Agenda 02/12/2013 Item #16C12/12/2013 16.C.1. EXECUTIVE SUMMARY Recommendation to approve a grant application to the Florida Division of Emergency Management, Hazard Mitigation Grant Program, in the amount $37,945 to retrofit 33 overhead doors at the Public Utilities Division's Operations Center located at 4370 and 4420 Mercantile Avenue, Naples. OBJECTIVE: Apply for a grant to the Florida Division of Emergency Management, Hazard Mitigation Grant Program (HMGP), to fund the replacement of 33 overhead doors with hurricane wind rated doors to reduce or eliminate the potential loss of life and public property due to natural disasters. CONSIDERATIONS: The HMGP arises out of the Presidential Disaster Declaration of July 3, 2012, related to Tropical Storm Debby (FEMA -4068 DR -FL). This grant program is designed to harden sites to prevent or limit losses during future storms and disasters. The HMGP is managed by the Florida Division of Emergency Management, and funding is allocated by the United States Department of Homeland Security, Federal Emergency Management Agency. Collier County's estimated share of funds under the grant program for Tropical Storm Debby is $1,098,575.09. The Collier County Public Utilities Division's Operations Center is essential infrastructure in the n day - today operations of Utility Billing and Customer Service, the Water Department and the Wastewater Department. Replacing 33 existing overhead doors with roll -up steel doors designed to withstand a 130 -mph wind load will provide additional protection for three vehicle bays, inventory bays, and work areas, substantially reducing or eliminating the potential loss of life and /or public property in the event of a natural disaster. FISCAL IMPACT: The Florida Department of Emergency Management will reimburse up to $28,456.50. This grant requires a 25 percent in -kind staff time and/or cash match $9,488.50 for a total award of $37,945.00. The minimum cash match of $9,488.50 is available within the Water Operating Fund (408). LEGAL CONSIDERATIONS: This item has been reviewed and approved by the County Attorney's Office, is legally sufficient for Board action and only requires a majority vote for approval —SRT. GROWTH MANAGEMENT IMPACT: There is no impact on the Growth Management Plan associated with this item. RECOMMENDATION: That the Board of Commissioners, Ex- officio the Governing Board of the Collier County Water -Sewer District, approve and authorize the Chairwoman to sign the attached grant application to the Florida Division of Emergency Management, Hazard Mitigation Grant Program, in the amount of $37,945.00 to retrofit 33 overhead doors at the Public Utilities Division's Operations Center located at 4370 and 4420 Mercantile Avenue, Naples. Prepared By: James Price, Technical Support Professional, Public Utilities Water Department Packet Page -1320- Attachments: 1. Grant Application 2. Notice of Funding Availability 3. Rankings Packet Page -1321- 2/12/2013 16.C.1. n n 2/12/2013 16.C.1. '-IN COLLIER COUNTY Board of County Commissioners Item Number: 16.16.C.16.C.1. Item Summary: Recommendation to approve a grant application to the Florida Division of Emergency Management, Hazard Mitigation Grant Program, in the amount $37,945 to retrofit 33 overhead doors at the Public Utilities Division's Operations Center located at 4370 and 4420 Mercantile Avenue, Naples. Meeting Date: 2/12/2013 Prepared By Name: Donna Bergeron Title: Administrative Assistant, Senior,Water 1/9/2013 4:29:34 PM Submitted by Title: Director - Water,Water Name: Paul Mattausch 1/9/2013 4:29:35 PM Approved By Name: HapkeMargie Title: Operations Analyst, Public Utilities Date: 1/10/2013 8:16:04 AM Name: Pam Libby Title: Manager - Operations- Water /WW,Water Date: 1/11/2013 7:01:32 AM Name: Paul Mattausch Title: Director - Water,Water Date: 1/14/2013 9:31:41 AM Name: Joseph Bellone Title: Manager - Utility Billing & Cust Serv.,Utilities F ^ Date: 1/14/2013 10:28:59 AM Packet Page -1322- Name: Susan Jacobs Title: Operations Analyst, Public Utilities Date: 1/14/2013 11:34:27 AM Name: SunyakMark Title: Project Manager, Principal,Public Utilities Engine Date: 1/18/2013 9:41:40 AM Name: ChmelikTom Title: Director, Public Utilities Engineering Date: 1/24/2013 8:13:33 AM Name: Joshua Thomas Title: Grants Support Specialist, Date: 1/25/2013 10:57:08 AM Name: YilmazGeorge Title: Administrator, Public Utilities Date: 1/26/2013 8:47:57 AM Name: TeachScott Title: Deputy County Attorney,County Attorney Date: 1/28/2013 10:05:05 AM Name: GreenwaldRandy Title: Management/Budget Analyst,Office of Management & B Date: 1/28/2013 11:23:01 AM Name: KlatzkowJeff Title: County Attorney Date: 1/30/2013 10:38:44 AM Name: StanleyTherese Title: Management/Budget Analyst, Senior,Office of Manage Date: 2/4/2013 12:30:14 PM Name: OchsLeo Title: County Manager Date: 2/5/2013 9:09:11 AM Packet Page -1323- 2/12/2013 16.C.1. DRAFT STATE OF FLORIDA -HAZARD MITIGATION GRANT PROGRAM APPI 2/12/2013 16.C.1. THIS SECTION FOR STATE USE ONLY FEMA- 4068 -DR -FL ❑ Standard HMGP ❑ 5% Initiative Application ❑ Application Complete ❑ Standard FMA ❑ Initial Submission or ❑ Re- Submission Support Documents Eligible Applicant Project Type(s) ❑ Conforms w/ State 409 Plan ❑ State or Local Government ❑ Wind ❑ In Declared Area ❑ Private Non - Profit (Tax ID Received) ❑ Flood ❑ Statewide ❑ Recognized Indian Tribe or Tribal Organization ❑ Other: Community NFIP Status: (Check all that apply) Reviewer Phone #: ❑ Participating Community ID #: Reviewer Fax #: ❑ In Good Standing ❑ Non - Participating ❑ CRS Reviewer E -Mail: Date Application Received: State Application ID: State Reviewer: Signature: Date: This application is for all Federal Emergency Management Agency (FEMA Region IV) Hazard Mitigation Grant Program (HMGP) proposals. Please complete ALL sections and provide the documents requested. If you require technical assistance with this application, please contact your State Emergency Management Division at (850) 922 -5269. A. To Fill Out This Application: Complete all sections that correspond with the type of proposed project General Application Secti Environmental Review. Maintenance Agreement. Damage Frequency Assessment Worksheet: Flood Drainage Improvement Worksheet: Tornado Worksheet: Wind Retrofit Worksheet: Request for Public Assistance Form: Acquisition Forms. Application Completeness Checklist. B. Applicant Information FEMA4068 -DR -FL ons: All applicants must complete these sections All applicants must complete these sections Any applications involving public property, public ownership, or management of property Acquisition, Elevation, Floodproofing (if FIS and H &H are unavailable) -- one worksheet per structure Acquisition, Elevation, Floodproofing (if FIS and H &H are available) -- one worksheet per structure Safe Room Projects only Wind retrofit projects only -- one worksheet per structure FEMA Form 90 -49 (Request for Public Assistance): All applicants must complete, if applicable. If project type is Acquisition, these forms must be completed. (Only one of the two Notice of Voluntary Interest forms is necessary.) Model Statement of Assurances for Property Acquisition Projects Declaration and Release Notice of Voluntary Interest (Town Hall Version) Notice of Voluntary Interest (Single Site Version) Statement of Voluntary Participation FEMA Model Deed Restriction Language All applicants are recommended to complete this checklist DISASTER NAME: Tropical Storm Debby Ems, FEMA - 1609- DR -FL: Hurricane Wilma Title / Brief Descriptive Project Summary: Collier County, Public Utilities Operations Center/ Wind Retrofit 1. Applicant (Organization): Collier County Water Sewer District 2. Applicant Type: ®State or Local Government ❑Recognized Native American Tribe ❑Private Non -Profit Packet Page -1324- m No. HMGP 001, Eff. 06/2012 DRAFT 2/12/2013 16.0.1. 3. County: Wher County 4. State Legislative House DiShwK* 37 Sttete Legislative Seet:ft DwbwKsX 3-7 Congressional House District(s): 76 s. Federal Tax LD. Nambex: 59- 6000558 -.. 6. Daft Universal Numbering System (DUNS): 076997790 7. FIM Code*: 021- 99021 -00 (*if your PIPS code is not brown, please 811 out FEMA Forme 90.49 (Request for Public Assistance) so that the Dent may obtain a PIPS code for you) 8. National Flood Insurance Program (NPIP) Comumnity ideotificiatiOn Number (this masher can be obtained from file FIRM map for your arm): 120167 9. NFIP Community Rating System Class Number (if avaelabley. 7 10. NFIP Last Community Assistance Visit Date (FMA ONLY): 11. Attach proof of current Flood Insurance Policy (FMA ONLY), 12. Point of Contact ❑Ms• ®Mr. OMrs. First Name: James Last Name: pus' � Title: Technical Sunman Professional Street Address: 4370 Mien Udc Ave City: Naples State: & Zip Code: 34104 Telephone: 239 -252 -6246 Fax. 239 -252 -6413 Email Address: 13. Apples Prepared by OMs. ®Mr. OMrs. First Name: IMM Last Name: P= q•ide• Technical SWM professional Telephone: 239,252,42M Fax: 239 - 252.6243 Email Address: jamlespr►o ocoiliapov -net 14. Asftriud Appllcnmt Agent (PMf 6Jr&ff&w a wAt6#ity rMs kwO . []Ms. ❑Mr. ®Mrs. Fiat Name: Caeora alai Last Name: Hiller er Title: Chaky -A nett Telephone: 239-252 -f602 Street Address: 3299 Tsadami Trail East Suite 300 ATTEST City: Nook state: Fl Zip code 411 pMy{QHT E BROCK, CLERK Email Address: BY: Signature: Date: 15. All proposed projects should be included in the county's Local Mitigation Strategy (LMS). Attached is a letter of endorsement for the projoet S+om the county's Local Mitigation Strategy Chairperson. ®Yes ❑No 16. Has" project been submitted and/or funded under a previous dessa w event? U so please provide the disaster number and project number if available. No Secdom L Project Deacripiiom A�rwM gs w tw. M�est A. Hazards to be Wit gated / Level of Protection 1. Select the type of hazards the proposed project will mitigate: bepdy County AUw0wrft7 ❑ Flood ® wind ❑ Storm surge ❑ Other (list): 2. identify the type of proposed project ❑ Elevation and retrofitting of residential or non - residential shucture ❑ Acquisition and relocation Acquisition and demolition ® wind retrofit H Minor drw3ap project that reduces locaiiaed fbodmg Attach any continuations or additional items to this page Form No. HMGP 001, Eff. 0612012 Packet Page -1325- DRAFT 2/12/2013 16.C.1. ❑ Other (please explain) 3. List the total number of persons that will be protected by the proposed project: 113 4. Fill in the level of protection and the magnitude of event the proposed project will mitigate. (e.g. 23 structures protected against the 100 -year [1 %] flood) structure(s) protected against the -year Flood (10, 25, 50, 100, or 500 year) 2 structure(s) protected against 135 mile per hour (mph) winds 5. Engineered projects only (e.g. Drainage Improvements, Erosion Control or other special project types. [Other special project types include drainage and other engineered projects. These projects are unlike acquisition, elevation or wind retrofits /shutters.]) Attach to this page ALL engineering calculations and design plans used to determine the above level of protection. 6. Project will provide protection against the hazard(s) above for 15 years. (i.e., what is the useful life of the project ?) B. Project Description, Scope of Work, and Protection Provided (Must be Completed in Detail) 1. Describe, in detail, the existing problem, the proposed project, and the scope of work. Explain how the proposed project will solve the problem(s) and provide the level(s) of protection described in Part A. Also, if available, attach a vendor's estimate and/or a contractor's bid for the scope of work. Please ensure that each proposed project is mitigation and not maintenance. 2. Description of the existing problems: Currently the two buildings located at 4370 Mercantile have 33 overhead doors that do not meet current hurricane wind standards. 3. Describe the type(s) of protection that the proposed project will provide: The project, when completed, will provide increased protection for the overhead bay and warehouse doors against hurricane strength winds up to 130 mph. The doors are Wind Resistant Windlock 652 Series Doors that are designed to lock the door edges into the 16 gauge steel guides. 4. Scope of Work (describe in detail what you are planning to do): Replace 33 outdated overhead doors with hurricane rated doors that are designed to last 15 years or more. The doors will be installed by a certified installer hired by Action Automatic Door and Gate. 5. Describe any other on -going or proposed projects in the area that may impact, positively or negatively, the proposed HMGP or FMA project: None Section II. Project Location (Fully describe the location of the proposed project.) A. Site 1. Describe the physical location of this project, including street numbers (or neighborhoods) and zip codes. If available, please provide precise longitude and latitude coordinates for the site utilizing a hand -held global positioning system (GPS) unit or the equivalent:: Two buildings located at 4370 Mercantile Ave, Naples FL, 34104. LATITUDE = 26 °09'550047 "N, LONGITUDE = 81045'21.344"W. 2. Title Holder: Collier County Water -Sewer District 3. Is the project site seaward of the Coastal Construction Control Line (CCCL)? ❑YES []NO 4. Provide the number of each structure type (listed below) in the project area that will be affected by the project. That is, all structures in project area. Attach any continuations or additional items to this p Packet Page -1326- Form No. HMGP 001, Eff. 06/2012 DRAFT 2/12/2013 16.C.1. ❑ Residential property: ❑ Businesses /commercial property: ® Public buildings: 2 ❑ Schools/hospitals /houses of worship: ❑ Other: B. Flood Insurance Rate Man (FIRM) showing Project Site ® Attach two (2) copies of the FIRM map, a copy of the panel information from the FIRM, and, if available, the Floodway Map. FIRM maps are required for this application (if published for your area). Also, all attached maps must have the project site and structures clearly marked on the map. FIRMs are typically available from your local floodplain administrator who may be located in a planning, zoning, or engineering office. Maps can also be ordered from the Map Service Center at 1- 800 - 358 -9616. For more information about FIRMs, contact your local agencies or visit the FIRM site on the FEMA Web -page at bttns : / /msc.fema.gov /webapl2/wcs/ stores /servlet/FemaWelcomeView ?storeld= 10001 &catalogId = 10001 &lan Ig d = -1 Using the FIRM, determine the flood zone(s) of the project site (Check all zones in the project area). (See FIRM legend for flood zone explanations) (A Zone must be identified) ❑ VE or V 1 -30 ❑ AE or A 1 -30 ❑ AO or AH ❑ A (no base flood elevation given) ® B or X (shaded) ❑ C or X (unshaded) ❑ Floodway ❑ Coastal Barrier Resource Act (CBRA) Zone (Federal regulations strictly limit Federal funding for projects in this zone. Please coordinate with your state agency before submitting an application for a CBRA Zone project). ❑ If the FIRM Map for your area is not published, please attach a copy of the Flood Hazard Boundary Map (FHB for your area, with the project site and structures clearly marked on the map. ®Attach a copy of a Special Flood Hazard Area Flood Insurance Assurance(s). C. City or County Map with Project Site and Photographs ®Attach a copy of a city or county scale map (large enough to show the entire project area) with the project site and structures marked on the map. ®Attach a USGS TOPO map with project site clearly marked on the map. ❑For acquisition or elevation projects, include copy of Parcel Map (Tax Map, Property Identification Map, etc.) showing each property to be acquired. The map should include the Tax ID numbers for each parcel, if possible. ®Attach photographs (a minimum of 2 photographs) for each project site per application. The photographs should be representative of the project area, including any relevant streams, creeks, rivers, etc., and drainage areas, which affect the project site or will be affected by the project. For each structure, please include the following angles: front, back and both sides. Attach any continuations or additional items to this p Packet Page -1327- Form No. HMGP 001, Eff. 06/2012 M) DRAFT 2/12/2013 16.C.1. Section III. Budget/Costs In this section, provide details of all the estimated costs of the project. As this information is used for the Benefit -Cost Analysis, reasonable cost estimates are essential. Do not include contingency costs in the budget. Avoid the use of lump sum costs. Note: To be eligible for HMA funding, Pre -award costs must be identified as separate line items in the cost estimate of the application This must be done in addition to filling out the HMGP Pre -Award Cost Request Form Please mark each pre award cost with an asterisk M. A. Materials Roll-Up Door W/ Chain Hoist 10' x 12' uu.icac 16 %_Ual per vncc 891.00 Uosi 14,256.00 Roll-Up Door W/O Chain Hoist 10'x 12' 16 871.00 13,936.00 Roll-Up Door W/ Chain Hoist 12 x 12 951.00 951.00 B. Labor (Include equipment costs. Please indicate all ` °soft" or in -kind matches. All in -kind match must be identified in the Section III. Budget/Costs of this application.) Description Hours Rate ('nvt C. Fees Paid (Include any other costs associated with the project.) /A Description of Task Hours Rate Cost Total Estimated Project Cost $ 37.954.00 Attach any continuations or additional items to this p Packet Page -1328- Form No. HMGP 001, Eff. 06/2012 DRAFT 2/12/2013 16.C.1. D. Funding Sources (Round figures to the nearest dollar.) The maximum FEMA share for HMGPprojects is 75 %. The other 25% can be made up of State and Local funds as well as in -kind services. The FMA program requires that the maximum in -kind match be no more than 12.5% of the total project costs. HMGP/FMA funds may be packaged with other Federal funds, but other Federal funds (except for Federal funds that lose their Federal identity at the State level such as CDBG and certain tribal funds) may not be used for the non - Federal share of the costs. Estimated FEMA Share Non - Federal Share Estimated Local Share Other Agency Share $ 28,465.50 $ 9,488.50 Global Match Project Title: (Identify Other Non - Federal Agency and availability date: Total Funding sources from above $ 37,954.00 75 % of Total (maximum of 75 %) 25 % of Total (Cash) % of Total (In- kind *) % of Total (Project Global Match * *) % of Total 100 Total % (should equal 100 %) *Identify proposed eligible activities directly related to project to be considered for In -kind services. (Note on Section B) * *Separate project application must be submitted for each project (Global) Match project. E. Project Milestones /Schedule of Work List the major milestones in this project by providing an estimated time -line for the critical activities not to exceed a period of 3 years for performance, e.g. Designing, Engineering, Permitting, etc. These milestones should correspond with the scope of work and budget. Milestone Number o Da s to Complete [Example: Demolition of 6 structures and removal of debris 14 days] Obtain quotes from vendors to install 33 wind resistant doors 21 Days Review quotes and select the one that best meets the requirements 5 Days Approve contract and schedule a start date 21 Days Removal and installation of 33 doors 14 Days Inspection of work done 2 Days Payment and close out of project 45 Days Attach any continuations