until the 180th day after you acquire or form the organization or the end of the The following is added to SECTION IV - COM- policy period, whichever is earlier; MERCIAL GENERAL LIABILITY CONDITIONS, 8. Transfer Of Rights of Recovery Against Others To b. Coverage A does not apply to "bodily in- Us. jury" or "property damage" that occurred before you acquired or formed the organi- When you have agreed to waive your right of sub- zation; and rogation in a written contract, executed prior to loss, with any person or organization, we waive c. Coverage B does not apply to "personal any right to recovery we may have against such injury" or "advertising injury" arising out person or organization because of payments we of an offense committed before you ac- make for injury or damage arising out of your on- quired or formed the organization. going operations or "your work" done under a contract with that person or organization and in- No person or organization is an insured with cluded in the "products-completed operations respect to the conduct of any current or past hazard". partnership, joint venture or limited liability company that is not shown as a Named In- All other policy terms and conditions apply. sured in the Declarations. Includes copyrighted material of Insurance Services Office, Inc., with its permission. Copyright Insurance Services Office, Inc., 1982, 1988, 2002, 2004 Page 8 of 8 l iE EXHIBIT A-2: CONTRACTOR'S BID SUBMITTAL FORMS AND ADDENDUM (FOLLOWING THIS PAGE1 9 Construction Services Agreement:Revised 022018 1 lE •iffe r Email: Adam,Northru a)colliercount fl, ov Administrative Servs Department Telephone: (239)252-6098 Pmeuretrent Serviuts Oreibon ADDENDUM 1 Memorandum Date: December 19,2017 From: Adam Northrup,Procurement Strategist To: Interested Bidders Subject: UB 18-7276"Immokalee Road(Collier Blvd to Wilson Blvd)Landscape and Irrigation." The following changes have been made to the above mentioned Collier County solicitation: Landscaping Plans were not included with original posting. Please see attached file titled Attachment Bl— 18-7276 Immokalee Road Landscapeing Plans.pdf, which is added to this posting as an integral part of this solicitaion. Page 1 of 1 1 1 E Colter Capinty ...........—%„............___ Email: Adam.Northru.a)colliercount 11,vo V Administrative Services Depart/nay; Telephone: (239)252-6098 Plecuren tent Sevogxe,DNibtao ADDENDUM 2 Memorandum Date: December 28,2017 From: Adam Northrup,Procurement Strategist To: Interested Bidders Subject: ITB 18-7276"Immokalee Road(Collier Blvd to Wilson Blvd)Landscape and Irrigation." The following changes have been made to the above mentioned Collier County solicitation: Solicitation packet,file 18-7276 hnmokalee Rd Landscape&Irrizalion has been wholly replaced with the file titled 18-7276 Immokalee Rd Landscape&Irrigation(Addendum#2). This updates page 14 of the document to include the requirement for Bid Bonds and Performance and Payment Bonds. Changes highlighted in the document. C / Aii --- ).4 Olvqbe Page lot 1 11E C.,orier County Email: Adam.Northrucolliercounty.l..gov Adman' Telephone: 252-6048 Pro urement ser Division ep {234} ADDENDUM 3 'Memorandum Date: January 11,2018 From: Adam Northrup,Procurement Strategist To: Interested Bidders Subject: ITB 18-7276"Immokalee Road(Collier Blvd to Wilson.Blvd)Landscape and Irrigation." The following changes have been made to the above mentioned Collier County solicitation: Sample copy of standard county construction document added to solicitation. Please seefile titled Construction Services Affreement 411)ig Page 1 of i 1 lE CSer Comity Email: Adam.Northrupcolliercountyfl.gov Procuem�entServicesDivision Telephone:{239)252 6098 ADDENDUM 4 Memorandum Date: January 17,2018 From: Adam Northrup,Procuiement Strategist . ll To: Interested Bidders Subject: ITB 18-7276"Immokalee Road(Collier Blvd to Wilson Blvd)Landscape and Irrigation." The following changes have been made to the above mentioned Collier County solicitation: Substantial Completion and Project Days Changes: The successfid bidder shall be required to finally complete all Work within Two Hundred Ten(210)calendar days from and after the Commencement Date specified in the Notice to Proceed. The final completion days includes substantial completion of One Hundred Eighty(180)days with an additional thirty(30)calendar days to final completion. These changes are reflected in the 18-7276 ITB Immokalee Rd Landscape and Irrigation(Addendum#4)and wholly replaces the file titled 18-7276Immokalee Rd Landscape and Irrigation(Addendum#4) Submission Deadline Change: The bid submission deadline has changed to January 31,2018 at 3:00PM and the question and answer deadline has been changed to January 24th 2018 at 5:00PM Bid Schedule:To address issues with line numbering on the bid schedule, the file titled Attachment A—18-7276 Bid Schedule has been wholly replaced by the,file titled Attachment A—18-7276 Bid Schedule(Addendum#4). The following clarifications are made to the above mentioned Collier County solicitation as a result of the prebid conference and questions posted in the online bidding system. If you require additional information please post a question on the Online Bidding site or contact me at the information noted above. 1. Insurance Certificate Form: Review form carefully,specifically item numbers seven (7)Bid Bond,and eight (8)Performance and Payment Bonds. 2. Construction Agreement,Performance and Payment Bonds: An addendum was issued on January 16,2018, with a sample Construction Agreement in the document are Exhibit A1—Public Payment Bond and Exhibit A2 —Public Performance Bond. 3. Bid Bond Form,fill-in dollar amount clarification: The third(3d)paragraph, the dollar amount to fill in is the liquidated damages amount. Bidder to fill in acknowledging and verging the amount for liquidated damages. The amount of liquidated damages is$1,584.00 4. Bid Bonds Submission: Scan fully executed bonds, and submit in the online bidding system with the bid. Then mail or bring the originals to Collier County Procurement Services, 3295 Tamiami Trail East,Naples,FL 34112-4901 by the submission due date and time.Please ensure Bid No. 18-7276 "Immokalee Road(Collier Blvd to Wilson Blvd)is referenced on the package, and to the attention: Adam Northrup,Procurement Strategist. Page 1 of 4 1lE 5. Subcontractor Form Submission: Subcontractors for this project must be listed such as plumbing input the well driller, electrical input the electrician, and so forth. 6. Well Permits: The subcontractor listed for well drilling must complete the permits, and the well and pump installer must apply for the permit. The permits generally require cross-section well depths. The permit process takes thirty(30)days. 7. Well Details: There are five(5)wells,six inches(6')in depth. Each location is detailed on the plans;it is encouraged to go to the site to review. Wells are located in the south portion of the ROW, not in the middle of the median, on the sides and along swales,so the embankment will need building up. 8. Well Installation: Visit locations to review the issues. There is a separate form on Bid Sync which has the details,and it lists the components supplied by the County. 9. (Question)Right-of-Way(ROW)Permit? No,ROW permit required. This is a Collier County Capital project funded through ad valorem tax dollars. 10. Locates: Before digging,the contractor is responsible to call 811 for underground utility locates. Il. (Question) Why can't the well head go in at grade? Limited ROW on sides, and it will require working with the well driller from the beginning. The wells are all located on the south side of the road with overhead power lines, the area is very tight. The pumps need to be level. 12. (Question) Why can't the trade for well head change? Standard pump station with limited ROW. Need well driller from the beginning. Need to keep the pump equipment level. Overhead wires on the south side of the road. Put the well in at grade and build up the swales. Need to keep it level. Some of the sites require additional soil and rip rap to stabilized the pump and equipment. 13. Pumps: The pumps are ordered,and they are about six(6)weeks out. Collier county will buy the pump station. The contractor is responsible for the electrical connections to the pump from the FPL service line througha licensed electrician. (Refer to 18-7276-Standard Details Immokalee Road(Collier Boulevard to Wilson Boulevard)Landscape and Irrigation). The landscape contractor's electrical subcontractor will apply for the FPL permit. If there is any additional power needed per FPL, Collier County will pay for the FPL estimate/invoice at each pump station location. The specified power for the pump station is 120/240, 1 phase. 14. Standard Details Form:Refer to I8-7276-Standard Details Immokalee Road(Collier Boulevard to Wilson Boulevard)Landscape and Irrigation for Well/Pump and Electrical Installation,components,and vendor contact information. 15. Pump electrical connections: The Landscape Contractor is responsible for electrical connections from the FPL service line. The connection are completed by the contractor's electrical contractor. 16. Motorola Controllers: 120/240, I phase(Refer to 18-7276-Standard Details Immokalee Road(Collier Boulevard to Wilson Boulevard)Landscape and Irrigation for Well/Pump and Electrical Installation, components,and vendor contact information). The contractor is responsible for parts pickup from Landscape Operations staff at 2885 South Horseshoe Drive,Naples,FL 34104. 17. Motorola Protramming: The Landscape Contractor to install and wire the controller. The County's irrigation contractor to program the controllers as specified by the watering needs,plans, and specifications. 18. (Question)Microsoft CPMs accepted? Yes 19. (Question)Are the payers, Tri-Circle? Yes, concrete interlocking,set on six inches(6')limestone base, compacted. Need to list the paver installer in the subcontractor section. 20. (Question)Does the contractor pay for density test? The contractor pays for the density test. l iE 21. (Question)Mortared Curb or Ribbon Curb? A mortared edge is to be installed for brick pavers with one inch (1')to one and one-half inch(1.5')bedding sand(See Detail 2,page LA-22). 22. Plant Material Issues? If you experience any inventory issues with plant materials notify the County immediately. The County will review and adjust the bid tabs if necessary. There is no Floratam sod in this design. 23. Signaffe Sleeves and Parts: Signage sleeves are break-away and are installed brick paved areas. Before installing them, the work requires coordination with Traffic Operations. These sleeves are designed to break- away if they are hit. Traffic Operations will provide the parts,and they will assist in concrete placement around the sign. It is a eight inch(8')sleeve,and the flange is three inches(3')above grade. The existing signage is currently in the medians. The sleeves require proper orientation and are installed in conjuction with the paver installation. The sleeves need to be picked up at Traffic Operations 2885 South Horseshoe Drive Naples,Florida 34104. 24. (Question) Where do we include the costs for bonds? Include bond costs into the Mobilization line item and referes to Florida Department of Transportation Specifications,Section 101. SECTION 101 MOBILIZATION 101-1 Description. Perform preparatory work and operations in mobilizing for beginning work on the project, including, but not limited to, those operations necessary for the movement of personnel, equipment,supplies, and incidentals to the project site and for the establishment of temporary offices,buildings,safety equipment and first aid supplies,and sanitary and other facilities.Include the costs of bonds and any required insurance and any other preconstruction expense necessary for the start of the work, excluding the cost of construction materials. 25. (Question)Is County's Finance Department Rolm,to require a paid receipt for the bonds? Collier County Clerk Finance does not require receipts for bond payments if they are lump sum in a competitively bid agreement. However, it is encouraged that bidders maintain receipts because the Clerk has the option to review any supporting costs under public records law. Include FDOT Mobilization Section 101 specification for this pay item when requesting payment. 26. (Question) Will the County provide a stagine area? There are several retention ponds in the Right-of-way for staging. Contractor is responsible for staging and identified in the pay item FDOT Mobilization Section 101 specification. Any area where the contractor staged,they will need to restore to original conditions. There is no staging on Collier County owned private property. 27. (Question) What do you expect from this site work on plans spec LA-22.Detail I(top left)? The contractor will need to kill the sod, excavating a four foot(4')off the back of curb in the plant area, and a three foot(3') cut in sod area. You are cutting back to create a crown. You need to remove the rock and form a crown. It is currently flat, and you need to review the site.Follow the specification and detail,Landscape Plan,Sheet LA- 22, Detail 1. 28. (Question)Can we expect road rock? Rock in the median can be expected. 29. (Question)Soil Clarification: The soil specifications can be found on Sheet LA-21,Note number 25 and refer to planting soil preparation,Section V. There is backfill for the trees listed in plans specifications,LA-21. Add fertilizer to lower ph(Sheet LA-22,Note 32 and 33). Adding fertilizer before and post construction which is three(3)months of applications following project completion.All identified in the Landscape Plans. (Sheet LA-22,Note 32 and 33). 30. (Question)Limerock keeps raising plant ph? There was soil testing completed,and the test came back at seven(7). 31. (Question)Median maintenance? The contractor must maintain project during the course of constniction to County standards(per the plans and specifications),from the issuance of Notice to Proceed start date through final completion acceptance. The grass must be mowed and cannot exceed eighteen inches(18"). 1 lE 32. (Question)Purpose of the low bid,are alternates included? Please see section 12.2 of the "Construction Bid Instructions Form"included with this solicitation. 12.2 Statement of.Award: The Award of Contract shall be issued to the lowest,responsive and responsible Bidder determined by the base bid,and any,or all,selected alternates,and the Owner's investigations of the Bidder. In determining the lowest, responsive and responsible bidder, the Owner shall consider the capability of the Bidder to perform the contract in a timely and responsible manner. When the contract is awarded by Owner,such award shall be evidenced by a written Notice of Award,signed by a Procurement professional of the Owner's Procurement Services Division or his or her designee and delivered to the intended awardee or mailed to awardee at the business address shown in the Bid. 33. Attachment A—18-7276—Bid Schedule? In GROUNDCOVERS section on the bid schedule,line item 35 was numbered the same for five(5)line items. Those lines have been revised and have been consecutively numbered throughtout the spreadsheet. Addendum 4-Attachment A—18-7276 Bid Schedule must be used for bid submission. 34. (Question Are there restrictions on lane closures? There are no lane closures permitted between the hours of 7:00 AM through 9.00 AM and 3:30 PM through 6:30 PM on weekdays.Maintenance of Traffic(MOT) must follow the proper FDOT indexes for the roadway. 35. (Question)Permits paid by Contractor? a. Florida Power&Light: Once the electrical subcontractor requests the required power for the location, FPL will provide a quote/invoice. Collier County will open the purchase order for the FPL work and pay them directly. b. Right-of-Way permit: There is no right of way permit for landscaping or irrigation. c. South Florida Water Management District(SFWMD) Well Permits: The contractor is responsible for permit costs, application preparations,and processing SFWMD Consumptive Use Permit for wells. d. Collier County Electrical Permit: The contractor is responsible for the Collier County electrical permit costs, application preparation, and inspections. This allows the electrical subcontractor to do line voltage and gives FPL permission for the electrical inspection.For more information contact David Engelhart, Plans Reviewer, Collier County Building Review&Permitting(239)252-5723 (David.Engelhartf_alcolliercounfigoy). cc: Operations Support Division: Melissa Pearson,Contract Administration Specialist;Road Maintenance Division: Katherine Chachere,Landscape Project Manager;Pamela Lulich,Landscape Project Manager;Joseph Delate, Principal Project Manager. 1 lE C.Aler y Email: Adam.Northrup@colliercountstflgov Adrylnistrative Sermon,Department Telephone: (239)252-6098 pwagernent Sexvoces[Imo ADDENDUM 5 Memorandum Date: January 18,2018 From: Adam Northrup,Procurement Strategist To: Interested Bidders Subject: ITB 18-7276"Immokalee Road(Collier Blvd to Wilson Blvd)Landscape and Irrigation." The following changes have been made to the above mentioned Collier County solicitation: In reference to section N of the bid schedule titled"Plant Materials",lines 13-17 were not included in the section total(Line#41).This has been corrected in the file titled "Attachment A-18-7276 Bid Schedule Addendum 5"and fully replaces the previous bid schedules. /---) 14/144 Page 1 of 1 1 lE 'ter vity Email: Adam.Northrup(aeolliercountvfl.gov Atirninstative Services Department Telephone:(239)252-6098 Procurement Sens Division ADDENDUM 6 Memorandum Date: January 17,2018 From: Adam Northrup,Procurement Strategist 1 91 Pi ovrvivV To: Interested Bidders Subject: TTB 18-7276"Immokalee Road(Collier Blvd to Wilson Blvd)Landscape and Irrigation." The following changes have been made to the above mentioned Collier County solicitation: Bid Schedule:To address issues brought up in the question and answer forum (question 11),the file titled Attachment A—18-7276 Bid Schedule(Addendum#5)has been wholly replaced by the file titled Attachment A— 18-7276 Bid Schedule(final). To address questions brought up in the question and answer forum regarding HDPE to PVC connections(question 11), the file titled Addendum#6—HDPE to PVC Connection has been issued to clarifY the plans document. The following clarifications are made to the above mentioned Collier County solicitation as a result of the prebid conference and questions posted in the online bidding system. If you require additional information please post a question on the Online Bidding site or contact me at the information noted above. I. There is a discrepancy in the 100%plans,IR-29, Item#18 "IRRIGATION WELL PUMP AND CONTROLS". The pump performance is described as "150 GPM @ 70 PSI", this is incorrect. The actual pump performance is "70 GPM @ 70 PSI". Other specifications for this pump and all other pumps included in this project are correct. cc: Operations Support Division: Melissa Pearson,Contract Administration Specialist;Road Maintenance Division: Katherine Chachere,Landscape Project Manager;Pamela Lulich,Landscape Project Manager;Joseph Delate, Principal Project Manager. Page loll 11E BID RESPONSE FO BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY,FLORIDA lmmokalee Road(Collier Blvd to Wilson Blvd)Landscape and Irrigation BID NO. 18-7276 Full Name of Bidder Hannula Landscadin2 And Irri*ation.Inc. Main Business Address 7050 Pennsylvania Street Fort Mvcrs,Florida 33912 Place of Business... Lee County,Florida Telephone No, 239-437-9666Fax No, 239-437-9665 _ ..... .. State Contractor's License# N/A FDOT Certification Of Qualification State of Florida Certificate of Authority Document.Number P92000010592 Federal Tax Identification Number 65-0375795 DUNS#02272420 CCR# Cage Code To: BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY,FLORIDA (hereinafter called the Owner) The undersigned, as Bidder declares that the only person or parties interested in this Bid as principals are those named herein, that this Bid is submitted without collusion with any other person, firm or corporation; that it has carefully examined the location of the proposed Work, the proposed form of Agreement and all other Contract Documents and Bonds,and the Contract Drawings and Specifications. Bidder proposes, and agrees if this Bid is accepted, Bidder will execute the Agreement included in the Bidding Documents, to provide all necessary machinery, tools, apparatus and other means of construction, including utility and transportation services necessary to do all the Work, and furnish all the materials and equipment specified or referred to in the Contract Documents in the manner and time herein prescribed and according to the requirements of the Owner as therein set forth, furnish the Contractor's Bonds and Insurance specified in the General Conditions of the Contract, and to do all other things required of the Contractor by the Contract Documents, and that it will take full payment the sums set forth in the following Bid Schedule: Unit prices shall be provided in no more than two decimal points, and in the case where further decimal points are inadvertently provided,rounding to two decimal points will be conducted by Procurement Services Division staff. Detail by Entity Name Page 1 of 2 1 LE ,,te Departmeet of State / Dmmon at Coraorat ars / SeatcN Records / Beta 1 By Doaumer t Number/ Detail by Entity Name Florida Profit Corporation HANNULA LANDSCAPING AND IRRIGATION, INC. Filing Information Document Number P92000010592 FEI/EIN Number 65-0375795 Date Filed 12/08/1992 State FL Status ACTIVE Last Event NAME CHANGE AMENDMENT Event Date Filed 07/18/2008 Event Effective Date NONE Principal Address 7050 Pennsylvania St. Fort Myers,FL 33912 Changed: 01/30/2017 Mailing Address 7050 Pennsylvania St. Fort Myers,FL 33919 Changed: 01/30/2017 Registered Agent Name&Address HANNULA, DALE F 7050 Pennsylvania St. Fort Myers,FL 33912 Name Changed: 01/30/2017 Address Changed:01/30/2017 Officer/Director Detail Name&Address Title PST HANNULA,DALE F 7020 Pennsylvania St. Fort Myers, FL 33912 http://search.sunbiz.org/Inquiry/CorporationSearch/SearchResultDetail?inquirytype=Entity... 3/1/2018 Detail by Entity Name Page 2 of/ 1 1 E Annual Reports Report Year Filed Date 2016 04/19/2016 2017 01/30/2017 2018 01/17/2018 Document Images 01/1712018--ANNUAL REPORT View image in PDF format 01/30/2017--ANNUAL REPORT View image in PDF format 04!19/7016--ANNUAL REPORT View image in PDF format 04/0/20.5--ANN,'JAL_REP..0.T, View image in PDF format 04/17/2014--ANNUAL REPORT View image in PDF format 04/19/2013--ANNUAL REPORT View image in PDF format 04/09/2012--ANNUAL REPORT' View image in PDF format 04126/2011--ANNUAL REPORT' View image in PDF format 04/28/2010--ANNUAL.REPORT View image in PDF format 04/14/2009--ANNUAL.REPORT View image in PDF format 07/18/2008--Name Change View image in PDF format 04/28/2008--ANNUAL REPORT View image in PDF format 04/30/2007--ANNUAL REPORT View image in PDF format 04/17/2006—ANNUAL REPORT View image in PDF format 04/29/2005—ANNUAL REPORT View image in PDF format 04/28/2004—ANNUAL REPORT View image in PDF format 04/25/2003—ANNUAL REPORT View image in PDF format 05/1512002--ANNUAL REPORT View image in PDF format 05!02/2001—ANNUAL REPORT View image in PDF format 05/16/2000—ANNUAL REPORT View image in PDF format 05/03/1999—ANNUAL REPORT View image in PDF format 05/06/1998—ANNUAL REPORT View image in PDF format 04/29/1997—ANNUAL.REPORT View image in PDF format 05/01/1996 ANNUAL REPORT View image in PDF format 05101/1995--ANNUAL REPORT View image in PDF format rbraa Oeparfinent of gate,Oivi,on of Cuep.rat:mu http://search.sunbiz.org/Inquiry/CorporationSearch/SearchResultDetail?inquirytype=Entity... 