Loading...
Agenda 05/28/2013 Item #16D 9 5/28/2013 16.D.9. EXECUTIVE SUMMARY Recommendation to approve the first extension of the Interim Management Plan for the Conservation Collier Winchester Head multi-parcel project. OBJECTIVE: To obtain approval from the Board of County Commissioners (Board) to extend the Interim Management Plan for the Winchester Head multi-parcel project. CONSIDERATIONS: Winchester Head (WH) is one of two formally designated Board-approved multi- parcel acquisition projects for Conservation Collier. Multi-parcel projects, comprised of multiple lots and ownerships, have been a challenge for the Program. Challenges include: higher prices for smaller lots, fluctuating values over multiple years of buying, unwilling sellers within the project boundary, and lack of assurance that in-holding parcels can be acquired in the future - a particular challenge of the willing- seller environment—and currently, no funds remaining for acquisition. Approximately 47% (75.11 acres out of 158.67 acres) has been acquired within WH. This project was suspended by the Board of County Commissioners on 1/25/11, Agenda Item IOB, unless a "very good deal" is offered to Conservation Collier. Other potential ways to acquire lots within the project include: • Donations made under the offsite preservation option of the Land Development Code (LDC 3.05.07 H.1.f.i.(f)and(g)). • Ord. 2007-63 (Section 14.7) provides that parcels within this project area can be traded to consolidate a contiguous area. • Staff has submitted a proposed project (with assistance from the Conservancy of SW Florida) to acquire remaining lots within the project using RESTORE Act funds. Currently, the pattern of County ownership in WH is scattered lots throughout the project (see map attached). At this time, staff hesitates to prepare a Final Management Plan, as the ownership is too scattered to begin making long term plans for management actions and public access. The Conservation Collier Ordinance (2007-65, Section 14.1)requires that a Final Management Plan be prepared within two years unless by affirmative action of the Board, the interim plan shall continue. An Interim Management Plan for WH was last approved by the Board on 10/28/08 (Agenda Item 16E2), and is overdue for extension. Staff has prepared a Draft Extended Interim Management Plan for WH multi-parcel project. This plan was reviewed by the Conservation Collier Land Acquisition Advisory Committee at their regular public meeting on 4-8-13, where it was unanimously positively recommended. FISCAL IMPACT: There is no fiscal impact with this item. GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this item. LEGAL CONSIDERATIONS: This item has been reviewed as to form and legality, and requires a majority vote for Board approval. JW RECOMMENDATION: That the Board approves the attached proposed extension of the WH multi- parcel project IMP. Packet Page-2101- 5/28/2013 16.D.9. Prepared By: Alexandra Sulecki,Principal Environmental Specialist,Parks and Recreation Department Attachments: Proposed extended Winchester Head IMP Packet Page-2102- 5/28/2013 16.D.9. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.D.16.D.9. Item Summary: Recommendation to approve the first extension of the Interim Management Plan for the Conservation Collier Winchester Head multi-parcel project. Meeting Date: 5/28/2013 Prepared By Name: BetancurNatali Title: Operations Analys, Parks &Rec-NCRP Admin 4/30/2013 9:01:15 AM Submitted by Title: Environmental Specialist, Senior,Facilities Manage Name: SuleckiAlexandra 4/30/2013 9:01:16 AM Approved By Name: WilliamsBarry Title: Director-Parks&Recreation,Parks &Recreation Date: 5/7/2013 9:34:18 AM Name: AlonsoHailey Title: Operations Analyst,Public Service Division Date: 5/9/2013 2:12:47 PM Name: WrightJeff Title: Assistant County Attorney,County Attorney Date: 5/14/2013 10:27:06 AM Name: CarnellSteve Title: Director-Purchasing/General Services,Purchasing Date: 5/14/2013 12:16:03 PM Name: WrightJeff Packet Page-2103- 5/28/2013 16.D.9. Title:Assistant County Attorney,County Attorney Date: 5/16/2013 10:54:20 AM Name: KlatzkowJeff Title: County Attorney Date: 5/16/2013 11:54:03 AM Name: IsacksonMark Title: Director-Corp Financial and Mgmt Svs,CMO Date: 5/16/2013 4:26:34 PM Name: IsacksonMark Title:Director-Corp Financial and Mgmt Svs,CMO Date: 5/17/2013 9:58:27 AM Packet Page -2104- i 5/28/2013 16.D.9. Conservation Collier: Winchester Head COIN, .ATION •LLIER Conservation Collier: Winchester Head 41st Ave NE ,a,..4 `� , _?: t .,` §q Y . ., .