Loading...
Agenda 02/26/2013 Item #16A 42/26/2013 16.A.4. EXECUTIVE SUMMARY Recommendation to grant final approval of the private roadway and drainage improvements for the final plat of Heritage Bay Phase 2A Application Number AR -PPL -8346 with the roadway and drainage improvements being privately maintained and authorizing the release of the maintenance security and acceptance of the plat dedications. OBJECTIVE: To have the Board of County Commissioners grant final approval of the infrastructure improvements associated with that subdivision known as Heritage Bay Phase Two - A, release the developer's maintenance security, and accept the plat dedications. CONSIDERATIONS: On May 14, 2007, the Engineering Services Department granted preliminary acceptance of the roadway and drainage improvements in Heritage Bay Phase Two -A. 2. The roadway and drainage improvements will be maintained by the project's Community Development District. 3. The required improvements have been constructed in accordance with the Land Development Code. The Engineering Services Department has inspected the improvements and is recommending final acceptance of the improvements. 4. A resolution for final acceptance has been prepared and approved by the County Attorney's Office. The resolution is a requirement of Section 10.02.05 C.3 of the Land Development Code. A copy of the document is attached. This PUD has been found to be in substantial compliance. FISCAL IMPACT: The roadway and drainage improvements will be maintained by the project's Community Development District. The existing security in the amount of $45,423.93 will be released upon Board approval. The original security in the amount of $1,607,012.00 has been reduced to the current amount based on the previous work performed and completed and pursuant to the terms of the Construction and Maintenance Agreement dated April 26, 2006. LEGAL CONSIDERATIONS: The County Attorney's Office has reviewed and approved this item, has determined that approval is legally sufficient, and requires a majority vote for approval. ERP GROWTH MANAGEMENT IMPACT: There is no growth management impact. Packet Page -847- 2/26/2013 16.A.4. RECOMMENDATION: Recommendation that the Board of County Commissioners grant final acceptance of the roadway and drainage improvements in Heritage Bay Phase Two -A, Application Number AR PPL -8346 release the maintenance security, and authorize; 1. The Chairwoman to execute the attached resolution authorizing final acceptance of the improvements and acceptance of the plat dedications. 2. The release of the maintenance security in the amount of $45,423.93. Prepared By: John Houldsworth, Senior Site Plans Reviewer, Engineering Services, Growth Management Division, Planning and Regulation Attachments: 1) Location Map 2) Bond Basis 3) Resolution Packet Page -848- 2/26/2013 16.A.4. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.4. Item Summary: Recommendation to grant final approval of the private roadway and drainage improvements for the final plat of Heritage Bay Phase 2A Application Number AR -PPL- 8346 with the roadway and drainage improvements being privately maintained and authorizing the release of the maintenance security and acceptance of the plat dedications. Meeting Date: 2/26/2013 Prepared By Name: HouldsworthJohn Title: Site Plans Reviewer, Senior,Engineering & Environm 1/24/2013 1:11:35 PM Approved By Name: BeardLaurie Title: Planner,Transportation Planning Date: 1/29/2013 11:24:11 AM Name: PuigJudy Title: Operations Analyst, GMD P &R Date: 1/30/2013 9:23:30 AM Name: McKennaJack Title: Manager - Engineering Review Services,Engineering & Environmental Services Date: 2/6/2013 10:27:05 AM Name: MarcellaJeanne Title: Executive Secretary,Transportation Planning Date: 2/6/2013 2:59:32 PM Name: PepinEmily Title: Assistant County Attorney, CAO Litigation Date: 2/14/2013 8:24:46 AM Name: FinnEd Title: Senior Budget Analyst, OMB Packet Page -849- Date: 2/14/2013 2:37:28 PM Name: KlatzkowJeff Title: County Attorney Date: 2/15/2013 10:15:21 AM Name: OchsLeo Title: County Manager Date: 2/15/2013 11:59:13 AM Packet Page -850- 2/26/2013 16.A.4. -ZSS- aced 101Jed Z o <g w r- - � O w O � E GWA3ln0a rB 30Y11tl3N C HERILAGE BAY BL W. 't"V'9 � MZ /9Z /Z cQ W Q Ti— z O H Q U J a 3 r w Q x a a m w a w x d JdNn0o 33� o z - LLJ w J 3 s - .—alms H311100 1SB'H'0 -o < � � f 3 GooMl3tlndl � l a5 � < o anon slei I 5 't"V'9 � MZ /9Z /Z cQ W Q Ti— z O H Q U J a 3 r w Q x a a m w a w x 2/26/2013 16.A.4. Miller New Directions In Planning, Design & Engineering Engineer's Opinion of Probable Cost, 9/15105 HERITAGE BAY PHASE 2A PPL Summary Potable Water $361,854 Wastewater $443,070 Drainage $190,275 Paving $353,911 Lighting $108,500 Silt Fence $3,308.60 Total $1,460,919.62 110% of total estimated contract costs: $1,456,994.59 * 110% _ $1,607,012 Christopher C. Hayes, P.E. License No. 60725 WilsonMiller, Inc. — FL LIC. #LC -00017 WilsonMiller, Inc. certificate of Authorization #43 i 9+152005- 156165V- 1- AHOLLAND Packet Page -852- 1 2-213-001 - EWRK - 29794 w 2/26/2013 16.A.4. rrojecz: ventage rnase Zr+ rrL Ur PIN: N0442- 213 -03-0 01 Calc by: DCH 8/5/20 New Directions In Planning, Design & Engineering Checked by: Heritage Bav Phase 2A PPL OPC S Drai Sub Total Paving $353,911.42 Drainage $190,275.00 Lighting (31Poles@S3500.0o /poke) $108,500.00 Silt Fence (3308.6LF 0 $1.001LF) $3,308.60 Total Amount $655,995 Description Sub Total Potable Water $361,854. Sanitary Sewer $443,070. Total Amount $804,924. z— __.- x-06 opher C. Hayes, P.E. License No. 60725 WilsonMiller, Inc. — FL LIC. *LC-OOOi7 WilsonMiller, Inc. Certificate of Authoriz3bun v03 9115f2805 - 156165 V-1i AHOU AND =2-211- 1 -FWRK -28794 Packet Page -853- Wils6pAfflller New Directions In Planning, Design & Engineering 2/26/2013 16.A.4. Project: Heritage Bay Phase 2A PPL OPC PIN: N0442- 213 -001 Cale by: DCH 8/5/2005 Checked by: Heritage Bay Phase 2A PPL OPC POTABLE WATER - SHEET 7 Description Unit Price Total Quantity Total Amount 16" PVC CL150 Water Main LF $30.00 1,063 $31,890.00 16" PVC CL200 Water Main LF $36.00 55 $1,980.00 10" PVC CL150 Water Main LF $22.40 31 $694.40 10" PVC CL200 Water Main LF $26.80 42 $1,125.60 8" PVC CL150 Water Main LF $17.00 212 $3,604.00 8" PVC CL200 Water Main LF $18.60 124 $2,306.40 6" PVC CL150 Water Main LF $12.00 48 $576.00 6" PVC CL200 Water Main LF $15.00 40 $600.00 16" Gate Valve EA $5,500.00 4 $22,000.00 8" Gate Valve EA $1,173.00 6 $7,038.00 6" Gate Valve EA $1,000.00 4 $4,000.00 Fire Hydrant Assembly EA $3,200.00 0 $0.00 Temporary Blow -Off EA $2,000.00 4 88,000.00 RPZ Backflow & Master Meter Assembly EA $7,500.00 2 $15.000.00 6" Double Check Detector Assembly EA $4,500.00 1 $4,500.00 8" Double Check Detector Assembly EA $6,500.00 2 $13,000.00 Single Water Service (Typ.) EA $540.00 0 $0.00 Double Water Service (Typ.) EA $650.00 0 $0.00 $116,314.40 *512005 - 156165 Ver 1- AHOLLANO G""' Packet Page -854 - N4►42- 213 -001 • EYYRK - 29794 11 R ilso 1 7miller New Directions In Planning, Design & Engineering 2/26/2013 16.A.4. Project: Heritage Bay Phase 2A PPL OPC PIN: N0442- 213 -001 Calc by: DCH 8/5/2005 Checked by: Heritage Bay Phase 2A PPL OPC POTABLE WATER - SHEET 8 Total Description Unit Price Quantity Total Amount 16" PVC CL150 Water Main LF $30.00 1,169 $35,070.00 16" PVC CL200 Water Main LF $36.00 0 $0.00 10" PVC CL150 Water Main LF $22.40 0 $0.00 10" PVC CL200 Water Main LF $26.80 0 $0.00 8" PVC CL150 Water Main LF $17.00 156 $2,652.00 8" PVC CL200 Water Main LF $18.60 99 $1,841.40 6" PVC CL150 Water Main LF $12.00 38 $456.00 6" PVC CL200 Water Main LF $15.00 0 $0.00 16" Gate Valve EA $5,500.00 4 $22,000.00 8" Gate Valve EA $1:173.00 5 $5,865.00 6" Gate Valve EA $1,000.00 3 $3,000.00 Fire Hydrant Assembly EA $3.200.00 0 $0,00 Temporary Blow -Off EA $2,000.00 0 $0.00 RPZ Backflow & Master Meter Assembly EA $7,500.00 2 $15,000.00 6" Double Check Detector Assembly EA $4,500.00 0 $0.00 8" Double Check Detector Assembly EA $6.500.00 0 $0.00 Single Water Service (Typ.) EA $540.00 0 $0.00 Double Water Service (Typ.) EA $650.00 0 $0.00 $85,884.40 OWNS- 158185 Vert - ANOLLAND :0"3 Packet Page -855- *42-213-001 - EWRK - 29794 WiIsOnlWifier New Directions In Planning, Design & Engineering 2/26/2013 16.A.4. Project: Heritage Bay Phase 2A PPL OPC PIN: N0442- 213 -001 Calc by: DCH 8/512005 Checked by: Heritage Bay Phase 2A PPL OPC POTABLE WATER - SHEET 9 EA S1,173.00 2 $2,346,00 6" Gate Valve EA $1,000.00 Total $0.00 Description Unit Price Quantity Total Amount Temporary Blow -Off EA $2,000.00 0 $0.00 16" PVC CL150 Water Main LF $30.00 1,113 $33,390.00 16" PVC CL200 Water Main LF $36.00 60 $2,160.00 10" PVC CL150 Water Main LF $22.40 0 $0.00 10" PVC CL200 Water Main LF $26.80 0 $0.00 8" PVC CL150 Water Main LF $17.00 130 $2,210.00 8" PVC CL200 Water Main LF $18.60 86 $1,599.60 6" PVC CL150 Water Main LF $12.00 5 $60.00 6" PVC CL200 Water Main LF $15.00 40 $600.00 16" Gate Valve EA $5,500.00 4 $22 000 00 8" Gate Valve EA S1,173.00 2 $2,346,00 6" Gate Valve EA $1,000.00 0 $0.00 Fire Hydrant Assembly EA $3,200.00 3 $9,600.00 Temporary Blow -Off EA $2,000.00 0 $0.00 RPZ Backflow & Master Meter Assembly EA $7.500.00 2 $15,000.00 6" Double Check Detector Assembly EA $4,500.00 0 $0.00 8" Double Check Detector Assembly EA $6,500.00 0 $0.00 Single Water Service (Typ.) EA $540.00 1 $540,00 Double Water Service (Typ.) EA $650.00 15 $9.750.00 $99,255.60 015r=5 - I WISS Ver7- AHOLLAND Packet Page -856- t12- 213001 -EWRK -29794 11 �1/ilso�Mil/er New Directions In Planning, Design & Engineering 2/26/2013 16.A.4. Project: Heritage Bay Phase 2A PPL OPC PIN: N0442- 213 -001 Calc by: DCH 8!5/2005 Checked by: Heritage Bay Phase 2A PPL OPC POTABLE WATER - SHEET 10 EA 