Loading...
Agenda 05/13/2013 Item #16A305/14/2013 16.A.30. EXECUTIVE SUMMARY Recommendation to approve a Work Order with Humiston & Moore for Doctors Pass Maintenance Dredging engineering and construction support services for a not to exceed time and material amount of $36,910, make a finding that this item promotes tourism, authorize the County Manager or his designee to execute the Work Order, and approve necessary budget amendments. OBJECTIVE: To approve a Work Order with Humiston & Moore to move forward with engineering and constructions support services for the upcoming Doctor's Pass Maintenance Dredging project. CONSIDERATIONS: Humiston & Moore will assist the County with design and construction phase services required to perform the 2013 dredging of Doctor's Pass. Their scope of work will include design, specifications and reviews required to obtain a Notice -to- Proceed from Florida Department of Environmental Protection (FDEP) and the United States Army Corps of Engineers (USACE). In doing this, Humiston & Moore will utilize the survey data and analysis performed by Atkins North America. Additionally, Humiston & Moore will develop a bid package and provide bidding and construction phase assistance. Humiston & Moore will design this project for two (2) disposal locations. One will be a nearshore discharge at Lowdermilk Park as the existing permit currently allows and the other will be an on -beach disposal just south of Doctor's Pass in the vicinity of Indies West. Permit modifications will be performed by Coastal Planning and Engineering. Humiston & Moore will be required to closely coordinate with Coastal Planning and Engineering to accomplish this task. FISCAL IMPACT: Funds for the design and construction of the 2013 Doctors Pass Maintenance Dredging are currently budgeted in project 90549 - Tourist Development Tax Fund 195 and estimated to be $850,000. GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management Plan related to this action. ADVISORY COMMITTEE RECOMMENDATIONS: At the April 11, 2013 Coastal Advisory Committee (CAC) meeting this item was unanimously approved by a vote of 7 to 0. At the April 22, 2013 Tourist Development Council (TDC) meeting the motion was made recommending this item for approval if sand is placed upon beach. This motion passed 5 to 3. LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney's Office, requires majority vote, and is legally sufficient for Board action. — CMG RECOMMENDATION: To approve a Work Order with Humiston & Moore for engineering and construction support services for the 2013 Doctors Pass Maintenance Dredging for a not to exceed time and material amount of $36,910, make a finding that this item promotes tourism, Packet Page -1481- 5/14/2013 16.A.30. authorize the County Manager or his designee to execute the Work Order and approve necessary budget amendments. Prepared By: J. Gary McAlpin, P.E., Coastal Zone Management, Natural Resources Department Attachments: A) H &M Proposal; B) Work Order Packet Page -1482- 5/14/2013 16.A.30. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.30. Item Summary: Recommendation to approve a Work Order with Humiston & Moore for Doctors Pass Maintenance Dredging engineering and construction support services for a not to exceed time and material amount of $36,910, make a finding that this item promotes tourism, authorize the County Manager or his designee to execute the Work Order, and approve necessary budget amendments. Meeting Date: 5/14/2013 Prepared By Name: HambrightGail Title: Accountant,Coastal Zone Management 4/19/2013 9:07:34 AM Approved By Name: LaPierreBarbara Title: Management/Budget Analyst,Transportation