Agenda 04/23/2013 Item #16C44/23/2013 16.C.4. EXECUTIVE SUMMARY OBJECTIVE: Replace fire hydrants that have reached the end of their useful life to ensure compliance with fire protection codes and ordinances, and provide a point to flush the water distribution system when necessary to comply with state and federal water quality standards. CONSIDERATIONS: On June 24, 2008, as Agenda Item IOG, the Board of County Commissioners (Board) adopted the 2008 Water Master Plan Update, which identified requirements for renewal and replacement of distribution system components. The proposed scope of work for Project 70023, "Fire Hydrant Replacement" is consistent with the 2010 Water CIP Update, page 2 of 4, line 86, as identified in the 2011 User Fee Rate Study. The scope of these two work orders includes the replacement of 60 fire hydrants: 36 in Imperial Circle and Bentley Village and 24 in Bay Forest. The existing fire hydrants are past their useful life and could interfere with fire protection and water quality flushing needs. Request for Quotation number 08- 5011 -73, "Fire Hydrant Replacement Imperial Circle and Bentley Village" was posted October 11, 2012, and distributed to all vendors of the Fixed -Term Underground Utilities Contract number 08 -5011. All five vendors submitted quotations for this project by the deadline of October 26, 2012. The quotations are summarized below. VENDOR BID Quality Enterprises USA, Inc. $93,009.60 Kyle Construction, Inc. $106,128.00 Mitchell & Stark Co. $108,000.00 Haskins, Inc. $108,900.00 Q N. Higgins, Inc Douglas $121 896.00 , Request for Quotation number 08- 5011 -79, "FY 13 Bay Forest Fire Hydrant Replacement" was posted February 13, 2013, and distributed to all vendors of the Fixed -Term Underground Utilities Contract 08 -5011. All five vendors submitted quotations for this project by the deadline of March 1, 2013. The quotations are summarized below. VENDOR BID Haskins, Inc. $46,440.00 Kyle Construction, Inc. $53,760.00 Quality Enterprises USA, Inc. $62,784.00 Douglas N. Higgins, Inc $69,552.00 Mitchell & Stark Co. $84,000.00 Packet Page -1083- 4123/2013 16.C.4. Staff determined that the lowest quote on both of the above referenced projects is fair and reasonable, and recommends awarding the work order "Fire Hydrant Replacement Imperial Circle and Bentley Village" to Quality Enterprises USA, Inc. and the work order "Fire Hydrant Replacement Bay Forest" to Haskins, Inc. In addition to the above referenced quotes for labor, there is also material cost for hydrants and appurtenances that were purchased separately through Ferguson Waterworks under contract number 09 -5201. Material for "Fire Hydrant Replacement Imperial Circle and Bentley Village" totaled $89,684.62. Estimated costs for materials for "Fire Hydrant Replacement Bay Forest" are $55,000. By purchasing materials directly, the County does not pay the State's six percent sales tax. Total material costs are estimated at $144,684.62. Total labor costs under these two work orders is $139,449.60. The total cost for this portion of Project 70023, Fire Hydrant Replacement, is $284,134.22; which is above the $200,000.00 threshold and requires Board approval. FISCAL IMPACT: Funding is available in and is consistent with the FY2013 Capital Budget approved by the Board on September 20, 2012. Funding is available in the Water User Fee Fund (412). LEGAL CONSIDERATIONS: This item has been reviewed and approved by the County Attorney's Office, is legally sufficient for Board action and only requires a majority vote for approval —SRT. GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: That the Board of County Commissioners, as Ex- officio the Governing Board of the Collier County Water -Sewer District: • approve the award of a work order under Request for Quotation 08- 5011 -73 in the amount of $93,009.60 to Quality Enterprises USA, Inc., • approve the award of a work order under Request for Quotation 08- 5011 -79 in the amount of $46,440.00 to Haskins, Inc., and • authorize the