Loading...
Agenda 01/08/2013 Item #16C2 1/8/2013 Item 16.C.2. EXECUTIVE SUMMARY Recommendation to approve a work order in the amount of$405,000 to Haskins, Inc., for construction tasks set forth in Request for Quotation 08-5011-75, Irrigation Quality Water Sites Priority Group#3. OBJECTIVE: Obtain approval of a work order in the amount of$405,000 to Haskins, Inc., for construction tasks set forth in Request for Quotation (RFQ) 08-5011-75, Irrigation Quality (IQ) Water Sites Priority Group #3. The public purpose of this project is to ensure and maintain a reliable supply of IQ water to all customers, based on their contractual obligations. CONSIDERATIONS: On June 24, 2008, as Agenda Item 10G, the Board of County Commissioners (Board) adopted the 2008 Wastewater Master Plan Update that identified the requirement for enhancing the SCADA system and its utilization. The proposed scope of work for Project 70062, "IQ SCADA and Instrumentation Technical Support," is consistent with the 2010 Wastewater CIP Update (dated October 5, 2010), page 2 of 4, line 66, as identified in the 2011 User Fee Rate Study. The IQ water provided to customers is based on customer demand as defined in contractual agreements. To reliably deliver the quantity of water allotted by contractual agreements, the Wastewater Department plans to install motor operated valves that can be controlled remotely. The installation of these new valves will provide a more efficient and effective use of supply sources to ensure contractual demands are met. Construction will occur at the following locations. Oakes Boulevard and Vanderbilt Beach Road Vanderbilt Beach Road and I-75 Vineyards Press Immokalee Road Supplemental Water Wells RFQ 08-5011-75, IQ Water Sites,was posted on November 29, 2012, and distributed to the five vendors of the Fixed-Term Underground Utilities Contract 08-5011 via the county's electronic bid process. All five vendors submitted quotations by the December 1 1, 2012, deadline. The bid specifications informed the bidders there may be unforeseen conditions associated with the project. The total project cost incorporates an allowance in the amount of$45,000, which includes but is not limited to support equipment, personnel time, and/or replacement materials as determined by staff that may be required during construction. The price for any additional work shall be negotiated prior to commencement in accordance with the county's Purchasing Policy and the terms of the agreement. The quotations are summarized in the table below. Packet Page -1364- 1/8/2013 Item 16.C.2. Firm Sub-Total Allowance Total Project Amount Haskins,Inc. $ 360,000.00 $ 45,000 $ 405,000.00 DN Higgins $ 388,767.00 $ 45,000 $ 433,767.00 Kyle Construction $ 391,890.00 $ 45,000 $ 436,890.00 Quality Enterprises $ 411,270.00 $ 45,000 $ 456,270.00 Mitchell &Stark $ 444,785.00 $ 45,000 $ 489,785.00 The engineer's November 30, 2012, estimate of probable construction cost was $469,892.00 (attachment#4). Staff determined the lowest quote to be fair and reasonable and recommends awarding the project to Haskins, Inc. The $405,000 quote is 13.8% less than the engineers's estimated cost, including allowance. The design professional, Hole-Montes, Inc., in its December 14, 2012, letter (attachment #6) recommends award to Haskins, Inc. Haskins, Inc. has a satisfactory performance and warranty record on previous, similar wastewater utility-related projects. FISCAL IMPACT: Funding is available in and is consistent with the FY13 Capital Budget approved by the Board on September 20, 2012. The source of funding is the Wastewater User Fee Fund 414. LEGAL CONSIDERATIONS: This item has been reviewed and approved by the County Attorney's Office, is legally sufficient for Board action and only requires a majority vote for approval—SRT. GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATIONS: That the Board of County Commissioners, as Ex-officio the Governing Board of the Collier County Water-Sewer District, award a work order for construction tasks set forth in RFQ 08-5011-75 to Haskins Inc., in the amount of$405,000.00, which includes an allowance in the amount of$45,000 for unforeseen conditions; and, authorize the Chair to sign the work order after final review by the County Attorney's Office. Prepared by: David Ahmad, Technical Support Specialist, PPUMD. Attachments: 1. Bid/RFQ Tabulation 2. RFQ Solicitation 3. Contract 4. Engineer's Estimate Letter 5. PPMD Financial Analysis of Bid Tabs 6. Recommendation of Award 7. Work Order Packet Page-1365- 1/8/2013 Item 16.C.2. COLLIER COUNTY Board of County Commissioners Item Number: 16.C.2. Item Summary: Recommendation to approve a work order in the amount of$405,000 to Haskins, Inc., for construction tasks set forth in Request for Quotation 08-5011-75, Irrigation Quality Water Sites Priority Group#3. Meeting Date: 1/8/2013 Prepared By Name: AhmadDavid Title: VALUE MISSING 12/14/2012 2:20:27 PM Submitted by Title: VALUE MISSING Name: AhmadDavid 12/14/2012 2:20:29 PM Approved By Name: HapkeMargie Title: Operations Analyst,Public Utilities Date: 12/17/2012 10:17:09 AM Name: Susan Jacobs Title: Operations Analyst,Public Utilities Date: 12/17/2012 2:03:09 PM Name: Susan Jacobs Title: Operations Analyst,Public Utilities Date: 12/17/2012 2:52:32 PM Name: Steve Messner Title: Plant Manager,Water Date: 12/18/2012 10:03:30 AM Packet Page-1366- 1/8/2013 Item 16.C.2. Name: CromerAaron Title: Project Manager,Principal,Public Utilities Engineering Date: 12/18/2012 2:11:13 PM Name: ChmelikTom Title: Director,Public Utilities Engineering Date: 12/21/2012 1:02:59 PM Name: YilmazGeorge Title: Administrator,Public Utilities Date: 12/25/2012 9:29:40 PM Name: TeachScott Title:Deputy County Attorney,County Attorney Date: 12/26/2012 3:35:14 PM Name:UsherSusan Title: Management/Budget Analyst, Senior,Office of Manage Date: 12/26/2012 4:33:52 PM Name: KlatzkowJeff Title: County Attorney Date: 12/27/2012 9:08:25 AM Name: OchsLeo Title: County Manager Date: 12/31/2012 9:24:10 AM Packet Page-1367- -89E1-abed la>lped N N L11 111 r1 ri 'p -O O .-I fL N — \ "O > CO N O U ai a) 0 0 N cc QS O 0 O ti7 0 a) C � 0 N O N LL ?_• U Gr.'' LO 6 co ra ro a1 0 O 00 .` N N 0 0 (D �- 0 N 0 N w tn. O O 00. O O -5 O 0 00 0 0o t'' U Lt1 lD C 01 • M O m y/1 U ' co 4k 0 0 Q C 0 0 O O too 1V) lN0 0 lND Z U M . CY Z O O .r O N O O c-I c N 0 O L O co Ln c/ 0 O O o Q 00 U O U tH O N H 0' tif). iv.).0 L > D cc O E m as u) 2 N J Q T D 0. 06 O 0) J cCu H Q C D a) c 0 O .. RS - -0 ' �0 � U U O U Li---)- N as U O -0 — O (0 a$ N U w co 0 w L N -,_ N U o. ..• Q N 13 -O CO to c c Cl- ,-.,_,_ -6 3 CO = a1 > COO o o o Q c 0 0 z U -a•D -aCD SD m N °' to N w O c— a) c M 5 Q 0 aXi 0 'Z.o'9L wall £1-0Z/8/1- 1/8/2013 Item 16.C.2. Go er County Adnvnisirative Services Division Purchasing REQUEST FOR QUOTATIONS UNDER CONTRACT#08-5011 "Annual Contract for Underground Utilities" Date: November 30, 2012 From: Nicole Parker, Contract Specialist 239-252-4270,Telephone Number 239-252-6549, Fax Number nicoleparkeralcollie rgov.net To: Prospective Vendors Subject: RFQ#08-5011-75 Upgrades to IQ Water Sites Priority Group#3 As provided in the referenced contract,the Collier County Purchasing Department is soliciting quotes for the referenced project. RFQ Due Date: December 11,2012 at 3:00 P.M. Pre-Quote Meeting Date/Time: November 29,2012 at 2:00 P.M. Pre-Quote Meeting Location: PUD Conference Room in Bldg H—Conf Rm B Number of Days to Final Completion: 365 days to Final Completion Liquidated Damages: $401.50 per day Plans and Specs: By Hole Montes dated August 2012 Description Quantity Price UOM Total BASE BID:All work required in accordance with the plans and specifications 1 LS ALLOWANCE:Owner's use as directed for unforeseen work and costs associated with the existing underground piping and electrical utilities. 