Loading...
Backup Documents 01/09/2018 Item #16A 2 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 16A 2 TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must he received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. 3. County Attorney Office County Attorney Office (� /'� 4. BCC Office Board of County S'k Commissioners (/c5 `N\x-zAkS 5. Minutes and Records Clerk of Court's Office 41, 4 8 -A,M44 PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to conta9 staff for additional or missing information. Name of Primary Staff Jodi Hughes Phone Number x-5744 1,/ Contact/ DepartmInt Agenda Date Item was 1/9/18 ir Agenda Item Number 16A2 Approved by the BCC Type of Document Plat Number of Original 1 Attached Documents Attached PO number or account number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) I. Does the document require the chairman's original signature? 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name; Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman, with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. JH 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the JH document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's JH si:nature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 1/9/18 and all changes made during the meeting have been incorporated in the attached document. The County Attorney's ✓A��/ an option,fpr Office has reviewed the changes,if applicable. r.. _ me 9. Initials of attorney verifying that the attached document is the version approved by the BCC, all changes directed by the BCC have been made,and the document is ready for e JOE an optioda Chairman's signature. ' I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 1 6 A 2 • TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 2. I n 3. County Attorney Office County Attorney Office ] /J 1 4. BCC Office Board of County Commissioners \r“-/67 4\\3\\% 5. Minutes and Records Clerk of Court's Office MA) ikkt3V ,.a114/14, PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event ne of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff Jodi Hughes Phone Number x-5744 Contact/ Department Agenda Date Item was 1/9/18 Agenda Item Number 16A2 No, Approved by the BCC Type of Document Bond,Maintenance Agreement Number of Original 2 Attached Documents Attached PO number or account number if document is to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A"in the Not Applicable column, whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature? JIT S J 2. Does the document need to be sent to another agency for additional signatures? If yes, N/A provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman,with the exception of most letters,must be reviewed and signed by the Office of the County Attorney. JH 4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A Office and all other parties except the BCC Chairman and the Clerk to the Board 5. The Chairman's signature line date has been entered as the date of BCC approval of the JH document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's JH signature and initials are required. 7. In most cases(some contracts are an exception),the original document and this routing slip should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be aware of your deadlines! 8. The document was approved by the BCC on 1/9/18 and all changes made during the ,00 meeting have been incorporated in the attached document. The County Attorney's tr00 oft nft Office has reviewed the changes,if applicable. ! / 6til 9. Initials of attorney verifying that the attached document is the version approved by the BCC, all changes directed by the BCC have been made,and the document is ready for the Chairman's signature. I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 16A 2 CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS THIS CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS entered into this 3rd day of April, 2018 between Standard