Loading...
Agenda 04/10/2018 Item #16A 904/10/2018 EXECUTIVE SUMMARY Recommendation to approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Barrington Cove Phase 3, PL20160001129 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance and unconditional conveyance of these potable water and sewer facilities and to release the Final Obligation Bond in the total amount of $4,000, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Barrington Cove Phase 3, has constructed the potable water and sewer facilities within dedicated easements to serve this development. (See attached location map). 2) Preliminary acceptance of these utility facilities was approved by the Development Review staff on September 15, 2016. At that time, the value of these potable water and sewer utility facilities (assets) was $94,445.50 and $78,768, respectively. 3) Staff recorded all preliminary acceptance documents associated with the facilities being conveyed to the County in the public records of Collier County, which were reviewed and approved by the County Attorney’s office as to form and legality. The County acquired its record interest by Utility Facilities Warranty Deed, and Bill of Sale recorded in Official Records Book 5453, at Page 1604, and Book 5479, at Page 3977, of the Public Records of Collier County, Florida. 4) The potable water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Development Review staff on January 30, 2018, in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Staff recommends final acceptance of the subject utility facilities and to release the Final Obligation Bond in the total amount $4,000. 7) This final acceptance is in accordance with Collier County Ordinance No. 2004-31, as amended. 8) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact . However, approval of this Executive Summary will result in the Collier County Water -Sewer District receiving unconditional title to the utility facilities, which at the time of preliminary acceptance, had a total gross value of $173,213.50 (no depreciation applied). GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. 16.A.9 Packet Pg. 370 04/10/2018 LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval - SAS RECOMMENDATION: To approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Barrington Cove Phase 3, PL20160001129 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amo unt of $4,000 to the Project Engineer or the Developer’s designated agent. Prepared by: Lucia S. Martin, Technician, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Exhibit A (PDF) 3. Assets Sheet (PDF) 16.A.9 Packet Pg. 371 04/10/2018 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.9 Doc ID: 5044 Item Summary: Recommendation to approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Barrington Cove Phase 3, PL20160001129 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer’s designated agent. Meeting Date: 04/10/2018 Prepared by: Title: Technician – Growth Management Development Review Name: Lucia Martin 03/06/2018 12:52 PM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 03/06/2018 12:52 PM Approved By: Review: Wastewater Steve Nagy Additional Reviewer Completed 03/06/2018 1:04 PM Water Pamela Libby Additional Reviewer Completed 03/06/2018 1:35 PM Water Steve Messner Additional Reviewer Completed 03/06/2018 1:45 PM Wastewater Steve Messner Additional Reviewer Completed 03/06/2018 1:46 PM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 03/06/2018 4:13 PM Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 03/07/2018 9:25 AM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 03/07/2018 3:22 PM Growth Management Department Judy Puig Level 1 Reviewer Completed 03/09/2018 9:00 AM Growth Management Department Matthew