1 $45,000 TM $45,000 TOTAL Your quotation response for this project is due no later than the date and time specified above. We will not accept any quotation responses later than the noted time and date. If your firm is unable to respond electronically,your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specified.We look forward to your participation in this request for information/quotation process. Performance and payment bonds shall be required if the lowest responsive quote exceeds$200,000. Firm's Complete Legal Name Telephone Number/Fax Number Signature Title Print Name Date RFQ_ContractDriven_RevisedSeptember2009 1 Packet Page -1369- 1/8/2013 Item 16.C.2. AGREEMENT 08-5011 "Annual Contract for Underground Utility Contracting Services" THIS AGREEMENT is made and entered into this 104'day of /Vlctr-c:_il , 2008, by and between the Board of County Commissioners for Collier County, Florida, a political subdivision of the State of Florida (hereinafter referred to as the "County" or "Owner") and Haskins, Inc. authorized to do business in the State of Florida, whose business address is 10956 Enterprise Avenue, Bonita Springs, Florida 34135 (hereinafter referred to as the "Contractor"). WITNESSETH: 1. COMMENCEMENT: The contract shall be for the period of twenty four (24) months. Additionally, by mutual agreement and funding availability, the contract may be renewed for two (2) terms of twenty four (24) months each. In no event, including renewal options, shall the contract exceed six (6) years. The Purchasing/General Services Director or his designee may, at his discretion, extend the Agreement under all of the terms and conditions contained in this Agreement for up to one hundred eighty (180) days. The Purchasing/General Services Director, or his designee, shall give the Contractor written notice of the County's intention to extend the Agreement term not less than ten (10) days prior to the end of the Agreement term then in effect. 2. STATEMENT OF WORK: The Board of County Commissioners deemed five firms to be pre- qualified and awarded a Contract to each firm. Each awardee will enter into an Agreement to provide complete services for a wide range of minor-to-medium scale future construction, renovation and retrofit projects on an as-needed basis as may be required by the Owner in accordance with the terms and conditions of RFP 08-5011 and the Contractor's proposal made an integral part of this agreement. The execution of this Agreement shall not be a commitment to the Contractor that any work will be awarded to the Contractor. Rather, this Agreement governs the rights and obligation of the Quotation procedure outlined in the next paragraphs and all Work undertaken by Contractor for Owner pursuant to this Agreement and that procedure during the term and any extension of the term of this Agreement. The Owner shall provide a summary of Work to be performed which will afford the Contractor the opportunity to submit a formal quotation for the Work; the Contractor shall respond with the information sought within seven (7) working days. For projects with an estimated cost of Fifty Thousand ($50,000) or less, the Owner shall obtain a proposal from one or more of the five (5) selected firms, negotiate favorable project terms and conditions, and issue a numbered Work Order to initiate the projects. For projects with an estimated cost over Fifty Thousand Dollars ($50,000) and less than Two Hundred Thousand Dollars ($200,000), competitive quotes shall be solicited from all of the contracted firms; the Contractor shall respond with the information and or proposal sought within ten (10) working days, the Owner shall negotiate favorable project terms and conditions, and issue a numbered Work Order to initiate the projects. Division Administrator and County Attorney approval is required at this level. For projects over Two Hundred Thousand Dollars ($200,000) and less than Seven Hundred Fifty Thousand ($750,000), competitive quotations shall be solicited from all of the contracted firms. Staff recommendations will then be submitted to the Board of County Commissioners for approval after County Attorney and Division Administrator approval. Page -1- Packet Page-1370- 1/8/2013 Item 16.C.2. In each Request for Quotation, the Owner reserves the right to specify the period of completion and the collection of liquidated damages in the event of late completion. Work orders shall not be required for emergency work but will be authorized by Purchase Order only. The Forms attached to this Agreement as Exhibits A through D shall not be required for emergency work. The Contractor will be compensated for time and material work, either emergency or scheduled, in accordance with the rate sheet with material and specialty equipment markup. 3. EMERGENCY WORK: Contractors under this Agreement will be on an on-call rotation schedule for emergency underground utility contracting services. The on-call Contractor shall be required to have a cell phone number, along with a home number, to the County so that the County will be able to contact the Contractor when needed. This schedule will be rotated on a one (1) week basis. In the event that a Contractor cannot be on-call as scheduled, it will be rotated to the next scheduled Contractor, and the schedule will continue with each Contractor having no more than two (2) weeks in a row on-call. 4. THE CONTRACT SUM: The Owner shall pay the Contractor for the performance of the Work pursuant to the quoted price offered by the Contractor in his response to a specific Request for Quotation. Any County agency may utilize the service offered under this contract, provided sufficient funds are included in their budget(s). 5. NOTICES: All notices from the County to the Contractor shall be deemed duly served if mailed by registered or certified mail to the Contractor at the following address: Haskins, Inc. Joel Chambers 10956 Enterprise Ave., Bonita Springs, FL 34135 Phone: 239-947-1846 Fax: 239-947-3857 All notices from the Contractor to the County shall be deemed duly served if mailed by registered or certified mail to the County at the following address: Collier County Government Complex Attn: Purchasing/General Services Director Purchasing Department 3301 East Tamiami Trail, Purchasing Building G Naples, Florida 34112 239-252-8407 The Contractor and the County may change the above mailing address at any time upon giving the other party written notification. All notices under this Service Agreement must be in writing. 6. NO PARTNERSHIP: Nothing herein contained shall create or be construed as creating a partnership between the County and the Contractor or to constitute the Contractor as an agent of the County. Paae -2- Packet Page -1371- 1/8/2013 Item 16.C.2. 