Loading...
Lely Beautification MSTU Agenda 04/19/2018 Page 1 of 2 GOLF ESTATES BEAUTIFICATION MSTU ADVISORY COMMITTEE 3299 Tamiami Trail East, Suite 103 Naples, FL 34112 PROJECTOR PROJECTOR PROJECTOR AGENDA APRIL 19TH, 2018 I. CALL TO ORDER – II. ATTENDANCE – Tony Branco - Chair (10/1/21) Robert Slebodnik - Vice Chair (10/1/18) Kathleen Dammert (10/1/18) Linda Rae Jorgensen (10/1/21) Vacancy ( – ) III. APPROVAL OF AGENDA – IV. APPROVAL OF MINUTES – MARCH 15TH, 2017 V. CHAIRMAN’S REPORT – TONY BRANCO A. ___________________. B. ___________________. C. ___________________. VI. LANDSCAPE ARCHITECT’S REPORT – MCGEE & ASSOCIATES (10/24/2018) VII. LANDSCAPE MAINTENANCE REPORT – COMMERCIAL LAND MAINTENANCE (BCC APPROVAL) A. Summary comments. VIII. PROJECT MANAGERS REPORT – DAN SCHUMACHER A. Budget Report. B. FY-19 Millage – Motion to renew or change. C. Lighting Inspection Report. D. Lely HOA Sign Replacements – PO requested. E. Irrigation – 86 psi Pressurized Effluent (non-potable) supply at Warren St. F. Tree Replacements – Quotes requested. IX. OLD BUSINESS – A. REFURBISHMENT OF ENTRY MONUMENTS – 1. County Zoning Division Sign Review – a. Design proposal from McGee & Assoc. b. Land Survey & maximum height Determination received. c. Zoning Division recommends using a full-service sign company for design. d. Easements for both entry- and exit-side St Andrews monuments confirmed. B. NEW LIFT STATION @ HIDDEN VALLEY DRIVE – 1. FY-18 Public Utilities project – Johnson Engineering Drawing. C. UNFINISHED BUSINESS – 1. Insurance Pebble Beach Light Pole. 2. Insurance - St Andrews Median #3. AGENDA April 19, 2018 Lely Golf Estates Beautification MSTU Page 2 of 2 X. NEW BUSINESS – A. PROJECT PROPOSALS FOR THE FY-18 YEAR 1. Lighting – Pebble Beach Circle, potentially Doral Circle. XI. MEMBER COMMENTS – XII. PUBLIC COMMENTS – XIII. ADJOURNMENT – NEXT MEETING: MAY 17TH, 2018 AT 2:00 PM Collier County Library East Naples Branch 8787 Tamiami Trail East Naples, FL 34113 (239) 775-5592 1/7 GOLF ESTATES BEAUTIFICATION MSTU ADVISORY COMMITTEE 3299 Tamiami Trail East Suite 103 Naples, FL 34113 Minutes March 15, 2018 I. Call to Order Chairman Branco called the meeting to order at 2:20 PM. A quorum was established. II. Attendance Members: Tony Branco - Chair, Robert Slebodnik - Vice Chair (Excused), Kathleen Dammert, Linda Jorgensen, Vacancy County: Dan Schumacher - Project Manager Others: Mike McGee - Landscape Architect; Gary Gorden - CLM; Wendy Warren – Juristaff; George Barton - Resident III. Approval of Agenda Ms. Dammert moved to approve the March 15, 2018 Agenda of the Lely Golf Estates Beautification M.S.T.U. as amended: Add: Item V. Chairman’s Report – A. Irrigation; B. HOA Association Street Signage; C. Committee Member Comments. Item VIII. Project Managers Report - F. Median U.S. 41 Landscaping Second by Ms. Jorgensen. Carried unanimously 3 - 0. IV. Approval of Minutes – February 15, 2018 Ms. Jorgensen moved to approve the minutes of the February 15, 2018 Lely Golf Estates Beautification M.S.T.U. meeting as presented. Second by Ms. Dammert. Carried unanimously 3 - 0. V. Chairman’s Report – Tony Branco Chairman Branco reported on the community tour with Mr. Schumacher & Mr. McGee as follows: A. Irrigation  Coverage is insufficient as evidenced by dry spots and an inspection of the systems including filters, nozzles and rotors should be undertaken.  Mr. Schumacher will request the schedule for wet checks from CLM – weekly.  The pressure gauge replacement at the Warren Street pump station is pending. B. HOA Association Street Signage Status Update  The Homeowners Association voted to accept the proposal from Municipal Supply & Sign Co. to replace damaged signs in the Lely community.  The signs blades will display black street sign lettering on a white background with existing dimensions, approved for use by county Traffic Operations. Mr. Schumacher will research the status of the Sherriff’s report filing for the missing street poles. MINUTES March 15, 2018 LELY GOLF ESTATES MSTU 2/7 C. Committee Member Comments Ms. Jorgensen noted holes from removed trees should be filled in for safety purposes as requested by the Homeowners Association. Chairman Branco reported enhanced appearance of the Golf Cart crossing at Pinehurst Circle as a result of pruning in the area of the sprinkler head by the Golf Course crew as requested during the drive-through. VI. Landscape Architects Report – McGee & Associates A. Summary, Detail Mr. McGee summarized the “Lely Golf Estates Landscape Observation Report” FY17-18 dated March 6, 2018 noting the report identifies items to address when the Committee is ready to discuss replacements. General  Caterpillar activity observed on all types of Bougainvillea shrubs; recommend CLM treat infestation as soon as possible. Signs denoting treatment application and the corresponding date should be placed on location.  Soil drench and/or fertilize Flax Lilies.  Hand prune dead wood in shrubs and trees.  Fill holes resulting from damaged tree removal.  Monitor Torpedo Grass for treatment. Irrigation  Reuse water consumption has now overtaken potable water usage. Fertilizer  Fertilizer was not applied in accordance with the January and February schedule and a purchase order is in place for the chemicals. Mr. McGee recommended accelerating the triple 14 fertilization scheduled for April. Mr. Schumacher will review the fertilizer schedule and coordinate with CLM. Saint Andrews Boulevard  Median #1 o Palm Rat activity observed. CLM will set box traps to eradicate pests. o Routine landscape maintenance required on the back half of the median.  Median #2 o Dead turf and excessive weeds observed. o Prune out dead/diseased foliage from Crinum Lilies. o Perform regular maintenance. o Review Crown of Thorns for potential replacement. Valley Stream  Median #13 o Six Plumbago plants around the water meter should be replaced. MINUTES March 15, 2018 LELY GOLF ESTATES MSTU 3/7 Chairman Branco addressed the inaction on the requests for plant and tree replacements in Mr. McGee’s Summary Reports and highlighted in previous meeting minutes. The following course of action was implemented:  Mr. Schumacher will compile a report of shrubs to be replaced based on the quantities recorded in Mr. McGee’s report dated March 6, 2018.  The tree inventory has been compiled and will be reviewed under Section VIII. - Project Manager’s Report.  