Pacific of Florida hereinafter referred to as "Developer," and the Board of County Commissioners of Collier County, Florida, hereinafter referred to as the "Board". RECITALS: A. Developer has, simultaneously with the delivery of this Agreement, applied for the approval by the Board of a certain plat of a subdivision to be known as: Bent Creek Preserve Phase 2B. B. Chapters 4 and 10 of the Collier County Land Development Code requires the Developer. to post appropriate guarantees for the construction of the improvements required by said subdivision regulations, said guarantees to be incorporated in a bonded agreement for the construction of the required improvements. NOW, THEREFORE, in consideration of the foregoing premises and mutual covenants hereinafter set forth, Developer and the Board do hereby covenant and agree as follows: 1. Developer will cause to be constructed: Site improvements including but not limited to installation of storm drainage, potable water, sanitary sewer and roadway construction associated with Bent Creek Preserve Phase 2B (PL20170001778)within 12 months from the date of approval said subdivision plat, said improvements hereinafter referred to as the required improvements. 2. Developer herewith tenders its subdivision performance security (attached hereto as Exhibit "A" and by reference made a part hereof) in the amount of$1,248,971.42 which amount represents 10% of the total contract cost to complete construction plus 100% of the estimate cost of to complete the required improvements at the date of this Agreement. 3. In the event of default by the Developer or failure of the Developer to complete such improvements within the time required by the Land Development Code, Collier County may call upon the subdivision performance security to insure satisfactory completion of the required improvements. 4. The required improvements shall not be considered complete until a statement of substantial completion by Developer's engineer along with the final project records have been 1 6 A 2 furnished to be reviewed and approved by the County Manager or his designee for compliance with the Collier County Land Development Code. 5. The County Manager or his designee shall, within sixty (60) days of receipt of the statement of substantial completion, either: a) notify the Developer in writing of his preliminary approval of the improvements; or b) notify the Developer in writing of his refusal to approve improvements, therewith specifying those conditions which the Developer must fulfill in order to obtain the County Manager's approval of the improvements. However, in no event shall the County Manager or his designee refuse preliminary approval of the improvements if they are in fact constructed and submitted for approval in accordance with the requirements of this Agreement. 6. The Developer shall maintain all required improvements for a minimum period of one year after preliminary approval by the County Manager or his designee. After the one year maintenance period by the Developer has terminated, the Developer shall petition the County Manager or his designee to inspect the required improvements. The County Manager or his designee shall inspect the improvements and, if found to be still in compliance with the Collier County Land Development Code as reflected by final approval by the Board, the Board shall release the remaining 10% of the subdivision performance security. The Developer's responsibility for maintenance of the required improvements shall continue unless or until the Board accepts maintenance responsibility for and by the County. 