Agenda 07/09/2013 Item #14A2 7/9/2013 14.A.2.
EXECUTIVE SUMMARY
As recommended by Commissioner Henning, I am providing an operations plan and
financial review report to modify the Immokalee and Everglades Airport operations by
September 2, 2013 to achieve the following: (1) staff reduction plan at the Immokalee
Regional Airport from 5 FTE to 1.5 FTE encumbering no more than $128,949 and moving
the administrative secretary to a part-time position available with the Airport Authority
Administration to maintain financial levels of service for all airports; (2) Reduce staff from
1 FTE to .5 FTE at Everglades Airport and provide a feasibility analysis for potentially
reduced operations; (3) Analyze adopting a ramp fee of $25 for Immokalee Regional
Airport and its effects on airport usage and move forward immediately with a minimum
fuel purchase of 5 gallons; (4) Adopt a single flowage fee of 25 cents for fuel regardless of
volume or fuel source to increase revenues; (5) Review the ability to end the fueling
contract with World Fuels without penalty and consider purchasing fuel for all airports as
part of the bid purchase price of the City of Naples Airport Authority if it reduces price
and is acceptable to their contractor and/or if prices are not lower remain with World
Fuels; and (6) Implement a pre-paid fuel card program beginning in September to increase
funds collected in advance and develop a related discount plan for the $50,000 and
$100,000 pre-purchase fuel cards and analyze the level of full-service fueling that would
remain available by having a working General Manager and/or staff provide this service
with a reduced staff level.
OBJECTIVE: To reduce personnel cost without compromising existing leases and/or customer
relationships. The continuing goal is to help the Immokalee and Everglades Airports to become
budget independent.
CONSIDERATIONS: This item was continued from the June 11, 2013 BCC meeting and has
been modified to include additional steps for Airport Authority improvements.
Currently, the Immokalee Regional Airport has budgeted $284,402 for 5 full time employees
(FTE). The savings calculated under Fiscal Impact is based on keeping 1.5 FTE plus benefits
encumbering no more than $129,000. I will reduce staffing from 5 FTE to 1.5 FTE at the
Immokalee Regional Airport.
1.5 FTE at Immokalee Regional Airport and .5 FTE at Everglades Airport would provide
adequate staff if the airport moves from full-service options towards a self-service platform for
customers. I will review the Immokalee Regional Airport's fees to include possibly a ramp fee
and/or a minimum fuel purchase, the Authority could increase variable revenue, and reduce the
deficit by up to 56% with staff reductions. Related to airport landscaping and maintenance, the
Airport Authority would use existing contracts with Collier County to provide those services. I
have attached a copy of the landscaping plan that I feel is necessary to maintain compliance with
FAA and FDOT.
Packet Page-253-
7/9/2013 14.A.2.
The Airport Authority currently has two flowage fee options under the current rates and charges
structure based on volume or fuel source. I am suggesting a set fuel flowage fee charge of$.25
per gallon. This rate should provide some additional revenue for the Collier County Airports.
Commissioner Henning had requested we move to a fully self-service fuel system; however the
Airport Authority Administration had cause for concern that jets expecting full-service fueling
may then choose not to fuel up at the Immokalee Regional Airport. Therefore, as part of the
smart-sized operations plan, the Authority will continue to provide full-service fueling during
business hours with its reduced staffing by having a working General Manager responsible for
this amenity to customers. This allows the Authority to maintain its current level of service,
reduce staff and increase savings without adversely affecting the profit margin on fuel, which is
higher for full service.
Currently, one Immokalee Airport sub-tenant purchases 51 to 54 percent of fuel sold each year.
A pre-paid fuel card program reduces the staffing. Pre-paid fuel cards could range from $250 to
$100,000 with a graduated rate of discount for the $50,000 and $100,000 cards. The Immokalee
Regional Airport already uses a credit card payment system so no additional outfitting is
required.
The Collier County Airport Authority's contract with World Fuels expires in November 2013.