or additional items to this p Packet Page -1329- Form No. HMGP 001, Efl 06/2012 DRAFT 2/12/2013 16.C.1. Section IV. Environmental Review and Historic Preservation Compliance /0—\ (NOTE: This application cannot be processed if this section is not completed) Because HMGP/FMA are federally funded programs, all projects are required to undergo an environmental and historic preservation review as part of the grant application process. Moreover, all projects must comply with the National Environmental Policy Act (NEPA) and associated Federal, State, Tribal, and Local statutes to obtain funding. NO WORK can be done prior to the NEPA review process. If work is done on your proposed project before the NEPA review is completed, it will NOT be eligible for Federal funding. A. The following information is required for the Environmental and Historic Preservation review: All projects must have adequate documentation to determine if the proposed project complies with NEPA and associated statutes. The State Environmental Staff provide comprehensive NEPA technical assistance for applicants, with their consent, to complete the NEPA review. The type and quantity of NEPA documents required to make this determination varies depending upon the project's size, location, and complexity. However, at a minimum, please provide the applicable documentation from this section to facilitate the NEPA compliance process. ® Detailed project description, scope of work, and budget/costs (Section I and Section III of this application). ® Project area maps with project site and staging area marked (Section II, part B & C of this application). ® Project area/structure photographs (Section II, part C of this application). ® Preliminary project plans. ® Project alternatives description and impacts (Section IV of this application). ® Please complete the applicable project worksheets. Dates of construction are required for all structures. ® Environmental Justice — Attach documents regarding evaluation (required) and satisfactory resolution (if necessary) of Environmental Justice issues (Highly Disproportionate, Adverse Impacts [effects] on Minority or Low Income Populations.) Documents can include public meeting-records, media reports, letters from interested persons and groups, studies on population, ethnic groups, quality of life, housing, economics, transportation, public services, schools, public health, recreation, voting, etc. ® Provide any applicable information or documentation referenced on the Information and Documentation Requirements by Project Type (p. 10 of this application). B. Executive Order 12898, Environmental Justice for Low Income and Minority Population Are there low income or minority populations in the project area or adjacent to the project area? If yes, please describe any disproportionate and adverse effects to these populations. No To help evaluate the impact of the project, please indicate below any other information you are providing: ❑ Description of the population affected and the portion of the population that would be disproportionately and adversely affected. Please include specific efforts to address the adverse impacts in your proposal narrative and budget. ® Attached materials or additional comments. Attach any continuations or additional items to this p packet Page -1330- Form No. HMGP 001, Eff. 06/2012 DRAFT 2/12/2013 16.C.1. C. Information required for Tribal Consultations Section 106 of the National Historic Preservation Act (NHPA) requires federal agencies to take into account the effect of their undertakings on historic properties. The NHPA requires that agencies must complete this process prior to the n expenditure of any Federal funds on the undertaking. A Tribal Consultation is required for any project disturbing ground or moving soil, including but not limited to: drainage projects; demolition; construction; elevation; communication towers; tree removal; utility improvements. 1. Describe the current and future use of the project location. Aland use map maybe provided in lieu of a written description. 2. Provide information on any known site work or historic uses for project location. ❑ Attach a copy of a city or county scale map (large enough to show the entire project area) with the horizontal limits (ft) and vertical depths (sq ft) of all anticipated ground disturbance. D. Alternative Actions The NEPA process requires that at least two alternative actions be considered that address the same problem/issue as the proposed project. In this section, list two feasible alternative projects to mitigate the hazards faced in the project area. One alternative is the "No Action Alternative." 1. No Action Alternative Discuss the impacts on the project area if no action is taken. If no action is taken and Collier County is impacted by a major hurricane, it is possible that the buildings and its contents will sustain extensive wind and structural damage. 2. Other Feasible Alternative Discuss a feasible alternative to the proposed project. This could be an entirely different mitigation method or a significant modification to the design of the current proposed project. Complete all of parts a -e (below) and include engineering details (if applicable). a. Project Description for the Alternative Describe, in detail, the alternative project. Also, explain how the alternative project will solve the problem(s) and/or provide protection from the hazard(s). The project, when completed, will provide increased protection for the overhead bay and warehouse doors against hurricane strength winds up to 130 mph. The doors are Wind Resistant Windlock 652 Series Doors that are designed to lock the door edges into the 16 gauge steel guides. b. Project Location of the Alternative (describe briefly) ❑Attach a map or diagram showing the alternative site in relation to the proposed project site ❑Photographs (2 copies) of alternative site Attach any continuations or additional items to this p packet Page -1331- Form No. HMGP 001, Eff. 06/2012 DRAFT 2/12/2013 16.C.1. C. Scope of Work for Alternative Project Replace 33 outdated overhead doors with hurricane rated doors that are designed to last 15 years or more. The doors will be installed by a certified installer hired by Action Automatic Door and Gate. d. Impacts of Alternative Project Below, discuss the impact of this alternative on the project area. Include comments on these issues as appropriate: Environmental Justice, Endangered Species, Wetlands, Hydrology (upstream and downstream surface water impacts), Floodplain/Floodway, Historic Preservation and Hazardous Materials. None e. Estimated Budget/Costs for Alternative Project ^ In this section, provide details of all the estimated costs of the alternative project (round figures to the nearest dollar). A lump sum budget is acceptable. 1. Materials Item n Rolling Stell Door with Chain Hoist 10' x 12' y"urittly 32 uwz per unit $1,915.00 cost $6,1280.00 Rolling Steel Door with Chain Hoist 12'x 12' 1 $2,282.00 $2,282.00 2. Labor (Include equipment costs. Please indicate all "soft" or in -kind matches.) Attach any continuations or additional items to this p packet Page -1332- Form No. HMGP 001, Eff. 06/2012 DRAFT 2/12/2013 16.C.1. 3. Fees Paid (Include any other costs associated with the project.) Description of Task Hours Rate Cost /A Total Estimated Project Cost $$75.399.00 Attach any continuations or additional items to this p packet Page -1333- Form No. HIvIGP 001, Eff. 06/2012 DRAFT 2/12/2013 16.C.1. HMGP ENVIRONMENTAL REVIEW Information and Documentation Requirements by Project Type Retrofits to Existing Facilities/Structures Elevations Acquisitions with Demolition ✓ Dates of Construction ✓ Concurrence from State Historic Preservation Officer if structure is 50 years or older, if work to be done is outside the existing footprint or if there is six (6) inches or more of ground disturbance. Drainage Improvements ✓ Engineering plans /drawings ✓ Permit or Exemption letter to address any modifications to water bodies and wetlands • Department of Environmental Protection • Water Management District • U.S. Army Corps of Engineers ✓ Concurrence letter from State Historic Preservation Office addressing archeological impacts. Required if there is six (6) inches or more of ground disturbance. ✓ Concurrence from U.S. Fish and Wildlife addressing any impacts to wildlife, particularly endangered and threatened species and their habitats. ✓ If the project is in coastal area, attach a letter from the National Marine Fisheries Service addressing impacts to marine resources. ✓ Concurrence from Natural Resource Conservation Service if project is located outside city limits and may impact prime or unique farmland. Note: This is a general guideline for most projects. However, there will be exceptions. Consult with environmental staff on project types not listed. Attach any continuations or additional items to this page Form No. HMGP 001, Eff. 06/2012 Packet Page -1334- 2/12/2013 16.C.1. Section V. Maintenance Agreement All applicants whose proposed project involves the retrofit or modification of wing public property or whose proposed project would result in the public ownership or management of property, structures, or facilities, must first sign the following agreement prior to submitting the application to FEMA. (NOTE: Those applicants whose project only involves the retrofitting, elevation, or other modiflea on to private property where the ownership will remain private after project completion DO NOT have to complete this form.) The Board of County Commissioners of Collier County, State of Florida, hereby agrees that if it receives any Federal aid as a result of the attached project application, it will accept responsibility, at its own expense if necessary, for the routine maintenance of any real property, structures, or facilities acquired or constructed as a result of such Federal aid. Routine maintenance shall include, but not be limited to, such responsibilities as keeping vacant land clear of debris, garbage, and vermin; keeping stream channels, culverts, and storm drains clear of obstructions and debris; and keeping detention ponds free of debris, trees, and woody growth. The purpose of this agreement is to make clear the Subgrantee's maintenance responsibilities following project award and to show the Subgrantee's acceptance of these responsibilities. It does not replace, supercede, or add to any other maintenance responsibilities imposed by Federal law or regulation and which are in force on the date of project award. Signed by Georgia A. Hiller, Chairwoman, the duly authorized representative of the Collier County Board of County Commissioners, on this 12`s day of February, 2013. ATTEST: OWNER: DWIGHT E. BROCK, Clerk BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA Dwight E. Brock, Clerk By: Georgia A. Hiller, Chairwoman Approved as to form and Legal sufficiency: Scott R. Teach Deputy County Attorney Packet Page -1335- 2/12/2013 16.C.1. THIS WORKSHEET APPLIES FOR THE FOLLOWING MITIGATION ACTIVITIES: -Non - structural Retrofitting of Existing Buildings and Facilities (Ex: Shutters, Roof Hurricane Straps, etc.) Structural Retrofitting of Existing Buildings (Ex: Code Plus, Load Path, etc.) Acquisition Mitigation Reconstruction Note Please make sure you review the eligible activities, depending on the program you are applying for. PROJECT GENERAL INFORMATION 71 1 PROJECT NAME Public Utilities Operations Center Hurricane Door Hardening 2 OWNER / APPLICANT Collier County Water -Sewer District 3 CONTACT PERSON Name:James Price 7 Address (Please include City, State, and Zip Code): 370 Mercantile Ave, Naples, FL, 34104 Phone number:239- 252 -6246 Email: jamesprice @colliergov.net 4 PROGRAM APPLICATION (FMA, SRL, RFC, HMGP, PA, PDM) HMGP STRUCTURE GENERAL INFORMATION 5 STRUCTURE TYPE (Please select) BUILDING I OTHER UTILITY 6 ADDRESS 4370 Mercantile Ave 7 CITY, STATE AND ZIP Naples, FL, 34104 8 COUNTY Collier 9 IS THIS A HISTORIC BUILDING? YES E:— NO E�3 MITIGATION 10 1 MITIGATION TYPE (Please select below) SHUTTERS 0j PROJECT USEFUL LIFE LOAD PATH 0 I ROOF I CODE PLUS 13 I ACQUISITION (Only residential) COST ESTIMATION • 11 PROJECT USEFUL LIFE 15 years 12 MITIGATION PROJECT COST $ 22,960.00 13 ANNUAL MAINTENANCE COST OF THE PROJECT $700.00 Packet Page -1336- 2/12/2013 16.C.1. STRUCTURE INFORMATION 14 ZIP CODE OR LATITUDE AND LONGITUDE OF THE PROPERTY ZIP CODE 34104 IS THIS A RESIDENTIAL BUILDING? LATITUDE 6 °09'550047 "N LONGITUDE 81 °45'21.344 "W 15 WHAT IS THE TOTAL SIZE OF THE BUILDING? (SF) 2,792 Note: For non - residential buildings, please provide the square footage for first floor only. For residential buildings, the total size consists of the enclosed area within the building, including finished and unfinished basements, and the entire living space; however, it does not include porches, sarases, or other outside areas. 16 BUILDING REPLACEMENT VALUE ($ /SF) $3,931,200.00 17 IS THIS A RESIDENTIAL BUILDING? YES = NO 18 IF NOT, PLEASE ANSWER ONE OF THE FOLLOWING RETROFIT PROJECT NEW BUILDING 19 IS THIS A CODE PLUS PROJECT? (Not allowed for wood buildings) IYES I IND I l 20 IF 50, PLEASE ANSWER THE FOLLOWING DESIGN WIND SPEED (MPH) CODE PLUS WIND SPEED (MPH) 21 NUMBER OF STORIES ABOVE GRADE 22 LOSS OF RENT 23 ITYPE OF CONSTRUCTION (Please select one below) 1 -- HOME LOSS OF SERVICE - NON RESIDENTIAL BUILDING 24 VALUE OF BUILDING CONTENTS $66$000.00 25 DISPLACEMENT COST ($ /MONTH) $1/SF/Month 26 ANNUAL OPERATING BUDGET OF ORGANIZATION $116.,700.00 If building is a Fire Station, the following information is required: Packet Page -1337- 2/12/2013 16.C.1. If building is a Hospital, the following information is required: 32 WHAT IS THE DISTANCE IN MILES BETWEEN THIS FIRE STATION AND THE FIRE N/A 29 STATION THAT WOULD PROVIDE FIRE PROTECTION FOR THE GEOGRAPHIC AREA RURAL 36 NORMALLY SERVED BY THIS FIRE STATION? 30 DOES THE FIRE STATION PROVIDE EMERGENCY MEDICAL SERVICE (EMS)? YES NO HOW MANY POLICE OFFICERS WOULD SERVE THE SAME AREA IF THE POLICE STATION WAS SHUT DOWN DUE TO DISASTER? IF YES, WHAT IS THE DISTANCE IN MILES BETWEEN THIS FIRE STATION AND THE FIRE 31 STATION THAT WOULD PROVIDE FIRE PROTECTION FOR THE GEOGRAPHIC AREA NORMALLY SERVED BY THIS FIRE STATION? If building is a Hospital, the following information is required: 32 HOW MANY PEOPLE ARE SERVED BY THIS HOSPITAL? N/A 33 WHAT IS THE DISTANCE IN MILES BETWEEN THIS HOSPITAL AND THE HOSPITAL THAT RURAL 36 WOULD TREAT THESE PEOPLE IN THE EVENT THIS HOSPITAL WAS INOPERATIVE? 34 HOW MANY PEOPLE ARE NORMALLY SERVED BY THE ALTERNATIVE HOSPITAL? If building is a Police Station, the following information is required: 35 INDICATE THE TYPE OF AREA SERVED BY THIS POLICE STATION METROPOLITAN N/A CITY RURAL 36 HOW MANY PEOPLE ARE REGULARLY SERVED BY THIS POLICE STATION? 37 HOW MANY POLICE OFFICERS WORK AT THIS POLICE STATION? 38 HOW MANY POLICE OFFICERS WOULD SERVE THE SAME AREA IF THE POLICE STATION WAS SHUT DOWN DUE TO DISASTER? Packet Page -1338- 2/12/2013 16.C.1. THIS WORKSHEET APPLIES FOR THE FOLLOWING MITIGATION ACTIVITIES: Non- structural Retrofitting of Existing Buildings and Facilities (Ex: Shutters, Roof Hurricane Straps, etc.) Structural Retrofitting of Existing Buildings (Ex: Code Plus, Load Path, etc.) Acquisition Mitigation Reconstruction Note: Please make sure you review the eligible activities, depending on the program you are applying for. 1 PROJECT NAME Public Utilities Operations Center Hurricane Door Hardening, ; 2 OWNER / APPLICANT Collier County Water -Sewer District 3 CONTACT PERSON Name: James Price 7 Address (Please include City, State, and Zip Code): 370 Mercantile Ave, Naples, FL, 34104 Phone number239 -252 -6246 Email: jamesprice @colliergov.net 4 PROGRAM APPLICATION (FMA, SRL, RFC, HMGP, PA, PDM) HMGP 5 STRUCTURE TYPE (Please select) BUILDING X� 12 OTHER UTILITY 6 ADDRESS 4420 Mercantile Ave 7 CITY, STATE AND ZIP Naples, FL 34104' 8 COUNTY Collier 9 IS THIS A HISTORIC BUILDING? YES NO MITIGATION 10 MITIGATION TYPE (Please select below) 15 years 12 MITIGATION PROJECT COST $14,994.00 SHUTTERS X LOAD PATH ROOF CODE PLUS ACQUISITION (Only residential) COST ESTIMATION INFO 11 PROJECT USEFUL LIFE 15 years 12 MITIGATION PROJECT COST $14,994.00 13 ANNUAL MAINTENANCE COST OF THE PROJECT $455.00 Packet Page -1339- 2/12/2013 16.C.1. 14 ZIP CODE OR LATITUDE AND LONGITUDE OF THE PROPERTY ZIP CODE 34104 LATITUDE 6 °09'550047"N LONGITUDE 81 °45'21.344 "W 15 WHAT IS THE TOTAL SIZE OF THE BUILDING? (SF) 2792 -16 -, N CC�C NI vviue Me square Tooiage Tor tirst tloor only. For residential buildings, the total size consists of the enclosed area within the building, including finished and unfinished basements, and the entire living space; however, it does not include porches, 16 BUILDING REPLACEMENT VALUE ($ /SF) $3,888,000.00 17 IS THIS A RESIDENTIAL BUILDING? YES NO 18 IF NOT, PLEASE ANSWER ONE OF THE FOLLOWING RETROFIT PROJECT NEW BUILDING 19 IS THIS A CODE PLUS PROJECT? (Not allowed for wood buildings) YES NO 20 IF SO, PLEASE ANSWER THE FOLLOWING DESIGN WIND SPEED (MPH) ICODE PLUS WIND SPEED (MPH) 24 VALUE OF BUILDING CONTENTS $668,000.00 25 DISPLACEMENT COST ($ /MONTH) $1 SF' Month 26 ANNUAL OPERATING BUDGET OF ORGANIZATION $116700.00 If building is a Fire Station, the following information is required: 27 HOW MANY PEOPLE ARE SERVED BY THIS FIRE STATION? N/A 28 INDICATE THE TYPE OF AREA SERVED BY THIS FIRE STATION URBAN SUBURBAN RURAL WILDERNESS Packet Page -1340- 2/12/2013 16.C.1. If building is a Hospital, the following information is required: 32 WHAT IS THE DISTANCE IN MILES BETWEEN THIS FIRE STATION AND THE FIRE N/A 29 STATION THAT WOULD PROVIDE FIRE PROTECTION FOR THE GEOGRAPHIC AREA RURAL 33 NORMALLY SERVED BY THIS FIRE STATION? 30 DOES THE FIRE STATION PROVIDE EMERGENCY MEDICAL SERVICE (EMS)? YES NO HOW MANY POLICE OFFICERS WOULD SERVE THE SAME AREA IF THE POLICE STATION WAS SHUT DOWN DUE TO DISASTER? IF YES, WHAT IS THE DISTANCE IN MILES BETWEEN THIS FIRE STATION AND THE FIRE 31 STATION THAT WOULD PROVIDE FIRE PROTECTION FOR THE GEOGRAPHIC AREA NORMALLY SERVED BY THIS FIRE STATION? If building is a Hospital, the following information is required: 32 HOW MANY PEOPLE ARE SERVED BY THIS HOSPITAL? N/A WHAT IS THE DISTANCE IN MILES BETWEEN THIS HOSPITAL AND THE HOSPITAL THAT RURAL 33 WOULD TREAT THESE PEOPLE IN THE EVENT THIS HOSPITAL WAS INOPERATIVE? 34 HOW MANY PEOPLE ARE NORMALLY SERVED BY THE ALTERNATIVE HOSPITAL? If building is a Police Station, the following information is required: 35 INDICATE THE TYPE OF AREA SERVED BY THIS POLICE STATION METROPOLITAN N/A CITY RURAL 36 HOW MANY PEOPLE ARE REGULARLY SERVED BY THIS POLICE STATION? 37 HOW MANY POLICE OFFICERS WORK AT THIS POLICE STATION? 