Administr Date: 4/23/2013 3:56:22 PM Name: PuigJudy Title: Operations Analyst, GMD P &R Date: 4/24/2013 8:44:55 AM Name: KearnsAllison Date: 4/24/2013 1:10:05 PM Name: McAlpinGary Title: Director - Coastal Management Programs,Coastal Zon Date: 4/24/2013 2:11:57 PM Name: LorenzWilliam Title: Director - CDES Engineering Services,Comprehensive Date: 4/24/2013 4:26:34 PM Name: MarkiewiczJoanne Title: Manager - Purchasing Acquisition,Purchasing & Gene Packet Page -1483- Date: 4/25/2013 5:45:26 AM Name: MarkiewiczJoanne Title: Manager - Purchasing Acquisition,Purchasing & Gene Date: 4/25/2013 5:46:00 AM Name: CummingsRhonda Title: Contracts Specialist,Purchasing & General Services Date: 4/25/2013 11:16:50 AM Name: MarcellaJeanne Title: Executive Secretary,Transportation Planning Date: 4/30/2013 8:49:55 AM Name: GreeneColleen Title: Assistant County Attomey,County Attorney Date: 4/30/2013 9:39:09 AM Name: KlatzkowJeff Title: County Attorney Date: 4/30/2013 10:14:19 AM Name: FinnEd Title: Senior Budget Analyst, OMB Date: 4/30/2013 4:23:42 PM Name: OchsLeo Title: County Manager Date: 5/2/2013 3:50:15 PM Packet Page -1484- 5/14/2013 16.A.30. HUMISTON & MOORE ENGINEERS COASTAL ENGINEERING DESIGN AND PERMITTING April 10, 2013 Mr. Gary McAlpin, Manager Collier County Coastal Zone Management Department 2800 N. Horseshoe Drive Naples, FL 34104 C.— .,,..., v 5/14/2013 16.A.30. 1_.— 5679 STRAND COURT NAPLES, FLORIDA 34110 FAX:239 594 2025 PHONE: 239 594 2021 Re: Proposal for Doctors Pass Maintenance Dredging, Plans, Technical Specifications, Construction Observations, and Surveys H &M File No. 22 -063, Collier County Contract 09- 5262 -S2 Dear Gary, As requested, we are providing this proposal for assisting the County with Construction Phase Services for the maintenance dredging of Doctors Pass. At your request we will use the same dredge template as currently permitted by Florida Department of Environmental Protection (DEP) under Joint Coastal Permit 0235740 - 001 -JC with the ability for the use of two disposal areas. The preferred disposal area will be the beach disposal south of Doctors Pass which is currently being permitted by Coastal Planning and Engineering, Inc. The second disposal area is the currently authorized disposal under the active permit which is the nearshore area seaward of Lowdermilk Park. It is assumed that authorizations from the DEP and the U.S. Army Corps of Engineers for the proposed dredging and disposal will be provided by others. Please note that a pre - construction submerged aquatic vegetation (SAV) survey is required within the flood shoal region as part of the Notice to Proceed process. The SAV surveys, pre and post will be handled by the County. The county will be responsible for obtaining the necessary regulatory authorizations to proceed. Additionally, the county staff will do onsite observation and address all the requirements of the sediment quality assurance plan and turbidity and environmental monitoring and reporting. H &M will attend weekly meetings and provide support as required. During construction the contractor will be required to provide progress surveys by a registered Florida surveyor for pay quantities and of sufficient quality for post construction project certifications. Contractor will also provide sufficient surveys of the disposal area including all survey requirements of the DEP approved monitoring plan. We propose the following Scope of Work: Specification, Bidding 1. Plans and technical specifications: Based on a 2013 pre- construction monitoring survey to be provided by Atkins, Inc., Humiston & Moore Engineers (H &M) will prepare final construction plans and technical specifications. These will be provided to the County to be included with the County's Bid Documents for bidding the maintenance dredging project. Est. Cost: $12.320 (T &M) F:1H &M -22- 000122 -063 - Collier County RFP 5262 - 5212013 Doctors Pass122 -063 Doctors Pass Construction Phase 2013 - 4-10.docx Page 1 of 2 Packet Page -1485- 2 5/14/2013 16.A.30. 