Loading...
Agenda 01/08/2013 Item #10E 1/8/2013 Item 10.E. EXECUTIVE SUMMARY Recommendation to discuss Item 11E from the Board's September 11,2012 agenda regarding"Wastewater Basin Program"contracts. OBJECTIVE: To discuss with the Board the agenda item as presented to the Board regarding the Wastewater Basin Program approved Contract 11-5782. CONSIDERATIONS: On September 11, 2012 the Board of County Commissioners approved item 11E, Contract 11-5782 for three design contracts for the "Wastewater Basin Program". The Clerk would like to discuss this item with the Board. GROWTH MANAGEMENT IMPACT: None. FISCAL IMPACT: Approved amount of the 3 contracts$5,730,468. LEGAL CONSIDERATIONS: RECOMMENDATION: That the Board of County Commissioners further discuss this item. Prepared by: Crystal K.Kinzel,Finance Director Clerk of Courts Packet Page-522- Packet Page-444- 1/8/2013 Item 10.E. COLLIER COUNTY Board of County Commissioners Item Number: 10.E. Item Summary: Request for reconsideration by Commissioner Henning of Item 13A from the October 9, 2012 BCC meeting titled: Recommendation to discuss Item 11E from the Board"s September 11, 2012 agenda regarding "Wastewater Basin Program" contracts. Meeting Date: 12/11/2012 Prepared By Approved By Name: SheffieldMichael Title: Manager-Business Operations, CMO Date: 11/29/2012 9:11:30 AM Packet Page-445- 1/8/2013 Item 10.E. Amok EXECUTIVE SUMMARY Recommendation to approve Contract 11-5782 for three design contracts for the "Wastewater Basin Program," Project Numbers 70043, 70044, 70046, 70050, 70051, and 70064, in the total amount of$5,730,468, with AECOM Technical Services, Inc., CDM Smith Inc., and Hole Montes, Inc. to perform professional engineering services; and authorize a budget amendment in the amount of$1,648,267.31. OBJECTIVE: Obtain contract approval for expert professional engineering services to rehabilitate mission critical infrastructure in the wastewater collection system. CONSIDERATIONS: On June 24, 2008, as Agenda item 10G, the Board of County Commissioners (Board) adopted the 2008 Wastewater Master Plan Update that identified the general requirement for rehabilitating wastewater collection systems. The proposed scope of work will be executed under multiple projects shown in the attached Table 1. These projects are consistent with the 2010 Wastewater CIP Update, pages 2 and 3, as identified in the 2011 User Fee Rate Study. On February 14, 2012, as Agenda item 16.C.1, the Board, as Ex-officio the Governing Board of the Collier County Water-Sewer District, approved the selection committee rankings and authorized staff to enter into negotiations with AECOM Technical Services, Inc., CDM Smith, Inc., and Hole Montes, Inc., for three separate contracts under Request for Proposal No. 11-5782. Multiple technical support projects, Project Numbers 70043, 70044, 70046, 70050, 70051, and 70064, are being combined to fund this portion of the Wastewater Basin Program. At this time staff is seeking the approval of the proposed contracts for each of the Board-approved engineering consultants. On March 27, 2012, the Board requested staff to return with revised contracts that were more explicitly defined and demonstrable. The resulting scopes of work will now provide tangible, complete engineering designs and construction drawings for the following prioritized worst-first areas of the infrastructure: • Rehabilitate eight aging master pump stations, adding overflow containment and updating them to meet current Florida Department of Environmental Protection and Florida Building Code Standards. • Rehabilitate 111 pump stations, eliminating below grade leak hazards, adding containment where feasible and emergency back-up pumping at critical pump stations. • Alleviate potential overflow conditions that exist in Basin 101 (Naples Park). • Replace a 40-year-old sub-aqueous force main crossing with an aerial crossing at the 111th Street bridge. • Provide an alternative path for wastewater to reach the South County Water Reclamation Facility (SCWRF). Currently, 80 percent of the flow to the SCWRF goes through one force main. Reconstruction of Master Pump Station (MPS) 306 and a force main from MPS 306 to the SCWRF will provide a parallel path for needed reliability and maintainability (Sabal Bay). Packet Page-446- 1/8/2013 Item 10.E. • Replace 22,865 feet of gravity sewer clay pipe. • Replace 660 clay pipe service laterals. • Replace 14,275 feet of wastewater force main. The infrastructure being addressed represents the highest priority, worst-first areas based on internal condition assessments. Each contract contains a scope of work that has been customized based on the tasks requested in RFP 11-5782 in order to fit the needs of the particular basin that each vendor is to be working on. Although not all requested tasks in the RFP are needed for each basin, all of the tasks in each scope of work were requested in RFP 11-5782. Subsequent contracts for construction of the required infrastructure as developed under these engineering designs, as well as construction, engineering and inspection services (CEI), will be presented to the Board for review and approval. FISCAL IMPACT: Funding is available in, and is consistent with, the FY2012 Capital Budget approved by the Board on September 22, 2011. The source of funding is Wastewater User Fees, Fund (414). A budget amendment is required from Project Numbers 72552, Lift Station Facility Rehab, 70064, Collection System Lightning Protection, 73050, Wastewater Line Technical Support, and 70021, Energy Efficiency Studies, all from Fund 414, in the amount of $1,648,267.31. LEGAL CONSIDERATIONS: This item has been approved by the County Attorney's Office, the contracts are each legally sufficient, and the contracts require a majority vote for approval. -ERP GROWTH MANAGEMENT IMPACT: This project is consistent with and furthers the goals, objectives, and policies of the Growth Management Plan to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: That the Board of County Commissioners, as Ex-officio the Governing Board of the Collier County Water-Sewer District, 1. Approve Contract 11-5782 to AECOM Technical Services, Inc., CDM Smith Inc., and Hole Montes, Inc., for professional engineering services, and authorize funding for the initial contract phase in the amounts of $1,870,468, $1,940,000 and $1,920,000, respectively (a total of$5,730,468); and, 2. Authorize the Chairman to execute the contracts with each firm after approval by the County Attorney's Office; and, 3. Approve the necessary Budget Amendment to transfer funds in the amount of $1,648,267.31 from Project Number 72552 (Lift Station Facility Rehab), Project Number 70064 (Collection System Lightning Protection), Project Number 73050 (Wastewater Line Technical Support), and Project Number 70021 (Energy Efficiency Studies) to Project Number 70046 (Wastewater Pump Station Technical Support). Packet Page-447- 1/8/2013 Item 10.E. Prepared By: Craig Pajer, PE, Principal Project Manager, Public Utilities Planning and Project Management Department Attachments: 1) Table 1,Funding Sources: 2008 Wastewater Master Plan Update and 2011 Wastewater CIP Update Reference Table 2) Solicitation Document for 11-5782 3) Proposed Contracts Packet Page-448- 1/8/2013 Item 10.E. N h 4O h O b b 40 NI z t a a C4 0. e ° G ca QN � 0 U .+ oH _ S o cn e 0 ° ° ° fu CL o a, rn 0 c N SE Av t o 0 0 32 -e, 8 � a ° Ua3 53zw .• a2u M N M1 N d' .-. O 't1O . ' w.+ U 0 O p. O M O..n N d . el t N O co ce a g n r- n n r- n n 1--. n n b G v Z et 'D s.D 0' co '-' N et ON u I-. n m -• .•-. N N Ni N '-+ C 5 a `' z C. ° 2 4 N e 0 3 1 CO 120 O fI1 N F I E p a U Q 0 O A"2 woe u U 5so� a '3 " 0 o ', 4 ° .0 • a� C.m E " o 0.N U o " c Co aC U � �N ° u � . o A o '42 2Ww0 � N u V °p s1 O 0 0 c °0 0 O 4 8".d A ,.a 3 .nrn -0rnEnvai� ° 4ac c.a ca,1 3Z as O N 'O v, 'O n 00 — b .... h N "4 N N N N e�1 r't 00 00 00 00 00 00 00 •0 3 M M 0 0 0 0 0 0 0 3 n n z N N N N N N N Packet Page-449- 1/8/2013 Item 10.E. REQUEST FOR PROPOSALS In accordance with Florida Statute 287.055, Consultants' Competitive Negotiation Act. COOL" C.007431ty Administrative Services Division Purchasing COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS CCNA Solicitation #11 -5782 Wastewater Basin Analyses Nicole Parker, Procurement Strategist 239-252-4270(Telephone) 239-252-6549 (Fax) nicoleparker @colliergov.net(Email) This proposal solicitation document is prepared in a Microsoft Word format. Any alterations to this document made by the Vendor may be grounds for rejection of proposal, cancellation of any subsequent award, or any other legal remedies available to the Collier County Government. 4�L�1f�Y Purchasing Department•3327 Tamiami Trail East•Naples,Florida 34112.4901•www.colsergov.cet'purchasing CCNA(Revision 8/10) Packet Page-450- • 1/8/2013 Item 10.E. Table of Contents LEGAL NOTICE 3 EXHIBIT I:SCOPE OF WORK,SPECIFICATIONS AND RESPONSE FORMAT 4 EXHIBIT II:GENERAL RFP INSTRUCTIONS 20 EXHIBIT III:COLLIER COUNTY PURCHASE ORDER TERMS AND CONDITIONS 24 EXHIBIT IV:ADDITIONAL TERMS AND CONDITIONS FOR RFP 28 ATTACHMENT 1:VENDOR'S NON-RESPONSE STATEMENT 35 ATTACHMENT 2:VENDOR CHECK LIST 36 ATTACHMENT 3:CONFLICT OF INTEREST AFFIDAVIT 37 ATTACHMENT 4:VENDOR DECLARATION STATEMENT 38 ATTACHMENT 5:IMMIGRATION AFFIDAVIT CERTIFICATION 40 ATTACHMENT 6:VENDOR SUBSTITUTE W—9 41 ATTACHMENT 7:INSURANCE AND BONDING REQUIREMENTS 42 ATTACHMENT 8: REFERENCE QUESTIONNAIRE 44 G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 2 Packet Page-451- 1/8/2013 Item 10.E. • Co lex County Administrative Services Division Purchasing Legal Notice Pursuant to approval by the County Manager, Sealed Proposals to provide Professional Engineering Services for Wastewater Basin Analyses will be received until 2:30 pm. Naples local time, on December 16, 2011 at the Collier County Government, Purchasing Department, 3327 Tamiami Trail East, Naples, FL 34112. CCNA Solicitation# 11-5782 Wastewater Basin Analyses Services to be provided shall include, but not be limited to the following: Develop the Wastewater Basin Program for each basin region including, but not limited to the following three (3) phases of work performed by the consultant: • Phase 1: Wastewater Collection System Analyses • Phase 2: Design rehabilitation program • Phase 3: Post Design Services A mandatory pre-proposal conference will be held on December 2, 2011, commencing promptly at 2:30 pm., and will be held in the Conference Room of Collier County Government, Purchasing Department, 3327 Tamiami Trail East, Naples, FL 34112. All statements shall be made upon the official proposal form which must be obtained only on the Collier County Purchasing Department E-Procurement website: www.colliergov.net/bid. Collier County does not discriminate based on age, race, color, sex, religion, national origin, disability or marital status. BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA, BY: /S/ Stephen Y. Carnell, C.P.M. Purchasing &General Services Director This Public Notice was posted on the Collier County Purchasing Department website: www.colliergov.net/purchasinq and in the Lobby of Purchasing Building "G", Collier County Government Center on November 18, 2011. G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 3 Packet Page-452- 1/8/2013 Item 10.E. Exhibit I: Scope of Work, Specifications and Response Format As requested by the Collier County Public Utilities PPMD Department (hereinafter, the "Division or Department"), the Collier County Board of County Commissioners Purchasing Department (hereinafter, "County") has issued this Request for Proposal (hereinafter, "RFP") with the intent of obtaining proposals from interested and qualified firms in accordance with the terms, conditions and specifications stated or attached. The Vendor, at a minimum, must achieve the requirements of the Specifications and Scope of Work stated herein. Brief Description The selected consultant(s) shall perform a comprehensive analysis of the County-owned wastewater system within specified basin boundaries to establish the basis of design for system renovations. Upon completion of the analyses, the selected consultant(s) will perform design and construction-related support services. This solicitation anticipates the selection of three professional engineering firms to conduct the referenced professional services for three specific wastewater service basins, namely, the following: 1) Master Pump Station (MPS) Basin 101 (Gulfshore Drive and Naples Park); 2) Master Pump Station (MPS) Basin 306, consisting of basins 303, 304 and 306 (Bayshore Drive and Thomasson Drive); and 3) Master Pump Station (MPS) Basin 305, consisting of basins 308 (Gateway Triangle), 309 (Flamingo Estates), and 305 (The Glades). Background The Planning and Project Management Department (PPMD) of the Public Utilities Division has six major program areas funded annually for the evaluation and upgrading of the County's Wastewater Collection System. The TSP (Technical Support Projects) program areas are: 1. Gravity Transmission System TSP (manholes, pipes, laterals) 2. Force Main Transmission System TSP (ARVs, valves, pipes) 3. Pump Stations and Sub Master Pump Stations TSP 4. Master Pump Stations TSP 5. Collection System Power Systems TSP 6. Collection System Lightning Surge Control Grounding Historically, PPMD's rehabilitation approach was to focus on critical facilities and upgrading the "worst first." The Wastewater Collections Department has identified three wastewater basins needing rehabilitation. In order to effectively and efficiently design rehabilitation projects, PPMD has decided to investigate the complete wastewater collection system on a basin basis in order to systematically analyze and construct needed improvements. Initially this program will focus on the engineering evaluation and analysis of the collection system after which will come the improvements design and construction phases. G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 4 Packet Page-453- 1/8/2013 Item 10.E. Detailed Scope of Work The County is interested in contracting with the most qualified firm(s) to develop and implement a Wastewater Basin Study Program for three initial distinct geographical regions. Each Wastewater Basin Study shall include three general phases of work (as described below), and the contract will not be completed until the County has accepted final construction completion on each geographical area. The County reserves the right to select one (1), two (2) or three (3) firms to perform and coordinate all work in the geographical areas. Each of the three region proposals will be evaluated independent of the others. Should the County decide to hire multiple consulting firms, it is expected that the selected firms will work cooperatively with the other firms to provide best value services to the Public Utilities Division and will share "lessons learned" for the benefit of the County's rate payers. The three (3) basin regions are described below: 1. Naples Park—MPS 101 (Area located north of Vanderbilt Beach Road, west of US 41 and south of 111th Street) 2. The Glades— MPS 305 (Area north of US 41,west of the Lakewood Community in the south, west of Foxfire, west of Livingston Road, south of the Golden Gate Canal and east of the Gordon River, excluding Naples Airport) 3. Bayshore— MPS 306 (Area South of US 41, and east of the Gordon River, excluding the City of Naples Wastewater Service Area) Throughout the duration of the program, consultant will provide project management assistance consisting of the following: • Attend biweekly (every two weeks) progress meeting with PUD staff • Graphics/exhibit preparation • Progress meeting assistance • Project management assistance • Project management plan preparation • SCADA design • Subsurface investigations of underground utilities • Wastewater System Field Measurements Evaluate Alternatives: Throughout the Scope of Work herein, a number of tasks are identified that include the evaluation of several process and/or facility alternatives. Evaluation of the specific alternatives will be based on a selection criteria weighting/ranking process utilized by the Engineer specific to the particular task component. The anticipated selection criteria for the various alternative evaluations will be from the following list, as determined applicable by the Engineer and County for the given process and/or facility component: • Automation • Capital Cost • Chemical Cost • Constructability • Electrical (Power) Cost • Fatal Flaw Analysis G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 5 Packet Page-454- 1/8/2013 Item 10.E. • Good Neighbor Policy • Maintenance • Odor, Light, Noise Potential • Operational Flexibility • Operator Attention • Performance and Reliability • Process Monitoring • Public Acceptance • Redundancy/Reliability • Safety • Security • Site Aesthetics • Space Utilization • Wet Weather Tolerance The basis for recommendation of a selected alternative for a given process and/or facility component will be a 3-step weighting/ranking approach developed by the Engineer, except as otherwise directed by the County, as described in the following: Step 1 Each criteria item will be given a "Weight" factor between 1 and 3 relative to the specific process and/or facility component being evaluated, where "1" is considered least important and "3" is considered most important. Step 2 Each criteria item will then be given a "Rank" factor between 1 and 5 relative to the specific process and/or facility component being evaluated, where "5" is considered best (i.e., cheapest, easiest, etc.) and "1" is considered worst. Step 3 An overall process evaluation matrix will be developed, where the individual criteria "Weight" and "Rank" will be multiplied together, and total points determined for each process and/or facility component being evaluated. Alternative recommendation will be based upon the highest total points accordingly. Final alternative selection will be reviewed and approved with County staff. Attend Project Progress Meetings: Bi-weekly meetings with County representatives will be conducted, as requested by the Program Manager, throughout the program to keep the County informed of the project progress, to make certain that the Engineer is productively conducting its consulting services and to obtain input and direction as required for outstanding project issues. A firm day and time will be established for all bi-weekly meetings. Meeting objectives will be to provide progress updates, reach decisions on pertinent issues relative to the specific topics being addressed. Progress meetings may be held with other selected Engineers in order to effectively collaborate the work effort associated with this program. The Engineer will prepare and distribute agendas and minutes for each meeting incorporating agenda items and meeting minute corrections provided by the County. Agendas will be submitted to the County at least two days prior to the meeting. Draft minutes will be submitted to the County no more than three working days following each meeting; County will provide comments no more than three working days after receipt of draft minutes. The Wastewater Basin Study in each basin region shall include but is not limited to the following three (3) phases of work performed by the consultant: G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 6 Packet Page-455- 1/8/2013 Item 10.E. iisew • Phase 1: Wastewater Collection System Analysis • Phase 2: Design rehabilitation program • Phase 3: Post Design Services Phase 1: Wastewater Collection System Analysis TASK 1.1 — Identify, analyze, prioritize and recommend the rehabilitation program for the basin region. Tasks may include, but are not limited to: 1) Determine/confirm the pump station (PS) service area (basin) for each pump station 2) Determine existing and ultimate theoretical wastewater generation for each pump station (PS) service area based on current land use and zoning. Estimate potential ultimate wastewater flow generation for vacant land by assuming a practical potential zoning designation consistent with historic rezoning trends. 3) Collect the necessary information to confirm the build out flow conditions for each pump station both public and private. Obtain the following documents: a. FDEP permit files for each lift station to identify the original design flow b. Existing and future land use maps c. Existing zoning maps d. Existing and proposed (if known) PUDs e. GMD approved wastewater pump station plans 4) Determine current wastewater flow generation for each pump station service area based on recorded measured flow readings either entering or leaving a pump station for a three month time period 5) Evaluate historical pump station operation to validate whether it is operating efficiently 6) Physically examine condition of all collection system components in a Pump Station service area based on criteria provided by PUPPMD. Provide information in both Excel and GIS format. Some portions of the study area may have been previously examined by either Collier County Collections Department staff or other contractors. These areas will not need to be reexamined. 7) The inventory of conditions should include a physical survey of the collection system which is being evaluated during the I/I investigations. The physical survey is conducted to isolate I/I problem areas, select flow gauging (continuous and instantaneous) sites, and provide a basis for a preliminary assessment of the general physical (structural and operational) condition of the collection system. At a minimum, the following tasks are to be performed during the inventory of conditions: a. Inspection of manholes b. Identification of continuous and instantaneous flow gauging manholes c. Determination of gauging area boundaries for continuous and instantaneous gauging areas d. Measure or determine groundwater levels e. Gravity sewer/service lateral inspection — if warranted, retain the services of a qualified lateral inspection company to assess the condition of gravity sewer/service laterals f. Force Main Evaluation — Evaluate the condition of all force mains located within the basin. Contract the services of a pipeline condition evaluation firm if warranted. g. Identify problem areas 8) Perform a Sewer System Evaluation Survey as defined by USEPA. G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 7 Packet Page-456- 1/8/2013 Item 10.E. 9) Prepare exhibits for each pump station service area illustrating the pump station service area and the associated existing and future land use and zoning. Install wastewater flow measuring devices for a minimum period of three months in each pump station basin. Provide organized flow monitoring report that presents recorded flow rates in tabular and graphic formats. Analyze metered flow to determine Base Wastewater Flow (BWF), Groundwater Infiltration (GWI) and Rainfall-Derived Infiltration/Inflow (RDII). 10) Perform an Infiltration/Inflow Analysis of the study area including smoke testing. 