7. PERMITS: LICENSES: TAXES: In compliance with Section 218.80, Florida Statutes, all permits necessary for the prosecution of the Work shall be obtained by the Contractor. Payment for all such permits issued by the County shall be processed internally by the County. Contractor is not responsible for paying for permits issued by Collier County, but is responsible for acquiring all permits. Owner may require the Contractor to deliver internal budget transfer documents to applicable Collier county agencies when the Contractor is acquiring permits. All permits, fees and licenses necessary for the prosecution of the Work which are not issued by Collier County shall be acquired and paid for by the Contractor. Contractor shall pay all sales, consumer, use and other similar taxes associated with the Work or portions thereof, which are applicable during the performance of the Work. 8. NO IMPROPER USE: The Contractor will not use, nor suffer or permit any person to use in any manner whatsoever, county facilities for any improper, immoral or offensive purpose, or for any purpose in violation of any federal, state, county or municipal ordinance, rule, order or regulation, or of any governmental rule or regulation now in effect or hereafter enacted or adopted. In the event of such violation by the Contractor or if the County or its authorized representative shall deem any conduct on the part of the Contractor to be objectionable or improper, the County shall have the right to suspend the Contract of the Contractor. Should the Contractor fail to correct any such violation, conduct, or practice to the satisfaction of the County within twenty-four (24) hours after receiving notice of such violation, conduct, or practice, such suspension to continue until the violation is cured. The Contractor further agrees not to commence operation during the suspension period until the violation has been corrected to the satisfaction of the County. 9. TERMINATION: Should the Contractor be found to have failed to perform his services in a manner satisfactory to the County and requirements of this Agreement, the County may terminate said Agreement immediately for cause; further the County may terminate this Agreement for convenience with a seven (7) day written notice. The County shall be sole judge of non- performance. 10. NO DISCRIMINATION: The Contractor agrees that there shall be no discrimination as to race, sex, color, creed or national origin. 11. INSURANCE: The Contractor shall provide insurance as follows: A. Commercial General Liability: Coverage shall have minimum limits of $2,000,000 Per Occurrence, Combined Single Limit for Bodily Injury Liability and Property Damage Liability. This shall include Premises and Operations; Independent contractors; Products and Completed Operations and Contractual Liability. B. Business Auto Liability: Coverage shall have minimum limits of $1,000,000 Per Occurrence, Combined Single Limit for Bodily Injury Liability and Property Damage Liability. This shall include Owned Vehicles, Hired and Non-Owned Vehicles and Employee Non- Ownership. C. Workers' Compensation: Insurance covering all employees meeting Statutory Limits in compliance with the applicable state and federal laws. The coverage must include Employers' Liability with a minimum limit of$500,000 for each accident. Pace -3- Packet Page -1372- 1/8/2013 Item 16.C.2. Special Requirements: Collier County Board of County Commissioners shall be listed as me Certificate Holder and included as an Additional Insured on the Comprehensive General Liability. Current, valid insurance policies meeting the requirement . herein identified shall be maintained by Contractor during the duration of this Agreement. Renewal certificates shall be sent to the County 30 days prior to any expiration date. There shall be a thirty (30) day notification to the County in the event of cancellation or modification of any stipulated insurance coverage. Contractor shall insure that all subcontractors comply with the same insurance requirements that he is required to meet. The same Contractor shall provide County with certificates of insurance meeting the required insurance provisions. 12. INDEMNIFICATION: To the maximum extent permitted by Florida law, the Contractor/Vendor/Consultant shall indemnify and hold harmless Collier County, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys' fees and paralegals' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the ContractorNendor/Consultant or anyone employed or utilized by the ContractorNendor/Consultant in the performance of this Agreement. This indemnification obligation shall not be construed to negate, abridge or reduce any other rights or remedies which otherwise may be available to an indemnified party or person described in this paragraph. This section does not pertain to any incident arising from the sole negligence of Collier County. 13.BONDS. A. The Owner shall use its discretion for bonding where a project may be in excess of fifty thousand dollars ($50,000) but completed in less than sixty (60) days. B. When required by Owner, the Contractor shall furnish a Performance and/or Payment Bond prior to commencing performance, for the full amount of the Work which shall act as a security guaranteeing the performance of the Contractor's work and the payment by the Contractor to any other party (ies) providing labor and/or materials in connection with each construction or renovation project performed by the Contractor in excess of fifty thousand dollars ($50,000). The bonds shall be furnished using the forms prescribed in Exhibit "A". C. If the surety for any bond furnished by Contractor is declared bankrupt, becomes insolvent, its right to do business is terminated in the State of Florida, or it ceases to meet the requirements imposed by the Contract Documents, the Contractor shall, within five (5) calendar days thereafter, substitute another bond and surety, both of which shall be subject to the Owner's approval. 14.PAYMENTS. Generally, the Contractor will be paid upon completion; however, for Work in excess of thirty (30) days, the Contractor may indicate on his response to the Request for Quotation his wish to receive Progress Payments. Before any payment will be made, Contractor must provide Owner with a fully executed Release and Affidavit in the form attached hereto as Exhibit "B" as a condition precedent to release of each progress payment. All applications for payment, whether for full payment or a progress payment shall be in writing, and in substantially the form attached hereto as Exhibit"C". Page -4- Packet Page-1373- 1/8/2013 Item 16.C.2. 15.PAYMENTS WITHHELD. Owner may decline to approve any Application tor rayment, or portions thereof, because of defective or incomplete work, outstanding punchlist items, subsequently discovered evidence or subsequent inspections. The Owner may nullify the whole or any part of any approval for payment previously issued and Owner may withhold any payments otherwise due Contractor under this Agreement or any other agreement between Owner and Contractor, to such extent as may be necessary in the Owner's opinion to protect it from loss because of: (a) defective Work not remedied; (b) third party claims failed or reasonable evidence indicating probable fling of such claims; (c) failure of Contractor to make payment properly to subcontractors or for labor, materials or equipment; (d) reasonable doubt that the Work can be completed for the unpaid balance of the Contract Amount; (e) reasonable indication that the Work will not be completed within the Contract Time; (f) unsatisfactory prosecution of the Work by the Contractor; or (g) any other material breach of the Contract Documents. If any conditions described above are not remedied or removed, Owner may, after three (3) days written notice, rectify the same at Contractor's expense. Owner also may offset against any sums due Contractor the amount of any liquidated or unliquidated obligations of Contractor to Owner, whether relating to or arising out of this Agreement or any other agreement between Contractor and Owner. 16.SUBMITTALS AND SUBSTITUTIONS. Any substitution of products/materials from specifications shall be approved in writing by Owner in advance. 