Proposals will be solicited for Committee consideration. VII. Landscape Maintenance Report – Commercial Land Maintenance A. Summary Comments  St. Andrews, Median #2: Bougainvilleas will be trimmed to conform to sight line standards.  Holes from tree removal will be filled in.  Pinehurst by Golf Cart Crossing: Philodendron leaf will be cut back to prevent solar panel encroachment.  CLM will provide a proposal for replacement plants and trees based on inventory lists provided by Mr. Schumacher. Mr. McGee will develop a map identifying all medians by number for reference at the M.S.T.U. meetings and forward it to Mr. Schumacher. VIII. Project Managers Report - Dan Schumacher A. Budget Report Mr. Schumacher summarized the “Lely MSTU Fund Budget 152 dated March 15, 2018” for information purposes and provided an overview of the budget noting:  $227,209.91 of the FY18 Ad Valorem property tax revenue budget of $255,500.00 has been collected.  Total revenue FY18 is $563,500.00 including investment interest, transfers and contributions (minus a 5% reserve of $12,900).  Current Operating Expense budget is $192,000 of which commitments total $97,562.72; expenditures $30,223.29.  Uncommitted Operating Expense funds available are $64,213.99.  Sunbright Industry invoice for mulch application was recommended for payment.  Based on a multi-year contract approval by the Board of County Commissioners for Florida Land Maintenance, dba CLM, a Purchase Order was issued. Balances for two interim purchase orders will be closed.  A Purchase Order for Community Street and Stop sign replacements will be issued.  Improvements General funds of $146,900.00 can be accessed for special projects.  Reserves for Insurance and Catastrophic/Hurricane funds total $179,400.00, an increase of $9,400.00.  Total available balance less committed expenses $429,181.69. Mr. Schumacher will present the proposed FY19 budget at the April meeting. B. Lighting Inspection Report Mr. Schumacher provided a lighting report compiled by Commercial Land Maintenance and reported Hart’s Electrical replaced three lamp outages on Saint Andrews and Pebble Beach Boulevards. The Sign Light-DS-2 reported outage will be confirmed. MINUTES March 15, 2018 LELY GOLF ESTATES MSTU 4/7 Report Modifications The report will indicate which Luminaires are LED and record the date the lamps were installed. Mr. Schumacher will confirm funds are available in the budget to order additional lamps if the inventory level is reduced to two or three units. C. Lely HOA Sign Replacements – Quotes for Street Sign “Blades” under Review. Mr. Schumacher reported on the status of damaged signs for the Lely community.  Municipal Sign & Supply Co. submitted a proposal in the amount of $3,281.00 to replace sixty-eight (68) signs.  Estimated installation is two to three weeks from receipt of the Purchase Order.  Blades will display black street sign lettering on a white background in accordance with County specifications.  The street suffix (i.e. Blvd, etc.) will be 2 ¾” high and entered a few spaces to the right of the street name (versus current right justified).  A template will be produced and tested on site for approval prior to production. Pole Replacements Mr. Schumacher will obtain specifications from Traffic Operations for sign poles. Quotes for two styles of poles (Option A. - fully molded pole or Option B. - pole with clam shell base as separate attachment) will be solicited. Ms. Dammert motioned to approve Municipal Signs & Supply Co. proposal for fabrication, replacement and installation of sixty-eight street signs with black lettering on a white background for an amount Not-To-Exceed $4,000.00 for the Lely Community. Second by Ms. Jorgensen. Carried unanimously 3 – 0. D. Irrigation – Pressurized Effluent (Non-Potable) Supply at Warren St. – Evaluating & Trouble Shooting Mr. Schumacher reported the Warren Street irrigation system is being evaluated to ensure proper performance. E. Tree Replacements – Inventory Mr. Schumacher distributed the Lely MSTU Replacement Trees – Inventory report dated March 1, 2018. He noted the data compiled is based on a Community tour with Mr. McGee who specified twenty-six trees for replacement. A Request for Quote (RFQ) will be issued to Commercial Land Maintenance. Additional RFQ’s may be required from qualified contractors if the project dollar amount exceeds the County’s mandated level for single bid procurement. Chairman Branco requested the quote be presented at the April meeting. F. Median U.S. 41 Landscaping Ms. Schumacher will confer with Liz Soriano, Supervisor – Road Maintenance Landscape Operations, to determine the process for landscape refurbishment for the median on U.S. 41 in front of the East Naples Library. MINUTES March 15, 2018 LELY GOLF ESTATES MSTU 5/7 IX. Old Business A. Refurbishment of Entry Monuments 1. County Zoning Division Sign Review a. Determination – maximum monument height. b. Center line of west-bound US-41 can be reference for maximum 8ft sign height. c. Land Survey received – Hole Montes. d. Zoning Division recommends using a full-service sign company for design. e. Easements for both entry and exit sides St. Andrews monuments confirmed. Mr. Schumacher reported on results of a meeting with Chairman Branco and Diane Compagnone, Sign Review Specialist, Growth Management Division to review zoning requirements for the monuments, and distributed a letter from Ray Bellows, Zoning Manager, Growth Management Division. The letter dated March 5, 2018 states the modification to the top of the existing nonconforming monument signs can be approved since the proposal doesn’t increase the nonconforming setback. The center line of the road should be considered (R1 and R2 as recorded on the Hole Montes survey) for the sign height measurement. The net result is the height of the existing entry monument structures may be increased by approximately 22 inches. A photograph of the current monument with an arched line superimposed to define the maximum height permitted was presented by Chairman Branco as a visual tool. During Committee discussion the following options were considered:  Construct a decorative element behind the monument, such as a trellis, to aesthetically enhance the structure and residential ambiance.  Place the logo on a smaller structure in front of the wall to enable design flexibility with the existing wall.  Modify the color scheme and surface material of the wall.  