Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Agenda 01/08/2013 Item #16A10
1/8/2013 Item 16.A.10. EXECUTIVE SUMMARY Recommendation to approve final acceptance of the water and sewer utility facilities for The Quarry — Entry Road (AR-5360), Entry Road Phase 2 (AR-5360), Phase 1-1 (8958), and Phase 1-2 (AR-9541) and to release the Final Obligation Bond in the total amount of$4,000 to the Project Engineer or the Developers Designated Agent. OBJECTIVE: To have the Board of County Commissioners, Ex-Officio the Governing Board of the Collier County Water-Sewer District, to accept final and unconditional conveyance of these water and sewer facilities and to release the Final Obligation Bond in the total amount of $4,000.00. CONSIDERATIONS: 1) The Developer of The Quarry — Entry Road, Entry Road Phase 2, Phase 1-1 and, Phase 1-2 has constructed the water and sewer facilities within dedicated easements to serve this development. See attached location maps. 2) Preliminary acceptance of these utilities has been approved by the Engineering Services Staff. At that time,this was the value of these utility facilities: Project Preliminary Acceptance Assets Date Water Sewer Entry Road November 3, 2005 $58,966.34 $145,829.37 Entry Road Phase 2 May 3, 2006 $80,597.20 $97,439.28 Phase 1-1 May 5, 2006 $351,246.10 $603,585.19 Phase 2-2 August 7, 2006 $48,802.10 $339,620.48 The total gross value of the assets are $1,726,086.06. This final acceptance is in accordance with Collier County Ordinance No. 2004-31, as amended. See attachment asset sheets. 3) Staff recorded all preliminary acceptance documents in the public records of Collier County, which have been reviewed and approved by the County Attorney's office as to form and legal sufficiency. 4) The water and sewer facilities have been operated and maintained by the Collier County Water-Sewer District during, not less than,the required one (1)year warranty period. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Engineering Services staff in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Final Obligation Bond in the total amount of$4,000.00 to be released. See attached Exhibit A. 7) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. Packet Page-1207- 1/8/2013 Item 16.A.10. FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. However, approval of this Executive Summary will result in the Collier County Water-Sewer District receiving unconditional title to the above utility facilities, which at the time of preliminary acceptance, had a total gross value of$1,726,086.06 (no depreciation applied). GROWTH MANAGEMENT IMPACT: Approval of this Executive Summary will have no growth management impact. LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney's Office, is legally sufficient, and requires a majority vote for approval. —ERP RECOMMENDATION: To have the Board of County Commissioners, Ex-Officio the Governing Board of the Collier County Water-Sewer