7. Six (6) months after the execution of this Agreement and once within every six (6) months thereafter the Developer may request the County Manager or his designee to reduce the dollar amount of the subdivision performance security on the basis of work complete. Each request for a reduction in the dollar amount of the subdivision performance security shall be accompanied by a statement of substantial completion by the Developer's engineer together with the project records necessary for review by the County Manager or his designee. The County Manager or his designee may grant the request for a reduction in the amount of the subdivision performance security for the improvements completed as of the date of the request. 8. In the event the Developer shall fail or neglect to fulfill its obligations under this Agreement, upon certification of such failure, the County Manager or his designee may call upon the subdivision performance security to secure satisfactory completion, repair and maintenance of the required improvements. The Board shall have the right to construct and maintain, or cause to 16A 2 be constructed or maintained,pursuant to public advertisement and receipt and acceptance of bids, the improvements required herein. The Developer, as principal under the .ubdivision performance security, shall be liable to pay and to indemnify the Board, upon com• etion of such construction, the final total cost to the Board thereof, including, but not limit d to, engineering, legal and contingent costs, together with any damages, either direct or cons quential, which the Board may sustain on account of the failure of the Developer to fulfill all of e provisions of this Agreement. 9. All of the terms,covenants and conditions herein ontained are and shall be binding upon the Developer and the respective successors and assigns • the Developer. IN WITNESS WHEREOF, the Board and the Develo -r have caused this Agreement to be executed by their duly authorized representatives this 3rd da of April, 2018. SIGNED IN THE PRESENCE OF: (Name of E ty) .001 .v`+ By: int Name: )1,v1A Darin McMurray, VP Standard Pacific of Florida CSP, .I r`C At_ , —10'Ne C`Ir\o(t 7G-t-\r\ec o� 5 56�aCt��C Pri• am,: ':A o \or,c\CL ATTEST: BOARD OF CO TY COMMISSIONERS DWIGHT E. BROCK, Clerk OF COLLIE' 0 Y, FLO' •7-' ,De: ty ' •ndy Solis, Chairman A -Attest as to Chairman's signature only. Approved as to form and 1110011619insag\4:3ak( h�= Scott A. Stone Assistant County Attorney Approved Form—JAK—February 2006 16A 2 FIDELITY GUARANTY AND ACCEPTANCE CORP . pill 700 NW 107 AVENUE - SUITE 204 MIAMI , FLORIDA 33172 PHONE ( 305 ) 553 -8724 IRREVOCABLE STANDBY LETTER OF CREDIT NO.FGAC-18099 ISSUER: FIDELITY GUARANTY AND ACCEPTANCE CORP.(HEREINAFTER"ISSUER") 700 NW 107TH AVENUE,SUITE 204 MIAMI,FLORIDA 33172 PHONE(786)257-4353 DATE OF ISSUE: MARCH 19,2018 PLACE OF EXPIRY: AT ISSUER'S COUNTERS LOCATED AT 700 NW 107 AVE,SUITE 204 MIAMI,FLORIDA 33172 DATE OF EXPIRY: THIS CREDIT SHALL BE VALID UNTIL MARCH 19,2019,AND SHALL THEREAFTER BE AUTOMATICALLY RENEWED FOR SUCCESSIVE ONE-YEAR PERIODS ON THE ANNIVERSARY OF THE ISSUE UNLESS AT LEAST SIXTY(60)DAYS PRIOR TO ANY SUCH ANNIVERSARY DATE, THE ISSUER NOTIFIES THE BENEFICIARY IN WRITING BY REGISTERED MAIL THAT THE ISSUER ELECTS NOT TO RENEW THIS CREDIT. APPLICANT: LENNAR HOMES,LLC.(HEREINAFTER"DEVELOPER") 10481 SIX MILE CYPRESS PARKWAY FORT MYERS,FLORIDA 33966 BENEFICIARY: THE BOARD OF COUNTY COMMISSIONERS,COLLIER COUNTY,FLORIDA (HEREINAFTER"BENEFICIARY") C/O DEVELOPMENT REVIEW DIVISION 2800 NORTH HORSESHOE DRIVE NAPLES,FL 34104 AMOUNT: UP TO AN AGGREGATE AMOUNT OF$1,248,971.42 (ONE MILLION TWO HUNDRED FORTY EIGHT THOUSAND NINE HUNDRED SEVENTY ONE AND 42/100 US DOLLARS) RE: INFRASTRUCTURE CONSTRUCTION PROJECT NAME: BENT CREEK PRESERVE PHASE 2B CREDIT AVAILABLE WITH: ISSUER BY: PAYMENT AGAINST DOCUMENTS DETAILED HEREIN AND BENEFICIARY'S DRAFTS AT SIGHT DRAWN ON THE ISSUER. DOCUMENTS REQUIRED: AVAILABLE BY BENEFICIARY'S DRAFT(S) AT SIGHT DRAWN ON THE ISSUER AND PRESENTED AT PLACE OF EXPIRY ACCOMPANIED BY BENEFICIARY'S STATEMENT PURPORTEDLY MANUALLY SIGNED AND DATED BY THE COUNTY MANAGER,OR HIS DESIGNEE,CERTIFYING THAT: A. "(I)DEVELOPER HAS FAILED TO CONSTRUCT AND/OR MAINTAIN THE IMPROVEMENTS ASSOCIATED WITH THAT CERTAIN PLAT OF A SUBDIVISION KNOWN AS