3/1/2018 1 1E MATERIAL MANUFACTURERS ACTURERS THIS FORM MUST BE COMPLETED OR BID SHALL BE DEEMED NON-RESPONSIVE All Bidders shall confirm by signature that they will provide the manufacturers and materials outlined in this Bid specifications,including compliance with Florida Statute 255.20 to provide lumber,timber and other forest products produced and manufactured in the State of Florida as long as the price, fitness and quality are equal. Exceptions (when equals are acceptable)may be requested by completing the Material Manufacturer Exception List below. If an exception for a manufacturer and/or material is proposed and listed below and is not approved by Engineer/Project Manager, Bidder shall furnish the manufacturer named in the specification. Acceptance of this form does not constitute acceptance of material proposed on this list. Complete and sign section A OR B. Section A(Acceptance of all manufactures and materials in Bid specifications) On behalf of my firm,I confirm that we will use all manufacturers and materials as specifically outlined in the Bid specifications. Company' Hannula Lnt scaping rid Irrigation,Inc 0Signature �, Vit'', .� Dale 1 Hannula Date; I-31-18 Section B(Exception requested to Bid specifications manufacturers and materials) EXCEPTION MATERIAL EXCEPTION MANUFACTURER 1. 2. 3. 4. 5. Please insert additional pages as necessary. Company* _ Date l 1E LIST OF MAJOR SUBCONTRACTORS THIS LIST MUST BE COMPLETED OR BID MAY BE DEEMED NON-RESPONSIVE The undersigned states that the following is a list of the proposed subcontractors for the major categories outlined in the requirements of the Bid specifications. The undersigned acknowledges its responsibility for ensuring that the Subcontractors for the major categories listed herein are"qualified"(as defined in Ordinance 2017-08 and Section 15 of Instructions to Bidders)and meet all legal requirements applicable to and necessitated by the Contract Documents, including, but not limited to proper licenses, certifications,registrations and insurance coverage. The Owner reserves the right to disqualify any Bidder who includes non-compliant or non-qualified Subcontractors in its bid offer. Further, the Owner may direct the Successful Bidder to remove/replace any Subcontractor, at no additional cost to Owner, whichis found to be non- compliant with this requirement either before or after the issuance of the Award of Contract by Owner. (Attach additional sheets as needed). Further, the undersigned acknowledges and agrees that promptly after the Award of Contract, and in accordance with the requirements of the Contract Documents,the Successful Bidder shall identify all Subcontractors it intends to use on the Project. The undersigned further agrees that all Subcontractors subsequently identified for any portion of work on this Project must be qualified as noted above. Major Category of Work Subcontractor and Address 1. Electrical Brittiana Electric, Inc.6361 Metro Plantation.Rd.Ft.Myers,FL 33966 2. Mechanical 3. Plumbing 4. Site Work 5. Identify other subcontractors Directional Boring: CABCO Corp.,P.O.Box 60531 Ft.Myers, that represent more than 10% F1,33906 Pavers: Paver Pro.9778 Connecticut St. Bonita Spgs. of price or that affect the Fl.34135 Well:Golden Gate Well Drilling 1822 40th.Terrace critical. ath of the schedule SW Naples,FI.34116 Company:Hannula Landsca. ii “.•.tt�n 7,c Signature (j,A -, Dale F.Hannula Date. 1-31-18 1 1 E STATEMENT OF EXPERIENCE OF BIDDER '----- — I The Bidder is required to state below what work of similar magnitude completed within the last five(5)years is a judge of its experience, skill and business standing and of its ability to conduct the work as completely and as rapidly as required under the terms of the Agreement. Project and Location Reference(include phone#or email address) 1. Gulf Shore Blvd.Median Restoration Naples, City Of Naples. Heather Schields 239-213- Fl. 7136 2. RSW Airport Terminal Access Road Wright Construction Group Neil Monkman Widening, Fort Myers,FL 239-481-5000 3. Gilchrist Ave.Boca Grande.FL Lee County DOT Bob DeBrock 239-533-9425 4. Ben C. Pratt Six Mile Cypress Landscape & Lee County DOT Bob DeBrock 239-533-9425 Irrigation Project Fort Myers,Fl. _... .. 5 SR 951 Collier Blvd. Median Landscape Collier County Growth Mgt. Rd. Maint. Div. Naples,Florida Pamela Lulich 239-0252-8924 6. City Of Ft. Myers McGregor Blvd. Fort J.B. Schuetz 239-321-7590 Myers,Fl. Company .: Aula 2 4 4 Calin! And I !Wort Inc Dale F Hannula (F."---- Date 1-31-18 1 1 E TRENCH SAFETY ACT Bidder acknowledges that included in the various items of the bid and in the Total Bid Price are costs for complying with the Florida Trench Safety Act (90-96, Laws of Florida) effective October 1, 1990. The Bidder further identifies the cost to be summarized below: Trench Safety Units of Unit Unit Extended Cost Measure Measure (Quantity) Cost (Description) (LF,SY) PVC Main Line L.F. 17,363 1.05 18,231.15 2. 3. 4. 5, TOTAL 18 231 15 Failure to complete the above may result in the Bid being declared non-responsive. Company.Hannula Landsc in. d I Latt Inc _ Signature. Dale F liannula Date 1-31-18 1 1E Comity Administrativeas Caporal ont €ICKN renx:r;t&Mca:S OhraVA FORM II-IMMIGRATION AFFIDAVIT CERTIFICATION This Affidavit is required and should be signed,notarized by an authorized principal of the firm and submitted with formal solicitation submittals. Further,Vendors are required to enroll in the E-Verify program,and provide acceptable evidence of their enrollment,at the time of the submission of the Vendor's proposal. Acceptable evidence consists of a copy of the properly completed E-Verify Company Profile page or a copy of the fully executed E-Verify Memorandum of Understanding for the company. Failure to include this Affidavit and acceptable evidence of enrollment in the E-Verify program may deem the Vendor's proposal as non- responsive. Collier County will not intentionally award County contracts to any Vendor who knowingly employs unauthorized alien workers, constituting a violation of the employment provision contained in 8 U.S.C. Section 1324 a(e)Section 274A(e)of the Immigration and Nationality Act("INA"). Collier County may consider the employment by any Vendor of unauthorized aliens a violation of Section 274A(e)of the INA. Such Violation by the recipient of the Employment Provisions contained in Section 274A(e)of the INA shall be grounds for unilateral termination of the contract by Collier County. Vendor attests that they are fully compliant with all applicable immigration laws (specifically to the 1986 Immigration Act and subsequent Amendment(s))and agrees to comply with the provisions of the Memorandum of Understanding with E-Verify and to provide proof of enrollment in The Employment Eligibility Verification System(E-Verify),operated by the Department of Homeland Security in partnership with the Social Security Administration at the time of submission of the Vendor's proposal. Company Name ..A)24;JA11001 Print Name ;•.t ,,. F � t Title tri Signature . `: . .,,. Date Fidtl State of ... "k a7 ..,.,. County of Lee The signee of these Affidavit guarantees,as evidenced by the sworn affidavit required herein,the truth and accuracy of this affidavit to interrogatories hereinafter made. t RENEg 1 , MY COMMISSION*GO064928 Commission No.: Expoteejanualy 23,2021 r 1/30/2018 E-Verify:Employer Wizard-Company Information 1 1E ry Welcome Renee Rehbein .=MENU Company Information Company Name Hannula Landscaping and Irrigation,Inc. Company ID Number 262825 Doing Business As(DNA)Name DUNS Number Physical Location Address I 7050 Pennsylvania Street Address 2 City Fort Myers State FL zip Code 33912 County LEE Malting Address Address f Address 2 City Stats Zip Code Additional Information Employer Identification Number 653375795 Total Number of Employees 100 to 499 Parent Organization Hannula Landscaping,Inc. Administrator Organization Designation Employer Category None of these categories apply View t Ed% NAICS Code 238-SPECIALTY TRADE CONTRACTORS ;ewr dit1 Total Hiring Sites https://e-verity.uscis.gov/web/EmployerWizard.aspx 1/1 1 1E C ler Comity [hxuienenf�aMcrx CTnsM FORM 12-VENDOR SUBSTITUTE W-9 Request for Taxpayer Identification Number and Certification In accordance with the Internal Revenue Service regulations, Collier County is required to collect the following information for tax reporting purposes from individuals and companies who do business with the County(including social security numbers if used by the individual or company for tax reporting purposes). Florida Statute 119.071(5)requires that the county notify you in writing of the reason for collecting this information,which will be used for no other purpose than herein stated. Please complete all information that applies to your business and return with your quote or proposal. 1. General Information(provide all information) Taxpayer Name Vka n i t,rl (as shown on income tax return) Business Name(if different from rarpayer name) Address -7r:3 s`:;' 's'r _uk City State � z.at 'J `W_` Telephone 3 # '-V3) { %w i mailer r VAay;vw 140t L'O ' Order Information(Must be filled out) Remit/Payment Information(Must be filled out) Address 7050 ?eNi+s:/iv+rn.+iz, e Address ;; 5 (1 e vrvs,-' vn yr 5.frce el_ City Forti tilexk State V(u2;a, Zip 35q l2 City t M8r , State trX';J., Zip 3391 . Email rr f h' N.c) �.,wlti 101 rvi sr,wpe r4.C©h'? Email 1`r Zki eu V‘A4a.Niviii 101.1 Stelp#v • 2. Company Status(check only one) Individual/Sole Proprietor ')C Corporation Partnership Tax Exempt(Federal income tax-exempt entity Limited Liability Company under Internal Revenue Service guidelines IRC Enter the tax classification 501 (c)3) (D=Disregarded Entity, C=Corporation,P=Partnership) 3. Taxpayer Identification Number(for tax reporting purposes only) Federal.Tax Identification Number('TIN) - ° "j- 7 9 ........_............_.._..._.........._... (Vendors who do not have a TIN,will be required to provide a social security number prior to an award). 4. Sign and Date Form:Certification: Under penalties of perjur,1 certify that the information shown on this fonrn is correct to my knowledge. Sign a i Date •.�- cit.-�t�-•r-,�, � t t7 Title ' Phone Number 'ry'Yac'►; ra 939-`i S1..'._ _(2'. i___.. 1 lE Bond No.:N/A ts‘V° s'il'!: U1;3 ii cr .ri.'..S..: )'*"F'4,7:64.-Pb that v. L HannulaIay)dscmitty and Irrigation,Inc. Cnonrin 414." Calit•A th;.. ri-..,2,,,ir,,I) 12atio2p - •i, •f 4 f. fl i CgraWym...... , (ITTO-.". i'...:11c:i tS; b11.11,1.. $1. :'717;';,%;",":Zi k ti.,-.1t.r4 itlixt ,....V,:it;".... c„idr• the. Irwc, of -Iv 1,,,,,,t, A CA _ ,citli ;t4, pz:cn 4-.0 orr4;et, isi tis. 4 C4: Irvine,CA .„, ,.1:.il ;Atli...ifs/se 4,4 41.c4ir r: -.'s,.: Starr cif Florida firmly bc el iv a.a t',a Collier County Board of County Commissioners 6,,,:c:ii.,',er 4 sibis.,04:Oat wet, in too 4,1* :tail jost 'clan d Five Percent of Amognt Bid in U.S.--------------- it:41v' 6.1% )i,tios,'.,micl icrvtb1,ti ow,.of C4i,7J:critic!J!'ifit.z.,‘ iyf Am'.Ti.o.to'4:pall rc,..a ci,-.L.-.ians..i of the 0-4,ar,ri to 1-4,;•;44 imvr=„rn't ' c11 Lod Ix")te it'',arZZIC0 the Pzincr1 ad tis. ;-:.4's-of hod rtarmi.."Ivett.*avir In‘h-c,end,i-wr cwior.,441111:* 'ir Ar'I aril itt,*,..4,,JV if ix;:.a o,I1 asei.o-aII:,taa--:'Spey trz Wheta4m.,the frdwipal isi*nit to eubm 4-4 or lies submitted to der 0.10.4r,4 Bid fc)r tiXIIiihirig all labw.,nts,Ntaiars, ogapment ord incidentals nrowinesty to furnish, inetall, slid fully bempler tee Work on th, Proi-t't knowb as Innettkaloe Road(C:oliler Bled to 14'11-mb Blvd)Landeerre nod Irrigoricw,RIP NO.1S476 NOW,1 higRilonr,if Ow Owner sbali accept Cho Bid of the nu,40rAL art 1),c PRINCIPAL&ILO now SI.m..0 ett, A frieen=t with the now and within win shys elks the $i4 of ann.).- Notice of Awird io acodadaraT wit'a the toms°1h14."Id gtv0 14 i'llh brod or lanfel ta del=Dant Of DO',141;$:041.1 CotItTle:itriuNill,to rt4 '111Dents of COritnYA DiVaZ14416 with owed obi MitEctetd aunty ia ti.e faidifil par niece of da; NytettOtte It',Aid I'm the prompt payrocitt of libiss,rnateti‘ls,Ist;splirs fambilerti in th4.:rmoccitti.2:a LIL4.4ttif or,in thr evens of 4,, Lase of the FAINCIPAL t*‘Ilier Pita ITZA Ngteement or to give sash hold or bonds,met de-ma I) (..lrisiwr the re4amed iscertificrotos of ar,urgovia, if tie PRDICIPAL shall pay to th4 .t loaf L the Bled Site r*.l. $ 5%. 40tecl shove as hnuislutedi•Y z;Zet,en1 net av 4 *,Ir: ,i',1 pfe4i4M1 10 th0 r..''0. DM 11403:01ç thX;11 thsii e`bliheiian RiNtal be null in 4 void,otlesteise to merlin in Mil force.14 direr IN A LSTIIVKAVY"tberoot,the PrIncipal ard Scanty howcranstd the rivet* to he du/y ,.-431 d and•nralm:de, ' 24th day of Janlim , 0 IS , Hannula Landscapin:and Irritation Inc. frino,pal ‘ At, "--- (Seat) PeYCIOP.ers NcilndembitY Company David B.nk ,Attorney-in- act anTETEeifieelr rkesident Agent M241176— c suray (Seal), N/A Leal *4 i,„'1%-,-, Vs.,,',1,, , l',,i',...lor Develors Surely and Indemnity Com.gar„iy____ __..........._____._ I iE POWER OF ATTORNEY FOR DEVELOPERS SURETY AND INDEMNITY COMPANY PO Box 19725,IRVINE,CA 92623 (949)283.3300 KNOW ALL BY THESE PRESENTS that except as expressly limited,DEVELOPERS SURETY AND INDEMNITY COMPANY,does hereby make,constitute and appoint: ***David B. Shick*** as its true and lawful Attorney(s)-in-Fact,to make,execute,deliver and acknowledge,for and on behalf of said corporation,as surety,bonds,undertakings and contracts of suretyship giving and granting unto said Attomey(s)-in-Fact full power and authority to do and to perform every act necessary,requisite ar proper to be done in connection therewith as each of said corporation could do,but reserving to each of said corporation ful power of substitution and revocation,and all of the acts of said Attorney(s)-in-Fact,pursuant to these presents,are hereby ratified and confirmed. This Power of Attorney is granted and is signed by facsimile under and by authority of the following resolution adopted by the Board of Directors of DEVELOPERS SURETY AND INDEMNITY COMPANY,effective as of January 1st,2008. RESOLVED,that a combination of any two of the Chairman of the Board,the President,any Executive Vice-President,Senior Vice-President or Vice-President of the corporation be,and that each of them hereby Is,authorized to execute this Power of Attorney,qualifying the attorney(s)named in the Power of Attorney to execute,on behalf of the corporation,bonds,undertakings and contracts of suretyship;and that the Secretary or any Assistant Secretary of the corporation be,and each of them hereby is,authorized to attest the execution of any such Power of Attorney; RESOLVED,FURTHER,that the signatures of such officers may be affixed to any such Power of Attorney or to any certificate relating thereto by facsimile,and any such Power of Attorney or certificate bearing such facsimile signatures shall be valid and binding upon the corporation when so affixed and in the future with respect to any bond,undertaking or contract of suretyship to which it is attached. IN WITNESS WHEREOF,DEVELOPERS SURETY AND INDEMNITY COMPANY has caused these presents to be signed by its officers and attested by its Secretary or Assistant Secretary this 6th day of Feburary,2017. 44141 ir Daniel You'ng,Senior Vice-President • wr 1936 i`c By: Mark Lansdon,Vice-President .. „o'•�•••• A notary public or other officer completing this certificate verifies only the Identity of the individual who signed the document to which this certificate is attached,and not the truthfulness,accuracy,or validity of that document, State of California County of Orange On February 6,2017 before me, ._.._.___..._._._ Lucille(ay pond,_. tY Pubuic Ocb personally appeared Daniel Your ond Mark Lanat§itt Namftf l r>f Pz es s4 who proved to me on the basis of satisfactory evidence to be the person(s)whose name(s)is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capadty(ies),and that by his/her/their signature(s)on the instrument the person(s),or the entity upon behalf of LUCILLE which the person(s)acted,executed the instrument, WL Commission 0 2011915 NotaryPublic-CaliforniaI certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is Orange Countytrue and correct. £'°'' Coram, it Oct 13 20131�. C WITNESS my hand and official seal. Place Notary Seal Above Signature Lucd Fpey end,Notary Public CERTIFICATE The undersigned,as Secretary or Assistant Secretary of DEVELOPERS SURETY AND INDEMNITY COMPANY or INDEMNITY COMPANY OF CALIFORNIA,does hereby certify that the foregoing Power of Attorney remains in full force and has not been revoked and,furthermore,that the provisions of the r solutions of the respective Boards of Directors of said corporations set forth in the Power of Attorney are in force as of the date of this Certificate. q.......e. This Certificate is executed in the City of Irvine,California,this 24th day of January , 2013 j`;0y ar,o......... I.j 4 1936 :x= By.�_ _ t CassiieJ. rrisford Assistant S r cry 'c::$ ?gcrfow!f r` +e.r...•o" ATS-1004(02/17) 1iE Upon notification that its Bid has been awarded,the Successful Bidder will execute the Agreement form attached to the Bidding Documents within ten (10) calendar days and deliver the Surety Bond or Bonds and Insurance Certificates as required by the Contract Documents. The bid security attached is to become the property of the Owner in the event the Agreement, Insurance Certificates and Bonds are not executed and delivered to Owner within the time above set forth, as liquidated damages, for the delay and additional expense to the Owner, it being recognized that,since time is of the essence,Owner will suffer financial loss if the Successful Bidder fails to execute and deliver to Owner the required Agreement, Insurance Certificates and Bonds within the required time period. In the event of such failure, the total amount of Owner's damages, will be difficult, if not impossible, to definitely ascertain and quantify. It is hereby agreed that it is appropriate and fair that Owner receive liquidated damages from the Successful.Bidder in the event it fails to execute and deliver the Agreement, Insurance Certificates, and Bonds as required hereunder. The Successful Bidder hereby expressly waives and relinquishes any right which it may have to seek to characterize the above noted liquidated damages as a penalty, which the parties agree represents a fair and reasonable estimate of Owner's actual damages at the time of bidding if the Successful.Bidder fails to execute and deliver the Agreement, Insurance Certificates,and Bonds in a timely manner. Upon receipt of the signed and approved agreement and Purchase Order, the undersigned proposes to commence work at the site within five (5) calendar days from the commencement date stipulated in the written Notice to Proceed unless the Project Manager, in writing, subsequently notifies the Contractor of a modified (later) commencement date. The undersigned further agrees to substantially complete all work covered by this Bid within one hundred and eighty (180) consecutive calendar days, computed by excluding the commencement date and including the last day of such period,and to be fully completed to the point of final acceptance by the Owner within thirty (30) consecutive calendar days after Substantial Completion, computed by excluding commencement date and including the last day of such period. Respectfully Submitted: State of Florida County of Lee,_ Dale F.Hannula ,being first duly sworn on oath deposes and says that the Bidder on the above Bid is organized as indicated and that all statements herein made are made on behalf of such Bidder and that this deponent is authorized to make them. Dale F. Hannula Hannula Landscaping And Irrigation Inc. „ also deposes and says that it has examined and carefully prepared its Bid from the Bidding Documents,including the Contract Drawings and Specifications and has checked the same in detail before submitting this Bid;that the statements contained herein are true and correct. (a)Corporation The Bidder is a corporation organized and existing under the laws of the State of _Florida_, which operates under the legal name of Ilannula Landscaping And Irrigation,Inc.,and the full names of its officers are as follows: President Dale F.Hannula Secretary Dale F.Hannula Treasurer Dale F.Hannula Manager Damon Himmel The _President,Dale F.Hannula is authorized to sign construction bids and contracts for the company by action of its Board of Directors taken January 1752018 , a certified copy of which is hereto attached (strike out this last sentence if not applicable). (b)Co-Partnership The Bidder is a co-partnership consisting of individual partners whose full names are as follows: The co-partnership does business under the legal name of: 1 lE (c)Individual The Bidder is an individual whose full name is and if operating under a trade name,said trade name is Complete for information contained in(a)Corporation,(b)Co-Partnership or(c)Individual from previous page. DAT5 Janu I 201 8 Ar Hannula Landscaping And Irrigation,Inc. Legal Entity tit,/ f BY: Dale F.Hannula Wit Name of 1.,*t•I'yp •41 4%.--,dem17,14,-,- Witnes Signature President itis STATE OF Florida COUNTY OF Lee The foregoing instrument was acknowledged before me this 31st day of January 2018, by Dale F. Hannula,as President of Harmula Landscaping And Irrigation,Inc.,a Florida corporation, on behalf of the corporation. He/she is personally known to me or has produced as identification and did(did n 441; oath My Commission Expires: lioael aimp (Signature of Notary). RENNAME: A ot: EI (Legibly Printed) ; MY C• SMON#GG084023 (AFFIX OFFI L eAPIRES January 23.20;1 Notary Public,State of k rti&N. vjCommission No.: Q a Clio LI q 1 lE State of Florida Department of State I certify from the records of this office that HANNULA LANDSCAPING AND IRRIGATION, INC. is a corporation organized under the laws of the State of Florida, filed on December 8, 1992. The document number of this corporation is P92000010592. I further certify that said corporation has paid all fees due this office through December 31, 2018, that its most recent annual report/uniform business report was filed on January 17,2018, and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee,the Capital,this the Seventeenth day of January, 2018 ‘•Ati% (1. '444k <4r5f., • ,,,,`ML el • #"0" Secretary of State Tracking Number:CC2098310334 To authenticate this certificate,visit the following site,enter this number,and then follow the instructions displayed. https://servieea.nunbiz.org/Filings/CertifieateOfStatus/CertifieateAuthentieatmn 1 lE ... ........... BIDDERS CHECKLIST IMPORTANT: Please read carefully,sign in the spaces indicated and return with your Bid. Bidder should check off each of the following items as the necessary action is completed: 1. The Bid has been signed. 2. The Bid prices offered have been reviewed. 3. The price extensions and totals have been checked. 4. Any required drawings,descriptive literature,etc.have been included. 5. Any delivery information required is included. 6. Immigration Affidavit completed and the company's E-Verify profile page or memorandum of understanding 7. Certificate of Authority to Conduct Business in State of Florida and the County's Substitute W9 8. If required,the amount of Bid bond has been checked,and the Bid bond or cashier's check has been included. 9. Any addenda have been signed and included. 10. Ail attached forms have been completed,reviewed,and signed where necessary by an authorized personnel. 11. The Bid will be uploaded in time to be received no later than the specified opening date and time,otherwise the Bid cannot be considered. Bidder Name Hannula Landscaping And Irrigation, Inc. resident, January 31,2018 Signature&Title Date 11E EXHIBIT A-3: CONTRACTOR'S KEY PERSONNEL ASSIGNED TO THE PROJECT Name Personnel Category Damon Himmel Construction Superintendent Dale Hannula Project Manager 10 Construction Services Agreement:Revised 022018 ....., ii,;rj&:1,., P;::£t t 1 1E I,,, i -L ::;263[1. p .. ( PROSURE GROUP ir ,,,,,.,...;),-3,-.... 