- � ,Cu reT Cuurrhf ,. s ,- O. a t: t .. �s�.. N- t ��� �• A �� ': R ?. y{� r.' j red}n.��er t a. €r ,,5' .._ ice' y, 'A *' m F 39th Ave ��y� ` : ti L , 1,,,,-J'',,,- �. to nr -,_ s► - -7.� .-.w....= - tea„ t • ', t.44.14)..-7! ;+ ,., h t }, I .1ar F s of R ":'y ' r" l ,' .n s eta I .r P*3~ — r i r.: . ,. s n ..-'I-37th Ave NE _ wry - 3, i r`_ vC �. • � . �» inchesterHead Multi parcel Projec t Data So .P band 2012 aerlak • rV `,'Y ? .,I Collar c nryp pemAppraser #. Privately Owned• C ede d by Cons ervation C etrr.r St.E lA Sulerk' O:\COns ercation COIberlmapctACquied propertite' Wmobteter HeadrMaoe for Updated IMPiC OVER.mat and.jpp Sea a 2012 'Ya 500 1 000 Feet Conservation Collier Extended Interim Management Plan First Extension Prepared By: Collier County's Conservation Collier Program Parks & Recreation Department 15000 Livingston Road Naples, FL 34109 March 2013 G:\CDES Planning Services\Land Development Services\Conservation Collier\Land Management\Winchester Head Properties\Winchester Head 2013 Update IMP DraR.docx 12/5/12 Packet Page-2105- 5/28/2013 16.D.9. March 2013 Conservation Collier: Winchester Head Project Extended IMP—DRAFT Table of Contents 1.0 Purpose and Scope of the Interim Management Plan 3 2.0 Management Authority and Responsibilities 4 3.0 Interim Site Plan 4 3.1 Location and Site Description 4 3.2 Signage 5 3.3 Easements, Concessions or Leases 5 3.4 Structures 5 3.5 Surrounding and Adjacent Land Uses 5 4.0 Interim Management Objectives 5 4.1 Natural Resource Protection 5 4.2 Site Security 6 4.3 Exotic Vegetation Removal and Maintenance Plan 6 4.4 Cultural, Historical and Archeological Resource Protection 6 4.5 Public Access 7 4.6 Site Monitoring Plan 7 4.7 Partnerships 7 5.0 Exhibits 8 EXHIBIT 1: Location Map 8 EXHIBIT 2: Aerial Map 9 EXHIBIT 3: Winchester Head Boundary and Golden Gates Estates Tract Numbers 9 EXHIBIT 4: Golden Gates Estates Unit 62 Plat Map 10 EXHIBIT 5: Golden Gates Estates Unit 65 Plat Map 11 EXHIBIT 6: Winchester Head Light Detection and Ranging Map 12 EXHIBIT 7: Location of the North Golden Gate Estates Flowway Project 13 EXHIBIT 8: Estimated Cost Table 14 EXHIBIT 9: Estimated Implementation Time Line 15 2 Packet Page -2106- 5/28/2013 16.D.9. March 2013 Conservation Collier: Winchester Head Project Extended IMP—DRAFT 1.0 Purpose and Scope of the Interim Management Plan Winchester Head is one of two multi-parcel projects undertaken by the Conservation Collier Program. The Winchester Head Project boundary encompasses 115 parcels totaling 158.67 acres. As of December 2012, 52 parcels or 75.11 acres (47%) have been acquired by Conservation Collier in a checkerboard fashion throughout the project area. The Collier Soil and Water Conservation District (CSWCD) owns two parcels within the project area. Although the Board of County Commissioners (BCC) approved the remaining 63 parcels totaling 83.56 acres for acquisition subject to land values and to being offered as a "very good deal," acquisitions in general by Conservation Collier were suspended in January 2011, and no additional properties within this area have been acquired since that time. Conservation Collier has not requested a market study and appraisal since 2009. That market study and appraisal valued these parcels at $16,375 per acre. As of March 2013, the Property Appraiser is valuing parcels within this area at $5,000 per acre. Conservation Collier will continue to pursue the acquisition of all approved parcels within Winchester Head as means to do so present themselves. There is currently no budget for outright acquisition; however, there are some potential ways for properties to come under County ownership: • Offsite alternatives to the Land Development Code's Off-site native vegetation retention requirements (LDC, Sec 3.05.07 H.1.f.iii.) offer a way for properties within multi-parcel projects to be acquired and donated to Conservation Collier in lieu of developers retaining vegetation onsite at development projects. • Current proposals being considered as part of the County's Watershed Management Plan involve development of a Transfer of Development Rights (TDR) Program and a Watershed Mitigation Program in the North Golden Gate Estates, which could result in