11) Prepare a signed and sealed Technical Memorandum for each pump station service area identifying: a. The original design capacity and flow b. Existing pump station run time information c. Projected build out capacity and flow requirements 12) Pump Station Evaluations a. A local knowledgeable Florida-licensed professional land surveyor or mapper shall survey each pump station site and confirm that it is located inside a legal easement owned by or issued to the Collier County Water Sewer District. Retain the services of a local title research company specializing in ownership and encumbrance property reports to confirm easement ownership. Provide a detailed survey sketch of all above ground features, including landscaping within a 50-ft radius from the pump station site including topography with both 1-foot contours and intermediate spot elevations. Locate and identify above-ground structures within 100 feet from the pump station. Deliver sketches in hard copy, PDF and AutoCAD format. b. Provide legal sketches and legal descriptions of required temporary and permanent easements when requested. c. Develop a pump station checklist to facilitate data collection during site visits. d. Visit each pump station site and document the structural, electrical, civil and mechanical conditions. Each site visit will include at a minimum, a civil (water/wastewater) engineer, structural engineer and an electrical engineer experienced with wastewater facilities. All engineers shall be registered professional Engineers in the state of Florida. All work performed shall be signed and sealed by Engineers performing the work. e. Use field kits to estimate the hydrogen sulfide levels generated at each pump station. f. Gather available information related to each pump station to assist with pump station evaluation, including: • Pump Station As-Built information • Pump Station Operational Data including pump run times, system maps, original design data for pump station sizing, system modifications which may have altered the pump station flow since the original design was performed. • Available permit information from applicable regulatory agencies including construction permits, SDPs, certifications of completion, conveyance documents, and compliance information. It will be the consultant's responsibility to obtain this information. • Property ownership and recorded information regarding easements, as may be applicable. g. Utilize local (Collier County) knowledgeable registered land surveyors to stake out the easements and/or property boundaries; collect and record the G/Current-Solicitation Template\RFP_CCNATemplate 08042010 11-5782 RFP_CCNATemplate 8 Packet Page-457- 1/8/2013 Item 10.E. limits of the boundary as well as the physical location of the existing pump station components such that the adequacy of the existing area can be reviewed for future expansion. As part of this task, call Sunshine State One- Call System to have the existing utilities located and to determine pipe ownership (water, irrigation quality water, gas, electric, force mains, etc) prior to performing any field survey efforts. h. Utilize the information from the field evaluations and the data collection stage to perform an overall evaluation of each pump station. The field evaluations will include evaluation of pump station components. This will include: • An analysis of current and projected flows based on data collected • Availability of fiber optic connections • Available storage capacity in the pump stations collection system. This storage capacity shall include storage within manholes and sewer mains up to the lowest manhole overflow level • Collection System Storage Time - Determine the available response time from a pump station failure (high level alarm) to system overflow at current and ultimate design flows • Compliance with FEMA Flood Elevations • Costs of potential improvements • Electrical system components including site lighting, power feed (above- ground vs. underground), feed size, emergency power supply and related site electrical • Existing utilities which may be in conflict with future improvements • Existing vegetation that would require trimming and/or removal • Fencing/Bollards (conditions and sufficiency for future expansion) • Flow meter and by-pass assembly (if applicable) • Landscaping (code considerations) and irrigation • Odor control condition, size, unit type (if applicable) • Potential for bypass pumping • Presence of blower system for grease reduction • Pump condition and size adequacy (to meet future flows) • Pump controls and communication including control panels, programmable logic controllers (if present), variable frequency drives (if present), radio feed and tower location • Pump energy efficiency • Site access • Site layout of proposed improvements • Site size sufficiency • Water and irrigation quality water service availability • Wet well condition and sizing (to meet future flows) • Wet well ventilation i. Pump Station Evaluation Report Preparation 1. Following completion of Pump Station Evaluation, prepare a draft "Fence to Fence" Evaluation Report (Report) addressing each pump station within the basin. The Report will include a summary of the findings for each evaluation component listed above. Prepare exhibits for each pump station service area illustrating the pump station service area and the associated existing and future land use and current zoning. G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 9 Packet Page-458- 1/8/2013 Item 10.E. 2. A summary memorandum will be prepared for each pump station identifying: a. The original design capacity (head and flow) b. Existing pump station run time information c. Projected build out capacity (head and flow requirements) d. Recommended pump model number and pump curve 1. Four (4) hard and one electronic copy in PDF format copies of each draft Report will be delivered to Collier County for review and comment. Upon completion of the county's review of each report, meet with the County to discuss the report and any comments that the county may have. 2. Revise each report based on comments received from Collier County and incorporate them into the final report for each pump station. Upon completion, four(4) signed and sealed copies of each report will be provided to Collier County for their use in future planning for pump station upgrades. 3. The following deliverables are anticipated: a. Provide copies of the draft Ill Analysis and Technical Memorandum for each pump station basin. b. Provide copies of the final Ill Analysis and Technical Memorandum for each lift station incorporating comments received from Collier County. Phase 2: Design Engineer shall design the rehabilitation program, assist with bid process and recommend construction contractor to execute the basin program within the region; and • Prepare bid/quote documents for collection system renovations • Monitor collection system renovation activities • Design pump station • Observe and provide oversight The following tasks are included as part of the scope of work. Task 2.1 Final Design and Permitting Phase a. On the basis of the accepted preliminary fence to fence layout, Consultant will prepare final drawings and specifications, which provide the general scope, extent and character of the work to be furnished, and performed by the Contractor. Consultant will prepare and submit drawings and specifications at the 60-, 90- and 100-percent complete stages for review and approval. An engineer's opinion of probable construction cost will accompany each submittal. Technical specifications will be based on the 16-Division format of the Construction Specifications Institute (CSI) in MS Word format. In addition to technical specifications, Engineer will coordinate with County to develop necessary General Conditions, Supplemental Conditions, and Special Provisions Specifications will be developed specifically for the project being constructed. Standard Collier County Specifications may be used for reference but the Engineer shall not rely on them as G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 10 Packet Page-459- 1/8/2013 Item 10.E. a replacement for sound engineering judgment and responsibility. Documents shall include drawings and project specifications ready for bidding, consistent with Collier County standards, including the following: 1) Cover sheet, index and key map. 2) Civil Site Plan including fencing and landscaping. 3) Civil Details 4) Demolition Plan 5) Pump Station Plan and Profile 6) Mechanical Details 7) Electrical Site Plan 8) Electrical Details 9) Riser and Wiring Diagram 10) Control Panel Layout, Name Plate Layout b. Prepare applications for an Insubstantial Change to a Site Improvement Plan when required from Collier County Growth Management Division and respond to requests for additional information. Prepare all other required permit applications. Permitting fees will be paid by the County. c. Furnish copies of Contract Documents that include engineering drawings and specifications. Present and review them in person with the County at the 60-percent and 90-percent completion stages in the project and make appropriate changes for the pump station site. Amok d. Prepare a permit application for submittal to the Florida Department of Environmental Protection (FDEP) and provide backup documentation including drawings and specifications for each lift station site. Respond to a request for additional information (RAI) from the FDEP. All permit fees will be paid by the County. Task 2.2 Bidding and Award Phase With the exception of the following, bid/quote services will be performed by the Collier County Purchasing Department. Consultant will assist the County with the following: a. Assist in preparing addenda, as required, to interpret, clarify, or expand the Bidding Documents. b. Consult with and advise the County as to the acceptability of the contractor and subcontractors, suppliers and other persons and organizations proposed by the Prime Contractor for those portions of the work as to which such acceptability is required by the Bidding Documents. c. Consult with the County concerning and determine the acceptability of substitute material and equipment proposed by the Contractor when substitution prior to the award of contracts is allowed by the Bidding Documents. d. Conduct a pre-bid/quote conference G/Current-Solicitation Template\RFP CCNATemplate_08042010 11-5782 RFP_CCNATemplate 11 Packet Page-460- 1/8/2013 Item 10.E. e. Attend the bid opening, review bids, qualifications, f. Provide a recommendation of award. Phase 3— Post Design Services Consultant's inspector shall observe regular construction and testing activities related to the Project as directed by the Project Manager, including rehabilitation work. Construction/testing reports and pictures of construction will be prepared daily on the day the construction activity takes place by the Construction inspector. All construction documentation will be provided no later than the next morning via electronic E-mail to the project manager. A hard copy will be kept in the project file. Task 3.1 —Construction Observation and Documentation The construction inspector (or activity observer) will provide the services outlined below. This section also incorporates activity observations associated with Collection System Analyses performed in Phase 1 (i.e., smoke testing, flow monitoring, inspections, etc.). 3.1 —Construction/Testing Observation —The construction inspector will conduct on-site observations and inspections of all construction/testing activities on the Project on a full or part time basis unless directed otherwise by the project manager to ensure that all work is completed in accordance with the Contract Documents. The Construction Inspector will inform the project manager and the on-site superintendent of the construction/testing contractor of any concerns related to conformance of the work with the Contract Documents (a concern or an Issue) as an attempt to resolve any concern or issue on-site. If the concern or issue is not immediately resolved in the field, the Construction Inspector shall inform the Engineer of Record (EOR) and the project manager in writing about the concern or issue within eight (8) business hours, but not more than one business day after the discovery of any concern or issue. The EOR will be responsible for investigating the concern or issue and resolving the same through a written directive to the construction contractor and so inform the project manager and the Construction Inspector in writing. This protocol will be initiated any time the Construction Inspector becomes aware of any construction that is unsatisfactory, faulty or defective, does not conform to the Contract Documents, does not meet the requirements of any inspections, tests or approval required to be made, or has been damaged before final payment. The Construction Inspector will maintain a separate Issue Resolution Log documenting any issue or concern that is conveyed in writing to the EOR, including the written directive resolving the issue or concern. 3.2 - Log and Construction Documentation —The construction inspector will prepare a daily log with pictures recording activities and details related to the work on a form approved in advance by the project manager. Information will be recorded in the log when at the Project Site. Log entries will record all relevant aspects of the construction observed while on site including, but not limited to: construction crew (labor) details, equipment used, materials used, compliance testing and inspection performed, weather, temperature, site conditions, trench conditions, backfill material used, dewatering methods, compaction methods, location of the work, and all other details related to the Work. The log will reference the digital photographs and or video taken with appropriate file names and file locations. In addition to the construction details, the daily log will contain information related to: time and hours on the job site, weather conditions, data pertaining to questions of quantities of materials used, extras or deductions, list of visiting G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 12 Packet Page-461- 1/8/2013 Item 10.E. ogetik officials and representatives of manufacturers, fabricators, suppliers and distributors, observations in general and specific observations in more detail as in observing test procedures, conformance inspection of materials and fittings, name plate data for equipment and material installed, and other information requested by the project manager. Logs, photograph files and other construction documentation will be provided to the project manager by the Construction inspector on a daily basis in an electronic file via E-mail, on a digital CD only if requested by the project manager and a printed copy to be maintained on the project site in the inspector's trailer. 3.3— Photographic and Video Record—The Construction inspector will provide a comprehensive digital photographic record of all construction activities related to the Project. The digital file names will be referenced in the log along with a brief description of the photograph, the date and time of the photograph and the name of the photographer. The digital files will be transferred via E-mail to the project manager on a daily basis, to a digital CD if requested by the project manager, and submitted on a daily basis along with the construction documentation. The photographs may be electronic sent via E-mail to the project manager on a daily basis. If requested by the project manager, pictures will be printed in high resolution color, two captioned photos per 8 1/2" x 11" sheet, printed one side only. The prints if requested will be provided to the project manager when needed. If requested by the project manager, Video will be provided in digital format on DVD bi-weekly. 3.4 -General Coordination —The Construction inspector will coordinate all activities related to the Project between the construction contractor, the EOR and the project manager. The Construction inspector will oversee substantial and final completion inspections, and prepare and maintain the punch list, including follow-up inspections to ensure that punch list items are corrected and/or completed. 3.5 -Observe Regulatory Agency Inspections—The inspector will accompany visiting inspectors representing any regulatory agencies having jurisdiction over the Project and will record all discussions and the outcome of these regulatory inspections in the logs. The inspector will always notify the project manager prior to any such inspections. 3.6 - Construction Progress Meetings—The inspector will coordinate bi-weekly progress meetings chaired by the project manager, attended by the construction contractor to review project status and identify issues that may affect the Project. The inspector will prepare a DRAFT Agenda at least two business days in advance of the each meeting and issue written meeting notes identifying a summary of the discussion, conclusions and any risks that have been encountered or are expected within two days after the meeting to the project manager, EOR, and the construction contractor. 3.7 - Substantial Completion Inspections—The Construction inspector will conduct substantial completion inspections when requested by the construction contractor and the EOR recommends that the work is sufficiently complete to warrant a substantial completion inspection. During the substantial completion inspection the Construction inspector will prepare a punch list of items requiring completion or correction to the satisfaction of the EOR and the project manager. The Construction inspector will be responsible for maintaining the punch-list and issuing updates to the punch-list on a weekly basis. The Construction inspector will coordinate and participate in the final walk-through to ensure that the punch-list items are completed to the satisfaction of the EOR and the project manager. All services related to the G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 13 Packet Page-462- 1/8/2013 Item 10.E. Substantial Completion Inspection shall be provided in writing and pictures to the project manager for the Project. 3.8 — Final Completion Inspection - Upon the request of the construction contractor and concurrence of the EOR and the project manager, the Construction inspector will conduct final inspections of portions of the project, as they are finished to determine if construction has been completed in accordance with the Contract Documents and the construction contractor has fulfilled all obligations therein. Based on the results of the final inspection, the EOR, project manager, and the Construction inspector will judge the work complete or not complete. If the work is judged complete, the Construction inspector will issue a "notice of final acceptance and recommendation for final payment". If the work is judged not complete, the Construction inspector will issue written instructions to the construction contractor identifying the work judged not complete. Upon provision of the construction contractor evidence or assurance that the deficiencies noted above have been corrected or completed, a second final inspection will be scheduled to verify that the outstanding issues have been resolved and the Construction inspector can issue a "notice of final acceptance and recommendation for final payment". All services related to the Final Completion Inspection shall be provided to the project manager of the Project. 3.9 — Final Construction Certification— Upon issuance of a "notice of final acceptance and recommendation for final payment" the Construction inspector will provide a signed and sealed certification by a professional engineer of the EOR in responsible charge of the work provided by the Construction inspectors stating that the "Project has been completed by the construction contractor in accordance with the Plans and Specifications of the Contract Documents as amended by the Engineer OF RECORD". All services related to the Final Construction Certification shall be provided to the project manager of the Project. TASK 3.2 —Construction Inspector and Project Oversight 3.2.1 - General Management and Oversight—The Construction inspector will provide support services customarily related to the construction observation and inspection of similar projects including, but not limited to: a. Participate in a pre-construction meeting with the project manager, EOR, and the general contractor. b. Participate in other meetings as described or implied herein. c. Review and verify correctness of the construction contractor's monthly applications for payment and accompanying data and recommend approval of payments due to the construction contractor. The Construction inspector's recommendation of any payment requested in an application for payment shall constitute a representation by the Construction inspector to the project manager as an experienced and qualified professional, that based on Construction inspector's onsite observations and inspections of construction in progress, that the construction quantities in the applications for payment accurately reflect the progress of the work and that the work is constructed in accordance with the Contract Documents. The Construction inspector will process pay requests in accordance with the Florida Prompt Payment Act. All incoming pay requests processed by the Construction inspector shall be mechanically stamped with the date received. G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP CCNATemplate 14 Packet Page-463- 1/8/2013 Item 10.E. d. The Construction inspector will review the monthly updates to the construction schedule prepared by the construction contractor and provide written comments to the project manager and EOR. e. The Construction inspector will provide such field testing and verification that all materials, equipment and supplies installed or utilized on the Project are in full accordance with the Contract Documents and approved Shop Drawings provided by the EOR. f. Within one week after the construction contractor notifies the EOR and the project manager that the Work on the Project is substantially complete in accordance with the Contract Documents, the Construction inspector will provide a signed and sealed certification by a professional engineer registered in the State of Florida, that the Work was done under his supervision and performed in accordance with the Contract Documents, including all approved shop drawings and change orders except as noted. 3.2.2—Coordination of Shop Drawings, Contract Interpretations and Clarifications—The Construction inspector will coordinate with the design engineer(EOR) regarding the issuance of interpretations and clarifications of Contract Documents during construction. The DESIGN Engineer(EOR) shall be responsible for technical review and decisions regarding interpretation and clarification of Contract Documents. The Construction inspector shall coordinate the DESIGN Engineer's (EOR) decisions and responses with the construction contractor. 