District, authorize final acceptance of these water and sewer utility facilities for The Quarry — Entry Road (AR-5360), Entry Road Phase 2 (AR-5360), Phase 1-1 (8958) and, Phase 1-2 (AR-5541) and authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000.00 to the Project Engineer or the Developer's designated agent. PREPARED BY: Jodi Hughes, Technician,Engineering Services, Growth Management Division,Planning and Regulation Attached Documents: 1. Location Maps 2. Asset Sheets 3. Exhibit A Packet Page-1208- 1/8/2013 Item 16A10. COLLIER COUNTY Board of County Commissioners Item Number: 16.A.10. Item Summary: Recommendation to approve final acceptance of the water and sewer utility facilities for The Quarry—Entry Road (AR-5360), Entry Road Phase 2 (AR-5360), Phase 1-1 (8958), and Phase 1-2 (AR-9541) and to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developers Designated Agent. Meeting Date: 1/8/2013 Prepared By Name: HughesJodi Title: Techni cian,Engineering&Environmental Services 12/11/2012 9:28:43 AM Approved By Name: Steve Messner Title: Plant Manager,Water Date: 12/11/2012 10:23:28 AM Name: Paul Mattausch Title: Director-Water,Water Date: 12/11/2012 10:26:43 AM Name:NagySteve Title: Manager-Wastewater Collection, Wastewater Date: 12/11/2012 10:45:53 AM Name: KovenskyKenneth Title: Management/Budget Analyst, Senior,Operations&Regulatory Management Date: 12/13/2012 8:54:16 AM Name: Pam Libby Title: Manager-Operations-Water/WW,Water Date: 12/18/2012 7:42:12 AM Name: BeardLaurie Title: Planner,Transportation Planning Packet Page-1209- 1/8/2013 Item 16.A.10. Date: 12/18/2012 7:45:12 AM oNtok Name: PuigJudy Title: Operations Analyst,GMD P&R Date: 12/18/2012 9:28:07 AM Name: SunyakMark Title:Project Manager,Principal,Public Utilities Engine Date: 12/19/2012 12:56:33 PM Name: BradfordAlison Title: Project Manager,Transportation Planning Date: 12/19/2012 2:42:26 PM Name: Susan Jacobs Title: Operations Analyst,Public Utilities Date: 12/20/2012 12:55:35 PM Name: MarcellaJeanne Title: Executive Secretary,Transportation Planning Date: 12/20/2012 4:47:56 PM Name: PepinEmily Title: Assistant County Attorney, CAO Litigation Date: 12/27/2012 10:55:38 AM Name: KlatzkowJeff Title: County Attorney Date: 12/27/2012 2:36:06 PM Name: GreenwaldRandy Title: Management/Budget Analyst,Office of Management&B Date: 12/28/2012 4:56:05 PM Name: IsacksonMark Title: Director-Corp Financial and Mgmt Svs,CMO Date: 12/31/2012 10:07:12 AM Packet Page-1210- 1/8/2013 Item 16.A.10. uI I R €g2 1 S it ' 11 °le a9m alt LOGAN BOulEvARD i 191. adg I— © ®I_ _ r- O m AB�l� D �4 ° uI a IWI C.0.9lf 4 ©iti ___ /MR MB COlL1EA BOULEVARD il o � ][11:i ,or Z u :"1-, p I 1 ti 6 o o LEE COUNTY D 0 L b o m F z Si -IM I ° m Ve° — ° c m D 11-1-711,1 10 31 CMall - m z o v P. 2 1 41 III II s d. g Q � a �/� S /amour lobo:. ilociAVIAY HARBOR COURT �a `� 'AOOOOIE T OR f Apo- 2 99 t 9T4 M � + '�B' 1 �9 > ,b5 it ..