17.CONTRACT TIME AND TIME EXTENSIONS. A. Time is of the essence in the performance of any Work under this Agreement and Contractor shall diligently pursue the completion of the Work and coordinate the Work being done on the Project by its subcontractors and materialmen, as well as coordinating its Work with all work } of others at the Project Site, so that its Work or the work of others shall not be delayed or impaired by any act or omission by Contractor. Contractor shall be solely responsible for all construction means, methods, techniques, sequences, and procedures as well as coordination of all portions of the Work under the Contract Documents, and the coordination of Owner's supplies and contractors. B. Should Contractor be obstructed or delayed in the prosecution of or completion of the Work as a result of unforeseeable causes beyond the control of Contractor, and not due to its fault or neglect, including but not restricted to acts of Nature or of the public enemy, acts of Government, fires, floods, epidemics, quarantine regulation, strikes or lockouts, Contractor shall notify the Owner in writing within forty-eight (48) hours after the commencement of such delay, stating the cause or causes thereof, or be deemed to have waived any right which Contractor may have had to request a time extension. C. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of the Work from any cause whatever, including those for which Owner may be responsible, in whole or in part, shall relieve Contractor of his duty to perform or give rise to any right to damages or additional compensation from Owner. Contractor expressly acknowledges and agrees that it shall receive no damages for delay. Contractor's sole remedy, if any, against Owner will be the right to seek an extension to the Contract Time; provided, however, the granting of any such time extension shall not be a condition precedent to the aforementioned "No Damage for Delay" provision. This paragraph shall expressly apply to claims for early completion, as well as to claims based on late completion. 18.CHANGES IN THE WORK. Owner shall have the right at any time during the progress of the Work to increase or decrease the Work. Promptly after being notified of a change, Contractor Pane -5- Packet Page-1374- 1/8/2013 Item 16.C.2. shall submit an itemized estimate of any cost or time increases or savings it toresees as a result of the change. Except in an emergency endangering life or property, or as expressly set forth herein, no addition or changes to the Work shall be made except upon written order of Owner, and Owner shall not be liable to the Contractor for any increased compensation without such written order. No office, employee or agent of Owner is authorized to direct any extra or changed work orally. A Change Order in the form attached as Exhibit "D" to this Agreement, shall be issued and executed promptly after an agreement is reached between Contractor and Owner concerning the requested changes. Contractor shall promptly perform changes authorized by duly executed Change Orders. The Contract Amount and Contract Time shall be adjusted in the Change order in the manner as Owner and Contractor shall mutually agree. 19.COMPLIANCE WITH LAWS. Contractor agrees to comply, at its own expense, with all federal, state and local laws, codes, statutes, ordinances, rules, regulations and requirements applicable to the Project, including but not limited to those dealing with taxation, workers' compensation, equal employment and safety (including, but not limited to, the Trench Safety Act, Chapter 553, Florida Statutes). If Contractor observes that the Contract Documents are at variance therewith, it shall promptly notify Owner in writing. 20.CLEAN UP. Contractor agrees to keep the Project site clean at all times of debris, rubbish and waste materials arising out of the Work. At the completion of the Work, Contractor shall remove all debris, rubbish and waste materials from and about the Project site, as well as all tools, appliances, construction equipment and machinery and surplus materials, and shall leave the Project site clean and ready for occupancy by Owner. 21.ASSIGNMENT. Contractor shall not assign this Agreement or any part thereof, without the prior • consent in writing of Owner. If Contractor does, with approval, assign this Agreement or any part thereof, it shall require that its assignee be bound to it and to assume toward Contractor all of the obligations and responsibilities that Contractor has assumed toward Owner. 22.WARRANTY. Contractor shall obtain and assign to Owner all express warranties given to Contractor or any subcontractors by any materialmen supplying materials, equipment or fixtures to be incorporated into the Project. Contractor warrants to Owner that any materials and equipment furnished under the Contract Documents shall be new unless otherwise specified, and that all Work shall be of good quality, free from all defects and in conformance with the Contract Documents. Contractor further warrants to Owner that all materials and equipment furnished under the Contract Documents shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with the instructions of the applicable manufacturers, fabricators, suppliers or processors except as otherwise provided for in the Contract Documents. If, within one (1) year after final completion, any Work is found to be defective or not in conformance with the Contract Documents, Contractor shall correct it promptly after receipt of written notice from Owner. Contractor shall also be responsible for and pay for replacement or repair of adjacent materials or Work which may be damaged as a result of such replacement or repair. These warranties are in addition to those implied warranties to which Owner is entitled as a matter of law. Paae -6- Packet Page -1375- 1/8/2013 Item 16.C.2. 23.EMPLOYEES. The Contractor shall employ people to work at the Owner's tacilities wno are neat, clean, well groomed and courteous. 24.TESTS AND INSPECTIONS. If the Contract Documents or any codes, laws, ordinances, rules or regulations of any public authority having jurisdiction over the Project requires any portion of the Work to be specifically inspected, tested or approved, Contractor shall assume full responsibility therefore, pay all costs in connection therewith and furnish to the Owner the required certificates of inspection, testing or approval. All inspections, tests or approvals shall be performed in a manner and by organizations acceptable to the Owner. 25.PROTECTION OF WORK. A. Contractor shall fully protect the Work from loss or damage and shall bear the cost of any such loss or damage until final payment has been made. If Contractor or anyone for whom Contractor is legally liable is responsible for any loss or damage to the Work, or other work or materials of Owner or Owner's separate contractors, Contractor shall be charged with the same, and any monies necessary to replace such loss or damage shall be deducted from any amounts due Contractor. B. Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. C. Contractor shall not disturb any benchmark established by the Owner with respect to the Project. If Contractor, or its subcontractors, agents or anyone, for whom Contractor is legally liable, disturbs the Owner's benchmarks, Contractor shall immediately notify Owner. The Owner shall re-establish the benchmarks and Contractor shall be liable for all costs incurred by Owner associated therewith. 