2. Opinion of Probable Costs: Provide the County with an Opinion of Probable Costs for the project: Est. Cost: $1,260 (T &M) 3. Pre -Bid Meeting and Bid Addenda: Respond to requests from Contractors, assist County staff with the Pre -Bid Conference, prepare any necessary addenda to the bid documents as deemed necessary by County staff, review submitted bids for dredging work by potential contractors, and make recommendations to the County regarding the award of a contract. Est. Cost: $4,040 (T &M) Subtotal I: II. Construction Phase 4. Construction Observation: Attend weekly progress meetings with county staff and contractor and provide support to county as required. County will be responsible for onsite construction observation, QA/QC requirements and turbidity and environmental monitoring. H &M will process the survey data for pay quantity review and for final certifications, assuming a 40 -day construction period, 2417 operation. Est. Cost: $8,900 (T &M) 5. Post Construction Report: Using progress surveys provided by Contractor, H &M will plot final sections and prepare a post construction report and certifications. Subtotal I I: Total I + II: Est. Cost: $10,390 T &M) 19 290 $30,910 Tasks will be billed on a time and materials basis, unless otherwise noted. The budgets for these tasks may therefore be considered as not -to- exceed amounts with the understanding that in the event regulatory requirements or requests from County staff result in Additional Services exceeding the estimated budget amounts, a budget amendment will be requested. Please call if you have any questions. Sincerely yours, HUMISTON & MOORE ENGINEERS Brett D. Moore, P.E. President FAHW -22- 000122 -063 - Collier County RFP 5262- S212013 Doctors Pass122 -063 Doctors Pass Construction Phase 2013 - 4- 10.docx Page 2 of 2 Packet Page -1486- v 5/14/2013 16.A.30. 3 _.._ Packet Page -1487- Date: April 10, 2013 Tasks Doctors Pass Maintenance Spot Dredging 1.0 Plans & Specifications 2.0 Probable Opinion of Costs 3.0 Pre -Bid Meeting and Bid Addenda 4.0 Construction Observation Support, Pay Quantity & Certifications _ 5.0 Post Construction Report _ 1.0 Plans & Specifications RATE /UNIT HOURS /QTY COST JIVIARKUP JAMOUNT jPrinciple Eng. /Pjt. Mgr. 175 24 4,200.00 Senior Eng /Senior Analyst 145 0 0.00 Analyst 1 125 0 ! Engineer III /Eng. Production= 105 40 4,200.00 j Engineer II /Coastal Eng. 95 0 I 0.00 Engineer I' 901 0 0.00 Senior Technician 851 8 ! 680.00 j Env. Science Tech. /Field Ob. 75 40 3,000.00 lJr. Tech. /GIS Tech 70 0 0.00 _ I Microsoft Project Tech ( 55 —0-11- 0.00 Administrative /Clerical I 40 61 1 240.00 1PLOTTING, BOND 1 25.00 0.00 !PLOTTING, VELLUM 10.00 ; 0.00 IEXPENSE'SDI Survey 0.00 !EXPENSE- I $0 j 0.00 EXPENSE - mileage i 0.00 12 320.00 Subconsultants 0.00 H &M $12,320.00 _ Total Task 1.0 $12,320.00 Packet Page -1487- v 5/14/2013 16.A.30. 