The City of Naples Airport Authority has entered into a new fueling contract and has invited the
Collier County Airport Authority to purchase fuel at potentially reduced rates. The new fuel
contactor for the City of Naples Airport Authority must approve such transactions and the Naples
Airport Executive Director will work with the Collier County Airport Authority. We will obtain
a copy of the RFP and contract from the Naples Airport Authority to evaluate fuel charges to
include intangibles. If the rates are better than we have under World Fuels, we will work with
the provider(AVFUELS) through the County Purchasing Department to purchase fuel at reduced
rates
FISCAL IMPACT: Staff reductions at the Immokalee Regional Airport and Everglades
Airpark would result in a cost savings between $155,543 and $181,310. However, the cost of
outsourcing landscape operations at the Immokalee Airport, which may have the largest single
impact on expenses at that airport, is unknown at this time, and could potentially outweigh any
savings gained by staff reductions. Additionally, the probable loss of fuel revenue from flight
school and jet traffic that will likely result by providing self service fueling only will further
negate a portion of the savings realized by the reduction of staff.
LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, raises no
legal issues, and requires majority support for approval. -JAK.
RECOMMENDATION: That the Board of County Commissioners, acting as the Collier
County Airport Authority, accepts the Airport Authority Executive Director's plan to modify the
Immokalee and Everglades Airport operations by September 2, 2013 to reduce the airport budget
deficit, and for the Executive director to develop an operations plan and financial review report
to achieve the following: (1) staff reduction plan at the Immokalee Regional Airport from 5 FTE
to 1.5 FTE and/or not encumbering any more than $129,000 in burdened salaries for staff and to
Packet Page-254-
7/9/2013 14.A.2.
provide a written feasibility analysis reducing Everglades Airport staff level to .5 FTE; (2)
Analyze adopting a ramp fee of $25 for Immokalee Regional Airport and a minimum fuel
purchase of 5 gallons and other reasonable fee adjustments that might increase revenues; (3)
Adopt a single flowage fee for fuel regardless of volume or fuel source; (4) Consider purchasing
fuel for all airports as part of the bid purchase price of the City of Naples Airport Authority if it
reduces price and is acceptable to their contractor; and (5) Implement a pre-paid fuel card
program to increase funds collected in advance, eliminate full-service fueling and develop a
related discount plan for the $50,000 and $100,000 pre-purchase fuel cards.
Prepared by: Chris Curry, Executive Director
Packet Page -255-
7/9/2013 14.A.2.
COLLIER COUNTY
Board of County Commissioners
Item Number: 14.14.A.14.A.2.
Item Summary: As recommended by Commissioner Henning, I am providing an
operations plan and financial review report to modify the Immokalee and Everglades Airport
operations by September 2, 2013 to achieve the following: (1) staff reduction plan at the
Immokalee Regional Airport from 5 FTE to 1.5 FTE encumbering no more than $128,949 and
moving the administrative secretary to a part-time position available with the Airport Authority
Administration to maintain financial levels of service for all airports; (2) Reduce staff from 1 FTE
to .5 FTE at Everglades Airport and provide a feasibility analysis for potentially reduced
operations; (3) Analyze adopting a ramp fee of$25 for Immokalee Regional Airport and its
effects on airport usage and move forward immediately with a minimum fuel purchase of 5
gallons; (4) Adopt a single flowage fee of 25 cents for fuel regardless of volume or fuel source to
increase revenues; (5) Review the ability to end the fueling contract with World Fuels without
penalty and consider purchasing fuel for all airports as part of the bid purchase price of the City
of Naples Airport Authority if it reduces price and is acceptable to their contractor and/or if
prices are not lower remain with World Fuels; and (6) Implement a pre-paid fuel card program
beginning in September to increase funds collected in advance and develop a related discount
plan for the $50,000 and $100,000 pre-purchase fuel cards and analyze the level of full-service
fueling that would remain available by having a working General Manager and/or staff provide
this service with a reduced staff level.
Meeting Date: 7/9/2013
Prepared By
Name: BrueggemanDebra
Title: Operations Coordinator, Airport Authority
7/1/2013 1:10:36 PM
Submitted by
Title: Executive Director-Airport Authority,Airport Aut
Name: CurryChris
7/1/2013 1:10:39 PM
Approved By
Packet Page-256-
7/9/2013 14.A.2.