3.2.3 - Monitor Project Records—The Construction inspector shall monitor all required Project records, including but not limited to delivery schedules, inventories and construction reports. Amok 3.2.4—As Constructed Field Drawings—The Construction inspector shall maintain red pencil "mark-up" notations and sketches on full size construction plans that reflect the actual details of constructed facilities. These Constructed Field Drawings will be used by the Construction inspector to validate the "As Built" documentation provided by the construction contractor. The Construction inspector will notify the project manager, EOR and the construction contractor of any differences in the documents maintained by the general contractor and the Construction inspector on a weekly basis for resolution by the EOR. 3.2.5—Start-up and Re-commissioning Support—The Construction inspector will assist the project manager, the EOR, and the construction contractor during start-up of each segment designated for Beneficial Use by the EOR and project manager, including but not limited to signing off on regulatory permits and general coordination between the EOR, project manager, and construction contractor. Task 3.3—Additional Services 3.3.1 —Additional Services (only as authorized in writing) —In accordance with the contract or purchase order, in the event that other services may arise during the course of the work, but were not envisioned as part of the original or amended scope of work; Engineer shall submit a proposal to perform Additional Services prior to the performance of the work. The proposal shall include the specific services to be performed, time to complete, compensation, and an explanation as to why the services were not previously envisioned as part of the scope of work. The proposed Additional Services must be approved by the project manager in writing in advance of performance of said Additional Services. Failure to notify the project manager in G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 15 Packet Page-464- 1/8/2013 Item 10.E. writing of Additional Services shall be deemed a waiver of any claim by the Engineer that such services were Additional Services. Written authorization from the project manager will be required for any charges that exceed the predetermined upper limit. Term of Contract The term of this contract shall be for sixty (60) days following the final acceptance of the construction project associated with this agreement and no longer than six (6) years, unless prior approval by the Board of County Commissioners. Projected Solicitation Timetable The following projected timetable should be used as a working guide for planning purposes only. The County reserves the right to adjust this timetable as required during the course of the RFP process. Event Date Issue Solicitation Notice November 18, 2011 Mandatory pre-solicitation meeting December 2, 2011, 2:30 PM, Naples Local Time and Locations Last Date for Receipt of Written Questions December 9, 2011, 2:30 PM, Naples Local Time Solicitation Deadline Date and Time December 16, 2011, 2:30 PM, Naples Local Time Response Format The Vendor understands and agrees to abide by all of the RFP specifications, provisions, terms and conditions of same, and all ordinances and policies of Collier County. The Vendor further agrees that if the contract is awarded the work will be performed in accordance with the provisions, terms and conditions of the contract. To facilitate the fair evaluation and comparison of proposals, all proposals must conform to the guidelines set forth in this RFP. Any portions of the proposal that do not comply with these guidelines must be so noted and explained in the Acceptance of Conditions section of the proposal. However, any proposal that contains such variances may be considered non-responsive. Proposals should be prepared simply and economically, providing a straightforward concise description of the Vendor's approach and ability to meet the County's needs, as stated in the RFP. All proposals should be presented as described in the RFP in PDF or Microsoft Word format with Tabs clearly marked. If applicable, the utilization of recycled paper for proposal submission is strongly encouraged. G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP CCNATemplate 16 Packet Page-465- 1/8/2013 Item 10.E. Auk The items listed below shall be submitted with each proposal and should be submitted in the order shown. Each section should be clearly labeled, with pages numbered and separated by tabs. Failure by a Vendor to include all listed items will result in the rejection of its proposal. I. Tab 1: Cover Letter and Acceptance of Conditions— No points awarded In no more than two pages (executive summary), briefly describe the overall project approach and the firm's experience in providing the requested services as identified in this RFP and identify which Wastewater Basin Regions the firm is submitting its proposal (select one, two or three): Naples Park Glades Bayshore II. Tab 2: Project Understanding Approach — Maximum 45 points Provide the following information: • Project Understanding - Describe the background of the project and the local circumstances driving the need for this program. • Key Issues - Describe the key issues anticipated for this project and summarize your oak approach to them and your experience dealing with similar issues on other projects. • Overall Approach - Presents an overview of the your project approach and map the program process from beginning to end, including building public trust and maintaining public communications throughout the project. • Technical Approach - Provide a detailed step-by-step description of how you will work through this program development process. • Areas Requiring Special Consideration - Highlight how you will address project areas of broad importance to Collier County and its stakeholders. • Staffing and Location of Work- Show the depth of the team's resources and where the project will be managed. • Program Timeline- Describe the firm's timeline for completing the three phases of work in the Wastewater Basin Study Project. • Representative Projects - Provide a sample of a work product for each of the three phases that is of similar nature to the County's scope of work contained in this RFP. III. Tab 3: Technical Team — Maximum 35 points • Provide an Organizational Chart of the Project Team (excluding Collier County staff) including subconsultants. • Provide Team Member Profiles - Provide resumes for all of the full time staff members assigned to the Collier County Wastewater Basin Study Project for all of the three phases of work; identify the specific staff assigned to each of the phases. • Provide the percentage of subconsultant percentages expected to use for the three phases and describe the discipline/work. G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP CCNATemplate 17 Packet Page-466- 1/8/2013 Item 10.E. IV. Tab 4: Location, Availability and Responsiveness—Maximum 10 points The selected consultant(s) will be required to interface with Public Utilities' staff on a daily or more frequent basis. Collier County has concluded that selecting a local (Collier and Lee Counties) consultant 1) is in its best interest to contain costs, 2) minimizes task completion time frames, and 3) results in higher quality of professional services due to their knowledge and understanding of local geography and topology. Illustrate how available and how responsive the Engineer's team members will be for this program. Firms having a local office (Collier and Lee Counties) will receive the maximum number of points (10). Firms having office their office located within 75 miles of the Collier County Government complex will receive 5 points. Firms having an office beyond 75 miles will not receive any points under this category. V. Tab 5: References— Five (5) Completed and Returned - Maximum 10 points In order for the firm to be awarded any points for this tab, the County requests that the firm submits five (5) completed reference forms (see Attachment 8: Reference Questionaire) from clients whose projects are of a similar nature to the Wastewater Basin Study Program as described in this RFP. The County will only use the methodology calculations for the first five (5) references (only) submitted by the firm in their proposal. Prior to the Selection Committee reviewing proposals, the following methodology will be applied to each firm's information provided in this area: • The County shall total each of the firm's five reference questionnaires and create a ranking from highest number of points to lowest number of points. References marked with an N/A (or similar notation will be given the score of zero (0)). Firms who do not turn in reference forms will be counted as zero (0). • The greatest number of points allowed in this criterion will be awarded to the firm who has the highest score. • The next highest firm's number of points will be divided by the highest firm's points which will then be multiplied by criteria points to determine the firm's points awarded. Each subsequent firm's point score will be calculated in the same manner. • Points awarded will be extended to the one decimal point (per Microsoft Excel). For illustrative purposes only, see chart for an example of how these points would be distributed among the five proposers. Firm Total Reference Firm Name Points Awarded Score Firm ABC 445 10 Firm DEF 435 9.8 Firm GHI 425 9.6 Firm JKL 385 8.7 Firm MNO 385 8.7 Firm PQR 250 5.6 The points awarded by firm will be distributed to the Selection Committee prior to their evaluation of the proposals. The Selection Committee will review the firm's proposal to G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 18 Packet Page-467- 1/8/2013 Item 10.E. Atow ensure consistency and completion of all tasks in the RFP, and review the Points Awarded per firm. The Selection Committee may, at their sole discretion, contact references, and/or modify the reference points assigned after a thorough review of the proposal and prior to final ranking by the final Selection Committee. VI. Tab VII, Required Form Submittals • Attachment 2: Vendor Checklist • Attachment 3: Conflict of Interest Affidavit • Attachment 4: Vendor Declaration Form • Attachment 5: Immigration Affidavit and company's E-Verify profile page and memorandum of understanding • Attachment 6: Vendor Substitute 9 • Attachment 7: Insurance Requirements • Other: License, informational materials, signed addenda As G/Current-Solicitation Template\RFP CCNATemplate_08042010 11-5782 RFP_CCNATemplate 19 Packet Page-468- 1/8/2013 Item 10.E. Exhibit II: General RFP Instructions 1. Questions Direct questions related to this RFP to the Collier County Purchasing Department E- Procurement website: www.collieroov.net/bid. Vendors must clearly understand that the only official answer or position of the County will be the one stated on the Collier County Purchasing Department E-Procurement website. For general questions, please call the referenced Procurement Strategist noted on the cover page. 2. Pre-Proposal Conference The purpose of the pre-proposal conference is to allow an open forum for discussion and questioning with County staff regarding the RFP with all prospective Vendors having an equal opportunity to hear and participate. Oral questions will receive oral responses, neither of which will be official, nor become part of the RFP. Only written responses to written questions will be considered official, and will be included as part of the RFP as an addendum. All prospective Vendors are strongly encouraged to attend, as, this will usually be the only pre-proposal conference for this solicitation. If this pre-proposal conference is denoted as "mandatory", prospective Vendors must be present in order to submit a proposal response. 3. Compliance with the RFP Proposals must be in strict compliance with this RFP. Failure to comply with all provisions of the RFP may result in disqualification. 4. Ambiguity, Conflict, or Other Errors in the RFP It is the sole responsibility of the Vendor if the Vendor discovers any ambiguity, conflict, discrepancy, omission or other error in the RFP, to immediately notify the Procurement Strategist, noted herein, of such error in writing and request modification or clarification of the document prior to submitting the proposal. The Procurement Strategist will make modifications by issuing a written revision and will give written notice to all parties who have received this RFP from the Purchasing Department. 5. Proposal, Presentation, and Protest Costs The County will not be liable in any way for any costs incurred by any Vendor in the preparation of its proposal in response to this RFP, nor for the presentation of its proposal and/or participation in any discussions, negotiations, or, if applicable, any protest procedures. G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 20 Packet Page-469- 1/8/2013 Item 10.E. 6. Delivery of Proposals All proposals are to be delivered before 2:30 pm, Naples local time, on or before December 16, 2011 to: Collier County Government Purchasing Department 3327 Tamiami Trail E Naples FL 34112 Attn: Nicole Parker, Procurement Strategist The County shall not bear the responsibility for proposals delivered to the Purchasing Department past the stated date and/or time indicated, or to an incorrect address by Vendor's personnel or by the Vendor's outside carrier. However, the Purchasing/General Services Director, or designee, shall reserve the right to accept proposals received after the posted close time under the following conditions: • The tardy submission of the proposal is due to the following circumstances, which shall include but not be limited to: late delivery by commercial carrier such as Fed Ex, UPS or courier where delivery was scheduled before the deadline. • The acceptance of said proposal does not afford any competing firm an unfair advantage in the selection process. Vendors must submit two (2) paper copies with one copy clearly labeled "Master," and six (6) compact disks (CD's)with one copy of the proposal on each CD in Word or Amok PDF electronic format. List the Solicitation Number and Title on the outside of the disk and box or envelope. 7. Validity of Proposals No proposal can be withdrawn after it is filed unless the Vendor makes their request in writing to the County prior to the time set for the closing of Proposals. All proposals shall be valid for a period of one hundred eighty (180) days from the submission date to accommodate evaluation and selection process. 8. Method of Source Selection The County is using the Competitive Sealed Proposals methodology of source selection for this procurement, as authorized by Ordinance Number 87-25, and Collier County Resolution Number 2006-268 establishing and adopting the Collier County Purchasing Policy. The County may, as it deems necessary, conduct discussions with qualified Vendors determined to be in contention for being selected for award for the purpose of clarification to assure full understanding of, and responsiveness to solicitation requirements. 9. Evaluation of Proposals Collier County will evaluate and select these Services in accordance with Florida Statute 287.055, Consultants' Competitive Negotiation Act. G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 21 Packet Page-470- 1/8/2013 Item 10.E. The County's procedure for selecting is as follows: 1. The County Manager shall appoint a Selection Committee to review all proposals submitted. 2. Request for Proposals issued. 3. Subsequent to the closing of proposals, the Procurement Strategist and Project Manager shall review the proposals received and verify whether each proposal appears to be minimally responsive to the requirements of the published RFP. 4. Meetings shall be open to the public and the Procurement Strategist shall publicly post prior notice of such meeting in the lobby of the Purchasing Building at least one (1) day in advance of all such meetings. 5. The committee members shall review each Proposal individually and score each proposal based on the evaluation criteria stated herein. 6. Prior to the first meeting of the selection committee, the Procurement Strategist will post a notice announcing the date, time and place of the first committee meeting. Said notice shall be posted in the lobby of the Purchasing Building not less than three (3) working days prior to the meeting. The Procurement Strategist shall also post prior notice of all subsequent committee meetings and shall endeavor to post such notices at least one (1) day in advance of all subsequent meetings. 7. Collier County will consider all the material submitted by the Proposer and other information Collier County may obtain to determine whether the Proposer is capable of and has a history of successfully completing projects of this type, including, without limitation, additional information Collier County may request interviews, or oral presentations. Should the County request interviews or presentations, the evaluation criteria will be disseminated to the selected firm(s) prior to the date of the presentation. 8. The Selection Committee, as approved by the County Manager, will review, evaluate and rank all responsive proposals received from Proposers responding to this RFP. The committee members shall score each Proposal in accordance with the rating criteria set forth below and may, at their discretion, schedule presentations from any firms submitting a proposal. The Selection Committee will rank qualified firms in order of preference and by consensus using all information presented to the Committee, choose the top ranked firm and will subsequently enter into negotiations with the top ranked firm. Award of the contract is dependent upon the successful and full execution of a mutually agreed contract. 9. Negotiations shall begin with the top-ranked firm(s) in accordance with Florida Statute 287.055. 10. Upon the successful completion of negotiations, contracts will be presented to the Board of County Commissioners for approval. The County reserves the right to withdraw this RFP at any time and for any reason, and to issue such clarifications, modifications, addendums, and/or amendments as it may deem appropriate, including, but not limited, to requesting supplemental proposal information. Receipt of a proposal by the County or a submission of a proposal to the County offers no rights upon the Vendor nor obligates the County in any manner. G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP CCNATemplate 22 Packet Page-471- 1/8/2013 Item 10.E. Acceptance of the proposal does not guarantee issuance of any other governmental approvals. Proposals which include provisions requiring the granting of zoning variances shall not be considered. 10. References • The County reserves the right to contact any and all references submitted as a result of this solicitation. 11. Proposal Selection Committee and Evaluation Factors The County Manager shall appoint a Selection Committee to review all proposals submitted. The factors to be considered in the evaluation of proposal responses are listed below. Tab Criteria Points 2 Project Understanding Approach 45 3 Technical Team 35 4 Location, Availability and Responsiveness 10 5 References 10 TOTAL 100 Tie Breaker: In the event of a tie, both in individual scoring and in final ranking, the firm with the lowest paid dollars by Collier County to the vendor (as obtained from the County's financial system)within the last five (5) years will receive the higher individual ranking. This information will be based on information provided by the Vendor, subject to verification at the County's option. If there is a multiple firm tie in either individual scoring or final ranking, the firm with the lowest volume of work shall receive the higher ranking, the firm with the next lowest volume of work shall receive the next highest ranking and so on. 12. Acceptance or Rejection of Proposals The right is reserved by the County to waive any irregularities in any proposal, to reject any or all proposals, to resolicit for proposals, if desired, and upon recommendation and justification by Collier County to accept the proposal which in the judgment of the County is deemed the most advantageous for the public and the County of Collier. Any proposal which is incomplete, conditional, obscure or which contains irregularities of any kind, may be cause for rejection. In the event of default of the successful Vendor, or their refusal to enter into the Collier County contract, the County reserves the right to accept the proposal of any other Vendor or to readvertise using the same or revised documentation, at its sole discretion. G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 23 Packet Page-472- , 1/8/2013 Item 10.E. Exhibit Ill: Collier County Purchase Order Terms and Conditions 1. Offer and to comply with all carrier This offer is subject to cancellation by the regulations. Risk of loss of any goods COUNTY without notice if not accepted by sold hereunder shall transfer to the VENDOR within fourteen (14) days of COUNTY at the time and place of issuance. delivery; provided that risk of loss prior to actual receipt of the goods by the 2. Acceptance and Confirmation COUNTY nonetheless remain with This Purchase Order (including all VENDOR. documents attached to or referenced b) No charges will be paid by the COUNTY therein) constitutes the entire agreement for packing, crating or cartage unless between the parties, unless otherwise otherwise specifically stated in this specifically noted by the COUNTY on the Purchase Order. Unless otherwise face of this Purchase Order. Each delivery provided in Purchase Order, no invoices of goods and/or services received by the shall be issued nor payments made COUNTY from VENDOR shall be deemed to prior to delivery. Unless freight and be upon the terms and conditions contained other charges are itemized, any in this Purchase Order. discount will be taken on the full amount of invoice. No additional terms may be added and c) All shipments of goods scheduled on the Purchase Order may not be changed except same day via the same route must be by written instrument executed by the consolidated. Each shipping container COUNTY. VENDOR is deemed to be on must be consecutively numbered and notice that the COUNTY objects to any marked to show this Purchase Order additional or different terms and conditions number. The container and Purchase contained in any acknowledgment, invoice Order numbers must be indicated on bill or other communication from VENDOR, of lading. Packing slips must show notwithstanding the COUNTY'S acceptance Purchase Order number and must be or payment for any delivery of goods and/or included on each package of less than services, or any similar act by VENDOR. container load (LCL) shipments and/or with each car load of equipment. The 3. Inspection COUNTY reserves the right to refuse or All goods and/or services delivered return any shipment or equipment at hereunder shall be received subject to the VENDOR'S expense that is not marked COUNTY'S inspection and approval and with Purchase Order numbers. payment therefore shall not constitute VENDOR agrees to declare to the acceptance. All payments are subject to carrier the value of any shipment made adjustment for shortage or rejection. All under this Purchase Order and the full defective or nonconforming goods will be invoice value of such shipment. returned pursuant to VENDOR'S instruction d) All invoices must contain the Purchase at VENDOR'S expense. Order number and any other specific information as identified on the To the extent that a purchase order requires Purchase Order. Discounts of prompt a series of performances by VENDOR, the payment will be computed from the date COUNTY prospectively reserves the right to of receipt of goods or from date of cancel the entire remainder of the Purchase receipt of invoices, whichever is later. Order if goods and/or services provided Payment will be made upon receipt of a early in the term of the Purchase Order are proper invoice and in compliance with non-conforming or otherwise rejected by the Chapter 218, Fla. Stats., otherwise COUNTY. known as the "Local Government 4. Shipping and Invoices Prompt Payment Act," and, pursuant to a) All goods are FOB destination and must the Board of County Commissioners be suitably packed and prepared to Purchasing Policy. secure the lowest transportation rates G/Current-Solicitation Template\RFP CCNATemplate_08042010 11-5782 RFP CCNATemplate 24 Packet Page-473- 1/8/2013 Item 10.E. 5. Time Is Of the Essence and transportation shall conform to all Time for delivery of goods or performance of applicable laws, including but not limited to services under this Purchase Order is of the the Occupational Health and Safety Act, the essence. Failure of VENDOR to meet Federal Transportation Act and the Fair delivery schedules or deliver within a Labor Standards Act, as well as any law or reasonable time, as interpreted by the regulation noted on the face of the Purchase COUNTY in its sole judgment, shall entitle Order. the COUNTY to seek all remedies available to it at law or in equity. VENDOR agrees to 9. Advertising reimburse the COUNTY for any expenses No VENDOR providing goods and services incurred in enforcing its rights. VENDOR to the COUNTY shall advertise the fact that further agrees that undiscovered delivery of it has contracted with the COUNTY for nonconforming goods and/or services is not goods and/or services, or appropriate or a waiver of the COUNTY'S right to insist make use of the COUNTY'S name or other upon further compliance with all identifying marks or property without the specifications. prior written consent of the COUNTY'S Purchasing Department. 