BENT CREEK PRESERVE PHASE 2B AS REQUIRED BY COLLIER COUNTY ORDINANCES AND RESOLUTIONS (THE "LAND DEVELOPMENT REGULATIONS"); (II) DEVELOPER HAS BEEN GIVEN WRITTEN NOTICE DESCRIBING THE EVENT OR CONDITION OF SUCH DEFAULT IN REASONABLE DETAIL BY CERTIFIED MAIL, RETURN RECEIPT REQUESTED; AND(III)THE DEFAULT HAS NOT BEEN CURED WITHIN THE CURE PERIOD PROVIDED FOR THEREIN,IF ANY."; OR B. "A FINAL INSPECTION OF THE IMPROVEMENTS FOR BENT CREEK PRESERVE PHASE 2B AS REQUIRED BY COLLIER COUNTY ORDINANCES AND RESOLUTIONS(THE"LAND DEVELOPMENT REGULATIONS") SATISFACTORY TO COLLIER COUNTY HAS NOT BEEN PERFORMED PRIOR TO THE DATE OF EXPIRY, AND A SATISFACTORY ALTERNATIVE PERFORMANCE SECURITY HAS NOT BEEN PROVIDED TO AND ACCEPTED BY THE BENEFICIARY." 16A 2 FIDELITY GUARANTY AND ACCEPTANCE CORP . MI 700 NW 107 AVENUE - SUITE 204 MIAMI , FLORIDA 33172 PHONE ( 305 ) 553 - 8724 THIS IS AN INTEGRAL PART OF LETTER OF CREDIT NO.FGAC-18099 PAGE 2 DRAFT(S) DRAWN UNDER THIS LETTER OF CREDIT SHALL BE MARKED: "DRAWN UNDER FIDELITY GUARANTY AND ACCEPTANCE CORP. CREDIT NO. FGAC-18099, DATED MARCH 19, 2018" AND MUST BE ACCOMPANIED BY THIS ORIGINAL LETTER OF CREDIT AND ALL ORIGINAL AMENDMENTS,IF ANY,FOR PROPER ENDORSEMENT. THIS LETTER OF CREDIT SETS FORTH IN FULL THE TERMS OF THE ISSUER'S UNDERTAKING,AND SUCH UNDERTAKING SHALL NOT IN ANY WAY BE MODIFIED, AMENDED, OR AMPLIFIED BY REFERENCE TO ANY DOCUMENT,INSTRUMENT,OR AGREEMENT REFERENCED TO HEREIN OR IN WHICH THIS LETTER OF CREDIT RELATES,AND ANY SUCH REFERENCE SHALL NOT BE DEEMED TO INCORPORATE HEREIN BY REFERENCE ANY DOCUMENT,INSTRUMENT OR AGREEMENT. ISSUER HEREBY ENGAGES WITH BENEFICIARY THAT DRAFT(S) DRAWN UNDER AND IN COMPLIANCE WITH THE TERMS AND CONDITIONS OF THIS CREDIT WILL BE DULY HONORED BY ISSUER IF PRESENTED WITHIN THE VALIDITY OF THIS CREDIT TOGETHER WITH THE DOCUMENTS REQUIRED HEREIN AT THE PLACE OF EXPIRY PRIOR TO 4:00 P.M.EST.ON OR PRIOR TO THE DATE OF EXPIRY.PRESENTATIONS MAY BE MADE BY CERTIFIED OR REGISTERED MAIL,RETURN RECEIPT REQUESTED OR BY FEDERAL EXPRESS OR ANY OTHER NATIONALLY RECOGNIZED COURIER COMPANY. THIS CREDIT IS SUBJECT TO THE UNIFORM CUSTOMS AND PRACTICE FOR DOCUMENTARY CREDITS(2007 REVISION)INTERNATIONAL CHAMBER OF COMMERCE PUBLICATION NO.600. FIDELITY GUARANTY AND ACCEPTANCE CORP. JACQ4N U DE SOA,VICE PRESIDENT 16A 2 STANDARD PACIFIC OF FLORIDA GP, INC. CERTIFICATE OF INCUMBENCY FEBRUARY 13,2018 The undersigned, Mark Sustana, as the duly elected, qualified and acting Secretary of Standard Pacific of Florida GP, Inc., a Delaware corporation (the "Corporation"), hereby certifies that: The individuals listed on Schedule I attached hereto and made a part hereof, are duly elected, qualified and acting officers of the Corporation, and hold the officers set forth opposite their name, serving continuously in such capacity since their election on February 13, 2018 IN WITNESS WHEREOF, the undersigned has executed this Certificate of Incumbency on behalf of the Corporation effective as of the date first written above. Mark Sustana, Secretary STATE OF FLORIDA COUNTY OF MIAMI-DADE Sworn to and subscribed before me this 13th day of February 2018, by Mark Sustana, Secretary of Standard Pacific of Florida GP, Inc., a Delaware corporation, on behalf of the Corporation. He is personally known to me and did not take an oath. is ?_ VICKI RIVERO NOTARY PUBLIC COMMISSION#t;t;09464 State of Florida t.=Ft.