1,,,,,,,..) az, :..,,,,vbv.i ti`.a ,...s ,.. r3: This is the front page of the performance/payment bond issued in compliance with Florida Statute Chapter 255.05 THE PROVISIONS AND LIMITATIONS OF SECTION 255.05 FLORIDA STATUTES, INCLUDING BUT NOT LIMITED TO THE NOTICE AND TIME LIMITATIONS IN SECTIONS 255.05(2)AND 255.05(10),ARE INCORPORATED IN THIS BOND BY REFERENCE Bond Number: 60127416 Surety in which bond's written: Capitol Indemnity Corporation Local Address: 1600 Aspen Commons Middleton,WI 53705 Local Phone Number: (800)475-4450 Contractor/Principal Name: Hannula Landscaping and Irrigation, Inc. Address: 7050 Pennsylvania Street, Fort Myers, FL 33912 Phone: (239)992-2210 Owner of Property/Contracting Entity: Collier County Board of County Commissioners Address: 3299 Tamiami Trail East, Naples, FL 34112 Phone: (239)252-8097 Contract Number: IFB#18-7276 Immokalee Road (Collier Blvd.to Wilson Blvd.) Project Name: Landscape& Irrigation Project Address: Immokalee Road, Naples, FL. Project Description: Landscaping, Irrigation, Sodding This bond has been furnished to comply with the requirements of F.S.A. 255.05. This bond is hereby amended such that all provisions and limitations, including conditions, motive and time limitation of F.S.A. 255.05 are incorporated herein by reference.Any provisions of this bond which conflicts with or purports to grant broader or more expanded coverage in excess of the minimum requirements of the applicable statute shall be deemed herefrom. This bond is a statutory bond, not a common law bond. This is the front page of the bond regardless of preprinted numbers on the other pages issued in compliance with F.S.A. 255.05 SURETY BONDS 1 <{;, s I :;4'C. >i .., C".lite , ES( "<,. I _ '.( _,., .� (i's 1 '?�,€- 111`.> ;�� ••,,,v f t �isi '�� �€;� � �'.;,. ¢�.s��:.�.;rr • �'£'33�'`.`.r2�,�� ,f..;�� , 1 IE 's T 1: j BOND le-127a Bond No. 60127416 Contract No, 18-7276 KNOW ALL MEN BY THESE PRESENTS. That Hgpnu1a,_,Landscaping an4 ltrigatio , as Principal, and Capitol Indemnity Corporation , as Surety, located at 1600 Aspen Commons, M iddleton2Wl 53705 (Business Address)are held and firmly bound to1 ie Cly B,,q.C.C. as Obligee In the SUM Of OneMillion Five Hundred Twelve Thousand Two Hundred Seventy Four&87/10($1.512,274,87 )for the pant whereof we bind turves,our heirs,executors, personal representatives,successors and assigns,jointly and severally. WHEREAS,Principal has entered into a contract dated as of the day of 20 , with Obligee for Immo) lee Road Lan scape&jrrieation in I F B# 18-7276 accordance a with drawings and specifications, which contract is incorporated by reference end made a part hereof,and is referred to herein as the Contract. THE CONDITION OF THIS BOND Is that if Principal. • Promptly makes payment to all claimants as defined In Section 285.05(1), Florida Statutes, supplying Principal with labor,materials or supplies, used directly or indirectly by Prindpal in the { prosecution of the work provided for in the Contract,then this bond is void; otherwise ft remains in full force. Any changes In or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes dog not affect Sureties obligation under this Bond. The provisions of this bond are subject to the time limitations of Sedion 285.05(2). In no event wit/the Surety be liable In the aggregate to claimants for more than the penal sum of this Payment Bond,regardless of the number of sults that may be filed by claimants. IN WITNESS WHEREOF, the above parties have executed this instrument this day of 20 ,the none oeach party being affixed and these presort duly alined by its u representative,pursuant to authority of its governing body. Yl oisstission se 4ces Agren s enL FOAted 02201 a 1 lE Signed,sealed and delivered in the presence of: / _____Ii 1PRINCIPAL V;/ "1 & Hannula Landscaping and 1rrigatior Inc. 1 ♦ - A _ r.+r.9II r'. BY: .. W, . es as to P cipal NAME: _,1241_4_,fdt ........_ ITS: . i STATE OF Fib ill CID-- CUNTY CF \.p e The foregoing in was acknowledged before this day of_..i _,I,L g by 'b ....1141 as ,eo s it.r.•41 of - ... a � corporation, on behaV of the • potation.He/she is .,-••• - Iy kn•' to me(3R has produced as identification and did(did not)take an oaf . —''---- • Commission 1 Exptrea. 1/03/..)-/ .ib. fi° I ,i, RENEE REHBEIN (Signature of Notary) ,� MY COMMISSION M GC•084828 NAME' Piz.,3.e.r RI-Jai -i '7 EXPIRES January 23,2011 (Legibly Printed) (AFFIX OFFICIAL SEAL) Notary Public,State ofcn �.� Commission No.: 6,6,�(G„ 9„ .4;),., ATTEST: SURETY: cAait In (Printed Name) 1600 Aspen Commons Middleton WI 53 5 (Business Address (Authorized Signature) _ ._ to Surety (Printed Name) UN`s' 12 C0netructIon$eMces Agreement Rmhee4 02201 1 1E ,! /7 OR As Attorney Fact&Licensed FLL Resident (Attach Power of Attorney)Agent#A241176 ..-..�..; &ta...,..-1 --.2.—...,.—..,— avid B.S ' .. _.. , Witriesses d Name) 7217 Benjamin Road Tampa,FL 33634 (Business Address) ($13)243-1110 (Telephone a Number) STATE OF , ,,,- COUNTY OF Hilliorough The foregoing instrument was acknowledged before me this qday of larch ! 20 18 , by II. ' ,' as Attorney-in-Fact of Capitol Indemnity Corporation Surety, on behalf of Surety. NeiShe Is personally- to me OR has proaiced N/A as tionwand who did(did not)take an oattr r My Commission Expires: C\'. , V l\' `i\ (90 re) Name: i Whal (tekibtY Noted) (AFFIX OFFICIAL SEAL) Notary Public,Stats:F.�.2,�.. r Commission No.: j : ��� , Danielle Whalen `�'• "` COMMISSION 0 FF184425 � ;x EXPIRES:December 18,2018 'pk' . www.AARONNOTteer.COet ��nnt�` t3 Consuut:ton Sink /Agreement:Revised pmt® 1 1 111-727$ Bond No.60127416 Contract No. t8-TZ75 KNOW ALL MEN BY THESE PRESENTS: That Hannula Landscaping and Irrigation,Inc. . as Principal, and c gjjgl„Inde itv orpor to ion,,, as Surety, located at 1600 Aspen Commons Middleton,WI 53705 (Business Address) are held and firmly bound to Collier County Board of Count'Commissioners , as Obligee in the sum of One Million Five Hundred Twelve Thousand Two Hundred Seventy Four and 87/100 U.S. Dollars-- (01,51;.274,57 )for the payment whereof we bond ourselves,our heirs,executors,personal reprerttaftvee,successors and assigns,jointly and severally WHETtEAS, Principal has entered into a contract dated es of the day of 20 with Obligee for Immokalee Road(Collier Blvd.to Wilson Blvd)Landscape&Irrigation; IFB#18-7276 in accordance with drawings and specifications, which contract is incorporated by reference end made a part hereof,and Is referred to herein as the Contract. THE CONDITION OF THIS BOND is that If Principal: 1. Performs the Contract at the times and in the manner prescribed in the Contract:and 2. Pays Obligee any and all losses,damages,costs and attorneys'fees that Obligee sustains because of any default by PrIndpal under the Contract, including, but not limited to, all delay damages,whether liquidated or actual,incurred by Obligee;and 3. Performs the guarantee of all work and materials furnished under the Contract for the time specified in the Contract,then this bond Is void;otherwise it remains In full force. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect Sureties obligation under this Bond. The Surety,for value received,hereby stipulates and agrees that no changes,extensions of time, alterations or additions to the terms of the Contract or other work to be performed hereunder,or the specifications referred to therein shall in anywise affect its obligations under this bond, and it does hereby waive notice of any such changes,extensions of time,alterations or additions to the terms of the Contract or to work or to the specifications. This instrument shell be construed in all respects as a common law bond. It Is expressly underertood that the time melsions and statute of limitations under Section 255.115, Florida Statutes,shed!not apply to this bond. In no event wiN the Surety be liable in the aggregate to Obligee for more than the penal sum of this Performance Bond regardless of the number of suits that may be filed by Obligee. IN WITNESS WHEREOF, the above parties have executed this Instrument this day of ,20 , the name of each party being affixed and these preseres duty signed by its undersigned representative,pursuant to authority of Its governing body. l4 conation services Agreement:Revised 022018 1 lE Signed,Sealed and delivered in ese�nce of PRINCIPAL J / (.% L f Limo Hspnula Lanan�l t�Ips,_ r asses as to Principal ANAME: evie. F i tl Ns: MAN — STATE OF \.. � COUNTY OF ._. The foregoing instrument was adcnaw!e.4,, before me ttnt .L day of c'-ct I , 2A I°c� ,. by _ T., _..a _ as ...f.,, a (\k of .01 i. �►.. - . rs , a (fig, t at n,an, et Date Is personal,, own otOR has produceid v _ 4. as Identification and+did(did not) , =an oath. Aft F _; r., ii'""'" ;; RMNl�II N NB IN (Slgr=+ -) ""'r." g :`; MY COMMISSION 0 00084928Nem >�. p 1, ' ,. EXPIRES January 23,2021 (Legit*Printed) (AFFIX OFFICIAL SEAL) Notary Public,SOCA of: L) Commission No.:(,,,r2 c1,' T 445 15 CorwttudiOn agruttesAgreenuglir F t'd 0220119 1 lE ATTEST: SURETY: Luba 1 e (Printed Name) 1 lvtisIdelton,WI (Business Acidness) dne ) (Authorized Signature) VYArtesses as to Surety (Printed Name) As Attorney In act&Licen ed F L Resident A l (Attach Power of me)Agent#A241176 David B.Shick Wit (Printed Mime) 7217 Benjamin Road Tampa FL 33634 (Business Address) ) 813243-1110 (Telephone Number) STATE OF FL COUNTY OF b l The foregoing insturnent was acknowledged before me taus 22nd day of March 20 18 ,by Davjd •B.S k ,as Attorney in-Fact Of Capitol Indemnity Corporation ,a WI corporate Seely,On bOhili,of Surety. HeIShe is personally known to me OR has produced N/A as kientfloakkr and whodiAidt4 not4 take an oath. My Commission Expires \ `.r (4/ik Name: i i• I- A - (Legrbiy Printed) (AFFIX OFFICIAL SEAL) Notary Public, Comion No.: \ ' �.�.. AAt sir." Danielle Whalen COMMISSION # Ff184425 EXPIRES:December 18,2018 to e . ARONNOTARY.COM ,somas veementrimmedp s i lE EXHIBIT B-3: INSURCE REQUIREMENTS The Contractor shall at its own expense, carry and maintain insurance coverage from responsible companies duly authorized to do business in the State of Florida as set forth in EXHIBIT B of this solicitation. The Contractor shall procure and maintain property insurance upon the entire project, if required, to the full insurable value of the scope of work. The County and the Contractor waive against each other and the County's separate Contractors, Contractors, Design Consultant, Subcontractors, agents and employees of each and all of them, all damages covered by property insurance provided herein,except such rights as they may have to the proceeds of such insurance. The Contractor and County shall,where appropriate, require similar waivers of subrogation from the County's separate Contractors, Design Consultants and Subcontractors and shall require each of them to include similar waivers in their contracts. Collier County shall be responsible for purchasing and maintaining its own liability insurance. Certificates issued as a result of the award of this solicitation must identify "For any and all work performed on behalf of Collier County", or, the specific solicitation number/contract number and title. The General Liability Policy provided by Contractor to meet the requirements of this solicitation shall name Collier County, Florida, as an additional insured as to the operations of Contractor under this solicitation and shall contain a severability of interests provisions. The Certificate Holder shall be named as Collier County Board of County Commissioners, OR, Board of County Commissioners in Collier County, OR Collier County Government, OR Collier County. The Certificates of Insurance must state the Contract Number, or Project Number, or specific Project description, or must read: For any and all work performed on behalf of Collier County. The amounts and types of insurance coverage shall conform to the minimum requirements set forth in EXHIBIT B with the use of Insurance Services Office (ISO) forms and endorsements or their equivalents. If Contractor has any self-insured retentions or deductibles under any of the below listed minimum required coverage, Contractor must identify on the Certificate of Insurance the nature and amount of such self- insured retentions or deductibles and provide satisfactory evidence of financial responsibility for such obligations. All self-insured retentions or deductibles will be Contractor's sole responsibility. Coverages shall be maintained without interruption from the date of commencement of the Work until the date of completion and acceptance of the scope of work by the County or as specified in this solicitation,whichever is longer. The Contractor and/or its insurance carrier shall provide thirty (30) days written notice to the County of policy cancellation or non-renewal on the part of the insurance carrier or the Contractor. The Contractor shall also notify the County, in a like manner, within twenty-four (24) hours after receipt, of any notices of expiration, cancellation, non-renewal or material change in coverage or limits received by Contractor from its insurer and nothing contained herein shall relieve Contractor of this requirement to provide notice. In the event of a reduction in the aggregate limit of any policy to be provided by Contractor hereunder, Contractor shall immediately take steps to have the aggregate limit reinstated to the full extent permitted under such policy. 17 Construction Services Agreement:Revised 022018 1 IE Should at any time the Contractor not maintain the insurance coverage required herein, the County may terminate the Agreement or at its sole discretion shall be authorized to purchase such coverage and charge the Contractor for such coverage purchased. If Contractor fails to reimburse the County for such costs within thirty (30) days after demand, the County has the right to offset these costs from any amount due Contractor under this Agreement or any other agreement between the County and Contractor. The County shall be under no obligation to purchase such insurance, nor shall it be responsible for the coverages purchased or the insurance company or companies used. The decision of the County to purchase such insurance coverage shall in no way be construed to be a waiver of any of its rights under the Contract Documents. If the initial or any subsequently issued Certificate of Insurance expires prior to the completion of the scope of work,the Contractor shall furnish to the County renewal or replacement Certificate(s) of Insurance not later than ten (10) calendar days after the expiration date on the certificate. Failure of the Contractor to provide the County with such renewal certificate(s)shall be considered justification for the County to terminate any and all contracts. • 18 Construction Services Agreement:Revised 022018 1IE Collier County Florida Insurance and o Requirements Insurance/Bond Type Required Limits 1. ►.(Worker's Compensation Statutory Limits of Florida Statutes, Chapter 440 and all Federal Government ent Statutory Limits and Requirements Evidence of Workers' t ontpeusatior eov owe cit a Certificate of F:xentpti'n issued by the State of Florida is re.-aired. 1'ntities that are filmed as Sole Propnekaships shalt not be required to pro%ide,i wool of eNrmpuon. :\n appheuticm ft-Pr exemption can be of+ta kted online at ? f �P �„� _. �r E I° 2. ►,1 Employer's Liability $_1,000,000 single limit per occurrence 3. ®Commercial General Bodily Injury and Property Damage Liability(Occurrence Form) patterned after the current $_1,000,000 single limit per occurrence, $2,000,000 aggregate for Bodily Injury ISO form Liability and Property Damage Liability. This shall include Premises and Operations; Independent Contractors; Products and Completed Operations and Contractual Liability. 4. i Indemnification To the maximum extent permitted by Florida law,the ContractorNendor shall defend, indemnify and hold harmless Collier County,its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys'fees and paralegals'fees,to the extent caused by the negligence,recklessness, or intentionally wrongful conduct of the Contractor/Vendor or anyone employed or utilized by the ContractorNendor in the performance of this Agreement. 5. ®Automobile Liability $_1,000,000 Each Occurrence; Bodily Injury & Property Damage, Owned/Non-owned/Hired;Automobile Included 6. ❑Other insurance as noted: ❑Watercraft $ Per Occurrence ❑United States Longshoreman's and Harborworker's Act coverage shall be maintained where applicable to the completion of the work. $ Per Occurrence ❑ Maritime Coverage (Jones Act) shall be maintained where applicable to the completion of the work. Per Occurrence ❑Aircraft Liability coverage shall be carried in limits of not less than$5,000,000 each occurrence if applicable to the completion of the Services under this Agreement. $ Per Occurrence ❑Pollution $ Per Occurrence ❑Professional Liability $ Per claim&in the aggregate ❑Project Professional Liability Per Occurrence ❑Valuable Papers Insurance S _._ Per Occurrence ❑Cyber Liability $ Per Occurrence Technology Errors&Omissions S Per Occurrence 7. ®Bid bond Shall be submitted with proposal response in the form of certified funds,cashiers'check or an irrevocable letter of credit,a cash bond posted with the County Clerk,or proposal 19 Construction Services Agreement:Revised 022018 11E bond in a sum equal to 5%of the cost proposal.All checks shall be made payable to the Collier County Board of County Commissioners on a bank or trust company located in the State of Florida and insured by the Federal Deposit Insurance Corporation. 8. ®Performance and For projects in excess of$200,000,bonds shall be submitted with the executed contract Payment Bonds by Proposers receiving award,and written for 100%of the Contract award amount,the cost borne by the Proposer receiving an award.The Performance and Payment Bonds shall be underwritten by a surety authorized to do business in the State of Florida and otherwise acceptable to Owner;provided,however,the surety shall be rated as"A-"or better as to general policy holders rating and Class V or higher rating as to financial size category and the amount required shall not exceed 5%of the reported policy holders' surplus,all as reported in the most current Best Key Rating Guide,published by A.M. Best Company,Inc.of 75 Fulton Street,New York,New York 10038. 9. ® Vendor shall ensure that all subcontractors comply with the same insurance requirements that he is required to meet. The same Vendor shall provide County with certificates of insurance meeting the required insurance provisions. 10. 1:1 Collier County must be named as "ADDITIONAL INSURED" on the Insurance Certificate for Commercial General Liability where required.This insurance shall be primary and non-contributory with respect to any other insurance maintained by,or available for the benefit of,the Additional Insured and the Vendor's policy shall be endorsed accordingly. 11. t1 The Certificate Holder shall be named as Collier County Board of County Commissioners, OR, Board of County Commissioners in Collier County,OR Collier County Government,OR Collier County. The Certificates of Insurance must state the Contract Number,or Project Number,or specific Project description,or must read: For any and all work performed on behalf of Collier County. 12. ® Thirty(30)Days Cancellation Notice required. 12/18/17-GG We understand the insurance requirements of these specifications and that the evidence of insurability may be required within five(5) days of the award of this solicitation. Name of Firm c7 rvMK J« L..4,v,i5 ,.._p &.,.Wl,?.'e.b ,f o rvi' Date Ft;*rza 4� ,,,1f,,,)9 i g Contractor Signature v. '... •. 1,2.--,,, -.. Print Name 1+.1 e— . "R ok tvN ut.{ Insurance Agency 1C,,vto 1. (" ..ttvwAi 6{xIt t,12,i ON 0 ;•f-t.,4',.,.a4c,Av11 FV4a* letrei...3°5//)-4/sal Agent Name ' S Zle.s. ._ Telephone Number a39 l 1912 20 Construction Services Agreement:Revised 022018 x r v Y v �»� ''b. .f �;v'''. f'"rr'+'".a�'�`C. �.�s'.;r ��h.v,.fi� ,�; ,. -- 'i I 3�;^frK y;• ':':1':t. 'r'1' '�'1afP•h�rp'', r�\ r��"h l44.1;Ptip1 f 1 vl,:of..vfr ! Y:�a 41§.!'.4- it .P'• f °4 ,. stub I�}Ili I �h„6�Illh ff Af, !�.1�.!�f�,I �lf I I �}Mtf I iii•fPtlh.i f 1'1h.)l I'�°}'l�ht�rr°° >i�'. rlv< „'i1 ^'} r e - } ''0ii�.�Oi• �hi'', ,.,., i ';;;*ti t 1 I 14 t l,t},{�n ry 1 f'Yf{ 9t 111 > i �, }fe Ir}It.`11.111 94:;',l'�Ole i ++++fi t Ii+l,i1.1i!„`o t i+ttfl Y�li.i,lf;4.:.,',;.:•,'t i1,'r 11„llfilr'1+it1, •111 f + �,,_�, .rt,. er ,A th'll.r...Rr trf.,,.f t. r.- rf t t{t.,,.It� ., , t, . '{, t...r� th'N r ��IJ,ttr.ntut,.__ ,unlet.: tS,r r+.r,l , Helve e,,t,P i,,+lt. ise,{. .rter �',,rnr'r,ra,l.� nu .•,'+S ,! 4) :Ott 0t t" overt}l tt i1. ort 1{y�rr' 1e9 tigCtt i if �11'C1i'ft;4.1,1 ittt*♦ :ruin ip1,I+f ,`91ftt iihttttt.i ttritf.l t/oif,,p lytf# ditto -^mtift ipiitt 1.,k t lit.'}�rtn}(,; .t0, �i(fi!(l1 -131 3't ltftLL�tlitni All IlI dl;11041trau Qlttlik inulol ii,slifi :t it t.until► ttil3tLaiultlttk Ultitlliftlitllig1111Hul 1)i1111T 11ffltltl ittlillt ftl31+t-? '-'. . �; .-fir— _..� r 4.. 1 CAPITOL INDEMNITY CORPORATION 6 0127 416 l : 1 i;,.. r =E POWER ATTORNEY ,1,-:-,,,,----...,,,,,♦ /1 - :.'1.L.,-----:::'.,),),:.; to '„4 ,1 kies KNOW AL1 MEN I3Y .FHESE,PRESENTS,That the CAPITOL INDEMNITY CORPORATION,a corporation of the State of Wisconsin,having dr .i, its principal ,ltl<es in d> Cit,. r7, NIltl{licion Wisconsin does make,constitute and appoint ,..t rrc�` c12,‘w DAVID B SHICK;REBECCA STANTON E. Iits uuc.anif L,n,esti;an n.. I,,i-tai-tai i.to make.execute,seal and,1, . t !,:.!t surety,and:as its art and deed,any all ll hoed un;i: ,J",`.r -� s 4 and c<>ntriact•,if sure; ,)v ided that no bond or undert thin_:_ - >Irp executed under this authority shall exceed in am.tint if ii•.1 p.".+';;;?;': ::":!'',::! I : ::::':::?:".••7:,4! ALL WRITTEN INSTRUMENTS IN AN AMOUNT NOT TO EXCEED:$20,000,000 F s '� z ' This Paso of attorney r arani.:,I and is signed and sealed by I.!csinnie under and by the ituthority of the following Restitution adopted by the Board Of 1 o �'� Directors of C' .PI'FOI.INDFMNII'Y CORPORATION at a meeting dilly tatted and held on the 8th day ot huwary,2(102, � _ L+. • -RFSC)LVI:I) that ttu I't sident Executive Vice President.Vice President,Secretary or Treasurer,acting individually of otherwise,be tool they hereby -' x ar granted the paver and authofization to appoint by a Power of Attorne>,'for the purposes only of executing and attesting bonds;utd.undettal.rngs,'iind • •= other isritin ,>bligateny in the mature thereof.one or more restIiirit v ice-presidents,'assistant secietarics and auornty(st-in-fust,eaclvtippointee to have = � ,` the powers and duties usual to such offices to the business of this company:the signature of such officers and seal of the Company may he affixed to any s ; such power of attorney or to any certificate relating thereto by facsimile.and any such power of attorney or certificate heating such facsimile signatures f :..;'.:. .. ..... i f,;:. or facsimile seal shall be valid and binding upon the Company,and any such power so executed and certified by facsimile signatures and facsimile seal ..0� :1 ' • shall be valid and binding upon the Company in the future with respect to any bond or undertaking or other writing ohlisatory in the nature thereof to .+! stitch it is attached,Any such appointment may be revoked.for cause,or v,ithout•carise,-by riny of said officers,at any thele" tt .e; • In connection with Obligations ire favor of the Florida Department of Transportation only,it is agreed that the power and authority hereb' given to the ,z a, - Attonte'-in Fact includes any and Al consents for the release of retained percentages and/or final estimates on engineering and construction&intracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Depaoment of Transportation :.......:::e..4., s +• ,,,,k making payment of the final estimate to the Contractor and/or its assignee.shall not relieve this surety company of any of its obligations under its bond. r :v *w In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Nr;. ass "' " Attorney-in F tcf camtot be modified or revoked unless prior written pgrsc?nal notice of such intent has been given to the Commissioner-Department of �2 ,,r Highways iif the Edhrmouwealth'of Kentucky at least thirty 130)days prior to the modtfic.rtivn or revocation. • • = r. „ .....x.: IN WITNESS WI3HRFOF:.the'CAPITOL INDEMNITY CORPORATION has caused these presents to be signed by its officer Undersigned and its ri'' i r • �t'2 corporate seal to he hereto affixed duly attested,this 3rd day of May,2017 :.w+..;l • .0..0.:44' Attest: .i ,, CAPITOL iNDEMNCCY"CORPORATION fiat Ri /l h i=Q pAW 7V V� itt„.,+ + ,, ,-pPFGRAr4 Yr r Z. "fes`.: 4., :+ j ,lobe F R cputski •_ '' — _ ,t - idrjyt;,4 I� '�„r. t ,-+ Vice President, I'reasutet &CFO SF ? ! of 3 1�J7 Stephen I Sells ~r : CEO Presidentt . i Ur+ ltAhs0. '' ° 1 Butane Al Broadbent !!I "b ides , h ssrt ant Si ret ` Secretary iiz S all O 1 SS.F WISCONSIN e..s f` � ..