6. Changes The COUNTY may at any time and by 10. Indemnification written notice make changes to drawings VENDOR shall indemnify and hold harmless and specifications, shipping instructions, the COUNTY from any and all claims, quantities and delivery schedules within the including claims of negligence, costs and general scope of this Purchase Order. expenses, including but not limited to Should any such change increase or attorneys' fees, arising from, caused by or decrease the cost of, or the time required for related to the injury or death of any person performance of the Purchase Order, an (including but not limited to employees and equitable adjustment in the price and/or agents of VENDOR in the performance of delivery schedule will be negotiated by the their duties or otherwise), or damage to COUNTY and VENDOR. Notwithstanding property (including property of the COUNTY the foregoing, VENDOR has an affirmative or other persons), which arise out of or are obligation to give notice if the changes will incident to the goods and/or services to be decrease costs. Any claims for adjustment provided hereunder. by VENDOR must be made within thirty (30) days from the date the change is ordered or 11. Warranty of Non-Infringement within such additional period of time as may VENDOR represents and warrants that all be agreed upon by the parties. goods sold or services performed under this Purchase Order are: a) in compliance with 7. Warranties applicable laws; b) do not infringe any VENDOR expressly warrants that the goods patent, trademark, copyright or trade secret; and/or services covered by this Purchase and c) do not constitute unfair competition. Order will conform to the specifications, drawings, samples or other descriptions VENDOR shall indemnify and hold harmless furnished or specified by the COUNTY, and the COUNTY from and against any and all will be of satisfactory material and quality claims, including claims of negligence, costs production, free from defects and sufficient and expense, including but not limited to for the purpose intended. Goods shall be attorneys' fees, which arise from any claim, delivered free from any security interest or suit or proceeding alleging that the other lien, encumbrance or claim of any third COUNTY'S use of the goods and/or party. These warranties shall survive services provided under this Purchase Order inspection, acceptance, passage of title and are inconsistent with VENDOR'S payment by the COUNTY. representations and warranties in section 11 (a). 8. Statutory Conformity Goods and services provided pursuant to If any claim which arises from VENDOR'S this Purchase Order, and their production breach of section 11 (a) has occurred, or is G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 25 Packet Pane-474- 1/8/2013 Item 10.E. likely to occur, VENDOR may, at the and acts of nature. When VENDOR has COUNTY'S option, procure for the COUNTY knowledge of any actual or potential force the right to continue using the goods or majeure or other conditions which will delay services, or replace or modify the goods or or threatens to delay timely performance of services so that they become non-infringing, this Purchase Order, VENDOR shall (without any material degradation in immediately give notice thereof, including all performance, quality, functionality or relevant information with respects to what additional cost to the COUNTY). steps VENDOR is taking to complete delivery of the goods and/or services to the 12. Insurance Requirements COUNTY. The VENDOR, at its sole expense, shall provide commercial insurance of such type 15. Assignment and with such terms and limits as may be VENDOR may not assign this Purchase reasonably associated with the Purchase Order, nor any money due or to become due Order. Providing and maintaining adequate without the prior written consent of the insurance coverage is a material obligation COUNTY. Any assignment made without of the VENDOR. All insurance policies shall such consent shall be deemed void. be executed through insurers authorized or eligible to write policies in the State of 16. Taxes Florida. Goods and services procured subject to this Purchase Order are exempt from Florida 13. Compliance with Laws sales and use tax on real property, transient In fulfilling the terms of this Purchase Order, rental property rented, tangible personal VENDOR agrees that it will comply with all purchased or rented, or services purchased federal, state, and local laws, rules, codes, (Florida Statutes, Chapter 212), and from and ordinances that are applicable to the federal excise tax. conduct of its business. By way of non- exhaustive example, this shall include the 17. Annual Appropriations American with Disabilities Act and all The COUNTY'S performance and obligation prohibitions against discrimination on the to pay under this Purchase Order shall be basis of race, religion, sex creed, national contingent upon an annual appropriation of origin, handicap, marital status, or veterans' funds. status. Further, VENDOR acknowledges and without exception or stipulation shall be 18. Termination fully responsible for complying with the This Purchase Order may be terminated at provisions of the Immigration Reform and any time by the COUNTY upon 30 days Control Act of 1986 as located at 8 U.S.C. prior written notice to the VENDOR. This 1324, et seq. and regulations relating Purchase Order may be terminated thereto, as either may be amended. Failure immediately by the COUNTY for breach by by the awarded firm(s) to comply with the VENDOR of the terms and conditions of this laws referenced herein shall constitute a Purchase Order, provided that COUNTY has breach of the award agreement and the provided VENDOR with notice of such County shall have the discretion to breach and VENDOR has failed to cure unilaterally terminate said agreement within 10 days of receipt of such notice. immediately. Any breach of this provision may be regarded by the COUNTY as a 19. General material and substantial breach of the a) This Purchase Order shall be governed contract arising from this Purchase Order. by the laws of the State of Florida. The venue for any action brought to 14. Force Majeure specifically enforce any of the terms and Neither the COUNTY nor VENDOR shall be conditions of this Purchase Order shall responsible for any delay or failure in be the Twentieth Judicial Circuit in and performance resulting from any cause for Collier County, Florida beyond their control, including, but without b) Failure of the COUNTY to act limitation to war, strikes, civil disturbances immediately in response to a breach of G/Current-Solicitation Template\RFP CCNATemplate_08042010 11-5782 RFP CCNATemplate 26 Packet Page -475- 1/8/2013 Item 10.E. itow this Purchase Order by VENDOR shall accordance with Florida Statute Chapter not constitute a waiver of breach. 112.061, Per Diem and Travel Waiver of the COUNTY by any default Expenses for Public Officers, employees by VENDOR hereunder shall not be and authorized persons. deemed a waiver of any subsequent e) In the event of any conflict between or default by VENDOR. among the terms of any Contract c) All notices under this Purchase Order Documents related to this Purchase shall be sent to the respective Order, the terms of the Contract addresses on the face page by certified Documents shall take precedence over mail, return receipt requested, by the terms of the Purchase Order. To the overnight courier service, or by personal extent any terms and /or conditions of delivery and will be deemed effective this Purchase Order duplicate or overlap upon receipt. Postage, delivery and the Terms and Conditions of the other charges shall be paid by the Contract Documents, the provisions of sender. A party may change its address the Terms and/or Conditions that are for notice by written notice complying most favorable to the County and/or with the requirements of this section. provide the greatest protection to the d) The Vendor agrees to reimbursement of County shall govern. any travel expenses that may be associated with this Purchase Order in AO 14 Ott s G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 REP_CCNATemplate 27 Packet Page-476- Exhibit IV: Additional Terms and Conditions for RFP 1/8/2013 Item 10.E. 1. Insurance and Bonding Requirements The Vendor shall at its own expense, carry and maintain insurance coverage from responsible companies duly authorized to do business in the State of Florida as set forth in the Insurance and Bonding attachment of this solicitation. The Vendor shall procure and maintain property insurance upon the entire project, if required, to the full insurable value of the scope of work. The County and the Vendor waive against each other and the County's separate Vendors, Contractors, Design Consultant, Subcontractors agents and employees of each and all of them, all damages covered by property insurance provided herein, except such rights as they may have to the proceeds of such insurance. The Vendor and County shall, where appropriate, require similar waivers of subrogation from the County's separate Vendors, Design Consultants and Subcontractors and shall require each of them to include similar waivers in their contracts. Collier County shall be responsible for purchasing and maintaining, its own liability insurance. Certificates issued as a result of the award of this solicitation must identify "For any and all work performed on behalf of Collier County." The General Liability Policy provided by Vendor to meet the requirements of this solicitation shall name Collier County, Florida, as an additional insured as to the operations of Vendor under this solicitation and shall contain a severability of interest's provisions. Collier County Board of County Commissioners shall be named as the Certificate Holder. The "Certificate Holder" should read as follows: Collier County Board of County Commissioners Naples, Florida The amounts and types of insurance coverage shall conform to the minimum requirements set forth in Insurance and Bonding attachment, with the use of Insurance Services Office (ISO) forms and endorsements or their equivalents. If Vendor has any self-insured retentions or deductibles under any of the below listed minimum required coverage, Vendor must identify on the Certificate of Insurance the nature and amount of such self- insured retentions or deductibles and provide satisfactory evidence of financial responsibility for such obligations. All self-insured retentions or deductibles will be Vendor's sole responsibility. Coverage(s) shall be maintained without interruption from the date of commencement of the Work until the date of completion and acceptance of the scope of work by the County or as specified in this solicitation, whichever is longer. The Vendor and/or its insurance carrier shall provide 30 days written notice to the County of policy cancellation or non-renewal on the part of the insurance carrier or the Vendor. The Vendor shall also notify the County, in a like manner, within twenty-four(24) hours after receipt, of any notices of expiration, cancellation, non-renewal or material change in coverage or limits received by Vendor from its insurer and nothing contained herein shall relieve Vendor of this requirement to provide notice. In the event of a reduction in the aggregate limit of any policy to be provided by Vendor hereunder, Vendor shall immediately take steps to have the aggregate limit reinstated to the full extent permitted under such policy. G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 28 Packet Page-477- 1/8/2013 Item 10.E. Should at any time the Vendor not maintain the insurance coverage(s) required he. _. , _.._ _ _ __._ . .__, terminate the Agreement or at its sole discretion shall be authorized to purchase such coverage(s) and charge the Vendor for such coverage(s) purchased. If Vendor fails to reimburse the County for such costs within thirty (30) days after demand, the County has the right to offset these costs from any amount due Vendor under this Agreement or any other agreement between the County and Vendor. The County shall be under no obligation to purchase such insurance, nor shall it be responsible for the coverage(s) purchased or the insurance company or companies used. The decision of the County to purchase such insurance coverage(s) shall in no way be construed to be a waiver of any of its rights under the Contract Documents. If the initial or any subsequently issued Certificate of Insurance expires prior to the completion of the scope of work, the Vendor shall furnish to the County renewal or replacement Certificate(s) of Insurance not later than ten (10) calendar days after the expiration date on the certificate. Failure of the Vendor to provide the County with such renewal certificate(s) shall be considered justification for the County to terminate any and all contracts. 2. Offer Extended to Other Governmental Entities Collier County encourages and agrees to the successful vendor extending the pricing, terms and conditions of this solicitation or resultant contract to other governmental entities at the discretion of the successful vendor. 3. Additional Items and/or Services During the contract term, Collier County reserves the right to add related items and/or services upon negotiation of a satisfactory price by the Project Manager and Vendor. 4. Use of Subcontractors Bidders on any service related project, including construction, must be qualified and directly responsible'° ' for NA% or more of the solicitation amount for said work. 5. County's Right to Inspect The County or its authorized Agent shall have the right to inspect the Vendor's facilities/project site during and after each work assignment the Vendor is performing. 6. Additional Terms and Conditions of Contract Collier County has developed standard contracts/agreements, approved by the Board of County Commissioners (BCC). The selected Vendor shall be required to sign a standard Collier County contract within twenty one (21) days of Notice of Selection for Award. The County reserves the right to include in any contract document such terms and conditions, as it deems necessary for the proper protection of the rights of Collier County. A sample copy of this contract is available upon request. The County will not be obligated to sign any contracts, maintenance and/or service agreements or other documents provided by the Vendor. 7. Site Inspection If services to be provided involve or are related to a physical site(s), including, but not limited to: design services for construction, physical monitoring, environmental studies, inspections or other similar activities, prior to submission of proposal, proposers shall visit the site(s) with the County ork project manager to become familiar with local conditions that may in any manner affect G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 29 Packet Page-478- performance of the Work. This site visit shall be documented in writing by the prop_1/8/2013 Item 10.E. by the County project manager; this documentation shall be submitted with the proposal. The proposal will be deemed non-responsive if the site visit documentation is not presented to the County in the proposer's submitted proposal materials. Upon award of the contract, subsequent site visits shall be at intervals appropriate to the stage of the project, as determined by the County project manager. No plea of ignorance of conditions or difficulties that may exist or conditions or difficulties that may be encountered in the execution of the Work pursuant to this Agreement as a result of failure to make the necessary examinations and investigations shall be accepted as an excuse for any failure or omission on the part of the awarded proposer, nor shall they be accepted as a basis for any claims whatsoever for extra compensation or for an extension of time. 9. Payment Method Payments are made in accordance with the Local Government Prompt Payment Act, Chapter 218, Florida Statutes. Vendor's invoices must include: • Purchase Order Number • Description and quantities of the goods or services provided per instructions on the County's purchase order or contract. Invoices shall be sent to: Board of County Commissioners Clerk's Finance Department ATTN: Accounts Payable 3299 Tamiami Trail E Ste 700 Naples FL 34112 Collier County, in its sole discretion, will determine the method of payment for goods and/or services as part of this agreement. Payment methods include: • Traditional — payment by check, wire transfer or other cash equivalent. • Standard — payment by purchasing card. Collier County's Purchasing Card Program is supported by standard bank credit suppliers (i.e. VISA and MasterCard), and as such, is cognizant of the Rules for VISA Merchants and MasterCard Merchant Rules. Collier County cautions vendors to consider both methods of payment when determining pricing as no additional surcharges or fees will be considered (per Rules for VISA Merchants and MasterCard Merchant Rules). The County will entertain bids clearly stating pricing for standard payment methods. An additional separate discounted price for traditional payments may be provided at the initial bid submittal if it is clearly marked as an "Additional Cash Discount." Upon execution of the Contract and completion of each month's work, payment requests shall be submitted to the Project Manager on a monthly basis by the Vendor for services rendered for that prior month. Services beyond sixty (60) days from current monthly invoice will not be considered for payment without prior approval from the Project manager. All invoices must be submitted within the fiscal year the work was performed. (County's fiscal year is October 1 - September 30.) Invoices submitted after the close of the fiscal year will not be accepted (or processed for payment) unless specifically authorized by the Project Manager. G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 30 Packet Page-479- Payments will be made for articles and/or services furnished, delivered, and acce 1/8/2013 Item 10.E. approval of invoices submitted on the date of services or within six (6) months after completion of contract. Any untimely submission of invoices beyond the specified deadline period is subject to non- payment under the legal doctrine of"'aches" as untimely submitted. Time shall be deemed of the essence with respect to the timely submission of invoices under this agreement. In instances where the successful contractor may owe debts (including, but not limited to taxes or other fees)to Collier County and the contractor has not satisfied nor made arrangement to satisfy these debts, the County reserves the right to off-set the amount owed to the County by applying the amount owed to the vendor or contractor for services performed of for materials delivered in association with a contract. Invoices shall not reflect sales tax. After review and approval, the invoice will be transmitted to the Finance Division for payment. Payment will be made upon receipt of proper invoice and in compliance with Chapter 218 Florida Statutes, otherwise known as the "Local Government Prompt Payment Act." Collier County reserves the right to withhold and/or reduce an appropriate amount of any payment for work not performed or for unsatisfactory performance of Contractual requirements. 10. Environmental Health and Safety All Vendors and Sub vendors performing service for Collier County are required and shall comply with all Occupational Safety and Health Administration (OSHA), State and County Safety and Occupational Health Standards and any other applicable rules and regulations. Vendors and Sub vendors shall be responsible for the safety of their employees and any unsafe acts or conditions that may cause injury or damage to any persons or property within and around the work site. All firewall penetrations must be protected in order to meet Fire Codes. Collier County Government has authorized OSHA representatives to enter any Collier County facility, property and/or right-of-way for the purpose of inspection of any Vendor's work operations. This provision is non-negotiable by any department and/or Vendor. All new electrical installations shall incorporate NFPA 70E Short Circuit Protective Device Coordination and Arc Flash Studies where relevant as determined by the engineer. All electrical installations shall be labeled with appropriate NFPA 70E arch flash boundary and PPE Protective labels. 11. Licenses The Vendor is required to possess the correct Business Tax Receipt, professional license, and any other authorizations necessary to carry out and perform the work required by the project pursuant to all applicable Federal, State and Local Law, Statute, Ordinances, and rules and regulations of any kind. Additionally, copies of the required licenses must be submitted with the proposal response indicating that the entity proposing, as well as the team assigned to the County account, is properly licensed to perform the activities or work included in the contract documents. Failure on the part of any Vendor to submit the required documentation may be grounds to deem Vendor non-responsive. A Vendor, with an office within Collier County is also required to have an occupational license. All State Certified contractors who may need to pull Collier County permits or call in inspections must complete a Collier County Contractor License registration form and submit the required fee. After registering the license/registration will need to be renewed thereafter to remain "active" in Collier County G/C u rrent-S olicitat ion Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 31 Packet Page-480- If you have questions regarding professional licenses contact the Contractor Licen_1/8/20 -. Item 10.E. Development and Environmental Services at (239) 252-2431, 252-2432 or 252-2909. Questions regarding required occupational licenses, please contact the Tax Collector's Office at (239) 252-2477. 12. Principals/Collusion By submission of this Proposal the undersigned, as Vendor, does declare that the only person or persons interested in this Proposal as principal or principals is/are named therein and that no person other than therein mentioned has any interest in this Proposal or in the contract to be entered into; that this Proposal is made without connection with any person, company or parties making a Proposal, and that it is in all respects fair and in good faith without collusion or fraud. 13. Relation of County It is the intent of the parties hereto that the Vendor shall be legally considered an independent Vendor, and that neither the Vendor nor their employees shall, under any circumstances, be considered employees or agents of the County, and that the County shall be at no time legally responsible for any negligence on the part of said Vendor, their employees or agents, resulting in either bodily or personal injury or property damage to any individual, firm, or corporation. 14. Termination Should the Vendor be found to have failed to perform his services in a manner satisfactory to the County, the County may terminate this Agreement immediately for cause; further the County may terminate this Agreement for convenience with a thirty (30) day written notice. The County shall be sole judge of non-performance. 