some parcels being stripped of development rights and deeded to Conservation Collier. If properties cannot be acquired using the above means, or it becomes apparent that few properties can be acquired in this manner, Conservation Collier staff will seek to exercise a provision of the Conservation Collier ordinance (2007-65, Section 14.7) that allows for the exchange of lands within and between multi-parcel projects in accordance with the goals of the Program. The objective of any such exchanges will be to consolidate the areas owned by Collier County under the Conservation Collier program into one contiguous area. All acquired properties will be managed only for conservation, protection and enhancement of natural resources and for public outdoor recreation that will be compatible with the conservation, protection and enhancement of the site and its surrounding lands. Public use of the site will not be practical until more contiguous properties within Winchester Head can be acquired. This interim management plan is intended to update the key management priorities and issues within the site and give direction for management through 2015. This document is intended to be the precursor to a final management plan, which will provide more specific aspects of site management once a contiguous block of properties can be assembled in the center of the project. 3 Packet Page-2107- 5/28/2013 16.D.9. March 2013 Conservation Collier: Winchester Head Project Extended IMP—DRAFT Key Interim Management Objectives 1. Monitor vegetation until a contiguous block in the center of the project can be acquired which will trigger vegetation management actions. 2. Explore opportunities for grant funding and partnerships for management. Action Plan 1 a. Make semi-annual site visits to monitor the spread of any and all Category I and II invasive plant species within parcels. Once a contiguous tract at the center of the project is acquired, begin exotic plant management within this tract, if warranted. Continue monitoring the remainder of parcels. 2a. Seek grant funding opportunities for the removal of exotic flora. 2.0 Management Authority and Responsibilities The Conservation Collier Program, part of the Collier County Parks & Recreation Department since October 2012, will be solely responsible for managing the Winchester Head parcels, but will also seek to obtain grants and form partnerships for management activities. 3.0 Interim Site Plan 3.1 Location and Site Description The Winchester Head Parcels are located east of Everglades Blvd. North, between 41St Ave NE and 35th Ave NE in Sections 8 & 17, Township 48 and Range 28 in Golden Gate Estates, Units 62 and 65 within Collier County, Florida. The southernmost parcels are located south of 37th Ave NE but do not extend to 35th Ave NE (Exhibits 1-5). The approximate center of the project is located at 26°18'9.67"N and 81°32'19.58"W. Winchester Head is comprised of Mixed Wetland Hardwoods (FLUCCS 617), Cypress (FLUCCS 621), Cypress, Pine, Cabbage Palm (FLUCCS 624) and Freshwater Marsh (FLUCCS 641). Compared to the higher elevations of the lands surrounding Winchester Head, from 18 to 24 feet above sea level, the natural depression of this cypress area (Exhibit 6)at 15-17 feet below sea level, combined with the presence of hydric, poorly drained soils allows for water to collect and slowly percolate into the ground. Thus, Winchester Head is ideal for obligate and facultative wetland plant and animal species. Conservation Collier's Winchester Head multi-parcel project is within the North Golden Gate Estates (NGGE) Flowway Restoration Project (Exhibit 7), which is an area of focus within the County's Watershed Management Plan (WMP). The goal of this project is to reconnect the historic flowway and redirect storm water drainage away from NGGE's canals, allowing it to move south toward North Belle Meade and naturally low county areas while allowing ground absorption along the way. As part of the WMP, a Phase 1 and Phase II analysis of the flowway, which includes Winchester Head, have been completed. The Phase I estimated that Winchester Head contains approximately 414.7 acre-feet of storage based on an average, water surface elevation of 16.0 feet (North American Vertical Datum of 1988). The goal of reconnecting wetland systems within the NGGE has been incorporated into development of the County's Watershed