�l <�rri NTS'OF DANE ) , 1 On the,rd day of MA4aay.2017 hcfore me personally came Stephen J.Sills,to me known,who being by me duly sworn,did itepose and s.ty:that ho resides i 4 s't`'J!1 it the County of New York.State of New York:that he is President of CAPITOL iNDENINiT'Y CORPORATION.the corp,iration described in and lige.„:;:::?:;::,:. which txecuted the above instrument;that he knows the seal of the said corporation:that the seal affixed to said instrument is such corporate seal;that it 1z 'N:;',..;;.1..;,10-_,•.,1„iwas so affixed by order of the Board of Directors of said corporation and that he signed his name thereto by like order. il+;�+;:... z _..�� 1 M ,� O ilk 4T��n�GFI�, - ..S2,.,-e+,. t ` r� y QgtA a Das J.Rtgeie „d S"t \I l OF WISCONSIN 5 ','F s Notary Public.Dane Co.,WI ('(ti N'Ci 01'DANEMy C'onunts,ion Is Permanent I ° Ir'4 . .:T.'",:• ''.:2.'3 1,the undersigned,duly elected to the office stated below,now the incumbent in CAPITOL INDE;MNFTY CORPORATION,a Wisconsin C nrporatiinI I _ 10 ,a' authorized to Hosts this certificate, DO HEREBY CERTIFY that the ftoregorn_ altaclied Power ot Attorney remains to full forceanel has. not l N'+ riti uk(d .and fuithelmore,that the Resolution of the Board of i)irectors ':rt rth in Pie Powir of Attorney is Hour it force. +A. Fr Sig;,cit and settled it the City of Middleton,State of Wisconsin this • __ _tdav of 2 8 •, ° 4 « j S-f.AI = Case COL*, 1t-4: t' - Antonio Cu' a I �+1 I General Counsel.1 rec Pr. tt ,i ICI,,,r', e N 1 1 Af_11:) UNLESS t i5tN l U(IN t t 1 I Ut t � a~� • 1 ♦ r a fAC H.ttRt')i'+11)WITH A RED SERI AI_NI,Nllt� I?IN TM" i'!lIT1 R I t hili I II 'Z , F1, i1 I a' �A I .'I at I s ru INS t i 1 s RNINtt I IIt ti�'tii N i l"t a afiS tlUC ;NIT NT CALL L sora- 1 � � L -t�.-.11�i, ,, I tut i w• as ._....__. -►1 f -^ r'{y�a�1tTI?li. 411f1!7}..tlfitgg tfttillyy ��., ,j{}it, [FIf/��....IS'i711.',1{17f{�'tg1li'att •,u:r ; '& 1 11. {117 ..RPtt l �, 7t tITU.-.._I i-�..�._ ,I.,?.c.tutu(fir. ntil1lNyi'rtitnf 11,# ni \iter t•:et�I t llfnir ttni}f=tifrui. llrttf 1'1,i�.yry�1Nt +in.a....Nt1N'i*'t 111 Ila V: r 11 Q:yp-..111 1 l... Myren ilfl ,� A t,yf.t4t.et t11t t .;{foil ?Hip :Iirf„ ''if144,1 r,rnl, .{i.,q> AU ,1 II,9,1 ({1c �.1 i7,f t,44 ti t it n t 7ie7l t 1 l +.;414 1.4 ,%to A.,14; ,. 9 1+ ;. +4+,t•,I $ , + . t1 r } 4 4 1, �141{rn 111.{,a tusk/it 1111 4 444:,i41. 1,1'i # yy WON gq ( `l 1 '...'•••• �h,ti �4',': }I",',V ,v's ilii 1 �1 hl /lith iii + 7 ',ti+f T il,.t>T ifliit T li l,,A�1+hT t+tid,t+t ,- °:: �}! �o>., °"�f.ti '.4T4' �'°A I,s .p�,: .,air::;.}�rr J ;J b,+ 0 0 4 +:Y".,�1";��et,ll:{'air:'.t t4a ��i> •¢s� +'ani a'�i e r `v• ♦r• '`+v :S"v .� � v °r +fs + .. :I:- • .ii , :I++ .t.•0 4:• a °.. :: . , .,t•- r.1h te.e. ;.t, t;.. ♦.I. VJ%%• 1 lE ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS:That the ZURICH AMERICAN INSURANCE COMPANY,a corporation of the State of New York,the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY,a corporation of the State of Maryland,and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Maryland (herein collectively called the "Companies"), by MICHAEL BOND,Vice President, in pursuance of authority granted by Article V, Section 8, of the By-Laws of said Companies,which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute,and appoint Mark C.BUNDY,Tammy A.WARD,Terri K.STRAWHAND,Daniel J.GRYGO and Kathryn SNELL,all of Virginia Beach,Virginia, EACH its true and lawful agent and Attorney-in-Fact,to make, execute, seal and deliver,for,and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents,shall be as binding upon said Companies,as fully and amply,to all intents and purposes,as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills,Maryland.,and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland.,in their own proper persons. The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8,of the By-Laws of said Companies,and is now in force. IN WITNESS WHEREOF,the said Vice-President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND,this 26th day of June,A.D.2017. ATTEST: ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND Apcouty% 1,0.0 fSEAL..Ir 7 9�IttM •y 'u i i i o 796Bfc Wnl * Secretary Vice President Michael McKibben Michael Bond State of MarylandFOR YOUR PROTECTION, County of Baltimore LOOK FOR THE ZURICH WATERMARK On this 26th day of June,A.D.2017,before the subscriber,a Notary Public of the State of Maryland,duly commissioned and qualified,MICHAEL BOND,Vice President,and MICHAEL MCKIBBEN,Secretary,of the Companies,to me personally known to be the individuals and officers described in and who executed the preceding instrument,and acknowledged the execution of same,and being by me duly sworn,deposeth and saith,that he/she is the said officer of the Company aforesaid,and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies,and that the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporations. IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed my Official Seal the day and year first above written. 97t6LA,e,;,10 to, �if(1111�``` Constance A.Dunn,Notary Public My Commission Expires:July 9,2019 POA-F 176-3814A • -1. if EXTRACT FROM BY-LAWS OF THE COMPANIES "Article V,Section 8,Attorneys-in-Fact. The Chief Executive Officer,the President,or any Executive Vice President or Vice President may, by written instrument under the attested corporate seal, appoint attorneys-in-fact with authority to execute bonds, policies, recognizances, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorize any officer or any such attorney-in-fact to affix the corporate seal thereto;and may with or without cause modify of revoke any such appointment or authority at any time." CERTIFICATE I, the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the foregoing Power of Attorney is still in full force and effect on the date of this certificate;and I do further certify that Article V, Section 8,of the By-Laws of the Companies is still in force. This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duly called and held on the 15th day of December 1998. RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary and the Seal of the Company may be affixed by facsimile on any Power of Attorney...Any such Power or any certificate thereof bearing such facsimile signature and seal shall be valid and binding on the Company." This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of May, 1994, and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the 10th day of May, 1990. RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vice-President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter,wherever appearing upon a certified copy of any power of attorney issued by the Company,shall be valid and binding upon the Company with the same force and effect as though manually affixed. AN TESTIMONY WHEREOF,WClHEREOF,I have here nto subscribed my name and affixed the corporate seals of the said Companies, this Clay of ! rC/1 ,20 /Y. lb 4 . _9,41068..f�ei «rw *7 6.4.0:xLt.e° i. 7 David McVicker,Vice President TO REPORT A CLAIM WITH REGARD TO A SURETY BOND,PLEASE SUBMIT ALL REQUIRED INFORMATION TO: Zurich American Insurance Co. Attn: Surety Claims 1299 Zurich Way Schaumburg,IL 60196-1056 l iE EXHIBIT C: RELEASE AND AFFIDAVIT FORM COUNTY OF (COLLIER) STATE OF (FLORIDA) Before me,the undersigned authority, personally appeared who after being duly sworn, deposes and says: (1) In accordance with the Contract Documents and in consideration of $ to be received, ("Contractor") releases and waives for itself and it's subcontractors, material-men, successors and assigns, all claims demands, damages, costs and expenses, whether in contract or in tort, against the Board of County Commissioners of Collier County, Florida, relating in any way to the performance of the Agreement between Contractor and Owner, dated ,20 for the period from to . This partial waiver and release is conditioned upon payment of the consideration described above. It is not effective until said payment is received in paid funds. (2) Contractor certifies for itself and its subcontractors, material-men, successors and assigns, that all charges for labor, materials, supplies, lands, licenses and other expenses for which Owner might be sued or for which a lien or a demand against any payment bond might be filed,shall be fully satisfied and paid upon Owner's payment to Contractor. (3) Contractor agrees to indemnify,defend and save harmless Owner from all demands or suits,actions,claims of liens or other charges filed or asserted against the Owner arising out of the performance by Contractor of the Work covered by this Release and Affidavit. (4) This Release and Affidavit is given in connection with Contractor's [monthly/final] Application for Payment No. CONTRACTOR BY: Witness ITS: President DATE: Witness [Corporate Seal] STATE OF COUNTY OF The foregoing instrument was acknowledged before me this day of 20 , by , as of , a corporation, on behalf of the corporation. He/she is personally known to me or has produced as identification and did (did not)take an oath. My Commission Expires: (Signature of Notary) NAME: (Legibly Printed) Notary Public, State of (AFFIX OFFICIAL SEAL) Commissioner No.: 21 Construction Services Agreement:Revised 022018 1lE EXHIBIT D FORM OF CONTRACT APPLICATION FOR PAYMENT Collier County Board of County Commissioners(the OWNER)or Collier County Water-Sewer Owner's Project Bid No. Manager's Name: _ County's Division Name _ Project No. Submitted by Contractor Application Date: Representative: Name Contractor's Name& Payment Application No. Address: Original Contract Time: Original Contract Price: $ Revised Contract Time: Total Change Orders to Date: $ Revised Contract Amount: $ Total Value of Work Completed& $ Stored to Date: Retainage @10% $ Retainage @ 10%through [Insert $ through [Insert Date] date] Retainage @ % $ Less Retainage $ after[Insert date] Total Earned Less Retainage $ Less previous payment(s) Percent Work Completed % AMOUNT DUE THIS $ to Date: APPLICATION: Percent Contract Time Completed to Date: Liquidated Damages to $ Remaining Contract Balance $ Be Accrued ATTACH SCHEDULE OF VALUES AND ACCOMPANYING DOCUMENTATION TO THIS APPLICATION CONTRACTOR'S CERTIFICATION: The undersigned CONTRACTOR certifies that: (1) all previous progress payments received from OWNER on account of Work done under the Contract referred to above have been applied to discharge in full all obligations of CONTRACTOR incurred in connection with Work covered by prior Applications for Payment numbered 1 through inclusive; (2) title to all materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to OWNER at time of payment free and clear of all liens, claims, security interests and encumbrances(except such as covered by Bond acceptable to OWNER); (3)all amounts have been paid for work which previous payments were issued and received from the OWNER and that current payment is now due; and (4) CONTRACTOR has only included amounts in this Application for Payment properly due and owing and CONTRACTOR has not included within the above referenced amount any claims for unauthorized or changed Work that has not been properly approved by Owner in writing and in advance of such Work. Contractor's Name Contractor's Signature: Date: Type Title: Shall be signed by an authorized representative of the Contractor. Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is recommended by: Design Professional's Name: Signature: Date: Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is recommended by: Owner's Project Manager Name: Signature: Date: 22 Construction Services Agreement:Revised 022018 1 1E EXHIBIT D(Continued) SCHEDULE OF VALUES Project Name: Project Number: '.. Date:.. .... Period To: ITEM DESCRIPTION SCHEDULED WORK COMPLETED STORED TOTAL PERCENT BALANCE 10% _% TOTAL NUMBER VALUE MATERIALS COMPLETED COMPLETE TO FINISH RETMNAGE RETAINAGE RETAINAGE PREVIOUS APPUCATIONS THIS &STORED (reduced rate) WITHHELD THRU DATE SINCE DATE PERIOD TO DATE TOTALS *Explanation for the two columns under Previous Applications:The Thru Date is where you will place all information until the contract is complete unless a release or reduction of retainage issue cot into play. If this happens,all information up to the date of the%change in retainage is placed in the Thru Date column. Information after that date is placed in the Since Date column.This states what has happened since the change in retainage. 23 Construction Services Agreement:Revised 022018 l iE Exhibit D (Continued) Stored Materials Record Formula:A+ B-C - D= E A B C D E Invoice Previously Received Previously Installed Balance To Date Description Supplier Number Received This Period Installed This Period Install 24 Construction Services Agreement:Revised 022018 1 1E EXHIBIT E: CHANGE ORDER An electronic data entry form may be found at: http://bccsp01/SiteDirectory/ASD/Purchasinci/Formsl/Forms/Default.aspx Change Order Form Contract*: Change* Purchase Orders: Project*: Co ntracto r(Fi cm Name: Project Name: Project Manager Name Department: Original Contract'Work Crder Amount aigiral BCC Appir oral Date;Agenda Item* Current BCC Apcxoved Amount Last DCC Arochoval Date,Agenda Item# Current Conk actrW ark Order Amount SAP Contract Expiration Date(Master) Dollar Amount of the Change IVIOl Tots(Change from a igins I Amount Revised ContractVI olio:Order Total S 0.00 tVD IWO! Change from Current BCC Approved Amount Cumulative Changes 5 0.00 00 IWO! Change fromCurrent Amount Completion Date, Description of the Tasks)Change,and Rationale for the Change Notice to Proceel OriginalLast Approved Revised Date Date Completion Da= Date ttrioudes its Varga *of Days Added Select Tasks 0 Add new task(s) CI Delete task(s) D Change task{s) 0 Other(see dect):: Provide a response to the following:1.}detai led and specific exp lanationhatio rale of the requested change(s)to the taskrs)and I or the arid itio nal days added(if requested!:2.)why this change was not included in the original contract:and,3.)describe the impact if this change is not processed. Attach additional mformation from the Design Profess ionial indior Contractor 6 needed, Prepared by: Dale: (Project Manager Name and Department) AccarAance of this Change Ordershaill consimne a modircation to contract I work order identified above and will be subject to attire sam e terms and conditions as contained in tee contract work order indicated above,as faityas if tire same were stated in this isimiptince The f me r4,tarry,totheCorrtracl sheconstitute a full and final settlement of any and ail claims of the Contractor I Vendor.,Cons ultart Design Profes sional arising out of or related to the change set forth herein,including claims for impact and delay costs. Accepted by: Date: (Contractor.'Vendor I Consultant.l Design Professional and Name of Flom.if project applicable) Approved by: Date: (Design Professional and Name of Finn,if prowl applicable) Approved by: Date: {Procurement Profess tonal :7;) L jj-xL,3L, Ati.dn.leosaxr 25 Construction Services Agreement: Revised 022018 iE EXHIBIT F: CERTIFICATE OF SUBSTANTIAL COMPLETION OWNER'S Project No. Design Professional's Project No. PROJECT: CONTRACTOR Contract For Contract Date This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the following specified parts thereof: To OWNER And To Substantial Completion is the state in the progress of the Work when the Work (or designated portion) is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. The Work to which this Certificate applies has been inspected by authorized representatives of OWNER, CONTRACTOR AND DESIGN PROFESSIONAL, and that Work is hereby declared to be substantially complete in accordance with the requirements of the Contract Documents on: DATE OF SUBSTANTIAL COMPLETION A tentative list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete all the Work in accordance with the Contract Documents. The items in the tentative list shall be completed or corrected by CONTRACTOR within days of the above date of Substantial Completion. The responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance, heat, utilities, insurance and warranties shall be as follows: 26 Construction Services Agreement:Revised 022018 l IE RESPONSIBILITIES: OWNER: CONTRACTOR The following documents are attached to and made a part of this Certificate: This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of CONTRACTOR'S obligation to complete the Work in accordance with the Contract Documents. Executed by Design Professional on , 20 Design Professional By: Type Name and Title CONTRACTOR accepts this Certificate of Substantial Completion on 20 CONTRACTOR By: Type Name and Title OWNER accepts this Certificate of Substantial Completion on , 20 OWNER By: Type Name and Title 27 Construction Services Agreement:Revised 022018 11E EXHIBIT G: FINAL PAYMENT CHECKLIST Bid No.: Project No.: Date: , 20 Contractor: The following items have been secured by the for the Project known as and have been reviewed and found to comply with the requirements of the Contract Documents. Original Contract Amount: Final Contract Amount: Commencement Date: Substantial Completion Time as set forth in the Agreement: Calendar Days. Actual Date of Substantial Completion: Final Completion Time as set forth in the Agreement: Calendar Days. Actual Final Completion Date: YES NO 1. All Punch List items completed on 2. Warranties and Guarantees assigned to Owner(attach to this form). 3. Effective date of General one year warranty from Contractor is: 4. 2 copies of Operation and Maintenance manuals for equipment and system submitted (list manuals in attachment to this form). 5. As-Built drawings obtained and dated: 6. Owner personnel trained on system and equipment operation. 7. Certificate of Occupancy No.: issued on (attach to this form). 8. Certificate of Substantial Completion issued on 9. Final Payment Application and Affidavits received from Contractor on: 10. Consent of Surety received on 11. Operating Department personnel notified Project is in operating phase. 12. All Spare Parts or Special Tools provided to Owner: 13. Finished Floor Elevation Certificate provided to Owner: 14. Other: If any of the above is not applicable, indicate by N/A. If NO is checked for any of the above, attach explanation. Acknowledgments: By Contractor: (Company Name) (Signature) (Typed Name&Title) By Design Professional: (Firm Name) (Signature) (Typed Name&Title) By Owner: (Department Name) (Signature) (Name&Title) 28 Construction Services Agreement:Revised 022018 1 1 E EXHIBIT H: GENERAL TERMS AND CONDITIONS 1. INTENT OF CONTRACT DOCUMENTS. 1.1 It is the intent of the Contract Documents to describe a functionally complete Project (or portion thereof) to be constructed in accordance with the Contract Documents. Any work, materials or equipment that may reasonably be inferred from the Contract Documents as being required to produce the intended result shall be supplied whether or not specifically called for. When words which have a well-known technical or trade meaning are used to describe work, materials or equipment, such words shall be interpreted in accordance with that meaning. Reference to standard specifications, manuals or codes of any technical society, organization or association or to the laws or regulations of any governmental authority having jurisdiction over the Project, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code, law or regulation in effect at the time the Work is performed, except as may be otherwise specifically stated herein. 1.2 If before or during the performance of the Work Contractor discovers a conflict, error or discrepancy in the Contract Documents, Contractor immediately shall report same to the Project Manager in writing and before proceeding with the Work affected thereby shall obtain a written interpretation or clarification from the Project Manager; said interpretation or clarification from the Project Manager may require Contractor to consult directly with Design Professional or some other third party, as directed by Project Manager. Contractor shall take field measurements and verify field conditions and shall carefully compare such field measurements and conditions and other information known to Contractor with the Contract Documents before commencing any portion of the Work. 1.3 Drawings are intended to show general arrangements, design and extent of Work and are not intended to serve as shop drawings. Specifications are separated into divisions for convenience of reference only and shall not be interpreted as establishing divisions for the Work, trades, subcontracts, or extent of any part of the Work. In the event of a discrepancy between or among the drawings, specifications or other Contract Document provisions, Contractor shall be required to comply with the provision which is the more restrictive or stringent requirement upon the Contractor, as determined by the Project Manager. Unless otherwise specifically mentioned, all anchors, bolts, screws, fittings, fillers, hardware, accessories, trim and other parts required in connection with any portion of the Work to make a complete, serviceable, finished and first quality installation shall be furnished and installed as part of the Work, whether or not called for by the Contract Documents. 2. INVESTIGATION AND UTILITIES. 2.1 Subject to Section 2.3 below, Contractor shall have the sole responsibility of satisfying itself concerning the nature and location of the Work and the general and local conditions, and particularly, but without limitation, with respect to the following: those affecting transportation, access, disposal, handling and storage of materials; availability and quality of labor; water and electric power, availability and condition of roads; work area; living facilities; climatic conditions and seasons; physical conditions at the work-site and the project area as a whole; topography and ground surface conditions; nature and quantity of the surface materials to be encountered; subsurface conditions; equipment and facilities needed preliminary to and during performance of the Work; and all other costs associated with such performance. The failure of Contractor to acquaint itself with any applicable conditions shall not relieve Contractor from any of its responsibilities to perform under the Contract Documents, nor shall it be considered the basis for any claim for additional time or compensation. 29 Construction Services Agreement:Revised 022018 w. 1 iE 2.2 Contractor shall locate all existing roadways, railways, drainage facilities and utility services above, upon, or under the Project site, said roadways, railways, drainage facilities and utilities being referred to in this Sub-Section 2.2 as the"Utilities". Contractor shall contact the owners of all Utilities to determine the necessity for relocating or temporarily interrupting any Utilities during the construction of the Project. Contractor shall schedule and coordinate its Work around any such relocation or temporary service interruption. Contractor shall be responsible for properly shoring, supporting and protecting all Utilities at all times during the course of the Work. The Contractor is responsible for coordinating all other utility work so as to not interfere with the prosecution of the Work (except those utilities to be coordinated by the Owner as may be expressly described elsewhere in the Contract Documents). 