15. Lobbying All firms are hereby placed on NOTICE that the Board of County Commissioners does not wish to be lobbied, either individually or collectively about a project for which a firm has submitted a Proposal. Firms and their agents are not to contact members of the County Commission for such purposes as meeting or introduction, luncheons, dinners, etc. During the process, from Proposal closing to final Board approval, no firm or their agent shall contact any other employee of Collier County in reference to this Proposal, with the exception of the Purchasing Director or his designee(s). Failure to abide by this provision may serve as grounds for disqualification for award of this contract to the firm. 16. Certificate of Authority to Conduct Business in the State of Florida (Florida Statute 607.1501) In order to be considered for award, firms submitting a response to this solicitation shall be required to provide a certificate of authority from the Florida Department of State Divisions of Corporations in accordance with the requirements of Florida Statute 607.1501 (www.sunbiz.orq/search.html). A copy of the document shall be submitted with the solicitation response and the document number shall be identified. Firms who do not provide the certificate of authority at the time of response shall be required to provide same within five (5) days upon notification of selection for award. If the firm cannot provide the document within the referenced timeframe, the County reserves the right to award to another firm. 17. Single Proposal Each Vendor must submit, with their proposal, the required forms included in this RFP. Only one proposal from a legal entity as a primary will be considered. A legal entity that submits a proposal as a primary or as part of a partnership or joint venture submitting as primary may not then act as a sub- consultant to any other firm submitting under the same RFP. If a legal entity is not submitting as a G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 32 Packet Page-481- 1/8/2013 Item 10.E. primary or as part of a partnership or joint venture as a primary, that legal entity ---- --- -- --- consultant to any other firm or firms submitting under the same RFP. All submittals in violation of this requirement will be deemed non-responsive and rejected from further consideration. 18. Protest Procedures Any actual or prospective Vendor to a Request for Proposal, who is aggrieved with respect to the former, shall file a written protest with the Purchasing Director prior to the due date for acceptance of proposals. All such protests must be filed with the Purchasing Director no later than 11:00 a.m. Collier County time on the final published date for the acceptance of the Request for Proposals. The Board of County Commissioners will make award of contract in public session. Award recommendations will be posted outside the offices of the Purchasing Department on Wednesdays and Thursdays. Any actual or prospective respondent who desires to formally protest the recommended contract award must file a notice of intent to protest with the Purchasing Director within two (2) calendar days (excluding weekends and County holidays) of the date that the recommended award is posted. Upon filing of said notice, the protesting party will have five (5) days to file a formal protest and will be given instructions as to the form and content requirements of the formal protest. A copy of the "Protest Policy" is available at the office of the Purchasing Director. 19. Public Entity Crime A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid, proposal, or reply on a contract to provide any goods or services to a public entity; may not submit a bid, proposal, or reply on a contract with a public entity for the construction or repair of a public building or public work; may not submit bids, proposals, or replies on leases of real property to a public entity; may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity; and may not transact business with any public entity in excess of the threshold amount provided in s. 287.017 for CATEGORY TWO for a period of 36 months following the date of being placed on the convicted vendor list. 20. Security and Background Checks If required, Vendor/ Contractor/ Proposer shall be responsible for the costs of providing background checks by the Collier County Facilities Management Department, and drug testing for all employees that shall provide services to the County under this Agreement. This may include, but not be limited to, checking federal, state and local law enforcement records, including a state and FBI fingerprint check, credit reports, education, residence and employment verifications and other related records. Contractor shall be required to maintain records on each employee and make them available to the County for at least four (4) years. 21. Conflict of Interest Vendor shall complete the Conflict of Interest Affidavit included as an attachment to this RFP document. Disclosure of any potential or actual conflict of interest is subject to County staff review and does not in and of itself disqualify a firm from consideration. These disclosures are intended to identify and or preclude conflict of interest situations during contract selection and execution. 22. Prohibition of Gifts to County Employees No organization or individual shall offer or give, either directly or indirectly, any favor, gift, loan, fee, service or other item of value to any County employee, as set forth in Chapter 112, Part III, Florida Statutes, the current Collier County Ethics Ordinance and County Administrative Procedure 5311. G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 33 Packet Page-482- Violation of this provision may result in one or more of the following consequences 1/8/2013 Item 10.E. individual, firm, and/or any employee of the firm from contact with County staff for a specified period of time; b. Prohibition by the individual and/or firm from doing business with the County for a specified period of time, including but not limited to: submitting bids, RFP, and/or quotes; and, c. immediate termination of any contract held by the individual and/or firm for cause. 23. Immigration Law Affidavit Certification Statutes and executive orders require employers to abide by the immigration laws of the United States and to employ only individuals who are eligible to work in the United States. The Employment Eligibility Verification System (E-Verify) operated by the Department of Homeland Security (DHS) in partnership with the Social Security Administration (SSA), provides an Internet-based means of verifying employment eligibility of workers in the United States; it is not a substitute for any other employment eligibility verification requirements. The program will be used for Collier County formal Invitations to Bid (ITB) and Request for Proposals (RFP) including professional services and construction services. Exceptions to the program: • Commodity based procurement where no services are provided. • Where the requirement for the affidavit is waived by the Board of County Commissioners Vendors/ Bidders are required to enroll in the E-Verify program, and provide acceptable evidence of their enrollment, at the time of the submission of the vendor's/bidder's proposal. Acceptable evidence consists of a copy of the properly completed E-Verify Company Profile page or a copy of the fully executed E-Verify Memorandum of Understanding for the company. Vendors are also required to provide the Collier County Purchasing Department an executed affidavit certifying they shall comply with the E-Verify Program. The affidavit is attached to the solicitation documents. If the BidderNendor does not comply with providing the acceptable E-Verify evidence and the executed affidavit the bidder's /vendor's proposal may be deemed non-responsive. Additionally, vendors shall require all subcontracted vendors to use the E-Verify system for all purchases not covered under the "Exceptions to the program" clause above. For additional information regarding the Employment Eligibility Verification System (E-Verify) program visit the following website: http://www.dhs.gov/E-Verify. It shall be the vendor's responsibility to familiarize themselves with all rules and regulations governing this program. Vendor acknowledges, and without exception or stipulation, any firm(s) receiving an award shall be fully responsible for complying with the provisions of the Immigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324, et seq. and regulations relating thereto, as either may be amended and with the provisions contained within this affidavit. Failure by the awarded firm(s) to comply with the laws referenced herein or the provisions of this affidavit shall constitute a breach of the award agreement and the County shall have the discretion to unilaterally terminate said agreement immediately. G/Current-Solicitation Template\RFP_CCNATemptate_08042010 11-5782 RFP_CCNATemplate 34 Packet Page-483- 1/8/2013 Item 10.E. er County Adernisve Services Don Aosow Purchasing Attachment 1: Vendor's Non-Response Statement The sole intent of the Collier County Purchasing Department is to issue solicitations that are clear, concise and openly competitive. Therefore, we are interested in ascertaining reasons for prospective Vendors not wishing to respond to this solicitation. If your firm is not responding to this RFP, please indicate the reason(s) by checking the item(s) listed below and return this form via email or fax, noted on the cover page, or mail to Collier County Government, Purchasing Department, 3327 Tamiami Trail E, Naples, FL 34112. We are not responding to CCNA Solicitation #11-5782 Wastewater Basin Analyses for the following reason(s): ❑ Services requested not available through our company. ❑ Our firm could not meet specifications/scope of work. ❑ Specifications/scope of work not clearly understood or applicable (too vague, rigid, etc.) ❑ Project is too small. ❑ Insufficient time allowed for preparation of response. ❑ Incorrect address used. Please correct mailing address: Amok ❑ Other reason(s): Name of Firm: Address: City, State, Zip: Telephone: Email: Representative Signature: Representative Name: Date G/Current-Solicitation Template\RFP_CCNATemplate 08042010 11-5782 RFP_CCNATemplate 35 Packet Page-484- 1/8/2013 Item 10.E. iffit County Administratike Services Division Purchasing Attachment 2: Vendor Check List IMPORTANT: THIS SHEET MUST BE SIGNED. Please read carefully, sign in the spaces indicated and return with your Proposal. Vendor should check off each of the following items as the necessary action is completed: ❑ The Proposal has been signed. ❑ All applicable forms have been signed and included, along with licenses to complete the requirements of the project. ❑ Any addenda have been signed and included. ❑ The mailing envelope has been addressed to: Collier County Government Purchasing Department 3327 Tamiami Trail E Naples FL 34112 Attn: Nicole Parker, Procurement Strategist CCNA Solicitation: #11-5782 Wastewater Basin Analyses El The mailing envelope must be sealed and marked with Proposal Number, Proposal Title and Due Date. El The Proposal will be mailed or delivered in time to be received no later than the specified due date and time. (Otherwise Proposal cannot be considered.) ALL COURIER-DELIVERED PROPOSALS MUST HAVE THE RFP NUMBER AND TITLE ON THE OUTSIDE OF THE COURIER PACKET Name of Firm: Address: City, State, Zip: Telephone: Email: Representative Signature: Representative Name: Date G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 36 Packet Page-485- 1/8/2013 Item 10.E. Co itt eir County Administrative Service Division Purchasing Attachment 3: Conflict of Interest Affidavit By the signature below, the firm (employees, officers and/or agents) certifies, and hereby discloses, that, to the best of their knowledge and belief, all relevant facts concerning past, present, or currently planned interest or activity (financial, contractual, organizational, or otherwise) which relates to the proposed work; and bear on whether the firm (employees, officers and/or agents) has a possible conflict have been fully disclosed. Additionally, the firm (employees, officers and/or agents) agrees to immediately notify in writing the Purchasing/General Services Director, or designee, if any actual or potential conflict of interest arises during the contract and/or project duration. Firm: Signature and Date: Print Name Title of Signatory State of County of SUBSCRIBED AND SWORN to before me this day of , 20 , by , who is personally known to me to be the for the Firm, OR who produced the following identification • Notary Public My Commission Expires G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 37 Packet Page-486- 1/8/2013 Item 10.E. #1. Co ler County Administrative Juices Division Purchasing Attachment 4: Vendor Declaration Statement BOARD OF COUNTY COMMISSIONERS Collier County Government Complex Naples, Florida 34112 RE: CCNA Solicitation: #11-5782 Wastewater Basin Analyses Dear Commissioners: The undersigned, as Vendor declares that this proposal is made without connection or arrangement with any other person and this proposal is in every respect fair and made in good faith, without collusion or fraud. The Vendor agrees, if this proposal is accepted, to execute a Collier County document for the purpose of establishing a formal contractual relationship between the firm and Collier County, for the performance of all requirements to which the proposal pertains. The Vendor states that the proposal is based upon the proposal documents listed by CCNA Solicitation: #11-5782 Wastewater Basin Analyses. IN WITNESS WHEREOF, WE have hereunto subscribed our names on this day of 201_in the County of , in the State of Firm's Legal Name: Address: City, State, Zip Code: Florida Certificate of Authority Document Number Federal Tax Identification Number Telephone: FAX: Signature by: (Typed and written) Title: G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 38 Packet Page-487- Additional Contact Information 1/8/2013 Item 1O.E. Send payments to: (required if different from above) Company name used as payee Contact name: Title: Address: City, State,ZIP Telephone: FAX: Email: Office servicing Collier County to place orders (required if different from above) Contact name: Title: Address: City, State,ZIP Telephone: Email: G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 39 Packet Page-488- • 1/8/2013 Item 10.E. C:.o ler C..ou zty Administrative Services Division Purchasing Attachment 5: Immigration Affidavit Certification CCNA Solicitation: #11-5782 Wastewater Basin Analyses This Affidavit is required and should be signed, notarized by an authorized principal of the firm and submitted with formal Invitations to Bid (ITB's)and Request for Proposals (RFP) submittals. Further, Vendors/Bidders are required to enroll in the E-Verify program, and provide acceptable evidence of their enrollment, at the time of the submission of the vendor's/bidder's proposal. Acceptable evidence consists of a copy of the properly completed E-Verify Company Profile page or a copy of the fully executed E-Verify Memorandum of Understanding for the company. Failure to include this Affidavit and acceptable evidence of enrollment in the E-Verifv program may deem the Vendor/ Bidder's proposal as non-responsive. Collier County will not intentionally award County contracts to any vendor who knowingly employs unauthorized alien workers, constituting a violation of the employment provision contained in 8 U.S.C. Section 1324 a(e)Section 274A(e) of the Immigration and Nationality Act("INA"). Collier County may consider the employment by any vendor of unauthorized aliens a violation of Section 274A(e) of the INA. Such Violation by the recipient of the Employment Provisions contained in Section 274A(e) of the INA shall be grounds for unilateral termination of the contract by Collier County. Vendor attests that they are fully compliant with all applicable immigration laws (specifically to the 1986 Immigration Act and subsequent Amendment(s)) and agrees to comply with the provisions of the Memorandum of Understanding with E-Verify and to provide proof of enrollment in The Employment Eligibility Verification System (E-Verify), operated by the Department of Homeland Security in partnership with the Social Security Administration at the time of submission of the Vendor's/ Bidder's proposal. Company Name Print Name Title Signature Date State of County of The foregoing instrument was signed and acknowledged before me this day of by who has produced as identification. (Print or Type Name) (Type of Identification and Number) Notary Public Signature Printed Name of Notary Public Notary Commission Number/Expiration The signee of this Affidavit guarantees, as evidenced by the sworn affidavit required herein, the truth and accuracy of this affidavit to interrogatories hereinafter made. G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 40 Packet Page-489- 1/8/2013 Item 10.E. Cofer County Admistralwe Services Division Purchasing Attachment 6:Vendor Substitute W—9 Request for Taxpayer Identification Number and Certification In accordance with the Internal Revenue Service regulations, Collier County is required to collect the following information for tax reporting purposes from individuals and companies who do business with the County (including social security numbers if used by the individual or company for tax reporting purposes). Florida Statute 119.071(5) require that the county notify you in writing of the reason for collecting this information, which will be used for no other purpose than herein stated. Please complete all information that applies to your business and return with your quote or proposal. 1. General Information (provide all information) Taxpayer Name (as shown on income tax return) Business Name (if different from taxpayer name) Address City State, Zip Telephone FAX Email Order Information Remit/Payment Information Address Address City State Zip City State Zip FAX FAX Email Email 2. Company Status (check only one) _Individual/Sole Proprietor _Corporation _Partnership Tax Exempt (Federal income tax-exempt entity _Limited Liability Company under Internal Revenue Service guidelines IRC 501 (c)3) Enter the tax classification (D=Disregarded Entity, C=Corporation, P=Partnership) 3. Taxpayer Identification Number(for tax reporting purposes only) Federal Tax Identification Number(TIN) (Vendors who do not have a TIN,will be required to provide a social security number prior to an award of the contract.) 4. Sign and Date Form Certification: Under penalties of perjury, I certify that the information shown on this form is correct to my knowledge. Signature Date Title Phone Number G/Current-Solicitation Template\RFP_CCNATemplate_08042010 11-5782 RFP_CCNATemplate 41 Packet Page-490- 1/8/2013 Item 10.E. Co ier County Adrrirnstrative Services l uision Purchasing Attachment 7: Insurance and Bonding Requirements Insurance/Bond Type Required Limits 1. ®Worker's Statutory Limits of Florida Statutes, Chapter 440 and all Federal Government Compensation Statutory Limits and Requirements 2. ® Employer's Liability $1.000.000single limit per occurrence 3. ® Commercial General Bodily Injury and Property Damage Liability (Occurrence Form) patterned after the current $1,000.000single limit per occurrence ISO form 4. ® Indemnification To the maximum extent permitted by Florida law, the ContractorNendor/Consultant shall indemnify and hold harmless Collier County, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys' fees and paralegals'fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the ContractorNendor/Consultant or anyone employed or utilized by the ContractorNendor/Consultant in the performance of this Agreement. This indemnification obligation shall not be construed to negate, abridge or reduce any other rights or remedies which otherwise may be available to an indemnified party or person described in this paragraph. This section does not pertain to any incident arising from the sole negligence of Collier County. 4. ® Automobile Liability $ 1,000,000 Each Occurrence; Bodily Injury & Property Damage, Owned/Non-owned/Hired; Automobile Included 5. ® Other insurance as ❑ Watercraft $ Per Occurrence noted: ❑ United States Longshoreman's and Harborworker's Act coverage shall be maintained where applicable to the completion of the work. $ Per Occurrence ❑ Maritime Coverage (Jones Act) shall be maintained where applicable to the completion of the work. $ Per Occurrence ❑ Aircraft Liability coverage shall be carried in limits of not less than $5,000,000 each occurrence if applicable to the completion of the Services under this Agreement. $ Per Occurrence ❑ Pollution $ Per Occurrence ® Professional Liability $1,000,000 Per Occurrence • $ 500,000 each claim and in the aggregate • $1,000,000 each claim and in the aggregate • $2,000,000 each claim and in the aggregate ❑ Project Professional Liability $ Per Occurrence RFP: 11-5782 42 RFP CCNA Template_06012011 Packet Page-491- 1/8/2013 Item 10.E. ❑Valuable Papers Insurance $ Per Occurrence 6. ❑ Bid bond Shall be submitted with proposal response in the form of certified funds, cashiers' check or an irrevocable letter of credit, a cash bond posted with the County Clerk, or proposal bond in a sum equal to 5% of the cost proposal. All checks shall be made payable to the Collier County Board of County Commissioners on a bank or trust company located in the State of Florida and insured by the Federal Deposit Insurance Corporation. 7. ❑ Performance and For projects in excess of$200,000, bonds shall be submitted with the Payment Bonds executed contract by Proposers receiving award, and written for 100% of the Contract award amount, the cost borne by the Proposer receiving an award. The Performance and Payment Bonds shall be underwritten by a surety authorized to do business in the State of Florida and otherwise acceptable to Owner; provided, however, the surety shall be rated as"A-" or better as to general policy holders rating and Class V or higher rating as to financial size category and the amount required shall not exceed 5% of the reported policy holders' surplus, all as reported in the most current Best Key Rating Guide, published by A.M. Best Company, Inc. of 75 Fulton Street, New York, New York 10038. 8. ® Vendor shall ensure that all subcontractors comply with the same insurance requirements that he is required to meet. The same Vendor shall provide County with certificates of insurance meeting the required insurance provisions. 9. ® Collier County must be named as "ADDITIONAL INSURED" on the Insurance Certificate for Commercial General Liability where required. 10. ® The Certificate Holder shall be named as Collier County Board of County Commissioners, OR, Board of County Commissioners in Collier County, OR Collier County Government, OR Collier County. 11. ® Thirty (30) Days Cancellation Notice required. Vendor's Insurance Statement We understand the insurance requirements of these specifications and that the evidence of insurability may be required within five (5) days of the award of this solicitation. Name of Firm Date Vendor Signature Print Name Insurance Agency Agent Name Telephone Number RFP: 11-5782 43 RFP CCNA Template_06012011 Packet Page-492- 1/8/2013 Item 10.E. Co ierCounty AdmnistratveSeNicesOnitsian Purchasing Attachment 8: Reference Questionnaire Solicitation: 11-5782 Wastewater Basin Analyses Reference Questionnaire for: (Name of Company Requesting Reference Information) (Name of Individuals Requesting Reference Information) Name: Company: (Evaluator completing reference questionnaire) (Evaluator's Company completing reference) Email: FAX: Telephone: Collier County is implementing a process that collects reference information on firms and their key personnel to be used in the selection of firms to perform this project. The Name of the Company listed in the Subject above has listed you as a client for which they have previously performed work. Please complete the survey. Please rate each criteria to the best of your knowledge on a scale of 1 to 10, with 10 representing that you were very satisifed (and would hire the firm/individual again) and 1 representing that you were very unsatisfied (and would never hire the firm/indivdival again). If you do not have sufficient knowledge of past performance in a particular area, leave it blank and the item or form will be scored "0." Project Description: Completion Date: Project Budget: Project Number of Days: hange Orders- Dollars Added : Change Orders- Days Added: Item Citeria - Score 1 Ability to manage the project costs (minimize change orders to scope). 2 Ability to maintain project schedule (complete on-time or early). 3 Quality of work. 4 Quality of consultative advice provided on the project. 5 Professionalism and ability to manage personnel. 6 Close out project process (final product turnover; invoices; manuals or going forward documentation, etc.) 7 Ability to verbally communicate and document information clearly and succinctly. 8 Abiltity to manage risks and unexpected project circumstances. 