38 HOW MANY POLICE OFFICERS WOULD SERVE THE SAME AREA IF THE POLICE STATION WAS SHUT DOWN DUE TO DISASTER? Packet Page -1341- 2/12/2013 16.C.1. TO: Harry Huber Senior Project Manager Public Utilities Engineering Department FROM: Hans Russell Property Acquisition Specialist Real Estate Services DATE: July 29, 2003 RE: Public Utilities Operations Center -- Structural Inspection Report On July 23, 2003, an inspection of the structures and systems existing at the property on Mercantile and Progress Avenues proposed for the above facility was conducted by representatives of the Facilities Management Department. This inspection was conducted in accordance with Section 6.015 of the Agreement for Sale and Purchase pertaining to the facility as approved by the Board of County Commissioners on June 24, 2003. The inspection team consisted of the following individuals: Mark Callis, Maintenance Supervisor Ben Bryan, Tradesworker Carpenter Bernard Cleary, Master Fire Technician David Holmes, Senior Electrician Kurt Jokela, Senior HVAC Craftsman Glen Miles, Senior Plumber The team was conducted through the facility by Mike Vance, full time maintenance person for the current owner of the facility, and myself. The team was given ample time and opportunity to conduct their inspections and to question various aspects of the facility. They were then asked to make note of their concerns on Facility Inspection Forms and return them to me. Copies of the Forms submitted are attached for reference, and the areas of concern are summarized as follows: Structural: -No elevator in Phase I [2 -story office section of east building]. - Noticed several areas -roof leaks. Office of Real Estate Services Packet Page -1342- - Severe building]. 2/12/2013 16.C.1. floor crack in front section Phase III [2 -story office section of west -Also soft spot in parking lot northeast front caused severe crack in floor of that area. - Windows don't appear to be hurricane proof. - Missing screens top floor Phase III. -Phase I doors don't fit properly. -Floor tile sounds hollow underneath. -Most overhead doors open spaces at tops. -Not enough bathrooms. -Light fixtures in way of door opening. -Front walks in need of railings. area of Phase III that might have Fire /Safety: -No fire sprinkler system. -No central fire alarm system. -Dead batteries in many emergency lights. - Several holes in fire and smoke barrier walls. - Elevator needs to be inspected before occupancy. Electrical: -Poor in most areas except main finished offices. -No outlets in some bathrooms. -Some uncovered electrical boxes. -Some K.O. seals missing on boxes and panelboards. -Light fixtures in poor repair in some warehouse areas. - Emergency and exit signs need new batteries. -Some conduit is loose in some warehouse areas. -Note: unable to check electrical service(s) because some areas. HVAC: power is off by F.P.L. in -Add return ductwork and vents to all rooms and hallways. -Units new and appear to work OK [some not yet connected]. Plumbing: -Water leak by west building front. - Overall condition of building, property and parking area good. -Lawn sprinkling system and landscaping OK. -Room for future use. The representative of the current owner has agreed to address the roof leaks and water leak issues discovered, and I have asked that I be provided with acceptable proof that these items have been appropriately repaired. In addition, the owner has agreed to have the two underground propane gas tanks that are not currently in use removed by the gas company. I also noticed a rectangular hole cut by one of the tenants in the west side of the west building for ventilation purposes, which I will request be closed up once that tenant has vacated. Pending your review of this report, I have not specifically Office of Real Estate Services Packet Page -1343- 2/12/2013 16.C.1. addressed any of the other areas of concern, many of which may or could be handled during the renovation process. 10-1�1 Your attention is directed to Section 6.02 of the Agreement for Sale and Purchase, which outlines our remedies if we are not satisfied with the results of the inspections. Although the current owner has agreed to make some repairs, and may agree to others, he is under no obligation to do so. Our remedy is to withdraw from the deal if we are not satisfied, and if this is the case we must do so within the next two weeks. Would you please give me a call once you have digested this information so that we can discuss your questions and comments and determine where we go from here. I will look forward to hearing from you. My direct extension is 2623. Attachments as stated cc: T. A. Mott Office of Real Estate Services Packet Page -1344- 2/12/2013 16.C.1. 6 December 2012 Mr. Miles Anderson, State Hazard Mitigation Officer Florida Division of Emergency Management 2555 Shumard Oaks Blvd. Tallahassee, FL 32399 -2100 Re: Hazard Mitigation Grant Program (HMGP) Applications for FEMA 4068 -DR -FL "Tropical Storm Debby" Dear Mr. Anderson, The Collier County Local Mitigation Strategy (LMS) working group has approved by vote and prioritized the following projects for HMGP funding from this disaster. These projects align with our goals and objectives as noted and with the State's mitigation goals and objectives (in accordance with the Code of Federal Regulations 44 201.6) The Collier County LMS group therefore presents the projects below in the order in which they are to be considered for funding. Funding Project Name or Description Applicant Goal /Objective Estimated Priority Implemented Federal Share 1 Public Utilities Ops Ctr Collier County Public Goal 3: Obj 3.1.& 3.3 overhead door replacement Utilities Division $28,500 for wind hazard 2 Portable Generator Cable Collier County School Goal 1,Obj:1.1, 1.2 Goal 3, pass- through hole and District . Obj 3.1 generator pad with $75,000 anchoring point for General Population Risk - Shelters 3 Naples City Hall Window City of Naples Goal 3, objs 3.1,3.3 replacement for wind $487,500 protection 4 Marco Substation Relay Lee County Electric Goal 1, objs. 1.1, 1.2, 1.2.1, Vault Replacement & Cooperative Goal 2, objs. 2.2, 2.3, 2.4, and $337,500 Elevation Goal 3, objs. 3.1, 3.2, 3.3 5 Wood pole replacement Lee County Electric Goal 1, objs. 1.1, 1.2, 1.2.1, with concrete ones Cooperative Goal 2, objs. 2.2, 2.3, 2.4, and $750,000 Goal 3, objs. 3.1, 3.2, 3.3 6 Wind retrofit residential Retrofit Southwest Goal 1, Obj 1. 1, 1.2, & Goal $987.000 homes Florida 5, obj 5.2 For further information or inquiry, please contact Richard Zyvoloski, 239 - 252 -3603, RichardZvvoloski @CollierGov.net. Sincerely, Victor Hill, LMS Chair Collier County Local Mitigation Strategy Working Group Packet Page -1345- 11� Collier County Map q n 4370 Mercantile Ave �w §° - s Packet Page -1346- 2/12/2013 16.C.1. I MyTopo Map Print Paae 1 of 1 2/12/2013 16.C.1. 0 6 M. Map provided by MyTopo.com 0 30000 Ft Packet Page -1347- http:// map - pass .mytopo.com /maps /print_mytopo. asp ?print =20 &scale =60 &layer = DRG &l... 12/18/2012 a 0 6 M. Map provided by MyTopo.com 0 30000 Ft Packet Page -1347- http:// map - pass .mytopo.com /maps /print_mytopo. asp ?print =20 &scale =60 &layer = DRG &l... 12/18/2012 RICK SCOTT Governor 2/12/2013 16.C.1. MANAGEMENT BRYAN W.KOON Director To: Local Governments, State and Regional Agencies, Indian Tribal Governments, Local Mitigation Strategy Working Groups, Private Non- Profit Organizations Submitting Hazard Mitigation Grant Program Applications for the Tropical Storm Debby. From: Bryan W. Koon, State Coordinating Officer V Subject: Hazard Mitigation Grant Program Funding Summary Dater October 18, 2012 Program Summary The Florida Division of Emergency Management (the Division) is pleased to announce the availability of Hazard Mitigation Grant Program (HMGP) funds as a result of the recent Presidential Disaster Declaration for Tropical Storm Debby (FEMA 4068- DR -FL). HMGP funding is authorized by Section 404 of the Robert T. Stafford Disaster Relief Act. This funding helps communities implement measures to reduce or eliminate long- term risk to people and property from natural hazards and their effects. The Division encourages all potential applicants to submit applications for projects that address eligible mitigation activities. The amount of HMGP funding available to the state is based on the total federal disaster assistance for the Presidential Disaster Declaration. Application Timeline Applications are currently being accepted. The application period will close February 15, 2013. Applications mailed to the Division must be postmarked on or before February 15, 2013. Hand - delivered applications must be stamped in at the Division no later than 5:00 p.m. EST on February 15, 2013. The Division encourages potential applicants to submit complete applications before the close of the application period. Applications will only be accepted from eligible applicants as defined in the Minimum Program Eligibility section of this notice. FLORIDA RECOVERY OFFICE - DIVISION HEADQUARTERS • STATE LOGISTICS RESPONSE-CENTER 5900 Lake Ellenor Drive 2555 Shurnard Oak Boulevard 2702 Directors Row Orlando, FL 32809 Tallahassee, FL 32399 -2100 Orlando, FL 32809 -5631 Tel: 850 -413 -9969 • Fax: 850 -488 -1016 W�. Packet Page -1348- 2/12/2013 16.C.1. MEMORANDUM October 18, 2012 Page 2 Please provide four completed copies of the State of Florida Hazard Mitigation Grant Program Application and all appropriate attachments. The application and all other pertinent forms may be obtained at the Division's website located at htta: / /www.floridadisaster.org /Mitigation /Hazardtforms.htm. You may also contact the Division directly at (850) 922 -4182. Completed applications must be sent to the following address: ATTN: Kathleen Marshall, Hazard Mitigation Grant Program Florida Division of Emergency Management Mitigation Section 2555 Shumard Oak Boulevard Tallahassee, Florida 32399 -2100 Minimum Program Eligibility Eligible Applicants: According to the Code of Federal Regulations (CFR) 44 §206.434(a), the following parties are eligible to apply for Hazard Mitigation Grant Program funds: • State and local governments who have an approved Local Mitigation Strategy (LMS) in accordance with 44 CFR 201.6, prior to receipt of HMGP subgrant funding for projects; • Private non - profit organizations or institutions that own or operate a private non - profit facility as defined in §206.221(e); and • Indian tribes or authorized tribal organizations. Eligible Activities: Activities include mitigation projects that will result in protection of public or private property from natural hazards. Activities for which implementation has already been initiated or completed are not eligible for funding. Eligible projects include, but are not limited to, the following: • Acquisition or relocation of hazard prone structures • Retrofitting of existing buildings and facilities that will result in increased protection from hazards • Elevation of flood prone structures • Infrastructure protection measures • Stormwater management improvements • Minor structure flood control projects • Residential and community safe room construction Packet Page -1349- 2/12/2013 16.C.1. MEMORANDUM October 18, 2012 ^ Page 3 Ineligible Activities: The state will not consider funding requests for: Generators (unless they are an integral part of a larger eligible project); • Construction of new facilities (Nevertheless, the cost associated with above code upgrades to new facilities may be considered); • Equipment such as emergency pumps, vehicles, and communication devices; • Tree removal, debris removal and other forms of maintenance; or • Projects already in progress (Construction may not begin until the contract between the State and subgrantee is executed and the project has met requirements of the National Environmental Policy Act). Eligibility Criteria: All projects submitted must meet minimum criteria to be considered for funding. An eligible project must: • Conform to the Florida State Hazard Mitigation Plan and the respective community's LMS; • Conform to the funding priorities for the disaster, as established in the appropriate LMS; • Demonstrate cost - effectiveness; • Be technically feasible; • Benefit the designated disaster area; • Conform to all applicable environmental laws and regulations, as well as Executive Orders; • Solve a problem independently or constitute a functional part of a solution; • Benefit a National Flood Insurance Program (NFIP) participating community that is not on probation or is suspended from the NFIP; and • Meet all applicable State and local codes and standards. Cost -Share Requirements Under the HMGP, FEMA will contribute up to 75- percent of the total amount approved under the grant award to implement eligible, cost- effective mitigation measures. The applicant must provide the remaining 25- percent non - federal share. Contributions, cash, and in -kind services are acceptable as part of the non - federal share. Requirements for in -kind contributions can be found in 44 CFR §13.24. In -kind contributions must be directly related to the eligible project cost and are those personnel, materials, equipment and supplies owned, controlled, and operated by the applicant or a third party contributor. Applicants may use the Global Match concept as part of the 25- percent non- federal share. Global Match permits a potential applicant to meet the non - federal share match by receiving credit for state and /or local government funds that were committed to n similar type project(s). These similar, non - federally funded projects must meet all of the Packet Page -1350- 2/12/2013 16.C.1. MEMORANDUM October 18, 2012 Page 4 HMGP eligibility requirements. This means that if Global Match is approved, the applicant may receive up to 100- percent federal share. Pre -Award Costs Prior to receiving a grant award, pre -award costs may be requested. Pre -award costs include items such as engineering, environmental study, permitting, and other "soft" costs associated with a construction project. Construction activities are not considered pre -award costs. Pre -award costs must be requested in writing. Guidelines for pre - award costs are included in Attachment A. County Funding Allocation To ensure funds are distributed equitably, designated counties have been assigned a portion of the total HMGP grant. The amount is based on a calculation of the proportional share of the total federal assistance under the Public Assistance (PA), Individual Assistance (IA), and Small Business Administration (SBA) programs as of October 2012. Commitment of project funds by the Division is contingent upon receipt of appropriate Legislative Budget Authority. These figures are shown in Attachment B and represent the estimated amount of r� HMGP funds currently available. HMGP funding is available only to those counties that have a current FEMA- approved LMS. Project applications will be considered only if: (1) The application is accompanied by an endorsement by the LMS Chairperson or Vice - Chairperson stating that the project is included in the current LMS; and, (2) If more than one project is submitted, the endorsement indicates the prioritization. A sample project submission letter is shown in Attachment C. The Division will attempt to fund each submitted project in priority order until the county's allocation has been exhausted. In accordance with Florida Administrative Code (F.A.C.) 27P- 22.006, the Division uses the following tiered allocation system up until the State application deadline with FEMA: Tier I The available HMGP funds are allocated to counties included in the relevant Presidential Disaster Declaration in proportion to each county's share of federal disaster funding from the Public Assistance (PA), Individual Assistance (IA), and Small Business Administration (SBA) Disaster Loan Program as of the date of receipt of the FEMA funding notice described above. Eligible projects submitted by each county included in the relevant Presidential Disaster Declaration will be funded in order of priority as outlined in the LMS until the allocated funds (through the 12 -Month Lock -in) are exhausted or all eligible projects are funded. Packet Page -1351- 2/12/2013 16.C.1. MEMORANDUM October 18, 2012 Page 5 Tier 2 Any allocation remaining after all eligible projects in any declared county are funded, shall be re- allocated to those counties included in the relevant Presidential Disaster Declaration whose allocation was not sufficient to fund all submitted eligible projects. The order of priority for re- allocating funds is detailed in Attachment D. Tier 3 In the event funds remain after the Tier 1 and Tier 2 process, any remaining funds will be offered on a statewide basis as described in Attachment D. Please see Attachment D for a detailed explanation of funding tiers. Funding Availability and Notification FEMA notifies the State of HMGP funding availability at several milestones: 1. Initial Estimate This represents an early estimate only and is not an actual commitment of funding by FEMA. Funding may increase or decrease based on actual disaster claims during the declaration period. These estimates are provided for planning purposes and to jump -start the HMGP application process. 2. 