4 Packet Page -1488- Date: April 10, 2013 Tasks I Doctors Pass Maintenance Spot Dredging 1.0 Plans & Specifications 2.0 Probable Opinion of Costs 3.0 Pre -Bid Meeting and Bid Addenda 4.0 Construction Observation Support, Pay Quantity & Certifications 5.0 Post Construction Report I I 2.0 Probable Opinion of Costs IRATEIUNIT HOURS /QTY COST IMARKUP AMOUNT Principle Eng. /Pjt. Mgr. 1 175; 2 350.00 Senior Eng /Senior Analys 145; 01 0.00 Analyst 1 125 0' 0.00 Engineer III /Eng. Productii 105 01 1 0.00 En meer II /Coastal Eng. 1 95 61 570.00 Engineer 11 90 0 0.00 Senior Technician 85 4 340.00 Env. Science Tech. /Field 75 01 0.00 Jr. Tech. /GIS Tech 70 01 0.00 Microsoft Project Tech 1 55 0' ( 0.00 Administrative /Clerical 40 0 0.00 PLOTTING, BOND 25.00 _ 0.00, PLOTTING, VELLUM 10.00 0.00 EXPENSE - mailings, copying 0, 0.00 _ EXPENSE- ! $01 0.00 EXPENSE - mileage 0.00 1 260.00 Subconsuitants 0.00 H &M i $1,260.00 !Total Task 3.0 $1,260.00 Packet Page -1488- C.— — ..,.... v 5/14/2013 16.A.30. 5 _.._ Packet Page -1489- Date: April 10, 2013 Tasks IDoctors Pass Maintenance Spot Dredging 1.0 1 Plans & Specifications 2.0 Probable Opinion of Costs 3.0 Pre -Bid Meeting and Bid Addenda 4.0 Construction Observation Support, Pay Quantity Certifications 5.0 Post Construction Report _ 3.0 Pre -Bid Meeting and Bid Addenda RATEIUNIT HOURS /QTY COST JMARKUP AMOUNT Principle Eng. /Pjt. Mgr. 1 175 8 1,400.00 Senior Eng /Senior Analys 145 Oj 0.00 Analyst 1 125; 0 0.00 Engineer III /Eng. Producti 105 6 630.00 (Engineer II /Coastal Eng. 95j _ 0 0.00 Engineer 1 90 81 720.00 _ Senior Technician 1 85 81 Env. Science Tech. /Field ( 75 6 450.00' Jr. Tech. /GIS Tech 70 01 0.00 IMicrosoft Project Tech 55 01 1 0.00 (Administrative /Clerical 40 41 160.00 PLOTTING, BOND 25.00 0.00 PLOTTING, VELLUM 10.00 0.00 EXPENSE - mailings, copying 0 _ 0.00 EXPENSE- 0' 0.00 EXPENSE- mileage mtgs - rock j 0i 0.00 $4,040.00 I Subconsultants 0.00 H &M 1 $4,040.00 ITotal Task 4.0 $4,040.00 Packet Page -1489- C.— .. v 5/14/2013 16.A.30. 6- .- Packet Page -1490- Date: April 10, 2013 Tasks IDoctors Pass Maintenance Spot Dredging 1.0 Plans & Specifications j 2.0 Probable Opinion of Costs 3.0 Pre -Bid Meeting and Bid Addenda 4.0 Construction Observation Support, Pay Quantity & Certifications j 5.0 Post Construction Report I 4.0 Construction Observation Support, Pay Quantity & Certifications j 1 RATE /UNIT HOURS/QTYj COST MARKUP AMOUNT Principle En . /P't. Mgr. 175 18 3,150.00' _ Senior Eng /Senior Analyst 145 01 _ Analyst 1 1 125 101 1,250.00 Engineer III /Eng. Producti,_ 105 0' 0.00 Engineer II /Coastal Eng. 95 01 0.00, Engineer 1 901 0 0.001 Senior Technician 851 01 I 0.00, Env. Science Tech. /Field ( 751 601 4,500.001 Jr. Tech. /GIS Tech 70 0 0.00 Microsoft Project Tech 551 0' 0.00 Administrative /Clerical 40 01 0.00 PLOTTING, BOND 25.00 0.00 PLOTTING, VELLUM 10.00 0.001 EXPENSE; Sediment 10 j 0 0.00 _ EXPENSE- 01 0.001 EXPENSEIpostage courier 0'i 0.00, 8 900.00 Subconsultants__ j 0.00 H &M $8,900.00 I Total Task 5.0 $8,900.00 Packet Page -1490- C.,..__, .. ­1 v 5/14/2013 16.A.30 7_ . - Packet Page -1491- DDate: April 10, 2013 Tasks Doctors Pass Maintenance Spot Dredging 1.0 Plans & Specifications i 2.0 Probable Opinion of Costs 3.0 1 Pre -Bid Meeting and Bid Addenda 4.0 1 Construction Observation Support, Pay Quantity & Certifications 5.0 Post Construction Report 5.01 Post Construction Report _ RATEIUNIT HOURS /QTY COST MARKUP JAMOUNT I Principle Eng. /Pjt. Mgr. 175 10 1,750.001 Senior Eng /Senior Analyst 145 0 0.00; Analyst 1 125 0 1 0.00 _ _ Engineer 111 /Eng. Producti 105 40 4,200.00 Engineer II /Coastal Eng. 95 0 0.00 Engineer 1' 90 401 _ 3,600.00 !Senior Technician 85 81 680.00; Env. Science Tech. /Field 75 0 i 0.00 IJr. Tech. /GIS Tech 70 0 0.001 I Microsoft Project Tech 55 0 0.00 Administrative /Clerical 40 4 160.00 IPLOTTING, BOND 25.00 0,001 PLOTTING, VELLUM 10.00 0.00 _ !EXPENSE - mailings, copying 0 0.00! �EXPENSEiSDI survey 1 0.00, EXPENSE- mileage mtgs - rock 0 0.001 _ 10 390.00 Subconsultants 0.00 H &M $10,390.00 !Total Task 7.0 $10,390.00 Packet Page -1491- C. __, — v 5/14/2013 16.A.30. 