Management Plan, approved by the Board of County Commissioners in December 2011. The WMP 4 Packet Page-2108- 5/28/2013 16.D.9. March 2013 Conservation Collier: Winchester Head Project Extended IMP—DRAFT includes structural projects and policy initiatives, both of which would affect the Winchester Head area. Structural projects include adding culverts and other water management structures. Policy initiatives include a potential TDR Program and a Watershed Mitigation Program. At present, no specific projects have been authorized. If Conservation Collier were to acquire and restore parcels within Winchester Head, this would serve WMP goals. However, the choice of projects determined for Winchester Head and north of Winchester Head within the flowway could affect how Conservation Collier approaches management. Structural projects could increase the volume of water stored within the WH project boundaries and thus alter proposed management actions, while a proposed TDR program could assist Conservation Collier in acquiring more parcels and getting more contiguous area under management. The WMP is addressed in this plan to provide a comprehensive view of the area and its importance. 3.2 Signage Signs denoting parcels as Conservation Land will be installed as contiguous parcels of 20 acres or more are acquired. 3.3 Easements, Concessions or Leases There are sixty-foot (60') platted right-of-way and utility easements dedicated to Collier County, along 41st Ave. NE, 39th Ave NE, and 37th Ave NE. No other easements, concessions or leases currently exist within Winchester Head. No other easements, concessions or leases are proposed for the future, and would not be permitted unless they further conservation objectives, such as a conservation easement. 3.4 Structures No structures are present on the parcels at this time. 3.5 Surrounding and Adjacent Land Uses Several single-family Golden Gate Estates zoned parcels—many of which have yet to be developed, surround Winchester Head. Everglades Blvd. North is west of the properties and the Faka Union canal is located to the east of the properties. 4.0 Interim Management Objectives 4.1 Natural Resource Protection Existing Vegetation: The following list identifies native plants observed during site visits: Swamp fern (Blechnum serrulatum), false nettle (Boehmeria cylindrica), arrowhead (Sagittaria spp.), sawgrass (Cladium jamaicense), royal fern (Osmunda regalis), pickerelweed (Pontederia cordata), cattail (Typha spp), buttonbush (Cephalanthus occidentalis), bald cypress (Taxodium distichum), willow (Salix spp.) and numerous species of native wetland grasses. Unique Natural Features: Winchester Head is comprised entirely of depressional cypress and marsh wetlands and therefore, provides habitat for wetland dependant species. Evidence 5 Packet Page-2109- 5/28/2013 16.D.9. March 2013 Conservation Collier: Winchester Head Project Extended IMP—DRAFT onsite and data from the Southwest Florida Amphibian Monitoring Network 1 indicate that Winchester Head is used by wetland dependent species. Although it contributes only minimally to aquifer recharge, the area is a depressional feature in the landscape that holds water during the rainy season, enhancing water quality and offering flood protection to adjacent lands. Possible Listed Species: The observed habitat and location would support the presence of the following listed species: American alligator (Alligator misissippiensis), wood stork (Mycteria americana), limpkin (Aramus guarauna) and white ibis (Eudocimus albus). The Florida Fish and Wildlife Conservation Commission has documented Florida black bears (Ursus americanus floridanus) along the edges of the property. 4.2 Site Security At present, no known security issues exist within Winchester Head. Because Collier County currently owns 52 of the parcels, only some of which are contiguous, fencing will not be considered until a larger percentage of the parcels in the project area are acquired. 