9 Ability to follow County policies, procedures, rules, regulations, etc. 10 Overall comfort level with hiring the company in the future (customer satisfaction). TOTAL SCORE OF ALL ITEMS ,ease FAX this completed survey to: By RFP: 11-5782 44 RFP CCNA Tempiate_06012011 Packet Page-493- 1/8/2013 Item 10.E. Contract#11-5782 Wastewater Basin Analyses (Basin 3) PROFESSIONAL SERVICES AGREEMENT For BASIN #3 Master Pump Station (MPS) Basin 306 - Bayshore, consisting of basins 303, 304 and 306 (Bayshore Drive and Thomasson Drive); (Area South of US 41, and East of the Gordon River, excluding the City of Naples Wastewater Service Area) THIS AGREEMENT is made and entered into this day of , 2012 by and between the Board of County Commissioners for Collier County, Florida, a political subdivision of the State of Florida (hereinafter referred to as the "COUNTY" or "OWNER") and AECOM Technical Services, Inc., authorized to do business in the State of Florida, whose business address is 4415 Metro Parkway, Suite 404 Ft. Myers, FL. 33916 (hereinafter referred to as the "CONSULTANT"). WITNESSETH: WHEREAS, the OWNER desires to obtain the professional Engineering Consulting Services of the CONSULTANT concerning Wastewater Basin Analyses (Basin 3) (hereinafter referred to as the "Project"), said services being more fully described in Schedule A, "Scope of Services", which is attached hereto and incorporated herein; WHEREAS, the CONSULTANT has submitted a proposal for provision of those services; and WHEREAS, the CONSULTANT represents that it has expertise in the type of professional services that will be required for the Project. NOW, THEREFORE, in consideration of the mutual covenants and provisions contained herein, the parties hereto agree as follows: Page 1 Packet Page-494- 1/8/2013 Item 10.E. ARTICLE ONE CONSULTANT'S RESPONSIBILITY 1.1. CONSULTANT shall provide to OWNER professional Engineering Consulting Services (Basin 3) in all phases of the Project to which this Agreement applies. 1.2. The Basic Services to be performed by CONSULTANT hereunder are set forth in the Scope of Services described in detail in Schedule A. The total compensation to be paid CONSULTANT by the OWNER for all Basic Services is set forth in Article Five and Schedule B, "Basis of Compensation", which is attached hereto and incorporated herein. 1.3. The CONSULTANT agrees to obtain and maintain throughout the period of this Agreement all such licenses as are required to do business in the State of Florida and in Collier County, Florida, including, but not limited to, all licenses required by the respective state boards and other governmental agencies responsible for regulating and licensing the professional services to be orovided and performed by the CONSULTANT pursuant to this Agreement. 1.4. The CONSULTANT agrees that, when the services to be provided hereunder relate to a professional service which, under Florida Statutes, requires a license, certificate of authorization or other form of legal entitlement to practice such services, it shall employ and/or retain only qualified personnel to provide such services to OWNER. 1.5. CONSULTANT designates Lennart J. Lindahl, P.E., a qualified licensed professional to serve as the CONSULTANT'S project coordinator (hereinafter referred to as the "Project Coordinator"). The Project Coordinator is authorized and responsible to act on behalf of the CONSULTANT with respect to directing, coordinating and administering all aspects of the services to be provided and performed under this Agreement. Further, the Project Coordinator has full authority to bind and obligate the CONSULTANT on all matters arising out of or relating to this Agreement. The CONSULTANT agrees "gat the Project Coordinator shall devote whatever time is required to satisfactorily manage the services to be provided and performed by the CONSULTANT hereunder. The Project Coordinator Page 2 Packet Page-495- 1/8/2013 Item 10.E. Atts shall not be removed by CONSULTANT from the Project without OWNER'S prior written approval, and if so removed must be immediately replaced with a person acceptable to OWNER. 1.6. CONSULTANT agrees, within fourteen (14) calendar days of receipt of a written request from Owner to promptly remove and replace the Project Coordinator, or any other personnel employed or retained by the CONSULTANT, or any subconsultants or subcontractors or any personnel of any such subconsultants or subcontractors engaged by the CONSULTANT to provide and perform services or work pursuant to the requirements of this Agreement, said request may be made with or without cause. Any personnel so removed must be immediately replaced with a person acceptable to OWNER. 1.7. The CONSULTANT represents to the OWNER that it has expertise in the type of professional services that will be performed pursuant to this Agreement and has extensive experience with projects similar to the Project required hereunder. The CONSULTANT agrees that all services to be provided by CONSULTANT pursuant to this Agreement shall be subject to the OWNER'S review and approval and shall be in accordance with the generally accepted standards of professional practice in the State of Florida, as well as in accordance with all applicable laws, statutes, including the Local Government Prompt Payment Act (218.735 and 218.76 F.S.) as amended in the 2010 legislative session, ordinances, codes, rules, regulations and requirements of any governmental agencies, including the Florida Building Code where applicable, which regulate or have jurisdiction over the Project or the services to be provided and performed by CONSULTANT hereunder. In the event of any conflicts in these requirements, the CONSULTANT shall notify the OWNER of such conflict and utilize its best professional judgment to advise OWNER regarding resolution of each such conflict. OWNER'S approval of the design documents in no way relieves CONSULTANT of its obligation to deliver complete and accurate documents necessary for successful construction of the Project. 1.7.1 The County reserves the right to deduct portions of the (monthly) invoiced (task) amounts for the following: Tasks not completed within the expressed time frame, including require deliverables, incomplete and/or deficient documents, failure to comply with local, state and/or Page 3 Packet Page-496- 1/8/2013 Item 10.E. federal requirements and/or codes and ordinances applicable to Consultant's performance of the work as related to the project. This list is not deemed to be all-inclusive, and the County reserves the right to make sole determination regarding deductions. After notification of deficiency, if the Consultant fails to correct the deficiency within the specified timeframe, these funds would be forfeited by the Consultant. The County may also deduct or charge the Consultant for services and/or items necessary to correct the deficiencies directly related to the Consultant's non- performance whether or not the County obtained substitute performance. 1.8. CONSULTANT agrees not to divulge, furnish or make available to any third person, firm or organization, without OWNER'S prior written consent, or unless incident to the proper performance of the CONSULTANT'S obligations hereunder, or in the course of judicial or legislative proceedings where such information has been properly subpoenaed, any non-public information concerning the services to be rendered by CONSULTANT hereunder, and CONSULTANT shall require all of its ..mployees, agents, subconsultants and subcontractors to comply with the provisions of this paragraph. CONSULTANT shall provide OWNER prompt written notice of any such subpoenas. 1.9 As directed by OWNER, all plans and drawings referencing a specific geographic area must be submitted in an AutoCAD Digital Exchange File (DXF) format on a CD or DVD, drawn in the Florida State Plane East (US Feet) Coordinate System (NAD 83/90). The drawings should either reference specific established Survey Monumentation, such as Certified Section Corners (Half or Quarter Sections are also acceptable), or when implemented, derived from the RTK (Real-Time Kinematic) GPS Network as provided by OWNER. Information layers shall have common naming conventions (i.e. right-of-way - ROW, centerlines - CL, edge-of-pavement - EOP, etc), and adhere to industry standard CAD specifications. Page 4 Packet Page-497- 1/8/2013 Item 10.E. ARTICLE TWO ADDITIONAL SERVICES OF CONSULTANT If authorized in writing by OWNER through a Change Order to this Agreement, CONSULTANT shall furnish or obtain from others Additional Services of the types listed in Article Two herein. The agreed upon scope, compensation and schedule for Additional Services shall be set forth in the Amendment authorizing those Additional Services. With respect to the individuals with authority to authorize Additional Services under this Agreement, such authority will be as established in OWNER'S Purchasing Policy and Administrative Procedures in effect at the time such services are authorized. These services will be paid for by OWNER as indicated in Article Five and Schedule B. Except in an emergency endangering life or property, any Additional Services must be approved in writing via an Amendment to this Agreement prior to starting such services. OWNER will not be responsible for the costs of Additional Services commenced without such express prior written approval. Failure to obtain such prior written approval for Additional Services will be deemed: (i) a waiver of any claim by CONSULTANT for such Additional Services and (ii) an admission by CONSULTANT that such Work is not additional but rather a part of the Basic Services required of CONSULTANT hereunder. Ifs"`' OWNER determines that a change in the Agreement is required because of the action taken by CONSULTANT in response to an emergency, an Amendment shall be issued to document the consequences of the changes or variations, provided that CONSULTANT has delivered written notice to OWNER of the emergency within forty-eight (48) hours from when CONSULTANT knew or should have known of its occurrence. Failure to provide the forty-eight (48) hour written notice noted above, waives CONSULTANT'S right it otherwise may have had to seek an adjustment to its compensation or time of performance under this Agreement. The following services, if not otherwise specified in Schedule A as part of Basic Services, shall be Additional Services: 2.1. Preparation of applications and supporting documents (except those already to be furnished under this Agreement) for private or governmental grants, loans, bond issues or advances in connection with the Project. Page 5 Packet Page-498- 1/8/2013 Item 10.E. .2. Services resulting from significant changes in the general scope, extent or character of the Project or its design including, but not limited to, changes in size, complexity, OWNER'S schedule or character of construction; and revising studies, reports, design documents or Contract Documents previously accepted by OWNER when such revisions are required by changes in laws, rules, regulations, ordinances, codes or orders enacted subsequent to and not reasonably anticipated prior to the preparation of such studies, reports or documents, or are due to any other causes beyond CONSULTANT'S control and fault. 2.3 Providing renderings or models for OWNER'S use. 2.4 Investigations and studies involving detailed consideration of operations, maintenance and overhead expenses; the preparation of feasibility studies, cash flow and economic evaluations, rate schedules and appraisals; and evaluating processes available for licensing and assisting OWNER in ,btaining such process licensing. 2.5. Furnishing services of independent professional associates and consultants for other than the Basic Services to be provided by CONSULTANT hereunder. 2.6. Services during travel outside of Collier and Lee Counties required of CONSULTANT and directed by OWNER, other than visits to the Project site or OWNER's office. 2.7 Preparation of operating, maintenance and staffing manuals, except as otherwise provided for herein. 2.8. Preparing to serve or serving as a CONSULTANT or witness for OWNER in any litigation, or other legal or administrative proceeding, involving the Project (except for assistance in consultations which are included as part of the Basic Services to be provided herein). Page 6 Packet Page-499- 1/8/2013 Item 10.E. 2.9 Additional services rendered by CONSULTANT in connection with the Project, not otherwise provided for in this Agreement or not customarily furnished in Collier County as part of the Basic Services in accordance with generally accepted professional practice. ARTICLE THREE OWNER'S RESPONSIBILITIES 3.1. The OWNER shall designate in writing a project manager to act as OWNER'S representative with respect to the services to be rendered under this Agreement (hereinafter referred to as the "Project Manager"). The Project Manager shall have authority to transmit instructions, receive information, interpret and define OWNER'S policies and decisions with respect to CONSULTANT'S services for the Project. However, the Project Manager is not authorized to issue any verbal or written orders or instructions to the CONSULTANT that would have the effect, or be interpreted to have the effect, of modifying or changing in any way whatever: (a) The scope of services to be provided and performed by the CONSULTANT hereunder; (b) The time the CONSULTANT is obligated to commence and complete all such services; or (c) The amount of compensation the OWNER is obligated or committed to pay the CONSULTANT. 3.2. The Project Manager shall: (a) Review and make appropriate recommendations on all requests submitted by the CONSULTANT for payment for services and work provided and performed in accordance with this Agreement; (b) Provide all criteria and information requested by CONSULTANT as to OWNER's requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; Page 7 Packet Page-500- 1/8/2013 Item 10.E. (c) Upon request from CONSULTANT, assist CONSULTANT by placing at CONSULTANT'S disposal all available information in the OWNER'S possession pertinent to the Project, including existing drawings, specifications, shop drawings, product literature, previous reports and any other data relative to the Project; • (d) Arrange for access to and make all provisions for CONSULTANT to enter the Project site to perform the services to be provided by CONSULTANT under this Agreement; and (e) Provide notice to CONSULTANT of any deficiencies or defects discovered by the OWNER with respect to the services to be rendered by CONSULTANT hereunder. ARTICLE FOUR TIME 4.1. Services to be rendered by CONSULTANT shall be commenced subsequent to the execution of .iis Agreement upon written Notice to Proceed from OWNER for all or any designated portion of the Project and shall be performed and completed in accordance with Schedule C, attached hereto and made a part hereof. Time is of the essence with respect to the performance of this Agreement. The term of this contract shall be for sixty (60) days following the final acceptance of the construction project associated with this agreement and no longer than six (6) years, unless with prior approval by the Board of County Commissioners. 4.2. Should CONSULTANT be obstructed or delayed in the prosecution or completion of its services as a result of unforeseeable causes beyond the control of CONSULTANT, and not due to its own fault or neglect, including but not restricted to acts of nature or of public enemy, acts of government or of the OWNER, fires, floods, epidemics, quarantine regulations, strikes or lock-outs, then CONSULTANT shall notify OWNER in writing within five (5) working days after commencement of such delay, stating the specific cause or causes thereof, or be deemed to have waived any right vvhich CONSULTANT may have had to request a time extension for that specific delay. Page 8 Packet Page-501- 1/8/2013 Item 10.E. 4.3. No interruption, interference, inefficiency, suspension or delay in the commencement or progress of CONSULTANT'S services from any cause whatsoever, including those for which OWNER may be responsible in whole or in part, shall relieve CONSULTANT of its duty to perform or give rise to any right to damages or additional compensation from OWNER. CONSULTANT'S sole remedy against OWNER will be the right to seek an extension of time to its schedule provided, however, the granting of any such time extension shall not be a condition precedent to the aforementioned "No Damage For Delay" provision. This paragraph shall expressly apply to claims for early completion, as well as claims based on late completion. Provided, however, if through no fault or neglect of CONSULTANT, the services to be provided hereunder have been delayed for a total of 180 calendar days, CONSULTANT'S compensation shall be equitably adjusted, with respect to those services that have not yet been performed, to reflect the incremental increase in costs experienced by CONSULTANT, if any, as a result of such delays. Agaitk- 4.4 Should the CONSULTANT fail to commence, provide, perform or complete any of the services to be provided hereunder in a timely manner, in addition to any other rights or remedies available to the OWNER hereunder, the OWNER at its sole discretion and option may withhold any and all payments due and owing to the CONSULTANT until such time as the CONSULTANT resumes performance of its obligations hereunder in such a manner so as to reasonably establish to the OWNER's satisfaction that the CONSULTANT'S performance is or will shortly be back on schedule. 4.5 In no event shall any approval by OWNER authorizing CONSULTANT to continue performing Work under this Agreement or any payment issued by OWNER to CONSULTANT be deemed a waiver of any right or claim OWNER may have against CONSULTANT for delay or any other damages hereunder. Page 9 Packet Page-502- 1/8/2013 Item 10.E. ARTICLE FIVE COMPENSATION 5.1. Compensation and the manner of payment of such compensation by the OWNER for services rendered hereunder by CONSULTANT shall be as prescribed in Schedule B, entitled "Basis of Compensation", which is attached hereto and made a part hereof. ARTICLE SIX OWNERSHIP OF DOCUMENTS 6.1. Upon the completion or termination of this Agreement, as directed by OWNER, CONSULTANT shall deliver to OWNER copies or originals of all records, documents, drawings, notes, tracings, plans, AutoCAD files, specifications, maps, evaluations, reports and other technical data, other than working papers, prepared or developed by or for CONSULTANT under this Agreement ("Project Documents"). OWNER shall specify whether the originals or copies of such Project Documents are to be delivered by CONSULTANT. CONSULTANT shall be solely responsible for all costs associated iith delivering to OWNER the Project Documents. CONSULTANT, at its own expense, may retain copies of the Project Documents for its files and internal use. 6.2. Notwithstanding anything in this Agreement to the contrary and without requiring OWNER to pay any additional compensation, CONSULTANT hereby grants to OWNER a nonexclusive, irrevocable license in all of the Project Documents for OWNER'S use on this Project. CONSULTANT warrants to OWNER that it has full right and authority to grant this license to OWNER. Further, CONSULTANT consents to OWNER'S use of the Project Documents to complete the Project following CONSULTANT'S termination for any reason or to perform additions to or remodeling, replacement or renovations of the Project. CONSULTANT also acknowledges OWNER may be making Project Documents available for review and information to various third parties and hereby consents to such use by OWNER. Page 10 Packet Page-503- 1/8/2013 Item 10.E. ARTICLE SEVEN MAINTENANCE OF RECORDS 7.1. CONSULTANT will keep adequate records and supporting documentation which concern or reflect its services hereunder. The records and documentation will be retained by CONSULTANT for a minimum of five (5) years from (a) the date of termination of this Agreement or (b) the date the Project is completed, whichever is later, or such later date as may be required by law. OWNER, or any duly authorized agents or representatives of OWNER, shall, free of charge, have the right to audit, inspect and copy all such records and documentation as often as they deem necessary during the period of this Agreement and during the five (5) year period noted above, or such later date as may be required by law; provided, however, such activity shall be conducted only during normal business hours. ARTICLE EIGHT INDEMNIFICATION Atook 8.1. To the maximum extent permitted by Florida law, CONSULTANT shall indemnify and hold.- harmless OWNER, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys' fees and paralegals' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of CONSULTANT or anyone employed or utilized by the CONSULTANT in the performance of this Agreement. This indemnification obligation shall not be construed to negate, abridge or reduce any other rights or remedies which otherwise may be available to an indemnified party or person described in this paragraph 8.1. ARTICLE NINE INSURANCE 9.1. CONSULTANT shall obtain and carry, at all times during its performance under the Contract Documents, insurance of the types and in the amounts set forth in SCHEDULE D to this Agreement. Page 11 Packet Page-504- 1/8/2013 Item 10.E. n.2 All insurance shall be from responsible companies duly authorized to do business in the State of rlorida. 9.3 All insurance policies required by this Agreement shall include the following provisions and conditions by endorsement to the policies: 9.3.1. All insurance policies, other than the Business Automobile policy, Professional Liability policy, and the Workers Compensation policy, provided by CONSULTANT to meet the requirements of this Agreement shall name Collier County Government, Collier County, Florida, as an additional insured as to the operations of CONSULTANT under this Agreement and shall contain a severability of interests provisions. 9.3.2. Companies issuing the insurance policy or policies shall have no recourse against OWNER for payment of premiums or assessments for any deductibles which all are at the sole responsibility and risk of CONSULTANT. 9.3.3. All insurance coverages of CONSULTANT shall be primary to any insurance or self-insurance program carried by OWNER applicable to this Project, and the "Other Insurance" provisions of any policies obtained by CONSULTANT shall not apply to any insurance or self-insurance program carried by OWNER applicable to this Project. 9.3.4. The Certificates of Insurance must read: For any and all work performed on behalf of Collier County. 9.3.5. All insurance policies shall be fully performable in Collier County, Florida, and shall be construed in accordance with the laws of the State of Florida. 9.4. CONSULTANT, its subconsultants and OWNER shall waive all rights against each other for damages covered by insurance to the extent insurance proceeds are paid and received by OWNER, except such rights as they may have to the proceeds of such insurance held by any of them. Page 12 Packet Page-505- 1/8/2013 Item 10.E. 9.5 All insurance companies from whom CONSULTANT obtains the insurance policies requiredoft hereunder must meet the following minimum requirements: 9.5.1. The insurance company must be duly licensed and authorized by the Department of Insurance of the State of Florida to transact the appropriate insurance business in the State of Florida. 9.5.2. The insurance company must have a current A. M. Best financial rating of"Class VI" or higher. ARTICLE TEN SERVICES BY CONSULTANT'S OWN STAFF 10.1. The services to be performed hereunder shall be performed by CONSULTANT'S own staff, unless otherwise authorized in writing by the OWNER. The employment of, contract with, or use of the services of any other person or firm by CONSULTANT, as independent consultant or otherwise, shall be subject to the prior written approval of the OWNER. No provision of this Agreement shall, however, be construed as constituting an agreement between the OWNER and any such other person or firm. Nor shall anything in this Agreement be deemed to give any such party or any third party any claim or right of action against the OWNER beyond such as may then otherwise exist without regard to this Agreement. 