26.EMERGENCIES. In the event of any emergency affecting the safety or protection of persons or the Work or property at the Project site or adjacent thereto, Contractor, without special instruction or authorization from Owner is obligated to act to prevent threatened damage, injury or loss. Contractor shall give the Owner written notice within forty-eight (48) hours after the occurrence of the emergency, if Contractor believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby. If the Owner determines that a change in the Contract Documents is required because of the action taken in response to an emergency, a Change Order shall be issued to document the consequences of the changes or variations. If Contractor fails to provide the forty-eight (48) hour written notice noted above, the Contractor shall be deemed to have waived any right it otherwise may have had to seek an adjustment to the Contract Amount or an extension to the Contract Time. 27.COMPLETION. When the entire Work (or any portion thereof designated in writing by Owner) is ready for its intended use, Contractor shall notify Owner in writing that the entire Work (or such designated portion) is substantially complete and request that Owner issue a Certificate of Completion (substantial or final Certificate of Completion). Within a reasonable time thereafter, Owner and Contractor shall make an inspection of the Work (or designated portion thereof) to determine the status of completion. If Owner does not consider the Work (or designated portion) substantially complete, the Owner shall notify Contractor in writing giving the reasons therefor. Paae -7- Packet Page-1376- 1/8/2013 Item 16.C.2. If Owner considers the Work (or designated portion) substantially complete, Owner snail prepare and deliver to Contractor a Certificate of Completion (substantial or final Certificate of Completion) which shall fix the date of Substantial Completion for the entire Work (or designated portion thereof) and include a tentative punchlist of items to be completed or corrected by Contractor before final payment. Owner shall have the right to exclude Contractor from the Work and Project site (or designated portion thereof) after the date of Substantial Completion, but Owner shall allow Contractor reasonable access to complete or correct items on the tentative punchlist. Upon receipt of written certification by Contractor that the Work is completed in accordance with the Contract Documents and is ready for final inspection and acceptance, and upon receipt of a final Application for Payment, Owner will make such inspection and, if Owner finds the Work acceptable and fully performed under the Contract Documents, he shall promptly issue a final Certificate for Payment, recommending that on the basis of his observations and inspections, and the Contractor's certification that the Work has been completed in accordance with the terms and conditions of the Contract Documents, that the entire balance found to be due Contractor is due and payable. Final payment shall not become due and payable until Contractor submits: (1) The Release and Affidavit in the form attached as Exhibit "B". (2) Consent of Surety (if applicable) to final payment. (3) If required by Owner, other data establishing payment or satisfaction of all obligations, such as receipt, releases and waivers of liens, arising out of the Contract Documents, to the extent and in such form as may be designated by Owner. Owner reserves the right to inspect the Work and make an independent determination as to the Works acceptability. Unless and until the Owner is completely satisfied, the final payment shall not become due and payable. 28.LIQUIDATED DAMAGES. The "Commencement Date" shall be established in the Notice to Proceed to be issued by the Owner. Contractor shall commence the work within five (5) calendar days from the Commencement Date. No Work shall be performed at the Project site prior to the Commencement Date. Any Work performed by Contractor prior to the Commencement Date shall be at the sole risk of Contractor. The Work shall be substantially completed within the time specified in the Request for Quotation. The date of substantial completion of the Work (or designated portions thereof) is the date certified by the Owner when construction is sufficiently complete, in accordance with the Contract Documents, so Owner can occupy or utilize the Work (or designated portions thereof) for the use for which it is intended. The Work shall reach final completion and be ready for final acceptance by Owner within the time specified in the Request for Quotation. Owner and Contractor recognize that since time is of the essence for any work under this Agreement, Owner will suffer financial loss if the Work is not substantially completed within the time specified in the Request for Quotation. Should Contractor fail to substantially complete the Work within the specified time period, Owner shall be entitled to assess as liquidated damages, but not as a penalty, the amount specified in the Request for Quotation for each calendar day thereafter until substantial completion is achieved. The Project shall be deemed to be substantially completed on the date the Owner issues a Certificate of Substantial Completion pursuant to the terms hereof. Contractor hereby expressly Panes -R- Packet Page -1377- 1/8/2013 Item 16.C.2. waives and relinquishes any right which it may have to seek characterize the above notea liquidated damages as a penalty, which the parties agree represents a fair and reasonable estimate of the Owner's actual damages at the time of contracting if Contractor fails to substantially complete the Work in a timely manner. When any period of time is referenced by days herein, it shall be computed to exclude the first day and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day shall be omitted from the computation, and the last day shall become the next succeeding day which is not a Saturday, Sunday or legal holiday. 29.CONTRACT ADMINISTRATION. This Agreement shall be administered on behalf of the County by the Public Utilities Engineering Department. 30.COMPONENT PARTS OF THIS CONTRACT. This Contract consists of the attached or referenced component parts, all of which are as fully a part of the Agreement as if herein set out verbatim, including: Contractor's Proposal, Insurance Certificate, Request for Proposal No. 08- 5011, any addenda, Exhibits A, B, C and D, any Quotation/Work Order made or issued pursuant to this Agreement, and any related plans or specifications for any such Quotations or Work Orders. 31.SUBJECT TO APPROPRIATION. It is further understood and agreed, by and between the parties herein that this Agreement is subject to appropriation by the Board of County Commissioners. 32. PROHIBITION OF GIFTS TO COUNTY EMPLOYEES. No organization or individual shall offer or give, either directly or indirectly, any favor, gift, loan, fee, service or other item of value to any County employee, as set forth in Chapter 112, Part III, Florida Statutes, Collier County Ethics Ordinance No. 2004-05, and County Administrative Procedure 5311. Violation of this provision may result in one or more of the following consequences: a. Prohibition by the individual, firm, and/or any employee of the firm from contact with County staff for a specified period of time; b. Prohibition by the individual and/or firm from doing business with the County for a specified period of time, including but not limited to: submitting bids, RFP, and/or quotes; and, c. immediate termination of any contract held by the individual and/or firm for cause. 