Loading...
Backup Documents 04/10/2018 Item #16C 6 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 16 C 6 TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later than Monday preceding the Board meeting. **NEW** ROUTING SLIP Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office. Route to Addressee(s) (List in routing order) Office Initials Date 1. 5, AII. - mei. CGp1I�-P'P( A G,r .- 1l( g 2. 3. County Attorney Office County Attorney Office G '`', /IJv� 1 4. BCC Office Board of County Qsc:,,--\ Commissioners vo AS / '4\lov'i. 5. Minutes and Records Clerk of Court's Office T1' 1 q/ oft B 4:0210111 PRIMARY CONTACT INFORMATION Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees above,may need to contact staff for additional or missing information. Name of Primary Staff eikoL/tJtj Z i titiff 54066 Phone Number '3? R 2- 2 Z Contact/ Department (� T�/J'•J Agenda Date Item was Wi* fAgenda Item Numberoor �� VApproved by the BCC r` Type of Document Number of Original Attached �� —" `�` Documents Attached PO number or account number if document is k4ik • to be recorded INSTRUCTIONS & CHECKLIST Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not appropriate. (Initial) Applicable) 1. Does the document require the chairman's original signature? 3ç \ (14 vJ df 2. Does the document need to be sent to another agency for additional signatures? If yes, provide the Contact Information(Name; Agency;Address; Phone)on an attached sheet. 3. Original document has been signed/initialed for legal sufficiency. (All documents to be signed by the Chairman,with the exception of most letters,must be reviewed and signed a" by the Office of the County Attorney. 4. All handwritten strike-through and revisions have been initialed by the County Attorney's Office and all other parties except the BCC Chairman and the Clerk to the Board nAld 5. The Chairman's signature line date has been entered as the date of BCC approval of the document or the final negotiated contract date whichever is applicable. 6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's signature and initials are required. CW 7. In most cases(some contracts are an exception),the original document and this routing slip should be provided to the County Attorney Office at the time the item is input into SIRE. Some documents are time sensitive and require forwarding to Tallahassee within a certain time frame or the BCC's actions are nullified. Be wa a of your deadlines! 8. The document was approved by the BCC on ((Q ll and all changes made during t not the meeting have been incorporated in the attached document. The County /� ►'tnfor Attorney's Office has reviewed the changes, if applicable. (• tl brie 9. Initials of attorney verifying that the attached document is the version approved by the WA LIN BCC, all changes directed by the BCC have been made, and the document is ready for the an o*j�'�: r Chairman's signature. til'4 �" . 1:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12 16C 6 MEMORANDUM Date: April 11, 2018 To: Corinne Trtan, Project Manager Public Utilities Engineering & Project Management From: Martha Vergara, Deputy Clerk Minutes & Records Department Re: Work Order - Contract #14-6213-111 "Underground Utility Contractors" PS 302.07 Canal Crossing Attached are one scanned copy of the original of the document referenced above, (Item #16C6) approved by the Board of County Commissioners on Tuesday, April 10, 2018. An original has been kept by the Minutes and Record's Department for the Board's Official Record. If you have any questions, please feel free to contact me at 252-7240. Thank you Attachment 16C 6 WORK ORDER/PURCHASE ORDER Contract 14-6213'111 "Underground Utility Contractors" Contract Expiration Date:July 7,2018 ./ This Work Order is for professional underground services for work known as: Project Name:PS 302.07 Canal Crossing Project No:70208.2 The work is