10.2 Attached as Schedule F is a listing of all key personnel CONSULTANT intends to assign to the Project to perform the Services required hereunder. Such personnel shall be committed to this Project in accordance with the percentages noted in Schedule F. CONSULTANT also has identified each subconsultant and subcontractor it intends to utilize on the Project in Schedule F. All personnel, subconsultants and subcontractors identified in Schedule F shall not be removed or replaced without OWNER'S prior written consent. 10.3 CONSULTANT is liable for all the acts or omissions of its subconsultants or subcontractors. By appropriate written agreement, the CONSULTANT shall require each subconsultant or Page 13 Packet Page -506- 1/8/2013 Item 10.E. -ubcontractor, to the extent of the Services to be performed by the subconsultant or subcontractor, to be bound to the CONSULTANT by the terms of this Agreement, and to assume toward the CONSULTANT all the obligations and responsibilities which the CONSULTANT, by this Agreement, assumes toward the OWNER. Each subconsultant or subcontract agreement shall preserve and protect the rights of the OWNER under this Agreement with respect to the Services to be performed by the subconsultant or subcontractor so that the subconsulting or subcontracting thereof will not prejudice such rights. Where appropriate, the CONSULTANT shall require each subconsultant or subcontractor to enter into similar agreements with its sub-subconsultants or sub-subcontractors. 10.4 CONSULTANT acknowledges and agrees that OWNER is a third party beneficiary of each contract entered into between CONSULTANT and each subconsultant or subcontractor, however nothing in this Agreement shall be construed to create any contractual relationship between OWNER and any subconsultant or subcontractor. Further, all such contracts shall provide that, at Owner's discretion, they are assignable to OWNER upon any termination of this Agreement. ARTICLE ELEVEN WAIVER OF CLAIMS 11.1. CONSULTANT'S acceptance of final payment shall constitute a full waiver of any and all claims, except for insurance company subrogation claims, by it against OWNER arising out of this Agreement or otherwise related to the Project, and except those previously made in writing in accordance with the terms of this Agreement and identified by CONSULTANT as unsettled at the time of the final payment. Neither the acceptance of CONSULTANT'S services nor payment by OWNER shall be deemed to be a waiver of any of OWNER'S rights against CONSULTANT. Page 14 Packet Page-507- 1/8/2013 Item 10.E. ARTICLE TWELVE TERMINATION OR SUSPENSION "' 12.1. CONSULTANT shall be considered in material default of this Agreement and such default will be considered cause for OWNER to terminate this Agreement, in whole or in part, as further set forth in this section, for any of the following reasons: (a) CONSULTANT'S failure to begin services under the Agreement within the times specified under the Notice(s) to Proceed, or (b) CONSULTANT'S failure to properly and timely perform the services to be provided hereunder or as directed by OWNER, or (c) the bankruptcy or insolvency or a general assignment for the benefit of creditors by CONSULTANT or by any of CONSULTANT'S principals, officers or directors, or (d) CONSULTANT'S failure to obey any laws, ordinances, regulations or other codes of conduct, or (e) CONSULTANT'S failure to perform or abide by the terms and conditions of this Agreement, or (f) for any other just cause. The OWNER may so terminate this Agreement, in whole or in part, by giving the CONSULTANT seven (7) calendar days written notice of the material default. 12.2. If, after notice of termination of this Agreement as provided for in paragraph 12.1 above, it is determined for any reason that CONSULTANT was not in default, or that its default was excusable, or that OWNER otherwise was not entitled to the remedy against CONSULTANT provided for in paragraph 12.1, then the notice of termination given pursuant to paragraph 12.1 shall be deemed to be the notice of termination provided for in paragraph 12.3, below, and CONSULTANT's remedies against OWNER shall be the same as and be limited to those afforded CONSULTANT under paragraph 12.3, below. 12.3. OWNER shall have the right to terminate this Agreement, in whole or in part, without cause upon seven (7) calendar days written notice to CONSULTANT. In the event of such termination for convenience, CONSULTANT'S recovery against OWNER shall be limited to that portion of the fee earned through the date of termination, together with any retainage withheld and any costs reasonably incurred by CONSULTANT that are directly attributable to the termination, but CONSULTANT shall not be entitled to any other or further recovery against OWNER, including, but Page 15 Packet Page-508- 1/8/2013 Item 10.E. it limited to, anticipated fees or profits on work not required to be performed. CONSULTANT must mitigate all such costs to the greatest extent reasonably possible. 12.4. Upon termination and as directed by Owner, the CONSULTANT shall deliver to the OWNER all original papers, records, documents, drawings, models, and other material set forth and described in this Agreement, including those described in Section 6, that are in CONSULTANT'S possession or under its control. 12.5. The OWNER shall have the power to suspend all or any portions of the services to be provided by CONSULTANT hereunder upon giving CONSULTANT two (2) calendar days prior written notice of such suspension. If all or any portion of the services to be rendered hereunder are so suspended, the CONSULTANT'S sole and exclusive remedy shall be to seek an extension of time to its schedule in accordance with the procedures set forth in Article Four herein. 12.6 In the event (i) OWNER fails to make any undisputed payment to CONSULTANT within forty- five (45) days after such payment is due or such other time as required by Florida's Prompt Payment Act or (ii) OWNER otherwise persistently fails to fulfill some material obligation owed by OWNER to CONSULTANT under this Agreement, and (ii) OWNER has failed to cure such default within fourteen (14) days of receiving written notice of same from CONSULTANT, then CONSULTANT may stop its performance under this Agreement until such default is cured, after giving OWNER a second fourteen (14) days written notice of CONSULTANT'S intention to stop performance under the Agreement. If the Services are so stopped for a period of one hundred and twenty (120) consecutive days through no act or fault of the CONSULTANT or its subconsultant or subcontractor or their agents or employees or any other persons performing portions of the Services under contract with the CONSULTANT, the CONSULTANT may terminate this Agreement by giving written notice to OWNER of CONSULTANT'S intent to terminate this Agreement. If OWNER does not cure its default within fourteen (14) days after receipt of CONSULTANT'S written notice, CONSULTANT may, upon Page 16 Packet Page-509- 1/8/2013 Item 10.E. fourteen (14) additional days' written notice to the OWNER, terminate the Agreement and recover from the Owner payment for Services performed through the termination date, but in no event shall CONSULTANT be entitled to payment for Services not performed or any other damages from Owner. ARTICLE THIRTEEN TRUTH IN NEGOTIATION REPRESENTATIONS 13.1. CONSULTANT warrants that CONSULTANT has not employed or retained any company or person, other than a bona fide employee working solely for CONSULTANT, to solicit or secure this Agreement and that CONSULTANT has not paid or agreed to pay any person, company, corporation, individual or firm, other than a bona fide employee working solely for CONSULTANT, any fee, commission, percentage, gift or any other consideration contingent upon or resulting from the award or making of this Agreement. 13.2. In accordance with provisions of Section 287.055, (5)(a), Florida Statutes, the CONSULTANT agrees to execute the required Truth-In-Negotiation Certificate, attached hereto and incorporated herein as Schedule E, certifying that wage rates and other factual unit costs supporting the compensation for CONSULTANT'S services to be provided under this Agreement are accurate, complete and current at the time of the Agreement. The CONSULTANT agrees that the original Agreement price and any additions thereto shall be adjusted to exclude any significant sums by which the OWNER determines the Agreement price was increased due to inaccurate, incomplete, or non-current wage rates and other factual unit costs. All such adjustments shall be made within one (1) year following the end of this Agreement. ARTICLE FOURTEEN CONFLICT OF INTEREST 14.1. CONSULTANT represents that it presently has no interest and shall acquire no interest, either direct or indirect, which would conflict in any manner with the performance of services required Page 17 Packet Page-510- 1/8/2013 Item 10.E. :reunder. CONSULTANT further represents that no persons having any such interest shall be employed to perform those services. ARTICLE FIFTEEN MODIFICATION 15.1. No modification or change in this Agreement shall be valid or binding upon either party unless in writing and executed by the party or parties intended to be bound by it. ARTICLE SIXTEEN NOTICES AND ADDRESS OF RECORD 16.1. All notices required or made pursuant to this Agreement to be given by the CONSULTANT to the OWNER shall be in writing and shall be delivered by hand, by fax, or by United States Postal Service Department, first class mail service, postage prepaid, addressed to the following OWNER'S address of record: Board of County Commissioners, Collier County Florida Purchasing Department 3327 Tamiami Trail East Naples, FL. 34112 Attention: Director of Purchasing / General Services Phone: 239-252-8407; Fax: 239-732-0844 16.2. All notices required or made pursuant to this Agreement to be given by the OWNER to the CONSULTANT shall be made in writing and shall be delivered by hand, by fax or by the United States Postal Service Department, first class mail service, postage prepaid, addressed to the following CONSULTANT'S address of record: AECOM Technical Services 4415 Metro Parkway, Suite 404 Ft. Myers, FL. 33916 Attn: Ron Cavalieri Telephone: 239-278-7996; Fax: 239-278-0913 Page 18 Packet Page-511- 1/8/2013 Item 10.E. 16.3. Either party may change its address of record by written notice to the other party given in accordance with requirements of this Article. ARTICLE SEVENTEEN MISCELLANEOUS 17.1. CONSULTANT, in representing OWNER, shall promote the best interests of OWNER and assume towards OWNER a duty of the highest trust, confidence, and fair dealing. 17.2. No modification, waiver, suspension or termination of the Agreement or of any terms thereof shall impair the rights or liabilities of either party. 17.3. This Agreement is not assignable, or otherwise transferable in whole or in part, by CONSULTANT without the prior written consent of OWNER. 17.4. Waivers by either party of a breach of any provision of this Agreement shall not be deemed to be a waiver of any other breach and shall not be construed to be a modification of the terms of this Agreement. 17.5. The headings of the Articles, Schedules, Parts and Attachments as contained in this Agreement are for the purpose of convenience only and shall not be deemed to expand, limit or change the provisions in such Articles, Schedules, Parts and Attachments. 17.6. This Agreement, including the referenced Schedules and Attachments hereto, constitutes the entire agreement between the parties hereto and shall supersede, replace and nullify any and all prior agreements or understandings, written or oral, relating to the matter set forth herein, and any such prior agreements or understanding shall have no force or effect whatever on this Agreement. 17.7 Unless otherwise expressly noted herein, all representations and covenants of the parties shall survive the expiration or termination of this Agreement. Page 19 Packet Page-512- 1/8/2013 Item 10.E. 17.8 This Agreement may be simultaneously executed in several counterparts, each of which shall be an original and all of which shall constitute but one and the same instrument. 17.9 The terms and conditions of the following Schedules attached hereto are by this reference incorporated herein: Schedule A SCOPE OF SERVICES Schedule B BASIS OF COMPENSATION Schedule C PROJECT SCHEDULE Schedule D INSURANCE COVERAGE Schedule E TRUTH IN NEGOTIATION CERTIFICATE Schedule F KEY PERSONNEL, SUBCONSULTANTS AND SUBCONTRACTORS RFP #11-5782 TERMS & CONDITIONS ARTICLE EIGHTEEN APPLICABLE LAW 18.1. This Agreement shall be governed by the laws, rules, and regulations of the State of Florida, and by such laws, rules and regulations of the United States as made applicable to services funded by the United States government. Any suit or action brought by either party to this Agreement against the other party relating to or arising out of this Agreement must be brought in the appropriate federal or state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction on all such matters. ARTICLE NINETEEN SECURING AGREEMENT/PUBLIC ENTITY CRIMES 19.1 CONSULTANT warrants that CONSULTANT has not employed or retained any company or erson, other than a bona fide employee working solely for CONSULTANT, to solicit or secure this Agreement and that CONSULTANT has not paid or agreed to pay any person, company, corporation, Page 20 Packet Page-513- 1/8/2013 Item 10.E. individual or firm, other than a bona fide employee working solely for CONSULTANT, any fee, commission, percentage, gift or any other consideration contingent upon or resulting from the award or making of this Agreement. At the time this Agreement is executed, CONSULTANT shall sign and deliver to OWNER the Truth-In-Negotiation Certificate identified in Article 13 and attached hereto and made a part hereof as Schedule E. CONSULTANT'S compensation shall be adjusted to exclude any sums by which OWNER determines the compensation was increased due to inaccurate, incomplete, or noncurrent wage rates and other factual unit costs. 19.2 By its execution of this Agreement, CONSULTANT acknowledges that it has been informed by OWNER of and is in compliance with the terms of Section 287.133(2)(a) of the Florida Statutes which read as follows: "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid, proposal, or reply on a contract to provide any goods or services to a public entity; may not submit a bid, proposal, or reply on a contract with a public entity for the construction or repair of a public building or public work; may not submit bids, proposals, or replies on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity; and may not transact business with any public entity in excess of the threshold amount provided in s. 287.017 for CATEGORY TWO for a period of 36 months following the date of being placed on the convicted vendor list. ARTICLE TWENTY DISPUTE RESOLUTION 20.1 Prior to the initiation of any action or proceeding permitted by this Agreement to resolve disputes between the parties, the parties shall make a good faith effort to resolve any such disputes by negotiation. The negotiation shall be attended by representatives of CONSULTANT with full decision-making authority and by OWNER'S staff person who would make the presentation of any settlement reached during negotiations to OWNER for approval. Failing resolution, and prior to the commencement of depositions in any litigation between the parties arising out of this Agreement, the Page 21 Packet Page-514- 1/8/2013 Item 10.E. parties shall attempt to resolve the dispute through Mediation before an agreed-upon Circuit Court ,iediator certified by the State of Florida. The mediation shall be attended by representatives of CONSULTANT with full decision-making authority and by OWNER'S staff person who would make the presentation of any settlement reached at mediation to OWNER'S board for approval. Should either party fail to submit to mediation as required hereunder, the other party may obtain a court order requiring mediation under section 44.102, Fla. Stat. 20.2 Any suit or action brought by either party to this Agreement against the other party relating to or arising out of this Agreement must be brought in the appropriate federal or state courts in Collier County, Florida, which courts have sole and exclusive jurisdiction on all such matters. ARTICLE 21 IMMIGRATION LAW COMPLIANCE 21.1 By executing and entering into this agreement, the CONSULTANT is formally acknowledging without exception or stipulation that it is fully responsible for complying with the provisions of the .1nmigration Reform and Control Act of 1986 as located at 8 U.S.C. 1324, et seq. and regulations relating thereto, as either may be amended. Failure by the CONSULTANT to comply with the laws referenced herein shall constitute a breach of this agreement and the County shall have the discretion to unilaterally terminate this agreement immediately. ****************************,* Remainder of page intentionally left blank Page 22 Packet Page-515- 1/8/2013 Item 10.E. IN WITNESS WHEREOF, the parties hereto have executed this Professional Services Agreement for Engineering Consulting Services concerning Wastewater Basin Analyses (Basin 3) the day and year first written above. ATTEST: BOARD OF COUNTY COMMISSIONERS FOR COLLIER COUNTY, FLORIDA, Dwight E. Brock, Clerk By: Date: By: Fred W. Coyle, Chairman AECOM Technical Services, Inc. By: Witness Typed/Printed Name and Title Typed/Printed Name and Title Witness Typed/Printed Name and Title Approved as to form and legal sufficiency: Scott Teach Deputy County Attorney Page 23 Packet Page-516- 1/8/2013 Item 10.E. SCHEDULE A SCOPE OF SERVICES 1. DESCRIPTION OF PROJECT: 1.1. The basin region is described below: BASIN #3 Master Pump Station (MPS) Basin 306 - Bayshore, consisting of basins 303, 304 and 306 (Bayshore Drive and Thomasson Drive); (Area South of US 41, and East of the Gordon River, excluding the City of Naples Wastewater Service Area) A. SCOPE OF SERVICES The scope of work to be provided to the COUNTY is organized into five (5) Task Groups as detailed below. B. COUNTY RESPONSIBILITIES 1. COUNTY will attend all required meetings and provide feedback in a timely manner. 2. COUNTY will provide CONSULTANT access to the project area. 3. COUNTY will provide available as-constructed documents (including drawings, specifications, shop drawings, etc.) for the existing facilities. The CONSULTANT may rely on this information without further verification. 4. COUNTY will review, make comments, and approve all submittals made by CONSULTANT to the OWNER as set forth herein. Fourteen (14) calendar days have been allocated in the schedule for each OWNER review. 5. COUNTY will provide CONSULTANT with most current GIS shapefiles and geodatabase for existing wastewater collection and conveyance system. COUNTY will be responsible for validity of GIS geodatabase data. 6. COUNTY will provide CONSULTANT with most current Excel spreadsheet for existing pump station and wet well data. COUNTY will be responsible for validity of information provided in the spreadsheet. 7. COUNTY will provide CONSULTANT with design and permit documents associated with the planned unit developments in the MPS 306 Basin. CONSULTANT will consider this information for projection of future wastewater flow buildout condition. 8. COUNTY will provide CONSULTANT with a copy of the Preliminary Alignment Study for the new force main. A-1 Packet Page-517- 1/8/2013 Item 10.E. TASK DESCRIPTION Task Group No. 1 - Project Management Throughout the duration of the program, the Consultant will provide project management assistance consisting of the following: • Attend biweekly (every two weeks) progress meeting with PUD staff • Graphics/exhibit preparation • Progress meeting assistance • Project management assistance • Project management plan preparation. Project Management Plan will include project goals and objectives, scope of work and work breakdown structure, project schedule and budget, staffing plan with individual roles and responsibilities, document management system, contact information and communication protocol, monitoring and reporting plan, description of deliverables and review process plan, Quality Assurance/Quality Control (QA/QC) Plan, and Health and Safety Plan (HASP). • Coordinate project activities throughout the duration of the project • Conduct project kick-off meeting Attendance at Project Progress Meetings: The Consultant shall attend bi-weekly meetings with County representatives, as requested by the Program Manager, throughout the program to keep the County informed of the project progress, to make certain that the Consultant is productively conducting its Alsok consulting services and to obtain input and direction as required for outstanding project issues. A firm day and time will be established for all bi-weekly meetings. Meeting objectives will be to provide progress updates, reach decisions on pertinent issues relative to the specific topics being addressed. Progress meetings may be held with other selected Engineers in order to effectively collaborate on the work effort associated with this program. The Consultant shall prepare and distribute agendas and minutes for each meeting incorporating agenda items and meeting minute corrections provided by the County. Agendas shall be submitted to the County at least two days prior to the meeting. Draft minutes will be submitted to the County no more than three (3) working days following each meeting; County will provide comments no more than three working days after receipt of draft minutes. Subtasks under this Task include:: 1. Prepare Project Management Plan 2. Attend Progress Meetings, including kick-off meeting. There will be 40 progress meetings plus the kick-off meeting. 3. Coordinate project activities throughout the duration of the project. The estimated project duration is 80 weeks. Task Group No. 2 -Work Plan Development Consultant will prepare a Field Data Collection Work Plan prior for implementation of field data collection activities. The Field Data Collection Work Plan will be completed as outlined below: 1) Review existing information and prepare field data collection work plan outline and submit to COUNTY for review prior to holding a data collection workshop. A-2 Packet Page-518- 1/8/2013 Item 10.E. 2) Prepare data collection meeting agenda; attend meeting with COUNTY staff to discuss data needs and planned data collection efforts; and prepare and distribute meeting notes. 3) Prepare draft Field Data Collection Work Plan and submit to COUNTY for review. The Field Data Collection Work Plan will include the following: • Introduction—purpose and objectives of field data collection • Existing System.and Operation—overview of MPS Basin 306 • Requirements for data collection, including Pump Station indirect flow monitoring, and pressure monitoring • Pump Station Evaluations — objective and procedure for station survey, and criteria for physical inspections (civil, electrical and l&C, structural) • Hydraulic Modeling — purpose, methodology for model construction, data collection requirements Consultant shall conduct internal QA/QC review of draft Work Plan prior to submission to the COUNTY 4) Meet with COUNTY to discuss the draft data collection work plan and receive COUNTY comments. Prepare and distribute final field data collection work plan. Task Group No. 3— Preliminary Engineering 1) Determine/confirm the pump station (PS) service area (basin)for each pump station. Consultant shall prepare a sewer shed map and shapefile delineating the sewer shed tributary to each pump station for the MPS Basin 306 wastewater collection and conveyance system. 