33. IMMIGRATION LAW COMPLIANCE: By executing and entering into this agreement, the Contractor is formally acknowledging without exception or stipulation that it is fully responsible for complying with the provisions of the Immigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324, et seq. and regulations relating thereto, as either may be amended. Failure by the Contractor to comply with the laws referenced herein shall constitute a breach of this agreement and the County shall have the discretion to unilaterally terminate this agreement immediately. 34. VENUE: Any suit or action brought by either party to this Agreement against the other party relating to or arising out of this Agreement must be brought in the appropriate federal or state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction on all such matters. 35. OFFER EXTENDED TO OTHER GOVERNMENTAL ENTITIES: Collier County encourages and agrees to the successful proposer extending the pricing, terms and conditions of this solicitation or resultant contract to other governmental entities at the discretion of the successful proposer. Pane -9- Packet Page-1378- 1/8/2013 Item 16.C.2. IN WITNESS WHEREOF, the Contractor and the County, have each, respectively, by an authorized person or agent, hereunder set their hands and seals on the date and year first above written. BOARD OF COUNTY COMMISSIONERS ATTEST: .-i, ,. COLLIER COU TY, FL IDA Dwight E 'Brock, Clerk of Courts By: IA 4• ICtA By 7 Miedall ____,,,. ` ' , ` Torn Henning , Chair n Dated ,. Attest-a ea ,' � �!�, fns s Q st attar, °oi Haskins, Inc. si/ii Contractor By: //• ,/ First Witness Signature 27)e, IT/wC 11 ,. �u c, exs Type/Print Witness Name Typed Signature .._ • ALe.±... / 40v46Ee -ct4 d Witness Title 3 1 « 30Li Type/Print Witness Name Approved as to form and legal suffici • - .: /'7 Ro•ert N. Zaary Assistant County Attorney Page -10- Packet Page-1379- 1/8/2013 Item 16.C.2. EXHIBIT A PUBLIC PAYMENT BOND f Bond No. Contract No. 08-5011 KNOW ALL ME BY THESE PRESENTS: That as Principal, and , as Surety, located at (Business Address) are held and firmly bound to as Oblige in the sum of ($ ) for the payment whereof we bind ourselves, our heirs, executors, personal representatives, successors and assigns, jointly and severally. WHEREAS, Principal has entered into a contract dated as of the day of 200_, with Oblige for in accordance with drawings and specifications, which contract is incorporated by reference and made a part hereof, and is referred to as the Contract. THE CONDITION OF THIS BOND is that if Principal: Promptly makes payment to all claimants as defined in Section 255.05(1), Florida Statutes, \.>,: supplying Principal with labor, materials or supplies, used directly or indirectly by Principal in the prosecution of the work provided for in the contract, then this bond is void; otherwise it remains in full force. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect sureties obligation under this Bond. The provisions of this bond are subject to the time limitations of Section 255.0592. In no event will the Surety be liable in the aggregate to claimants for more than the penal sum of this Payment Bond, regardless of the number of suits that may be filed by claimants. IN WITNESS WHEREOF, the above parties have executed this instrument this day of 200 , the name of under-signed representative, pursuant to authority of its governing body. Paae -11- Packet Page-1380- 1/8/2013 Item 16.C.2. Signed, sealed and delivered in the presence of: PRINCIPAL: By: Witnesses as to Principal Name: Its: STATE OF COUNTY OF The foregoing instrument was acknowledged before me this of 200_, by , as of , a corporation, on behalf of the corporation. He/she is personally known to me OR has produced as identification and did (did not) take an oath. My Commission Expires: (Signature of Notary) Name: (Legibly Printed) (AFFIX OFFICIAL SEAL) Notary Public, State of Commission No.: ATTEST: SURETY: (Printed Name) (Business Address) (Authorized Signature) Witness as to Surety (Printed Name) OR Paae -12 Packet Page -1381- 1/8/2013 Item 16.C.2. As Attorney in Fact (Attach Power of Attorney) Witnesses (Business Address) (Printed Name) (Telephone Number) STATE OF COUNTY OF The foregoing instrument was acknowledged before me this day of 200_, by , as of , Surety, on behalf of Surety. He/She is personally known to me OR has produced as identification and who did (did not) take an oath. My Commission Expires: (Signature of Notary) Name: (Legibly Printed) (AFFIX OFFICIAL SEAL) Notary Public, State of Commission No.: Pace -13- Packet Page-1382- 1/8/2013 Item 16.C.2. EXHIBIT A-1 PUBLIC PERFORMANCE BOND Bond No. Contract No. 08-5011 KNOW ALL MEN BY THESE PRESENTS: That , as Principal, and , as Surety, located at (Business Address) are held and firmly bound to , as Oblige in the sum of ($ ) for the payment whereof we bond ourselves, our heirs, executors, personal representatives, successors and assigns,jointly and severally. WHEREAS, Principal has entered into a contract dated as of the day of 200 , with Oblige for in accordance with drawings and specifications, which contractor is incorporated by reference and made a pat hereof, and is referred to as the Contract. THE CONDITION OF THIS BOND is that if Principal: 1. Performs the Contract at the times and in the manner prescribed in the Contract, and 2. Pays Oblige any and all losses, damages, costs and attorneys' fees that Oblige sustains because of any default by Principal under the Contract, including, but not limited to, all delay damages, whether liquidated or actual, incurred by Oblige; and 3. Performs the guarantee of all work and materials furnished under the Contract for the time specified in the Contract, then this bond is void; otherwise it remains in full force. Any changes in or under the Contract and compliance or noncompliance with any formalities connected with the Contract or the changes do not affect Sureties obligation under this bond. The Surety, for value received, hereby stipulates and agrees that no changes, extensions of time, alterations or additions to the terms of the Contract or other work to be performed hereunder, or the specifications referred to therein shall in anywise affect its obligations under this bond, and it does hereby waive notice of any such changes, extensions of time, alternations or additions to the terms of the Contract or to work or to the specifications. Panes -14- Packet Page-1383- 1/8/2013 Item 16.C.2. This instrument shall be construed in all respects as a common law bond. It is expressly understood that the time provisions and statute of limitations under Section 255.05, Florida Statutes, shall not apply to this bond. In no event will the Surety be liable in the aggregate to Oblige for more than the penal sum of this Performance bond regardless of the number of suits that may be filed by Oblige. IN WITNESS WHEREOF, the above parties have executed this instrument this day of 200 , the name of each party being affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body. Signed, sealed and delivered in the presence of : PRINCIPAL: By: Witnesses as to Principal Name: Its: STATE OF COUNTY OF The foregoing instrument was acknowledged before me this day of 200_, by , as of , a corporation, on behalf of the corporation. He/She is personally known to me OR has produced as identification and did (did not)take an oath. My Commission Expires: (Signature of Notary) Name: (Legibly Printed) (AFFIX OFFICIAL SEAL) Notary Public, State of Commission No.: Pace -15- Packet Page -1384- 1/8/2013 Item 16.C.2. ATTEST: SURETY: (Printed Name) (Business Address) (Authorized Signature) Witness as to Surety (Printed Name) OR