4.3 Exotic Vegetation Removal and Maintenance Plan Melaleuca (Melaleuca quinquenervia) and Brazilian pepper (Schinus terebinthifolius) are present around the edges of the entire project area and along the roadways that intersect the project—in a density of approximately 15—20%. Until more properties are acquired, Conservation Collier will not remove these invasive, exotic species. If old world climbing fern (Lygodium microphyllum) is observed on any acquired properties, Conservation Collier will remove and/or treat this species immediately. Conservation Collier staff will field locate property lines and direct contractors to County owned parcels within Winchester Head. All located old world climbing fern infested areas within Winchester Head will be treated during the dry season. If a larger percentage of contiguous parcels are not acquired by 2015, this plan will be updated and recommendations made to address any existing exotic vegetation infestation. 4.4 Cultural, Historical and Archeological Resource Protection Winchester Head is not within an area of historical and archaeological probability, and no historical or archaeological sites appear to be present in the property. The County will notify the Division of Historical Resources immediately if evidence is found to suggest any archaeological or historic resources are present within the Winchester Head project. If such properties are identified on-site, staff shall cordon off the area, and a professional survey and assessment shall be instituted. The archaeologist shall prepare a report outlining results of the assessments and issue recommendations to County staff about The Southwest Florida Amphibian Monitoring Network represents a diverse group of citizen volunteers organized for the purpose of monitoring amphibians(mostly frogs)in southwest Florida Websitc: http -%www.frogwatch.net� 6 Packet Page -2110- 5/28/2013 16.D.9. March 2013 Conservation Collier: Winchester Head Project Extended IMP—DRAFT management of any sites discovered, per provisions of the Collier County Land Development Code Section 2.2.25. This report shall be sent to the Division of Historical Resources. The County shall cooperate fully with direction from the Division of Historical Resources on the protection and management of archaeological and historical resources. The management of these resources will comply with the provisions of Chapter 267, Florida Statutes, specifically Sections 267.061 2 (a) and (b). The collection of artifacts or the disturbance of archaeological and historic sites within Winchester Head will be prohibited unless prior authorization has been obtained from the Collier County Board of County Commissioners and the Department of State, Division of Historical Resources. 4.5 Public Access Public access will not be addressed until a larger percentage of contiguous parcels within Winchester Head are acquired or parcels are consolidated and a Final Management Plan is prepared. 4.6 Site Monitoring Plan Monitoring of the site shall consist of a walk-through by staff at semi-annual intervals. Any treatment and retreatment of exotic vegetation is dependent on the amount of contiguous acreage acquired. Conservation Collier shall be responsible for this treatment with tasks contracted out as deemed necessary. Prior to any land management activities, photo monitoring points will also be established at strategic locations within the project area to monitor vegetation communities. 4.7 Partnerships The South Florida Water Management District Big Cypress Basin may have interest in partnership and will be approached to determine interest. Conservation Collier will work closely with the Growth Management Division as the Watershed Management Plan projects come to fruition. 7 Packet Page-2111- 5/28/2013 16.D.9. March 2013 Conservation Collier: Winchester Head Project Extended IMP—DRAFT 5.0 Exhibits EXHIBIT 1: Location Map Conservation Collier: \-. Winchester Head Location Map C_f ier County LIMPKIN RD Z IMMOKALEE RD ----\ _� __I a.z J 72ND AVE NE RABBIT RUN RD _ —Q- 70TH AVE E NE z 1 z PLATT RD w 68TH AVE NE w I WILD TURKEY DR �' 66TH AVE NE ° I 64TH AVE NE 1 I 62ND AVE NE I 60TH AVE NE 58TH AVE NE 56TH AVE NE J m 54TH AVE NE w 52ND AVE NE (9 z c• - w w 50TH AVE NE w z , N 47TH AVE NE 48TH AVE NE = w w w w w w us 47TH AVE NE o _W.z z z—z--Z.---Z--z ( v.. 45TH AVE NE z F- F- F- F- F- F- F- f I- 0 0 (I) h N 0 0 45TH AVE NE CI-- ° U N N 43RD AVE NE 41ST AVE NE I I 41ST AVE NE 39TH AVE NE { 39TH AVE NE 37TH AVE NE `S U ("` f 37TH AVE NE I O _ 35TH AVE NE Q FAIRMONT LN 35TH AVE NE 33RD AVE NE 4 6 L OIL WELL RD G DR_ ....... .....____ROVE t PA�� VERMONTL 1 l I \!. i I N Legend 0 0.375 0.75 1.5 Mites NM Winchester Head 1k e Parcels Owned by CSWCD Data Gnome Par.