Loading...
Agenda 04/10/2018 Item #16C 604/10/2018 EXECUTIVE SUMMARY Recommendation to approve a $527,994 work order under Request for Quotation 14-6213-111 to Douglas N. Higgins, Inc., under Project Number 70208, “PS 302.07 Gravity Sewer,” and authorize the necessary budget amendment. OBJECTIVE: To eliminate pump station 302.07 by installing a manhole and gravity sewer line within the Valley Stream and Doral Subdivisions. CONSIDERATIONS: The proposed scope of work under Project Number 70208, “PS 302.07 Gravity Sewer,” is consistent with the Capital Improvement Program (CIP) contained in the 2017 Water, Wastewater, Irrigation Quality Water, and Bulk Potable Water Master Plan/CIP Plan approved by the Board of County Commissioners (Board) November 10, 2015, as Agenda Item 9C, Appendix III of the 2015 AUIR/CIE. Funding is available in, and is consistent with, the FY2018 CIP Budget. The proposed canal crossing to eliminate Pump Station 302.07 is located within the Valley Stream and Doral Subdivisions south and east of the intersection of Rattlesnake Hammock Road and U.S. 41 (Tamiami Trail East). It serves the area bound by Rattlesnake Hammock Road to the north, U.S. 41 to the southwest and the Lely Canal to the southeast. The pump station service area is approximately 40 acres in size. The project includes removing the old pump station adjacent to the residential units in the Valley Stream Subdivision, replacing the gravity sewer upstream from the existing wet well, and installing a gravity sewer main across the Lely Canal with a connection to a manh ole upstream from Pump Station 302.49. The condition of this asset is defined as “Red: Level 3 - Risked Compliance,” as reported to the Board at the October 1, 2013 Asset Assessment and Management Workshop. The age of the collection system in the Pump Station 302.07 service area varies. The collection system constructed in conjunction with Pump Station 302.07 is the oldest, being constructed in the early 1970s. Access to the pump station is by a 10 -foot wide stabilized access way from Rattlesnake Hammock Road. At the pump station site, there is no stabilized access to the wet well or for vehicular turn around. The pump station is situated approximately 15 feet from the back door and window of a unit of Buckeye Condominiums, and 20 feet from the Lely Canal. The new piping configuration redirects flows by gravity under the Lely Canal to Pump Station 302.49, which is equipped with an emergency generator, providing reliability and reducing the risk of a wastewater overflow into the Lely Canal. Request for Quotation 14-6213-111, “PS 302.07 Canal Crossing,” was distributed January 10, 2018 to all vendors of the Fixed-Term Underground Utilities Contract 14-6213 via email. Of the six vendors notified, three submitted quotations. The quotations received January 23, 2018 are summarized in the table below. VENDOR QUOTE Douglas N. Higgins, Inc. $527,994 Quality Enterprises USA, Inc. $554,258 Haskins, Inc. $657,030 No quotes were received from Kyle Construction, Inc., Mitchell & Stark Construction Company, Inc., or Southwest Utility Systems, Inc. The quote specifications informed the respondents there may be unforeseen conditions associated with the project. The quote amount incorporates an allowance of $40,000 for owner-directed work related to unforeseen conditions including, but not limited to, conflicts with existing facilities not reflected in record 16.C.6 Packet Pg. 676 04/10/2018 drawings, and modifications or repairs resulting from unforeseen utility work associated with this project. Compensation will be determined by the owner to be time and materials, lump sum, and/or unit price depending upon the nature of the work. The price for any needed additional work will be negotiated prior to commencement in accordance