Chairwoman to sign and execute both work orders. Prepared By: Jereme Shaidle, PE, Senior Project Manager, Public Utilities Planning & Project Management Attachments: Attachment 1 Request for quote "Fire Hydrant Replacement Imperial Circle and Bentley Village" Attachment 2 Request for quote "Fire Hydrant Replacement Bay Forest" Attachment 3 Quote Tabulation "Fire Hydrant Replacement Imperial Circle and Bentley Village" Attachment 4 Quote Tabulation "Fire Hydrant Replacement Bay Forest" Attachment 5 Work Order "Fire Hydrant Replacement Bay Forest" Attachment 6 Work Order "Fire Hydrant Replacement Bay Forest" Packet Page -1084- 4/23/2013 16.C.4. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.C.16.C.4. Item Summary: Recommendation to approve a work order to Haskins, Inc., and a work order to Quality Enterprises USA, Inc., in the combined amount of $139,449.60 under Project Number 70023, Fire Hydrant Replacement. Meeting Date: 4/23/2013 Prepared By Name: RaineyJenniferA Title: VALUE MISSING 3/29/2013 9:56:16 AM Submitted by Title: VALUE MISSING Name: RaineyJenniferA 3/29/2013 9:56:17 AM Approved By Name: HapkeMargie Title: Operations Analyst, Public Utilities Date: 3/29/2013 10:24:56 AM Name: Pam Libby Title: Manager - Operations- Water/WW,Water Date: 4/1/2013 10:19:25 AM Name: Paul Mattausch Title: Director - Water,Water Date: 4/2/2013 11:15:44 AM Name: ChmelikTom Title: Director, Public Utilities Engineering Date: 4/4/2013 4:01:34 PM Packet Page -1085- Name: SunyakMark Title: Project Manager, Principal,Public Utilities Engine Date: 4/5/2013 8:50:25 AM Name: JacobsSusan Title: Operations Analyst, Public Utilities Date: 4/5/2013 10:27:44 AM Name: Joseph Bellone Title: Manager - Utility Billing & Cust Serv.,Utilities F Date: 4/5/2013 11:32:11 AM Name: ParkerNicole Title: Contracts Special ist,Purchasing & General Services Date: 4/5/2013 11:42:09 AM Name: ParkerNicole Title: Contracts Specialist,Purchasing & General Services Date: 4/5/2013 11:42:38 AM Name: MarkiewiczJoanne Title: Manager - Purchasing Acquisition,Purchasing & Gene Date: 4/5/2013 11:57:40 AM Name: YilmazGeorge Title: Administrator, Public Utilities Date: 4/6/2013 9:30:55 AM Name: TeachScott Title: Deputy County Attomey,County Attorney Date: 4/11/2013 10:04:04 AM Name: KlatzkowJeff Title: County Attorney Date: 4/11/2013 11:29:58 AM Name: UsherSusan Title: Management/Budget Analyst, Senior,Office of Manage Date: 4/12/2013 4:34:57 PM Name: OchsLeo Title: County Manager Date: 4/14/2013 9:41:28 PM Packet Page -1086- 4/23/2013 16.C.4. Cu E v v Z> o = N cri � a a LL w ? o Co LL m 0 u� 00 0 LL 5 Packet Page -1087- 4/23/2013 16.C.4. s m 0) z H N Z_ N 0 � C7 2 z o a O c) to fn CLa m m an M a W v v Y U (O a v G) I .— 4: m @ H 0 y = C C N 1 (U m C LL > Packet Page -1088- 4/23/2013 16.C.4. Z p vi Z aA O O t!1 () CLO M Y L/) Q u 2 O M T aJ � O C = ti 'J.~ O O a J U L J W �- U O z f6 '._ c` O C O a In P-- O m = 4J z O _ VE o 00 N I— N U u D F t0 O LU O T n N V► 00 M a d= z v �, m J Y ` :d C) L � T Y N ark iz w In �' Q1 w O �n z w 0o O U. C) Cr LL a `� Lri M a W v v Y U (O a v G) I .— 4: m @ H 0 y = C C N 1 (U m C LL > Packet Page -1088- 4/23/2013 16.C.4. 4/23/2013 16.C.4. REQUEST FOR QUOTATIONS FOR MULTIPLE PROECTS UNDER CONTRACT #08 -5011 "Annual Contract for Underground Utilities" Date: October 11, 2012 From: Nicole Parker, Contract Specialist 239 - 252 -4270, Telephone Number 239 - 252 -6549, Fax Number nicoleparker(a,colliergov.net To: Prospective Vendors Subject: RFQ #08- 5011 -73 Fire Hydrant Replacement Imperial Circle and Bentley Village As provided in the referenced contract, the Collier County Purchasing Department is soliciting quotes for the referenced project. RFQ Due Date: October 26, 2012 at 3:00 P.M. Pre -Quote Meeting Date/Time: October 19, 2012 at 3:00 P.M. Pre -Quote Meeting Location: Distribution Office - 4425 Progress Ave Q&A Deadline: October 23, 2012 at 3:00 P.M. Number of Days to Final Completion: 180 Plans and Specs: See scope of work, maps and hydrant list Description Quantity Price UOM