%-Colima County PtopMlY Apptaner s Created by 1Gonserwtlon Caw Ste IA.Karan. Roads C:'!CornervaKat Cola*nwpx'AWwee pmP+ni.GAi Jiaeter HeaaWMi tat IMPS Localbnnu9 aM 04 xne s.xaas 8 Packet Page-2112- I 5/28/2013 16.D.9. March 2013 Conservation Collier: Winchester Head Project Extended IMP—DRAFT EXHIBIT 2: Aerial Map EXHIBIT 3: Winchester Head Boundary and Golden Gates Estates Tract Numbers Conservation Collier: Winchester Head Boundary and GGE Tract Numbers 118 ,_ 6 5 22 54 59 75 86 91 117 : 27 38 43 70 116 4 23 26 42 55 90 39 58 71 74 87 115 !3 41st Ave NE 114 2 24 56 89 fil 25 40 41 57 72 73 88 113 1 Unit 62 128 Z 16 Unit 65 'V 17 32 33 80 81 96 p 127 15 48 49 64 65 m 39th Ave NE Ln 126 14 d 18 31 34 47 50 79 82 95 LIJ 63 66 13 125 124 12 19 67 78 83 94 11 30 35 46 51 62 123 37th Ave NE 122 ... 10 36 45 61 68 77 84 93 20 29 52 121 9 120 8 21 53 60 69 76 85 92 28 37 44 0 250 500 1,000 Feet Gamier County Legend Winchester Head Boundary z Data source:Parcels ComerGawy werortra+am er Roads S Tract Nanden GOES Craal d by Zonaa valiat Calm Staff ra,Kann' G''Gaaser,rat'o0 coutenntapatasolarea proPemas,Vwlatayra Neae'AWgs rar palaultt_fxwnuarp_aaramxa emµg Golden Gate Estates Unit Tract Numbers June 18-2006 9 Packet Page-2113- 5/28/2013 16.D.9. March 2013 Conservation Collier: Winchester Head Project Extended IMP DRAFT EXHIBIT 4: Golden Gates Estates Unit 62 Plat Map [, r ! r.. •II tr i H At: 4 GOLDEN GATE ESTATES UNIT N0,62 r A SSA I O s4 V5.ON 0C PAGTS GG facrlaraS f Gail,T-aG-$,k-g:E-t_rL1u.1..rtr. Ctr�wTY,FLX,F,De., �k I — __ tt. wr�Gs� • r ! L tr i ar .F Gr .I aw .'t' f l i t4 a..a� 1 r, r rt.err r __ _ �_ .39t t -:I 24h"i_._ ''L; b i s ts. L I i M I r • a -1, .4 I e • 1 an •a i a.. u p I .1 Lr A,• MYGF k c. p ra, M r.4 ara 4 a7 ,a r t a+ a rc U3 Gk a � �. F i l cry 0. -,2i. . i6 / a}{ ar a +t r I GS i ws{ r 4;' - ) , j r �a r ' `- i I a . rk1 f . . t s. a G t a L L an Y ' +Q �� ,, �. tL }' Yf n3 1��.�».....m-t'ar a.a• al q • as N (I a at ruy.e r a a I - G. ▪ 1 u,.r tte.t t - 4>MYL7j N':'£-"1..0 . • �L d t u t :s �x i � 3 t i'NC�.r...aas•< r # p: z jai_ t a s*, a, aa.x.i� '�r^ a a r .• G• .a 7 a� r !PT{ r Lam. I t ,r = ��>; a I 1 rrtrr -0t-r .,rc;.._7v - .. rte , krt .�. i - _. _.�r. 1..... _ 1 ar.rPa..G`!,�_/740 r I7 J F $ c r ., i _.a .i, a.1_ .F t I.s..S tsa 5 r: k4a 3z•.wr"�r_. T tS- i r HYL� #I i k p't �, ja a1 .r a a xf ,, ss r a i Y .turn _ as.1. .... rL._.v v. !. . ▪ _.� �aa...._ �:..z...A. .. _ �. I aw '. xsaaf..�_. ... _ _ _ .'n�r i4s nl Tr 2— . 1._. _ve_t 1S+�.r. _ r� L . anr/!._.,. r r z. ..4 Lam__ G t. fr Li' 1 a . a� ..tea - � �.7 S<cr... ........ 5 3«a. I ..rr�,�x?(r .zelsa. ._ - i h. ...' am .... u s.' .F'Ji 1 .,a f �..,... Lr . .r;t .G T1 .xx:t v 1 T ;,aram�SLq.ln...` �y.x r__ _" .-a t• L s ..ra. YE ah' 4als++��, __or____r. ..ca .rr-...1,,. .< . _ _ .,n,-__..n». arm_ , IT 3L. t. �1 1 tit[ 14 t"':,. 7 i ✓P T cn 1 ffr+ o41t .t Q a"..tFr lard t . i W -1 F a d..4� �s f" ,, a ....4..' .4 ri d' » ra.. ar,.r r __it a ,�r ltr,p�"a Str r.f.... � rr I IX I ; 4,, I 10 Packet Page-2114- 1 5/28/2013 16.D.9. March 2013 Conservation Collier: Winchester Head Project Extended IMP-DRAFT EXHIBIT 5: Golden Gates Estates Unit 65 Plat Map ., . „. .... ....., - r GOLDEN GATE ESTATES ............_____.. i f t UNFT NO.65 A,,,,,, w,„,, A.,,„,,,oF 47,0,1,1.,,,azitzr..,, -5,m-re-L.(.040...1 r R C.01.471T I',4 L2'asn 2 1 I 1 1 iiZA.:.,%01, 22.47,2 41X1144o Krzse 41,le,7,tee.72,277417.,tte.le24,2 ans-7-177.7 2.7,21 I 2 ,,,t At t j. -27477.2 'int,7-72-17.7.72 77 27 72.21■7277 17 772 77772 or,r.i.ri±lx, .8 2. ' ''' '12' 1 ' ' 1 ' ,,,,,._J„„., t7 .4'' 7.7 .7 s .74 en' as'n" 877 2.7 7.7. s •ss 4'.2. es./1 2 ea r..±±. ,2,777.7,Pa,. 722,77,xre,72.7 4.4r4r4:4*ia St& ittrIl7.,.1,t T.)Cc..222.771., 172,1 out 7.77 2.217271,10 42. jj. .7 .1 • 1 1 , 1 ; ; .:1, ; 21.2.1 as 2724 1.4,Leta 727.477.S.71.6 sc. 7.,an...2172 774 2177.2277. an slaws arm ham,"th..172-74.74 tas 717,eserxeceal 7.2.7.1 tns ,,ist..°2-2,s2-•=272245k, ,, 12,4,2142 72=22...ts,-.17.22.2"C±22.,.2-2,,", ..-. ......2...,""Z val.:ws-2.47.74.7 7.-..■212 2.2.272,-77 AY 1417773.777 0,717711•71 l■ ".... . ' . 1 1 14.4 i r i / Z IIIII 77r 74.P4RAIM611 172.7777•21 7-,itrts 7271772 I . ; I ... pt. 82 97 • 2 t - - a 7 *7■ •o ar•....,I , f. . 2 toot' fr en 2. . , .2' It 2, " Al- it, .. ..--- pue,2774-277,2442^.77177.7 7275 s .)7227-777 Ltr.for, 'I a II. I I • I roo, rt .221227,thia 20217.7772.,....01,1t,‘,, 172 nsess 77"77s 'I, • ' . I sell TA,.727-777277.....77 I.7.75L,722,-27J4777. 