Agenda 06/11/2013 Item #16C36/11/2013 16.C.3. EXECUTIVE SUMMARY Recommendation to approve a work order in the amount of $708,934.50 to Quality Enterprises under Request for Quotation 08- 5011 -89 to complete the interconnect of the Livingston Road Supplemental Wells to the Collier County Irrigation Quality water system; IQ Water Source Integration Project Number 74405 and authorize the necessary budget amendment. OBJECTIVE: The public purpose of this project is to provide a reliable supply of irrigation quality water in the North and South service areas of the County. CONSIDERATIONS: On June 24, 2008, as Agenda Item IOG, the Board of County Commissioners (Board) adopted the 2008 Wastewater Master Plan Update that identified the requirement for irrigation with irrigation quality (IQ) water as the primary means of effluent disposal with a action item to pursue means of long -term storage of IQ water and provision of supplemental supply sources to improve IQ water reliability. The proposed scope of work for the IQ water source integration project is consistent with the 2008 Wastewater Master Plan Update, Project 74405, "Irrigation Quality Water Source Integration," Section 8, Table 8 -2, page 5 of 5, line 160; and with the 2010 Wastewater CIP Update, page 2 of 4, line 97, as identified in the 2011 User Fee Rate Study. There are seven supplemental raw water wells located along Livingston Road. This project completes the interconnect of the existing raw water transmission line associated with the Livingston Road Supplemental Wells to the Collier County Irrigation Quality (IQ) water transmission system. Connecting the raw water line directly to the IQ storage ponds at the North County Water Reclamation Facility (NCWRF) will provide the following: (1) additional flow to the present IQ water system and (2) the ability to distribute supplemental water throughout the entire IQ water system. The raw water will combine with the reclaimed water at (NCWRF) where six high service pumps will distribute IQ water to the service area. This interconnect arrangement will also serve for conveyance and deep injection disposal of recovered aquifer storage and recovery (ASR) water that may not meet regulatory standards. The Purchasing Department electronically distributed Request for Quotation 08- 5011 -89, IQ Water Source Integration Phase 2A, on April 24, 2013, to the five vendors under the Fixed -Term Underground Utilities Contract No. 08 -5011. Four of those contractors submitted quotations by the May 10, 2013, deadline. The quotations are summarized in the table below. VENDOR PROJECT COST Quality Enterprises $ 708,934.50 Haskins, Inc. $ 714,000.00 Douglas N Higgins $ 814,630.00 Mitchell & Stark $ 911.805.00 Kyle Construction Did Not Quote The engineer's opinion of probable construction cost was $557,000.00. Staff reviewed the quotations and determined Quality Enterprises to be the lowest qualified and responsive bidder at approximately 27 percent above the engineer's cost estimate. Contributing factors to the higher quote price include the cost of the electrical service, which was not included in the cost estimate, and higher than expected contractor installation costs. The quote tabulation and graph are Attachments 1 and 2, respectively. The Purchasing Department concluded that bidding was competitive and representative of market conditions. The project Packet Page -1296- 6/11/2013 16.C.3. design professional, Hole Montes, also recommends award of this work order to Quality Enterprises per the attached letter dated May 14, 2013 (Attachment 3). Quality Enterprises has a satisfactory performance and warranty record on other similar utility- related construction projects with Collier County. The bid specifications informed the bidders there may be unforeseen conditions associated with the project. The project includes allowances totaling $65,700 for owner - directed work due to unforeseen conflicts with underground piping and structures ($50,700), and for a new electrical service ($15,000). Subject to the Purchasing Policy, staff will negotiate price prior to the start of any additional work. FISCAL IMPACT: Funding is