Landscape with substantial plantings or trees behind the wall to create privacy and camouflage commercial buildings.  Engage Mr. McGee to prepare design proposals for consideration. Mr. Schumacher will request AutoCAD files of the monument survey from Hole Montes to be provided to Mr. McGee for design review. Mr. McGee will provide a proposal for number of hours required to produce a finished design product for the Lely Golf Estates Entry Monuments. Chairman Branco moved for McGee & Associates Landscape Architecture to prepare preliminary designs for the Lely Golf Estates Entry Monuments for an amount Not-To-Exceed the Limited Refurbishment Funds available under the existing contract. Second by Ms. Dammert. Carried unanimously 3 – 0. MINUTES March 15, 2018 LELY GOLF ESTATES MSTU 6/7 B. New Lift Station @ Hidden Valley Drive 1. FY-18 Public Utilities project - Drawings Mr. Schumacher distributed Collier County construction plans Exhibit A, Sheet No. WW-7 – Pump Station Detail – Profile; Exhibit B, Sheet No. WW-8A – Community Pump Station with Generator Detail and Exhibit C, Sheet No. WW-9B – Community Pump Station Control Panel Detail Non-VFD Station with Generator for the sanitary lift station being relocated from Saint Andrews Boulevard to a County-owned parcel at the corner of Saint Andrews Boulevard and Hidden Valley Drive The M.S.T.U. will seek permission to landscape the area upon construction completion. Mr. Schumacher will request a site plan and confirm the estimated installation date, the equipment placement location on the lot, the fence height and material detail and irrigation availability. C. Unfinished Business 1. Insurance for Pebble Beach Light Pole. 2. Auto Accident Median #3. Insurance reimbursement is pending for both claims. X. New Business A. Project Proposals for the FY -18 Year The following projects are under consideration and will be addressed in 2018: 1. Lighting Pebble Beach Circle, Pebble Beach Cart Crossing, Forest Hills Cart Crossing and potential for Doral Circle. XI. Member Comments None XII. Public Comments None XIII. Adjournment There being no further business to come before the Committee, the meeting was adjourned by the Chair at 4:58 PM. MINUTES March 15, 2018 LELY GOLF ESTATES MSTU 7/7 LELY GOLF ESTATES BEAUTIFICATION MSTU ADVISORY COMMITTEE ________________________________ Tony Branco, Chairman The Minutes were approved by the Committee on _____________________ 2018, as presented ____, or as amended _____. NEXT MEETING: APRIL 19, 2018 – 2:00 PM COLLIER COUNTY EAST NAPLES LIBRARY 8787 TAMIAMI TRAIL EAST, NAPLES, FL 34113 (239) 775-5592 McGee & Associates Landscape Architecture Design * Environmental Management * Planning * Arborist 5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101 Phone (239) 417-0707 * Fax (239) 417-0708 LC 098 * FL 1023A Project: LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Landscape Observation Report: March 2018 Location: MSTU DISTRICIT ROADWAYS Project Manager: Collier County Public Services Division, Public Transportation & Neighborhood Enhancements Department Consultant: McGee & Associates Consultant’s Representative: Michael A. McGee, rla, isa Contractor: Commercial Land Maintenance Contractor’s Representative: Robert Kindelan, Gary Gorden Report Date: FY17-18, 04/10/18 Observation Date: 04/10/18 Report No. 6 AC - Indicates major or repeating items recommended to be discussed by the Advisory Committee S - Indicates items to be addressed by staff. C - Indicates items to be addressed by Contractor Contractor is requested to address items as soon as possible and indicate in RESPONSE/COMMENTS column when and which items are corrected. Note: Copy picture out of comment boxes and then paste to additional sheet if picture is desired in larger size. LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS All locations X 5 Caterpillar activity has been observed in all Bougainvillea plantings. Treat as soon as possible. M&A: 01/09/18 Caterpillar activity is still being observed. M&A: 02/05/18 Caterpillar activity is still being observed on all types of Bougainvillea shrubs. M&A: 03/06/18 Caterpillars observed in dwarf Bougainvillea median 24 and Bougainvillea Silhouette at US 41 & St. Andrews entrance. M&A: 4/10/18 It appears there is still caterpillar activity in the Bougainvillea Silhouettes at the US 41 entry and on the Dwarf Bougainvillea in median #24. St. Andrews Blvd. & US 41 In bound R/W South X 3 Caterpillar activity on Bougainvillea’s. M&A: 4/10/18 It appears there is still caterpillar activity in the Bougainvillea Silhouettes. X 5 Spider lily plants look poor. Recommend treatment with soil drench fungicide. X X 5 (6) Bougainvillea Silhouette are missing at first Oak tree along back side of sidewalk. X X 5 (3) Bougainvillea Silhouette at Light pole #5 are missing. X X 5 (16-18) Allamanda shrubs are missing and/or dead along parking lot edges. Shrubs are part of County LDC requirement for screening. Replacement with same or Variegated Schefflera should occur. Newsstand Area X X 5 All previously noted Blueberry Flax lily that were behind the bench are now missing. Out bound R/W North Suncoast Credit Union side of sidewalk X X 2 Caterpillar activity on Bougainvillea’s. M&A: 4/10/18 It appears there is still caterpillar activity in the Bougainvillea Silhouettes. X 5 (8-10) Dwarf Bougainvillea ‘Helen Johnson’ replacement shrubs are missing. X X 5 Turf areas are water stressed with multiple dead areas and areas containing noticeable weeds. St. Andrews Blvd. X 2 Easternmost Dwarf Bougainvillea bed being damaged from rat activity. McGee & Associates Landscape Architecture LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Report Date: FY17-18 04/10/18 Observation Date: 04/10/18 Report : 6 Page 2 of 7 LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS Median #1 X X 6 One Washingtonia palm removed. Flush cut or grind stump. Option 1: Consider removal of all remaining Washingtonia palms. M&A: 02/05/18 Finish removing stump and fill hole and mulch. No replacement recommended. X X 6 On end of median several Bougainvillea Silhouette have been removed and will need to be replaced. (3 5) 3 gal. size. Median #2 X X 5 On the west end about 240 s.f. of turf area contains dead areas and noticeable weeds. Median #3 X X 5 Washingtonia stump removal will cause about 1/3 of existing Plumbago to be removed. X X 6 (1) Washingtonia palm removed, Remove