Name: BrueggemanDebra
Title: Operations Coordinator,Airport Authority
Date: 7/1/2013 5:17:57 PM
Name: KlatzkowJeff
Title: County Attorney
Date: 7/2/2013 8:15:05 AM
Name: GreenwaldRandy
Title: Management/Budget Analyst,Office of Management&B
Date: 7/2/2013 8:52:24 AM
Name: KlatzkowJeff
Title: County Attorney
Date: 7/2/2013 9:19:55 AM
Name: OchsLeo
Title: County Manager
Date: 7/2/2013 9:58:41 AM
iokt
Packet Page-257-
7/9/2013 14.A.2.
The Immokalee Regional Airport, part of the Collier County Airport Authority is seeking quotes to mow
and maintain the grass and landscaped areas of the Immokalee Regional Airport located at 165 Airpark
Blvd. Immokalee, FL 34142.
The various areas of the Airport and the mowing frequencies are listed below. It is recommended that
site visits are scheduled so quotes are as accurate as possible.
Quotes are due to the Immokalee Airport Manager by July 14, 2013 close of business.
General Aviation Terminal Building and Parking Lot-Weekly
165 Airpark Blvd
Immokalee, FL 34142
• Mow,edge, string-trim,weed control,and blow weekly(including along fences)
• Treat fire ants at each mow
• Trim bushes and hedges monthly
• Spray fence-lines for weed control monthly
• Mulch twice a year around trees and non-rocked areas
• Trim all trees twice a year
• Fertilize annually(grass and shrubs)
• Test irrigation systems monthly
• Continually inspect vegetation for insects and fungus
General Aviation Ramp Area
• Mow, edge, string-trim (including along fences), weed control, and blow
o Weekly from April 1 to October 31
o Bi-weekly from November 1 to March 31
• Treat fire ants at each mow
• Spray fence-lines for weed control monthly
• Mow ditches/retention areas
• Fertilize annually(shrubs)
IMM Airport T-Hangars(Buildings A, B,and C)
• Mow,edge, string-trim (including along fences and buildings),weed control,and blow
o Weekly from April 1 to October 31
o Bi-weekly from November 1 to March 31
Packet Page-258-
7/9/2013 14.A.2.
• Treat fire ants at each mow
• Spray fence-lines and around t-hangar buildings for weed control monthly
Fletcher Flying Services
195 Airpark Blvd
Immokalee, FL 34142
• Mow, edge, string-trim (including along fences and buildings),weed control,and blow
o Weekly from April 1 to October 31
o Bi-weekly from November 1 to March 31
• Spray fence-lines and around building for weed control monthly
Federal FIS Inspection Building
205 Airpark Blvd
Immokalee, FL 34142
• Mow, edge, string-trim (including along fences and buildings), weed control,and blow
o Weekly from April 1 to October 31
o Bi-weekly from November 1 to March 31
• Spray fence-lines and around building for weed control monthly
• Mulch twice a year around trees and non-rocked areas
• Trim all trees twice a year
• Continually inspect vegetation for insects and fungus
Runway 18/36
• Mow,edge (if required), string-trim (around edge lights and signs), and blow(if required)
o Weekly from April 1 to October 31
o Bi-weekly from November 1 to March 31
• Mow ditches
• String-trim along fences
• Spray fence-lines, signs, and edge lights for weed control monthly(if required)
Runway 9/27
• Mow, edge (if required), string-trim (around edge lights and signs), and blow(if required)
o Weekly from April 1 to October 31
o Bi-weekly from November 1 to March 31
Packet Page -259-
7/9/2013 14.A.2.