available in, and is consistent with, the FY13 Capital Budget approved by the Board on September 20, 2012. The source of funding is the Wastewater User Fee Fund (414). A Budget amendment is required from Project 73950, Fund (414), in the amount of $708,934.50. Using today's dollars, the total capital cost to implement this project is $708,934.50 and has a life expectancy of 20 years, generating an approximate annual cost of $35,446.72. The project is expected to be completed by June 2014. There will be an increase in annual operation and maintenance cost for the additional force main, electrical service and electrical equipment as shown in the table below. Elements FY 2013 FY 2014 FY 2014 - FY2 333 Capital Outlay $ 708,934.50 $0 $0 Operating Cost Change * $ 0 $ 2,500 $ 50,000 Cost Savings $ 0 $ 0 $ 0 Net Operating Effect $ 0 $ 2,500 $ 50,000 New Personnel (FTE) 0 0 0 *This reflects the approximate cost in the annual operating budget for each fiscal year over the life of the asset. LEGAL CONSIDERATIONS: This item has been reviewed as to form and legality, and requires majority vote for Board approval. —SRT GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: That the Board of County Commissioners, as Ex- officio the Governing Board of the Collier County Water -Sewer District approve: a work order under Request For Quotation 08 -5011- 89, IQ Water Source Integration Phase 2A, in the amount of $708,934.50, and authorize the Chairwoman to sign and execute the attached work order after final review and approval by the County Attorney's Office; and, the necessary Budget Amendments to transfer funds in the amount of $708,934.50 from Project Number 73950, NCWRF Expansion to 30.6 MGD, to Project Number 74405, IQ Water Source Integration. Prepared By: Wayne Karlovich, Senior Project Manager Public Utilities Planning and Project Management Department. Attachments: Attachment 1- Quote tabulation Attachment 2- PPMD Bid Analysis Attachment 3- Recommendation Letter Attachment 4- Work Order Packet Page -1297- 6/11/2013 16.C.3. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.C.16.C.3. Item Summary: Recommendation to approve a work order in the amount of $708,934.50 to Quality Enterprises under Request for Quotation 08- 5011 -89 to complete the interconnect of the Livingston Road Supplemental Wells to the Collier County Irrigation Quality water system; IQ Water Source Integration Project Number 74405 and authorize the necessary budget amendment. Meeting Date: 6/11/2013 Prepared By Name: KarlovichWayne Title: VALUE MISSING 5/17/2013 11:30:07 AM Submitted by Title: VALUE MISSING Name: KarlovichWayne 5/17/2013 11:30:09 AM Approved By Name: Danette Kinaszczuk Title: Manager - Irrigation Quality,Wastewater Date: 5/17/2013 3:37:35 PM Name: HapkeMargie Title: Operations Analyst, Public Utilities Date: 5/20/2013 2:47:50 PM Name: JohnsonScott Title: Purchasing Agent,Purchasing & General Services Date: 5/22/2013 9:45:17 AM Name: WardKelsey Title: Manager - Contracts Administration,Purchasing & Ge Packet Page -1298- Date: 5/23/2013 9:07:48 AM Name: MarkiewiczJoanne Title: Manager - Purchasing Acquisition,Purchasing & Gene Date: 5/23/2013 9:46:59 AM Name: JohnssenBeth Date: 5/23/2013 11:20:32 AM Name: Jon Pratt Date: 5/23/2013 2:10:05 PM Name: Joseph Bellone Title: Manager - Utility Billing & Cust Serv.,Utilities F Date: 5/24/2013 9:26:03 AM Name: ChmelikTom Title: Director, Public Utilities Engineering Date: 5/24/2013 11:13:20 AM Name: JacobsSusan Title: Operations Analyst, Public Utilities Date: 5/24/2013 11:38:05 AM Name: PajerCraig Title: Project Manager, Senior,Public Utilities Engineeri Date: 5/24/2013 11:39:39 AM Name: JohnsonScott Title: Purchasing Agent,Purchasing & General Services Date: 5/24/2013 3:15:16 PM Name: TeachScott Title: Deputy County Attorney,County Attorney Date: 5/24/2013 4:33:10 PM Name: YilmazGeorge Title: Administrator, Public Utilities Date: 5/30/2013 1:14:38 PM Name: KlatzkowJeff Title: County Attorney Date: 5/30/2013 2:49:37 PM Packet Page -1299- 6/11 /2013 16.C.3. Name: UsherSusan Title: Management/Budget Analyst, Senior,Office of Manage Date: 6/3/2013 1:54:43 PM Name: OchsLeo Title: County Manager Date: 6/3/2013 2:39:02 PM Packet Page -1300- 6/11/2013 16.C.3. k Packet Page -1301 6/11/2013 16.0.3. 