or grind stump. Option 1: Remove remaing Washingtonia palms and consider alternate replacement palms (i.e. Foxtail, Christmas, Alexander palms or Sabal), M&A; 01/09/18 Stump removed. X X 6 (3) Queen’s crape myrtles (2) removed (1) damaged. Consider replacements of same or different species of Crape myrtle. Median #4 No major damaged observed. Median #5 X X 5 At address 140: (1) Juniper dead and (1) Juniper missing X 6 At address 164: (2) Queen’s crape myrtle leaning. Reset and stake. X 6 At address 164: (1) Holly trees needs corrective pruning. Median #6 X X 5 Plumbago look poor. Appears it maybe water stress or insects. M&A: 02/05/18 Recommend pruning shrubs to uniform shape and remove deadwood. X X 5 At address 228: (1) Holly tree is missing. X X 6 At address 246: (1) Washingtonia removed. Remove or grind stump. Option 1: Remove remaing Washingtonia palms and consider alternate replacement palms (i.e. Foxtail, Christmas, Alexander palms or Sabal) Median #7 No major damaged observed. Median #8 No major damaged observed. Median #8A No major damaged observed. Median #9 X X 5 At address 388: (12-14) Dwarf Bougainvillea ‘Helen Johnson’ are missing or damaged. X X 6 At address 364, 376 & 388: (3) Holly trees removed. Consider replacements with crape myrtles or smaller palms (i.e. Foxtail, Alexander, Christmas palms) X 6 At address 390: (1) Holly trees needs corrective pruning. Median #10 X X 6 At address 402: (1) Holly tree removed. Consider replacement with same. X X 6 (1) Replacement Holly tree is defoliated and in decline. Consider replacement with same. Forrest Hills Blvd McGee & Associates Landscape Architecture LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Report Date: FY17-18 04/10/18 Observation Date: 04/10/18 Report : 6 Page 3 of 7 LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS Median #11 X X 5 At address 455: (1) Washingtonia palm has lifted. Consider removal. X X 6 (1) Foxtail palm on south end removed due to accident damage. Replace with same. X 6 (1) Foxtail palm on north end needs pruning and then reviewed for bud damage. Median #12 X X 5 South end of Bougainvillea have been defoliated by caterpillars. X 5 The torpedo grass weeds are returning in the Bougainvillea shrubs at the north end of the median. X X X 5 At address 407-419: (4) Yellow Tabebuia trees have been removed. Consider replacement with Crape myrtle trees. X X 5 At address 426: (1) Holly tree removed. Consider replacement with same or Crape myrtle tree. Forest Hills Cart Crossing & Lake X X Irrigation coverage on the north side of the roadway around the crown of thorn and Xanadu needs to be reviewed and heads adjusted so to improve coverage. X X X 3 Crown of thorn in all plant beds should be considered for replacement with perennial peanut. Valley Stream Cr. Median #13 X 6 (1) Queen palm needs to be removed. (1) Pigmy date with Ganoderma was removed. X X 6 Paurotis palm needs dead frond removal. X X 6 Approximately 180 sq. ft. on the east side and 360 sq. ft. on the west side of the St. Augustine turf has died and contains weeds. Turf decline appears to be related to insect and/or fungus issues. Replacement is recommended. X 6 (6) Plumbago are declined and need replacing around water meters. Pebble Beach Blvd. Median #14 No major damaged observed. Median #15 X X 6 At address 32: (1) Holly tree needs to be removed and replacement considered. Replace with crape myrtle species. Median #16 X 6 Torpedo grass weed in Juniper on south end. Median #17 X X 6 At address 140: (1) Tabebuia ‘Ipe’ removed. Replace with same or crape myrtle species. X X 6 At address 132: (2) Sabal palms with broken trunks. Remove and replace with same. X X 6 At address 124: (1) Tabebuia ‘Ipe’ removed. Replace with same or crape myrtle species. X 6 At address 116: (1) Sabal palms with broken trunks needs to be removed. Remove and replace with same. Median #18 X X 4 At address 164: (1) Washingtonia removed. Flush cut or grind stump. Option 1: Consider removal of all remaining Washingtonia palms and replant with smaller palms (i.e. Foxtail, Alexander, Christmas palms) Median #19 No major damaged observed. Pebble Beach Blvd. Golf Cart Crossing X South side east end: Remove one dead Plumbago shrub at base of declined Foxtail palm. X X 5 Northwest side (8) Plumbago shrubs are missing. X 6 South side east end: (1) Foxtail needs to be pruned and reviewed. M&A: Foxtail palm is in considerable decline and removal and replacement maybe needed. M&A: 4/10/18 McGee & Associates Landscape Architecture LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Report Date: FY17-18 04/10/18 Observation Date: 04/10/18 Report : 6 Page 4 of 7 LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS Recommend removal of the declined Foxtail palm and delay replacement. Soil fungus treatment is recommended prior to any replacement. X X X 5 North side west end: Clean up debris and replant (5) Plumbago and recently removed Foxtail palm that was removed due to lightening. M&A: 01/09/18 Recommend replacement of previous removed Foxtail palm due to decline of existing Eucalyptus tree after hurricane Irma. Thorncrest Ln. cul-de-sac #20 X X 6 (3) Sabal palms removed. (5) dwarf Bougainvillea missing. Grind or remove stumps and replace missing Sabal with the same. Replant missing Bougainvillea. X 6 Torpedo grass weed in Bougainvillea Briarcliff Ln. Cu-de-sac #21 X X 6 (1) Sabal palms removed. Hurricane debris storage and removal has caused about 60 dwarf Bougainvillea plants to be removed and/or damaged to the point of replacement. Grind or remove stumps and replace missing Sabal with the same. Replant missing Bougainvillea. Heather Grove Ln. Cul-de-sac #22 X X 4 Approximately 20 to 25 dwarf Bougainvillea shrubs are missing or have been damaged. Some of the damage is related to recent roadway paving. X X 6 (1) Sabal palms removed. No replacement needed or replace with same. Baltusrol Signs X X 3 Recommend removing Crown of thorn beds and replace with Perennial Peanut. X X 4 On south side it appears (4 or 5) Plumbago have died and should be replaced. Doral Cr. East R/W X X 6 (1) Yellow Tabebuia tree uprooted. Remove and replace with Golden Tabebuia tree. X X 6 (1) Golden Tabebuia tree second from Rattlesnake Hammock needs corrective and structural pruning to create new main leader. Option 1: remove and replace with sam e. X X 6 (1) 50 ft. gray wood Royal palm has bud broken out. Remove and replace with smaller Royal palm. 4th from Rattlesnake Hammock West R/W & Rattlesnake Hammock Rd. X X 3 Check irrigation system coverage and settings. Small turf area and Blueberr y Flax Lily appear water stressed. X X 5 All broken and damaged tree branches hanging over the Podocarpus hedge should be removed. X X 6 Additional fertilizer is recommended for the first and fourth Foxtail palms west of Doral circle. 