Total Remove and Replace Fire Hydrants and Gate Valve Assemblies 36 EA Your quotation response for this project is due no later than the date and time specified above. We will not accept any quotation responses later than the noted time and date. If your firm is unable to respond electronically, your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specified. We look forward to your participation in this request for information /quotation process. Firm's Complete Legal Name Telephone Number/ Fax Number Signature Title Print Name Date RFQ_ ContractDriven _RevisedSeptember2009 1 Packet Page -1089- 4/23/2013 16.C.4. REQUEST FOR QUOTATIONS FOR MULTIPLE PROECTS UNDER CONTRACT #08 -5011 "Annual Contract for Underground Utilities" Date: February 13, 2013 From: Nicole Parker, Procurement Strategist 239 - 252 -4270, Telephone Number 239 - 252 -6549, Fax Number nicoleparker( colliergov.net To: Prospective Vendors Subject: RFQ #08- 5011 -79 FY13 Bay Forest Fire Hydrant Replacement As provided in the referenced contract, the Collier County Purchasing Department is soliciting quotes for the referenced project. RFQ Due Date: March 1, 2013 at 3:00 P.M. Pre -Quote Meeting Date/Time: February 21, 2013 at 3:00 P.M. Pre -Quote Meeting Location: Distribution Office - 4425 Progress Ave Q&A Deadline: February 26, 2013 at 3:00 P.M. Number of Days to Final Completion: 180 Plans and Specs: See scope of work, maps and hydrant list Description Quantity Price UOM Total Remove and Replace Fire Hydrants and Gate Valve Assemblies 24 EA Your quotation response for this project is due no later than the date and time specified above. We will not accept any quotation responses later than the noted time and date. If your firm is unable to respond electronically, your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specified. We look forward to your participation in this request for information /quotation process. Firm's Complete Legal Name Telephone Number/ Fax Number Signature Title Print Name Packet Page -1090- Date R FQ_Contra ctDriven_Revised Septem ber2009 1 WORK ORDER Agreement for Fixed Term Underground Utility Contract #08 -5011 Contract Date: March 11, 2008 Fixed Term Contract Expires March 19, 2014 (RFQ 408- 5011 -79) This Work Order is for Underground Utility Construction services for work known as: Project Name: Fire Hydrant Replacement Bay Forest Project No: 70023.3 4/23/2013 16.C.4. The Work is specified in the Request for Quotation, dated February 13, 2013 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above This Work Order is assigned to: Haskins, Inc. She of Work: Per Quote Tabulation form attached and the following: * Task I Remove and Replace Fire Hydrants and Gate Valve Assemblies Schedule of Work: Complete work within 180 days from the date of the Notice to Proceed which is accompanying this Work Order. Compensation: In accordance with Section 2 — Statement of Work for Agreement #08 -5011, the County will compensate the Firm in accordance with following method(s): ❑Negotiated Lump Sum; ❑Lump Sum Plus Reimbursable Costs; ®Time & Material; ❑Cost Plus Fixed Fee, as provided in the attached proposal. Task 1 $ 46,440.00 (TM) TOTAL FEE $ 46,440.00 a PREPARED BY: --- J e Shaidle, P.E., Project Manager tanning and Project M nagement Dept. APPROVED BY:/v Mark Sunyak, P. , incipal Project Manager Planning and Protect Management Dept, APPROVED BY: J cta",) om Chmelik, P.E., Director Planning and Project Management Dept. APPROVED BY: 'Paul Mattausch, Water Department Director Packet Page -1091- Date V 13 //3 Date ��,3 Date ° Date RFQ #08- 5011 -79 Page 1 4/23/2013 16. C.4. WORK ORDER Agreement for Fixed Term Underground Utility Contract #08 -5011 Contract Date: March 11, 2008 Fixed Term Contract Expires March 19, 2014 (RFQ #08- 5011 -79) APPROVED BY: Nicole Parker, Procurement Strategist Date APPROVED BY: George Yilmaz, Public Utilities Administrator Date Nf "(/4; ATTEST: BOARD OF COUNTY COMMISSIONERS Dwight E. Brock, Clerk Collier County, Florida By: By: Deputy Clerk Georgia