__: EXPIRES:August 14,2021 Bonded'Nu Notary Public Underwriters 16A 2 SCHEDULE I Appointments for Standard Pacific of Florida GP, Inc. Board Positions Name Position Bessette,Diane Director Sustana, Mark Director Officers Name Position Miller,Stuart A. Chief Executive Officer Gross,Bruce Chief Financial Officer Jaffe,Jonathan M. Chief Operating Officer Beckwitt,Richard President Burgess,William O. Senior Vice President Gualco,Larry Senior Vice President Tarbox,Kevin Senior Vice President Aune,Jonathan A. Vice President Baayoun),John Baayoun(Yahya Zakour Vice President Barker,Dustin Vice President Bavouset,James S. Vice President Bessette,Diane Vice President Broddle,Joy Vice President Calabro, Robert J. Vice President Clemens,Jeffrey T. Vice President Collins, David Vice President Condon,Joy Vice President Dowell, Michael R. Vice President Eckert,Sherrie Vice President Farrell,Todd Vice President Fortino,Joseph Vice President France,Jeffrey Vice President Gansheimer,Tom Vice President Goldberg,Sandy Vice President Goldfinger,Joel Vice President Tummolo, Robert Vice President Gonzalez,Carlos Vice President Gross,Bruce Vice President Gunderson,Jeffery Vice President Hammond,John Vice President Houck,Ryan Vice President Johnson,Robert W. Vice President 16A 2 Jones,Alan Vice President Keith, Earl Vice President Kirschner,Terrence V Vice President Klingensmith, Craig Vice President Knipe,James Vice President Luke, Donald A. Vice President McGuff,Greg Vice President McMurray, Darin L. Vice President Metheny,Marvin L Vice President Mignone,Anthony Vice President Mitchell,Andrew Vice President Nicholas, Brock Vice President Olin, Brian Vice President Ott, Greg Vice President Parness,Jeremy Vice President Roos,Jeffrey Vice President Rothman,Fred Vice President Smith, Ryan Vice President Smith,Steve Robert Vice President Stearns,Michael A. Vice President Sustana,Mark Vice President Tauscher,Patricia Vice President Thompson,Brian Vice President Torres, Mark Vice President Wineman,Matthew Vice President Velky,Michelle Vice President Grosswald, Dan Vice President Baselice,David Vice President Devereaux, Matt Vice President Byham,Jason Vice President Hardy,Jon Vice President Mignone,Anthony Vice President Parker,Jim Vice President Tinana,Andy Vice President DeVoe,Mike Vice President Wolf,Philip Vice President Hill,Casey Vice President Bates,Tim Vice President Johnson,Kevin Vice President Jensen,Craig Vice President Seeberger, Blake Vice President Hutton, Rob Vice President Grove,David Vice President George,Troy Vice President Barron, Brian Vice President Coleman,Charlie Vice President Lavender,John Vice President Davey,Anita Vice President Nelson, David Vice President Henninger,Mark Vice President Sustana, Mark Secretary Bessette,Diane Treasurer Collins,David Controller Bartos, Katrina Authorized Agent-Homebuilding/Sales Operations Bernstein,Susan Authorized Agent-Homebuilding/Sales Operations Bickel,Morgan Authorized Agent-Homebuilding/Sales Operations 16A 2 Blackstead, Elizabeth Authorized Agent-Homebuilding/Sales Operations Byham,Jason R. Authorized Agent-Homebuilding/Sales Operations Escamilla, Isabelle Authorized Agent-Homebuilding/Sales Operations Fohr,Timothy Authorized Agent-Homebuilding/Sales Operations Fulghum,Joe Authorized Agent-Homebuilding/Sales Operations Bolton,Michael Authorized Agent—Homebuilding/Sales Operations Funderburk,Angela Authorized Agent-Homebuilding/Sales Operations Glatz, Debra Authorized Agent-Homebuilding/Sales Operations Jones,Jill Authorized Agent-Homebuilding/Sales Operations Moss,Deborah Authorized Agent-Homebuilding/Sales Operations Pace,Ericka Authorized Agent-Homebuilding/Sales Operations Palinkas,Patricia Authorized Agent-Homebuilding/Sales Operations Romano,Dana Authorized Agent-Homebuilding/Sales Operations Stream,Kevin Authorized Agent-Homebuilding/Sales Operations Williams,Sarah Authorized Agent-Homebuilding/Sales Operations McPherson,Greg Authorized Agent—Homebuilding/Sales Operations Vance-Copen,Valarie Authorized Agent—Homebuilding/Sales Operations McChesney,Valerie Authorized Agent—Homebuilding/Sales Operations Ellis,Lance Authorized Agent—Homebuilding/Sales Operations Fry,Tom Authorized Agent—Homebuilding/Sales Operations Mitchem,Jeffrey Authorized Agent—Homebuilding/Sales Operations Curran,Tom Authorized Agent—Homebuilding/Sales Operations Byers,Tod Authorized Agent—Homebuilding/Sales Operations Braun,Christine Authorized Agent—Homebuilding/Sales Operations Mauch, Robert Authorized Agent—Homebuilding/Sales Operations