10 lbs. 13-3-13 palm special fertilizer with minors. M&A: 01/09/18 It is urgent that the fertilizer be placed in order to try and save the palm. M&A: Recommended due to level of decline and adjacent Oak tree growth over the palm that it be removed and not replaced. X X 13 31 54 +/- Blueberry Flax lilies are declined, dead and/or missing in the bed along Rattlesnake Hammock Rd. These plants were planted and maintained by the contractor. Replacements should be installed. M&A: 4/10/18 Well over 505 of the Flax lily are dead or missing. Recommend complete removal of all Flax lily and replacement with one row of Yellow African Iris 1 gal. size set 4 ft. off back of sidewalk and 4 ft. on center. (53) plants recommended. If two small area (less than 5 sq. ft.) of turf on the eastern end are removed an additional 3 McGee & Associates Landscape Architecture LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Report Date: FY17-18 04/10/18 Observation Date: 04/10/18 Report : 6 Page 5 of 7 LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS plants will be required. X X 6 (1) 50 ft. gray wood Royal palm has bud broken out. Remove and replace with smaller Royal palm.5th from Rattlesnake Hammock Median #23 X 3 Recommend pruning all Ixora shrubs to uniform shape and remove deadwood. X X 5 (2) Existing Ixora shrubs have declined and need to be replaced just behind irrigation controller. X X X 6 (4) Jatropha trees are uprooted. (2) trees were removed and (2) need to be replanted and staked. Replace removed Jatropha trees. Median #24 Treasure Point Cul- de-sac X 3 Review and treat Bougainvillea for Caterpillars. M&A: 3/6/18 insects still actively eating foliage. M&A: 4/10/18 Insects still actively eating foliage. X X 4 (6) dwarf Bougainvillea shrubs need to be planted in open bed areas. 3 gal. size. Warren St. Pumping Station X X 6 Pump station area needs to be mulched. Fertilization X X Revised fertilization schedule to add Perennial Peanut fertilizer times and rates. It is recommended to apply as soon as possible in April. McGee & Associates Landscape Architecture LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Report Date: FY17-18 04/10/18 Observation Date: 04/10/18 Report : 6 Page 6 of 7 LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS McGee & Associates Landscape Architecture LELY GOLF ESTATES BEAUTIFICATION, M.S.T.U. Report Date: FY17-18 04/10/18 Observation Date: 04/10/18 Report : 6 Page 7 of 7 LOCATION/WORK AREA AC S C R OBSERVATION & RECOMMENDATIONS ADDITIONAL COMMENTS LELY MSTU FUND 152 April 19, 2018 Vendor Item PO# Budget Commitments Expenditures Budget Remainder 1 CUR AD VALOREM TAX (255,500.00)$ -$ (236,552.01)$ (18,947.99)$ 2 DEL AD VALOREM -$ -$ -$ -$ 3 OVERNIGHT INTEREST -$ -$ (954.24)$ 954.24$ 4 INVESTMENT INTEREST (1,000.00)$ -$ (1,679.64)$ 679.64$ 5 INS CO REFUNDS -$ -$ -$ -$ 6 INTEREST TAX COLLECTOR -$ -$ (10.02)$ 10.02$ 7 REVENUE STRUCTURE (256,500.00)$ -$ (239,195.91)$ (17,304.09)$ 8 TRANSFERS FROM PROP APP -$ -$ -$ -$ 9 TRANSFERS FROM TAX COLL -$ -$ -$ -$ 10 CARRY FORWARD -$ -$ 11 CARRY FORWARD GEN (319,900.00)$ -$ -$ (319,900.00)$ 12 NEG 5% EST REV 12,900.00$ -$ -$ 12,900.00$ 13 TRANSFERS & CONTRIB (307,000.00)$ -$ -$ (307,000.00)$ 14 TOTAL REVENUE (563,500.00)$ -$ (239,195.91)$ (324,304.09)$ McGee & Associates Landscape Architect 4500182606 7,919.40$ 4,460.60$ Hole Montes Survey - Monuments 4500184641 -$ 972.50$ 15 ENG. FEES & OTHERS 15,000.00$ 7,919.40$ 5,433.10$ 1,647.50$ 16 INDIRECT COST REIMBURSE Collier County Indirect Cost Direct Pay 6,500.00$ 3,250.00$ 3,250.00$ -$ Florida Land Maintenance Incidentals -Interim 4500183370 10,000.00$ Florida Land Maintenance Incidentals - New 4500186351 10,000.00$ Florida Land Maintenance Incidentals 4500182568 2,645.50$ 2,354.50$ Florida Land Maintenance 4500172048 (102.60)$ 17 LANDSCAPE INCIDENTALS 25,000.00$ 22,645.50$ 2,251.90$ 102.60$ Florida Land Maintenance Grounds Maintenance- Interim 4500183370 1,082.50$ 26,917.50$ Florida Land Maintenance Grounds Maintenance- New 4500186351 17,764.00$ 10,236.00$ Annat, Inc-Municipal Supply/Sign Replacement of street signs TBD 10260758 3,281.00$ Florida Land Maintenance Grounds Maintenance 4500182568 12,155.00$ 5,845.00$ OTHER CONTRACTUAL 85,000.00$ 34,282.50$ 42,998.50$ 7,719.00$ 19 ELECTRICITY FPL Electricity Direct Pay 5,000.00$ 2,797.70$ 1,792.30$ 410.00$ 20 WATER AND SEWER Collier County Utilities Water Usage 470003503 15,000.00$ 7,200.90$ 5,799.10$ 2,000.00$ 21 RENT EQUIPMENT J.M. Todd Shared Copier Lease 4500182947 300.00$ -$ -$ 300.00$ 22 INSURANCE GENERAL Collier County Insurance General Direct Pay 400.00$ 100.00$ 300.00$ -$ Road & Bridge Access to R&B ICC Pro IGC 156.20$ Home Depot Proivde Irma irigation parts visa payment 69.19$ 23 FIS Pumps & related items 4500182573 1,133.93$ 866.07$ SPRINKLER SYSTEM MAINT 5,000.00$ 1,133.93$ 1,091.46$ 2,774.61$ 24 Forestry Resources Mulch 4500182571 1,000.00$ -$ (1,000.00)$ SunBright Mulch 4500184785 7,378.00$ MULCH 10,000.00$ 1,000.00$ 7,378.00$ 1,622.00$ Graybar Electrical Philips - Brand LED retrofit fixtures 4500182927 1,041.44$ 5,458.56$ Hart's Electrical CON-Reinstall retrofit kit at Pole #6 4500183213 -$ 165.00$ 25 Hart's Electrical Electrical Services 4500183630 1,530.00$ 400.00$ LIGHTING MAINTENANCE 10,000.00$ 2,571.44$ 6,023.56$ 1,405.00$ 26 LICENSE & PERMITS Road & Bridge Access to R&B ICC Pro IGC 4,000.00$ -$ 4,000.00$ Juristaff Transcriptionist 4500182570 2,285.55$ 1,214.45$ Whited Holiday Holiday Decorations 4500182978 465.00$ 2,535.00$ 27 OTHER MISCELLANEOUS 6,500.00$ 2,750.55$ 3,749.45$ -$ 28 OFFICE SUPPLIES Staples Advantage Office Supplies 4500182958 300.00$ 183.75$ 16.25$ 100.00$ 29 COPYING CHARGES J.M. Todd Copier CPC 4500182947 300.00$ 286.97$ 279.15$ (266.12)$ 30 FERT HERB CHEM Florikan Fertlizer 4500182569 3,500.00$ 2,500.00$ -$ 1,000.00$ CDW Provide office equipement for intern visa payment 32.00$ United States Flag Flags for Lely visa payment -$ 81.60$ 31 OTHER OPERATING 200.00$ 113.60$ 86.40$ 32 OPERATING EXPENSE 192,000.00$ 88,622.64$ 