74 177.12,1e2747,2 7,27.17800..a! 0 tlater .127.. 1 I I ' ' 8La4 2.42.7422424°122.4 '22141-2L4T2.7 1 I t ,7*, , I, ,, „...„..„.,,„„_, 1, .2,27.: 72 c ea si 7,s 22 . 7 4- 72• O.1 02. Pe 1 .7 1.-- 1 774777,474 ,..4,,,,..0...=.1.111. Ii ' ' I ' ' , s. r 77.7 72 7. O .... Li,,7 4 4or,r■r, ,88 4 27 t eca I is)s 4272 oess t .. 227,..222 fl I harat2L L. 14 c, p,Plar.e "r !' rsr■l • I ' - . - - - I i L ororor, . ' - I ,i s7'''-,J 721,4 I.7.4.4:,)ill.,1111:r...77,772.4,277114772, • .IL .L........azansisilasItmesance, -2.72.4...J..xi,2.274211ar, ',,,-rs. 7 c I ' ■ I j 2.7.7407.12244.77,.77 Jut 7,107 Pil,riotoUt.Al,rogara,,,,. ..r :A.t.: 217,17.7-271■2272772737.4 2 7.-77,22447.-.2.211 J. 4.- 32 frjii --.2 .2.A 22. sr 4 4., I 1 11. it;' 4.7 ' vs. nts,42- 32..-ma ,1. 11,4 Ws...ix 1 KO,Ill,...E 72 11.221., cr.4.4.72..72 72 7-74 ofts, 's " • 222.72.7 774,77.2. ,4Orr wol,tor,,,,I.G,t t.-i. 1.„ 1 il.t.7-2L'27.,.....--7..,,,. .-:,,°.=.."4,--2422,24-,74e.77l8A-LY.02 .4,2-472-2•472A7L-i-Z4 '°' ''''"*-i '..•"' • ; 72 J-27714 Tr.17,..7.11.1 own ill 77776 721)8.2„„2,72,7.7827 .11: A sr J '"'"I''''"•L I 1 - ' -7------ ;: ! odrot.21:4414.T Gir7474.11 se...04......as, ,,,,..,...,.,!II.Cor,,r,I.,`,.• , ,{}oro..0 3.33 ,.... 43 ,•5441,,,,,,,,,,,,41,3 1 iNt!4444 ,„ ;7..,At 4 ,71. It,4... c 72 0 7,• a* ; l.172,54 1.77.Sr.,wn**.d 4.,4 C4 44"il aan.:54444._ A1.1712.44.1 274 27.27:72,-...1,at 7454W- ...:IillitiL, III' II 1 I I I rot.%to,,ki, tt iro VOI SoI,...2.:14,,c to III Ir:I.ZiIII;:::.TI 'riolI.-er .II ,i ,,,,,,,o,.....!,,-„pt,`,15i. 71, .,---4=-41.,Z.1,-...rin,,,„,lf,4-it.:,„!„.....i e.. ',;'.,..',, ,”1-7:-.4-,PLI t._324 44 ;t5-',_ r422222-7,2 '..2.:_' i""' -°-74,727-2.7.7720442-•24,72377,2tist2r, ,, .. '222_1° 2" 1"'-' „ , , I”nr7,1,27.,7.... , , • , ;'It snl. ...7:',., 77 7217.2.777.1 7717.77,10 2 Losssa W.,. OrIZI,oroc, 7,-524444 ft71,2,.2.'.F. 4 r`II",:oro,r,r.orI,OOIIrr O....,.O.II 1....14II,,I.'...O.ITI ,..,----,... ..... .4 27 . 74 4 44 2 dsl J tee. .8.2.-,72 s turf;42.1...1.,:., 414-7711,777 r.Lat-747.87.7.rtt,.772272.7e 777772.77.5.77 AtEs7'74. : j ; 111 : , ' 4T...4iF:: .-7.7.1 in.11.1,,ror,Orr.444 t`...-127074 154.4: -7 71774 7, i..31471I.17747,,.,....cs ....72......., 27.72.42 ill,. "' ....tr724- • ' - s - r1;-,„; - ' • , - re7re vs•7.72,-,22.7.7,2 Pit:M.I...J.6.0'L.. wor woo.64orrwarl- oroW,IrroA[Cdo io..411.4,:routIVI17,57, 1III I'..IroolkOrr ....II'et.rnr :II.' I Or If..rriolto :GOO.11..1orioo o.o• IIIO,r. k tt,■ ..e ± .±-,...,,,...-.........: ...,1_ I No C,77 7272.-72 sh.1.27 uce M I .o 141. ,s.o tol.r.a.1r3r,-la n,css o rro...,7,7,,L,sOr,..9,2 7,r,2t2oro.r,2 24,-Z7or,.74 7t.t2r,.I.2-or.,,2o,r4ar2rO, .414144 2,74277.21.761.177 1 :.;.,,..-4,7,,,,,,,,,I.;.,,,,,..ts.,E'. a,,,,,,..1,-.... 4.1..±,c 44 4 la,J0;27,1.4..274 7 22,-, a. -5-..lesivs,is 72.7.21, ..., .. . . 2' 4.7 7-24.44, n 7.4.4„0,2.!:.74.4.7:4'',27 ,',17.,".S2s.7; 7,172 2.77 72777.72 h.,SI,277.77,727 727241 ds,4* 1.-'&27.21..2•74.72..... 147., 1777.ne7477.7 12 t. s.72,7,. torli“rri is...441.7.747727.121 it:17.77 14 tr.I.Ifir■Irroo or./114.C.11,0....O., ...toI t.,,, 47781-s, 445 NA*, ' . .4..4, ......, 74, lirRrrYttrn .,o1 II):.I...I...ttor,i , trt'strrrIr ■.,.,:",...,,,,,:.7, 4.77, ,„..2,L.itsnaos. .41/.1M4C. tag( ..„74 7r 7771 ,,,......7. IT','....,...,'.1',..1*”.•,-,•777,""7 7'''''""°"..f"'''s ,. 1f47772/;;It441.--` 077.nl C.27.7 s 2 777 %are vs 227.71,,7.717-4.442 s'2472.7777 17.2:Ant 22722 ,./ 2,, ...s.77,2,77.7 2,2.0,, 7-17,44 27-ss., r±,..:tr^ '.:1',fLi,'IP.;=Lr,., -,. - :...,,,,,4i..,,7,,,74444 77127174 71 141747-727 444441544, le lbs.I.I.Ivo-IV,WIZ 1.40 WIFV-Ilor,1,door 44.4 4741 dallairtt,i,r, rirrt 441441 +4214 ri,......04471177 77.17112.7-742,77-27.77.71 7,77.2. 7, 7777744 54417*, 2227 27> .4144*, 771, 14 -. '. 1 I.44,1,24 4;444.14't71*- ...t1.: ....7.227 r1.....1',. ..4...1454.02117,4,54 I g I.ta t el 144%71 .2427.227027 saes, 4441.22277277 17 4124 77442.7 Si 7244j7 277 11 171+222 44n4112, x 4:72.721. ('‘1 dr--,-4sjt"*t'r..tf.C.Ar'-Sll--J 227 7.& .7.1X42-12, . M" Vi 1 isAI I 11 • Packet Page -2115- 5/28/2013 16.D.9. March 2013 conservation Collier: Winchester Head Project Extended IMP DRAFT EXHIBIT 6: Winchester Head Light Detection and .:*g,,,r_.1'..Map ,,,r.''.,r,1..,f,r,.%;..'l"„,,1,'''.„,",_-.7.-*.'7.,1„,*--,,,,.,.,t„-„.,,--'''_'-_4.....'-._.1.I4-P—_,.'4-,'.'i q''-,ll e k,'.4,..,.„.',,i,,7=`:1W=7.,r 4.'7-*e*"-.',4--'..”4'"i-4-),"i,1.).