\ II V I = o R t O y m O m s R i P. k- P._ - - 1/8/2013 Item 16.A.10. I 0 t0 1 o °�i x:88 =af ' 1 I ' LOGAN BOULEVARD A : ` i ^1—4 gl _ u r-1.' ' 1 \ 5r .1 r T. g p - .a°o 1 m n it H m D ii Z 8 C R,h1 .r z TM FM* O COLl1FA BOUIEVARD 6 1 gyp iYQ 17�77� D T r r—r r I la F, ti i 'a '8 81 LEE COUNTY y0 2 z ms; m 0 s q 1. e o XI -C m Z X o 1 B o 1 m E i B A N i ii i b i .. am: d EN W . 41211:1111 n 4 ne lonivi• - . .: s. m qN -` 4 il 121X.gaill N l-11'111 1 C A Om O a 1 i E 1- _ ( T Packet Page-1212- 1/8/2013 Item 16.A.10. N fa Ili o oil 1 ' 11 '11 _1 :9t z w LOGAR ROBLEVADO Rug EA$. e I/ n 33 .1./ an ni m _--I a_4 Y 4 I- U__' .13:31.BOULEVARD COWER BOULEVARD S _ iv. n u E ._ 1 �s a 1" 1 li \ ig 1s @� II b D s g 5r, _ x a 1 1. r „ .. N p m °s °° D g p o LEE COUNTY z -1 i E O�v x Q I _ a D x CD M JL m1Y WlK - "L fY.Y aEMR t i f 1 ...Ea o o I Alp o +• I '►1 1 ! ! ,� ��a ooaao go do iii`:14 a 1�► 1 iimilligOIMmu cccdcccaoa ccccaD o�� 0000� a is _ 1 i _ �pTQI=f'°Q�Y�O o o �O o 1 ., ��d �[� an O'q dx 1v �lL__ _ 0 ,..in, o v l .11.P. u o f Ind) o Ogre' _ma 00 o ego�» c 'L�d�Dp. � N �opa .•'�a nD ! m goo° 1 . ! 1 .41 „ , D i 4 1 -13 .0,.,_ .:. 0. .�o o m eVCOCCCDp4 e (� ,�ooccoo a Po�'CAO::, z o%Neva 'era !1% 60oom000 aOaAao�'Y, ,�- ' �Et Cu;] m j 1 e i li Racket Page -1213- 1/8/2013 Item 16.A.10. U/ -5.s 1eo e 8 it " iF t.11 w= Ft g a r LOGAN R I Nap 1 ! 4 �I SR 9; a .i a p ie ; a _ r O 1 11 ' it Wr¢+cao I J J m m nj ^ l7 A -' II 11 a!! F t 1 NM —I C.R.0.51 r , - ----_ COWER IOtAEVMO °0 a 3 K _ 0 1.-� i—. P \ II I e 1 r s g arc; LEE COUNTY I e q k s Q d C 77 = Rot m self D 0) o ©� --- F— . -- i � VIA' 1 i Y s l ' . i s n r r Y r r a ©. to d ©�= s �t w . s s V' i © 0 • , —I d 0 © __-- • i m ° ii 0 Q7 21 s s ��aa� s © ° h1jjijiITI it �, oQo-! s y °m ri i Z i i $ i P k- •.!- -1214- 0 1/8/2013 Item 16.A.10. CERTIFICATION OF CONTRIBUTORY ASSETS - COUNTY PROJECT NAME: THE QUARRY ENTRY ROAD LOCATION: SECTION 23,TOWNSHIP 48 SOUTH, RANGE 26 EAST QP f, ", COLLIER COUNTY, FLORIDA I j NAME&ADDRESS OF OWNER: CENTEX HOMES r` 5801 PELICAN BAY BOULEVARD, SUITE 600 NAPLES, FL 34108 TYPE OF UTILITY SYSTEM: POTABLE WATER(MATERIALS ONLY) ITEM SIZE QUAN. UNIT COST TOTAL I 16"DR18 PVC WATER MAIN 16" 154 LF $24.15 $3,719.10 16"DR25 PVC WATER MAIN 16" 1953 LF $17.54 $34,255.62 10"C-900 CL-200 10" 67 LF $11.98 $802.66 16"GATE VALVE 16" 5 EA $3,482.30 $17,411.50 10"GATE VALVE 10" 2 EA $1,096.20 $2,192.40 1"WATER SERVICE 1" 2 EA $292.53 $585.06 TOTAL COST $58,966.34 Packet Page-1215- 1/8/2013 Item 16.A.10. I do hereby certify that the quantities of materials described above are a true and accurate representation of the system. C RTI- ING: BRENDA K. MERCHANT AUTHORIZED AGENT OF: Haleakala Construction, Inc. 5758 Taylor Road Naples, Florida 34109-1829 STATE OF FLORIDA ) )SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 25th day of August, 2005 Bre2da K. Merchant who is personally known to me and who did not take an oath. SEAL: LINDA MAHON DD 177119 Linda Mahon ?4.1 -. Comm ission 11DD177119 Expires:Feb 21,2007 y., ...