A. Hiller, Esq. Chairwoman ATTEST: By: (Print Name/Title) Approved as to Form and Legal Sufficiency: Assistant County Attorney Haskins, c. By: - L. (Print Name/Title) 1 U Packet Page -1092- RFQ #08- 5011 -79 Page 2 4/23/2013 16.C.4. ter; County Administrative Services Division sj Purchasing REQUEST FOR QUOTATIONS FOR MULTIPLE PROECTS UNDER CONTRACT #08 -5011 "Annual Contract for Underground Utilities" Date: February 13, 2013 From: Nicole Parker, Procurement Strategist 239 -252 -4270, Telephone Number 239 -252 -6549, Fax Number nicoleparker(tollier oq v_net To: Prospective Vendors Subject: RFQ #08-5011 -79 FYI Bay Forest Fire Hydrant Replacement As provided in the referenced contract, the Collier County Purchasing Department Is soliciting quotes for the referenced project. RFQ Due Date: March 1, 2013 at 3 :00 P.M. Pre -Quote Meeting Date/Time: February 21, 2013 at 3:00 P.M. Pre -Quote Meeting Location: Distribution Office - 4425 Progress Ave Q&A Deadline: February 26, 2013 at 3:00 P.M. Number of Days to Final Completion: 180 Plans and Specs: See scope of work, maps and hydrant list ** This price does not include the removal of large trees surrounding hydrants* Description Quantity Price uOM Total Remove and Replace Fire Hydrants and Gate Valve Assemblies 24 $1,935 EA $46,440 Your quotation response for this project is due no later than the date and time specified above. We will not accept any quotation responses later than the noted time and date. If your firm is unable to respond electronically, your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specified. We look forward to your participation in this request for information /quotation process. Haskins Inc. Firm's Complete Legal Name 239- 947 -1846 / 239 -947 -3857 Telephone Number / FaXSlLwnber- Signature Estimator Title Ryan MacPhee Print Name Date RFQ_ ContractDriven _RevisedSeptember2009 1 Packet Page -1093- 4/23/2013 16.C.4. o er Co Administrative Servioes Division Purchasing REQUEST FOR QUOTATIONS FOR MULTIPLE PROECTS UNDER CONTRACT #08 -5011 "Annual Contract for Underground Utilities" Date: February 13, 2013 From: Nicole Parker, Procurement Strategist 239 - 252 - 4270, Telephone Number 239 -252 -6549, Fax Number nicoleparker( collier ov net To: Prospective Vendors Subject: RFQ #08-5011 -79 FY13 Bay Forest Fire Hydrant Replacement As provided in the referenced contract, the Collier County Purchasing Department Is soliciting quotes for the referenced project. RFQ Due Date: March 1, 2013 at 3:00 P.M. Pre -Quote Meeting Date/Time: February 21, 2013 at 3:00 P.M. Pre -Quote Meeting Location: Distribution Office - 4425 Progress Ave Q&A Deadline: February 26, 2013 at 3:00 P.M. Number of Days to Final Completion: 180 Plans and Specs: See scope of work, maps and hydrant list ** This price does not include the removal of large h Your quotation response for this project is due no later than the date and time specified above. We will not accept any quotation responses later than the noted time and date. If your firm is unable to respond electronically, your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specked. We look forward to your participation in this request for information /quotation process. Haskins Inc. Firm's Complete Legal Name 239 - 947 -1846 / 239 - 947 -3857 Telephone Number / Fax Number Estimator Title Ryan MacPhee Print Name Date RFQ_ ContractDriven _RevisedSeptember2009 1 Packet Page -1094- Description Quantity Price UOM Total Remove and Replace Fire Hydrants and Gate Valve Assemblies 24 $1,935 EA 1 $46,440 Your quotation response for this project is due no later than the date and time specified above. We will not accept any quotation responses later than the noted time and date. If your firm is unable to respond electronically, your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specked. We look forward to your participation in this request for information /quotation process. Haskins Inc. Firm's Complete Legal Name 239 - 947 -1846 / 239 - 947 -3857 Telephone Number / Fax Number Estimator