0�� 0 M C.) n k z O j 2 </ 9 z �0 / ; K a) 0 m > 7� -_ m X > m z �0 2 �k� \ > Q C) \ Z C -n § Q® Co � F a/ /§§ = -0» / J 3 = c O O 2 O w a ]�0 m - CD y_ CD / \\ \ § \ k 2 a / / k § % 3 ° . r a _ c =° s= o& J° n ®£ f= a a] } / 2 ? ( / / � 2 / \ E 0 & ! n / \ / 0 \ / ° § / c § n ( m = f 2 $ ° - _ = o 7 # § ƒ / f C" \ / % \ y �_ ] 2 & � 0 a m M§ = o CD m m Cr & e E e E = a/ \_ 0 07 CD 0 = 0 °= 2= t O /� D ! 3000) c o $ E?% 2kR^§�/ E f / E§�ƒ° 7 m 7 E ; k @= c 2 a« J= cn E CD \ ƒ / 0 / / \ / / 0 \ = cD 0 o = 3 M c_ \ o o§ cD Ch / D /§ /off E °_CD +� E o f e 5 e e E e ( f f / / $ / / / ! e . o _ | U _! @ a \ \ m ® ® f 7\ U) \ » \ CL [ E \ �0 7 7 ¥ 'f Cri o % i ■ :/ k Co / C) / / S _ � 7 2 Co / R ° CA C E 7 .\ \ / / , 'P o 9 0 ,§ 2 / k O A A / o / a o c © k / 0 7 E U) 7 / \ / � R 5 Co / L 0 / \ / E ® @ 7 d 1 / Packet Page -1301 6/11/2013 16.0.3. 0�� 0 M C.) n k z O z 2 </ 9 z �0 / ; K a) 0 m > -q m -_ m X > m z �0 2 �k� \ > Q C) \ Z C -n » m KD Co � F � mm so m rn r+ 6/11/2013 16.C.3. Packet Page -1302- Ql V 00 lD O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O i/f O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O Packet Page -1302- IRM HOLE MONTES ENGUNEERS • PLANNERS • SURVEYORS 950 Encore Way - Napies, Florida 34110 - Phone 239.254.2000 - Fax: 239.254.2099 May 14, 2013 Wayne Karlovich, P.E., Senior Project Manager Collier County Public Utilities 3339 Tamiami Trail East Suite 303 Naples FL 34112 RE: EVALUATION OF QUOTATIONS IQ WATER SOURCE INTEGRATION PHASE 2A NORTH COUNTY WATER RECLAMATION FACILITY HM File No. 2012.052A Dear Wayne, 6/11/2013 16.C.3. We have reviewed the four quotes received by the County on 1Q Water Source Integration Phase 2A for County Quote No. 08- 5011 -89. The four bidders and their quoted price are identified below as provided by the County Purchasing Department. The apparent low quote is from Quality Enterprises in the amount of $708,934.50. Bidder 1 Quality Enterprises 2 Haskins, Inc. 3 DN Higgins, htc. 4 Mitchell R Stark Const. Co. Inc. Bid $708,934.50 $714,000.00 $814,630.00 $911,805.00 The Engineer's estimate is $557,000.00. The Contractor's bid was 27% higher than the Engineer's estimate, which may have been due to a change in the market place that increases the Contractor's material cost, overhead and profit and/or higher mark- up and installation costs. Quality Enterprises has successfully completed other construction projects for Collier County and is on the County's list of approved utility contractors. Therefore, we recommend award of this construction contract to Quality Enterprises in the amount of $708,934.50 subject to a final review by the Purchasing Department of the quotation documents. Please contact its if there are any questions about this quote evaluation. Thank you, OLE MONTES, INC. �rry R. Ta icska, Ph.D., P.E., B.C.E.E. nvirom ental Engineering Manager /Associate JRT:dni H:\2012\2012052\EMC Correspondence\CI Client CorrspondenceThase 2A\20130513 WK Award Letter JRT.doc Packet Page -1303 - 1VQFlGa - i Uil IYIy GIJ WORK ORDER/PURCHASE ORDER Agreement for "Annual Underground Utility Contractors" - #08 -5011 Contract Date: March 11, 2008 Fixed Term Contract Expires: March 10, 2014 (RFQ #08- 5011 -89) BCC approval Date: June 11, 2013 This Work Order is for Underground Utility Construction services for work known as: Project Name: IQ Water Source Integration Phase 2A Project No(s).: 74405.1.3 v The work is specified in the proposal dated May 10, 2013 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above and Request for Quotation #08- 5011 -89 dated April 24, 2013, as modified by Addendum 1 thru 2, attached hereto a part of this Work Order, is assigned to: Quality Enterprises USA Inc Scope of Work: As detailed in the attached proposal and the following: Task 1 Perform all Work described in the Proposal Task 2 Allowance for Owners Use as Directed Task 3 Allowance for Electric Service Schedule of Work: Work shall be substantially complete within 305 days from the date of the Notice to Proceed, which is accompanying this Work Order, with