�,pp. .,�pp'�tl`�.� Bonded Tiro Atlantic Bonding Co.,Inc. Packet Page-1216- • • 1/8/2013 Item 16.A.10. CERTIFICATION OF CONTRIBUTORY ASSETS - COUNTY PROJECT NAME: THE QUARRY ENTRY ROAD LOCATION: SECTION 23, TOWNSHIP 48 SOUTH, RANGE 26 EAST ONGIIVAL COLLIER COUNTY, FLORIDA NAME&ADDRESS OF OWNER: CENTEX HOMES 5801 PELICAN BAY BOULEVARD, SUITE 600 NAPLES, FL 34108 TYPE OF UTILITY SYSTEM: SANITARY SEWER I FORCE MAIN(MATERIALS ONLY) I ITEM SIZE QUAN. UNIT COST TOTAL 8"PVC SEWER 8'-10' 8" 81 LF $5.10 $413.10 8"PVC SEWER I0'-12' 8" 287 LF $5.10 $1,463.70 8"PVC SEWER 12'-14' 8" 42 LF $5.10 $214.20 MANHOLE 8'-10' 4' 1 EA $2,598.00 $2,598.00 MANHOLE 10'-12' 4' 1 EA $3,161.00 $3,161.00 MANHOLE 12'-14' 4' 1 EA $3,554.00 $3,554.00 GUARD HOUSE SERVICE 1" 1 EA $241.00 $241.00 PUMP STATION#1 1 EA $97,000.00 $97,000.00 16"DRI8 PVC FORCEMAIN 16" 161 EA $23.62 $3,802.82 ! 16"DR25 PVC FORCEMAIN 16" 1485 EA $17.23 $25,586.55 16"PLUG VALVE 16" 2 EA $3,300.00 $6,600.00 4"CL-200 PVC FORCEMAIN 4" 100 LF $11.95 $1,195.00 $0.00 $0.00 TOTAL COST $145,829.37 Packet Page -1217- • * 1/8/2013 Item 16.A.10. I do hereby certify that the quantities of materials described above are a true and accurate representation of the system. CERTIFYING: 04244 ...) c JAYS N ORESCHNICK VICE PRESIDENT OF: Haleakala Construction, Inc. 5758 Taylor Road Naples, Florida 34109-1829 STATE OF FLORIDA ) )SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 1st day of September, 2005 by Jayson Oreschnick who is personally known to me and who did not take an oath. SEAL: LINDA MAHON DD 177119 Linda Mahon , •• ,Commission#DD177119 .•=Expires:Feb 21,2007 � : Bonded Thm ,°f fl Atlantic Bonding Co.,Inc. Packet Page-1218- • • 1/8/2013 Item 16.A.10. CERTIFICATION OF CONTRIBUTORY ASSETS - COUNTY PROJECT NAME: The Quarry - Entry Road, Phase 2 LOCATION: SECTION 23, TOWNSHIP 48 SOUTH, RANGE 26 EAST COLLIER COUNTY, FLORIDA NAME&ADDRESS OF OWNER: CENTEX HOMES 5801 PELICAN BAY BOULEVARD, SUITE 600 NAPLES, FL 34108 TYPE OF UTILITY SYSTEM: POTABLE WATER(MATERIALS ONLY) ITEM SIZE QUAN. UNIT COST TOTAL AIR RELEASE VALVE 1 EA $983.60 $983.60 FLANGED ENTRY BRIDGE DIP 16" 80 LF $365.20 $29,216.00 FLANGED MIDDLE BRIDGE DIP 16" 138 LF $365.20 $50,397.60 TOTAL COST $80,597.20 I do hereby certify that the quantities of materials described above are a true and accurate representation of the system. IFYING: fi/ BRENDA K. ERCHANT AUTHORIZED AGENT OF: Haleakala Construction, Inc. 5758 Taylor Road Naples, Florida 34109-1829 STATE OF FLORIDA ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 11th day of January, 2006 by Brenda K. Merchant who is personally known to me and who did not take an oath. ,4I t 1.14J lid,/� �- SEAL: LINDA MAHON DD 177119 Linda Mahon Commission#DD 177119 *'%,�*=Expires:Feb 21,2007 --;94-OF• Bonded Thru '"11 " Atlantic Bonding Co.,Inc. Packet Page-1219- • • 1/8/2013 Item 16.A.10. CERTIFICATION OF CONTRIBUTORY ASSETS COUNTY PROJECT NAME: The Quarry - Entry Road, Phase 2 LOCATION: SECTION 23,TOWNSHIP 48 SOUTH, RANGE 26 EAST COLLIER COUNTY, FLORIDA NAME&ADDRESS OF OWNER: CENTEX HOMES 5801 PELICAN BAY BOULEVARD, SUITE 600 NAPLES, FL 34108 TYPE OF UTILITY SYSTEM: SANITARY SEWER/FORCE MAIN (MATERIALS ONLY) ITEM SIZE QUAN. UNIT COST TOTAL I AIR RELEASE VALVE 1 EA $1,953.00 $1,953.00 FLANGED MIDDLE BRIDGE DIP 16" 138 LF $410.56. _ __ $56,657.28 OPEN CUT CASING 30" 60 LF $368.90 $22,134.00 PLUG VALVE 16" 3 EA $5,565.00_ _ 316 695.00 _ _ TOTAL COST $97,439.28 I do hereby certify that the quantities of materials described above are a true and accurate representation of the system. C IFYING: a BRENDA K. MERCHANT AUTHORIZED AGENT OF: Haleakala Construction, Inc. 5758 Taylor Road Naples, Florida 34109-1829 STATE OF FLORIDA ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 11th day of January, 2006 b Brenda K. Merchant who is personally known to me and who did not take an oath. .4 l 7/1-6440Y•- SEAL: LINDA MAHON DD 177119 ``�, ,,,, LindaMall0n '�••" :CommissionCD177119 ? X21,1,2007 =.• �;'I'L Feb Bonded '',�OFf` � Atlantic Bonding Co., Packet Page-1220- • • 1/8/2013 Item 16.A.10. CERTIFICATION OF CONTRIBUTORY ASSETS PROJECT NAME: QUARY, PHASE 1-1 LOCATION: SECTION 23,TOWNSHIP 48 SOUTH, RANGE 26 EAST o R I G I N /t j COLLIER COUNTY FLA Y/ 1 NAME&ADDRESS OF OWNER: CENTEX HOMES 5801 PELICAN BAY BLVD, SUITE 600 NAPLES, FL 34108 TYPE OF UTILITY SYSTEM: POTABLE WATER ( MATERIAL ONLY) ITEM QUAN. UNIT COST TOTAL 16"C905 DR25 5480 LF $ 25.00 $137,000.00 16"C905 DR18 220 LF $ 28.50 $6,270.00 105' 16" DIP BRIDGE CROSSING 1 LS $ 55,600.00 $55,600.00 12"C900 DRI8 2,680 LF $ 18.10 $48,508.00 12"C900 DR14 120 LF $ 22.00 $2,640.00 10"C900 DRI4 140 LF $ 16.89 52,364.60 8"C900 DRI8 2175 LF $ 12.50 $27,187.50 8"C900 DRI4 195 LF $ 10.00 $1,950.00 16"GATE VALVE 9 EA $ 4,250.00 $38,250.00 12"GATE VALVE 4 EA $ 1,278.00 $5,112.00 10"GATE VALVE 3 EA $ 1,123.00 $3,369.00 8"GATE VALVE 6 EA $ 950.00 $5,700.00 PERM.BACT.SPL.PT. 2 EA $ 650.00 $1,300.00 AIR RELEASE VALVE 1 EA $ 1,250.00 $1,250.00 SINGLE WATER SERVICE 13 EA $ 125.00 $1,625.00 DOUBLE WATER SERVICE 41 EA $ 320.00 $13,120.00 • TOTAL COST $351,246.10 Packet Page-1221- • • • 1/8/2013 Item 16.A.10. • I do hereby certify that the quantities of material described above are true and accurate representation of the as-installed cost of the system. FYING: Brenda K. Merchant Authorized Agent OF: Haleakala Construction, Inc. 5758 Taylor Road Naples, Florida 34109-1829 STATE OF FLORIDA ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 17TH day of March, 2006 by Brenda K. Merchant who is personally known to me and who did not take an oath. SEAL: Linda Mahon DD 177119 ,,,•,��,,,, LindaMahon ;` Commission#DD17711 __ Expires:Feb 21,2007 � ttondadThru u°„t�k` Atlantic`itantlingCo.,Inc. Packet Page-1222- • 1/8/2013 Item 16.A.10. CERTIFICATION OF CONTRIBUTORY ASSETS PROJECT NAME: QUARY, PHASE 1-1 LOCATION: SECTION 23,TOWNSHIP 48 SOUTH, RANGE 26 EAST COLLIER COUNTY FLA ORIGINAL NAME&ADDRESS OF OWNER: CENTEX HOMES 5801 PELICAN BAY BLVD, SUITE 600 NAPLES, FL 34108 TYPE OF UTILITY SYSTEM: SANITARY SEWER (MATERIAL ONLY) I ITEM QUAN. UNIT COST TOTAL I 8"PVC SEWER O'-6' 2,428 LF $5.59 $13,572.52 8"PVC SEWER 6-8' 801 LF $5.59 $4,477.59 8"PVC SEWER 8'-10' 976 LF $5.59 $5,455.84 . 