-!t,`t,.-.2....'_4'44,-,'t1 3,,r;*.-I.;.1.''•.,"-,,,..,,1.,.,'1.'-k'.)„-.-,.-,.':.t.,-4.''-'''._'--;.„-,-„-,-,,.,-..._ -.-.,--..-:--,..-,'-,1 _i,i t,,,_.1,,,,-,,,,-,.. ,.„„-t-„..:-.-",--..''-"...7,,,,.!,-,.:;---,"..,-',;r.-,','._,',-.Ad'-,:-.,,,.,..,..:,..-,". rr ._ ` Conservation Collier: .4t-t -_'t,'P ,-r,,--L,r,J.'''.'' ',,)....,r r'«,.`,17'i-,',.-7:,.,.1„:.:.0,,.,''')-,,.:-„,,'-I-,.A'f4..-..•'t, .,.4..1...-,,',,4,,.,,.4,'tt'14,,'',t1...f,„4'i::v i,.I,:.,41T,i-.,:,.!t°i:„-`:\"-,,.,.I,r-.„,,4a",.,%,,,-f.4 tt!„..4t.*-V'1.;,",,-.,',„.1 :..:g f;z,.,;0i.-,, 7 Winchester Head Light Detection and Ranging Map k L. t 3F-fA , ffi'Hs'fi b2kfifYYf _. Y yy c. 4 .. '# x,3 oY 1 '#Y .,-. v ' � _ .. - 39TH AVE ,`r€;„ ._, t '";' tom u i as , Y �' �'x .yq�"C' �24 rc�„,..y `�� P2aS,�y{ �-� � 'g '^='? `az 3 ���° "C � ',�i FAr �✓#T�'�''s'A �r A z � s 3 �� a 'fir tt> �� -:��"Y��>', t. s'�'°� ...i�.t�� !'Q. �g �w k �u Legend mom'rte+'' ��”'���� r p,77 ���� s �^��a },. S " w � � '� �� � m Winchester Head Boundary 35THAVEaNE Roads s a ; � , ;z -9.909999771 - 9 �� ` z ti ivy �� ° ° 9.000000001 - 10 = 10.00000001 - 11 011.:W—LL RD 11.00040041 - 12 33RD:AVE 12.40000001 - 13 13.00400001 - 14 > 14.00000001 - 15 s 0 50Q 1.00Q Feet `'> 15.00000001 - 16 t. seta Source:Part11s and LOAN.COI a COWap P,p*ly Appraiser Crearetl Uy Copserwgwn Cam'S'''t'I..i a nn 16.40104001 - 2 5 G 1Canse+vasiun 0,bermaD .cou+ea prcpane�s, ... :. ` ser °pa u °� 25 0-- — 140 Auprst 12.2008 12 Packet Page-2116- I • 5/28/2013 16.D.9. March 2013 Conservation Collier: Winchester Head Project Extended IMP DRAFT EXHIBIT 7: Location of the North Golden Gate Estates Flowway Restoration Project Legend G . 7, 2,..1.. .fir E1 NGGEFW Project Boundary afr Horsepen Wetlands q k Major Roads - NGGEFW Wetlands .,•- '� Description ti �, - �- ,r —° _ �Ay l- Cypress , g HydncFlatwood '' ' � I ``• �' Hydnc Hammock '°� ` •` Marsh <;>.. i t � , Swamp Forest ` r;'Water :: u: a;"'i'•.01.41,0.‘;'7;.:- � .,4 }.� ! S, � fir. 4,s- y`� .� ,€��.c�.-.�.�" sr �+.-,— �� �-�?�" 0, '1- !4,}-,--.:.,,,,-: : It w'fi..w.._—»...an. n �{ "". r�` a .t I ti 111111"- 7 q..' 'R m $,.-z„4. s. is �,''�..2... . 'ter . `5 w �nf'. i #�u+ ...,iex-`°``` + .g"-''-t i• x dux am .. dy .e .` i e y ice- �'. {—. - i r - $:i. �� , , � te o � ';''':'' ' . -----,i.' '..'-=',:::::.:•5•.' ::;::.'". '''..,'';'.2..:',''''''-27'''''l's ''''''' ''-'g'.:-.;:g14..:1110.1;=2 .4..::„.7.'•:".!Z','!, .:,;.:1`1,:.:*'''':','..."':.':0"::. '- ', s ; m.Milesl� .ra 13 Packet Page-2117- 13 16.D.9. March 2013 Conservation Collier: Winchester Head 5/28/20 Project Extended IMP—DRAFT EXHIBIT 8: Estimated Cost Table 7 1 r$Vinent nifi itco , = ' "� �omm y, >" s.J..* -K11 477,si..». --.dam w. stA a.# Exotics Control - Exotic removal would be most Over the entire project t.b.d t.b.d cost effective when some area amount of contiguous acreage can be assembled. 'Exotic mmov l'��d e most a � o�at`zev k shell some Ex.a't��cs at l k :mount f contiguous acreage ©r a cd 50,000 . fl,0fl0 , could be sem Teed. Estmmtes pare ire eased n 20°x!0-> xotics over ourr.,entlyntl catterci parcels a �, x.,. _. s .. ..�a�.,vx ba...:cy`�,.<4 a1:JUt«Xw � �b.t..-... . ... ... Wish-list status. Current estimates run at $550 per linear foot — not including design, Raised boardwalk t.b.d. t.b.d. permitting and construction. Grants can be sought to assist with costs in the future if funding is identified. ,f ;merge toss, c► e}done on*-a :clump a >onttraet basis xwlth r�-�s s ., t -� "'�.. � r ' GOSt eln a `I 1 .: Trash ,, Q t .. .t1 d. taf ` c Ur:a lot l'ecmmend f � p 4 .�4��'� � i *F n L .: x MOP 4' 'Levi T� +'.rr' �s 4 conservation area & Signs $800 n/a prohibited activities signs ($200 each) n` �' 5 ',kWA ,.,�,y„�'� %"` ."ikP y�} y� 9f� '4. ✓ � a7�R ►4N '© i) r €.„ ,,-'� s` £ ,, ,, .:4�i ce p U1�. ..,. ,.»...�. 'a r..>h v`:#sK`o-a..iGrrtRS+....,. ,?k¢.,�+,w r, si.6M"ncX.?Fd> r 1 �.:Wax»` .� l .r..w r.. ....a.=_-...s 14 Packet Page -2118- 5/28/2013 16.D.9. March 2013 Conservation Collier: Winchester Head Project Extended IMP—DRAFT EXHIBIT 9: Estimated Implementation Time Line Monitoring Site Seek Partnerships Completion of final management plan Visit (or update of interim management plan if acquired parcels are still scattered) Jan-13 x April-13 x x July-13 x Oct-13 x Jan-14 x x April-14 x July-14 x Oct-14 x Jan-15 x x April-15 x July-15 x Oct-15 x x 15 Packet Page-2119-