with the county’s Procurement Ordinance and the terms of the agreement, and reviewed by the engineer of record for cost reasonableness. County staff determined the lowest bid to be fair and reasonable and recommends awarding the project to Douglas N. Higgins, Inc., the lowest responsive and qualified vendor. The b id received was 15.5 percent more than the engineer’s cost opinion. In its recommendation letter dated January 24, 2018 (Attachment 4), the design professional, RWA, Inc., recommends awarding the project to Douglas N. Higgins, Inc., that has an adequate performance and warranty record on previous, similar, utility-related projects. FISCAL IMPACT: The source of funding is Wastewater User Fees, Fund (414). A budget amendment is required to transfer $361,940 from Project 70145, Fund (414) to cover the cons truction cost. The project is expected to be completed in 2018. This is a pump station elimination project; therefore, operating costs are expected to decrease. LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote for Board approval. -SRT GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities, and to remain in compliance with all regulatory programs. RECOMMENDATION: That the Board of County Commissioners approves a $527,994 work order under Request for Quotation 14-6213-111 to Douglas N. Higgins, Inc., authorizes the necessary budget amendment to transfer funds in the amount of $361,940 from Project Number 70145 to Project Number 70208, and authorizes the Chair to sign the attached Work Order. Prepared By: Corinne Trtan, Project Manager, Engineering and Project Management Division ATTACHMENT(S) 1. Attachment 1 - Quote Tabulation (PDF) 2. Attachment 2 - EPMD Quote analysis (PDF) 3. Attachment 3 - Request for Quotation (PDF) 4. Attachment 4 - Recommendation Letter. (PDF) 5. Attachment 5 - Work Order (PDF) 16.C.6 Packet Pg. 677 04/10/2018 COLLIER COUNTY Board of County Commissioners Item Number: 16.C.6 Doc ID: 5071 Item Summary: Recommendation to approve a $527,994 work order under Request for Quotation 14-6213-111 to Douglas N. Higgins, Inc., under Project Number 70208, “PS 302.07 Gravity Sewer,” and authorize the necessary budget amendment. Meeting Date: 04/10/2018 Prepared by: Title: Project Manager – Public Utilities Planning and Project Management Name: Corinne Trtan 03/09/2018 11:57 AM Submitted by: Title: Division Director - Public Utilities Eng – Public Utilities Planning and Project Management Name: Tom Chmelik 03/09/2018 11:57 AM Approved By: Review: Procurement Services Opal Vann Level 1 Purchasing Gatekeeper Completed 03/09/2018 12:30 PM Wastewater Steve Nagy Additional Reviewer Completed 03/09/2018 12:47 PM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 03/12/2018 1:50 PM Public Utilities Planning and Project Management Craig Pajer Additional Reviewer Completed 03/12/2018 2:05 PM Wastewater Steve Messner Additional Reviewer Completed 03/13/2018 9:10 AM Procurement Services Ted Coyman Additional Reviewer Completed 03/13/2018 9:11 AM Public Utilities Operations Support Joseph Bellone Additional Reviewer Completed 03/16/2018 2:43 PM Procurement Services Catherine Bigelow Additional Reviewer Completed 03/20/2018 10:56 AM Public Utilities Department Heather Bustos Level 1 Division Reviewer Completed 03/21/2018 7:51 AM Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 03/21/2018 12:41 PM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 03/28/2018 10:04 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 03/28/2018 10:24 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 03/28/2018 10:46 AM Office of Management and Budget Susan Usher Additional Reviewer Completed 03/30/2018 2:25 PM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 04/01/2018 8:39 PM Board of County Commissioners MaryJo Brock Meeting Pending 