Branham,Melvin Authorized Agent—Homebuilding/Sales Operations Christensen,Matt Authorized Agent—Homebuilding/Sales Operations Goldfinger,Joel Authorized Agent—Homebuilding/Sales Operations Tyler,Judd Authorized Agent—Homebuilding/Sales Operations Leith,Shelia Authorized Agent—Homebuilding/Sales Operations Gabor, Stephen Authorized Agent—Homebuilding/Sales Operations Marion,Glenn Authorized Agent—Homebuilding/Sales Operations Goldstein,Benjamin Authorized Agent—Homebuilding/Sales Operations Hathaway,Tammy Authorized Agent—Homebuilding/Sales Operations Morgan,Karen Authorized Agent—Homebuilding/Sales Operations Baker,Vivian Authorized Agent—Homebuilding/Sales Operations Catanzariti,Jr.,Joseph Authorized Agent—Homebuilding/Sales Operations Adams, Denise Authorized Agent—Homebuilding/Sales Operations Petras,Jennifer Authorized Agent—Homebuilding/Sales Operations Ackerman,Guy Authorized Agent—Homebuilding/Sales Operations Hanna,Ashley Authorized Agent—Homebuilding/Sales Operations Dillon,John Authorized Agent—Homebuilding/Sales Operations White,Ophelia Veronica Authorized Agent—Homebuilding/Sales Operations Human,Michael D. Authorized Agent—Homebuilding/Sales Operations Moran,Jeff Authorized Agent—Homebuilding/Sales Operations Seeger,Steve Authorized Agent—Homebuilding/Sales Operations Kurkiewicz,Matt Authorized Agent—Homebuilding/Sales Operations Dotson,Michael Authorized Agent—Homebuilding/Sales Operations Tomberlin Jr.,Jerry Authorized Agent—Homebuilding/Sales Operations Harala,Scott Authorized Agent—Homebuilding/Sales Operations Leimbach,Chis Authorized Agent—Homebuilding/Sales Operations Schwallie,Ekaternia Authorized Agent—Homebuilding/Sales Operations Sigmund,Jim Authorized Agent—Homebuilding/Sales Operations Mahoney,Mike Authorized Agent—Homebuilding/Sales Operations Schmatz,Bob Authorized Agent—Homebuilding/Sales Operations Nelson,Kelli Authorized Agent—Homebuilding/Sales Operations 16A 2 Held,Jolene Authorized Agent—Homebuilding/Sales Operations Dunn,Patricia Authorized Agent—Homebuilding/Sales Operations McCann,Joanie Authorized Agent—Homebuilding/Sales Operations Stuart,John Authorized Agent—Homebuilding/Sales Operations Buchanan Smith,Heather Authorized Agent—Homebuilding/Sales Operations Mickle, Randy Authorized Agent—Homebuilding/Sales Operations James,Christina Authorized Agent—Homebuilding/Sales Operations Hollyday,Julie Authorized Agent—Homebuilding/Sales Operations Handt,Scott Authorized Agent—Homebuilding/Sales Operations Kaiserman, David J. Authorized Agent—Homebuilding/Sales Operations Raub,Melanie Authorized Agent—Homebuilding/Sales Operations Longo,Jason Authorized Agent—Homebuilding/Sales Operations Davis, Kate Authorized Agent—Homebuilding/Sales Operations Garcia, David Authorized Agent—Homebuilding/Sales Operations Fabian, Nicole Authorized Agent—Homebuilding/Sales Operations Slattery,Sherry Authorized Agent—Homebuilding/Sales Operations Greene,Tanika Authorized Agent—Homebuilding/Sales Operations Baker,Debbie Authorized Agent—Homebuilding/Sales Operations Scullion,Samantha Authorized Agent—Homebuilding/Sales Operations Eller,Jennifer Authorized Agent—Homebuilding/Sales Operations Reamer,Michael Authorized Agent—Homebuilding/Sales Operations Schreier,Melissa Authorized Agent—Homebuilding/Sales Operations Havel, Bryan Authorized Agent—Homebuilding/Sales Operations Brouilette,Kyle Authorized Agent—Homebuilding/Sales Operations Chahaya,Welly Authorized Agent—Homebuilding/Sales Operations Lavender,Jennifer Authorized Agent—Homebuilding/Sales Operations Galloway, Lisa Authorized Agent—Homebuilding/Sales Operations Figlesthaler, Matthew W Authorized Agent—Homebuilding/Sales Operations Chen,Sandy Authorized Agent—Homebuilding/Sales Operations Neto, Paulo Authorized Agent—Homebuilding/Sales Operations Morgan,Karen Authorized Agent—Homebuilding/Sales Operations Rapaport,Jon Authorized Agent—Homebuilding/Sales Operations Morin,Jeffrey Authorized Agent—Homebuilding/Sales Operations Sellinger,John