2.3 Notwithstanding anything in the Contract Documents to the contrary, if conditions are encountered at the Project site which are (i) subsurface or otherwise concealed physical conditions which differ materially from those indicated in the Contract Documents or (ii) unknown physical conditions of an unusual nature, which differ materially from those ordinarily found to exist and generally recognized as inherent in construction activities of the character provided for in the Contract Documents, and which reasonably should not have been discovered by Contractor as part of its scope of site investigative services required pursuant to the terms of the Contract Documents, then Contractor shall provide Owner with prompt written notice thereof before conditions are disturbed and in no event later than three(3) calendar days after first observance of such conditions. Owner and Design Professional shall promptly investigate such conditions and, if they differ materially and cause an increase or decrease in Contractor's cost of, or time required for, performance of any part of the Work, Owner will acknowledge and agree to an equitable adjustment to Contractor's compensation or time for performance, or both, for such Work. If Owner determines that the conditions at the site are not materially different from those indicated in the Contract Documents or not of an unusual nature or should have been discovered by Contractor as part of its investigative services, and that no change in the terms of the Agreement is justified, Owner shall so notify Contractor in writing, stating its reasons. Claims by Contractor in opposition to such determination by Owner must be made within seven (7) calendar days after Contractor's receipt of Owner's written determination notice. If Owner and Contractor cannot agree on an adjustment to Contractor's cost or time of performance, the dispute resolution procedure set forth in the Contract Documents shall be complied with by the parties. 3. SCHEDULE. 3.1 The Contractor, within ten (10) calendar days after receipt of the Notice of Award, shall prepare and submit to Project Manager, for their review and approval, a progress schedule for the Project (herein "Progress Schedule"). The Progress Schedule shall relate to all Work required by the Contract Documents, and shall utilize the Critical Path method of scheduling and shall provide for expeditious and practicable execution of the Work within the Contract Time. The Progress Schedule shall indicate the dates for starting and completing the various stages of the Work. 3.2 The Progress Schedule shall be updated monthly by the Contractor. All monthly updates to the Progress Schedule shall be subject to the Project Manager's review and approval. Contractor shall submit the updates to the Progress Schedule with its monthly Applications for Payment noted below. The Project Manager's review and approval of the submitted Progress Schedule updates shall be a condition precedent to the Owner's obligation to pay Contractor. 3.3 All work under this Agreement shall be performed in accordance with the requirements of all Collier County Noise Ordinances then in effect. Unless otherwise specified, work will generally be 30 Construction Services Agreement:Revised 022018 l iE limited to the hours of 7 a.m. to 7 p.m., Monday through Saturday. No work shall be performed outside the specified hours without the prior approval of the Project Manager. 4. PROGRESS PAYMENTS. 4.1 Prior to submitting its first monthly Application for Payment, Contractor shall submit to Project Manager, for their review and approval, a schedule of values based upon the Contract Price, listing the major elements of the Work and the dollar value for each element. After its approval by the Project Manager, this schedule of values shall be used as the basis for the Contractor's monthly Applications for Payment. This schedule shall be updated and submitted each month along with a completed copy of the Application for Payment form signed by the Contractor's authorized representative and attached to the Agreement as Exhibit D. 4.2 Prior to submitting its first monthly Application for Payment, Contractor shall provide to the Project Manager the list of its Subcontractors and materialmen submitted with its Bid showing the work and materials involved and the dollar amount of each subcontract and purchase order. Contractor acknowledges and agrees that any modifications to the list of Subcontractors submitted with Contractor's Bid and any subsequently identified Subcontractors are subject to Owner's prior written approval. The first Application for Payment shall be submitted no earlier than thirty(30) days after the Commencement Date. Notwithstanding anything herein to the contrary, if approved by Owner in its sole discretion, Contractor may submit its invoice for any required Payment and Performance Bonds prior to the first Application of Payment provided that Contractor has furnished Owner certified copies of the receipts evidencing the premium paid by Contractor for the bonds. 4.3 Unless expressly approved by Owner in advance and in writing, said approval at Owner's sole discretion, Owner is not required to make any payment for materials or equipment that have not been incorporated into the Project. If payment is requested on the basis of materials and equipment not incorporated into the Project, but delivered and suitably stored at the site or at another location, and such payment and storage have been agreed to by Owner in writing,the Application for Payment also shall be accompanied by a bill of sale, invoice or other documentation warranting that the Owner has received the materials and equipment free and clear of all liens, charges, security interests and encumbrances, together with evidence that the materials and equipment are covered by appropriate property insurance and other arrangements to protect Owner's interest therein, all of which shall be subject to the Owner's satisfaction. Thereafter, with each Application for Payment, Contractor also shall complete and submit to Owner as part of its Application for Payment, the Stored Materials Record attached hereto and made a part hereof as Exhibit D. 4.4 Contractor shall submit its monthly Application for Payment to the Project Manager or his or her designee, as directed by Owner (which designee may include the Design Professional). After the date of each Application for Payment is stamped as received and within the timeframes set forth in Section 218.735 F.S., the Project Manager, or Design Professional, shall either: (1) Indicate its approval of the requested payment; (2) indicate its approval of only a portion of the requested payment, stating in writing its reasons therefore; or (3) return the Application for Payment to the Contractor indicating, in writing, the reason for refusing to approve payment. Payments of proper invoices in the amounts approved shall be processed and paid in accordance with Section 218.735, F.S. and the administrative procedures established by the County's Procurement Services Division and the Clerk of Court's Finance Department respectively. 4.5 In the event of a total denial by Owner and return of the Application for Payment by the Project Manager, the Contractor may make the necessary corrections and re-submit the Application for Payment. The Owner shall, within ten (10) business days after the Application for Payment is 31 Construction Services Agreement:Revised 022018 l iE stamped and received and after Project Manager approval of an Application for Payment, pay the Contractor the amounts so approved. 4.6 Owner shall retain ten percent(10%) of the gross amount of each monthly payment request or ten percent(10%) of the portion thereof approved by the Project Manager for payment, whichever is less. Such sum shall be accumulated and not released to Contractor until final payment is due unless otherwise agreed to by the Owner in accordance with Florida Statute 255.078. The Project Manager shall have the discretion to establish, in writing, a schedule to periodically reduce the percentage of cumulative retainage held throughout the course of the Project schedule. Owner shall reduce the amount of the retainage withheld on each payment request subsequent to fifty percent (50%)completion subject to the guidelines set forth in Florida Statute 255.078 and as set forth in the Owner's procurement ordinance and policies. 4.7 Monthly payments to Contractor shall in no way imply approval or acceptance of Contractor's Work. 4.8 Each Application for Payment, subsequent to the first pay application, shall be accompanied by a Release and Affidavit, in the form attached as Exhibit C, acknowledging Contractor's receipt of payment in full for all materials, labor, equipment and other bills that are then due and payable by Owner with respect to the current Application for Payment. Further, to the extent directed by Owner and in Owner's sole discretion, Contractor shall also submit a Release and Affidavit from each Subcontractor, sub-subcontractor, or supplier in the form attached as Exhibit C acknowledging that each Subcontractor, sub-subcontractor or supplier has been paid in full through the previous month's Application for Payment. The Owner shall not be required to make payment until and unless these affidavits are furnished by Contractor. 4.9 Contractor agrees and understands that funding limitations exist and that the expenditure of funds must be spread over the duration of the Project at regular intervals based on the Contract Amount and Progress Schedule. Accordingly, prior to submitting its first monthly Application for Payment, Contractor shall prepare and submit for Project Manager's review and approval, a detailed Project Funding Schedule, which shall be updated as necessary and approved by Owner to reflect approved adjustments to the Contract Amount and Contract Time. No voluntary acceleration or early completion of the Work shall modify the time of payments to Contractor as set forth in the approved Project Funding Schedule. 4.10 Notwithstanding anything in the Contract Documents to the contrary, Contractor acknowledges and agrees that in the event of a dispute concerning payments for Work performed under this Agreement, Contractor shall continue to perform the Work required of it under this Agreement pending resolution of the dispute provided that Owner continues to pay Contractor all amounts that Owner does not dispute are due and payable. 4.11 Payments will be made for services furnished, delivered, and accepted, upon receipt and approval of invoices submitted on the date of services or within six (6) months after completion of contract. Any untimely submission of invoices beyond the specified deadline period is subject to non- payment under the legal doctrine of "laches" as untimely submitted. Time shall be deemed of the essence with respect to the timely submission of invoices under this agreement. 4.12 The County may, at its discretion, use VISA/MASTER card credit network as a payment vehicle for goods and/or services purchased as a part of this contract. The County may not accept any additional surcharges (credit card transaction fees) as a result of using the County's credit card for transactions relating to this solicitation 32 Construction Services Agreement:Revised 022018 1 lE 5. PAYMENTS WITHHELD. 5.1 The Project Manager may decline to approve any Application for Payment, or portions thereof, because of subsequently discovered evidence or subsequent inspections that reveal non- compliance with the Contract Documents. The Project Manager may nullify the whole or any part of any approval for payment previously issued and Owner may withhold any payments otherwise due Contractor under this Agreement or any other agreement between Owner and Contractor, to such extent as may be necessary in the Owner's opinion to protect it from loss because of: (a) Defective Work not remedied; (b) third party claims filed or reasonable evidence indicating probable filing of such claims; (c) failure of Contractor to make payment properly to subcontractors or for labor, materials or equipment; (d) reasonable doubt that the Work can be completed for the unpaid balance of the Contract Amount; (e) reasonable indication that the Work will not be completed within the Contract Time; (f) unsatisfactory prosecution of the Work by the Contractor; or (g) any other material breach of the Contract Documents by Contractor. 5.2 If any conditions described in 5.1. are not remedied or removed, Owner may, after three (3) days written notice, rectify the same at Contractor's expense. Provided however, in the event of an emergency, Owner shall not be required to provide Contractor any written notice prior to rectifying the situation at Contractor's expense. Owner also may offset against any sums due Contractor the amount of any liquidated or non-liquidated obligations of Contractor to Owner, whether relating to or arising out of this Agreement or any other agreement between Contractor and Owner. 5.3 In instances where the successful contractor may owe debts (including, but not limited to taxes or other fees) to Collier County and the contractor has not satisfied nor made arrangement to satisfy these debts, the County reserves the right to off-set the amount owed to the County by applying the amount owed to the vendor or contractor for services performed of for materials delivered in association with a contract. 6. FINAL PAYMENT. 6.1 Owner shall make final payment to Contractor in accordance with Section 218.735, F.S. and the administrative procedures established by the County's Procurement Services Division and the Clerk of Court's Finance Department after the Work is finally inspected and accepted by Project Manager as set forth with Section 20.1 herein, provided that Contractor first, and as an explicit condition precedent to the accrual of Contractor's right to final payment, shall have furnished Owner with a properly executed and notarized copy of the Release and Affidavit attached as Exhibit C, as well as, a duly executed copy of the Surety's consent to final payment and such other documentation that may be required by the Contract Documents and the Owner. Prior to release of final payment and final retainage, the Contractor's Representative and the Project Manager shall jointly complete the Final Payment Checklist, a representative copy of which is attached to this Agreement as Exhibit G. 6.2 Contractor's acceptance of final payment shall constitute a full waiver of any and all claims by Contractor against Owner arising out of this Agreement or otherwise relating to the Project, except those previously made in writing in accordance with the requirements of the Contract Documents and identified by Contractor as unsettled in its final Application for Payment. Neither the acceptance of the Work nor payment by Owner shall be deemed to be a waiver of Owner's right to enforce any obligations of Contractor hereunder or to the recovery of damages for defective Work not discovered by the Design Professional or Project Manager at the time of final inspection. 33 Construction Services Agreement:Revised 022018 1 l 7. SUBMITTALS AND SUBSTITUTIONS. 7.1 Contractor shall carefully examine the Contract Documents for all requirements for approval of materials to be submitted such as shop drawings, data, test results, schedules and samples. Contractor shall submit all such materials at its own expense and in such form as required by the Contract Documents in sufficient time to prevent any delay in the delivery of such materials and the installation thereof. 7.2 Whenever materials or equipment are specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular supplier, the naming of the item is intended to establish the type, function and quality required. Unless the name is followed by words indicating that no substitution is permitted, materials or equipment of other suppliers may be accepted by Owner if sufficient information is submitted by Contractor to allow the Owner to determine that the material or equipment proposed is equivalent or equal to that named. Requests for review of substitute items of material and equipment will not be accepted by Owner from anyone other than Contractor and all such requests must be submitted by Contractor to Project Manager within thirty (30) calendar days after Notice of Award is received by Contractor, unless otherwise mutually agreed in writing by Owner and Contractor. 7.3 If Contractor wishes to furnish or use a substitute item of material or equipment, Contractor shall make application to the Project Manager for acceptance thereof, certifying that the proposed substitute shall adequately perform the functions and achieve the results called for by the general design, be similar and of equal substance to that specified and be suited to the same use as that specified. The application shall state that the evaluation and acceptance of the proposed substitute will not prejudice Contractor's achievement of substantial completion on time, whether or not acceptance of the substitute for use in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with Owner for the Project) to adapt the design to the proposed substitute and whether or not incorporation or use by the substitute in connection with the Work is subject to payment of any license fee or royalty. All variations of the proposed substitute from that specified will be identified in the application and available maintenance, repair and replacement service shall be indicated. The application also shall contain an itemized estimate of all costs that will result directly or indirectly from acceptance of such substitute, including costs for redesign and claims of other contractors affected by the resulting change, all of which shall be considered by the Project Manager in evaluating the proposed substitute. The Project Manager may require Contractor to furnish at Contractor's expense additional data about the proposed substitute. 7.4 If a specific means, method, technique, sequence or procedure of construction is indicated in or required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, sequence, technique or procedure of construction acceptable to the Project Manager, if Contractor submits sufficient information to allow the Project Manager to determine that the substitute proposed is equivalent to that indicated or required by the Contract Documents. The procedures for submission to and review by the Project Manager shall be the same as those provided herein for substitute materials and equipment. 7.5 The Project Manager shall be allowed a reasonable time within which to evaluate each proposed substitute and, if need be, to consult with the Design Professional. No substitute will be ordered, installed or utilized without the Project Manager's prior written acceptance which shall be evidenced by a Change Order, a Work Directive Change, a Field Order or an approved Shop Drawing. The Owner may require Contractor to furnish at Contractor's expense a special performance guarantee or other surety with respect to any substitute. The Project Manager will 34 Construction Services Agreement:Revised 022018 1 lE record time required by the Project Manager and the Project Manager's consultants in evaluating substitutions proposed by Contractor and making changes in the Contract Documents occasioned thereby. Whether or not the Owner accepts a proposed substitute, Contractor shall reimburse Owner for the charges of the Design Professional and the Design Professional's consultants for evaluating each proposed substitute. 8. DAILY REPORTS, SIGNED AND SEALED AS-BUILTS AND MEETINGS. 8.1 Unless waived in writing by Owner, Contractor shall complete and submit to Project Manager on a weekly basis a daily log of the Contractor's work for the preceding week in a format approved by the Project Manager. The daily log shall document all activities of Contractor at the Project site including, but not limited to, the following: 8.1.1 Weather conditions showing the high and low temperatures during work hours, the amount of precipitation received on the Project site, and any other weather conditions which adversely affect the Work; 8.1.2 Soil conditions which adversely affect the Work; 8.1.3 The hours of operation by Contractor's and Sub-Contractor's personnel; 8.1.4 The number of Contractor's and Sub-Contractor's personnel present and working at the Project site, by subcontract and trade; 8.1.5 All equipment present at the Project site, description of equipment use and designation of time equipment was used (specifically indicating any down time); 8.1.6 Description of Work being performed at the Project site; 8.1.7 Any unusual or special occurrences at the Project site; 8.1.8 Materials received at the Project site; 8.1.9 A list of all visitors to the Project 8.1.10 Any problems that might impact either the cost or quality of the Work or the time of performance. The daily log shall not constitute nor take the place of any notice required to be given by Contractor to Owner pursuant to the Contract Documents. 8.2 Contractor shall maintain in a safe place at the Project site one record copy of the Contract Documents, including, but not limited to, all drawings, specifications, addenda, amendments, Change Orders, Work Directive Changes and Field Orders, as well as all written interpretations and clarifications issued by the Design Professional, in good order and annotated to show all changes made during construction. The annotated drawings shall be continuously updated by the Contractor throughout the prosecution of the Work to accurately reflect all field changes that are made to adapt the Work to field conditions, changes resulting from Change Orders, Work Directive Changes and Field Orders, and all concealed and buried installations of piping, conduit and utility services. All buried and concealed items, both inside and outside the Project site, shall be accurately located on the annotated drawings as to depth and in relationship to not less than two (2) permanent features 35 Construction Services Agreement:Revised 022018 1 l (e.g. interior or exterior wall faces). The annotated drawings shall be clean and all changes, corrections and dimensions shall be given in a neat and legible manner in a contrasting color. The "As-Built" record documents, together with all approved samples and a counterpart of all approved shop drawings shall be available to the Project Manager or Design Professional for reference. Upon completion of the Work and as a condition precedent to Contractor's entitlement to final payment, these "As-Built" record documents, samples and shop drawings shall be delivered to Project Manager by Contractor for Owner. 8.3 Contractor shall keep all records and supporting documentation, which concern or relate to the Work hereunder for a minimum of five (5) years from the date of termination of this Agreement or the date the Project is completed or such longer period as may be required by law, whichever is later, pursuant to Florida Public Records Law Chapter 119 and comply with specifically those contractual requirements in 119.0701(2)(a)-(b) as follows: IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT: Communication and Customer Relations Division 3299 Tamiami Trail East, Suite 102 Naples, FL 34112-5746 Telephone: (239) 252-8383 The Contractor must specifically comply with the Florida Pubic Records Law to: 1. Keep and maintain public records required by the public agency to perform the service. 2. Upon request from the public agency's custodian of public records, provide the public agency with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in this chapter or as otherwise provided by law. 3. Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to the public agency. 4. Upon completion of the contract, transfer, at no cost, to the public agency all public records in possession of the Contractor or keep and maintain public records required by the public agency to perform the service. If the Contractor transfers all public records to the public agency upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the public agency, upon request from the public agency's custodian of public records, in a format that is compatible with the information technology systems of the public agency. 