8 _.._ Packet Page -1492- Date: April 10, 2013 Tasks Doctors Pass Maintenance Spot D edging Budget H &M Sub 1OPlans & Specifications $12,320 $12,320 1 $0 2.01 Probable Opinion of Costs $1,260 $1,260 $0 3.01 Pre -Bid Meeting and Bid Addenda $4,040 $4,040 $0 4.01 Construction Observation Support , Pay Quantity & Certifications $8,900 1 $8,900 $0 5.01 Post Construction Report $10,390 $10,390 $0 i I Subtotal 1 thru 4: $17,620 1 $17,620 $0 Subtotal 5 thru 7 $19,290 $19,290 $0 I � 1 Total: $36,910 $36,910 $0 Rate Total Hrs. Principle Eng. /Pjt. Mgr. 175 62 Senior Eng/Senior Analys 145 0 Analyst 1 125 10 Engineer III /Eng. Producti 105 1 86 Engineer II /Coastal Engineer 11 90 48 Senior Technician 85 28 I Env. Science Tech.lField c 75 106 i Jr. Tech. /GIS Tech 70 0 i Microsoft Project Tech 55 0 j �- Administrative /Clerical 40 14 l j I Packet Page -1492- HUMISTON & MOORE ENGINEERS COASTAL ENGINEERING DESIGN AND PERMITTING Principal Engineer Senior Engineer /Senior Analyst Project Director /Project Manager /Project Coordinator Engineer III /Engineering Production /QC Engineer 11 /Coastal Monitor Engineer I Senior Technician Environmental Science Technician Junior Technician /GIS Technician Microsoft Project Technician Administration /Clerical Clerical This list is not intended to be all inclusive. Hourly rate fees for other categories of professional, support, and other services shall be mutually negotiated by the County and the firm on a project -by- project basis as needed. Packet Page -1493- C,.,..__, .. v 5/14/2013 16.A.30. 9- - 5679 Strand Court Naples, FL 34110 239 - 594 -2021 - Voice 239 - 594 - 2025 - Fax $175.00/hr. $145.00/hr. $125.00/hr. . $105.00 /hr. $ 95.00 /hr. $ 90.00 /hr. $ 85.00 /hr. $ 75.00 /hr. $ 75.00 /hr. $ 70.00 /hr. $ 55.00 /hr. $ 40.00 /hr. v 5/14/2013 16.A.30. 1 - -- Thi list is not intended to be all inclusive. Hourly rat fees for othe catego es of oessional, Suport, and other services h 11 be mutua�ly negotiatedy the County and the irm on a probe t- by- project asis as nee ed. FAH &M -22- 000122 -063 - Collier County RFP 5262 -S2 \Fee Schedule.doc Packet Page -1494- 5/14/2013 16.A.30. WORK. ORDERIPURCHASE ORDER Agreement for " Humiston & Moore Engineers" Dated: AP ,r►1 12, 2013 (Contract 09- 5262 -S2) This Work Order is for professional engineering services for work known as: Doctors Pass Maintenance Dredging, Plans, Technical Specifications, Construction Observations, and Surveys Project Name: Doctors Pass maintenance Dredging Project No: 195- 90549.1 The work is specified in the proposal dated April 10, 2013 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above, Work Order/Purchase Order # (please fill out once received) is assigned to: Humiston & Moore Engineers. Scope of Work: As detailed in the attached proposal and the following: • Task I Plans & Technical Specifications • Task II Opinion of Probable Costs • Task III Pre -Bid Meeting and Bid Addenda • Task IV Construction Observation • Task V Post Construction Report Schedule of Work: Complete work within 240 days from the date of the Notice to Proceed which is accompanying this Work Order. Compensation: In accordance with Article Five of the Agreement, the County will compensate the Firm in accordance with following method(s): ❑Negotiated Lump Sum QLump Sum Plus Reimbursable Costs ®Time & Material (established hourly rate — Schedule A) ElCost Plus Fixed Fee, (define which method will be used for which tasks) as provided in the attached proposal. PREPARED; APPROVED APPROVED Task I $ 12,320 Task II $ 1,260 Task III $ 4,040 Task IV $ 8,900 Task V V 10,390 TOTAL FEE $ 36,910 ACCEPTED BY: Humiston Moo ngineers rett D. Moore, P.E., President Packet Page -1495- Dame Date L-� ,Z y -/ 3 Date y a Date