180 Days from the Date of Declaration This represents the State's Lock -in Amount. It is the minimum the State can expect to receive from FEMA. County allocations Fisted in Attachment B are based on this estimate. After this disclosure, HNIGP funds to the State cannot be decreased. it is 'important for potential applicants to recognize that HMGP funds are contingent upon FEMA's reexamination of the disaster figures at the given time intervals. A county's funding allocation can increase or decrease after it has submitted an application. Technical Assistance The Division is in the process of scheduling HMGP application development workshops. Please check the Division's website htt : / /wwv►r.floridadisaster.or /Miti ation /Hazard for date, time, location and a short overview of the workshops. The Division will provide technical assistance throughout the application process. This includes assistance with the application process, Benefit Cost Analysis, Engineering Feasibility and Environmental /Historical Preservation Compliance. If there are any questions regarding the allocation of funds or the project review and selection criteria, please call Bureau staff at one of the following numbers: ^ (850) 922 -5944 (Program Eligibility) Packet Page -1352- MEMORANDUM October 18, 2012 Page 6 (407) 888 -3720 (Program Eligibility) (407) 856 -5040 (Environmental) (407) 856 -5010 (Engineering and Technical Feasibility) 2/12/2013 16.C.1. For additional information and technical assistance, please refer to FEMA's Hazard Mitigation Assistance Unified Guidance document available at http://www.fema.gov/librar-y/viewRecord.do?id=4225. To assist you in submitting qualified project applications, the following attachments are located on the Division website http: / /www.floridadisaster.oEg/ Mitigation /Hazard including the Hazard Mitigation Grant Program Assistance Application: Attachment A: HMGP Program Policy on Pre -award Cost and Form Attachment B: Initial Estimate of Available HMGP Funding Attachment C: Sample Project Submission Letter Attachment D: Florida Administrative Code 27P -22 BW K/km Attachments Packet Page -1353- 2/12/2013 16.C.1. Attachment A Packet Page -1354- 2/12/2013 16.C.1. Guidance on Pre -award Cost Associated with HMGP Projects Pre -award costs are costs incurred by a sub- grantee before the grant was awarded. Any and all pre -award costs associated with an HMGP project must be incurred after the date of declaration of a disaster under which the project is proposed for funding (GAO 10 -129). All construction associated with an HMGP project must be incurred after approval by FEMA and after the State of Florida and the sub - grantee has executed a project contract. According to Webster's 11 New Riverside Dictionary Revised Edition, the word construction means "the act, process, or work of building." Breaking ground, installing a shutter, taking out a window to replace with impact glass, are all examples of "construction." FEMA may approve pre -award costs. These costs include study or research required to plan a construction project. Such activities may include engineering, modeling, permitting, environmental study, benefit -cost analysis, etc. These are soft costs and not to be confused with hard construction costs. Construction costs may not be included as pre -award costs. Pre -award costs must be factored into total project costs and included in the benefit -cost analysis calculations. The applicant may request pre -award costs any time after the disaster declaration. The '001-N request must be in writing and include the type of activity or activities proposed and estimated cost. All pre -award activity must clearly be associated with the applicant's proposed project. The State and FEMA will do a preliminary review of the request and may concur that the activities are necessary for the type of project envisioned or may consult with the applicant on an identified activity that the State or FEMA does not feel is necessary for a proposed project. Conversely, the State or FEMA may suggest additional study or research the applicant has not identified for a particular project. Review by the State and FEMA of pre -award activities may save money and time for the State, FEMA, and the applicant. Letters and documentation of all pre -award activities will need to be submitted to the State with the project application. Preliminary review by the State or FEMA of pre -award activities is no guarantee of eligibility or approval of the activities or the proposed project. FEMA will provide a written final determination on the pre -award request. An alternative is for the applicant to request approval of pre -award cost by letter attached to the project application. The request must include the type of activity or activities and costs incurred by the applicant. There is greater risk to the applicant with this alternative that incurred costs may not be considered eligible. if the proposed project meets all eligibility criteria and is approved by FEMA, then pre - award costs identified by the applicant prior to project submittal, or identified by the applicant in documentation attached to the application, will be considered project costs eligible for 75/25 re- imbursement (same as other project costs). Packet Page -1355- 2/12/2013 16.C.1. All pre - award costs are subject to an approved grant award and available funding. If funding is not available, even if pre -award costs are approved in writing, they will not be reimbursed and will be solely the responsibility of the applicant. REFERENCES General Accounting Office, Principles of Federal Appropriations Law, Volume II, January 2004 Excerpts from OMB Cost Principle Circulars: OMB Circular A -87 and A -122 (2 CFR 225 and 2 CFR 230, respectively) - Pre -award costs are those incurred prior to the effective date of the award directly pursuant to the negotiation and in anticipation of the award where such costs are necessary to comply with the proposed delivery schedule or period of performance. Such costs are allowable only to the extent that they would have been allowable if incurred after the date of the award and only with the written approval of the awarding agency. OMB Circular A -21 (2 CFR 220) - Pre- agreement costs incurred prior to the effective date of the sponsored agreement, whether or not they would have been allowable thereunder if incurred after such date, are unallowable unless approved by the sponsoring agency. 44 CFR Part 206.439(c) further explains the pre -award cost regulations as allowable costs under HMGP. 44 CFR Part 13.22(b) lists the circulars above as the applicable cost principles for HMGP applicants; governments (A -87), private non - profits (A -122), & educational institutions (A -21). Packet Page -1356- DIVISION OF 2/12/2013 16.C.1. MANAGEMENT RICK SCOTT BRYAN W. KOON Govemor Director HAZARD MITIGATION ASSISTANCE PROGRAM PRE -AWARD COST REQUEST FORM To request Pre - Award Costs, please complete this form and submit with your project application. All ELIGIBLE pre -award costs are subject to an approved grant award and availability of funding. If funding is not available or the project is not approved, pre -award costs will NOT be reimbursed and will be the sole responsibility of the applicant. If your project is approved and pre -award costs are eligible, the costs share for the reimbursement of these activities is up to a 75/25 split. Program: Name of Applicant: Project Title: Start Date for Pre -Award Activities: Pre -award costs associated with this request incurred prior to the date of declaration are NOT eligible. These costs include: study or research to plan project, engineering, modeling, permitting or environmental study. These costs must be reflected as a line item in the project budget. Construction costs should NOT be included. Construction activities may NOT begin until after a contract has been fully executed with the State for this project. I Activity I Estimated Cost I Estimated Start Date I Point of Contact Information: Name: Agency: Address: Title: Phone: Email: Authorized Applicant Agent: Name: Signature: Title: Date: FLORIDA RECOVERY OFFICE • DIVISION HEADQUARTERS • STATE LOGISTICS RESPONSE CENTER 5900 Lake Ellenor Drive 2555 Shumard Oak Boulevard 2702 Directors Row Orlando, FL 32809 Tallahassee, FL 32399 -2100 Orlando, FL 32809 - 5631 Tel: 850- 413 -9969 - Fax: 850 -488 -1016 W Packet Page -1357- 2/12/2013 16.C.1. Attachment B Packet Page -1358- FEMA- 4068 -DR -FL Tropical Storm Debby Initial 90 -Day Estimate � lto+aatro>i ede�alMa � � � Baker County $284,505.24 $94,835.08 Bradford County $239,507.58 $79,835.86' Charlotte County $310,019.08 $103,339.69 Citrus County $195,941.03 $65,313.68 Clay County $414,405.12 $138,135.04 Collier County $1,098,575.09 $366,191.70' Columbia County $1,901,297.48 $633,765.83' Dixie County $88,480.48 $29,493.49 Duval County $696,234.39 $232,078.13 Franklin County $409,744.97 $136,581.66 Gilchrist County $2,530.13 $843.38 Gulf County $767,733.02 $255,911.01 Hamilton County $112,630.00 $37,543.33 Hernando County $478,888.85 $159,629.62, Highlands County $18,976.45 $6,325.48. Hillsborough County, $81,157.23 $27,052.41 Jefferson County $818,166.42 $272,722.14 Lafayette County $70,052.96 $23,350.99 Lee County $306,497.39 $102,165.80' Levy County $79,310.84 $26,436.95 Liberty County $106,618.88 $35,539.63 Madison County $124,624.57 $41,541.52 Manatee County $862,322.11 $320,774.04 Nassau County $203,526.92 $67,842.31 Pasco County $1,527,290.16 $509,096.72 Pinellas County $757,755.33 $252,585.11 Polk County $39,354.06 $13,118.02 Putnam County $95,662.76 $31,887.59 Santa Rosa County $256,552.90 $85,517.63' Sarasota County $873,387.65 $291,129.22, Suwannee County $2,343,665.41 $781,221.80 Taylor County 1 $77,401.05' Union County $167,870.39 $55,956.80 wakulla County $689,444.40 $229,814.80 KQ 30:31 55;33 ;7 r7 2/12/2013 16.C.1. *Note: The amounts shown are initial 90 -day estimates and should be used for planning purposes only. These figures are based upon best available data as of October 2012 and are subject to change. The State anticipates that FEMA will provide the 6 -month Lock -in estimate for the Hazard Mitigation Grant Program in January 2013. This future estimate will be used to re- evaluate the initial 90 -day estimate and establish a dock -in ceiling. At this time the lock -in ceiling will reflect any increase or decrease in the amount of available HMGP funding. Packet Page -1359- 2/12/2013 16.C.1. Attachment C Packet Page -1360- 2/12/2013 16.C.1. Date Mr. Miles Anderson, State Hazard Mitigation Officer Florida Division of Emergency Management 2555 Shumard Oaks Boulevard Tallahassee, Florida 32399 -2100 Re: Hazard Mitigation Grant Program (HMGP) applications for FEMA 4068 -DR- FL "Tropical Storm Debby" Dear Mr. Anderson, The County Local Mitigation Strategy (LMS) working group has approved by vote and prioritized the following projects for HMGP funding from this disaster. These projects align with our LMS goals and objectives as noted, and with the State's mitigation goals and objectives (in accordance with the Code of Federal Regulations 44§ 201.6.) The County LMS group therefore presents the projects below (or in the attachment) in the order in which they are to be considered for funding. FEMA 4068 -DR -FL "Tropical Storm Debby" Funding priority Project name or description Applicant Goal/ objective implemented Estimated federal share 1. Project name Applicant 3. B. 2 $000,000 2. Project name Applicant 1. A. (4 ) $000,000 3. Project name Applicant 2. B. (4 ) J$000,000 Etcetera For further information or inquiry, please contact me at phone number and email. Sincerely, cc: _, LMS Chair County LMS Packet Page -1361- 2/12/2013 16.C.1. Attachment D Packet Page -1362- 2/12/2013 16.C.1. CHAPTER 27P -22 HAZARD MITIGATION GRANT PROGRAM 27P - 22.001 Purpose 27P - 22.002 Definitions 27P - 22.003 Eligibility 27P- 22.004 LMS Working Groups 27P - 22.005 Local Mitigation Strategy 27P- 22.006 County Allocations and Project Funding 27P- 22.007 Application 27P - 22.001 Purpose. This chapter describes the processes for application, project selection and distribution of funds under the Hazard Mitigation Grant Program. Rulemaking Authority 252.35(2)(x) FS. Law Implemented 252.311, 252.32, 252.35 FS. History—New 2- 24 -02, Formerly 9G- 22.001. 27P - 22.002 Definitions. (1) "Adoption" means a resolution, ordinance or other formal action taken by the governing body of a county or municipality indicating agreement with and acceptance of the relevant Local Mitigation Strategy. (2) "Application" means the request for hazard mitigation funding as submitted to the ^' Division by an Applicant. (3) "Applicant" means a state agency, local government, Native American tribe or authorized tribal organization or private non -profit organization requesting hazard mitigation funding. (4) "FEMA" means the Federal Emergency Management Agency. (5) "Florida Hazard Mitigation Strategy" means Florida's version of the Hazard Mitigation Plan referred to in 44 C.F.R., Part 206, Subpart M. The Florida Hazard Mitigation Strategy (Rev. September 11, 1997) is hereby incorporated into this rule by reference. A copy may be obtained by contacting the Division of Emergency Management. (6) "Hazard" means a condition that exposes human life or property to harm from a man -made or natural disaster. (7) "Hazard Mitigation" means any action taken to reduce or eliminate the exposure of human life or property to harm from a man -made or natural disaster. (8) "Hazard Mitigation Grant Program ", herein referred to as HMGP, means the program authorized under Section 404 of the Stafford Act and implemented by 44 C.F.R., Part 206, Subpart N, hereby incorporated by reference, a copy of which may be obtained by contacting the Division, which provides funding for mitigation projects as identified in the State Hazard Mitigation Strategy. (9) ."Local Mitigation Strategy" or "LMS" means a plan to reduce the identified hazards within a county. (10) "Project" means a hazard mitigation measure as identified in an LMS. (11) "Repetitive loss structures" means structures that have suffered two or more Packet Page -1363- 2/12/2013 16.C.1. occurrences of damage due to flooding and which have received payouts from the National Flood Insurance Program as a result of those occurrences. (12) "Working Group" is the group responsible for the development and implementation of the Local Mitigation Strategy. Rulemaking Authority 252.35(2)(x) FS. Law Implemented 252.399, 252.32, 252.35 FS. History—New 2- 24 -02, Formerly 9G- 22.002. 27P- 22.003 Eligibility. (1) Eligible types of projects shall include, but not be limited to, the following: (a) New construction activities that will result in protection from hazards; (b) Retrofitting of existing facilities that will result in increased protection from hazards; (c) Elevation of flood prone structures; (d) Vegetative management/soil stabilization; (e) Infrastructure protection measures; (f) Stormwater management/flood control projects; (g) Property acquisition or relocation; and (h) Plans that identify and analyze mitigation problems and include funded, scheduled programs for implementing solutions. (2) In order to be eligible for funding, projects shall meet the following requirements: (a) Conform to the Florida Hazard Mitigation Strategy; (b) Conform to the funding priorities for the disaster as established in the LMS governing the project; (c) Conform to 44 C.F.R., Part 9, Floodplain Management and Protection of Wetlands, and 44 C.F.R., Part 10, Environmental Considerations, both hereby incorporated by reference, copies of which may be obtained by contacting the Division; (d) Eliminate a hazard independently or substantially contribute to the elimination of a hazard where there is reasonable assurance that the project as a whole will be completed; and (e) Be cost - effective and substantially reduce the risk of future damage, hardship, loss, or suffering resulting from a disaster. Rulemaking Authority 252.35(2)(x) FS. Law Implemented 252.371, 252.32, 252.35 FS. History —New 2- 24 -02, Formerly 9G- 22.003. 27P- 22.004 LMS Working Groups. Each county electing to participate in the HMGP must have a formal LMS Working Group and a current LMS. (1) Not later than the last working weekday of January of each year the Chairperson of the Board of County Commissioners shall submit to the Division a list of the members of the Working Group and its designated Chairperson and Vice - Chairperson. (2) The Working Group shall include, at a minimum: (a) Representation from various agencies of county government which may Packet Page -1364- 2/12/2013 16.C.1. include, but not be limited to, planning and zoning, roads, public works and emergency management; (b) Representation from all interested municipalities within the county; and (c) Representation from interested private organizations, civic organizations, trade and commercial support groups, property owners associations, Native American Tribes or authorized tribal organizations, water management districts, regional planning councils, independent special districts and non - profit organizations. (3) The county shall submit documentation to show that within the preceding year it has issued a written invitation to each municipality, private organization, civic organization, Native American Tribe or authorized tribal organization, water management district, independent special district and non - profit organization, as applicable, to participate in the LMS working group. This documentation shall accompany the membership list submitted to the Division. (4) The Working Group shall have the following responsibilities: (a) To designate a Chairperson and Vice- Chairperson; (b) To develop and revise an LMS as necessary; (c) To coordinate all mitigation activities within the County; (d) To set an order of priority for local mitigation projects; and (e) To submit annual LMS updates to the Division by the last working weekday of each January. Updates shall address, at a minimum: 1. Changes to the hazard assessment; 2. Changes to the project priority list; 3. Changes to the critical facilities list; 4. Changes to the repetitive loss list; and 5. Revisions to any maps. Rulemaking Authority 252.35(2)(x) FS. Law Implemented 252.399, 252.32, 252.35 FS. History New 2- 24 -02, Formerly 9G- 22.004. 27P- 22.005 Local Mitigation Strategy. Each LMS shall have the following components: (1) A description of the activities of local government and private organizations that promote hazard mitigation; a description of the policies, ordinances or programs that guide those activities; and any deficiencies in the policies, ordinances, and programs with recommendations to correct those deficiencies; (2) A description of the methods used to engage private sector participation; (3) A statement of general mitigation goals, with Working Group recommendations for implementing these goals, and estimated dates for implementation; (4) A description of the procedures used by the Working Group to review the LMS at regular intervals to ensure that it reflects current conditions within the County; (5) A hazard assessment to include, at the minimum, an evaluation of the vulnerability of structures, infrastructure, special risk populations, environmental resources and the economy to storm surge, high winds, flooding, wildfires and any other hazard to which the community is susceptible; ^ Packet Page -1365- 2/12/2013 16.C.1. (6) A statement of procedures used to set the order of priority for projects based on project variables which shall include technical and financial feasibility; (7) A list of approved projects in order of priority with estimated costs and associated funding sources; (8) A list of critical facilities that must remain operational during and after a disaster; (9) A list of repetitive loss structures; and (10) Maps, in Geographical Information System (GIS) format, depicting hazard areas, project locations, critical facilities and repetitive loss structures. Rulemaking Authority 252.35(2)(x) FS. Law Implemented 252.391, 252.32, 252.35 FS. History—New 2- 24 -02, Formerly 9G- 22.005, 27P- 22.006 County Allocations and Project Funding. (1) The available HMGP funds shall be allocated to the counties included in the relevant presidential disaster declaration, as defined in Section 252.34(1), F.S., in proportion to each county's share of the federal disaster funding from the Public Assistance, individual Assistance and Small Business Administration programs as of 90 days after the disaster declaration as reported by FEMA. (a) Eligible and submitted projects for each county included in the relevant presidential disaster declaration will be funded in order of priority as outlined in the LMS until the allocated funds are exhausted, or all eligible projects are funded, whichever occurs first. (b) Any allocation remaining after all eligible projects in any declared county are funded shall be reallocated to those counties included in the relevant presidential disaster declaration whose allocation was not sufficient to fund all submitted eligible projects in proportion to each county's share of unfunded projects. (2) If funds remain after all eligible projects under subsection (1) above have been funded, then they shall be applied to fund eligible projects submitted from counties not included in the relevant presidential disaster declaration on a first -came- first - served basis until all available funds are obligated. (3) Once a project has been selected for funding, the agreement between the applicant and the Division regarding the terms and conditions of the grant shall be formalized by contract. Rulemaking Authority 252.35(2)(x) FS. Law Implemented 252.399, 252.32, 252.35 FS. History —New 2- 24 -02, Formerly 9G- 22.006. 