McLean Additional Reviewer Completed 03/12/2018 9:03 AM Growth Management Department Thaddeus Cohen Department Head Review Completed 03/12/2018 10:16 AM Growth Management Department James French Deputy Department Head Review Completed 03/14/2018 7:54 PM County Attorney's Office Scott Stone Level 2 Attorney Review Completed 03/22/2018 4:53 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 03/23/2018 11:05 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 03/23/2018 11:46 AM Budget and Management Office Mark Isackson Additional Reviewer Completed 03/27/2018 9:21 AM County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 03/29/2018 3:28 PM 16.A.9 Packet Pg. 372 04/10/2018 Board of County Commissioners MaryJo Brock Meeting Pending 04/10/2018 9:00 AM 16.A.9 Packet Pg. 373 BARRINGTON COVE PHASE 3 LOCATION MAP 16.A.9.a Packet Pg. 374 Attachment: Location Map (5044 : Final Acceptance of Utilities - Barrington Cove Phase 3) Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond Amount Receipt Number 10% UPS Bond With Plat Final Obligation Bond $4,000 2016324643 Total Amount $4,000 The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment 16.A.9.b Packet Pg. 375 Attachment: Exhibit A (5044 : Final Acceptance of Utilities - Barrington Cove Phase 3) PROJECT NAME: LOCATION: NAi.{E AND ADDRESS OF OWNER VERIFICATION OF FINAL COST Barrington Cove Phase 3 Section 13, Township 48S, Range 25E DR Horton. lnc. 10 1 Ben C. Pratt Six Mile Cypress Parkway. Suite 100 Fort Myers, FL 33966 POTABLE WATER (Material and Services)TYPE OF UTILITY SYSTEM TEIETEUIE][ILIEEL PVC DR.18 6 PVC OR-18 I PVC DR.14 8 Gate Valve W Box 6 Gate Valve Box 8 Air Release Valve Fire Hydrant Assembly Valve Single Water Service Double Water Service Automatic Flushing Device Hot-Tap (lncludes '10"x8" Tapping sleeve and Valve) 373 2,339 191 6 6 4 5 29 24 4 1 LF LF LF EA EA EA EA EA EA EA LS $ 16.00 $ $ 20.00 $$ 28.00 $ $ 1,100.00 $ $ 1,500.00 $ $ 1,500.00 $$ 4,000.00 $$ 525.00 $$ 700.00 $ $ 4,s00.00 $ $ 4,300.00 $ s.968.00 46,780.00 5.348.00 6.600.00 9.000.00 6.000.00 20.000.00 15.225.00 16,800.00 18,000.00 4,300.00 TOTAL COST I do hereby certify that the quantities of material described above are a true and accurale representation of the system of the as-installed cost of the system. $ 154,021 00 CERTIFYING: ,/ --sa7 B,"i-*kn*)qW OF: Southwest Utilities. lnc STATE OF FLORIDA COUNTY OF COLLIER The foregoing instrument was signed and acknowledged before me this lZ a,v who is or flut/e";;8,,- to ,"2015 by Rt-elt lod€ id take an s t, ry Public l'..tra ng kon -$t"f+t 1 a rcn8ff€ [E]{ MY CoiA{ss,ot } FF A88A EXPIBES: Juno 9, iO1 9 Bond6d ftru I\oEy pd& lJlldeffi!.,s SEAL 16.A.9.b Packet Pg. 376 Attachment: Exhibit A (5044 : Final Acceptance of Utilities - Barrington Cove Phase 3) VERIFICATION OF FINAL COST Barrington Cove Phase 3 Section 13, Township 48S, Range 25E DR Horton, lnc. 10&'l Ben C. Pratt Six Mile Cypress Parkway, Suite 100 Fort Myers, FL 33966 TYPE OF UTILITY SYSTEI,,I TEITEUIIIIEUIIIIEEL PVC SDR-26 (Gravity Sewer) SINGLE SEWER SERVICE DOUBLE SEWER SERVICE MANHOLE TELEVISION INSPECTION 20'5 by did take an oath Notary Public LF2,5888 $ 45.23 $$ 375.00 $ $ 475.00 $$ 6,580.00 $ $ 1.00 $ 117 ,055.24 3,375.00 15,675.00 85,540.00 2,588.00 9 33 '13 2,588 EA EA EA LF TOTAL COST I do hereby certify that lhe quantities of material described above are a true and accurate representation of the system of the as-installed cost of the system CERT NG $ 224.233.24 Brajf- &l<err,roU Seud".y oF: Southwest Utilities. lnc STATE OF FLORIDA COUNTY OF COLLIER The foregoi g instrument was sig ed and acknowledged before me tnis -if! day of l./ Itlltsrtne Aroa.r who is personally to me SEAL c I tofiRAIE r..EOt li,iY Col ltSSlCt{ , FF AE892 EXPIf,ES:June 9. 