80,476.37$ 22,900.99$ 33 IMPROVEMENTS GENERAL 148,900.00$ -$ -$ 148,900.00$ 34 CAPITAL OUTLAY 148,900.00$ -$ -$ 148,900.00$ 35 REIMBURSEMENT FOR STAFF SUPPORT 34,700.00$ -$ 34,700.00$ 36 Budget Trans from Appraiser 2,000.00$ 1,482.30$ 517.70$ 37 Budget Trans from Tax Collector 6,500.00$ 5,730.94$ 769.06$ 38 TRANSFERS 43,200.00$ -$ 7,213.24$ 35,986.76$ 39 CATASTROPHE/HURRICANE RESERVE 79,400.00$ -$ -$ 79,400.00$ 40 Reserves for Insurance 100,000.00$ -$ -$ 100,000.00$ 41 RESERVES 179,400.00$ -$ -$ 179,400.00$ 42 TOTAL BUDGET 563,500.00$ 88,622.64$ 87,689.61$ 387,187.75$ Total Available Balance 387,187.75$ 119,917,030 FY 10 Final Taxable Value Plus Commited And Not Spent 88,622.64$ 104,325,032 FY 11 Final Taxable Value 95,871,609 FY 12 Final Taxable Value 92,697,303 FY 13 Final Taxable Value Estimated Cash 475,810.39$ 95,718,423 FY 14 Final Taxable Value 99,596,489 FY 15 Final Taxable Value 106,888,467 FY 16 Final Taxable Value 116,823,687 FY 17 July Taxable Value 127,772,474 FY 18 July Taxable Value 9.37% Adj. 17 to 18 FY 18 FY 17 Millage 2.0000 2.0000 2.0 mill cap Extension 255,545 233,647 FY 18 Gross Taxable Value 127,772,474 Minus: New Const. Annex. 1,738,539 Plus: Amendment #1 TV Component 0 Adj. Taxable Value 126,033,935 Prior year FY17 Levy (Proceeds) 233,647 Rolled Back Rate (less Amend One)1.8538 91% of Rolled Back Rate 1.6870 Property Tax Limitation Impact Estimated Cash Less 456,862.40$ Uncollected Ad Valorem Taxes LELY MSTU LIGHTING INSPECTIONS Jan‐18 SEE SEE SEE SEE  BELOW BELOW BELOW BELOW ST. ANDREWS ENTRANCE OFF US41 LIGHT DESCRIPTION JAN FEB MAR APRIL Flagpole Light‐1 Flagpole Light‐1 Flagpole Light‐1 Sign Light‐North US41 Sign Light‐South US41 OUT OUT OUT Single Luminare‐1 Single Luminare‐2 Single Luminare‐3 Single Luminare‐4 Single Luminare‐5 Single Luminare‐6 Single Luminare‐7 Single Luminare‐8 Single Luminare‐9 Single Luminare‐10 Single Luminare‐11 OUT OUT PEBBLE BEACH LIGHTING Double Luminare‐1 EAST SIDE OUT EAST SIDE OUT Double Luminare‐2 Double Luminare‐3 Double Luminare‐4 Double Luminare‐5 OUT Double Luminare‐6 Double Luminare‐7 Double Luminare‐8 Double Luminare‐9 Double Luminare‐10 EAST SIDE OUT EAST SIDE OUT OUT Double Luminare‐11 Double Luminare‐12 Double Luminare‐13 Double Luminare‐14 Double Luminare‐15 Double Luminare‐16 Double Luminare‐17 Double Luminare‐18 Double Luminare‐19 Double Luminare‐20 Double Luminare‐21 Single Luminare‐22 Single Luminare‐23 SOLAR LIGHT @AUGUSTA Solar Light‐@Augusta DORAL CIRCLE LIGHTING Double Luminare‐D‐1 Double Luminare‐D‐2 Sign Light‐DS‐1 Sign Light‐DS‐2 OUT   Single Luminare‐B1 OUT Single Luminare‐B2 Single Luminare‐B3 Single Luminare‐B4 PHASE 1 CONTRACTOR TO DEFLECT PROPOSED FM TO MAINTAIN MINIMUM 18" VERTICAL CLEARANCE FROM EXISTING 6" WM (AC) PHASE 1 CAP PHASE 2 PROPOSED 6" FM PHASE 2 PROPOSED PS #300.06 10' DIAMETER POLYMER CONCRETE WETWELL STA 0+83.43, 42.94 R RIM = 5.60 8" INV (S) = -8.74XXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXSS SS SS FM FM FM XXXFM HIDDEN V A L L E Y D R . DATE: PROJECT NO. FILE NO. SCALE: SHEET NUMBERREVISIONSNO. DESCRIPTION DATE2350 STANFORD COURT NAPLES, FLORIDA 34112 PHONE (239) 434-0333 FAX (239) 434-9320 E.B. #642 C-08 JAN. 2008 20149700-045 15-48-27 As Shown PUMP STATION DETAILS PUMP STATION 300.06RELOCATIONCOLLIER COUNTY, FLORIDAPHASE 2 PROPOSED 8" PVC (SDR26) 67 LF 0.42% SLOPE PHASE 2 PROPOSED 6" FM PROFILE PLAN PHASE 1 CAP PHASE 2 ASPHALT ACCESS 51 SY.ODORCONTROL8' CHAIN LINK FENCE SEE DETAIL SHEET C-09 BERM ELEV. = 6.0 PER DETAIL WW-7A CONTROL PANEL 8' DIAMETER POLYMER CONCRETE WETWELL 45° BEND WATER SERVICE PROPOSED COMMUNITY PUMP STATION SITE 22.5° BEND PHASE 1 PROPOSED SAN. MH. #3 POLYMER CONCRETE STA 0+57.83, 43.27 R RIM = 5.08 8" INV (SW) = 8.36 8" INV (N) = -8.46 (CORE PHASE 2) 34' 73'30' -10 -8 -4 0 4 7 6 5 3 2 1 -1 -2 -3 -5 -6 -7 -9 -10 -8 -4 0 4 7 6 5 3 2 1 -1 -2 -3 -5 -6 -7 -9 A A TELEMETRY ANTENNA SECTION A-A PUMP STATION SITE ELEV = 5.5 BERM HIDDEN VALLEY DR. 18' 8' HIGH CHAIN LINK FENCE PROPERTY LINE PROPOSED 6" FM PROPOSED 8" PVC GRAVITY MAIN TYPICAL PAVEMENT SECTION 30' COMMUNITY PUMP STATION SITER20'R 2 0 ' 16' COLLIER COUNTY VAC TRUCK FPL EASEMENT BACKU P DIESEL P U M P CHECK VALVE DISCHARGE SUCTION 17' PROPERTY LINE 3'5'5' McGee & Associates Landscape Architecture Design * Environmental Management * Planning * Arborist 5079 Tamiami Trail East / P. O. Box 8052 Naples, Florida 34101 Phone (239) 417-0707 * Fax (239) 417-0708 LC 098 * FL 1023A April 6, 2018 Dan Schumacher MSTU Project Manager Public Transit and Neighborhood Enhancement Department Public Services Division 3299 East Tamiami Trail East, Suite 103 Naples, Florida 34112-5746 Subject: Landscape Architectural Services for Lely Golf Estates M.S.T.U. St. Andrews & US 41 Entrance Beautification Improvements. 2018-007P Dear Mr. Sells: As requested, McGee & Associates is providing the following proposal of services for your review and approval. McGee & Associates (M & A) agrees to provide the following “Scope of Services” related to above described project. See attached “Project Man Hour and Fee Support Calculations”, Sheet 1 for service hours and fees. Scope of Services Task 1: Base Plan Preparation: 1.1 Review the existing MSTU drawings, Hole, Montes survey, and County aerial photos to develop a CAD base map for the concept and construction plans. The base site plan will not include the exact or field surveyed locations of any utilities or other objects in the project areas. Task 2: Site Investigation: 2.1 The LA of Record will review the project site so to complete an analysis of the existing site features, conditions, vegetation and adjacent land uses, so to produce a current base map for design purposes. Review Collier County LDC sign code requirements to show restrictions on base site plan. 2.2 The LA of record will strive to adhere to Collier County Roadway Rights-of-W ay, Collier County L.D.C. and F.D.O.T. Design Indexes, Design Guidelines, criteria and applicable ordinances and codes pertinent to signage, hardscape, landscape and irrigation installation for this specific project roadway and easement areas. Task 3: Conceptual Design: 3.1 The LA of Record will prepare conceptual hardscape (e.g. community identification signage renovation and improvements, sign and feature lighting, site amenities or other related features) and landscape designs that will illustrate the design intent for the proposed project areas. To include plans, drawings and/or presentation graphics. Provide as required structural engineering services through a Florida Registered Structural Engineer. The conceptual design will be based on the staff and MSTU Advisory Committee’s input. 