27P- 22.007 Application. (1) The following entities may apply for funding under the program: (a) State agencies and local governments; (b) Private non - profit organizations or institutions that own or operate a private non - profit facility as defined in 44 C.F.R., §206.221(e), hereby incorporated by reference, a copy of which may be obtained by contacting the Division; and (c) Indian tribes or authorized tribal organizations. Packet Page -1366- 2/12/2013 16.C.1. (2) The Division shall notify potential applicants of the availability of HMGP funds by publishing a Notice of Funding Availability in the Florida Administrative Weekly. (3) Applicants will have not less than ninety (90) days from the date of notification to submit project applications. The opening and closing dates will be specified in the Notice of Funding Availability, and applications must be postmarked or stamped in at the Division no later than 5:00 p.m. on the final due date. (4) A letter shall accompany each application from the Chairperson or Vice - Chairperson of the LMS Working Group endorsing the project. The endorsement shall verify that the proposed project does appear in the current LMS and state its priority in relation to other submitted projects. Applications without this letter of endorsement will not be considered. (5) Applications must be submitted using Form No. HMGP /FMA -001, State of Florida Joint Hazard Mitigation Grant Program & Flood Mitigation Assistance Application (Effective Date September 30, 2001), which is incorporated into this rule by reference, a copy of which may be obtained by contacting the Division. (6) If the Division receives an incomplete application, the applicant will be notified in writing of the deficiencies. The applicant will have thirty (30) calendar days from the date of the letter to resolve the deficiencies. If the deficiencies are not corrected by the deadline the application will not be considered for funding. (7) Applications are to be delivered or sent to: Division of Emergency Management Bureau of Mitigation 10-IN, 2555 Shumard Oak Boulevard Tallahassee, Florida 32399 ATTENTION: Hazard Mitigation Grant Program Rulemaking Authority 252.35(2)(x) FS. Law Implemented 252.311, 252.32, 252.35 FS. History-New 2- 24 -02, Formerly 9G- 22.007. Packet Page -1367- 2/12/2013 16.C.1. From: Balmer. Adele �.� To: Price]ames Subject: Poverty/Minority Date: Thursday, December 20, 2012 2:12:55 PM Hello Mr. Price, I looked up poverty status and minority status in zip code 34104. 1 found 13.9% minorities 11.2% below poverty level This information was obtained through the US Census Bureau American FactFinder 2007- 2011 American Community Survey 5 -Year Estimates on Dec 20, 2012. The information provide is enough for the application. Please feel free to contact me if you have any additional questions. Sincerely, .Adele Balmer Environmental Specialist, Mitigation ^ Florida Division of Emergency Management 2702 Directors Row Orlando, Florida 32809 -5631 Office: (407) 856 -5019 www.floridadisaster.orZ Packet Page -1368- 2/12/2013 16.C.1. ,Quality Assursanci Aepresentatige aloe Lr€ ns. Address /Phone /E-mail X34 JaTJUS4fi ernational Blvd. n�etc ala'`3A30179 fl�'St`a2= '2.$50 EIC� °$f�4 �alcellC�jafsusintl,t�om, Category Exterior Doors Subcategory Roll -Up Exterior Door Assemblies Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed Florida Professional Engineer 7i Evaluation Report - Hardcopy Received Florida Engineer or Architect Name who developed the JOSEPH H. DIXON Evaluation Report Florida License PE -7768 Quality Assurance Entity National Accreditation & Management Institute, Quality Assurance Contract Expiration Date 12/31/2015 Validated By Gordon Thomas, P.E. Validation Checklist - Hardcopy Received Certificate of Independence FL12230 R1 COI Financial Index 030209.odf Referenced Standard and Year (of Standard) Standard ANSI/DASMA 108 -02 ASTM E330 -02 Equivalence of Product Standards Certified By Sections from the Code Packet Page -1369- Year 2002 2002 = olwBi..,cjJdit!11°Iii4 BCIS Home Log In User Registration !. Hot Topics Submit Surcharge Stats & Facts Publications ! FBC Staff BCIS Site Map Links Search Busines ' l Profess ID`dI Product Approval USER: Public User Regulation Product Approval Menu > Product or Application Search > Application List > Application Detail r� J:la FL12230 =.R1' Fpl�atiOtf��<Ype: i� @i±lSftlil Cc3d>relsic�nUl#i ' Ppllcation Status Approved Comments Archived 77, , Product Manufacture' 3SDooI And �uildi g Components AddressjPhoo�lEma l 134 Jatrus 3ntematlonaI Blvd. °Tenaple'�GA:30179 770) "562=2850 Bxt360'; curtsojapuslntl com Authgrized Signature CUAis;5chroeder outis nuslntl,tnm Ter "linical-iRepreseAtative unit c ecler APdresPlaonelEmail3 Janus 36teriiatonal lslvd. "T an fi 30199' 7 5� X850 361) 4 ur#s"pusintl.com' ,Quality Assursanci Aepresentatige aloe Lr€ ns. Address /Phone /E-mail X34 JaTJUS4fi ernational Blvd. n�etc ala'`3A30179 fl�'St`a2= '2.$50 EIC� °$f�4 �alcellC�jafsusintl,t�om, Category Exterior Doors Subcategory Roll -Up Exterior Door Assemblies Compliance Method Evaluation Report from a Florida Registered Architect or a Licensed Florida Professional Engineer 7i Evaluation Report - Hardcopy Received Florida Engineer or Architect Name who developed the JOSEPH H. DIXON Evaluation Report Florida License PE -7768 Quality Assurance Entity National Accreditation & Management Institute, Quality Assurance Contract Expiration Date 12/31/2015 Validated By Gordon Thomas, P.E. Validation Checklist - Hardcopy Received Certificate of Independence FL12230 R1 COI Financial Index 030209.odf Referenced Standard and Year (of Standard) Standard ANSI/DASMA 108 -02 ASTM E330 -02 Equivalence of Product Standards Certified By Sections from the Code Packet Page -1369- Year 2002 2002 2/12/2013 16.C.1. Date Submitfed 02/23/2012 fiat ,uaiidatert 02123/2P12 pate diing FH a4ppmval X2/29/2012 :date Appfvued 641,03/2012 Summary of Products FL # Model, Number or Name Description 12230.1 501_502-30 ROLL UP SHEET DOOR WITH NYLON WINDLOCKS. MAXIMUM WIDTH 8 8 Limits of Use Installation Instructions Approved for use in HVHZ: No FL12230 R1 II 32003 Install 501- 502.Ddf Approved for use outside HVHZ: Yes FL12230 RI II 501 502 - 30 - 104.Ddf Impact Resistant: No Verified By: JOSEPH H. DIXON JR. PE -7768 Design Pressure: +28.0/ -30.0 Created by Independent Third Party: No Other: NOT FOR USE IN HIGH VELOCITY HURRICANE ZONE. Evaluation Reports FL12230 RI AE ER -09- 0003 -R.Ddf Created by Independent Third Party: Yes 12230.2 501_502 -42.2 ROLL UP SHEET DOOR WITH NYLON WINDLOCKS. MAXIMUM WIDTH 101-01, Limits of Use Installation Instructions Approved for use in HVHZ: No FL12230 RI II 32003 Install 501- 502.Ddf Approved for use outside HVHZ: Yes FL12230 RI II 501 502 - 42 - 120.Ddf Impact Resistant: No Verified By: JOSEPH H DIXON JR. PE -7768 Design Pressure: +39.6/ -42.2 Created by Independent Third Party: No Other: NOT FOR USE IN HIGH VELOCITY HURRICANE ZONE. Evaluation Reports FL12230 RI AE ER -09- 0003 -R.Ddf Created by Independent Third Party: Yes 12230.3 651 -28 ROLL UP SHEET DOOR WITH STEEL WINDLOCKS. MAXIUMUM DOOR WIDTH 20' -0 ". Limits of Use Installation Instructions Approved for use in HVHZ: No FL12230 RI II 32003 Install 651.odf Approved for use outside HVHZ: Yes FL12230 R1 II 651 - 26 - 240.Ddf Impact Resistant: No Verified By: JOSEPH H. DIXON JR. PE -7768 Design Pressure: +26.0/ -28.0 Created by Independent Third Party: No Other: NOT FOR USE IN HIGH VELOCITY HURRICANE ZONES. Evaluation Reports FL12230 R1 AE ER -09- 0003 -R.Ddf Created by Independent Third Party: Yes 12230.4 651 -37 ROLL UP SHEET DOOR WITH STEEL WINDLOCKS. MAXIMUM DOOR WIDTH 16-0 ". Limits of Use Installation Instructions Approved for use in HVHZ: No FL12230 RI II 32003 Install 651.Ddf Approved for use outside HVHZ: Yes FL12230 R1 II 651 - 37 - 192.Ddf Impact Resistant: No Verified By: JOSEPH H. DIXON JR. PE -7768 Design Pressure: +37.0/ -37.0 Created by Independent Third Party: No Other: NOT FOR USE IN HIGH VELOCITY HURRICANE ZONE. SEE Evaluation Reports DRAWING FOR VARIOUS PRESSURES VERSUS WIDTH. FL12230 R1 AE ER -09- 0003 -R.Ddf Created by Independent Third Party: Yes 12230.5 652-30 ( ROLL UP SHEET DOOR WITH NYLON WINDLOCKS. MAXIMUM WIDTH Limits of Use Installation Instructions Approved for use in HVHZ: No FU223Q R1 LF ZQ03ingtafl t152aidf Approved for use outside HVHZ: Yes FL12230'Rl Th 652:- 30 = "1=44.-Ddf Impact Resistant: No Verified By: JOSEPH H DIXON JR. PE -7768 Design Pressure: +28.0/ -30.0 Created by Independent Third Party: No Other: NOT FOR USE IN HIGH VELOCITY HURRICANE ZONE. SEE Evaluation Reports DRAWING FOR VARIOUS PRESSURES VERSUS WIDTH. FL12230 RI AE ER -09- 0003 -R.odf Created by Independent Third Party: Yes Contact Us :: 1940 North Monroe Street. Tallahassee Fl. 32399 Phone: 850- 487 -1824 The State of Florida is an AA /EEO employer. Coovrioht 2007 -2010 State of Florida.:: Privacy Statement :: Accessibility Statement :: Refund Statement Under Florida law, email addresses are public records. If you do not vent your e-mail address released in response to a public -records request, do not send electronic mail to this entity. Instead, contact the office by phone or by traditional mail. If you have any questions, please contact 850.487.1395. *Pursuant to Section 455.275(1)' Florida Statutes, effective October 1, 2012, licensees licensed under Chapter 455, F.S. must provide the Department with an email address if they have one. The emails provided may be used for official communication with the licensee. However email addresses are public record. If you do not wish to supply a personal address, please provide the Department with an email address which can be made available to the public. To determine if you are a licensee under Chapter 455, F.S., please dick here . Product Approval Accepts: ... "... Packet Page -1370- C S � S� O _> Co �W r u 0 x�� C m N` X c n \moo •-raw 2 SJ dew T C , C O O W a2 1- w O U V 0 D O C Y m � l —'o i L o Z y amo o p m O + 1j V1 x - y d Ov `� O m N m E 01 a jm Op p H N a W W 11 G 2/12/201316.C.1. c v o 0 V 7) N ° o m Y J n O ° w c p ° L O V �0.c W C p c c �•� m ✓ y N V L x 0 N ¢i •r r2�w 0 o U --m -C VN rn O � t •'S v a 2 SJ dew T C , C O O W a2 1- w O U V 0 D O C Y m � l —'o i L o Z y amo o p m O + N � 01 ° g m V1 x - y d Ov `� O m N m E 01 a jm Op p H N a W W po Q `S a p 2/12/201316.C.1. c c o 0 z u ° o 0_.1 Iz - c p ° L O V C p CL N n N m E 70 m o w om5 2 0 �z x 0 N ¢i 3Q-Oo'C 0 o tt tis O o Li o O M O V) Os �f Z t E ^ ' II Q pa po 17 d N n l c co p U vl � (• /1 ♦i�J 2 SJ dew T C , C O O W a2 1- w O U V 0 D O C Y m � l —'o i L o Z y amo o p m O + N � 01 ° g m V1 x - y d Ov `� O m N m E 01 a jm Op p H N a W cii �p ' po Q `S a p o o u c c 'v m o E ° Y o c U n m VO c p ° L O V C p -0 - ` moo N n N m E 70 m o M CJ O ,Q °° d x 0 N ¢i 3Q-Oo'C N E O O M O V) Os �f Z �= o E- w ® E-+ r o li N � O 1 mw•� • • � 0 n p TT7 U, (J �� o G p_ J O -► 10 0 O 0 o e • • z CY •••►i O z o LJ lJf A••• f swot! o o it w � Cu O J Lr) a c 5 ?— W zaa� ¢0w0 Z ;n O mO i� P N m O N V V,m U c � Y m O O Packet Page -1371- 6 M "7 O � N N O LO N F E- < n V R.' _ Q U o 0 �J �• f j Q i o1z `4V C) «` • 7 d� v o o u o° o O U t L CO Q N w Cy�3N � �t00— M CJ O ,Q °° d x 0 N ¢i O Z �= o E- w ® E-+ J W � mw•� 0 U, G p_ J O oN (n W 5 ?— W zaa� ¢0w0 Z ;n O mO i� P N m O N V V,m U c � Y m O O Packet Page -1371- 6 M "7 O � N N O LO N F E- < n V R.' _ Q U o 0 �J �• f j Q i o1z `4V C) «` • 7 d� 2/12/2013 16.�. . :OL000r. MODEL 652 DOOR INSTALLATION INSTRUCTIONS I I (�7 1 9dildirt Components - 5V-2F50 RIGHT BRACKET WARNING SPRING - H F L Ai 1 ii .l Fk 11 Ar I I ( 11 F L DRUM- A (AN SPIRALTUBE E I i) I I P R F E,--,', H_', I AL. SPRING BRACKET Cj) U-BOLT @r AXLE 0. SADDLE 17 LEFT DOOR BRACKET @ ROLLER CHAIN 19 'PROCKET 20 AXLE ` CENTERLINE 'R CHAIN HOIST BRACKET (UNIVERSAL) OPTIONAL CHAIN HOIST HEAD STOP WEAR STRIP LEFT DOOR GUIDE 0 11111H4., CHAIN LOOK PREPARED JAMBS BY OTHERS BOTTOM BAR - GUIDE "LEAD IN" 0 HEAD STOP RIGHT DOOR GUIDE 0 NYLON WIND LOCKS SPACER 71&, LOCK SLIDE 20" DOOR SHEETS LJ BOTTOM BAR ANGLE VINYL WEATHER STRIP OLIFT CLIP IMPORTANT REMARKS Wjj I y. BE INSTP1,," A� p _'t'r' WHEN T( I. M 44 4 U FA. I N E T E I, S, P T, F0 � EF Di L ''E[ A f E V 1. W 3,Lk. 1 N PlPif-)R HQ '_7JAPT,tk' A�,T' Packet Page -1372- P D E rr M Rkl J D El: IS FimTi( '0 AF� 5, 00, PH i U S M �0 I I t I T I _T r'.2 --- L" E P F, I T7 R 1.1 L R A!� I- A AL -, ;� Ij H k"' IT .4 r R A 4,� El H, )117� I C C', OR L T E Wiff Vii( _17 - - ------- - - - --- ­- - L _2 IJ 1Q 'a F I . . . . ...... I L ;7 -7 7 jr i- -------- ...... H01' -4 T _jM, ....... . . . . Packet Page -1372- 2/12/2013 16.C. U.61.0oo f 652DOOR INSTALLATION INSTRUCTIONS.. & 1 Components a Vti W_i DOOR SUPPORT BRACKET LOCATION TABLE STEP 1 CHECK DOOR OPENING CHECK THE WIDTH AND HEIGHT OF THE DOOR OPENING AND VERIFY THE MEASUREMENTS AGAINST THE SIZES SHOWN ON THE DOOR PACKING SLIP. CHECK BOTH DOOR JAMBS FOR PLUMB. CHECK HEADER AND FLOOR FOR LEVEL. CHECK TO BE SURE THAT THERE IS SUFFICIENT CLEARANCE AT THE JAMBS AND AT THE HEAD (SEE TABLE AT RIGHT). STEP 2 INSTALL SUPPORT BRACKETS FROM DIMENSION ON TABLE AT RIGHT, MARK THE LOCATION FOR DOOR SUPPORT BRACKET, 1F THE DOOR WAS SUPPLIED WITH A CHAIN HOIST USE THE DIMENSIONS SHOWN FOR Al ON THE SIDE HOIST IS TO BE INSTALLED. IF OPENING IS GREATER OR LESS THAN SHOWN ON THE PACKING SLIP, ADJUST THE Al AND A2 DIMENSIONS TO COMPENSATE FOR THE DIFFERENCE. IF OPENING IS MORE THAN 3/4" WIDER THAN SHOWN ON PACKING SLIP THE DOOR WILL NOT WORK. THE EDGE OF THE GUIDES WILL EXTEND INTO THE DOOR OPENING. MARK FOR HEIGHT LOCATION OF DOOR SUPPORT BRACKETS BY USING DIMENSION "C VERIFY THAT THERE IS AMPLE CLEARANCE ABOVE THE BRACKET, DIMENSION "D'. IF CLEARANCE iS NOT AVAILABLE, YOU CAN LOWER THE BRACKET TO OBTAIN THE REQUIRED SPACE. THE DOOR WILL HANG IN THE HEAD WHATEVER DISTANCE YOU LOWER THE BRACKETS IT WILL BE NECESSARY TO CUT CLEARANCES MINIMUM SIDE ROOM MINIMUM HEADROOM Al A2 B C D DOOR HEIGHT HAND OPERATED -PULL ROPE UP TO 10' -0" HIGH 5" 5" 19.5" 9.5" 10" Al I A2 I B I C D DOOR HEIGHT CHAIN OPERATOR- REDUCTION GEAR UP TO 10' -0" HIGH 6" 5" 19.5" 9.5° 10" 10' -1" TO 14' -0" HIGH 6" 5" 21.5" 10.5" 11" 14' -1" TO 16' -0" HIGH 6" 5" 23" 11" 12" D B C DOOR SUPPORT BRACKET SIDE VIEW CEILING s l SSEtJtBLS'•.. ® I:INTEL �HW R _ Ss5E;VA6F Al 'SM0 '. 2 THE SAME AMOUNT OFF THE BOTTOM OF BOTH GUIDES ONAI51 -N-1 AND RE -NOTCH FOR SLIDE BOLT LOCK CLEARANCE. NOTE: "'(Z; f/ V!!{, t !� REDUCED DRIVE CHAIN HOIST MAY BE ON` Yi�t�'W SIDE. FASTEN DOOR SUPPORT BRACKETS TO BUILDING WITH VERIFY WITH DOOR ASSEMBLY. FASTENERS SUPPLIED. USE A FASTENER IN ALL HOLES OF THE SUPPORT BRACKETS. OPTIONAL CHAIN HOIST STEEL JAMBS USE: 3/8 "x 1 1/2" HEX HEAD BOLTS. IF DOOR 1S TO BE CHAIN HOIST OPERATION, INSTALL MASONRY JAMBS USE: concrete screws 1/4" x 1.75" SPROCKET ON APPROPRIATE END OF DOOR BEFORE LIFTING NOTE: 3/8" "DIAMETER THROUGH BOLTS (NOT SUPPLIED) DOOR INTO POSITION ON BRACKETS (SEE FIGURE 2). ARE REQUIRED WHEN MOUNTING TO SOFT BRICK OR ACCESS TUBE BLOCK. IF STEEL MOUNTING PLATES (OPTIONAL) ARE TO HOLE SHAFT BE USED, ATTACH MOUNTING PLATE TO BUILDING AS 1 SHOWN IN FIGURE 1. / _STEEL BUILDING JAMB `WELDS -, DOOR— OPENING 2 J., �3/4. FIGURE 1 OPTIONAL 7'x 12% 3/16" STEEL PLATE ON NON HOIST SIDE. 7 "x 24 "x 3/16 STEEL PLATE ON 1/2" I REQUIRED D BOLTS f 7 11 / j a — HEX NUT LOCK WASHER CHAIN HOIST SIDE. CHAIN \ DRUM HOIST NOTE: WIND LOCKS NOT SHOWN SPROCKET 1 ( FIGURE 2 1 5/16" DO NOT CUT BANDS WHICH HOLD DOOR IN A ROLL. IF BOLTING USE YOU WILL BE TOLD AT A LATER TIME EXACTLY WHEN (3) -3/8 "BOLTS TO CUT THEM (STEP 6). NO GUARANTEE WILL BE GIVEN NOT SUPPLIED OR RESPONSIBILITY ACCEPTED BY MANUFACTURER IF DOOR IS NOT ERECTED AS INSTRUCTED. FOR PERFECT OPERATION FOLLOW INSTRUCTIONS GIVEN. PLEASE REVIEW ALL INSTRUCTIONS BEFORE STARTING ACTUAL WORK. Packet Page -1373- a 9-di "i Components '­"' :-17C!� 'III- °)j 2/12/2013 16. .652DOOR INSTALLATION INSTRUCTIONS I C.1. STEP 3 LIFTING THE .DOORASS.E.M.B.L.Y. PAD'Jlrjl_� 4,7C 'PJ L4 -.7 jtv j _A[)[)L[ G'A�) Or A L 'A M M E ',j ARE -41 i f POF2TANT 'Vv, 'A- ov 11 F t AR17 I j w%,­inu7,in­ I — STEP 5 PRETENSION THE D - OOR SPRING - S APPLY T L _ETF z tE. F 5B T' A M 0 UI IT L f"l C II E F F; L F A 7 DJU'l VIEHT "PR'll ',N L El`_ %% -TAPE F,j �;l7 Tj,' -000 , • STAT v- E-OF 0 0 "Z oIiivl� //"70NAL FIGURE 5 STEP 6 REMOVING TAPE 8, PLASTIC WRAP 7-17- ............ ............ . .. ...... ... ... . TH r! , -A� L Tt-,F� T � � �;,: C E F113;-IFF F 1H, L CAUTION: SPRINGS ARE UNDER TENSION AND DOOR COULD UNWIND IF LET GO. MAINTAIN COMPLETE CONTROL OF DOOR] M' P Hi -,"r T"' Tf Jl�p UNI"L L A PROr 11 Packet Page -1374- 2/12/2013 16.C.l. uu Ooor MODEL 652DOOR INSTALLATION INSTRUCTIONS i i Components STEP 9 cant STEP INSTALLI G_GUIDEP_ HE EPC�r THE PTAIN 1 P Q h A 1 A I IF I Ci P P E 1� 11 t 1PA! I ki(� SPIRIT LEVEL t I F + II.Elf -17 FASTDd G U IDES VMQ AWN Ry MF-T&ING UP -YEW! MIS TALL -'-'.,HAIN OF 4 FEET ABU 1 a " --,4 01, BUILDW- OTHEFS TiP.) I ENE OF i u7;T FIGURE 7A STEEL JAMBS MB M nA& PWFNER�_ INSTALL CHAIN ­E_IAIN k r.Ll+ .,tjF`F'LJ-ED) AFIDROXIMMM y FEET AB,NF FLOOR C I 1?1w — 001 NOW 6k 04, 00 NO z 7768 COIL SIDE E FIGU A I I W E 1 11VAD TGH7 7Pz� NASA's jQwK%* 9C PLA F 11 L&OnEN WLI SADT LF .� 4ND jL. EAMN F )" SA, ��: E TFI,1 SIC.-;*j, LET UP FLY EST TE1150N (FGL+l Y, 9D TIGHTEN AXLE _,ADDLE T(, 40 FOC� PuUt�D7­. 47' Pc STEP 4, THE" TEST D03P FOR Dm?PEP R&OAfir REPEAT f Fr�jP HEM E 111 TALL. :HAft,,, ti.�t7)T iF RE,Di,PEL). STEP 10 INSTALL SLIDE POLT LOCKS INEJAL,_ �LILDE &C�L'I A=';E, Li-71 P11P A-, 11--iud(AT-LL 0 I clori 4 W# F_ OU"H STEP 11 INSTALL LIFT CLIP (Manual Operation Only) 11j'_,,1ALL `F-ENTEP L!F1 A!![ 'V_ Packet Page -1375- FIGURE 11 T STEP 12 CHECK OPERATION OF DOOR OPERATE HROUf�-i 7FLAT NV OPERATE ORREM" WE MUM , WA NOT WAMER R FIGURE 1 NUF DQQ NOT CPEPATE PF,__­_-, PVOI,, OR BOW, REPA:P - �!P PC- FLAi, T GUIDES F TWI SSi E , CHED HE DOOR STEP 9 CHECK AND ADJUST BALANCE _ 1. CHECE BOTH DOOR MOS QE PUMB ADJIJ5T Q "ENVT'�,D `' 'W E EA: , Qj n4jr_ .- L,. MORE TEN SHAI 3. MFIRM THE MOUNING SURFACE T AN[ 4r AD-01iST THE "LE AE', IN" (N,11 7�%- i�,F EAt-H! '�i-PiDEL; BE4[� LL50 TENSM AT A NY AME, 5, AN, GUM& SET TO V E .q To NARROW? THERE SHOULD BE A 3,11,C 10ACE BrTWEEk EQ QT 1UPIAIN AN0 BAlk IF C I j i-PTA I N 1. VEFiF( "Hr-'-_ TriE 45 E L EVE I V 4 VVXT F Q P '"ka Ev, jin Dw LEVEL 9P LASER LE EPA, KETT "In/ 7 L W M47F 0EQUT E DGnF 2 CONTOV THAT TvE :OPPENT HEIGHT M.E A F K Ov nH Q 1 HE Dow" RDU, PAGE 2 CW THF 1171TPUCITH EGO, M: VF A� FE� 0E: 1 in E THE TDP US bv- wwo 0 nw�wt M Q� no OWL, T Packet Page -1375- 2/12/2013 16.C.1. Packet Page -1376- BOARD OF COUNTY COMMISSIONERS 3299 TAMIAMI TRAIL E STE 700 NAPLES FL 34112 JAMES PRICE 2/12/2013 16.C.1. Customer Proposal Proposal Date 11115/12 COLLIER COUNTY WATER DIST. DEPT 4370 MERCANTILE AVE NAPLES FL 34104 Salesperson: Paul Couto 239-707-4723 16 1Ox12 652-30 WHITE. CHAIN HOIST 16 1Ox12 652-30 WHITE. RE-CONNECT EXISTING OPERATOR 1 12x12 652-30 WHITE 33 'STEEL' MOUNTING PLATES 16 SPROCKET FOR EXISTING OPERATOR 33 REMOVE OLD DOOR US Door 651 roll-up steel door designed to meet 130 MPH windload by using windlocks on curtain and heavy duty ,guides with windlock bar; hot-dipped galvanized steel curtain with baked-on polyester primer paint. Minor ,scratches are not considered to be a defect. Choice of 20 standard factory colors. INCLUDES: INSTALLATION AND ONE YEAR GUARANTEE ON PARTS < LABOR. 