9. CONTRACT TIME AND TIME EXTENSIONS. 9.1 Contractor shall diligently pursue the completion of the Work and coordinate the Work being done on the Project by its subcontractors and material-men, as well as coordinating its Work with all 36 Construction Services Agreement:Revised 022018 1 lE work of others at the Project Site, so that its Work or the work of others shall not be delayed or impaired by any act or omission by Contractor. Contractor shall be solely responsible for all construction means, methods, techniques, sequences, and procedures, as well as coordination of all portions of the Work under the Contract Documents, and the coordination of Owner's suppliers and contractors as set forth in Paragraph 12.2. herein. 9.2 Should Contractor be obstructed or delayed in the prosecution of or completion of the Work as a result of unforeseeable causes beyond the control of Contractor, and not due to its fault or neglect, including but not restricted to acts of Nature or of the public enemy, acts of government, fires, floods, epidemics, quarantine regulation, strikes or lockouts, Contractor shall notify the Owner in writing within forty-eight (48) hours after the commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which Contractor may have had to request a time extension. 9.3 No interruption, interference, inefficiency, suspension or delay in the commencement or progress of the Work from any cause whatever,including those for which Owner may be responsible, in whole or in part, shall relieve Contractor of its duty to perform or give rise to any right to damages or additional compensation from Owner. Contractor expressly acknowledges and agrees that it shall receive no damages for delay. Contractor's sole remedy, if any, against Owner will be the right to seek an extension to the Contract Time; provided, however, the granting of any such time extension shall not be a condition precedent to the aforementioned "No Damage For Delay" provision. This paragraph shall expressly apply to claims for early completion, as well as to claims based on late completion. 9.4 In no event shall any approval by Owner authorizing Contractor to continue performing Work under this Agreement or any payment issued by Owner to Contractor be deemed a waiver of any right or claim Owner may have against Contractor for delay damages hereunder. 10. CHANGES IN THE WORK. 10.1 Owner shall have the right at any time during the progress of the Work to increase or decrease the Work. Promptly after being notified of a change, Contractor shall submit an itemized estimate of any cost or time increases or savings it foresees as a result of the change. Except in an emergency endangering life or property, or as expressly set forth herein, no addition or changes to the Work shall be made except upon written order of Owner, and Owner shall not be liable to the Contractor for any increased compensation without such written order. No officer, employee or agent of Owner is authorized to direct any extra or changed work orally. Any alleged changes must be approved by Owner in writing prior to starting such items. Owner will not be responsible for the costs of any changes commenced without Owner's express prior written approval. Failure to obtain such prior written approval for any changes will be deemed: (i) a waiver of any claim by Contractor for such items and (ii) an admission by Contractor that such items are in fact not a change but rather are part of the Work required of Contractor hereunder. 10.2 A Change Order, in the form attached as Exhibit E to this Agreement, shall be issued and executed promptly after an agreement is reached between Contractor and Owner concerning the requested changes. Contractor shall promptly perform changes authorized by duly executed Change Orders. The Contract Amount and Contract Time shall be adjusted in the Change Order in the manner as Owner and Contractor shall mutually agree. 10.3 If Owner and Contractor are unable to agree on a Change Order for the requested change, Contractor shall, nevertheless, promptly perform the change as directed by Owner in a written Work 37 Construction Services Agreement:Revised 022018 1 iE Directive Change. In that event, the Contract Amount and Contract Time shall be adjusted as directed by Owner. If Contractor disagrees with the Owner's adjustment determination, Contractor must make a claim pursuant to Section 11 of these General Conditions or else be deemed to have waived any claim on this matter it might otherwise have had. 10.4 In the event a requested change results in an increase to the Contract Amount, the amount of the increase shall be limited to the Contractor's reasonable direct labor and material costs and reasonable actual equipment costs as a result of the change (including allowance for labor burden costs) plus a maximum ten percent (10%) markup for all overhead and profit. In the event such change Work is performed by a Subcontractor, a maximum ten percent (10%) markup for all overhead and profit for all Subcontractors' and sub-subcontractors' direct labor and material costs and actual equipment costs shall be permitted, with a maximum five percent (5%) markup thereon by the Contractor for all of its overhead and profit, for a total maximum markup of fifteen percent (15%). All compensation due Contractor and any Subcontractor or sub-subcontractor for field and home office overhead is included in the markups noted above. Contractor's and Sub-Contractor's bond costs associated with any change order shall be included in the overhead and profit expenses and shall not be paid as a separate line item. No markup shall be placed on sales tax, shipping or subcontractor markup. 10.5 Owner shall have the right to conduct an audit of Contractor's books and records to verify the accuracy of the Contractor's claim with respect to Contractor's costs associated with any Change Order or Work Directive Change. 10.6 The Project Manager shall have authority to order minor changes in the Work not involving an adjustment to the Contract Amount or an extension to the Contract Time and not inconsistent with the intent of the Contract Documents. Such changes may be effected by Field Order or by other written order. Such changes shall be binding on the Contractor. 10.7 Any modifications to this Contract shall be in compliance with the County procurement ordinance and policies and Administrative Procedures in effect at the time such modifications are authorized. 11. CLAIMS AND DISPUTES. 11.1 Claim is a demand or assertion by one of the parties seeking an adjustment or interpretation of the terms of the Contract Documents, payment of money, extension of time or other relief with respect to the terms of the Contract Documents. The term "Claim" also includes other disputes and matters in question between Owner and Contractor arising out of or relating to the Contract Documents. The responsibility to substantiate a Claim shall rest with the party making the Claim. 11.2 Claims by the Contractor shall be made in writing to the Project Manager within forty-eight (48) hours from when the Contractor knew or should have known of the event giving rise to such Claim or else the Contractor shall be deemed to have waived the Claim. Written supporting data shall be submitted to the Project Manager within fifteen (15) calendar days after the occurrence of the event, unless the Owner grants additional time in writing, or else the Contractor shall be deemed to have waived the Claim. All Claims shall be priced in accordance with the provisions of Subsection 10.4. 11.3 The Contractor shall proceed diligently with its performance as directed by the Owner, regardless of any pending Oaim, action, suit or administrative proceeding, unless otherwise agreed 38 Construction Services Agreement:Revised 022018 1 IE to by the Owner in writing. Owner shall continue to make payments in accordance with the Contract Documents during the pendency of any Claim. 12. OTHER WORK. 12.1 Owner may perform other work related to the Project at the site by Owner's own forces, have other work performed by utility owners or let other direct contracts. If the fact that such other work is to be performed is not noted in the Contract Documents, written notice thereof will be given to Contractor prior to starting any such other work. If Contractor believes that such performance will involve additional expense to Contractor or require additional time, Contractor shall send written notice of that fact to Owner and Design Professional within forty-eight(48) hours of being notified of the other work. If the Contractor fails to send the above required forty-eight (48) hour notice, the Contractor will be deemed to have waived any rights it otherwise may have had to seek an extension to the Contract Time or adjustment to the Contract Amount. 12.2 Contractor shall afford each utility owner and other contractor who is a party to such a direct contract (or Owner, if Owner is performing the additional work with Owner's employees) proper and safe access to the site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such work and shall properly connect and coordinate its Work with theirs. Contractor shall do all cutting, fitting and patching of the Work that may be required to make its several parts come together properly and integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating or otherwise altering their work and will only cut or alter their work with the written consent of the Project Manager and the others whose work will be affected. The duties and responsibilities of Contractor under this paragraph are for the benefit of such utility owners and other Contractors to the extent that there are comparable provisions for the benefit of Contractor in said direct contracts between Owner and such utility owners and other contractors. 12.3 If any part of Contractor's Work depends for proper execution or results upon the work of any other contractor or utility owner (or Owner), Contractor shall inspect and promptly report to Project Manager in writing any delays, defects or deficiencies in such work that render it unavailable or unsuitable for such proper execution and results. Contractor's failure to report will constitute an acceptance of the other work as fit and proper for integration with Contractor's Work. 13. INDEMNIFICATION AND INSURANCE. 13.1 To the maximum extent permitted by Florida law, the Contractor/Vendor/Consultant shall defend, indemnify and hold harmless Collier County, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys' fees and paralegals' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the ContractorNendor/Consultant or anyone employed or utilized by the Contractor/Vendor/Consultant in the performance of this Agreement. 13.2 The duty to defend under this Article 13 is independent and separate from the duty to indemnify, and the duty to defend exists regardless of any ultimate liability of the Contractor, Owner and any indemnified party. The duty to defend arises immediately upon presentation of a claim by any party and written notice of such claim being provided to Contractor. Contractor's obligation to indemnify and defend under this Article 13 will survive the expiration or earlier termination of this Agreement until it is determined by final judgment that an action against the Owner or an indemnified party for the matter indemnified hereunder is fully and finally barred by the applicable statute of limitations. 39 Construction Services Agreement: Revised 022018 iE 13.3 Contractor shall obtain and carry, at all times during its performance under the Contract Documents, insurance of the types and in the amounts set forth in Exhibit B-3 to the Agreement. Further, the Contractor shall at all times comply with all of the terms, conditions, requirements and obligations set forth under Exhibit B-3. 14. COMPLIANCE WITH LAWS. 14.1 Contractor agrees to comply, at its own expense,with all federal, state and local laws, codes, statutes, ordinances, rules, regulations and requirements applicable to the Project, including but not limited to those dealing with taxation, worker's compensation, equal employment and safety (including, but not limited to, the Trench Safety Act, Chapter 553, Florida Statutes). If Contractor observes that the Contract Documents are at variance therewith, it shall promptly notify Project Manager in writing. To the extent any law, rule, regulation, code, statute, or ordinance requires the inclusion of certain terms in this Agreement in order for this Agreement to be enforceable, such terms shall be deemed included in this Agreement. Notwithstanding anything in the Contract Documents to the contrary, it is understood and agreed that in the event of a change in any applicable laws, ordinances, rules or regulations subsequent to the date this Agreement was executed that increases the Contractor's time or cost of performance of the Work, Contractor is entitled to a Change Order for such increases, except to the extent Contractor knew or should have known of such changes prior to the date of this Agreement. 14.2 By executing and entering into this agreement, the Contractor is formally acknowledging without exception or stipulation that it is fully responsible for complying with the provisions of the Immigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324, et seq. and regulations relating thereto, as either may be amended. Failure by the Contractor to comply with the laws referenced herein shall constitute a breach of this agreement and the County shall have the discretion to unilaterally terminate this agreement immediately. 14.3 Statutes and executive orders require employers to abide by the immigration laws of the United States and to employ only individuals who are eligible to work in the United States. The Employment Eligibility Verification System (E-Verify) operated by the Department of Homeland Security (DHS) in partnership with the Social Security Administration (SSA), provides an Internet- based means of verifying employment eligibility of workers in the United States; it is not a substitute for any other employment eligibility verification requirements. The program will be used for Collier County formal Invitations to Bid (ITB) and Request for Proposals (RFP) including professional services and construction services. Exceptions to the program: • Commodity based procurement where no services are provided. • Where the requirement for the affidavit is waived by the Board of County Commissioners Contractors/Bidders are required to enroll in the E-Verify program, and provide acceptable evidence of their enrollment, at the time of the submission of the Contractor's/bidder's proposal. Acceptable evidence consists of a copy of the properly completed E-Verify Company Profile page or a copy of the fully executed E-Verify Memorandum of Understanding for the company. Contractors are also required to provide the Collier County Procurement Services Division an executed affidavit certifying they shall comply with the E-Verify Program. The affidavit is attached to the solicitation documents. If the Bidder/Contractor does not comply with providing both the acceptable E-Verify evidence and the executed affidavit the bidder's/Contractor's proposal may be deemed non- responsive. 40 Construction Services Agreement:Revised 022018 1lE Additionally, Contractors shall require all subcontracted Contractors to use the E-Verify system for all purchases not covered under the"Exceptions to the program" clause above. For additional information regarding the Employment Eligibility Verification System (E-Verify) program visit the following website: http://www.dhs.qov/E-Verifv. It shall be the Contractor's responsibility to familiarize themselves with all rules and regulations governing this program. Contractor acknowledges, and without exception or stipulation,any firm(s) receiving an award shall be fully responsible for complying with the provisions of the Immigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324,et seq. and regulations relating thereto, as either may be amended and with the provisions contained within this affidavit. Failure by the awarded firm(s) to comply with the laws referenced herein or the provisions of this affidavit shall constitute a breach of the award agreement and the County shall have the discretion to unilaterally terminate said agreement immediately. 15. CLEANUP AND PROTECTIONS. 15.1 Contractor agrees to keep the Project site clean at all times of debris, rubbish and waste materials arising out of the Work. At the completion of the Work, Contractor shall remove all debris, rubbish and waste materials from and about the Project site, as well as all tools, appliances, construction equipment and machinery and surplus materials, and shall leave the Project site clean and ready for occupancy by Owner. 15.2 Any existing surface or subsurface improvements, including, but not limited to, pavements, curbs, sidewalks, pipes, utilities, footings, structures, trees and shrubbery, not indicated in the Contract Documents to be removed or altered, shall be protected by Contractor from damage during the prosecution of the Work. Subject to the Section 2.3 above, any such improvements so damaged shall be restored by Contractor to the condition equal to that existing at the time of Contractor's commencement of the Work. 16. ASSIGNMENT. 16.1 Contractor shall not assign this Agreement or any part thereof, without the prior consent in writing of Owner. Any attempt to assign or otherwise transfer this Agreement, or any part herein, without the Owner's consent, shall be void. If Contractor does, with approval, assign this Agreement or any part thereof, it shall require that its assignee be bound to it and to assume toward Contractor all of the obligations and responsibilities that Contractor has assumed toward Owner. 17. PERMITS, LICENSES AND TAXES. 17.1 Pursuant to Section 218.80, F.S., Owner will pay for all Collier County permits and fees, including license fees, permit fees, impact fees or inspection fees applicable to the Work through an internal budget transfer(s). Contractor is not responsible for paying for permits issued by Collier County, but Contractor is responsible for acquiring all permits. Owner may require the Contractor to deliver internal budget transfer documents to applicable Collier County agencies when the Contractor is acquiring permits. Owner will not be obligated to pay for any permits obtained by Subcontractors. 17.2 All permits, fees and licenses necessary for the prosecution of the Work which are not issued by Collier County shall be acquired and paid for by the Contractor. 41 Construction Services Agreement:Revised 022018 I IE 17.3 Contractor shall pay all sales, consumer, use and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the Work. 18. TERMINATION FOR DEFAULT. 18.1 Contractor shall be considered in material default of the Agreement and such default shall be considered cause for Owner to terminate the Agreement, in whole or in part, as further set forth in this Section, if Contractor: (1)fails to begin the Work under the Contract Documents within the time specified herein; or (2) fails to properly and timely perform the Work as directed by the Project Manager or as provided for in the approved Progress Schedule;or(3) performs the Work unsuitably or neglects or refuses to remove materials or to correct or replace such Work as may be rejected as unacceptable or unsuitable; or (4) discontinues the prosecution of the Work; or (5) fails to resume Work which has been suspended within a reasonable time after being notified to do so; or (6) becomes insolvent or is declared bankrupt, or commits any act of bankruptcy; or(7) allows any final judgment to stand against it unsatisfied for more than ten (10) days; or(8) makes an assignment for the benefit of creditors; or (9) fails to obey any applicable codes, laws, ordinances, rules or regulations with respect to the Work; or(10) materially breaches any other provision of the Contract Documents. 18.2 Owner shall notify Contractor in writing of Contractor's default(s). If Owner determines that Contractor has not remedied and cured the default(s)within seven(7)calendar days following receipt by Contractor of said written notice or such longer period of time as may be consented to by Owner in writing and in its sole discretion, then Owner, at its option, without releasing or waiving its rights and remedies against the Contractor's sureties and without prejudice to any other right or remedy it may be entitled to hereunder or by law, may terminate Contractor's right to proceed under the Agreement, in whole or in part, and take possession of all or any portion of the Work and any materials, tools, equipment, and appliances of Contractor, take assignments of any of Contractor's subcontracts and purchase orders, and complete all or any portion of Contractor's Work by whatever means, method or agency which Owner, in its sole discretion, may choose. 18.3 If Owner deems any of the foregoing remedies necessary, Contractor agrees that it shall not be entitled to receive any further payments hereunder until after the Project is completed. All moneys expended and all of the costs, losses, damages and extra expenses, including all management, administrative and other overhead and other direct and indirect expenses (including Design Professional and attorneys' fees) or damages incurred by Owner incident to such completion, shall be deducted from the Contract Amount, and if such expenditures exceed the unpaid balance of the Contract Amount, Contractor agrees to pay promptly to Owner on demand the full amount of such excess, including costs of collection, attorneys' fees (including appeals) and interest thereon at the maximum legal rate of interest until paid. If the unpaid balance of the Contract Amount exceeds all such costs, expenditures and damages incurred by the Owner to complete the Work, such excess shall be paid to the Contractor. The amount to be paid to the Contractor or Owner, as the case may be, shall be approved by the Project Manager, upon application, and this obligation for payment shall survive termination of the Agreement. 18.4 The liability of Contractor hereunder shall extend to and include the full amount of any and all sums paid, expenses and losses incurred, damages sustained, and obligations assumed by Owner in good faith under the belief that such payments or assumptions were necessary or required, in completing the Work and providing labor,materials, equipment, supplies, and other items therefore or re-letting the Work, and in settlement, discharge or compromise of any claims, demands, suits, and judgments pertaining to or arising out of the Work hereunder. 42 Construction Services Agreement:Revised 022018 1 I E 18.5 If, after notice of termination of Contractor's right to proceed pursuant to this Section, it is determined for any reason that Contractor was not in default, or that its default was excusable, or that Owner is not entitled to the remedies against Contractor provided herein, then the termination will be deemed a termination for convenience and Contractor's remedies against Owner shall be the same as and limited to those afforded Contractor under Section 19 below. 