As Attorney in Fact (Attach Power of Attorney) Witnesses (Business Address) (Printed Name) (Telephone Number) STATE OF COUNTY OF The foregoing instrument was acknowledged before me this day of 200_, by , as of , Surety, on behalf of Surety. He/She is personally known to me OR has produced as identification and who did (did not) take an oath. My Commission Expires: (Signature of Notary) Name: (Legibly Printed) (AFFIX OFFICIAL SEAL) Notary Public, State of Commission No.: Paae -16- Packet Page -1385- 1/8/2013 Item 16.C.2. EXHIBIT B RELEASE AND AFFIDAVIT FORM COUNTY OF COLLIER ) STATE OF FLORIDA ) Before me, the undersigned authority, personally appeared who after being duly sworn, deposes and says: (1) In accordance with the Contract Documents and in consideration of $ paid, ("Contractor") releases and waives for itself and it's subcontractors, material-men, successors and assigns, all claims demands, damages, costs and expenses, whether in contract or in tort, against the Board of County Commissioners of Collier County, Florida, relating in any way to the performance of the Agreement between Contractor and Owner, dated 200_for the period from to (2) Contractor certifies for itself and its subcontractors, material-men, successors and assigns, that all charges for labor, materials, supplies, lands, licenses and other expenses for which Owner might be sued or for which a lien or a demand against any payment bond might be filed, have been fully satisfied and paid. (3) Contractor agrees to indemnify, defend and save harmless Owner from all demands or suits, actions, claims of liens or other charges filed or asserted against the Owner arising out of the performance by Contractor of the Work covered by this Release and Affidavit. (4) This Release and Affidavit is given in connection with Contractor's [monthly/final] Application for Payment No. CONTRACTOR BY: ITS: President DATE: Witnesses [Corporate Seal] STATE OF COUNTY OF The foregoing instrument was acknowledged before me this day of , 200_, by , as of , a corporation, on behalf of the corporation. He/she is personally known to me or has produced as identification and did (did not) take an oath. My Commission Expires: (Signature of Notary) NAME: (Legibly Printed) (AFFIX OFFICIAL SEAL) Notary Public, State of Commissioner No.: Paae -17- Packet Page-1386- 1/8/2013 Item 16.C.2. EXHIBIT C FORM OF CONTRACT APPLICATION FOR PAYMENT (County Project Manager) RFP No. 08-5011 (County Department) Project No. Collier County Board of County Commissioners (the OWNER) Application Date FROM: (Contractor's Representative) Payment Application No. (Contractor's Name) for Work accomplished through the (Contractor's Address) Date: RE: (Project Name) Original Contract Time: Original Contract Amount: $ Revised Contract Time: Total Change Orders to Date $ Revised Contract Amount $ Total value of Work Completed and stored to Date $ Percent Work completed to Date: % Less Retainage $ Percent Contract Time completed Total earned Less Retainage $ to Date % Less previous payment (s) $ AMOUNT DUE THIS APPLICATION: $ ATTACH SCHEDULE OF VALUES AND ACCOMPANYING DOCUMENTATION TO THIS APPLICATION CONTRACTOR'S CERTIFICATION: The undersigned CONTRACTOR certifies that: (1) all previous progress payments received from OWNER on account of Work done under the Contract referred to above have been applied to discharge in full all obligations of CONTRACTOR incurred in connection with Work covered by prior Applications for Payment numbered 1 through inclusive; (2) title to all materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to OWNER at time of payment free and clear of all liens, claims, security interests and encumbrances (except such as covered by Bond acceptable to OWNER); (3) all amounts have been paid for work which previous payments were issued and received from the OWNER and that current payment is now due; (4) and CONTRACTOR agrees that all overruns as shown on the monthly estimate summary shall, in fact, be added to the revised contract and shall be incorporated into a future Change Order: By CONTRACTOR: (Contractor's Name) (Signature) DATE: (Type Name &Title) (shall be signed by a duly authorized representative of CONTRACTOR) Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is recommended: By Design Professional : (DP's Name) (Signature) DATE: (Type Name &Title) Payment to the CONTRACTOR for the above AMOUNT DUE THIS APPLICATION is approved: By OWNER'S Project Manager: (Signature) DATE: (Type Name and Title) Page -18- Packet Page-1387- 1/8/2013 Item 16.C.2. EXHIBIT D CHANGE ORDER CHANGE ORDER NO. CONTRACT NO.08-5011 TO: DATE: PROJECT NAME: PROJECT NO.: Under our AGREEMENT dated ,200_. You hereby are authorized and directed to make the following change(s)in accordance with terms and conditions of the Agreement: FOR THE(Additive)(Deductive) Sum of: $ ($ ) Original Agreement Amount $ Sum of Previous Changes $ This Change Order(Add) (Deduct) $ Present Agreement Amount $ The time for completion shall be(increased/decreased)by calendar days due to this Change Order. Accordingly, the Contract Time is now ( ) calendar days. The substantial completion date is and the final completion date is . Your acceptance of this Change Order shall constitute a modification to our Agreement and will be performed subject to all the same terms and conditions as contained in our Agreement indicated above, as fully as if the same were repeated in this acceptance. The adjustment, if any, to the Agreement shall constitute a full and final settlement of any and all claims of the Contractor arising out of or related to the change set forth herein, including claims for impact and delay costs. Accepted: ,200 CONTRACTOR: OWNER: BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA By: By: DESIGN PROFESSIONAL: By: Paae -19- Packet Page-1388- 1/8/2013 Item 16.C.2. ACORDTh, CERTIFICATE OF LIABILITY INSURANCE 1;22,`"008�' PRODUCER Phone: 239-278-0278 Fax: 239-278-5306 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ``�"''• Brown & Brown, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 3820 Colonial Blvd. Suite 200 HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Fort Myers FL 33966-1094 INSURERS AFFORDING COVERAGE NAIC# INSURED INSURERA:FCCI Commercial Insurance Co. Haskins, Inc. INsuRERB:FCCI Insurance Company H & K Equipment Sales & Rental, Inc. 10956 Enterprise Avenue INSURER C- Bonita Springs FL 34135 INSURERD: INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSRADD'L POLICYEFFECTIVE POUCYEXPIRATION UMRS . . .• a - . :_. POUCYNUMBER . r •� . L.