7'hanAr vau for vour bustness I Behind our work is more than just our great name -there's me, George Ebel. ff at any time you feel you did not receive a fair value Call me at 1-800-376-36, AFINANcE cHARGE Or 1%=% witt tie acoaditnot pai0viterin 30 days (ANNUAL PERCENTAGE RATE OF 113%�Areasonag+aco0ecuon tGOWS15,00 Plus W1 collection costs ana aftorne0ess M11 be patip ff Sultis bfoL_ ornotASERSA--E CHARGE OF 53 ' 00wil be addec'To ali accounts less Man SM-OD it not paid tinnin 30 gays Af�**44CE C++ARGE OF I %%V6fT be addecito a=,UnIS S200.00 Ormore ffnutVa1dW1Vun3G Oiwys CANNUALPERCENTAGE RATE OF 18%,-Areasonaoie coilechorifee of $15.00 Pius aft court msts andreasnable, attorney fees wrill be paid by creditor. THE TERMS ART) CONDIT09S PRINTEDORTHE BACK HERE OF ARE HEREBY ESPRESSWILY MADE APART OFTMSCONTRACT. ACCEPTED BY SELLER* ACCEPTED BY BUYER: BY: 'StaNsG,' DATE ACCEPTED: fTHM IS DAM OP `r+kM CONM r-T -17 Packet Page -1377- i�R"Cr 4"1W mt. ",Nil 11360 Metro Pkwy 275 Airport Rd N %)y Ft Myers, FL 33966 Naples, FL 34104 Fa�f4A� A& Phone-, 239-768-3667 Phone: 239-643-3667 APOOR&GA7E Fax: 239-768-3740 Fax: 239-643-4467 -74, 7� 'n.-' www.ActionDoor.com 800-375-3667 Customer: BOARD OF COUNTY COMMISSIONERS 3299 TAMIAMI TRAIL E STE 700 NAPLES FL 34112 JAMES PRICE 2/12/2013 16.C.1. Customer Proposal Proposal Date 11115/12 COLLIER COUNTY WATER DIST. DEPT 4370 MERCANTILE AVE NAPLES FL 34104 Salesperson: Paul Couto 239-707-4723 16 1Ox12 652-30 WHITE. CHAIN HOIST 16 1Ox12 652-30 WHITE. RE-CONNECT EXISTING OPERATOR 1 12x12 652-30 WHITE 33 'STEEL' MOUNTING PLATES 16 SPROCKET FOR EXISTING OPERATOR 33 REMOVE OLD DOOR US Door 651 roll-up steel door designed to meet 130 MPH windload by using windlocks on curtain and heavy duty ,guides with windlock bar; hot-dipped galvanized steel curtain with baked-on polyester primer paint. Minor ,scratches are not considered to be a defect. Choice of 20 standard factory colors. INCLUDES: INSTALLATION AND ONE YEAR GUARANTEE ON PARTS < LABOR. 7'hanAr vau for vour bustness I Behind our work is more than just our great name -there's me, George Ebel. ff at any time you feel you did not receive a fair value Call me at 1-800-376-36, AFINANcE cHARGE Or 1%=% witt tie acoaditnot pai0viterin 30 days (ANNUAL PERCENTAGE RATE OF 113%�Areasonag+aco0ecuon tGOWS15,00 Plus W1 collection costs ana aftorne0ess M11 be patip ff Sultis bfoL_ ornotASERSA--E CHARGE OF 53 ' 00wil be addec'To ali accounts less Man SM-OD it not paid tinnin 30 gays Af�**44CE C++ARGE OF I %%V6fT be addecito a=,UnIS S200.00 Ormore ffnutVa1dW1Vun3G Oiwys CANNUALPERCENTAGE RATE OF 18%,-Areasonaoie coilechorifee of $15.00 Pius aft court msts andreasnable, attorney fees wrill be paid by creditor. THE TERMS ART) CONDIT09S PRINTEDORTHE BACK HERE OF ARE HEREBY ESPRESSWILY MADE APART OFTMSCONTRACT. ACCEPTED BY SELLER* ACCEPTED BY BUYER: BY: 'StaNsG,' DATE ACCEPTED: fTHM IS DAM OP `r+kM CONM r-T -17 Packet Page -1377- i�R"Cr 4"1W mt. ",Nil 11Fh 111 ,11, 111 Ill { HII AIII!, � � iol 00 a a F s � k 2/12/2013 16.C.1. \� E ^a F-F 5F S FE• r• g•: Yk k a S• . -.. e I y__ + I i w i I I --- — _._.— - - — — • - -- -- --- =� a — I ez as Es! a as sa,1 ,� $ j I 3,i z ! r �c gg p p I tg5 € )) B E F skQ � 53E h A i _! 315 . 1 e ,� i a 1±21-1, ^ i E. i lI j 'Packet Page -1378- 2/12/2013 16.C.1. ': 'sIM (r90�I g ®e} eFeflII:Si YiiYea.eara y1�E�geleL�. Alk i gill >.G[i! @ 3 g 7 Oil G- - - - -- — { - - - - I J a -- - - - - - -- G- — — — — - - - - --- - - -1.1gq 6 I II i � i gyp$ YpLR Jq I � i a I � k E C" , I 1 i - -- — - --- --------------- — — - -- - - ---- - - - - -- - -- - -i — I s fie - — ra ' 4 0 j I > '144 il-i �a 3 i �4rA, ♦ � � s & +� a I' �� � �a i •E �3 � I II rl k � I f C'r-'All pp n Oil ypq� ai 1 303 S gyp -- � ; Packet Page -1379- ro � o a � 2/12/2013 16.C.1. o� Ln CD w Ln rt rt. E- Packet Page -1380- ro CL _ a z o X a Di r+ m rrD Vf y -, m L" x O d t� si _ ne Ln UO lQ W -y IM 0�9 W i1 LA kn 1 th x x x x A cu z r- n '� n A! C ani Ln Cu cn 7 O a Q +n -r4 ro rt 3 LA ro Z .a > d m ro � o a � H ro Ln Packet Page -1380- 2/12/2013 16.C.1. G1 99 b� M N .o ro ^ 1+� @ �• = k 90 to on o 3 r��n ^�. m N o D m �. x C a Q r: C �. m LA ZA m �� w tm .. n w LA Q 0 flo v i v�^i L LA rr t14 � rn t1h �`^ m n ;o v O' — m chi v %d s* _ c n 3 � < p D Z n 0 M Di 'lll� E, ��, C1 FD" D� O• 3 rn _.- m 3 ' m o � yip LA Ul -*S m n ( '° NW s Packet Page -1381- s I, C,� o c?�3z m o n1 Q "0 y r o r D I G7 O r D r7 m O{ X r D 0 m O < X mm' C m K O 4E N t ° I 0 p :E CD p 0 u3i � -!� C N. CNn. lD N a lD o CowCD Z :O ° C3 m nG) a9i »a . ° K`'^ f. ' m w m x 3o`oa'wN mN zr m f a m i :9 N 3 --. .I0N 67N D1N ^ >p i cD —n c -c) m-.om mp m to D 3 <u a a w ° m ': mto 47 N C� NO N7C 9!- ' @ ma N N a m w m n 3 3 O N C a CD �' O N 7 Q Q .:� CL p ty 0..7 ,G,n O N � C C3. N M N d� G N � A f� N C N Cj 7 t7 CLO CL � =r mO! OOIE�1�.� �. i on njoa {' 'D CL to O C7 N 7 O ma N � a a m iv CC<D 7 a �g tnmo Q. N CD n N LO7. o N !� sss o 3 a _ p .� n Q ui C m .� N m O CD a OWj a C C1 to ° N 3 CD N I -° Ol.. Cn O. a f/C N O N` a I^ a p ^ m ro o p � 7 O w N om. o p W p ca 0° t1 m ° w � Al ,17. <ro n m u� m rJ n m. ' . 3 Os' 3 -n m• v r 3 {� ; m G7 =ro W O ° .0 7 .0 ° m ° ter s a a ° )C W tOi, G• y r a N as tD a - tR w K n m .-4 = O 7 to Q m. to Qe a C m CD ti m to �Cn= ut °- = to v w m CWAI .a "G m Q 3 (D io CD tD co C7 m O1 o uN^ N W ? W Ly 7- c O .a.. C O _ S tq :. N CD C4. p CD to N Q. 0 t{D iU • � 7 Q n 3 ro s CD + N m O N II „rya m w y o CD N m 7 -� N o O YS c Cin C) T -` �' CD m tb 20 '' � lfl 7S'. 2/12/2013 16_ tJ� _ 0 0 � Y N r D G} ' m r D I G7 O r D r7 m O{ X r D 0 m O < X r 3 D Gi � m O K X -{ O C p i X 0 p O K O 4E N t ° I 0 p :E CD p 0 O. :F t0 O O a "{ i (D p ( O -!� i I p � .� t� tD � ° x �iol�m °N 5tD . ° K`'^ f. ' m w m x 3o`oa'wN mN zr m f a m i :9 N 3 --. .I0N 67N D1N ^ >p i cD —n c -c) m-.om mp 3. a) 3 W m -n cE G) 33,iID mw wo n m i G tDN °N tU m. a- LDO Oo (1) mB1 (]; m iNC O m v,N,m N Vi 7CI° ° Q °'� C7 m O N7c Nif .� N W ma, 47 N C� NO N7C 9!- ' @ ma o� OOH .N 3.7 N3 ° 301. Cb9,orCA =CD n. C O. Di bra �m (9 8n 3vim l nifc WSQ .0 7P3!f{. i 3° m= ° $.c W D•�3° A ��_O• L'� ° I ON 0..7 m G N Q ° p•. 3 0 � � j 0 Crm �(� N .-�,N O N � [[�� � n ? n 7 7 jp=j �i ° m it0 �{ � O =N cK pp - N -' tU ^�; om. N C N Cj 7 t7 CLO w G ! bl N .,.0' O m -w ° 7 m ..�; mO! OOIE�1�.� �. i on njoa {' 7��� .N-. �= N7' ?a3lmm m ^!�`a;cs°a CIO '3, ° tam 3.0° --Q O� Dlm °c3i n om�NV, 7C�7� fDm N m 7- +c ,_... ?Im �.N 37a= 'm ,� _o m {�ffr` .� pd m =' m RtD ,�6 = Q M= aN .7,. NN N C) dO 3. m O i fDO O 77iSump 7_ 1 {l J^ r Co ID '.,3.D? rL a OWm Er ° O < wa a._ID 00 �m N Cr W •aa off, O 00 O 7C, D � i11:7t1 .3-rO N p'O r :7n r a- 7 Q O K 1 O m OD �- i 7 CC : to CS = I 0 I 'O ! � o` p .� n Q ui OSi m to n n m'NN a .� N m �1 C I m 7C N ° 7C' a _ �` 3 to - _ N I -° Ol.. Cn O. a a1 a N` a I^ a p ^ m ro o p � 7 O w N om. o p W p ca 0° t1 m ° w � Al ,17. <ro n m u� m rJ n m. ' . 3 Os' 3 y r m G? ~a ro w O ° aC 1 7 .{ o. w v r 3 {� ; m G7 =ro W O ° .0 7 .0 ° Z tl �Npl °m �Nc, (D V) a , m °N sum tb N a. I a -�3 a I m ', a I(o. a - � n N ,o in om f�A N ` � m � n � J �f mm�N @,..@ ^ tAm 0a 0 i; °'3° m N C lti Y� '" �f O c i C I= N) N '3 �cu -W 11 C mC m � �m m ° �° 00. N °'ta Nom o.� chi ?3 CD 13!m �°iCw3 °_;, D m3' ° N Cam°, RL rD-0 N ( ° `< O „rn�1G p°.. `° N G. , m �G a i1/ m . C �. 9I `G *C p ' ^ p, N 2} fn I° N _tmn O . a- 7 O C ':N:A N N y' o 7^ �. 47 ° C m 0. .}� W 0 �.N W-• am.'.mC =C p [) m N m INN N�Vi W , Q:m CD G. C ©° C 3 N g 0 m CDm� � .mi• 08t1 N [y 0= n. O pepw T .owl CDNI8 W 09 a N 7 Cb CD NN O w OS NCD Ca, :An ilk CD O N /V m 0°. - 1 0 7 Ili o S a n 3. -, CS N _ -N N :. CA G NC N.. m O• n j W � N w", C0 - � Cb 1 m C o' '..' N N CD _� Z N On m ._.m G< PIX) w -S N o m C< .C•. D lD8 C. � �cCi, GCL, 0° =' CN1 OO. pN O3 I0-3. Dl . -C, tCa Nt OC^,O .. pN,I O°. Cl n� ?'O G C :G. ('� �. ! G C _ :C1 _m N O O C e C G 7 a 3 i to N N a C C= C13 N �. D D .m« .mi• "'1� «.m O O rt :,m,., -N O. N W rt0 Ca K. °) m [a a :N. O m.. •+ta N 37 -- N ! O a a m� CD. °, n` E w K. W. �-•i n ° �'° m N N „ w oo o 07' �° d I i 8• � c° Cam= 3 •chi a G° 3i'�� a p "p �• 3 w 7 a 3 m: =1 C: n i ° p ro N fm1_,. Nm < to m o -C°, rNt�, cmn 3 C m to o I m o a 7 rn tl Ci p n O C7 7 Ta i K ul m `'C G) m © x coo sp � ! D m G) : m -o n co'0 K �! •a G) m o n �co o o?� m �? �: D =L) $-ri a m � � m a o ri oG r T+. 7o CL I o as c a„v N o° a 3a C° = a�.p� o tl 3t3 ah c cry p = �� N 3o np a ;aaa 7 N 3p o ao 1ga� Z^ Gi t3 fray m' = -�- 3 iwnma o� a '5 3 w `mo oa7 al a 3 al tC,O �G _m � '��.°n x3 m '<nC'.on'�� = C1 3 m m 3-0 - ,,,,,, m - - m f0 N °tart m - tD Cb ° m o Its c a tQ C ra' ra ° t7a � tcl �` a n wSQ - ? a OA - ar' 0 w 3 2 Ci�yi N m `a m m -' m 30 m _ m - cx m m w7 ,=.. ,r ; m y'L1 Z C o 3 d• a 3 n 3 : to a' tr to m a 3 ro, o a v o Q m o v ° 3 K 3 4a 3 �c 3 to r- ^3. ^ m to+ °o. c to ra °o n j °oa m I $a G Z G� m - I� I I i1 -� I � � � x v ro m wx ro ro d m m ,m m R' N N al pn m -.m X I N m m m,o,o X! !+! �@ m w m m No T x ., . N C.,D� .. 0 m m m Dlo 7c' N W m. M to CCm} J @ 7 tU CD... CD i N CD R3 to 7 LU ' 791 CD N N CD.3 is 1 to m D) I N �. N C➢ N :tfl Ca DY N d a CD m tQ t0 D) N:w, N N CD 7 7 D D anlan ' 7' 4CL,0.° I" 7. p an�7n 3 p C1q =C7 � D N? 3 O n as � 0 � S C 1{ CZ o' Ci _0 Q o t� C') i 8 C. = O 1 n CD O , Ci I n p a CD E) C) o o 0 0 xlJ q p o c ( j j Cn W tJ CD w 0* :A : C31 w :!V /J O CD I tD tD .P m is .CS N N w ..a m �:. 6, pp11 w ; CA .ta y tJ1 t31 N N N A N -Co i M PD I C,.l Ut LX1 V iD Q C, W N .P .i O] I SfD N YT CD V V Cn ! tD is W V I. W O tD q (fl O ? V Ol W W} W w Ol Cfi G .Q - CD I V I al CJt V V N :. 01 N W I ttt f7D 'co N :P CT I N +G3 ?. °7 tD :A Cn •.i o '. % d3C V O ' � CD 1 t" w CF, Cn f,D (7 t0 crl (31 A m O N tV s1. Cfl V (71 231 W .{a : N O... w Ol ' bl Cfl CX:{%j i CD Cn :w ! •+ w CA. w ' N AA :Cn w w CT ? r -4 O 3 a 1 � I m V i w ` .P '� to CT N CD Q !!! o fl CD W.:1 CJ ( O t17 N CD -J N V i rn i t V to CA W C71 m t3 O CY, I! V [ CD as p i m -n V N _w i Co -W _ -,a bl : W Cn 'Ul -4 W -R •P • CA i47 O 41'r CD A •'f` Packet Page - 1382 - v X yr Z Z m Z m m r T m Z _C r Z V/ �r11: N .� O 00 P Y 0 C r X C V 0 o� ` t~ �r n� n 4 0 a. c i P R a F. 4 °a' II A C O^ C i c ti ti C m -n N O G tp' G2 N pOj fl} n O 7 tC) .*r R CD m 0_ p a� ctDa� = B o m N n .in 0 a O m a° m Na N ID 4n .h fn N Cn W XD w N to : w V CA Cn 0 o hmi t to cln v cn v In O O U' O Cn o Cn 0 Cn o �. � n J z tD � Op0 i m a V w � Q. w W m ©-co is m o o m p . o o Q o o O 00 o o rn s *v rn y nm m 3 o m o w m y o o C W a. n E. Rn O N �. @ j O m "o D m CD m ° c m m c' m moo° m a m m o S o d o re n Q (a & n w R! z a > O s 4n ! r � � r N ..+. Cn N V cn z W 1'+. -�. -. .P A N -+: N cn vn>ow wwcnw cna'CpwaLA 3 A N-4 o to ttr Lb CD tJ w LD +.y m 6 .p. !V w m G C a' M V W -4 O N :o (M -• 0 3>. cn N Cn C" N C) > m m M aW N c0 m 0 ib 0- cn ACA N -� V V Z j w Cs '3i CO t#7 .P m m M FD Cn O N CO W N N N V m CD W -I N 'a CO .t> N C7 W -4 Cn N N m .�...y'T W V <cc N N-4 . A W O V m W N N N N V tp -m r 0 ?> 4s+p %� rnrnmrn -N t�oau�ww �rnN•ar Q Cn 0 w O m v M o O �' to al w [VD O o -4 o� N cc f Q 4fl n N..u. C!'' .ji C7�. Cn �. •-` N -' :.N N W :? w w Cn'O ^C Cry Cs] tV p, 0 0 .� cn cn o a o w o 0 0 cn o rn cn rn a G ;C1 4A r 4A n m wNmvo ,I O j onN mmw -.Nw� o -n �d :P 'N W -i Cn 'V -� O (b m -d to in 6 cn p� CD Cncs+oo Z Nu'o u'ocnocaoOO m' o Ch 0 N. Cn Cn � � cr'N wwmJ, w ow w mN to o to 0 0 00 m Cn Cn O cn O Cn m O o 0 m Packet Page -1383- 2/12/2013 16.C.1. °_��_ CD 0 0 tD C7 ID� P s O 'T 0 O�. N -It 0:r p ' CC :CD p p 3om� 'N C o 'o Co i m � .19 Ell <' -.m m m o m m N N •p Cp tr- n ro O - • �ron D N N W m o r a O NN -r ?R »N cr m n 0 2 L CD y o ° m f° w W 3 C— 8 yr W. OVJ N tai C7t7� m m N Z! O ri. a: Co wC tD N �' a CD CD � v+ro N N, 0 40s ? -+. 9 7R K Cn P, � z rn CD CD C -°" O Q 7 R U iDBo ° Cn � �Nm m � � o x8 v m CD N A > _ c D �• Cn ID a O T p Cl O r m Ono 0 < < R � Snc ovC Nm CNu 'A to p o y p^ c Im CL Cn - O .CRP .Na W N .: CO o N ro - ;: M f O Cn {y9 Z . o 4f3 'rl N CD p CD o w = O @ mpcoom:,r s a m � m Cr 4s cea w o m . TJ Cr C3 � CD C) N o �• °. 6 0, ET nR3 W FEE - = » C n b CD (A m 4 to m Cn ar NnaNID m �KN` n (3yy N rn �...p A w O W A m a D v" Q w O o O N CD A -Cl N Cp n CD W CD ro. _ _ -„ n x �. CD D -tp 69 3 Cp N R >> 'ran°' C o 4A Co �3 ma o'= C 0Mm mwR- m onwao�oO 3 m nW oNn Cl) �o0 m =0.po� O ro mccu Ern W mo m m mmm =p Q �� =s-«Rm a= -0 C) fn 0 0 m . C _ m CRD o °' _ z _. R CP N {i 0 71 m d. W W Q. 0', N Ito n m rn Co w m y N 5'� CD m 1c = R�. 5_ �a `° m �v3 0 v F),mo 5 3 == 0 °� a W w m m o g w n o Q pi N w A p ' 3 w CD C CD m CDCDc @ C) R n p? p= CL o o O a C o:= � o CD m C O -- CS, (r Vd D .'0 o ao`y goo d == Cn ° cc ED O CR o 4n C� C. m to _ r- �• n p �. CD C: CD= 54 91 `� C D 0 Ln C6 0 a n -pi N p p N? Ec M Cn cn m o o CA CD o Q s CD sc0 c = 0 CL Cm CD �- acnra 2 - ° 6 � L N wcp)pCCpc NCn -N CD n r1 000 3 th m iD to CD CC :03- 'nacomS5 O tEP. a @ =�'n tp rn s *v rn y nm m 3 o m o w m y o o C W a. n E. Rn O N �. @ j O m "o D m CD m ° c m m c' m moo° m a m m o S o d o re n Q (a & n w R! z a > O s 4n ! r � � r N ..+. Cn N V cn z W 1'+. -�. -. .P A N -+: N cn vn>ow wwcnw cna'CpwaLA 3 A N-4 o to ttr Lb CD tJ w LD +.y m 6 .p. !V w m G C a' M V W -4 O N :o (M -• 0 3>. cn N Cn C" N C) > m m M aW N c0 m 0 ib 0- cn ACA N -� V V Z j w Cs '3i CO t#7 .P m m M FD Cn O N CO W N N N V m CD W -I N 'a CO .t> N C7 W -4 Cn N N m .�...y'T W V <cc N N-4 . A W O V m W N N N N V tp -m r 0 ?> 4s+p %� rnrnmrn -N t�oau�ww �rnN•ar Q Cn 0 w O m v M o O �' to al w [VD O o -4 o� N cc f Q 4fl n N..u. C!'' .ji C7�. Cn �. •-` N -' :.N N W :? w w Cn'O ^C Cry Cs] tV p, 0 0 .� cn cn o a o w o 0 0 cn o rn cn rn a G ;C1 4A r 4A n m wNmvo ,I O j onN mmw -.Nw� o -n �d :P 'N W -i Cn 'V -� O (b m -d to in 6 cn p� CD Cncs+oo Z Nu'o u'ocnocaoOO m' o Ch 0 N. Cn Cn � � cr'N wwmJ, w ow w mN to o to 0 0 00 m Cn Cn O cn O Cn m O o 0 m Packet Page -1383- 2/12/2013 16.C.1. ffo- CD 0 0 tD C7 _. C6 CD y C P s O 'T 0 O�. N -It 0:r p ' CC :CD p p a- n. p o 'o Co =iii R CD o(� D -0p d D.0 ("4. o m O G to tr- n ro O - • �ron D N m cu ?R »N cr m n �°s.•c�` L�. C :R W 3 C— 8 W. OVJ N -y CD CD a p.. O7 {71 ? N v+ro N N, 0 40s ? -+. 9 7R K Cn P, � z o Cp .a m N Cn m x_ �Nm a� CD zwaro =vm A > m I to fl Cn ID a Q Snc ovC i W c Im °moo Cn Co .Na ^� Cn N N Q . Cn {y9 Z . o 4f3 'rl N CD p CD o V in cn iv uy @ mpcoom:,r s a m � m Cr 0 w o m CD CL Ca C) 4R3. P:, -n - , FEE - = ^J N CAD o m Rs �..: C57 CD 4 to m Cn ar m c .o o O rn N W,<, Rw js m.�-. tJ w CD N : to =r p Cn Cn W Cn .Co Cp n CD W CD ro. _ _ -„ n x �. CD 4A -n JR 28200- 69 Co to V Ri :V. � p, = -%9 p p CD - x " .o• E- to rn s *v rn y nm m 3 o m o w m y o o C W a. n E. Rn O N �. @ j O m "o D m CD m ° c m m c' m moo° m a m m o S o d o re n Q (a & n w R! z a > O s 4n ! r � � r N ..+. Cn N V cn z W 1'+. -�. -. .P A N -+: N cn vn>ow wwcnw cna'CpwaLA 3 A N-4 o to ttr Lb CD tJ w LD +.y m 6 .p. !V w m G C a' M V W -4 O N :o (M -• 0 3>. cn N Cn C" N C) > m m M aW N c0 m 0 ib 0- cn ACA N -� V V Z j w Cs '3i CO t#7 .P m m M FD Cn O N CO W N N N V m CD W -I N 'a CO .t> N C7 W -4 Cn N N m .�...y'T W V <cc N N-4 . A W O V m W N N N N V tp -m r 0 ?> 4s+p %� rnrnmrn -N t�oau�ww �rnN•ar Q Cn 0 w O m v M o O �' to al w [VD O o -4 o� N cc f Q 4fl n N..u. C!'' .ji C7�. Cn �. •-` N -' :.N N W :? w w Cn'O ^C Cry Cs] tV p, 0 0 .� cn cn o a o w o 0 0 cn o rn cn rn a G ;C1 4A r 4A n m wNmvo ,I O j onN mmw -.Nw� o -n �d :P 'N W -i Cn 'V -� O (b m -d to in 6 cn p� CD Cncs+oo Z Nu'o u'ocnocaoOO m' o Ch 0 N. Cn Cn � � cr'N wwmJ, w ow w mN to o to 0 0 00 m Cn Cn O cn O Cn m O o 0 m Packet Page -1383- 2/12/2013 16.C.1. ffo- O CD 0 o A="o C F; cc "n Cow o CD p �°s.•c�` L�. C :R CD a 3 M m Z �Nm mm oty Z °moo 0 CIDT D M d CD 0 5 C. a C) 0 FEE - = � % 0 N Cp to 0 0 "m r 8 @M ^° m 3mm Cl) '<mI rn3CD CD Z F C C1 > CD (2 o m r 3 == n CD 0 C C.. R7 O co m D r -n (r Vd goo d == m o C r- Cn ho CD CA � m sc0 c = ro z T � L N n r1 C� v QC? m T CD m K Q 05 M �m N R R' m =7 C C m CD tn Q z Cr EF 'CD r -G mo O Cr o K = 5_ Cn w N CJ iQ cM w ro �, 0 0 K� to n N m �CD a r `D o N 3 Cr _ m to1 N N N O W O n o PUBLIC UTILITIES WEST 1ST FLOOR PLAN was I A T' ci, mm 0 92 w LLLJ BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, PLORIDA rAcimmEs mANAGEmrNr DEPARTMENT Packet Page -1385-,— 2/12/2013 16.C.1. W-11 tol**N lo-"%\ n /4n /nAd7 A^ n d G/ IG /LV IJ ID.I�. I. A (T i A v O O N GomCW� N < � D N w C N W m-C ._- IIi ca c, s oc� n i X00 liI -, m c:, O X IV N O � O W O _ 0 IV CJ �N IV fn Ca O o PUBLIC UTILITIES WEST BOARD OF COUNTY COMMISSIONERS f i , COLLIBR COUNTY. FLORIDA a 2ND FLOOR PLAN ' «'1 T -TLBN I Packet Page -1386- 2/12/2013 16.C.1. Collier County Water Distribution - Cornell Rolling Service Doors A. Materials Item Dimension nuantity Cost ner Unit Cost Rolling Steel Dr w/ Ch Hoist 10'0 x 12'0 32 1915.00 61280.00 Rolling Steel Dr w/ Ch Hoist 12'0 x 12'0 1 2282.00 B. Labor (Include equipment costs -- please indicate all "soft" or in -kind matches) Description Hours Rate 00 C. Fees Paid Include any other costs associated with the project. Description of Task Hours Rate Cost Total Estimated Project Cost $ 75399.00 Packet Page -1387- COLLIER COUNTY WATER DEPARTMENT 4370 Mercantile Avenue Naples, FL 34104 December 18, 2012 To Whom It May Concern, The Collier County Utilities Operations Center located at 4370 Mercantile Avenue is funded from user fees from the customer's of the Collier County Water Sewer .District. The current budget for FY13 is $116,700. The FY13 budget cycle is from October 1, 2012 to September 30, 2013. 1 have attached a copy of the budget as approved by the Board of County Commissioners. If you have any additional questions, please contact me at (239) 252 -6245 or via email at PamelaLibby @colliergov.net. Sincerely, Pamela Libby Water Operations ana r Packet Page -1388- 1 2/12/2013 16.C.1. Packet Page -1389- n O r r m n C a m �v m m 70 v N °W'w; • �c -n Q Co Co w Cb N j W O W W j A O A 0 O Co 0 -+ 0 N 0 W 0 O 0 O 0 0 p 0 O 0 O 0 CO Co O C O CL ..I rt imz�pCo> —' p Mz� -0 0mm� M���= m3 �m0zM Ov>M —° >z =M_ =�v om n3 ozznzo mvo�mz-iw 3 �zm� �°ycn�mmD CO) CO z m m m C m m o m z D > m > n CO) n 0 0 D O. O V eu CL 4 V v v N j J J M to fl. O 0 o N 0 O 0 O 0 M 0 W 0 M o W 0 N o CO 0 O 0 -4 o V 0 m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 O 0 O 0 O 0 O 0 O 0 O p O O O 0 O O O 0 O O O C O i I j 3 a CL CL m � V O 0 A 0 N 0 O 0 O 0 OD 0 CA) 0 U1 0 w 0 IV 0 O 0 O 0 0 V 0 O O O O O O O O O O O O O O 0 O 0 O 0 O 0 O 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Packet Page -1389- n O r r m n C a m �v m m 70 v N n A. Item Roll -Up Door W/ Chain Hoist Roll -Up Door W/O Chain Hoist Roll -Up Door W/ Chain Hoist B. 12 -Man Installation Labor Packet Page -1390- 2/12/2013 16.C.1. Materials 2/12/2013 16.C.1. Dimension 10' x 12' 16 $891.00 10' x 12' 16 $871.00 12' x 12' 1 $951.00 Labor (Include equipment costs -- please indicate all "soft" or in -kind matches) Total: Packet Page -1391- 2/12/2013 16.C.1. QuantiU Cost per Unit Cost $14,256.00 $13,936.00 $951.00 $37,954.00 Hours Rate Cost Packet Page -1392- z 2/12/2013 16. C.1. o PUBLIC UTILITIES EAST DOARD OP COUNTY COYYISSIONRRS R COLL/8R COUNTY, PLORIDA ^ p 1ST FLOOR PLAN '? ^........ ..... rrsnr p N Packet Page - 1393 -- �.,,_ r� n n lll1 2/12/2013 16.C.1. W iv m O N W x N N W N W W p _ O N po Zq N N O o_ PUBLIC UTILITIES EAST I BOARD OF COUNTY COMMISSIONERS Q COLLIER COUNTY, FLOR IDA - 0 2ND FLOOR PLAN > o•�••••••P ...�p..o.. moo oTYENT �s° n N Packet Page - 1394 - §[I -a ed I@Ped 'VO'9� c WZ U/3 Lo § | \ ƒ| § E \„ , E _ / k LL j } « ) � _ \ ( ) §� | |! ■ — c= \ � » 2 $ •£; / ° _ k © 6 ; E �E L3 ° \ © \ CD _ 2 2_Efk f Gi a LL &0 -2- ©� ° _ • � £_t / {�)� . UE 0 {! } . §% / § { #! 'VO'9� c WZ U/3 2/12/2013 16.C.1. AX d"A xmg A Vp'51 m !oa. N, ElE, 7mm�� g�' • V% TA T� J`� d. Vi n FN M Z�' , gi- 2 x1v MY iri'; W. '6 X W7. �-g D '-5N';h �V- g R JA j '4, .4 w- .. . . ...... . 'Air M-4. 'my Mr, - t-lb A T';. 7 u m @ . 