specified in the proposal dated January 23, 2018 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above,this Work Order/Purchase Order is assigned to:Douglas N.Higgins,Ina Scope of Work: As detailed in the attached proposal and the following: * Task I Canal Crossing to Replace Pump Station 302.0/ * Task II Project Allowance * Task III Alternate Schedule of Work: Complete work within I20 days from the date of the Notice to Proceed which is accompanying this Work Order. The Vendor a rees that any Work Order that extends beyond the expiration date of Agreement # 14-6213-11 will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. Compensation: In accordance with the Agreement refer9nced above,the County will compensate the Firm in accordance with following met od(s): ...INegotiated Lump Sum (NLS) Lump Sum Plus Reimbursable Costs(LS+RC)®Tim &Material (T&M)(established hourly rate—Schedule A)❑ Cost Plus Fixed Fee (CPFF), (define which method will be used for which tasks) as provided in the attached proposal. Task I $483,994.00 NLS I Task II $ 40,000.00 T&M/LS/Unit Price Task III $ 4,000.00 NLS' TOTAL FEE $527,994.00 PREPARED BY: 110 (Z 3 1I� Corinneiwn, ject nager Date APPROVED BY: — P 3 i 1ZI le Craig Pat'rincral Project Manager Date Page 1 of 3 16C 6 APPROVED BY: 0 / c �vt�"�"- r � �7 .ovic( :eth Jo ssen,Wastewater Director Date APPROVED BY: I ad (coot, 3 1 9 i l t) Tom khmelik,EPMD Director Date APPROVED BY: " 4� /� z /�d Josey' Be lon- Operations Sup.•rt DirectorDate � APPROVED BY: ..., Dr.George Yil • .r,Pu. ' tilities Administrator Date By the signature below, the Finn (including employees, officers and/or agents) certifies, and hereby discloses,that,to the best of their knowledge and belief,all relevant facts concerning past,present,or currently planned interest or activity (financial, contractual, organizational, or otherwise) which relates to the proposed work; and bear on whether the Firm has a potential conflict have been fully disclosed. Additionally, the Firm agrees to notify the Procurement Director, in writing within 48 hours of learning of any actual or potential conflict of interest that arises during the Work Order and/or project duration. ACCEPTED BY: Douglas N `Higgins,Inc. .,,,,, ,1 1..,.,- 1'.\ 1 i5 . TVame&T le of Authorized Officer Date C_Mv • CL A . 11ftfGE, '. V 11 (Remainder of page intentionally left blank) Page 2 of 3 16C 6 IN WITNESS WHEREOF,the parties hereto,have each,respectively,by an authorized person or agent,have executed this Work Order on the date and year first written below. ATTEST: BOARD OF Co' d T OMMISSI► ' PT' Dwight E,B ocl,Clerk of Courts COLLIER . NT , FLORIDA By: AA. AI441-_ =_s� By: A 1 �y� ,A dy Solis,Chairman Dated: l 1 $t `l (SE L),. Douglas N.Higgins,Inc. Attest as.to',Cltainnan's signature only By: L ; �, ►e r ss t n �ature te" ,e0e-4 bp/viti TType/print witness nameT TType/print signature and titleT46/Y1a4A �' *Ak VI LC PRLS+�� S .2 1 1; Second Witness ' fativi,i,& Lai) 'Type/print witness nameT// .proves •s to F o ;n1 Legality: NI A\ ounty Attorney finm,' Print ame Page 3 of 3 16C 6 CO 7eY C0141101 Administrative Services Department Procurement Services Division REQUEST FOR QUOTATIONS FOR MULTIPLE PROJECTS UNDER CONTRACT #14-6213 "Annual Contract for Underground Utilities & General Contractors" Date: January 9, 2018 From: Swainson Hall, Procurement Manager-Acquisitions 239-252-8935, Telephone Number 239-252-6334, Fax Number swainsonhall(a�colliergov.net To: Potential Quoters Subject: RFQ 14-6213-111 PS 302.07 Canal Crossing As provided in the referenced contract, the Collier County Procurement Services Division is soliciting quotes for the referenced project. RFQ Due Date: Friday,January 19, 2018 at 3:00 PM Friday, January 12, 2018 at 10:00 AM Procurement Services Conference Room 3295 Tamiami Trail East, Building C-2 Pre-Quote Meeting: Naples, FL 34112 Q&A Deadline: Wednesday,January 17, 2018 at 5:00 PM Number of Days to Final Completion: 90 days to substantial + 30 days final = 120 days total Scope Provided Yes Plans and Specs: Yes Liquidated Damages: $1,036.00 per day Payment & Performance Bonds If over$200,000.00 Your quotation response for this project is due no later than the date and time specified above. We will not accept any quotation responses later than the noted time and date. If your firm is unable to respond electronically, your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specified. We look forward to your participation in this request for information/quotation process. Douglas N. Higgins, Inc. Firm's Complete Legal Name 239-774-3130/239-774-4266 ,..- -- ---- Telephone N ber ax ,,,;i.er Si•,- u - Regional Manager Title ! `23 /'f Michael Lobello 1 Print Name Date C: Corinne Trtan/ Project Manager I RFQ 14-6213-111 16C b Co -16.-r County Email: kristoferlopez@colliergov.net Telephone: (239) 252-8944 Administrative Services Division FAX: (239)252-6593 Purchasing ADDENDUM #1 Memorandum Date: January 18, 2018 From: Kristofer Lopez, Procurement Strategist To: _ Potential Proposers Subject: Addendum #1 — RFQ 14-6213-111 PS 302.07 Canal Crossing The following clarifications are issued as an addendum identifying the following clarification to the scope of work for the referenced solicitation: 1. Change: e-- ` '=-' - •.. .- •.. . . . _ :..•,, Quotes will now open Tuesday, January 23, 2018 at 3:00PM 2. Documents: a. Pump Station Analysis Information b. Canal Construction Picture c. Revised Supplemental Specs (with changes highlighted in yellow) d. PS302.49 Wet Well Picture e. 6-PS302.07 Pictures f. OPC g. Pre-Quote Meeting Sign-in Sheets h. Pre-Quote Meeting Recording If you require additional information please post a question on the Online Bidding site or contact me using the above contact information. c: Corinne Trtan, Project Manager 1 16C 6 Canal Crossing to Replace Pump Station 302.07 Quote Tabulation SUMMARY Canal Crossing to Replace Pump Station 302.07 $ 483,994.00 Project Allowance $ 40,000.00 TOTAL $ 523,994.00 Alternate Al, Grouted 16"Steel Casing at Canal Crossing $ 4,000.00 TOTAL WITH ALTERNATE $527,994.00 Note: 1. Contractor shall be responsible to verify all quantities. Lump sum items shall include all items the contractor deems necessary for their bid. RWA,Inc. 6610 Willow Park Drive,Ste 200 Naples,Florida 34109 Phone:(239)597-0575 1/23/2018 Fax:(239)597-0578 2:13 PM 16C 6 Canal Crossing to Replace Pump Station 302.07 Date:January 19,2018 Canal Crossing to Replace Pump Station 302.07 DESCRIPTION UNIT QUANTITY UNIT TOTAL COST Mobilization/Demobilization LS 1 $ 48,000.00 $ 48,000.00 Project Sign EA 2 $ 2,000.00 $ 4,000.00 Stormwater Pollution Prevention LS 1 $ 4,000.00 $ 4,000.00 Sanitary Bypass Pumping LS 1 $ 25,000.00 $ 25,000.00 Canal Dewatering LS 1 $ 170,000.00 $ 170,000.00 P5 302.07 Removal LS 1 $ 13,000.00 $ 13,000.00 PS 302.07 Repurposing LS 1 $ 28,000.00 $ 28,000.00 8"PVC Sanitary Sewer(MH#5-MH#2,MH#1-MH#2,MH#9-PS 302.49) LF 160 $ 200.00 $ 32,000.00 8"PVC Sanitary Sewer at Canal Crossing(MH#2-MH 89) LF 148 $ 330.00 $ 48,840.00 8"Plug Valve and Support Pad EA 2 $ 7,000.00 $ 14,000.00 Sanitary Sewer Service Lateral: EA 1 $ 7,000.00 $ 7,000.00 Sanitary Sewer Manhole EA 3 $ 11,000.00 $ 33,000.00 PS 302.49 Connection LS 1 $ 15,000.00 $ 15,000.00 8"SS Pipe Grouting LF 102 $ 15.00 $ 1,530.00 8"FM Pipe Grouting LF 802 $ 12.00 $ 9,624.00 Plug Ex.8"FM Connection LS 1 $ 2,000.00 $ 2,000.00 Gabion Basket Restoration LS 1 $ 18,000.00 $ 18,000.00 Sod Surface Restoration LS 1 $ 6,000.00 $ 6,000.00 As-built Survey LS 1 $ 5,000.00 $ 5,000.00 Canal Crossing to Replace Pump Station 302.07 Sub-Total $ 483,994.00 Alternate Al LS 1 $ 4,000.00 $ 4,000.00 1/23/2018 INACURRENT BID D(KUMENTS\CC-P5 301.01 Canal CrossingB3BIV.RIO 14-6113-111 Bid Schedule.xisx Crossing to Replace PS 302.07 2:13 PM