8" Gate Valve EA 6" Gate Valve EA Fire Hydrant Assembly EA Total EA Description Unit Price Quantity Total Amount EA Single Water Service (Typ.) EA Double Water Service (Typ.) EA 16" PVC CL150 Water Main LF $30.00 1,181 $35,430.00 16" PVC CL200 Water Main LF $36.00 0 $0.00 10" PVC CL150 Water Main LF $22.40 0 $0.00 10" PVC CL200 Water Main LF $26.80 0 $0.00 8" PVC CL150 Water Main LF $17.00 0 $0.00 8" PVC CL200 Water Main LF $18.60 0 $0.00 6" PVC CL150 Water Main LF $12.00 0 $0.00 6" PVC CL200 Water Main LF $15 nn n an nn 16" Gate Valve EA 8" Gate Valve EA 6" Gate Valve EA Fire Hydrant Assembly EA Temporary Blow -Off EA RPZ Backflow & Master Meter Assembly EA 6" Double Check Detector Assembly EA 8" Double Check Detector Assembly EA Single Water Service (Typ.) EA Double Water Service (Typ.) EA $5,500.00 0 $0.00 $1,173.00 0 $0.00 $1,000.00 0 $0.00 $3.200.00 3 59,600.00 $2,000.00 0 $0.00 $7;500.00 0 $0.00 $4,500.00 0 $0.00 $6.500.00 0 $0.00 $540.00 8 $4,320.00 $650.00 17 $11.050.00 $60,400.00 915/2005. 158185 Vert- AHOLLAND Packet Page -857 - 0442.213 -001 - EWRK . 29794 2/26/2013 16.A.4. r,1S6 � Project: Heritage Bay Phase 2A PPL OPC IN: N0442- 213 -001 Calc � by. DCH 8/5/2005 New Directions In Planning, Design & Engineering Checked by: Heritage Bay Phase 2A PPL OPC SANITARY SEWER - SHEET 7 Total Description Unit Price Quantity Total Amount 8" PVC Gravity Sewer (0' -6' cut) LF $20.00 483 $9,660.00 8" PVC Gravity Sewer (6' -8' cut) LF $25.00 503 $12,575.00 8" PVC Gravity Sewer (8' -10' cut) LF $33.00 0 $0.00 8" PVC Gravity Sewer (10' -12' cut) LF $44.00 0 $0.00 8" PVC Gravity Sewer (12' -14' cut) LF $65.00 0 $0.00 Manhole (0'-6' cut) EA $2,700.00 2 $5,400.00 Manhole (6' -8' cut) EA $3,400.00 2 $6,800.00 Manhole (8' -10' cut) EA $4,800.00 0 $0.00 Manhole (10' -12' cut) EA $51800.00 0 $0.00 Manhole (12' -14' cut) EA $7,200.00 0 $0.00 Lift Station EA $126,300.00 0 $0.00 6" PVC CL150 Force Main LF $42.50 1,105 $46,962.50 6" PVC CL200 Force Main LF $48.70 56 $2,727.20 Single Sanitary Sewer Lateral EA $600.00 5 $3,000.00 Double Sanitary Sewer Lateral EA $680.00 0 $0.00 Television Inspection LF $2.00 986 $1,972.00 $89,096.70 - 156165 Vera- AHOLLAND -W1 - EWRK - 29794 Packet Page -858- 2/26/2013 16.A.4. wils6nmiller Project: Heritage Bay Phase 2A PPL OPC Calc by: D04H 2 -213 -001 8/5/2005 New Directions In Planning, Design & Engineering Checked by: Heritage Bay Phase 2A PPL OPC SANITARY SEWER - SHEET 8 Total Description Unit Price Quantity Total Amount 8" PVC Gravity Sewer (0' -6' cut) LF $20.00 0 $0.00 8" PVC Gravity Sewer (6' -8' cut) LF $25.00 124 $3,100.00 8" PVC Gravity Sewer (8' -10' cut) LF $33.00 532 $17,556.00 8" PVC Gravity Sewer (10' -12' cut) LF $44.00 513 $22,572.00 8" PVC Gravity Sewer (12' -14' cut) LF $65.00 24 $1,560.00 Manhole (0' -6' cut) EA $2,700.00 0 $0.00 Manhole (6' -8' cut) EA $3,400.00 0 $0.00 Manhole (8' -10' cut) EA $4,800.00 5 $24,000.00 Manhole (10' -12' cut) EA $5,800.00 2 $11,600.00 Manhole (12' -14' cut) EA $7,200.00 1 $7,200.00 Lift Station EA $126,300.00 1 $126,300.00 6" PVC CL150 Force Main LF $42.50 269 $11,432.50 6" PVC CL200 Force Main LF $48.70 0 $0.00 Single Sanitary Sewer Lateral EA $600.00 3 $1,800.00 Double Sanitary Sewer Lateral EA $680.00 0 $0.00 Television