an additional 60 days to Final Completion for a total of 365 days. Compensation: In accordance with Agreement #08 -5011, the County will compensate the Firm in accordance with following method(s): ®Negotiated Lump Sum ❑Lump Sum Plus Reimbursable Costs ® Time & Material (established hourly rate — Schedule A) ❑Cost Plus Fixed Fee, as provided in the attached proposal. Task 1 $ 643,234.50 (LS) Task 2 $ 50,700.00 (T &M) Task 3 $ 15.000.00 (T &M) Total Fee: $ 708,934.50 Any change made subsequent to final department approval will be considered an additional service and charged according to Schedule "A" of the original Contract Agreement, Prepared By: Wayn arlovic enior Project Manager Date Approved By: Craig P r, Princi Approved By: ZNAIA T I Project Manager Chmelik,`PPMD Director Approved By: Jo ratt, NC RF lant Manager �'f I � �,3 Date r ate .S'- /d -13 Date Approved Danette Kinaszczuk, Reuse Manager Date U i Work Order RFQ #08- 5011 -89 Page 2 Approved�oh Beth se n :\0 A e, I- terim wastewater Director Authorized By: Dr. George Yilmaz, Public Utilities Administrator Approved By: Evelyn Colon, Procurement Strategist ate S /3 Date 3 )Date , ATTEST: BOARD OF COUNTY COMMISSIONERS Dwight E. Brock, Clerk Collier County, Florida By: By: Deputy Clerk Georgia A. Hiller, Esq., Chairwoman Quality Enterprises USA, Inc. By: 1 Louis J. Gaudio Vice President (Print Name /Title) Approved as to Form and Legal Sufficien ATTEST: ) !,. (Witness By: Assistant County Attorney Marcie Cohen (Print Name /Title) REQUEST FOR QUOTA71ONS UNDER CONTRACT #08 -011 "Annual Contract for Underground Utilities- Date: April 24, 2013 From: Evelyn Collin, Procurement Strategist 239- 252 -2667, Telephone Number evelvncolon(dcollieraov net To: Prospective Vendors Subject: RFQ#08- 5011 -89 IQ Water Source Integration Phase 2A As provided in the referenced contract, the Collier County Purchasing Department is soliciting quotes for the referenced project. All quotations for individual projects shall be in accordance with the terms, conditions, and specifications stated herein and in accordance with the terms and conditions of Contract #08- 5011 of which your firm was an awardee. NO OTHER FlRMS ARE ELIGIBLE TO SUBMIT OR RECEIVE AN WARD FOR THIS PROJECT. RFQ Due Date: May 10, 2013 at 3:00 P.M. Price Non Mandatory Pre -Quote Meeting Date/'Time: May 2, 2013 at 3:00 P.M. Pre -Quote Meeting Location: _ NCWRF -10500 600dlette Rd, Naples 34109 Q&A Deadline: A ri130, 2013 at 3:00 P.M. Number of Days to Completion: 305 days to Substantial + 60 days to Final Completion = 365 days total Liquidated Damages: $1001.50 per day Plans and Specifications: Plans, Electrical Plans and Specifications Description -Quantity Price UOM Total Perform all Contract Work described in the Contract Documents 1 $643,234.5 LS $ 643 234.50 Allowance Fund for Owners Use as Directed. (Refer to Specification Section 01135 for more detail ) 1 $50 700 TM $50 700 Allowance for electric service. (Refer to Specification Section 16401) allowance will only be used for direct lost from the power company. Contractor coordination and carrying costs shall be included in the Contract Price. 1 $15,000 TM $15,000 TOTAL ._,,$,708,934.50 Your quotation response for this project is due no later than the date and time specified above. We will not accept any quotation responses later than the noted time and date. If your firm is unable to respond electronically, your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specified. We look forward to your participation in this request for information/quotation process. Performance and payment bonds shall be required if the lowest responsive quote exceeds $200,000. Quality -Enterprises USA Inc Firm's Complete Legal Name - 239- 435 -7200 239 -435 -7202 Telephone umber / Fax Number .