„ ,. • A GENERALLIABIUTY GL00056581 7/1/2007 7/1/2008 EACHOCCURRENCE $1,000,000 DAMAGETORNIED X COMMERCIAL GENERAL LIABILITY PREMISES(Eal=occurrence) $100,000 CLAIMSMADE Ix I OCCUR MED EXP(Any ors parson) $5.000 X ContrartrnrRl PERSONAL a ADV INJURY $1,000,000 GENERAL AGGREGATE $2,000,000 � GENt AGGREGATE LI MITAPPLI ES PER: PRODUCTS-COMP/OP AGG $2,000.000 X I POU CY X EC X LOC A AUTOMOBILE LIABIUTY CA00047494 7/1/2007 7/1/2008 COMBINED SINGLE UMIT $1,000,000 X ANY AUTO (Ea accident) ALL OWNED AUTOS BODILY INJURY $ SCHEDULED AUTOS _ )HIRED AUTOS BODILY INJURY $ NON-OWNED AUTOS (Per accident) _.. PROPERTY DAMAGE $ (Per accident) GARAGE LIABIUTY AUTO ONLY-EAACCIDENT $ ANY AUTO OTHER THAN EAACC $ AUTO ONLY: AGG S EACHOCCURRENCE 52,000.000 A �EX�CESS/UMBRELLAUABILITY UN�00056761 8/16/2007 8/16/2008 X OCCUR CLAIMSMADE AGGREGATE $2,000,000 $ DEDUCTIBLE $ X RETENTION $10,000 I _ $ B WORKERS COMPENSATION AND 54191 7/1/2007 7/1/2008 X IY LIMITS IOER EMPLOYERS'UABIUTY EL EACH ACCIDENT $1,000,000 ANY PROPRIETORIPARME ECUTIVE /M OFRCEREMBER EXCLUDED? E.L DISEASE-EA EMPLOYEE $1,000,000 If yes,describe under SPECIAL PROVISIONS below E.L DISEASE-POLICY LIMIT $1,000,000 A OTHER CM00031681 7/1/2007 7/1/2008 Maximum Limit 5100,000 Leased or Rented Equipment DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SP ECIAL PROVISIONS *10 DAYS NOTICE OF CANCELLATION FOR NON-PAYMENT OF PREMIUM APPLIES, 30 DAYS FOR ALL OTHER REASONS. UMBRELLA FOLLOWS FORM OVER GENERAL LIABILITY, BUSINESS AUTO, AND EMPLOYERS LIABILITY RE: RFP #08-5011 "Annual Contract for Underground Utility Contracting Services" Collier County Board of County Commissioners is Additional Insured with regards to the General Liability overage shown above, for work performed by the named insured as required by written contract. A Waiver of Subrogation is included for the General Liability coverage. CERTIFICATE HOLDER CANCELLATION10 Os vs SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER Collier County Board of County Commissioners WILL ENDEAVOR TO MAIL *30 DAYS WRITTEN NOTICE TO THE General Services Building CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO 3301 East Tamiami Trail SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON Npales FL 34112 THE INSURER, ITS AGENTS OR REPRESENTATIVES. AUTHOR¢EDREPRESENTATIVE ...> a. c..-. I -\,., , ACORD 25(2001/08) @ ACORD CORPORATION 1988 Packet Page -1389- 1/8/2013 Item 16.C.2. IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. ACORD 25(2001/08) Packet Page-1390- 1/8/2013 Item 16.C.2. Engineer's Preliminary Estimate of Probable Construction Cost Upgrades to IQ Water Sites-Priority Group#3 11/30/2012 H.M.#2011.028 ., Unit Number Cost Material Markup Installation Total Description of Units per Cost Cost Cost Unit 0.2 0.3 Mechanical Fittings&Piping 20"MJ C153 SOLID SLEEVE LONG EA 2 $385 $770 $154 $231 $1,155 16"MJ C153 SOLID SLEEVE LONG EA 1 $250 $250 $50 $75 $375 8"MJ C153 SOLID SLEEVE LONG EA 1 $100 $100 $20 $30 $150 8"MJ AW WA C153 TEE EA 1 $150 $150 $30 $45 $225 20"MEGALUG KIT EA 6 $255 $1,530 $306 $459 $2295 16"MEGALUG KIT EA 6 $240 $1,440 $288 $432 $2,160 8"MEGALUG KIT EA 6 $75 $450 $90 $135 $675 Subtotal $7,035 PVC Pipe 8"PVC DR-18,C-900 PIPE LF 40 $15 $600 $120 $180 $900 Subtotal $900 Valves 20"GATE VALVE MJ w/MOTOR OPERATOR EA 2 $25,000 $50,000 $10,000 $15,000 $75,000 16"GATE VALVE MJ w/MOTOR OPERATOR EA 1 $20,000 $20,000 $4,000 $6,000 $30,000 8"GATE VALVE MJ w/MOTOR OPERATOR EA 1 $12,000 $12,000 $2,400 $3,600 $18,000 8"GATE VALVE MJ EA 1 $1,000 $1,000 $200 $300 $1,500 Subtotal $124,500 Miscellaneous CONCRETE CRADLE EA 1 $5,000 $5,000 $1,500 $1,500 $8,000 CONCRETE VALVE PADS EA 3 $600 $1,800 $540 $540 $2,880 ABOVE GROUND VALVE STEMS AND OVERTOROUE PROTECTORS EA 4 $2,000 $8,000 $2,400 $2,400 $12,800 ELECTRICAL CONSTRUCTION COSTS LS 1 $123,490 $123,490 $37,047 - $160,537 CHAIN LINK FENCE LF 240 $20 $4,800 $1,440 $1,440 $7,680 6"RIP-RAP AND EROSION CONTROL FABRIC LS 1 $1,000 $1,000 $300 $300 $1,600 HIGH VIS. REFLECTIVE YELLOW FINISH WARNING MARKER&FDOT POST LS 1 $1,500 $1,500 $450 $450 $2,400 8" (6"THICK STEEL REINFORCED CONCRETE)MITRED END SECTION EA 1 $600 $600 $180 $180 $960 MISCELLANEOUSAPPERTENANCES LS 1 $5,000 $5,000 $1,500 $1,500 $8,000 RESTRAINING EXISTING PIPE JOINTS LS 1 $7,000 $7,000 - - $7,000 DEMOLITION LS 1 $5,000 $5,000 - - $5,000 SODDING SF 2000 $1 $2,000 $600 $600 $3,200 DEWATERING LS 1 $12,000 $12,000 - - $12,000 EARTHWORK AND GRADING LS 1 $5,000 $5,000 - - $5,000 Subtotal $237,057 Material and Installation Costs $369,492 Contractor's mobilization,overhead,profit @ 15% $55,400 Subtotal $424,892 Contingency $45.000 Total Construction Cost $469,892 Packet Page-1391- 1/8/2013 Item 16.C.2. 1-+ N W -I. v1 cn '.. p p p O p O O O O O O O C O O O O O O o 02 0. lfD w rn vt et N i I I i o -s ° • M • W . U ii ° CO F 7 I I I V tn Lrl I ( -O • I I Gq I I I Iv z I C. w { I rr • : I I 1 O 2 I • I A 1 co I * i O DJ 2 I ; j s I I II f I LA fD A l I • I c I O• a ro • I I E ; I I 1 C .O tt 1 p p vv \ 0 0 D 0 Im D -1 — ' O� o) VI m -5 rD C D r�-r c LL 6 0_""' 0- D Q. n o a a. cr rn O O fl N n co (p cm i Packet Page-1392- 1/8/2013 Item 16.C.2. HOLE MONTES ENGINEERS•PLANNERS•SURVEYORS LANDSCAPE ARCHITECTS - 950 Encore Way' Naples,Florida 34110•Phone:239.254,2000*Fax:239.254.2099 December 18, 2012 Aaron Cromer, P.E., Principal Project Manager Collier County Public Utilities 3339 Taniiami Trail East Suite 303 Naples FL 34112 RE: EVALUATION OF QUOTATIONS IQ Water Sites Priority Group 3 HM File No. 201 1.028 Dear Aaron, We have reviewed the five bids received by the County on IQ Water Sites Priority Group 3 for County Quote No. 08-5011-75. The five bidders and their quoted price are identified below as provided by the County Purchasing Department. The apparent low quote is from Haskins, Inc. in the amount of$405,000.00. Bidder Bid Haskins, Inc. $405,000.00 2 DN Higgins $433,767.00 3 Kyle Construction $436,890.00 4 Quality Enterprises $456,270.00 5 Mitchell & Stark Const. Co. Inc. $489,785.00 Haskins, Inc. has successfully completed other construction projects for Collier County and is on the County's Iist of approved utility contractors. The engineer's estimate is $469,892.00. Therefore, we recommend award of this construction contract to Haskins, Inc. in the amount of $405,000.00 subject to a final review by the Purchasing Department of the quotation documents. Please contact us if there are any questions about this quote evaluation. Thank you, HOLE MONTES, INC.f / Frank J. Feeney, P.E., LEED-AP Project Manager FJF:dlh H:120I 8201 I0281EMC Correspondence\C I Client Corrspondence\20121218 AC IQ Water Sites Priority Group 3 REVISED Award Recommendation ltr FIF.doc Packet Page-1393- 1/8/2013 Item 16.C.2. WORK ORDER/PURCHASE ORDER Agreement for Fixed Term Underground Utility Contract#08-5011 Contract Date:March 11,2008 Fixed Term Contract Expires March 10,2014 (RFQ#08-5011-75) BCC Approval Date: 1/8/2012 Item#16.C.4 This Work Order is for Underground Utility Construction Services for work known as: Project Name:70062.3.2 Upgrades to IQ Water Sites Priority Group#3 Project No:70062.3.2 Upgrades to IQ Water Sites Priority Group#3 The work is specified in the Proposal page,dated August 7,2012,which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above and Request for Quotation#08-5011-75 dated November 19,2012, as modified by Addendum 1 thru 3,attached hereto a part of this Work Order# (please fill in once received)is assigned to:Haskins,Inc. Scope of Work: Per Quote Tabulation form attached and the following: Contractor will add underground, actuated valves at the following four sites as detailed in the attached proposal and the following: * Task I All Work Described in the Request for Quotation Scope of Work * Task II Allowance Schedule of Work: Complete work within 365 days from the date of the Notice to Proceed which is accompanying this Work Order. Compensation: In accordance with Section 2—Statement of Work for Agreement#08-5011-75,the County will compensate the Finn in accordance with following method(s): Negotiated Lump Sum and®Time and Material(non-guaranteed,owner directed work),as provided in the attached proposal. Task I $360,000.00 (LS) Task II $45,000.00 (TM) TOTAL COSTS FOR TASKS I&II $405,000.00 PREPARED BY: David Ahmad,Tech Supp.Specialist Date APPROVED BY: Aaron Cromer,PPMD Principal Project Manager Date APPROVED BY: Danette Huff,Manager—Irrigation Quality Date APPROVED BY: Tom Chmelik,PPMD Director Date APPROVED BY: Steve Messner,WW Director Date APPROVED BY: George Yilmaz,Administrator Date APPROVED BY: Nicole Parker,Procurement Strategist Date ACCEPTED BY: HASKINS,INC. Ben D.Elwell,Manager Date Packet Page-1394-