8"PVC SEWER I0'-IT 177 LF $5.59 $989.43 MANHOLE 0'-6' 12 EA $5.59 $67.08 MANHOLE 6-8' 3 -EA $2,250.00 $6,750.00 MANHOLE 8'-10' 4 EA $3,810.00 $15,240.00 MANHOLE 10'-12' 4 EA $4,200.00 $16,800.00 DOUBLE SERVICE 42 EA $315.00 $13,230.00 SINGLE SERVICE 7 EA $385.00 $2,695.00 GUARD HOUSE SERVICE I EA $1,852.00 $1,852.00 LIFT STATION 2 EA $127,500.00 $255,000.00 105' 16"D.I.P. BRIDGE CROSSING 1 LS $55,689.00 $55,689.00 16"PVC C905 DR25 FORCEMAIN 1280 LF $69.00 $88,320.00 12"PVC FORCEMAIN DR 14 180 LF $22.00 $3,960.00 12"PVC FORCEMAIN DR 18 1170 LF $18.10 $21,177.00 10"PVC FORCEMAIN DR 14 60 LF $16.89 $1,013.40 10"PVC FORCEMAIN DR 18 1320 LF $14.25 $18,810.00 8"PVC FORCEMAIN DR 14 80 LF $12.50 $1,000.00 8"PVC FORCEMAIN DR 18 1750 LF $10.00 $17,500.00 4"PVC FORCEMAIN DR 14 137 LF $6.00 $822.00 4"PVC FORCEMAIN DR 18 1.277 LF $5.29 $6,755.33 16"PLUG VALVE I EA $4,980.00 $4,980.00 12"PLUG VALVE 2 EA $2,210.00 $4,420.00 10"PLUG VALVE 2 EA $1,652.00 $3,304.00 8"PLUG VALVE 3 EA $985.00 $2,955.00 4"PLUG VALVE 3 EA $650.00 $1,950.00 AIR RELEASE VALVE 12 EA $2,900.00 $34,800.00 TOTAL COST $603,585.19 Packet Page -1223- 1/8/2013 Item 16.A.1O. • •I do hereby certify that the quantities of material described above are true and accurate representation of the as-installed cost of the system. C ING: Brenda . Merchant Authorized Agent OF: Haleakala Construction, Inc. 5758 Taylor Road Naples, Florida 34109-1829 STATE OF FLORIDA ) )SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 17TH day of March, 2006 b Brenda K. Merchant who is personally known to me and who did not take an oath. SEAL: Linda Mahon DD 177119 LindaMVIahof. •rte':Commission#DD177119 EXpirBonded Thni 2007 '''1,°r 11 t O Atlantic Bonding Co.,Inc. Packet Page-1224- 1/8/2013 Item 16.A.10. CERTIFICATION OF CONTRIBUTORY ASSETS q NAL PROJECT NAME: QUARY, PHASE 1-2 LOCATION: SECTION 23,TOWNSHIP 48 SOUTH, RANGE 26 EAST COLLIER COUNTY FLA • NAME&ADDRESS OF OWNER: CENTEX HOMES 5801 PELICAN BAY BLVD, SUITE 600 NAPLES, FL 34108 TYPE OF UTILITY SYSTEM: POTABLE WATER (MATERIAL ONLY) I ITEM QUAN. UNIT COST TOTAL I 10"C900 DR18 2590 LF $ 12.74 532,996.60 8"C900 DR18 575 LF $ 12.50 57,187.50 10"GATE VALVE I EA $ 1,123.00 51,123.00 8"GATE VALVE 1 EA $ 950.00 5950.00 PERM.BACT.SPL.PT. 2 EA $ 650.00 51,300.00 SINGLE WATER SERVICE I EA $ 125.00 $125.00 DOUBLE WATER SERVICE 16 EA $ 320.00 $5,120.00 TOTAL COST $48,802.10 I do hereby certify that the quantities of material described above are true and accurate representation of the as-installed cost of the system. • C IFYING: Brenda K. Merchant Authorized Agent )SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 1st day of June, 2006 oy Brenda K. Merchant who is personally known to me and who did not take an oath. �.cn / /� �'L, SEAL: Linda Mahon DD 177119 `��"YP Linda Mahon • :r°` �`�:Commission#DD177119 ; ,:ec Expires:Feb 21,2007 ''9;.