�. S1to113 moo.. o; � ce res cent RFQ #wso11 -w 1 Signature Vice Pr ¢i rinnr Title RFO#DS-5011-83 2 COLLIER COUNTY BID NO. 08-5011-89 ADDENDUM NO. 1 IQ WATER SOURCE INTEGRATION PHASE 2A BIDS DUE NO LATER THAN 3:00 P.M. ON MAY 10, 2013 COLLIER COUNTY PURCHASING DEPARTMENT COLLIER COUNTY, FLORIDA DATE: 05/08/13 1. Contract Specification 01110 Summary of Work: Section 1.02A WAS Site 1- Livingston Road 1. Three motor actuators to existing 12" gate valves. Change: 1. Two motor actuators to existing 12" gate valves. Ske 3 Peliea,+-�: Delete (Remove from the project) Delete (Remove from the project) 2. PesAw and eqn#ej te ffleteF Delete (Remove from the project) 2. Contract Specification 16700 Network Communications: Section 2.4: Delete Section 2.4 in its entirety and replace with the following: 2.4 FOUNDATION FIELDBUS MODULES A. Provide protocol converters that are capable of bridging FOUNDATION Fieldbus Hl protocols into Ethernet TCP/IP compliant communications, mounted on DIN rail in an equipment enclosure. B. Provide Mprom/Rockwell Automation module 1788- EN2FFR or approved equal. 3. Contract Drawing: Sheet 3 -1: Remove from the project. 4. Contract Drawing: E-13 Remove from the project 5. Contract Drawing: Sheet D -2: WAS #9 " gauge 2 x 2" Mesh chain link fence fabric Change #9 gauge 2" x 2" Mesh chain link fence fabric shall be galvanized that is fission coated with a minimum seven mil coating of polyvinyl chloride. Fence shall have HDPE slats to screen interior area from view. Slat and fence fabric color shall be black or green (color to be selected by owner) to match. Submit color samples for approval. The HDPE slat shall have ultra violet inhibitors and Ethyl Vinyl Acetate to maintain a softer and flexible plastic. The slats shall provide wind C:\ Users\ waynekariovich \AppDatalLocalVvticrosoft \Windows \Temporary Intemet Files\ Content .OutiooklAHQ82OWG\ADDENDUM I.doc Page 1 of 2 COLLIER COUNTY BID NO. 08-6011-89 load and privacy factor of 90 % +/- 2 %. The slat shall be manufacture by Your Fence Store, North Logan, Utah 84341, @1.866.563.3623 or approved equal. 6. Contract Drawing: Sheet E -14: Ground Well Detail Was BARE 4/0 ALUN4INUM _ Change BAS 2/0 SOLID TINNED Cu END OF ADDENDUM NO. 1 C:\ Users\ waynekarlovich \AppData\Local\Microsoft \Windows \Temporary Internet Files\Commnt.0utlook\AHQ82OWG \ADDENDUM Ldoc Page 2 of 2 COLLIER COUNTY BID NO, 08-5011-89 ADDENDUM NO.2 IQ 'WATER SOURCE INTEGRATION PHASE 2A BIDS DUE NO LATER THAN 3:00 P.M. ON MAY 10, 2013 COLLIER COUNTY PURCHASING DEPARTMENT COLLIER COUNTY, FLORIDA DATE: 05 /09/13 1. General: Contractor shall utilize 280 feet (14 complete 20' pipe sections) of piping meeting the requirements for the "Proposed 18" PVC NPW Line" on this project. The piping is white in color and meets the specifications for this project. The piping is stored at the NCWRF plant site; contractor is responsible for moving the piping to the work area. These are the only materials the County will provide on this project; Contractor is responsible for providing all joint restraints, fittings, miscellaneous materials, and all additional piping and other material required for the project. Since white PVC piping may be difficult to obtain, the remainder of the "Proposed 18" PVC NPW Line" may be furnished in green color provided that Metalized Warning Tape of the appropriate color is provided. 2. Contract Specification Section 01135: Delete Paragraph 1.03 B. in its entirety and replace with the following: 1.03 Allowance for Owner's use as directed for unforeseen work and costs associated with unforeseen and underground piping, electrical and instrumentation, structures, and electrical and fiber optic services to the site. 3. Contract Specification Section 16401 Utility Electrical Service: Delete Paragraph 3.2 E. in its entirety and replace with the following: E. Allowance for Electrical Service: The direct cost of the electrical service from the Power Company shall be paid by the contractor from a $15,000 allowance included in the bid schedule. Contractor coordination and carrying costs are not paid from the allowance and shall be included in the bid price. 4. Contract Drawing: Sheet E -11: For Conduits 180 and 181, location of the connections to County IT Fiber Network and FPL Electrical Service are unknown at this time. Contractor shall assume 50 feet each conduit for bidding purposes. END OF ADDENDUM NO. 2 C:\ Users\ waynekarlovich \AMData\LocahMicrosoftiWindows \Temporary Internet Files\ Content .Outlook\AHQ82OWG\ADDENDUM 2.doc Page 1 of 1