• Mow ditches
• String-trim along fences
• Spray fence-lines, signs,and edge lights for weed control monthly (if required)
Approach Area To Runway 9
• Mow and string-trim bi-weekly
• String-trim along fences
• Trim trees and vegetation to maintain current heights
• Spray fence-lines and signs for weed control monthly(if required)
Approach Area To Runway 27
• Mow and string-trim bi-weekly
• String-trim along fences
• Trim trees and vegetation to maintain current heights
• Spray fence-lines for weed control monthly (if required)
Taxiway Alpha
• Mow, edge (if required), string-trim (around edge lights, drain boxes, and signs), and blow (if
required)
o Weekly from April 1 to October 31
o Bi-weekly from November 1 to March 31
• Mow ditches
• String-trim along fences
• Spray fence-lines, signs, and edge lights for weed control monthly(if required)
Taxiway Bravo
• Mow, edge (if required), string-trim (around edge lights, drain boxes, and signs), and blow(if
required)
o Weekly from April 1 to October 31
o Bi-weekly from November 1 to March 31
• Mow ditches
• String-trim along fences
• Spray fence-lines, signs,and edge lights for weed control monthly(if required)
Packet Page -260-
7/9/2013 14.A.2.
Taxiway Charlie "004,
• Mow, edge (if required), string-trim (around edge lights, drain boxes,and signs),and blow (if
required)
o Weekly from April 1 to October 31
o Bi-weekly from November 1 to March 31
• Mow ditches
• Spray signs and edge lights for weed control monthly(if required)
Approach Area To Runway 36
• Mow and string-trim
o Weekly from April 1 to October 31
o Bi-weekly from November 1 to March 31
• Mow ditches
• String-trim along fences
• Spray fence-lines and signs for weed control monthly(if required)
AWOS/Lighting Vault Area
• Mow and string-trim bi-weekly
• Mow ditches
• String-trim along fences and buildings
• Spray fence-lines and AWOS instrument area for weed control
Sod Farm/Open Land At North End of Airport
• Mow monthly
• Mow ditches
• String-trim along fences
• Spray fence-lines and signs for weed control monthly (if required)
Industrial Building—Incubator
160 Airpark Blvd
lmmokalee, FL 34142
• Mow, edge, string-trim (including along fences), weed control, and blow weekly
o Weekly from April 1 to October 31
Packet Page-261-
7/9/2013 14.A.2.
o Bi-weekly from November 1 to March 31
• Mow ditches
• Treat fire ants at each mow
• Trim bushes and hedges monthly
• Mulch twice a year around trees and non-rocked areas
• Trim all trees twice a year
• Fertilize annually(grass and shrubs)
• Test irrigation system monthly
• Continually inspect vegetation for insects and fungus
Industrial Building—Incubator Support Facility
170 Airpark Blvd
Immokalee, FL 34142
• Mow,edge, string-trim (including along fences), weed control, and blow
o Weekly from April 1 to October 31
o Bi-weekly from November 1 to March 31
• Mow ditches
• Treat fire ants at each mow
• Trim bushes and hedges monthly
• Mulch twice a year around trees and non-rocked areas
• Trim all trees twice a year
• Fertilize annually(grass and shrubs)
• Test irrigation system monthly
• Continually inspect vegetation for insects and fungus
Airpark Blvd Roadway and Medians
• Mow, edge, string-trim (including along fences), weed control, and blow
o Weekly from April 1 to October 31
o Bi-weekly from November 1 to March 31
• Mow ditches
• Treat fire ants at each mow
• Trim bushes and hedges monthly(if required)
• Mulch twice a year around trees and non-rocked areas
• Trim all trees twice a year
• Fertilize annually(grass and shrubs)
• Continually inspect vegetation for insects and fungus
Packet Page-262-
7/9/2013 14.A.2.
Airpark Blvd Camp Ground
• Mow, edge, string-trim (including along fences),weed control, and blow
o Weekly from April 1 to October 31
o Bi-weekly from November 1 to March 31
• Mow ditches
• Trim bushes and hedges monthly(if required)
• Trim all trees twice a year
Airpark Phase I Lake
• Mow, edge, string-trim,weed control, and blow bi-weekly
• Mow ditches and edges of lake
• Maintain sides of drainage ditch (mow and weed control)
• Trim aquatic vegetation annually
Airpark Industrial Land Tract
• Mow, string-trim (including along fences and buildings), and weed control, bi-weekly
• Mow ditches
• Maintain sides of drainage ditch (mow and weed control)
• Trim vegetation annually off fences
Packet Page -263-