Authorized Agent—Homebuilding/Sales Operations McDonald,Mark Authorized Agent-Land Development Operations Mignone,Anthony Authorized Agent-Land Development Operations Newman,Mitchell Authorized Agent-Land Development Operations Tinnesz,Anton Authorized Agent-Land Development Operations Ebner,Gabriel Authorized Agent—Land Development Operations Johnson,Thomas Authorized Agent—Land Development Operations Keiling,Scott M. Authorized Agent—Land Development Operations Murias,Manuel Authorized Agent-Payroll Operations Agatstein,Gary A. Authorized Agent-Tax Operations Petrolino,Michael Authorized Agent-Tax Operations Schaan,Todd Authorized Agent-Tax Operations Vogt, Feng Authorized Agent-Tax Operations Bavouset,James S. Assistant Secretary Bernstein,Susan Assistant Secretary Casagrande,Virginia S. Assistant Secretary Goldfinger,Joel Assistant Secretary Hargreaves, Mary M. Assistant Secretary Holley,Julie Assistant Secretary Houk, Melanie Assistant Secretary Leyva,Sandra Assistant Secretary Mayer,Joan Assistant Secretary Mignone,Anthony Assistant Secretary 16-A Santaella,Grace Assistant Secretary Duke,Joanna(Jodi) Assistant Secretary DeSouza,Jacqueline S. Assistant Treasurer Sustana, Mark General Counsel Jarvis,David Authorized Agent-Purchase Agreements 16 A 2 • ENGINEERING State of Florida Business Certificate No.EB-0007663 Bent Creek Preserve Phase 2B Engineer's Opinion of Probable Costs SUMMARY (S) SANITARY SEWER SUB-TOTAL $280,193.00 (W) POTABLE WATER SUB-TOTAL $198,145.00 (D) STORM DRAINAGE SUB-TOTAL $264,775.00 (P) PAVING AND GRADING SUB-TOTAL $364,307.32 (T) IMMOKALEE ROAD TURN LANE IMPROVEMENTS SUB-TOTAL $15,057.25 (L) LANDSCAPING SUB-TOTAL(2) $12,951.00 TOTAL $1,135,428.57 110% BONDING AMOUNT $1,248,971.42 Note: 1. This Engineer's Opinion of Probable Cost represents the estimated cost for constructing the above listed infrastructure for Bent Creek Preserve Phase 2A(RWA,Inc.File No.030008.11.05,REV 4 dated October 17,2017). 2. Landscaping cost provided by Chuck Yanette,signed and sealed 9/1/2017. Michael C.Pappas,P.E.#60910 RWA, Inc. 6610 Willow Park Drive,Ste 200 Naples, Florida 34109 4983 Royal Gulf Circle Fort Myers, Florida 33966 Phone:(239)597-0575 11/29/2017 Fax:(239)597-0578 9:37 AM 16A 1,-RIAL ENGINEERING Certificate of Business Certificate No.EB-0007663 Engineer's Opinion of Probable Construction Costs Project: Bent Creek Preserve Phase 2B Date:October 18,2017 Estimated By:David Poteete Checked By: Michael Pappas SANITARY SEWER DESCRIPTION UNIT QUANTITY UNIT TOTAL COST S-1 8"PVC Sanitary Sewer Main(0'-6'cut) LF 821 $33.00 $27,093.00 S-2 8"PVC Sanitary Sewer Main(6'-8'cut) LF 789 $44.00 $34,716.00 S-3 8"PVC Sanitary Sewer Main(8'-10'cut) LF 485 $54.00 $26,190.00 S-4 8"PVC Sanitary Sewer Main(10'-12'cut) LF 400 $64.00 $25,600.00 S-5 8"PVC Sanitary Sewer Main(12'-18'cut) LF 60 $78.00 $4,680.00 S-6 4'Diameter Manhole(0'-6'depth) EA 5 $4,800.00 $24,000.00 S-7 4'Diameter Manhole(6'-8'depth) EA 3 $5,500.00 $16,500.00 S-8 4'Diameter Manhole(8'-10'depth) EA 1 $6,300.00 $6,300.00 S-9 4'Diameter Manhole(10'-12'depth) EA 1 $7,200.00 $7,200.00 S-10 4'Diameter Manhole(12'-18'depth) EA 1 $11,800.00 $11,800.00 S-11 Single Sewer Service EA 2 $850.00 $1,700.00 S-12 Double Sewer Service EA 67 $980.00 $65,660.00 S-13 6"Sewer Cleanout EA 1 $800.00 $800.00 5-14 Sewer Lateral Removal and Cap EA 2 $500.00 $1,000.00 S-15 Television Inspection LF 2,555 $2.80 $7,154.00 S-16 Connect to Existing Manhole EA 2 $3,400.00 $6,800.00 S-17 6"Wye Branch and Cleanout EA 1 $600.00 $600.00 S-18 Cut-in Wye and housing for Sewer Service EA 4 $3,100.00 $12,400.00 Sanitary Sewer Sub-Total $280,193.00 2017-10-18 Phase 2B OPC 11/29/2017 16A 2 ENGINEERING Certificate of Business Certificate No.EB-0007663 Engineer's Opinion of Probable Construction Costs Project: Bent Creek Preserve Phase 2B Date:October 18,2017 Estimated By:David Poteete Checked By: Michael Pappas POTABLE WATER DESCRIPTION UNIT QUANTITY UNIT TOTAL COST W-1 6"PVC