�6Fwd'. Bonded Thru ' Atlantic Bonding Co.,Inc. Packet Page-1225- • • 1/8/2013 Item 16.A.10. ' R MAL CERTIFICATION OF CONTRIBUTORY ASSETS Altok PROJECT NAME: QUARY, PHASE 1-2 LOCATION: SECTION 23,TOWNSHIP 48 SOUTH, RANGE 26 EAST COLLIER COUNTY FLA NAME &ADDRESS OF OWNER: CENTEX HOMES 5801 PELICAN BAY BLVD, SUITE 600 NAPLES, FL 34108 TYPE OF UTILITY SYSTEM: SANITARY SEWER (MATERIAL ONLY) ITEM QUAN. UNIT COST TOTAL 8"PVC SEWER 3,064 LF $5.59 $17,127.76 MANHOLE 14 EA $3,684.12 $51,577.68 DOUBLE SERVICE 15 EA $315.00 $4,725.00 SINGLE SERVICE 4 EA $385.00 $1,540.00 LIFT STATION 2 EA $127,500.00 $255,000.00 4"PVC FORCEMAIN DR 18 1,276 LF $5.29 $6,750.04 AIR RELEASE VALVE I EA $2,900.00 $2,900.00 TOTAL COST $339,620.48 I do hereby certify that the quantities of material described above are true and accurate representation of the as-installed cost of the system. C FYING: Br da K. Merchant Authorized Agent OF: Haleakala Construction, Inc. 5758 Taylor Road Naples, Florida 34109-1829 STATE OF FLORIDA ) )SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 1st day of June, 2006 by Brenda K. Merchant who is personally known to me and who did not take an oath. (/ .4414 t 92ia4 -L... SEAL: Linda Mahon s.4�`'Y�'i• Linda Mahon DD 177119 ;� `• :Commission#DD 1771 19 _ - ?' Expires:Feb 21,2007 Bonded Thru Atlantic Bonding Co.,Inc. Packet Page-1226- 1/8/2013 Item 16.A.10. Exhibit A Utilities Performance Security Bonds (UPS) and Final Obligation Bond Quarry, Phase 1-1 Amount Receipt Number 10% UPS Bond Incorporated within Plat Final Obligation Bond $4,000.00 643704 Total Amount $4,000.00 The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and is based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, is according with Utility Ordinance 2004-31 Attachments: 1. Receipt of Payment Packet Page-1227- 1/8/2013 Item 16.A.10. Official Receipt - Collier County Board of County Commissioners CDPR1103-Official Receipt Trans Number Date Post Date Payment Slip Nbr 643704 2/27/2006 1:23:51 PM 2/27/2006 AR 8958 Appl Name: WILSONMILLER, INC Appl Stage/Status: REVIEW STAGE NO. 1/PENDING Address: ADAM HAYES, El 4571 COLONIAL BLVD FORT MYERS FL 33912 Proj Name: QUARRY PHASE 1 Type: RMF TAZ: 0 Subdiv Nbr: 100 Project Nbr: 2004070016 Payor: CENTEX HOMES Fee Information Fee Code Description GL Account Amount Waived 12BOND DEPOSITS-COMM DEV(CASH BOND)67000000022011300000 $4000.00 Total $4000.00 Payments Payment Code Account/Check Number Amount CHECK 4527432 $4000.00 Total Cash $0.00 Total Non-Cash $4000.00 Total Paid $4000.00 Memo: Cashier/location: HILLCAROL / 1 User: EATON_S Collier County Board of County Commissioners Printed:2/27/2006 1:24:37 PM CD-Plus for Windows 95/NT Packet Page -1228-