04/10/2018 9:00 AM 16.C.6 Packet Pg. 678 DN Higgins Quality Enterprises Haskins Southwest Utility Mitchell & Stark Kyle Construction 483,994.00$ 517,258.00$ 614,530.00$ No Quote No Quote No Quote 40,000.00$ 40,000.00$ 40,000.00$ No Quote No Quote No Quote TOTAL 523,994.00$ 557,258.00$ 654,530.00$ No Quote No Quote No Quote Alternate A1.Grouted 16" Steel Casing at Canal Crossing 4,000.00$ (3,000.00)$ 2,500.00$ No Quote No Quote No Quote TOTAL WITH ALTERNATE $527,994.00 $554,258.00 $657,030.00 No Quote No Quote No Quote Note: Canal Crossing to Replace Pump Station 302.07 Project Allowance Canal Crossing to Replace Pump Station 302.07 Quote Tabulation SUMMARY 1. Contractor shall be responsible to verify all quantities. Lump sum items shall include all items the contractor deems necessary for their bid. 16.C.6.a Packet Pg. 679 Attachment: Attachment 1 - Quote Tabulation (5071 : PS 302.07 Canal Crossing) $0 $100,000 $200,000 $300,000 $400,000 $500,000 $600,000 $700,000 Eng Est DN Higgins, Inc.Quality Enterprises Haskins Inc. Bid Results for PS 302.07 Canal Crossing KEY: Dashed Green- AVERAGE BID Dashed black- +/-1 std dev of avg bid Dotted red- +/-20% of eng estimate for horizontal construction 16.C.6.b Packet Pg. 680 Attachment: Attachment 2 - EPMD Quote analysis (5071 : PS 302.07 Canal Crossing) 16.C.6.cPacket Pg. 681Attachment: Attachment 3 - Request for Quotation (5071 : PS 302.07 Canal Crossing) 16.C.6.cPacket Pg. 682Attachment: Attachment 3 - Request for Quotation (5071 : PS 302.07 Canal Crossing) 16.C.6.cPacket Pg. 683Attachment: Attachment 3 - Request for Quotation (5071 : PS 302.07 Canal Crossing) 16.C.6.cPacket Pg. 684Attachment: Attachment 3 - Request for Quotation (5071 : PS 302.07 Canal Crossing) K:\2013\130063.00.29 13-6164 Canal Crossing-Replace Pump Station\007 Bidding Services\Recommendation of Award Letter r1.docx 6610 Willow Park Drive Suite 200 Naples, FL 34109 | (239) 597-0575 | Fax (239) 597-0578 www.consult-rwa.com January 24, 2018 Corinne Trtan Project Manager Public Utilities Engineering and Project Management Division 3339 Tamiami Trail East, Suite 303 Naples, Florida 34112 Re: Request for Quotations for Multiple Projects Under Contract #14-6213 RFQ 14-6213-111 PS302.07 Canal Crossing Recommendation for Award Dear Ms. Trtan: We have received and reviewed the Bid Tabulation for the referenced project. The information provided to us included bids from three contractors that met the submittal deadline and were opened at the prescribed time and place as listed in the advertisement for bid. The lowest responsive and responsible bid was provided by Douglas N. Higgins, Inc. in the amount of $527,994.00, which includes a project allowance of $40,000. The total bid is $70,772.75 or 15.5% higher than the engineer’s estimate of $457,221.25. Douglas N. Higgins, Inc. has been working in the area for many years and has completed a multitude of projects in southwest Florida and directly for Collier County. They have sufficient staff and equipment to successfully complete large public utility projects similar in size and scale to this project. Based on the information listed above, I am recommending award of the quote to Douglas N. Higgins, Inc. in the bid amount of $523,994.00. If you should have any questions, please contact me at (239)260-4341. Sincerely, Mark J. Sunyak, P.E. Senior Project Manager 527,994.00 16.C.6.d Packet Pg. 685 Attachment: Attachment 4 - Recommendation Letter. [Revision 1] (5071 : PS 302.07 Canal Crossing) 16.C.6.e Packet Pg. 686 Attachment: Attachment 5 - Work Order [Revision 1] (5071 : PS 302.07 Canal Crossing) 16.C.6.e Packet Pg. 687 Attachment: Attachment 5 - Work Order [Revision 1] (5071 : PS 302.07 Canal Crossing) 16.C.6.e Packet Pg. 688 Attachment: Attachment 5 - Work Order [Revision 1] (5071 : PS 302.07 Canal Crossing)