Water Main(C-900, DR 18,PC150) LF 114 $20.00 $2,280.00 W-2 6"PVC Water Main(C-900,DR 14,PC200) LF 45 $22.00 $990.00 W-3 8"PVC Water Main(C-900, DR 18,PC150) LF 2,613 $25.00 $65,325.00 W-4 6"Gate Valve w/Box EA 2 $1,200.00 $2,400.00 W-5 8"Gate Valve w/Box EA 4 $1,400.00 $5,600.00 W-6 Air Release Valve(AFD-TSP-BOV) EA 3 $4,200.00 $12,600.00 W-7 Fire Hydrant Assembly w/Valve EA 6 $4,500.00 $27,000.00 W-8 Permanent Sample Point EA 0 $1,500.00 $0.00 W-9 Hot-Tap(Includes 12"x8"Tapping Sleeve and Valve) LS 0 $4,500.00 $0.00 W-10 Single Water Service EA 37 $750.00 $27,750.00 W-11 Double Water Service EA 49 $900.00 $44,100.00 W-12 Temporary Gap Configuration EA 2 $3,800.00 $7,600.00 W-13 Testing LS 1 $2,500.00 $2,500.00 Potable Water Sub-Total $198,145.00 2017-10-18 Phase 2B OPC 11/29/2017 16A 2 Ywk, ENGINEERING Certificate of Business Certificate No.EB-0007663 Engineer's Opinion of Probable Construction Costs Project: Bent Creek Preserve Phase 2B Date:October 18,2017 Estimated By:David Poteete Checked By: Michael Pappas STORM DRAINAGE DESCRIPTION UNIT QUANTITY UNIT TOTAL COST D-1 10"HDPE Yard Drain Pipe LF 959 $28.00 $26,852.00 D-2 12"HDPE Yard Drain Pipe LF 557 $28.00 $15,596.00 D-3 15"RCP LF 516 $28.00 $14,448.00 D-4 18"RCP LF 197 $36.00 $7,092.00 D-5 24"RCP LF 1,108 $55.00 $60,940.00 D-6 36"RCP LF 363 $84.00 $30,492.00 D-7 3'x 4'Valley Gutter Inlet EA 12 $3,300.00 $39,600.00 D-8 Type'C'Inlet EA 6 $2,600.00 $15,600.00 D-9 Type'D'Inlet EA 3 $3,800.00 $11,400.00 D-10 Type'E'Inlet EA 2 $4,300.00 $8,600.00 D-11 5'X 5'Junction Box EA 1 $4,300.00 $4,300.00 D-12 24"FES EA 4 $1,400.00 $5,600.00 D-13 Yard Drain EA 11 $1,200.00 $13,200.00 D-14 Saw-Cut hole in Existing Box EA 1 $1,500.00 $1,500.00 D-15 Brick and Mortar Hole in Existing Box EA 1 $1,500.00 $1,500.00 D-16 Rock Excavation LF 537 $15.00 $8,055.00 Storm Drainage Sub-Total $264,775.00 2017-10-18 Phase 2B OPC 11/29/2017 16A 2 Y I A-1 i A_ ENGINEERING Certificate of Business Certificate No.EB-0007663 Engineer's Opinion of Probable Construction Costs Project: Bent Creek Preserve Phase 2B Date:October 18,2017 Estimated By:David Poteete Checked By: Michael Pappas PAVING AND GRADING DESCRIPTION UNIT QUANTITY UNIT TOTAL COST P-1 Mobilization LS 1 $12,000.00 $12,000.00 P-2 Staked Silt Fence LF 2,397 $1.25 $2,996.25 P-3 Double Silt Fence LF 1,836 $2.50 $4,590.00 P-4 12"Stabilized Subgrade(LBR 40) SY 8,158 $2.80 $22,842.40 P-5 8"Limerock Base(LBR 100) SY 6,286 $10.50 $66,003.00 P-6 3/4"Type S-III ACSC(1st Lift) SY 6,286 $4.70 $29,544.20 P-7 3/4"Type S-III ACSC(2nd Lift) SY 6,286 $6.00 $37,716.00 P-8 Concrete Valley Gutter LF 5,567 $8.00 $44,536.00 P-9 24"Ribbon Curb LF 24 $28.00 $672.00 P-10 5'Sidewalk LF 5,566 $12.00 $66,792.00 P-11 ADA Curb Ramps EA 2 $500.00 $1,000.00 P-12 Sod(4'strip between curb and sidewalk) SY 2,474 $1.72 $4,265.47 P-13 Signing and Striping LS 1 $5,000.00 $5,000.00 P-14 Street Lights EA 25 $2,200.00 $55,000.00 P-15 Seed and Mulch AC 1 $1,350.00 $1,350.00 P-16 Right-of-way Grading LS 1 $10,000.00 $10,000.00 Paving and Grading Sub-Total $364,307.32 2017-10-18 Phase 28 OPC 11/29/2017 16A 2 YWIV.,, ENGINEERING Certificate of Business Certificate No.EB-0007663 Engineer's Opinion of Increased Probable Construction Costs Project: Bent Creek Preserve Phase 2B Date:October 18,2017 Estimated By:David Poteete Checked By: Michael Pappas IMMOKALEE ROAD RIGHT OF WAY IMPROVEMENTS DESCRIPTION UNIT QUANTITY UNIT TOTAL COST T-1 Remove and Dispose Pavement SY 405 $9.00 $3,645.00 T-2 Remove and Dispose Type'F'Curb LF 81 $2.50 $202.50 T-3 Remove and Dispose Sidewalk SF 125 $1.75 $218.75 T-4 Remove and Dispose 24"Flared End Structures EA 2 $250.00 $500.00 T-5 Remove and Dispose 24"RCP LF 95 $22.00 $2,090.00 T-6 Remove Turn Arrows EA 2 $300.00 $600.00 T-7 Type'F'Curb LF 125 $14.00 $1,750.00 T-8 8'Sidewalk LF 114 $19.50 $2,223.00 T-9 6'Sidewalk LF 264 $14.50 $3,828.00 Immokalee Road Right of Way Improvements Sub-Total $15,057.25 2017-10-18 Phase 2B OPC 11/29/2017