3 o' To . F CL 0 B a -n M mo Ran 2 u =1w t�t 0 �µ r<.r ® C� HL I m m no m t, 0 CL � ['� [ I 1 -0 (x - p C^ 0 Cz L< 0 C C� @ s. V�' to 2C > Cf) 5'1D m po it. IT Cc CO TO 0 (D U Sil 0 Packet Page -1396- See PROJECT #: FUNDING AGENCY: FEMA AWARD AMOUNT: $28,465.50 DUNS# : 076997790 DU NS +4 #: 076997790 2/12/2013 16.C.1. FFATA Project File Form F!--A /A instructions ana worKsneet to compiete tnis BUSINESS NAME: Collier County Water Sewer District DBA NAME (IF APPLICABLE): PRINCIPAL PLACE OF BUSINESS ADDRESS: ADDRESS LINE 1: 4370 Mercantile Ave ADDRESS LINE 2: ADDRESS LINE 3: CITY: Naples STATE: FL ZIPCODE +4* *:34104 -3346 PARENT COMPANY DUNS# (IF APPLICABLE): CATALOG OF FEDERAL DOMESTIC ASSISTANCE (CFDA #): DESCRIPTION OF PROJECT (UP TO 4000 CHARACTERS): PRINCIPAL PLACE OF PROJECT PERFORMANCE (IF DIFFERENT THAN PRINCIPAL PLACE OF BUSINESS): ADDRESS LINE 1: 4370 Mercantile Ave ADDRESS LINE 2: ADDRESS LINE 3: CITY: Naples STATE: FL ZIP CODE +4 * *: 34104 -3346 CONGRESSIONAL DISTRICT FOR PRINCIPAL PLACE OF PROJECT PERFORMANCE: 76 * *Providing the Zip +4 ensures that the correct Congressional District is reported EXECUTIVE COMPENSATION INFORMATION (please refer to the "Instructions and Worksheet ") Question 1: Yes ❑ No❑ If you answered "No" to Question 1, move to signature. If yes to Question 1, answer Question 2: Yes❑ No❑ If you answered "Yes" to Question 2, move to signature If "No" to Question 2, please fill out the following information TOTAL COMPENSATION CHART FOR MOST RECENTLY COMPLETED FISCAL YEAR Date of Fiscal Year Completion:C11ch here to enter a date. Rank (Highest to Lowest) Name (Last, First, MI) Title Total Compensation for Most Recently Completed Fiscal Year 1 2 3 4 5 THE UNDERSIGNED CERTIFIES THAT ON THE DATE WRITTEN BELOW, THE INFORMATION PROVIDED HEREIN IS ACCURATE. SIGNATURE: NAME Akin TITI C• Packet Page -1397- DATE: 2/12/2013 16.C.1. Packet Page -1398- B[I- a ed 4eed '�,0,9LELOZ/ ZV% § . .. .. . . \�_ ; IL 0 / {+r b j ) f § } . j z 2 tm __•- ■{!]! /! = o a \ w / ) ) k % t . § % © w � Q = LL.o � " }k�.\ 2 k a o b . k r 2� E 2 2 (- 2 «� o A _.» _ §$ �w- L { �co w$ a \] \\ � u- Q IL k t7=7 e ` ) o .�. '�,0,9LELOZ/ ZV% � � \--m {+r 2 tm __•- ■{!]! /! = o a ! =2! m > % k $ q � t ]7§k| \ }k�.\ 2 » r ; z { |2 ) )§EELL \®! _ul ) {&!!! « ! +E!! _,� 2,L LL « i0 . E § (�tE LL '00 ) 9 g 9 §E -la8E \)}k/ .. � � \--m 20j2's L'o'9L MZ /ZL/Z a r �l 20j2's L'o'9L MZ /ZL/Z TO'91 C�OZ/U/z -CU'Vi- aBEd 1@�Ded }ape T0,9L UOZ/ZUZ I - - aBEd IDNDed '�'0'9� UOZ /ZL/Z t t` y �, r e ✓ a 1+ { 5 � V 4p� k '�'0'9� UOZ /ZL/Z J V0,9 £ WZ /Z UZ -tTtiT- aged I@Ved - 93Bd TO'9� £�OZ /U /Z RICK SCOTT Governor 2/12/2013 16.C.1. MANAGEMENT BRYAN W.KOON Director To: Local Governments, State and Regional Agencies, Indian Tribal Governments, Local Mitigation Strategy Working Groups, Private Non - Profit Organizations Submitting Hazard Mitigation Grant Program Applications for the Tropical Storm Debby, From: Bryan W. Koon, State Coordinating Officer Subject: Hazard Mitigation Grant Program Funding Summary Date: October 18, 2012 Program Summary The Florida Division of Emergency Management (the Division) is pleased to announce the availability of Hazard Mitigation Grant Program (HMGP) funds as a result of the recent Presidential Disaster Declaration for Tropical Storm Debby (FEMA 4068- DR -FL). HMGP funding is authorized by Section 404 of the Robert T. Stafford Disaster Relief Act. This funding helps communities implement measures to reduce or eliminate long- term risk to people and property from natural hazards and their effects. The Division encourages all potential applicants to submit applications for projects that address eligible mitigation activities. The amount of HMGP funding available to the state is based on the total federal disaster assistance for the Presidential Disaster Declaration. Application Timeline Applications are currently being accepted. The application period will close February 15, 2013. Applications mailed to the Division must be postmarked on or before February 15, 2013. Hand - delivered applications must be stamped in at the Division no later than 5 :00 p.m. EST on February 15, 2013. The Division encourages potential applicants to submit complete applications before the close of the application period. Applications will only be accepted from eligible applicants as defined in the Minimum Program Eligibility section of this notice. FLORIDA RECOVERY OFFICE - DIVISION HEADQUARTERS - STATE LOGISTICS RESPONSE CENTER 5900 Lake Ellenor Drive 2555 5humard Oak Boulevard 2702 Directors Row Orlando, FL 32809 Tallahassee, FL 32399 -2100 Orlando, FL 32809 -5631 Tel: 850- 413 -9969 • Fax: 850 - 488 -1016 W �. Packet Page -1414- 2/12/2013 16.C.1. MEMORANDUM October 18, 2012 Page 2 Please provide four completed copies of the State of Florida Hazard Mitigation Grant Program Application and all appropriate attachments. The application and all other pertinent forms may be obtained at the Division's website located at http://www.floridadisaster.org/Mitigation/Hazardtforms.htm. You may also contact the Division directly at (850) 922 -4182. Completed applications must be sent to the following address: ATTN: Kathleen Marshall, Hazard Mitigation Grant Program Florida Division of Emergency Management Mitigation Section 2555 Shumard Oak Boulevard Tallahassee, Florida 32399 -2100 Minimum Program Eligibility Eligible Applicants: According to the Code of Federal Regulations (CFR) 44 §206.434(a), the following parties are eligible to apply for Hazard Mitigation Grant Program funds: • State and local. governments who have an approved Local Mitigation Strategy (LMS) in accordance with 44 CFR 201.6, prior to receipt of HMGP subgrant funding for projects; • Private non - profit organizations or institutions that own or operate a private non- profit facility as defined in §206.221(e); and • Indian tribes or authorized tribal organizations. Eligible Activities: Activities include mitigation projects that will result in protection of public or private property from natural hazards. Activities for which implementation has already been initiated or completed are not eligible for funding. Eligible projects include, but are not limited to, the following: • Acquisition or relocation of hazard prone structures • Retrofitting of existing buildings and facilities that will result in increased protection from hazards • Elevation of flood prone structures • Infrastructure protection measures • Stormwater management improvements • Minor structure flood control projects • Residential and community safe room construction Packet Page -1415- 2/12/2013 16.C.1. MEMORANDUM October 18, 2012 Page 3 Ineligible Activities: The state will not consider funding requests for: • Generators (unless they are an integral part of a larger eligible project); • Construction of new facilities (Nevertheless, the cost associated with above code upgrades to new facilities may be considered); • Equipment such as emergency pumps, vehicles, and communication devices; • Tree removal, debris removal and other forms of maintenance; or • Projects already in progress (Construction may not begin until the contract between the State and subgrantee is executed and the project has met requirements of the National Environmental Policy Act), Eligibility Criteria: All projects submitted must meet minimum criteria to be considered for funding. An eligible project must: • Conform to the Florida State Hazard Mitigation Plan and the respective community's LMS; • Conform to the funding priorities for the disaster, as established in the appropriate LMS; • Demonstrate cost - effectiveness; • Be technically feasible; • Benefit the designated disaster area; • Conform to all applicable environmental laws and regulations, as well as Executive Orders; • Solve a problem independently or constitute a functional part of a solution; • Benefit a National Flood Insurance Program (NFIP) participating community that is not on probation or is suspended from the NFIP; and • Meet all applicable State and local codes and standards. Cost -Share Requirements Under the HMGP, FEMA will contribute up to 75- percent of the total amount approved under the grant award to implement eligible, cost - effective mitigation measures. The applicant must provide the remaining 25- percent non - federal share. Contributions, cash, and in -kind services are acceptable as part of the non - federal share. Requirements for in -kind contributions can be found in 44 CFR §13,24. In -kind contributions must be directly related to the eligible project cost and are those personnel, materials, equipment and supplies owned, controlled, and operated by the applicant or a third party contributor. Applicants may use the Global Match concept as part of the 25- percent non - federal share. Global Match permits a potential applicant to meet the non- federal share match by receiving credit for state and /or local government funds that were committed to similar type project(s). These similar, non-federally funded projects must meet all of the Packet Page -1416- 2/12/2013 16.C.1. MEMORANDUM October 18, 2012 Page 4 HMGP eligibility requirements. This means that if Global Match is approved, the applicant may receive up to 100 - percent federal share. Pre -Award Costs Prior to receiving a grant award, pre -award costs may be requested.. Pre -award costs include items such as engineering, environmental study, permitting, and other "soft" costs associated with a construction project. Construction activities are not considered pre -award costs. Pre -award costs must be requested in writing. Guidelines for pre - award costs are included in Attachment A. County Funding Allocation To ensure funds are distributed equitably, designated counties have been assigned a portion of the total HMGP grant. The amount is based on a calculation of the proportional share of the total federal assistance under the Public Assistance (PA), Individual Assistance ([A), and Small Business Administration (SBA) programs as of October 2012. Commitment of project funds by the Division is contingent upon receipt of appropriate Legislative Budget Authority. These figures are shown in Attachment B and represent the estimated amount of %-� HMGP funds currently available. HMGP funding is available only to those counties that have a current FEMA- approved LMS. Project applications will be considered only if: (1) The application is accompanied by an endorsement by the LMS Chairperson or Vice - Chairperson stating that the project is included in the current LMS; and, (2) If more than one project is submitted, the endorsement indicates the prioritization. A sample project submission letter is shown in Attachment C. The Division will attempt to fund each submitted project in priority order until the county's allocation has been exhausted. In accordance with Florida Administrative Code (F.A.C.) 27P- 22.006, the Division uses the following tiered allocation system up until the State application deadline with FEMA: Tier 9 The available HMGP funds are allocated to counties included in the relevant Presidential Disaster Declaration in proportion to each county's share of federal disaster funding from the Public Assistance (PA), Individual Assistance (IA), and Small Business Administration (SBA) Disaster Loan Program as of the date of receipt of the FEMA funding notice described above. Eligible projects submitted by each county included in the relevant Presidential Disaster Declaration will be funded in order of priority as outlined in the LMS until the allocated funds (through the 12 -Month Lock -in) are exhausted or all eligible projects are funded. Packet Page -1417- 2/12/2013 16.C.1. MEMORANDUM October 18, 2012 ^ Page 5 Tier 2 Any allocation remaining after all eligible projects in any declared county are funded, shall be re- allocated to those counties included in the relevant Presidential Disaster Declaration whose allocation was not sufficient to fund all submitted eligible projects. The order of priority for re- allocating funds is detailed in Attachment D. Tier 3 In the event funds remain after the Tier 1 and Tier 2 process, any remaining funds will be offered on a statewide basis as described in Attachment D. Please see Attachment D for a detailed explanation of funding tiers. Funding Availability and Notification FEMA notifies the State of HMGP funding availability at several milestones: 1. Initial Estimate This represents an early estimate only and is not an actual commitment of funding by FEMA. Funding may increase or decrease based on actual disaster claims during the declaration period. These estimates are provided for planning purposes and to jump -start the HMGP application process. 2. 180 Days from the Date of Declaration This represents the State's Lock -in Amount. It is the minimum the State can expect to receive from FEMA. County allocations listed in Attachment B are based on this estimate. After this disclosure, HMGP funds to the State cannot be decreased. It is important for potential applicants to recognize that HMGP funds are contingent upon FEMA's reexamination of the disaster figures at the given time intervals. A county's funding allocation can increase or decrease after it has submitted an application. Technical Assistance The Division is in the process of scheduling HMGP application development workshops. Please check the Division's website http://www.floridadisaster.c)m/Mitiri--,i- "' I for date, time, location and a short overview of the workshops. The Division will provide technical assistance throughout the application process. This includes assistance with the application process, Benefit Cost Analysis, Engineering Feasibility and Environmental /Historical Preservation Compliance. If there are any questions regarding the allocation of funds or the project review and selection criteria, please call Bureau staff at one of the following numbers: (850) 922 -5944 (Program Eligibility) Packet Page -1418- MEMORANDUM October 18, 2012 Page 6 (407) 888 -3720 (Program Eligibility) (407) 856 -5040 (Environmental) (407) 856 -5010 (Engineering and Technical Feasibility) 2/12/2013 16.C.1. For additional information and technical assistance, please refer to FEMA's Hazard Mitigation Assistance Unified Guidance document available at http : / /www.fema.gov /library /viewRecord.do ?id =4225 . To assist you in submitting qualified project applications, the following attachments are located on the Division website http: / /www.floridadisaster.ora/ Mitigation /Hazard including the Hazard Mitigation Grant Program Assistance Application: Attachment A: HMGP Program Policy on Pre -award Cost and Form Attachment B: Initial Estimate of Available HMGP Funding Attachment C: Sample Project Submission Letter Attachment D: Florida Administrative Code 27P -22 BW K/km ^ Attachments Packet Page -1419- Attachment A Packet Page -1420- 2/12/2013 16.C.1. 2/12/2013 16.C.1. Guidance on Pre -award Cost Associated with HMGP Projects Pre -award costs are costs incurred by a sub - grantee before the grant was awarded. Any and all pre - award costs associated with an HMGP project must be incurred after the date of declaration of a disaster under which the project is proposed for funding (GAO 10 -129). All construction associated with an HMGP project must be incurred after approval by FEMA and after the State of Florida and the sub- grantee has executed a project contract. According to Webster's II New Riverside Dictionary Revised Edition, the word construction means "the act, process, or work of building." Breaking ground, installing a shutter, taking out a window to replace with impact glass, are all examples of "construction." FEMA may approve pre -award costs. These costs include study or research required to plan a construction project. Such activities may include engineering, modeling, permitting, environmental study, benefit-cost analysis, etc. These are soft costs and not to be confused with hard construction costs, Construction costs may not be included as pre -award costs. Pre -award costs must be factored into total project costs and included in the benefit -cost analysis calculations. The applicant may request pre - award costs any time after the disaster declaration. The request must be in writing and include the type of activity or activities proposed and estimated cost. All pre -award activity must clearly be associated with the applicant's proposed project. The State and FEMA will do a preliminary review of the request and may concur that the activities are necessary for the type of project envisioned or may consult with the applicant on an identified activity that the State or FEMA does not feel is necessary fora proposed project. Conversely, the State or FEMA may suggest additional study or research the applicant has not identified for a particular project. Review by the State and FEMA of pre -award activities may save money and time for the State, FEMA, and the applicant. Letters and documentation of all pre -award activities will need to be submitted to the State with the project application. Preliminary review by the State or FEMA of pre -award activities is no guarantee of eligibility or approval of the activities or the proposed project FEMA will provide a written final determination on the pre -award request. An alternative is for the applicant to request approval of pre - award cost by letter attached to the project application. The request must include the type of activity or activities and costs incurred by the applicant. There is greater risk to the applicant with this alternative that incurred costs may not be considered eligible. If the proposed project meets all eligibility criteria and is approved by FEMA, then pre - award costs identified by the applicant prior to project submittal, or identified by the applicant in documentation attached to the application, will be considered project costs eligible for 75/25 re- imbursement (same as other project costs). Packet Page -1421- 2/12/2013 16.C.1. All pre -award costs are subject to an approved grant award and available funding. If funding is not available, even if pre -award costs are approved in writing, they will not be reimbursed and will be solely the responsibility of the applicant. REFERENCES General Accounting Office, Principles of Federal Appropriations Law, Volume 11, January 2004 Excerpts from OMB Cost Principle Circulars: OMB Circular A -87 and A -122 (2 CFR 225 and 2 CFR 230, respectively) - Pre -award costs are those incurred prior to the effective date of the award directly pursuant to the negotiation and in anticipation of the award where such costs are necessary to comply with the proposed delivery schedule or period of performance. Such costs are allowable only to the extent that they would have been allowable if incurred after the date of the award and only with the written approval of the awarding agency. OMB Circular A -21 (2 CFR 220) - Pre - agreement costs incurred prior to the effective date of the sponsored agreement, whether or not they would have been allowable thereunder if incurred after such date, are unallowable unless approved by the sponsoring agency. 