18.6 In the event(i) Owner fails to make any undisputed payment to Contractor within thirty (30) days after such payment is due or Owner otherwise persistently fails to fulfill some material obligation owed by Owner to Contractor under this Agreement, and (ii) Owner has failed to cure such default within fourteen (14) days of receiving written notice of same from Contractor, then Contractor may stop its performance under this Agreement until such default is cured, after giving Owner a second fourteen(14) days written notice of Contractor's intention to stop performance under the Agreement. If the Work is so stopped for a period of one hundred and twenty (120)consecutive days through no act or fault of the Contractor or its Subcontractors or their agents or employees or any other persons performing portions of the Work under contract with the Contractor or any Subcontractor, the Contractor may terminate this Agreement by giving written notice to Owner of Contractor's intent to terminate this Agreement. If Owner does not cure its default within fourteen (14) days after receipt of Contractor's written notice, Contractor may, upon fourteen (14) additional days' written notice to the Owner, terminate the Agreement and recover from the Owner payment for Work performed through the termination date, but in no event shall Contractor be entitled to payment for Work not performed or any other damages from Owner. 19. TERMINATION FOR CONVENIENCE AND RIGHT OF SUSPENSION. 19.1 Owner shall have the right to terminate this Agreement without cause upon seven (7) calendar days written notice to Contractor. In the event of such termination for convenience, Contractor's recovery against Owner shall be limited to that portion of the Contract Amount earned through the date of termination, together with any retainage withheld and reasonable termination expenses incurred, but Contractor shall not be entitled to any other or further recovery against Owner, including, but not limited to, damages or any anticipated profit on portions of the Work not performed. 19.2 Owner shall have the right to suspend all or any portions of the Work upon giving Contractor not less than two (2) calendar days' prior written notice of such suspension. If all or any portion of the Work is so suspended, Contractor's sole and exclusive remedy shall be to seek an extension of time to its schedule in accordance with the procedures set forth in the Contract Documents. In no event shall the Contractor be entitled to any additional compensation or damages. Provided, however, if the ordered suspension exceeds six (6) months, the Contractor shall have the right to terminate the Agreement with respect to that portion of the Work which is subject to the ordered suspension. 20. COMPLETION. 20.1 When the entire Work (or any portion thereof designated in writing by Owner) is ready for its intended use, Contractor shall notify Project Manager in writing that the entire Work (or such designated portion)is substantially complete.Within a reasonable time thereafter, Owner, Contractor and Design Professional shall make an inspection of the Work (or designated portion thereof) to determine the status of completion. If Owner, after conferring with the Design Professional, does not consider the Work (or designated portion) substantially complete, Project Manager shall notify Contractor in writing giving the reasons therefore. If Owner, after conferring with the Design Professional, considers the Work (or designated portion) substantially complete, Project Manager 43 Construction Services Agreement:Revised 022018 1E shall prepare and deliver to Contractor a Certificate of Substantial Completion which shall fix the date of Substantial Completion for the entire Work (or designated portion thereof) and include a tentative punch-list of items to be completed or corrected by Contractor before final payment. Owner shall have the right to exclude Contractor from the Work and Project site (or designated portion thereof) after the date of Substantial Completion, but Owner shall allow Contractor reasonable access to complete or correct items on the tentative punch-list. The Project Manager, shall coordinate with the Contractor the return of any surplus assets, including materials, supplies, and equipment. 20.2 Upon receipt of written certification by Contractor that the Work is completed in accordance with the Contract Documents and is ready for final inspection and acceptance, Project Manager and Design Professional will make such inspection and, if they find the Work acceptable and fully performed under the Contract Documents shall promptly approve payment, recommending that, on the basis of their observations and inspections, and the Contractor's certification that the Work has been completed in accordance with the terms and conditions of the Contract Documents, that the entire balance found to be due Contractor is due and payable. Neither the final payment nor the retainage shall become due and payable until Contractor submits: (1) Receipt of Contractor's Final Application for Payment. (2) The Release and Affidavit in the form attached as Exhibit C. (3) Consent of surety to final payment. (4) Receipt of the final payment check list. (5) If required by Owner, other data establishing payment or satisfaction of all obligations, such as receipts, releases and waivers of liens, arising out of the Contract Documents, to the extent and in such form as may be designated by Owner. Owner reserves the right to inspect the Work and make an independent determination as to the Work's acceptability, even though the Design Professional may have issued its recommendations. Unless and until the Owner is completely satisfied, neither the final payment nor the retainage shall become due and payable. 21. WARRANTY. 21.1 Contractor shall obtain and assign to Owner all express warranties given to Contractor or any subcontractors by any subcontractor or material men supplying materials, equipment or fixtures to be incorporated into the Project. Contractor warrants to Owner that any materials and equipment furnished under the Contract Documents shall be new unless otherwise specified, and that all Work shall be of good quality, free from all defects and in conformance with the Contract Documents. Contractor further warrants to Owner that all materials and equipment furnished under the Contract Documents shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with the instructions of the applicable manufacturers,fabricators, suppliers or processors except as otherwise provided for in the Contract Documents. If, within one(1) year after Substantial Completion, any Work is found to be defective or not in conformance with the Contract Documents, Contractor shall correct it promptly after receipt of written notice from Owner. Contractor shall also be responsible for and pay for replacement or repair of adjacent materials or Work which may be damaged as a result of such replacement or repair. Further, in the event of an emergency, Owner may commence to correct any defective Work, without prior notice to Contractor, at Contractor's expense. These warranties are in addition to those implied warranties to which Owner is entitled as a matter of law. 44 Construction Services Agreement:Revised 022018 1 IE 21.2 No later than 30 days prior to expiration of the warranty, the Project Manager, or another representative of the Owner, shall conduct an inspection of the warranted work to verify compliance with the requirements of the Agreement. The Contractor's Representative shall be present at the time of inspection and shall take remedial actions to correct any deficiencies noted in the inspection. Failure of the Contractor to correct the cited deficiencies shall be grounds for the Owner to disqualify the Contractor from future bid opportunities with the Owner, in addition to any other rights and remedies available to Owner. 22. TESTS AND INSPECTIONS. 22.1 Owner, Design Professional, their respective representatives, agents and employees, and governmental agencies with jurisdiction over the Project shall have access at all times to the Work, whether the Work is being performed on or off of the Project site, for their observation, inspection and testing. Contractor shall provide proper, safe conditions for such access. Contractor shall provide Project Manager with timely notice of readiness of the Work for all required inspections, tests or approvals. 22.2 If the Contract Documents or any codes, laws, ordinances, rules or regulations of any public authority having jurisdiction over the Project requires any portion of the Work to be specifically inspected, tested or approved, Contractor shall assume full responsibility therefore, pay all costs in connection therewith and furnish Project Manager the required certificates of inspection, testing or approval. All inspections, tests or approvals shall be performed in a manner and by organizations acceptable to the Project Manager. 22.3 Contractor is responsible, without reimbursement from Owner, for re-inspection fees and costs; to the extent such re-inspections are due to the fault or neglect of Contractor. 22.4 If any Work that is to be inspected,tested or approved is covered without written concurrence from the Project Manager, such work must, if requested by Project Manager, be uncovered for observation. Such uncovering shall be at Contractor's expense unless Contractor has given Project Manager timely notice of Contractor's intention to cover the same and Project Manager has not acted with reasonable promptness to respond to such notice. If any Work is covered contrary to written directions from Project Manager, such Work must, if requested by Project Manager, be uncovered for Project Manager's observation and be replaced at Contractor's sole expense. 22.5 The Owner shall charge to Contractor and may deduct from any payments due Contractor all engineering and inspection expenses incurred by Owner in connection with any overtime work. Such overtime work consisting of any work during the construction period beyond the regular eight(8) hour day and for any work performed on Saturday, Sunday or holidays. 22.6 Neither observations nor other actions by the Project Manager or Design Professional nor inspections, tests or approvals by others shall relieve Contractor from Contractor's obligations to perform the Work in accordance with the Contract Documents. 23. DEFECTIVE WORK. 23.1 Work not conforming to the requirements of the Contract Documents or any warranties made or assigned by Contractor to Owner shall be deemed defective Work. If required by Project Manager, Contractor shall as directed, either correct all defective Work, whether or not fabricated, installed or completed, or if the defective Work has been rejected by Project Manager, remove it from the site and replace it with non-defective Work. Contractor shall bear all direct, indirect and consequential 45 Construction Services Agreement:Revised 022018 11E costs of such correction or removal (including, but not limited to fees and charges of engineers, architects, attorneys and other professionals) made necessary thereby, and shall hold Owner harmless for same. 23.2 If the Project Manager considers it necessary or advisable that covered Work be observed by Design Professional or inspected or tested by others and such Work is not otherwise required to be inspected or tested, Contractor, at Project Manager's request, shall uncover, expose or otherwise make available for observation, inspection or tests as Project Manager may require, that portion of the Work in question, furnishing all necessary labor, material and equipment. If it is found that such Work is defective, Contractor shall bear all direct, indirect and consequential costs of such uncovering, exposure, observation, inspection and testing and of satisfactory reconstruction (including, but not limited to, fees and charges of engineers, architects, attorneys and other professionals), and Owner shall be entitled to an appropriate decrease in the Contract Amount. If, however, such Work is not found to be defective, Contractor shall be allowed an increase in the Contract Amount and/or an extension to the Contract Time, directly attributable to such uncovering, exposure, observation, inspection, testing and reconstruction. 23.3 If any portion of the Work is defective, or if Contractor fails to supply sufficient skilled workers, suitable materials or equipment or fails to finish or perform the Work in such a way that the completed Work will conform to the Contract Documents, Project Manager may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated. The right of Project Manager to stop the Work shall be exercised, if at all, solely for Owner's benefit and nothing herein shall be construed as obligating the Project Manager to exercise this right for the benefit of Design Engineer, Contractor, or any other person. 23.4 Should the Owner determine, at its sole opinion, it is in the Owner's best interest to accept defective Work, the Owner may do so. Contractor shall bear all direct, indirect and consequential costs attributable to the Owner's evaluation of and determination to accept defective Work. If such determination is rendered prior to final payment, a Change Order shall be executed evidencing such acceptance of such defective Work, incorporating the necessary revisions in the Contract Documents and reflecting an appropriate decrease in the Contract Amount. If the Owner accepts such defective Work after final payment, Contractor shall promptly pay Owner an appropriate amount to adequately compensate Owner for its acceptance of the defective Work. 23.5 If Contractor fails, within a reasonable time after the written notice from Project Manager, to correct defective Work or to remove and replace rejected defective Work as required by Project Manager or Owner, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any of the provisions of the Contract Documents, Owner may, after seven (7) days written notice to Contractor, correct and remedy any such deficiency. Provided, however, Owner shall not be required to give notice to Contractor in the event of an emergency. To the extent necessary to complete corrective and remedial action, Owner may exclude Contractor from any or all of the Project site, take possession of all or any part of the Work, and suspend Contractor's services related thereto, take possession of Contractor's tools, appliances, construction equipment and machinery at the Project site and incorporate in the Work all materials and equipment stored at the Project site or for which Owner has paid Contractor but which are stored elsewhere. Contractor shall allow Owner, Design Professional and their respective representatives, agents, and employees such access to the Project site as may be necessary to enable Owner to exercise the rights and remedies under this paragraph. All direct, indirect and consequential costs of Owner in exercising such rights and remedies shall be charged against Contractor, and a Change Order shall be issued, incorporating the necessary revisions to the Contract Documents, including an appropriate decrease to the Contract Amount. Such direct, indirect and consequential costs shall 46 Construction Services Agreement: Revised 022018 1lE include, but not be limited to, fees and charges of engineers, architects, attorneys and other professionals, all court costs and all costs of repair and replacement of work of others destroyed or damaged by correction, removal or replacement of Contractor's defective Work. Contractor shall not be allowed an extension of the Contract Time because of any delay in performance of the Work attributable to the exercise by Owner of Owner's rights and remedies hereunder. 24. SUPERVISION AND SUPERINTENDENTS. 24.1 Contractor shall plan, organize, supervise, schedule, monitor, direct and control the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be responsible to see that the finished Work complies accurately with the Contract Documents. Contractor shall keep on the Work at all times during its progress a competent resident superintendent, who shall be subject to Owner's approval and not be replaced without prior written notice to Project Manager except under extraordinary circumstances. The superintendent shall be employed by the Contractor and be the Contractor's representative at the Project site and shall have authority to act on behalf of Contractor. All communications given to the superintendent shall be as binding as if given to the Contractor. Owner shall have the right to direct Contractor to remove and replace its Project superintendent,with or without cause. Attached to the Agreement as Exhibit A-1 is a list identifying Contractor's Project Superintendent and all of Contractor's key personnel who are assigned to the Project; such identified personnel shall not be removed without Owner's prior written approval, and if so removed must be immediately replaced with a person acceptable to Owner. 24.2 Contractor shall have a competent superintendent on the project at all times whenever contractor's work crews, or work crews of other parties authorized by the Project Manager are engaged in any activity whatsoever associated with the Project. Should the Contractor fail to comply with the above condition, the Project Manager shall, at his discretion, deduct from the Contractor's monthly pay estimate, sufficient moneys to account for the Owner's loss of adequate project supervision, not as a penalty, but as liquidated damages, separate from the liquidated damages described in Section 5.B, for services not rendered. 25. PROTECTION OF WORK. 25.1 'Contractor shall immediately notify Project Manager and Design Professional. The Owner or Design Professional shall re-establish the benchmarks and Contractor shall be liable for all costs incurred by Owner associated therewith. 26. EMERGENCIES. 26.1 In the event of an emergency affecting the safety or protection of persons or the Work or property at the Project site or adjacent thereto, Contractor, without special instruction or authorization from Owner or Design Professional is obligated to act to prevent threatened damage, injury or loss. Contractor shall give Project Manager written notice within forty-eight (48) hours after Contractor knew or should have known of the occurrence of the emergency, if Contractor believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby. If the Project Manager determines that a change in the Contract Documents is required because of the action taken in response to an emergency, a Change Order shall be issued to document the consequences of the changes or variations. If Contractor fails to provide the forty-eight (48) hour written notice noted above, the Contractor shall be deemed to have waived any right it otherwise may have had to seek an adjustment to the Contract Amount or an extension to the Contract Time. 47 Construction Services Agreement:Revised 022018 I lE 27. USE OF PREMISES. 27.1 Contractor shall maintain all construction equipment, the storage of materials and equipment and the operations of workers to the Project site and land and areas identified in and permitted by the Contract Documents and other lands and areas permitted by law, rights of way, permits and easements, and shall not unreasonably encumber the Project site with construction equipment or other material or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or any land or areas contiguous thereto, resulting from the performance of the Work. 28. SAFETY. 28.1 Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 28.1.1 All employees on or about the project site and other persons and/or organizations who may be affected thereby; 28.1.2 All the Work and materials and equipment to be incorporated therein, whether in storage on or off the Project site; and 28.1.3 Other property on Project site or adjacent thereto, including trees, shrubs, walks, pavements, roadways, structures, utilities and any underground structures or improvements not designated for removal, relocation or replacement in the Contract Documents. 28.2 Contractor shall comply with all applicable codes, laws, ordinances, rules and regulations of any public body having jurisdiction for the safety of persons or property or to protect them from damage, injury or loss. Contractor shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of underground structures and improvements and utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation or replacement of their property. Contractor's duties and responsibilities for the safety and protection of the Work shall continue until such time as the Work is completed and final acceptance of same by Owner has occurred. All new electrical installations shall incorporate NFPA 70E Short Circuit Protective Device Coordination and Arc Flash Studies where relevant as determined by the engineer. All electrical installations shall be labeled with appropriate NFPA 70E arch flash boundary and PPE Protective labels. 28.3. Contractor shall designate a responsible representative located on a full time basis at the Project site whose duty shall be the prevention of accidents. This person shall be Contractor's superintendent unless otherwise designated in writing by Contractor to Owner. 28.4 Alcohol, drugs and all illegal substances are strictly prohibited on any Owner property. All employees of Contractor, as well as those of all subcontractors and those of any other person or entity for whom Contractor is legally liable(collectively referred to herein as "Employees"), shall not possess or be under the influence of any such substances while on any Owner property. Further, 48 Construction Services Agreement:Revised 022018 1 IE Employees shall not bring on to any Owner property any gun, rifle or other firearm, or explosives of any kind. 28.5 Contractor acknowledges that the Work may be progressing on a Project site which is located upon or adjacent to an existing Owner facility. In such event, Contractor shall comply with the following: 28.5.1 All Owner facilities are smoke free. Smoking is strictly prohibited; 28.5.2 All Employees shall be provided an identification badge by Contractor. Such identification badge must be prominently displayed on the outside of the Employees' clothing at all times. All Employees working at the Project site must log in and out with the Contractor each day; 28.5.3 Contractor shall strictly limit its operations to the designated work areas and shall not permit any Employees to enter any other portions of Owner's property without Owner's expressed prior written consent; 28.5.4 All Employees are prohibited from distributing any papers or other materials upon Owner's property, and are strictly prohibited from using any of Owner's telephones or other office equipment; 28.5.5 All Employees shall at all times comply with the OSHA regulations with respect to dress and conduct at the Project site. Further, all Employees shall comply with the dress, conduct and facility regulations issued by Owner's officials onsite, as said regulations may be changed from time to time; 28.5.6 All Employees shall enter and leave Owner's facilities only through the ingress and egress points identified in the site utilization plan approved by Owner or as otherwise designated, from time to time, by Owner in writing; 28.5.7 When requested, Contractor shall cooperate with any ongoing Owner investigation involving personal injury, economic loss or damage to Owner's facilities or personal property therein; 28.5.8 The Employees may not solicit, distribute or sell products while on Owner's property. Friends, family members or other visitors of the Employees are not permitted on Owner's property; and 28.5.9 At all times, Contractor shall adhere to Owner's safety and security regulations, and shall comply with all security requirements at Owner's facilities, as said regulations and requirements may be modified or changed by Owner from time to time. 29. PROJECT MEETINGS. Prior to the commencement of Work, the Contractor shall attend a pre-construction conference with the Project Manager, Design Professional and others as appropriate to discuss the Progress Schedule, procedures for handling shop drawings and other submittals, and for processing Applications for Payment, and to establish a working understanding among the parties as to the Work. During the prosecution of the Work,the Contractor shall attend any and all meetings convened by the Project Manager with respect to the Project, when directed to do so by Project Manager or 49 Construction Services Agreement:Revised 022018 I IE Design Professional. The Contractor shall have its subcontractors and suppliers attend all such meetings (including the pre-construction conference) as may be directed by the Project Manager. 