3.2 The LA of Record will meet with the MSTU Advisory Committee and/or County project manager to present and review the concepts, resolve questions, confirm the project budget, and receive approval to begin the conceptual design development. 3.3 The LA of Record will prepare an Opinion of Probable Costs based upon the Conceptional Design Development drawings. 3.4 Attend meetings and present conceptual documentation for receiving County permitting approvals. 27.A.7 Packet Pg. 419 Attachment: Backup - 7-Lely-180406-Monuments-McGee_Proposal (5503 : Lely Golf Estates Beautification MSTU - April 19, 2018) Page 2, 04/06/18 Dan Schumacher, MSTU Project Manager Lely Golf Estates MSTU Proposal 2018-007P Task 4: Final Design Development (60% Plans): 4.1 The LA of Record will prepare (60%) Hardscape, Landscape and Irrigation Design Development Plans for permitting, bidding and construction purposes based upon approved concepts, budgets and comments from the MSTU, Public and County staff. Provide as required structural engineering services through a Florida Registered Structural Engineer. 4.2 The LA of Record will prepare an Opinion of Probable Costs based upon the 60% Design Development drawing package. 4.3 The LA of Record shall submit to the County Project Manager two (2) 11” x 17” sets of (60%) Design Development drawings for review and comments. 4.4 The LA of Record shall meet with MSTU Advisory Committee and County staff to discuss their 60% plan review comments. County Staff and the LA of Records shall then work to resolve all outstanding issues. Task 5: Final Construction Documents (90% Plans): 5.1 The LA or Records will prepare (90%) Hardscape, Landscape and Irrigation Design Development Plans for permitting, bidding and construction purposes based upon staff approval of 60% Design Development Plans and Opinion of Probable Cost. Provide as required structural engineering services through a Florida Registered Structural Engineer. 5.2 The LA of Record will prepare an Opinion of Probable Costs based upon the 90% Construction Drawing package. 5.4 The LA of Record shall submit to the county Project Manager two (2) 11” x 17” sets of (90%) Construction Drawings for review and comments. 5.5 The LA of Record shall meet with MSTU Advisory Committee and County staff to discuss their (90%) project review comments. Staff and The LA of Record shall then work to resolve all outstanding issues. Task # 6.0 – Final Construction Documents (100%): 6.1 Based upon staff approval of 90% Construction Drawings the LA of Record will prepare (100%) Construction Plans, Details and Specifications to minimally include the following: a. Cover Sheet: Includes project name, limits, declarations, location map, and sheet index. b. Hardscape Plans: To include proposed site plan of proposed improvement features and amenities for community identification signage, sign & feature lighting, Arbor and/or Trellis structures, decorative pavement installation details and/or specifications. c. Planting Plans: Showing placement of plant materials, plant schedule: including plant quantities, species and size specifications, along with planting installation details and specifications. d. Irrigation Plans: To include piping, sprinkler selection and layout for 100 percent coverage of proposed plant materials, along with installation details and specifications. e. Prepare bid tabulation schedules. d. Provide final opinion of probable cost Provide as required structural engineering services through a Florida Registered Structural Engineer. Task #7.0 – Bidding & Permitting Assistance: 7.1 The LA of Record will attend one pre-bid meeting at the Collier County offices. 7.2 The LA of Record will assist staff in preparing any addendums to include bid tabulation adjustments and responses to the pre-bid meeting and bid questions. 27.A.7 Packet Pg. 420 Attachment: Backup - 7-Lely-180406-Monuments-McGee_Proposal (5503 : Lely Golf Estates Beautification MSTU - April 19, 2018) 27.A.7 Packet Pg. 421 Attachment: Backup - 7-Lely-180406-Monuments-McGee_Proposal (5503 : Lely Golf Estates Beautification MSTU - April 19, 2018) PROJECT MAN HOUR AND FEE ESTIMATE SUPPORT CALCULATIONS PROJECT NAME: Lely Golf Estates MSTU CONSULTANT: McGee & Associates Sheet No. 1 LOCATION: St. Andrews Blvd. and US 41 Community Entrance M&A PROJECT#: 2018-007P OWNER/CLIENT: Collier County Public Transit and Neighborhood Enhancement Department DATE: 04/06/2018 Public Services Division Rates per Contract #16-6598 PRINCIPAL/SENIOR CONTRACT LANDSCAPE TECHNICAL ADMIN. / CLERICAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED HOURS & RATES ARCHITECT CAD SUPPORT HOURS FEES SUBCONSULTANT TOTAL Hrs.RATE Hrs. RATE Hrs. RATES FEES FEES TASK DESCRIPTION $150.00/hr $70.00/hr $60.00/hr FEE FEE FEE Task 1: BASE PLAN PREPARATION 1.1 Base Plan Development 0.5 $75.00 1 $70.00 0.5 $30.00 2 $175.00 -$ $175.00 Task 1 Subtotal:0.5 $75.00 1 $70.00 0.5 $30.00 2 $175.00 -$ $175.00 Task 2: SITE INVESTIGATION 2.1 Site reviews & field confirmations 0.5 $75.00 0.5 $35.00 0.5 $30.00 1.5 $140.00 -$ $140.00 2.2 Design criteria research & review 0.5 $75.00 0.5 $35.00 0.5 $30.00 1.5 $140.00 -$ $140.00 Task 2 Subtotal:1 $150.00 1 $70.00 1 $60.00 3 $280.00 -$ $280.00 Task 3: CONCEPTUAL DESIGN 3.1 Design - Hardscape, Landscape & Irrigation 4 $600.00 8 $560.00 2 $120.00 14 $1,280.00 300.00$ $1,580.00 3.2 Reviews & Meetings 1 $150.00 1 $70.00 1 $60.00 3 $280.00 -$ $280.00 3.3 Opinion of Costs 1 $150.00 1 $70.00 1 $60.00 3 $280.00 -$ $280.00 3.4 Staff & Permitting Meetings 1 $150.00 1 $70.00 1 $60.00 3 $280.00 -$ $280.00 Task 3 Subtotal:7 $1,050.00 11 $770.00 5 $300.00 23 $2,120.00 300.00$ $2,420.00 Task 4: FINAL DESIGN DEVELOPMENT (60% Plans) 4.1 Design - Hardscape, Landscape & Irrigation 12 $1,800.00 8 $560.00 3 $180.00 23 $2,540.00 300.00$ $2,840.00 4.2 Opinion of Costs 1 $150.00 2 $140.00 1 $60.00 4 $350.00 -$ $350.00 4.3 Submittals (11x17 plans)0.5 $75.00 1 $70.00 1 $60.00 2.5 $205.00 -$ $205.00 4.4 Reviews, Meetings & Address Comments 1 $150.00 1 $70.00 1 $60.00 3 $280.00 -$ $280.00 Task 4 Subtotal:14.5 $2,175.00 12 $840.00 6 $360.00 32.5 $3,375.00 300.00$ $3,675.00 Task 5: FINAL CONSTRUCTION DOCUMENTS (90% Plans) 5.1 