44 CFR Part 206.439(c) further explains the pre -award cost regulations as allowable costs under HMGP. 44 CFR Part 13.22(b) lists the circulars above as the applicable cost principles for HMGP applicants; governments (A -87), private non- profits (A -122), & educational institutions (A -21). Packet Page -1422- DIVISION OF 2/12/2013 16.C.1. MANAGEMENT RICK SCOTT BRYAN W. KOON Govemor Director HAZARD MITIGATION ASSISTANCE PROGRAM PRE -AWARD COST REQUEST FORM To request Pre -Award Costs, please complete this form and submit with your project application. All ELIGIBLE pre -award costs are subject to an approved ,grant award and availability of funding. If funding is not available or the project is not approved, pre -award costs will NOT be reimbursed and will be the sole responsibility of the applicant. If your project is approved and pre -award costs are eligible, the costs share for the reimbursement of these activities is up to a 75/25 split. Program: Name of Applicant: Project Title: Start Date for Pre -Award Activities: Pre -award costs associated with this request incurred prior to the date of declaration are NOT eligible. These costs include: study or research to plan project, engineering, modeling, permitting or environmental study. These costs must be reflected as a line item in the project budget. Construction costs should NOT be included. Construction activities may NOT begin until after a contract has been fully executed with the State for this project. Activity I Estimated Cost I Estimated Start Date Point of Contact Information: Name: Agency: Address: Phone: Authorized Applicant Agent: Name: Signature: Title: Email: Title: Date: FLORIDA RECOVERY OFFICE - DIVISION HEADQUARTERS - STATE LOGISTICS RESPONSE CENTER 5900 Lake Ellenor Drive 2555 Shumard Oak Boulevard 2702 Directors Row Orlando, FL 32809 Tallahassee, FL 32399 -2100 Orlando, FL 32809 -5631 Tel: 850 -413- 9969 Fax. 850 -488 -1016 T Packet Page -1423- 2/12/2013 16.C.1. Attachment B Packet Page -1424- FEMA- 4068 -DR -FL Tropical Storm Debby Initial 90 -Day Estimate _ � � � v =k�v§k�3a�A tl�`catiori ��ede'ral Match' -anaX .,rFr=a=3a� ,n�e4o->�ek ...r.M k&"'E . «.KVL�. -,flF•x Baker County $284,505.24 $94,835.08 Bradford County $239,507.58 $79,835.86 Charlotte County $310,019.08 $103,339.69' Citrus County $195,941.03 $65,313.68 Clay County $414,405.12 $138,135.04 Collier County $1,098,575.09 $366,191.70 Columbia County $1,901,297.48 $633,765.83' Dixie County $88,480.48 $29,493.49 Duval County $696,234.39 $232,078.13 Franklin County $409,744.97 $136,581.66' Gilchrist County $2,530.13 $843.38 Gulf County $767,733.02 $255,911.01 Hamilton County $112,630.00 $37,543.33 Hernando County $478,888.85 $159,629.62 Highlands County $18,976.45 $6,325.48 Hillsborough County, $81,157.23 $27,052.41 Jefferson County $818,166.42 $272,722.14 Lafayette County $70,052.96 $23,350.99 Lee County $306,497.39 $102,165.80 Levy County x $79,310.84 $26,436.95 Liberty County $106,618.88 $35,539.63 Madison County ; $124,624.57 $41,541.52' Manatee County ' $962,322.11 $320,774.04 Nassau County $203,526.92 $67,842.31 Pasco County $1,527,290.16 $509,096.72 Pinellas County $757,755.33 $252,585.11 Polk County $39,354.06 $13,118.02 Putnam County $95,662.76 $31,887.59 Santa Rosa County $256,552.90 $85,517.63' Sarasota County $873,387.65 $291,129.22 Suwannee County $2,343,665.41 $781,221.80 Taylor County $77,401.05 $25,800.35 Union County $167,870.39 $55,956.80 Wakuila County $689,444.40 $229,814.80 2/12/2013 16.C.1. *Note: The amounts shown are initial 90 -day estimates and should be used for planning purposes only. These figures are based upon best available data as of October 2012 and are subject to change. The State anticipates that FEMA. will provide the 6 -month Lock -in estimate for the Hazard Mitigation Grant Program in January 2013. This future estimate will be used to re- evaluate the initial 90 -day estimate and establish a lock -in ceiling. At this time the lock -in ceiling will reflect any increase or decrease in the amount of available HMGP funding. Packet Page -1425- 2/12/2013 16.C.1. Attachment C Packet Page -1426- 2/12/2013 16.C.1. Date Mr. Miles Anderson, State Hazard Mitigation Officer Florida Division of Emergency Management 2555 Shumard Oaks Boulevard Tallahassee, Florida 32399 -2100 Re: Hazard Mitigation Grant Program (HMGP) applications for FEMA 4068 -DR- FL "Tropical Storm Debby" Dear Mr. Anderson, The County Local Mitigation Strategy (LMS) working group has approved by vote and prioritized the following projects for HMGP funding from this disaster. These projects align with our LMS goals and objectives as noted, and with the State's mitigation goals and objectives (in accordance with the Code of Federal Regulations 44§ 201.6.) The County LMS group therefore presents the projects below (or in the attachment) in the order in which they are to be considered for funding. FEMA 4068 -DR -FL "Trnninal Rtnrm nahhv*' Funding priority Project name or description Applicant Goal/ objective implemented Estimated federal share 1. Project name Applicant 3. B. 2 $000,000 2. Project name Applicant 1. A. 4 $000,000 3. Project name Applicant 2. B. 4 $000,000 Etcetera For further information or inquiry, please contact me at phone number and email. Sincerely, cc: _, LMS Chair County LMS Packet Page -1427- 2/12/2013 16.C.1. Attachment D Packet Page -1428- 2/12/2013 16.C.1. CHAPTER 27P -22 HAZARD MITIGATION GRANT PROGRAM 27P- 22.001 Purpose 27P - 22.002 Definitions 27P- 22.003 Eligibility 27P - 22.004 LMS Working Groups 27P- 22.005 Local Mitigation Strategy 27P- 22,006 County Allocations and Project Funding 27P- 22.007 Application 27P - 22.001 Purpose. This chapter describes the processes for application, project selection and distribution of funds under the Hazard Mitigation Grant Program. Rulemaking Authority 252.35(2)(x) FS. Law Implemented 252.311, 252.32, 252.35 FS. History—New 2- 24 -02, Formerly 9G- 22.001. 27P - 22.002 Definitions. (1) "Adoption" means a resolution, ordinance or other formal action taken by the governing body of a county or municipality indicating agreement with and acceptance of the relevant Local Mitigation Strategy. (2) "Application" means the request for hazard mitigation funding as submitted to the Division by an Applicant. (3) "Applicant" means a state agency, local government, Native American tribe or authorized tribal organization or private non - profit organization requesting hazard mitigation funding. (4) "FEMA means the Federal Emergency Management Agency. (5) "Florida Hazard Mitigation Strategy" means Florida's version of the Hazard Mitigation Plan referred to in 44 C.F.R., Part 206, Subpart M. The Florida Hazard Mitigation Strategy (Rev. September 11, 1997) is hereby incorporated into this rule by reference. A copy may be obtained by contacting the Division of Emergency Management. (6) "Hazard" means a condition that exposes human life or property to harm from a man -made or natural disaster. (7) "Hazard Mitigation" means any action taken to reduce or eliminate the exposure of human life or property to harm from a man -made or natural disaster. (8) "Hazard Mitigation Grant Program ", herein referred to as HMGP, means the program authorized under Section 404 of the Stafford Act and implemented by 44 C.F.R., Part 206, Subpart N, hereby incorporated by reference, a copy of which may be obtained by contacting the Division, which provides funding for mitigation projects as identified in the State Hazard Mitigation Strategy. (9) "Local Mitigation Strategy" or "LMS" means a plan to reduce the identified hazards within a county. (10) "Project" means a hazard mitigation measure as identified in an LMS. (11) "Repetitive loss structures" means structures that have suffered two or more Packet Page -1429- 2/12/2013 16.C.1. occurrences of damage due to flooding and which have received payouts from the National Flood Insurance Program as a result of those occurrences. (12) "Working Group" is the group responsible for the development and implementation of the Local Mitigation Strategy. Rulemaking Authority 252.35(2)(x) FS. Law Implemented 252.399, 252.32, 252.35 FS. History—New 2- 24 -02, Formerly 9G- 22.002. 27P- 22.003 Eligibility. (1) Eligible types of projects shall include, but not be limited to, the following: (a) New construction activities that will result in protection from hazards; (b) Retrofitting of existing facilities that will result in increased protection from hazards; (c) Elevation of flood prone structures; (d) Vegetative management/soil stabilization; (e) Infrastructure protection measures; (f) Stormwater management/flood control projects; (g) Property acquisition or relocation; and (h) Plans that identify and analyze mitigation problems and include funded, scheduled programs for implementing solutions. (2) In order to be eligible for funding, projects shall meet the following requirements: (a) Conform to the Florida Hazard Mitigation Strategy; (b) Conform to the funding priorities for the disaster as established in the LMS governing the project; (c) Conform to 44 C.F.R., Part 9, Floodplain Management and Protection of Wetlands, and 44 C.F.R., Part 10, Environmental Considerations, both hereby incorporated by reference, copies of which may be obtained by contacting the Division; (d) Eliminate a hazard independently or substantially contribute to the elimination of a hazard where there is reasonable assurance that the project as a whole will be completed; and (e) Be cost - effective and substantially reduce the risk of future damage, hardship, loss, or suffering resulting from a disaster. Rulemaking Authority 252.35(2)(x) FS. Law Implemented 252.319, 252.32, 252.35 FS. History —New 2- 24 -02, Formerly 9G- 22.003. 27P- 22,004 LMS Working Groups. Each county electing to participate in the HMGP must have a formal LMS Working Group and a current LMS. (1) Not later than the last working weekday of January of each year the Chairperson of the Board of County Commissioners shall submit to the Division a list of the members of the Working Group and its designated Chairperson and Vice - Chairperson. (2) The Working Group shall include, at a minimum: (a) Representation from various agencies of county government which may Packet Page -1430- 2/12/2013 16.C.1. include, but not be limited to, planning and zoning, roads, public works and emergency management; (b) Representation from all interested municipalities within the county; and (c) Representation from interested private organizations, civic organizations, trade and commercial support groups, property owners associations, Native American Tribes or authorized tribal organizations, water management districts, regional planning councils, independent special districts and non- profit organizations. (3) The county shall submit documentation to show that within the preceding year it has issued a written invitation to each municipality, private organization, civic organization, Native American Tribe or authorized tribal organization, water management district, independent special district and non - profit organization, as applicable, to participate in the LMS working group. This documentation shall accompany the membership list submitted to the Division. (4) The Working Group shall have the following responsibilities: (a) To designate a Chairperson and Vice- Chairperson; (b) To develop and revise an LMS as necessary; (c) To coordinate all mitigation activities within the County; (d) To set an order of priority for local mitigation projects; and (e) To submit annual LMS updates to the Division by the last working weekday of each January. Updates shall address, at a minimum: 1. Changes to the hazard assessment; ^ 2. Changes to the project priority list; 3. Changes to the critical facilities list; 4. Changes to the repetitive loss list; and 5. Revisions to any maps. Rulemaking Authority 252.35(2)(x) FS. Law Implemented 252.311, 252.32, 252.35 FS. History—New 2- 24 -02, Formerly 9G- 22.004. 27P- 22.005 Local Mitigation Strategy. Each LMS shall have the following components: (1) A description of the activities of local government and private organizations that promote hazard mitigation; a description of the policies, ordinances or programs that guide those activities; and any deficiencies in the policies, ordinances, and programs with recommendations to correct those deficiencies; (2) A description of the methods used to engage private sector participation; (3) A statement of general mitigation goals, with Working Group recommendations for implementing these goals, and estimated dates for implementation; (4) A description of the procedures used by the Working Group to review the LMS at regular intervals to ensure that it reflects current conditions within the County; (5) A hazard assessment to include, at the minimum, an evaluation of the vulnerability of structures, infrastructure, special risk populations, environmental resources and the economy to storm surge, high winds, flooding, wildfires and any other hazard to which the community is susceptible; 11—IN Packet Page -1431- 2/12/2013 16.C.1. (6) A statement of procedures used to set the order of priority for projects based on project variables which shall include technical and financial feasibility; (7) A list of approved projects in order of priority with estimated costs and associated funding sources; (8) A List of critical facilities that must remain operational during and after a disaster; (9) A list of repetitive loss structures; and (10) Maps, in Geographical Information System (GIS) format, depicting hazard areas, project locations, critical facilities and repetitive loss structures. Rulemaking Authority 252.35(2)(x) FS. Law Implemented 252.391, 252.32, 252.35 FS. History—New 2- 24 -02, Formerly 9G- 22.005.. 27P- 22.006 County Allocations and Project Funding. (1) The available HMGP funds shall be allocated to the counties included in the relevant presidential disaster declaration, as defined in Section 252.34(1), F.S., in proportion to each county's share of the federal disaster funding from the Public Assistance, Individual Assistance and Small Business Administration programs as of 90 days after the disaster declaration as reported by FEMA. (a) Eligible and submitted projects for each county included in the relevant presidential disaster declaration will be funded in order of priority as outlined in the LMS until the allocated funds are exhausted, or all eligible projects are funded, whichever occurs first. (b) Any allocation remaining after all eligible projects in any declared county are funded shall be reallocated to those counties included in the relevant presidential disaster declaration whose allocation was not sufficient to fund all submitted eligible projects in proportion to each county's share of unfunded projects. (2) If funds remain after all eligible projects under subsection (1) above have been funded, then they shall be applied to fund eligible projects submitted from counties not included in the relevant presidential disaster declaration on a first-come-first- served basis until all available funds are obligated. (3) Once a project has been selected for funding, the agreement between the applicant and the Division regarding the terms and conditions of the grant shall be formalized by contract. Rulemaking Authority 252.35(2)(x) FS. Law Implemented 252.311, 252.32, 252.35 FS. History —New 2- 24 -02, Formerly 9G- 22.006. 27P- 22.007 Application. (1) The following entities may apply for funding under the program: (a) State agencies and local governments; (b) Private non - profit organizations or institutions that own or operate a private non- profit facility as defined in 44 C.F.R., §206.221(e), hereby incorporated by reference, a copy of which may be obtained by contacting the Division; and (c) Indian tribes or authorized tribal organizations. Packet Page -1432- 2/12/2013 16.C.1. (2) The Division shall notify potential applicants of the availability of HMGP funds by publishing a Notice of Funding Availability in the Florida Administrative Weekly. (3) Applicants will have not less than ninety (90) days from the date of notification to submit project applications. The opening and closing dates will be specified in the Notice of Funding Availability, and applications must be postmarked or stamped in at the Division no later than 5:00 p.m. on the final due date. (4) A letter shall accompany each application from the Chairperson or Vice - Chairperson of the LMS Working Group endorsing the project. The endorsement shall verify that the proposed project does appear in the current LMS and state its priority in relation to other submitted projects. Applications without this letter of endorsement will not be considered. (5) Applications must be submitted using Form No. HMGP /FMA -001, State of Florida Joint Hazard Mitigation Grant Program & Flood Mitigation Assistance Application (Effective Date September 30, 2001), which is incorporated into this rule by reference, a copy of which may be obtained by contacting the Division. (6) If the Division receives an incomplete application, the applicant will be notified in writing of the deficiencies. The applicant will have thirty (30) calendar days from the date of the letter to resolve the deficiencies. If the deficiencies are not corrected by the deadline the application will not be considered for funding. (7) Applications are to be delivered or sent to: Division of Emergency Management Bureau of Mitigation 2555 Shumard Oak Boulevard Tallahassee, Florida 32399 ATTENTION: Hazard Mitigation Grant Program Rulemaking Authority 252.35(2)(x) FS. Law Implemented 252.311, 252.32, 252.35 FS, History—New 2- 24 -02, Formerly 9G- 22.007. Packet Page -1433- 2/12/2013 16.C.1. 6 December 2012 ,*—",,Mr. Miles Anderson, State Hazard Mitigation Officer Florida Division of Emergency Management 2555 Shumard Oaks Blvd. Tallahassee, FL 32399 -2100 Re: Hazard Mitigation Grant Program (HMGP) Applications for FEMA 4068 -DR -FL "Tropical Storm Debby" Dear Mr. Anderson, The Collier County Local Mitigation Strategy (LMS) working group has approved by vote and prioritized the following projects for HMGP funding from this disaster. These projects align with our goals and objectives as noted and with the State's mitigation goals and objectives (in accordance with the Code of Federal Regulations 44 201.6) The Collier County LMS group therefore presents the projects below in the order in which they are to be considered for funding. Funding Project Name or Description Applicant Goal /Objective Estimated Priority Implemented Federal Share 1 Public Utilities Ops Ctr Collier County Public Goal 3: Obj 3.1.& 3.3 overhead door replacement Utilities Division $28,500 for wind hazard 2 Portable Generator Cable Collier County School Goal 1,Obj:1.1, 1.2 Goal 3, pass- through hole and District Obj 3.1 generator pad with $75,000 anchoring point for General Population Risk - Shelters 3 Naples City Hall Window City of Naples Goal 3, objs 3.1,3.3 replacement for wind $487,500 protection 4 Marco Substation Relay Lee County Electric Goal 1, objs. 1.1, 1.2, 1.2.1, Vault Replacement & Cooperative Goal 2, objs. 2.2, 2.3, 2.4, and $337,500 Elevation Goal 3, objs. 3.1, 3.2, 3.3 5 Wood pole replacement Lee County Electric Goal 1, obis. 1.1, 1.2, 1.2.1, with concrete ones Cooperative Goal 2, objs. 2.2, 2.3, 2.4, and $750,000 Goal 3, objs. 3.1, 3.2, 3.3 6 Wind retrofit residential Retrofit Southwest Goal 1, Obj 1.1, 1.2, & Goal homes Florida 5, obj 5.2 $987,000 For further information or inquiry, please contact Richard Zyvoloski, 239 - 252 -3603, RichardZvvoloski@CollierGov .net. Sincerely, Victor Hill, LMS Chair Collier County Local Mitigation Strategy Working Group Packet Page -1434-