Inspection LF S2.00 1,193 $2,386.00 $229,506.50 Y1512605 - 156165 Ved. AMOLLAND VM3 Packet Page -859 - 0 2- 215.601 - E1ARK - 2971M 11 WO A�Miller New Directions In Planning, Design & Engineering 2/26/2013 16.A.4. Project: Heritage Bay Phase 2A PPL OPC PIN: N0442- 213 -001 Calc by: DCH 8/5/2005 Checked by: Heritage Bay Phase 2A PPL OPC SANITARY SEWER - SHEET 9 Total Description Unit Price Quantity Total Amount 8" PVC Gravity Sewer (0'-6' cut) LF $20.00 794 $15,880.00 8" PVC Gravity Sewer (6' -8' cut) LF $25.00 395 $9,875.00 8" PVC Gravity Sewer (8' -10' cut) LF $33.00 0 $0.00 8" PVC Gravity Sewer (10' -12' cut) LF $44.00 0 $0.00 8" PVC Gravity Sewer (12' -14' cut) LF $65.00 0 $0.00 Manhole (0' -6' cut) EA $2,700.00 2 $5,400.00 Manhole (6' -8' cut) EA $3,400.00 2 $6,800.00 Manhole (8' -10' cut) EA $4,800.00 1 $4,800.00 Manhole (10' -12' cut) EA $5,800.00 0 $0.00 Manhole (12' -14' cut) EA $7,200.00 0 $0.00 Lift Station EA $126,300.00 0 $0.00 6" PVC CL150 Force Main LF $42.50 0 $0.00 6" PVC CL200 Force Main LF $48.70 0 $0.00 Single Sanitary Sewer Lateral EA $600.00 5 $3,000.00 Double Sanitary Sewer Lateral EA $680.00 12 $8,160.00 Television Inspection LF $2.00 1,189 $2,378.00 $56,293.00 &15!4005 -156165 Vert - AHOLLAND �41.213.001 - EWRK - W794 Packet Page -860 - 2/26/2013 16.A.4. RESOLUTION NO. 13- A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA AUTHORIZING FINAL ACCEPTANCE OF CERTAIN ROADWAY AND DRAINAGE IMPROVEMENTS IN HERITAGE BAY PHASE TWO -A, ACCORDING TO THE PLAT THEREOF, RECORDED IN PLAT BOOK 45, PAGES 76 THROUGH 83; RELEASE OF THE MAINTENANCE SECURITY; AND ACCEPTANCE OF THE PLAT DEDICATIONS WHEREAS, the Board of County Commissioners of Collier County, Florida, on April 11, 2006, approved the plat of Heritage Bay Phase Two -A for recording; and WHEREAS, the Developer has constructed and maintained the roadway and drainage improvements in accordance with the approved plans and specifications as required by the Land Development Code (Collier County Ordinance No. 04 -41, as amended); and WHEREAS, the Developer is requesting final acceptance of the roadway and drainage improvements and release of his maintenance security; and WHEREAS, the Engineering Services Department has inspected the roadway and drainage improvements and is recommending acceptance of said facilities. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that final acceptance is hereby granted for those roadway and drainage improvements in Heritage Bay Phase Two -A, pursuant to the plat thereof, recorded in Plat Book 45, Pages 76 through 83, and the Clerk is hereby authorized to release the maintenance security. BE IT FURTHER RESOLVED AND ORDERED that the roadway and drainage improvements within Heritage Bay Phase Two -A will be maintained by the Heritage Bay Community Development District and will not be the responsibility of Collier County. This Resolution adopted after motion, second and majority vote favoring same this day of , 2013. ATTEST: DWIGHT E. BROCK, CLERK , Deputy Clerk 1 of 2 BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA GEORGIA A. HILLER, ESQ. Chairwoman Approved as to form and legal sufficiency: Imily R. tepin Y Assistant County Attorney CP \13- EIS - 02391 \2 2 of 2 2/26/2013 16.A.4.