Design - Hardscape, Landscape & Irrigation 2 $300.00 8 $560.00 2 $120.00 12 $980.00 300.00$ $1,280.00 5.2 Opinion of Costs `0.5 $75.00 1 $70.00 1 $60.00 2.5 $205.00 -$ $205.00 5.3 Submittals (11x17 plans)0.5 $75.00 1 $70.00 1 $60.00 2.5 $205.00 -$ $205.00 5.4 Reviews, Meetings & Address Commnets 1 $150.00 1 $70.00 1 $60.00 3 $280.00 -$ $280.00 Task 5 Subtotal:4 $600.00 11 $770.00 5 $300.00 20 $1,670.00 300.00$ $1,970.00 27.A.7 Packet Pg. 422 Attachment: Backup - 7-Lely-180406-Monuments-McGee_Proposal (5503 : Lely Golf Estates PROJECT MAN HOUR AND FEE ESTIMATE SUPPORT CALCULATIONS PROJECT NAME: Lely Golf Estates MSTU CONSULTANT: McGee & Associates Sheet No. 2 LOCATION: St. Andrews Blvd. and US 41 Community Entrance M&A PROJECT#: 2018-007P OWNER/CLIENT: Collier County Public Transit and Neighborhood Enhancement Department DATE: 04/06/2018 Public Services Division Rates per Contract #16-6598 Task 6: FINAL CONSTRUCTION DOCUMENTS (100% Plans) 6.1 Design - Hardscape, Landscape & Irrigation 0.5 $75.00 1 $70.00 0 $0.00 1.5 $145.00 1,800.00$ $1,945.00 6.1.a Cover sheet 0.5 $75.00 1 $70.00 0 $0.00 1.5 $145.00 -$ $145.00 6.1.b Hardscape Plans 0.5 $75.00 1 $70.00 0 $0.00 1.5 $145.00 -$ $145.00 6.1.c Planting plans 0.5 $75.00 1 $70.00 0 $0.00 1.5 $145.00 -$ $145.00 6.1.d Irrigation Plans 0.5 $75.00 1 $70.00 0 $0.00 1.5 $145.00 -$ $145.00 6.1.e Bid Tabulation Schedules 0.5 $75.00 1 $70.00 1 $60.00 2.5 $205.00 -$ $205.00 6.1.d Opinion of Costs 0.5 $75.00 1 $70.00 1 $60.00 2.5 $205.00 -$ $205.00 Task 6 Subtotal:3.5 $525.00 7 $490.00 2 $120.00 12.5 $2,935.00 1,800.00$ $2,935.00 Task 1-6 Subtotal:$10,555.00 $2,700.00 $11,455.00 Task 7: BIDDING & PERMITTING ASSISTANCE 7.1 Pre-bid meeting 1 $150.00 0.5 $35.00 0.5 $30.00 2 $215.00 -$ $215.00 7.2 Prepare Addendum & Adjust Bid Tabulation & Opinion of Cost 1 $150.00 0.5 $35.00 1 $60.00 2.5 $245.00 -$ $245.00 7.3 Permitting Assistance 1 $150.00 1 $70.00 1 $60.00 3 $280.00 -$ $280.00 Task 7 Subtotal:3 $450.00 2 $140.00 2.5 $150.00 7.5 $740.00 -$ $740.00 Task 8: CONSTRUCTION ASSISTANCE 8.1 Pre-Construction Meeting 0.5 $75.00 0.5 $35.00 0.5 $30.00 1.5 $140.00 -$ $140.00 8.2 Landscape, Hardscape & Irrigation Construction Observations & Compliance 0.5 $75.00 0.5 $35.00 1 $60.00 2 $170.00 -$ $170.00 8.2.a Project initial site meeting 1 $150.00 0.5 $35.00 0.5 $30.00 2 $215.00 -$ $215.00 8.2.b Project Site Construction Observations 4 $600.00 1 $70.00 3 $180.00 8 $850.00 -$ $850.00 8.2.c Attend Weekly Construction Meetings 8 $1,200.00 1 $70.00 3 $180.00 12 $1,450.00 -$ $1,450.00 8.2.d Review and approve pay applications 1.5 $225.00 0.5 $35.00 1.5 $90.00 3.5 $350.00 -$ $350.00 8.2.e Substantial Completion Assistance & Observation 1.5 $225.00 0.5 $35.00 0.5 $30.00 2.5 $290.00 300.00$ $590.00 8.2.f Final Completion Assistance & Observation 5 $750.00 0 $0.00 0 $0.00 5 $750.00 300.00$ $1,050.00 8.3. Submittals and Shop Drawing reviews and comments 2 $300.00 0.5 $35.00 1 $60.00 3.5 $395.00 -$ $395.00 8.4 As-built/Record drawing coordiantion and production of cad files.2 $300.00 4 $280.00 1 $60.00 7 $640.00 -$ $640.00 Task 8 Subtotal:26 $3,900.00 9 $630.00 12 $720.00 47 $5,250.00 600.00$ $5,850.00 Task 9 REIMBERSABLES - Per contract 16-6598 $100.00 $$100.00 Totals:59.5 $8,925.00 54 $3,780.00 34 $2,040.00 147.5 $16,645.00 3,300.00$ $21,445.00 ` 27.A.7 Packet Pg. 423 Attachment: Backup - 7-Lely-180406-Monuments-McGee_Proposal (5503 : Lely Golf Estates 1 SchumacherDan From:SorianoLiz Sent:Monday, March 19, 2018 6:41 AM To:SchumacherDan Subject:RE: US41 East Medians 30, 31, & 32 Good morning Dan, I understand the concerns that the MSTU have as I agree with them on the conditions of this roadway. We are working towards improving the maintenance and replacing plants. There have been a few issues that have brought on the conditions on US 41 East. The first issue was our previous maintenance contractor was unable to keep up with all their workload which caused numerous roadways to suffer including US 41 East. We are working with our current contractor to get this roadway back up to standards. The other issue was Irma, we had completed a plant replacement project not to long before Irma, most of the new plantings blew away in the hurricane. We have completed the plant replacement plan and will be putting out for quotes this week. Once we review the prices that are received, we will proceed with a PO if the prices are competitive. I will keep you updated so that you can report next month to the committee. Liz Soriano, FCHP Supervisor   Road Maintenance Division Exceeding Expectations Everyday 4800 Davis Blvd., Naples, Florida 34104 Phone: 239.252.8924 Fax: 239.252.6619 NOTE: Email Address Has Changed   From: SchumacherDan   Sent: Friday, March 16, 2018 3:58 PM  To: SorianoLiz <Liz.Soriano@colliercountyfl.gov>  Subject: US41 East Medians 30, 31, & 32    27.A.8 Packet Pg. 424 Attachment: Backup -8-Lely-180319-US41_Medians. (5503 : Lely Golf Estates Beautification MSTU - April 19, 2018) 2     Hello, Liz,    The monthly Lely Golf Estates MSTU meeting is held at the East Naples Branch library at 8787 Tamiami Trl E. (US41)    At yesterday’s meeting and in recent months comments and inquiries have been received about the perceived poor  condition of median 30 out front and medians 31 & 32 extending toward and past the St Andrews Blvd intersection.    Request:  Please reply with the status of the ongoing maintenance and any plans to restore better landscaping in that  area.    Thank you.    Respectfully,    Dan Schumacher  Project Manager      Public Transit & Neighborhood Enhancement Division NOTE: Email Address Has Changed 3299 Tamiami Trail E, Building F, Suite 103, Naples FL 34112 Phone: 239.252.5775 Cell: 239.227.4011 Email: dan.schumacher@colliercountyfl.gov   27.A.8 Packet Pg. 425 Attachment: Backup -8-Lely-180319-US41_Medians. (5503 : Lely Golf Estates Beautification MSTU - April 19, 2018) US41 E Medians - Lely 2004. Collier County Property Appraiser. While the Collier County Property Appraiser is committed to providing the most accurate and up-to-date information, no warranties expressed or implied are provided for the data herein, its use, or its interpretation. Page 1 of 1Print Map3/16/2018http://maps.collierappraiser.com/mapprint.aspx?pagetitle=US41%20E%20Medians%20-%20Lely&orient=LANDSCAPE&pape...27.A.9Packet Pg. 426Attachment: Backup - y-Lely-180316-US41_Medians (5503 : Lely Golf Estates Beautification MSTU - April