Title Ryan MacPhee Print Name Date RFQ_ ContractDriven _RevisedSeptember2009 1 Packet Page -1094- 4/23/2013 16.C.4. Copier Adrninisincte Services L7Msio Purchasing REQUEST FOR QUOTATIONS FOR MULTIPLE PROECTS UNDER CONTRACT #08.5011 "Annual Contract for Underground Utilities" Date: October 11, 2012 From: Nicole Parker, Contract Specialist 239 -252 -4270, Telephone Number 239 - 252 -6549, Fax Number nicoleparkerCa?collieraov.net To: Prospective Vendors Subject: RFQ #08- 5011 -73 Fire Hydrant Replacement Imperial Circle and Bentley Village As provided in the referenced contract, the Collier County Purchasing Department is soliciting quotes for the referenced project. RFQ Due Date: October 26, 2012 at 3:00 P.M. Pre -Quote Meeting Date/Time: October 19, 2012 at 3:00 P.M. Pre -Quote Meeting Location: Distribution Office - 4425 Progress Ave Q &A Deadline: October 23, 2012 at 3:00 P.M. Number of Days to Final Completion: 180 Plans and Specs: See scope of work, maps and hydrant list Description Quantity Price UOM Total Remove and Replace Fire Hydrants and Gate Valve Assemblies 36 $2,583.60 EA $93,009.60 Your quotation response for this project is due no later than the date and time specified above. We will not accept any quotation responses later than the noted time and date. If your firm is unable to respond electronically, your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specified. We look forward to your participation in this request for information /quotation process. Quality Enterprises USA, Inc. Firm's Complete Legal Name 239- 435 -7200 / 239- 435 -7202 TelephongN! � Fix Number Signature Vice President Title Louis J. Gaudio 10/26/12 Print Name Date RFQ _ContractDriven_RevisedSeptem ber2009 1 Packet Page -1095- WORK ORDER Agreement for Fixed Term Underground Utility Contract #08-5011 Contract Date: March 11, 2008 Fixed Term Contract Expires March 19, 2014 (RFQ #08-5011-73) This Work Order is for Underground Utility Construction services for work known as: Project Name: Fire Hydrant Replacement Imperial Circle and Bentley Village Project No: 70023.2 4/23/2013 16.C.4. The Work is specified in the Request for Quotation, dated October H, 2012 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above This Work Order is assigned to: Quality Enterprises USA Inc Scope of Work: Per Quote Tabulation form attached and the following: * Task 1 Remove and Replace Fire Hydrants and Gate Valve Assemblies Schedule of Work: Complete work within 180 days from the date of the Notice to Proceed which is accompanying this Work Order. Compensation: In accordance with Section 2 — Statement of Work for Agreement #08-5011, the County will compensate the Firm in accordance with following method(s): ❑Negotiated Lump Sum; ❑Lump Sum Plus Reimbursable Costs; Time & Material; ❑Cost Plus Fixed Fee, as provided in the attached proposal. Task 1 TOTAL FEE PREPARED BY: Jer haidle, P.E., Pryiect Manager arming and Project anagement Dept. APPROVED BY: `'"` Mark Sunyak, rincipal Project Manager Planning and Project Management Dept. APPROVED BY: To* Chmelik, P.E., Director Planning and Project Management Dept. APPROVED BY: aul Ma ttausc Water Department Director t APPROVED BY: Nicole Parker, Procurement Strategist Packet Page -1096- 93,009.60 (TM) 93,009.60 Date Date ! J Date Date ld Date RFQ #08- 5011 -73 Page 1 4/23/2013 16.C.4. WORK ORDER Agreement for Fixed Term Underground Utility Contract #08 -5011 Contract .Date: March 11, 2008 Fixed Term Contract Expires March 19, 2014 (RFQ #08- 5011 -73) APPROVED BY: Geor e Yilmaz Public Utilities Administrator j Date j ATTEST: BOARD OF COUNTY COMMISSIONERS Dwight E. Brock, Clerk Collier County, Florida By; By: Deputy Clerk Georgia A. Hiller, Esq. Chairwoman rT -TE-Sr WITNESS: By: �! r vfiCt� 7�Gr7 Marcie Cohen, Executive Assistant (Print Name /Title) Approved as to Form and Legal Sufficiency: Assistant County Attorney Quality Enterprises USA, Inc. By: � — Louis J. Gaudio, Vice President (Print Name /Title) Packet Page -1097- RFQ 408 - 5011 -73 Page 2