30. VENDOR PERFORMANCE EVALUATION. Owner has implemented a Vendor Performance Evaluation System for all contracts awarded in excess of $25,000. To this end, vendors will be evaluated on their performance upon completion/termination of this Agreement. 31. MAINTENANCE OF TRAFFIC POLICY. For all projects that are conducted within a Collier County Right-of-Way, the Contractor shall provide and erect Traffic Control Devices as prescribed in the current edition of the Manual On Uniform Traffic Control Devices (MUTCD), where applicable on local roadways and as prescribed in the Florida Department of Transportation's Design Standards(DS),where applicable on state roadways. These projects shall also comply with Collier County's Maintenance of Traffic Policy, #5807, incorporated herein by reference. Copies are available through Risk Management and/or Procurement Services Division, and is available on-line at colliergov.net/purchasing. The Contractor will be responsible for obtaining copies of all required manuals, MUTCD, FDOT Roadway & Traffic Design Standards Indexes, or other related documents, so to become familiar with their requirements. Strict adherence to the requirements of the Maintenance of Traffic("MOT") policy will be enforced under this Contract. All costs associated with the Maintenance of Traffic shall be included on the line item on the bid page. If MOT is required, MOT is to be provided within ten (10) days of receipt of Notice of Award. 32. SALES TAX SAVINGS AND DIRECT PURCHASE. 32.1 Contractor shall pay all sales, consumer, use and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the Work. No markup shall be applied to sales tax. Additionally, as directed by Owner and at no additional cost to Owner, Contractor shall comply with and fully implement the sales tax savings program with respect to the Work, as set forth in section 32.2 below: 32.2 Notwithstanding anything herein to the contrary, because Owner is exempt from sales tax and may wish to generate sales tax savings for the Project, Owner reserves the right to make direct purchases of various construction materials and equipment included in the Work("Direct Purchase"). Contractor shall prepare purchase orders to vendors selected by Contractor,for execution by Owner, on forms provided by Owner. Contractor shall allow two weeks for execution of all such purchase orders by Owner. Contractor represents and warrants that it will use its best efforts to cooperate with Owner in implementing this sales tax savings program in order to maximize cost savings for the Project. Adjustments to the Contract Amount will be made by appropriate Change Orders for the amounts of each Owner Direct Purchase, plus the saved sales taxes. A Change Order shall be processed promptly after each Direct Purchase, or group of similar or related Direct Purchases, unless otherwise mutually agreed upon between Owner and Contractor. With respect to all Direct Purchases by Owner, Contractor shall remain responsible for coordinating, ordering, inspecting, accepting delivery, storing, handling, installing, warranting and quality control for all Direct Purchases. Notwithstanding anything herein to the contrary, Contractor expressly acknowledges and agrees that all Direct Purchases shall be included within and covered by Contractor's warranty to Owner to the same extent as all other warranties provided by Contractor pursuant to the terms of 50 Construction Services Agreement:Revised 022018 1 I E the Contract Documents. In the event Owner makes a demand against Contractor with respect to any Direct Purchase and Contractor wishes to make claim against the manufacturer or supplier of such Direct Purchase, upon request from Contractor Owner shall assign to Contractor any and all warranties and Contract rights Owner may have from any manufacturer or supplier of any such Direct Purchase by Owner. 32.3 Bidder represents and warrants that it is aware of its statutory responsibilities for sale tax under Chapter 212, Florida Statutes, and for its responsibilities for Federal excise taxes. 33. SUBCONTRACTS. 33.1 Contractor shall review the design and shall determine how it desires to divide the sequence of construction activities. Contractor will determine the breakdown and composition of bid packages for award of subcontracts, based on the current Project Milestone Schedule, and shall supply a copy of that breakdown and composition to Owner and Design Professional for their review and approval prior to submitting its first Application for Payment. Contractor shall take into consideration such factors as natural and practical lines of severability, sequencing effectiveness, access and availability constraints, total time for completion, construction market conditions, availability of labor and materials, community relations and any other factors pertinent to saving time and costs. 33.2 A Subcontractor is any person or entity who is performing, furnishing, supplying or providing any portion of the Work pursuant to a contract with Contractor. Contractor shall be solely responsible for and have control over the Subcontractors. Contractor shall negotiate all Change Orders, Work Directive Changes, Field Orders and Requests for Proposal, with all affected Subcontractors and shall review the costs of those proposals and advise Owner and Design Professional of their validity and reasonableness, acting in Owner's best interest, prior to requesting approval of any Change Order from Owner. All Subcontractors performing any portion of the Work on this Project must be "qualified"as defined in Collier County Ordinance 2013-69, meaning a person or entity that has the capability in all respects to perform fully the Agreement requirements with respect to its portion of the Work and has the integrity and reliability to assure good faith performance. 33.3 In addition to those Subcontractors identified in Contractor's bid that were approved by Owner, Contractor also shall identify any other Subcontractors, including their addresses, licensing information and phone numbers, it intends to utilize for the Project prior to entering into any subcontract or purchase order and prior to the Subcontractor commencing any work on the Project. The list identifying each Subcontractor cannot be modified, changed, or amended without prior written approval from Owner. Any and all Subcontractor work to be self-performed by Contractor must be approved in writing by Owner in its sole discretion prior to commencement of such work. Contractor shall continuously update that Subcontractor list, so that it remains current and accurate throughout the entire performance of the Work. 33.4 Contractor shall not enter into a subcontract or purchase order with any Subcontractor, if Owner reasonably objects to that Subcontractor. Contractor shall not be required to contract with anyone it reasonably objects to. Contractor shall keep on file a copy of the license for every Subcontractor and sub-subcontractor performing any portion of the Work, as well as maintain a log of all such licenses. All subcontracts and purchase orders between Contractor and its Subcontractors shall be in writing and are subject to Owner's approval. Further, unless expressly waived in writing by Owner,all subcontracts and purchase orders shall (1) require each Subcontractor to be bound to Contractor to the same extent Contractor is bound to Owner by the terms of the Contract Documents, as those terms may apply to the portion of the Work to be performed by the Subcontractor, (2)provide for the assignment of the subcontract or purchase order from Contractor to Owner at the election of 51 Construction Services Agreement:Revised 022018 1 l Owner upon termination of Contractor, (3) provide that Owner will be an additional indemnified party of the subcontract or purchase order, (4) provide that Owner, Collier County Government, will be an additional insured on all liability insurance policies required to be provided by the Subcontractor except workman's compensation and business automobile policies, (5) assign all warranties directly to Owner, and (6) identify Owner as an intended third-party beneficiary of the subcontract or purchase order. Contractor shall make available to each proposed Subcontractor, prior to the execution of the subcontract, copies of the Contract Documents to which the Subcontractor will be bound. Each Subcontractor shall similarly make copies of such documents available to its sub- subcontractors. 33.5 Each Subcontractor performing work at the Project Site must agree to provide field (on-site) supervision through a named superintendent for each trade (e.g., general concrete forming and placement, masonry, mechanical, plumbing, electrical and roofing) included in its subcontract or purchase order. In addition, the Subcontractor shall assign and name a qualified employee for scheduling direction for its portion of the Work. The supervisory employees of the Subcontractor (including field superintendent,foreman and schedulers at all levels) must have been employed in a supervisory(leadership)capacity of substantially equivalent level on a similar project for at least two years within the last five years. The Subcontractor shall include a resume of experience for each employee identified by it to supervise and schedule its work. 33.6 Unless otherwise expressly waived by Owner in writing, all subcontracts and purchase orders shall provide: 33.6.1 That the Subcontractor's exclusive remedy for delays in the performance of the subcontract or purchase order caused by events beyond its control, including delays claimed to be caused by Owner or Design Professional or attributable to Owner or Design Professional and including claims based on breach of contract or negligence, shall be an extension of its contract time. 33.6.2 In the event of a change in the work,the Subcontractor's claim for adjustments in the contract sum are limited exclusively to its actual costs for such changes plus no more than 10% for overhead and profit. 33.6.3 The subcontract or purchase order, as applicable, shall require the Subcontractor to expressly agree that the foregoing constitute its sole and exclusive remedies for delays and changes in the Work and thus eliminate any other remedies for claim for increase in the contract price, damages, losses or additional compensation. Further, Contractor shall require all Subcontractors to similarly incorporate the terms of this Section 33.6 into their sub-subcontracts and purchase orders. 33.6.4 Each subcontract and purchase order shall require that any claims by Subcontractor for delay or additional cost must be submitted to Contractor within the time and in the manner in which Contractor must submit such claims to Owner, and that failure to comply with such conditions for giving notice and submitting claims shall result in the waiver of such claims. 34. CONSTRUCTION SERVICES. 34.1 Contractor shall maintain at the Project site, originals or copies of, on a current basis, all Project files and records, including, but not limited to, the following administrative records: 34.1.1 Subcontracts and Purchase Orders 34.1.2 Subcontractor Licenses 52 Construction Services Agreement:Revised 022018 1 lE 34.1.3 Shop Drawing Submittal/Approval Logs 34.1.4 Equipment Purchase/Delivery Logs 34.1.5 Contract Drawings and Specifications with Addenda 34.1.6 Warranties and Guarantees 34.1.7 Cost Accounting Records 34.1.8 Labor Costs 34.1.9 Material Costs 34.1.10 Equipment Costs 34.1.11 Cost Proposal Request 34.1.12 Payment Request Records 34.1.13 Meeting Minutes 34.1.14 Cost-Estimates 34.1.15 Bulletin Quotations 34.1.16 Lab Test Reports 34.1.17 Insurance Certificates and Bonds 34.1.18 Contract Changes 34.1.19 Permits 34.1.20 Material Purchase Delivery Logs 34.1.21 Technical Standards 34.1.22 Design Handbooks 34.1.23 "As-Built" Marked Prints 34.1.24 Operating & Maintenance Instruction 34.1.25 Daily Progress Reports 34.1.26 Monthly Progress Reports 34.1.27 Correspondence Files 34.1.28 Transmittal Records 34.1.29 Inspection Reports 34.1.30 Punch Lists 34.1.31 PMIS Schedule and Updates 34.1.32 Suspense (Tickler) Files of Outstanding Requirements The Project files and records shall be available at all times to Owner and Design Professional or their designees for reference, review or copying. 34.2 Contractor Presentations At the discretion of the County, the Contractor may be required to provide a brief update on the Project to the Collier County Board of County Commissioners, "Board", up to two (2) times per contract term. Presentations shall be made in a properly advertised Public Meeting on a schedule to be determined by the County Manager or his designee. Prior to the scheduled presentation date, the Contractor shall meet with appropriate County staff to discuss the presentation requirements and format. Presentations may include, but not be limited to, the following information: Original contract amount, project schedule, project completion date and any changes to the aforementioned since Notice to Proceed was issued. 35. SECURITY. The Contractor is required to comply with County Ordinance 2004-52, as amended. Background checks are valid for five (5) years and the Contractor shall be responsible for all associated costs. If required, Contractor shall be responsible for the costs of providing background checks by the Collier County Facilities Management Division for all employees that shall provide services to the County 53 Construction Services Agreement:Revised 022018 iE under this Agreement. This may include, but not be limited to, checking federal, state and local law enforcement records, including a state and FBI fingerprint check, credit reports, education, residence and employment verifications and other related records. Contractor shall be required to maintain records on each employee and make them available to the County for at least four(4) years. All of Contractor's employees and subcontractors must wear Collier County Government Identification badges at all times while performing services on County facilities and properties. Contractor ID badges are valid for one (1) year from the date of issuance and can be renewed each year at no cost to the Contractor during the time period in which their background check is valid, as discussed below.All technicians shall have on their shirts the name of the contractor's business. The Contractor shall immediately notify the Collier County Facilities Management Division via e-mail (DL-FMOPScollierqov.net)whenever an employee assigned to Collier County separates from their employment. This notification is critical to ensure the continued security of Collier County facilities and systems. Failure to notify within four (4) hours of separation may result in a deduction of $500 per incident. CCSO requires separate fingerprinting prior to work being performed in any of their locations. This will be coordinated upon award of the contract. If there are additional fees for this process, the Contractor is responsible for all costs. 36. VENUE. Any suit or action brought by either party to this Agreement against the other party relating to or arising out of this Agreement must be brought in the appropriate federal or state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction on all such matters. 37. VALUE ENGINEERING. All projects with an estimated cost of $10 million or more shall be reviewed for consideration of a Value Engineering (VE) study conducted during project development. A"project"shall be defined as the collective contracts, which may include but not be limited to: design, construction, and construction, engineering and inspection (CEI) services. Additionally, any project with an estimated construction value of$2 million or more may be reviewed for VE at the discretion of the County. 38. ABOVEGROUND/UNDERGROUND TANKS. 38.1 The contractor shall ensure compliance with all NFPA regulations: specifically 110 & 30/30A; FDEP chapter 62 regulations: specifically 761, 762, 777, and 780; 376 & 403 Florida Statutes; and STI, UL, PEI, ASME, NACE, NLPA, NIST & API referenced standards pertaining to the storage of hazardous materials and petroleum products. 38.2 The contractor shall notify the Solid & Hazardous Waste Management Department (SHWMD) prior to the installation, removal, or maintenance of any storage tank, including day tanks for generators, storing/will be storing petroleum products or hazardous materials. The contractor shall provide a 10 day and 48-hour notice to SHWMD 239-252-2508 prior to commencement. The contractor shall provide the plans pertaining to the storage tank systems containing hazardous materials/petroleum products to the SHWMD prior to plans submittal to a permitting entity and then SHWMD must approve the plans prior to contractor's submittal for permitting. 54 Construction Services Agreement: Revised 022018 1 lE 39. STANDARDS OF CONDUCT: PROJECT MANAGER, SUPERVISOR, EMPLOYEES. The Contractor shall employ people to work on Owner's projects who are neat, clean, well-groomed and courteous. Subject to the Americans with Disabilities Act, Contractor shall supply competent employees who are physically capable of performing their employment duties. The Owner may require the Contractor to remove an employee it deems careless, incompetent, insubordinate or otherwise objectionable and whose continued employment on Owner's projects is not in the best interest of the County. 40. DISPUTE RESOLUTION. Prior to the initiation of any action or proceeding permitted by this Agreement to resolve disputes between the parties, the parties shall make a good faith effort to resolve any such disputes by negotiation. The negotiation shall be attended by representatives of Contractor with full decision- making authority and by Owner's staff person who would make the presentation of any settlement reached during negotiations to Owner for approval. Failing resolution, and prior to the commencement of depositions in any litigation between the parties arising out of this Agreement,the parties shall attempt to resolve the dispute through Mediation before an agreed-upon Circuit Court Mediator certified by the State of Florida. The mediation shall be attended by representatives of Contractor with full decision-making authority and by Owner's staff person or designee who would make the presentation of any settlement reached at mediation to Owner's Board for approval. Should either party fail to submit to mediation as required hereunder, the other party may obtain a court order requiring mediation under Section 44.102, Fla. Stat. Any suit or action brought by either party to this Agreement against the other party relating to or arising out of this Agreement must be brought in the appropriate federal or state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction on all such matters. 55 Construction Services Agreement:Revised 022018 IE DATE(MM/DD/YYYY) ARD CERTIFICATE OF LIABILITY INSURANCE 3/8/2018 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Brown &Brown of FL, Inc. -Fort Myers PHONE Lorie Frost FAX 6611 Orion Drive (A/C.No.Ext);239-274-1438 (A/c,No):239-278-5306 Fort Myers FL 33912 ADDRESS: Ifrost@a bbswfla.com INSURER(S)AFFORDING COVERAGE NAIC# INSURER A: Bridgefield Casualty INSURED 16667 INSURER B:Southern OwnersXXXXXXXXXXXXXXX 10190 Hannula Landascaping &Irrigation Inc. 7050 Pennsylvania St INSURER C:Auto Owners Insurance Fort Myers FL 33912 INSURER D:Southern-Owners Ins Co` 10190 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:1375567070 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSRLTYPE OF INSURANCE IADDL SUBR NSD WVD POLICY NUMBER POLICY EFF POLICY EXP LIMITS (MM/DD/YYYY) (MM/DD/YYW) D X COMMERCIAL GENERAL LIABILITY Y 20317772 1/1/2018 1/1/2019 EACH OCCURRENCE $1,000,000 CLAIMS-MADE X OCCUR DAMAGE TO RENTED PREMISES(Ea occurrence) $1,000,000 MED EXP(Any one person) $10,000 PERSONAL&ADV INJURY $1,000,000 GE 'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,000,000 POLICY X Tp-F. LOC PRODUCTS-COMP/OP AGG $2,000,000 OTHER: $ C AUTOMOBILE LIABILITY 5156153400 1/1/2018 1/1/2019 COMBINED SINGLE LIMIT $ (Ea accident) 1.000.000 X ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS X HIRED X NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY (Per accident) _ B X UMBRELLA LIAB X OCCUR 5156153401 10/2018 10/2019 EACH OCCURRENCE $3,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $3,000,000 DED X RETENTION$10 000 $ A WORKERS COMPENSATION 019644920 1/1/2018 1/1/2019 X PER OTH- AND EMPLOYERS'LIABILITY Y/N STATUTE ER ANYPROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $1,000,000 OFFICER/MEMBEREXCLUDED? N N/A (Mandatory in NH) - E.L.DISEASE-EA EMPLOYEE $1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Project; 18-7276 Immokalee Rd.(Collier Blvd.To Wilson Blvd)Landscape&Irrigation"). Collier County Board of County Commissioners is included as Additional Insured with respects to General Liability and automobile liability only as required by written contract with ongoing and completed operations per form CGL55091 on a primary non-contributory basis and Waiver of Subrogation per form CGL55373. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Collier County Board of County Commissioners 3295 Tamiami Trail East Naples FL 34112-0000 AUTHORIZED REPRESENTATIVE 9;1; lir ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD 1 IE Agency Code 12-0233-00 COMMERCIAL GENERAL LIABILITY 55373 (1-07) THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BLANKET ADDITIONAL INSURED This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE FORM. A. Under SECTION II -WHO IS AN INSURED, the This insurance is primary for the Additional following is added: Insured, but only with respect to liability arising out of"your work"for that Additional Insured by A person or organization is an Additional Insured, or for you. Other insurance available to the only with respect to liability arising out of"your work" Additional Insured will apply as excess insur- for that Additional Insured by or for you: ance and not contribute as primary insurance to the insurance provided by this endorsement. 1. If required in a written contract or agreement; or 2. The following provision is added: 2. If required by an oral contract or agreement only if a Certificate of Insurance was issued prior to Other Additional Insured Coverage Issued By the loss indicating that the person or organiza- Us tion was an Additional Insured. If this policy provides coverage for the same B. Under SECTION III - LIMITS OF INSURANCE, the loss to any Additional Insured specifically shown following is added: as an Additional Insured in another endorsement to this policy, our maximum limit of insurance The limits of liability for the Additional Insured are under this endorsement and any other endorse- those specified in the written contract or agreement ment shall not exceed the limit of insurance in between the insured and the owner, lessee or the written contract or agreement between the contractor or those specified in the Certificate of insured and the owner, lessee or contractor, or Insurance, if an oral contract or agreement, not to the limits provided in this policy, whichever is exceed the limits provided in this policy. These less. Our maximum limit of insurance arising limits are inclusive of and not in addition to the limits out of an "occurrence", shall not exceed the limit of insurance shown in the Declarations. of insurance shown in the Declarations, regard- less of the number of insureds or Additional C. SECTION IV COMMERCIAL GENERAL Insureds. LIABILITY CONDITIONS, is amended as follows: All other policy terms and conditions apply. 1. The following provision is added to 4. Other Insurance: Includes copyrighted material of Insurance Services Office, Inc., with its permission. 55373 (1-07) Copyright Insurance Services Office, Inc., 1984, 2003. Page 1 of 1