2,019 8od€d Dru llolry pubr: Udelrrisi PROJECT NAME: LOCATION: NAME AND ADORESS OF OWNER: SANITARY WATER (Material and Services) TOTAL 16.A.9.b Packet Pg. 377 Attachment: Exhibit A (5044 : Final Acceptance of Utilities - Barrington Cove Phase 3) Collier County Growth Management Division 2800 Horseshoe Drive N. Naples, FL 34104 239-252-2400 RECEIPT OF PAYMENT Receipt Number:2016324643 Transaction Number:2016-031281 Date Paid:05/25/2016 Amount Due:$4,000.00 Payment Details:Payment Method Amount Paid Check Number Check $4,000.00 396793 Amount Paid:$4,000.00 Change / Overage:$0.00 Contact:DR Horton, Inc. 301 Commerce St., STE 500 Fort Worth, TX 76102 FEE DETAILS: Fee Description Reference Number Original Fee Amount Paid GL Account Refundable Bonds PL20160001129 $4,000.00 $4,000.00 670-000000-220113 Cashier Name:MartinRuedy Batch Number:5322 Entered By: melissaalvarez 16.A.9.b Packet Pg. 378 Attachment: Exhibit A (5044 : Final Acceptance of Utilities - Barrington Cove Phase 3) CERTIFICATION OF CONTRIBUTORY ASSETS - COUNTY TYPE OF UTILITY SYSTEM DR Ho(on, lnc. '10541 8en C. Pratt Six [,lile Cypress Parkway, Suite 100 Fort Myers, FL 33966 POTABLE WATER (N,laterial Only) ITEM EEEWUIL PVC DR-18 6' PVC OR-18 8', PVC DR.14 8' Gate Valve w/ Box 6" Gate Valve w/ Box 8' Air Release Valve Fire Hydrant Assembly W Valve Single Water Service Double Water Service Automatic Flushing Device HolTap (lncludes 10"x8" Tapping sleeve and Valve) I do hereby certify that the quantities of material described above are a true and accurate representation of the system being contributed to Collier County Utilities, lnc. CERTIFYING: 8!tft frccc{z+y OF: Southwest Utilities, lnc STATE OF FLORIDA COUNTY OF COLLIER The loregorng rnstrument was saoned andtZ oay ot 2,339 191 6 6 4 5 29 24 4 1 TOTAL COST 2.424.50 25.729.OO 2.292.OO 3.900.00 3.900.00 2.800.00 13.000.00 11,600.00 13,200.00 13,600.00 2,000.00 $ 94.445.50 LF LF LF EA EA EA EA EA EA EA LS $6$ 11 $12$ 650 $ 650 $ 700 $ 2,600 $ 400 $ 550 $ 3,400 $ 2,000 s0$ 00$ 00$ 00$ 00$ 00$00$ 00$ 00$ 00$ 00$ ackn before me this 1* Ahcnracl;2015 bvD^i who is personally known to me and drd take an ii ry slnlrc LoSRllttE Eorr MYCot lSS0 r FF 238E92 EXPIRES: Juoe9,2019 8on{hd Thru lSl,y Pi${. u lenl'nu( PROJECT NAME: LOCATION: NAME AND ADDRESS OF OWNER: Barrington Cove Phase 3 Section 13, Township 48S, Range 25E TOTAL SEAL 16.A.9.c Packet Pg. 379 Attachment: Assets Sheet (5044 : Final Acceptance of Utilities - Barrington Cove Phase 3) CERTIFICATION OF CONTRIBUTORY ASSETS - COUNTY Barrington Cove Phase 3PROJECT NAME: LOCATION: NAME AND AODRESS OF OWNER TYPE OF UTILITY SYSTEM Section 13, Township 48S, Range 25E DR Horton. lnc. 10541 Ben C. Pratt Six Mile Cypress Parkway, Suite '!00 Fort lvlyers, FL 33966 SANITARY SEWER (Material Only) TOTALCOST0ITEMEUUEUIL PVC SDR-26 (Gravity Seweo SINGLE SEWER SERVICE DOUBLE SEWER SERVICE MANHOLE TELEVISION INSPECTION I do hereby certify that the quantities of material described above are a true and accurate representation of the system being contributed to Collier County Utilities, lnc. CERTIFYING B.ett c, Seuoiu/ OF: Southwest Utilities, lnc STATE OF FLORIDA COUNTY OF COLLIER I he toregorng rnstrument was sEned and acknowledged before me this ,Ztday of k kzNrbdi - who is Person3llY known to me and did take an oath slblte 2,588 9 13 2,588 LF EA EA EA LF $ 5.00 $ $ 250.00 $$ 300.00 $ $ 3,930.00 $ $ 1.00 $ $ 78,768.00 tonMlE II0l{ MY ochffSsl(ti I FF A88sr EXPIRES| Jun6 9 Z{'19 8d{.d Tl!ru rurr Publc Undodier' TOTAL COST SEAL ry Public l\ortqwe lAoN t-@ 8',12,940.00 2,250.OO 9,900.00 51,090.00 2,588.00 2015 16.A.9.c Packet Pg. 380 Attachment: Assets Sheet (5044 : Final Acceptance of Utilities - Barrington Cove Phase 3)