2) Determine existing and ultimate theoretical wastewater generation for each pump station (PS) service area based on current land use and zoning. Estimate potential ultimate wastewater flow generation for vacant land by assuming a practical potential zoning designation consistent with historic rezoning trends. Consultant shall develop existing and ultimate wastewater generation flow rates for each pump station based on estimated population served within each sewer shed. Consultant will coordinate population projections with the Collier County Comprehensive Planning Section to utilize existing information for future land use and population projections. Consultant shall meet with the COUNTY and the Comprehensive Planning Section to agree upon the data sources and parameters that will be used for making these projections. The following information will be used in completing the theoretical and ultimate population and flow projections: • SCADA runtime records for all wastewater service area pump stations within the study area that are connected to the COUNTY's Water Reclamation Facilities (WRFs) • Historical diurnal flows to the South County WRF (SCWRF) • Pump curves for each wastewater pump station. • Traffic Analysis Zone (TAZ) population data for the wastewater service area • Collier County Water and Sewer Districts population data. Population estimates are based on Bureau of Economic and Business Research (BEBR) medium range growth through 2031 A-3 Packet Page-519- 1/8/2013 Item 10.E. • Level of Service Standards (LOSS). The LOSS for the NCWRF is 120 gpcd and for the SCWRF is 100 gpcd. • GIS files indicating current locations of wastewater pump stations and force mains, existing roads, topography, existing and future land use, and parcel data. Consultant shall prepare a draft Technical Memorandum summarizing the results of the existing and ultimate wastewater flow projections. Consultant shall conduct internal QA/QC review of draft Technical Memorandum prior to submission to the COUNTY. Meet with County staff to review draft Technical Memorandum and, after addressing COUNTY comments prepare and submit a final Technical Memorandum. 3) Collect the necessary information to confirm the build out flow conditions for each pump station both public and private. Obtain, if possible, the following documents: • FDEP permit files for each pump station to identify the original design flow • Existing and future land use maps • Existing zoning maps • Existing and proposed (if known) PUDs. • GMD or other approved wastewater pump station plans The information described in paragraph 3 above will be provided by PUPPMD staff prior to development of the existing and ultimate wastewater flow generation rates under Task 3.2. 4) Determine current wastewater flow generation for each pump station service area based on SCADA information provided by COUNTY or other methods acceptable to the Consultant and COUNTY. Consultant shall conduct indirect flow monitoring for all County-owned and private pump stations (a total of 34 stations, not counting the 3 MPSs). The indirect flow monitoring will be accomplished by monitoring the water surface elevation in the wet well and pump run times. The wet well elevation data will be recorded electronically using a data logger. To accomplish this Consultant will monitor wet well elevations for the seven (7) privately owned pump stations during a 4 week flow monitoring period. The wet well elevations for the 27 COUNTY owned stations will be monitored for 1 week to establish pump operating elevations. Thereafter, it is assumed that pumps will continue to operate at these elevations. Estimated flow will be computed from monitored data. The results of the indirect flow monitoring will be summarized in a technical memorandum, which include graphs of estimated flow versus time for each pump station during the entire monitoring period. The COUNTY will be responsible for providing pump run time data and to operate the system. Consultant shall also summarize the COUNTY's SCADA data over a three (3) year period to identify peak dry and peak wet weather flow for each of the COUNTY owned pump stations. COUNTY will provide Consultant with direct flow monitoring data for the MPSs 303, 304 and 306. 5) Consultant shall develop a hydraulic model of the manifolded force main network for the MPS Basin 306. The hydraulic model will be used in the assessment of pumping station hydraulics. The hydraulic model of the wastewater pump station and force main network will be constructed using the COUNTY's wastewater system GIS geodatabase, pump and wet well data, and pump station operations data and analysis. CONSULTANT shall create the hydraulic model in Sewer Gems® Sanitary, version V8i (series 3). The hydraulic model will include wet wells, pumps, and manifolded wastewater force main network. Gravity sewers will not be included in the hydraulic model. The model elements will be constructed with physical data (size, diameters, elevations, wet well operating levels, and pump curves) for the pump stations described above. Boundary A-4 Packet Page-520- 1/8/2013 Item 10.E. conditions will be established for points of connection to the system-wide Wastewater Collection and Conveyance System. To assist with model verification Consultant shall monitor pressure at six existing ARV locations in the MPS Basin 306 force main network. Consultant shall install pressure transducers at each location and monitor the pressure for a period of one (1) week. Consultant shall download data and provide graphical results. CONSULTANT shall prepare a draft hydraulic model construction Technical Memorandum . The Technical Memorandum will include a written description of the model construction and supporting documentation. Consultant will conduct QA/QC review and address QA/QC comments prior to submission to the COUNTY. Submit draft Technical Memorandum to the COUNTY. The Consultant shall meet with County staff to review draft Technical Memorandum, and, after addressing COUNTY comments prepare and submit a final Technical Memorandum. 6) Prepare exhibits for each pump station service area illustrating the pump station service area and the associated existing and future land use and zoning Exhibits for each pump station service area will be included in the Pump Station Evaluation Report prepared under Task 4. Task Group No. 4- Pump Station Evaluations and Reports 1) Pump Station Evaluations: Consultant will complete a pump station evaluation for only the COUNTY owned pump stations. There are 30 COUNTY owned pump stations within MPS 306 Basin, including 3 MPSs. a. A local knowledgeable Florida-licensed professional land surveyor or mapper shall survey each pump station site and confirm that it is located inside a legal easement owned by or issued to the Collier County Water Sewer District. Retain the services of a local title research company specializing in ownership and encumbrance property reports to confirm easement ownership. Provide a detailed survey sketch of all above ground features, including landscaping within a 50-ft radius from the pump station site including topography with both 1- foot contours and intermediate spot elevations. Locate and identify above- ground structures within 100 feet from the pump station. Deliver sketches in hard copy, PDF and AutoCAD format. Consultant shall also perform a subsurface utility exploration (SUE) for each pump station site to locate underground utilities. Soft digs to confirm size and type of utility are not included. The information obtained from the SUE will be included on the site surveys. b. Provide legal sketches and legal descriptions of required temporary and permanent easements when requested. Consultant shall prepare at least one (1) legal description and sketch for each COUNTY owned pump station for a total of thirty (30). c. Develop a pump station checklist to facilitate data collection during site visits. d. Visit each pump station site and document the structural, electrical, civil and mechanical conditions. Each site visit will include at a minimum, a civil (water/wastewater) engineer, structural engineer and an electrical engineer experienced with wastewater facilities. All engineers shall be registered professional Engineers in the state of Florida. All work performed shall be signed and sealed by Engineers performing the work. A-5 Packet Page-521- 1/8/2013 Item 10.E. e. Gather available information related to each pump station to assist with pump station evaluation, including: • Pump Station As-Built information • Pump Station Operational Data including pump run times, system maps, original design data for pump station sizing, system modifications which may have altered the pump station flow since the original design was performed. f. Utilize local (Collier County) knowledgeable registered land surveyors to stake out the easements and/or property boundaries; collect and record the limits of the boundary as well as the physical location of the existing pump station components such that the adequacy of the existing area can be reviewed for future expansion. As part of this task, call Sunshine State One-Call System to have the existing utilities located and to determine pipe ownership (water, irrigation quality water, gas, electric, force mains, etc) prior to performing any field survey efforts. g. Utilize the information from the field evaluations and the data collection stage to perform an overall evaluation of each pump station. The field evaluations will include evaluation of pump station components. This will include: • An analysis of current and projected flows based on data collected • Availability of fiber optic cable for future SCADA connections • Available storage capacity in the pump stations collection system. This storage capacity shall include storage within manholes and sewer mains up to the lowest manhole overflow level • Collection System Storage Time - Determine the available response time from a pump station failure (high level alarm) to system overflow at current and ultimate design flows • Compliance with FEMA Flood Elevations • Costs of potential improvements • Electrical system components including site lighting, power feed (above-ground vs. underground), feed size, emergency power supply and related site electrical • Existing utilities which may be in conflict with future improvements • Existing vegetation that would require trimming and/or removal • Fencing/Bollards (conditions and sufficiency for future expansion) • Flow meter and by-pass assembly (if applicable) • Landscaping (code considerations) and irrigation • Odor control condition, size, unit type (if applicable) • Potential for bypass pumping • Presence of blower system for grease management • Pump condition and size adequacy (to meet future flows) • Pump controls and communication including control panels, programmable logic controllers (if present), variable frequency drives (if present), radio feed and tower location • Pump energy efficiency • Site access • Site layout of proposed improvements • Site size sufficiency • Water and irrigation quality water service availability • Wet well condition and sizing (to meet future flows) • Wet well ventilation In addition to the above, Consultant shall complete a detailed evaluation and hydraulic analysis of MPS 306. The COUNTY plans to replace the existing MPS 306 with a new MPS located on Thomasson Lane, west of the existing station. The evaluation will include the items listed above as well as the following: A-6 Packet Page-522- 1/8/2013 Item 10.E. • The MPS 306 will be sized to include flow diverted from MPS 302 on a temporary basis. Normally flow is pumped from MPS 302 to the SCWRF, but in case of emergency or system maintenance, flow could be diverted to MPS 306. • A new force main from MPS 306 to the SCWRF. The COUNTY will provide Consultant with results of a Preliminary Alignment Study for the new force main. Consultant shall provide a preliminary alignment design on 22-inch x34-inch drawings at scale of 1-inch = 20 feet, which shows the proposed force main alignment. • Piping modifications at the MPS 302 to permit flow diversion from MPS 302 to MPS 306 or to receive flow diverted from MPS 306 to MPS 302. • Pipe arrangement at MPS 306, which will permit flow to be pumped to either MPS 302 or to the SCWRF • The new force main will be inter-connected to an existing force main from MPS 301. The connection will be designed to also permit flow from MPS 301 to be conveyed to MPS 306 via the new force main. Consequently, the MPS 306 must have adequate capacity to pump the flow from MPS 301 to the MPS 302. 2) Following completion of Pump Station Evaluation, prepare a draft "Fence to Fence" Evaluation Report (Report) addressing Level 3 pump stations and three Master Pump Stations within the basin. The Report will include a summary of the findings for each evaluation component listed above. Prepare exhibits for each pump station service area illustrating the pump station service area and the associated existing and future land use and current zoning. Consultant will complete a Pump Station Evaluation Report for only the COUNTY owned pump stations. There are 30 COUNTY owned pump stations within MPS 306 Basin, including 3 MPSs. The Pump Station Evaluation Report will include a description of the recommended improvements and proposed site plan for each pump station, except MPS 306. The improvements outlined under Task 5 will be included, unless otherwise directed by the COUNTY. A separate Preliminary Design Report (PDR) shall be prepared for MPS 306. The MPS 306 Preliminary Design Report will include the following: a. Introduction, including background purpose and scope b. Description of existing facilities and existing site plan, c. Topographic survey of new site d. Recommended improvements, including the following i. Proposed site plan ii. Civil/mechanical requirements, including preliminary pump and pipe layout iii. Odor control requirements iv. Architectural requirements, including building floor plan and elevations. The building will include 2 rooms, 1 for the standby power generators and 1 for the electrical and &C. v. Electrical requirements, including 1. Coordination with electric utility company 2. Preliminary single line diagrams vi. Instrumentation and control (l&C) requirements vii. Structural requirements, slab on grade for building, and below grade poured-in-place concrete structure for wet well A-7 Packet Page-523- 1/8/2013 Item 10.E. viii. Building mechanical requirements, including air conditioning for l&C room and ventilation for generator room. ix. Requirement for standby power generators and diesel fuel storage tank x. Landscape/irrigation requirements xi. Civil/site requirements xii. Demolition plan for existing MPS 306 xiii. Piping modifications for MPS 302 e. Requirements for geotechnical investigation f. Hydraulic calculations g. Opinion of probable construction cost h. Implementation Plan, including schedule and required permits/approvals 3) Five (5) printed copies and one electronic copy in PDF format of each draft Report will be delivered to Collier County for review and comment. Upon completion of the COUNTY's review of each report, meet with the COUNTY to discuss the report and any comments that the COUNTY may have. Consultant shall conduct internal QA/QC review of draft Pump Station Evaluation Report and MPS 306 PDR prior to submission to the COUNTY. Consultant shall attend one (1) meeting to review comments on each report. Revise each report based on comments received from Collier County and incorporate them into the final report for each pump station. Upon completion, four (4) signed and sealed copies of each report shall be provided to Collier County for their use in future planning for pump station upgrades. Task Group No. 5 — Final Design and Permitting 1) Plans and Specifications On the basis of the accepted preliminary fence to fence layout and recommended improvements, Consultant shall prepare final drawings and specifications, which provide the general scope, extent and character of the work to be furnished, and performed by the Contractor. Consultant will prepare and submit drawings and specifications at the 60-, 90- and 100-percent complete stages for review and approval. An engineer's opinion of probable construction cost will accompany each submittal. Sixty (60), ninety (90) and one hundred (100) percent submittals will be required for all construction contracts except for Contract 4: Force Main from MPS 306 to SCWRF and Contract 5: MPS Basin 306 Pump Station Improvements. A 60-percent submittal will not be included for these contracts. Technical specifications will be based on the 16-Division format of the Construction Specifications Institute (CSI) in MS Word format. In addition to technical specifications, Consultant will coordinate with COUNTY to develop necessary General Conditions, Supplemental Conditions, and Special Provisions Specifications will be developed specifically for the project being constructed. Standard Collier County Specifications may be used for reference but the Consultant shall not rely on them as a replacement for sound engineering judgment and responsibility. Documents shall include drawings and project specifications ready for bidding, consistent with Collier County standards. Consultant shall prepare separate drawings and specifications (i.e. bid documents) for the following construction contracts: A-8 Packet Page-524- 1/8/2013 Item 10.E. a) Contract 1: MPS 303. The improvements for MPS 303 are anticipated to include the following: a. Demolition of existing building if required to meet current building codes b. Replace existing building and all electrical, mechanical, and I&C equipment inside the building. New building will have 2 rooms, 1 for the standby power generator and 1 for electrical and I&C. The electrical and l&C room will be air conditioned. c. New standby power generator and/or pump and fuel oil storage tank d. Raise pump station valve vault piping above ground. Replace all piping inside wet well and above ground with HDPE pipe. e. ARV addition to above ground piping f. Provision for bypass piping and emergency pumping g. Addition of secondary containment berm to contain overflow from wet well h. It is assumed that the existing pumps and odor control equipment will not be replaced i. Consultant anticipates that plumbing and fire protection for the MPS 303 building are not required. b) Contract 2: MPS 304. The improvements for MPS 304 shall include the same components as those listed above for MPS 303. c) Contract 3: MPS 306. The improvements for MPS 306 shall include the following: a. Demolition of existing MPS 306 upon completion of the relocated Master Pump Station b. Construction of a new MPS 306 on a green field site located approximately 1000 feet west of the existing MPS 306. The capacity of the new pump station is anticipated to be in the range of 40 to 50 mgd. c. There may be either six or eight submersible pumps in a below grade poured in place concrete structure. d. A new building will be provided with 2 rooms: 1 for the standby power generators and/or pumps and 1 for the electrical and l&C. The electrical and l&C room will be air conditioned. e. Piping modifications at MPS 302, including installation of automatic motor operated valves and incorporated into the COUNTY's SCADA system for remote operation. f. Gravity sewer/force main extension between existing MPS 306 to new MPS 306. Estimated length is 1,200 feet. g. Proposed site plan will include secondary containment, landscaping, irrigation and stormwater drainage plan. h. A subsurface soil investigation will be performed for the new MPS 306 site. Two borings will be completed to a depth of 30 feet. i. Consultant anticipates that plumbing and fire protection for the MPS 306 building are not required. d) Contract 4: Force Main from MPS 306 to SCWRF. The design of the new force main will be based on the following: a. The new force main will extend from the new MPS 306 to the SCWRF. The estimated length is about 17,500 feet. b. It is anticipated that the force main alignment will follow the route shown for option B in the Collier County Force Main Extension Feasibility Study dated February 2012. Final pipe size and material selection will be determined during design of MPS 306. c. The COUNTY will provide Consultant with a Preliminary Alignment Study for the new force main. The Preliminary Alignment Study will include preparation of design level topographic survey, and location of existing utilities along the proposed route. COUNTY will provide electronic copy of drawings in dwg format. d. The Preliminary Alignment Study will include plans, which show the proposed horizontal location of the force main on 1-inch = 20 feet scale drawings. The design is anticipated to be A-9 Packet Page-525- 1/8/2013 Item 10.E. 30 % complete. Consultant will prepare plan and profile drawings, details and technical ' specifications for the final design. e. A field verification survey will be performed to confirm existing site conditions along the proposed route. For budgetary purposes, Consultant has assumed that no further survey will be required along the proposed force main alignment. f. A subsurface soil investigation will be performed along the proposed force main alignment. Borings will be located every 500 feet. g. Interconnection with force main from MPS 301 h. Surge suppression analysis and recommended improvements e) Contract 5: MPS Basin 306 Pump Station Improvements. The improvements for the MPS Basin 306 Pump Stations are anticipated to include the following: a. Raise pump station valve vault piping above ground. Replace all piping inside wet well and above ground with HDPE pipe. b. ARV addition to above ground piping c. It is anticipated that pumping equipment will not be replaced and there will be no electrical, structural or l&C improvements for the County owned pump stations. d. Consultant will prepare a typical demolition plan, and pump and valve vault piping plan for each of the County owned pump stations. A piping schedule will be prepared to provide pipe size and elevation specifications for each pump station. e. Design drawings will include existing site conditions plan and proposed site plan for each pump station. A Summary of Drawing Content for the anticipated final (issued for bidding) drawings is included in Table 1. Consultant anticipates that a budget for design of improvements in addition to those described above would be included in a separate Purchase Order. Furnish copies of Contract Documents that include engineering drawings and specifications. Present and review them in person with the County at the 60-percent and 90-percent completion stages in the project and make appropriate changes for the pump station site. Consultant shall Conduct QA/QC review and address QA/QC comments prior to submittal to COUNTY. Consultant shall meet with COUNTY staff to review each draft design submittal, and, after addressing COUNTY comments, prepare and submit final design documents. 2) Permits a. Prepare applications for an Insubstantial Change to a Site Improvement Plan when required from Collier County Growth Management Division and respond to requests for additional information. Prepare all other required permit applications. Permitting fees will be paid by the County. An application for Site Improvement Plan will be required for MPS 306. b. Prepare a permit application for submittal to the Florida Department of Environmental Protection (FDEP) and provide backup documentation including drawings and specifications for each pump station site. Respond to a request for additional information (RAI)from the FDEP. All permit fees will be paid by the County. Two separate permit applications will be required: 1 for MPS 306 and 1 for the force main from MPS 306 to the SCWRF. Modification to MPSs 303 and 304, and to the county A-10 Packet Page-526- 1/8/2013 Item 10.E. owned pump stations will be treated as a maintenance activity and a FDEP permit is not required. c. Prepare applications for working in Collier County and FDOT right of way. Permitting fees will be paid by the County. Consultant shall prepare an FDOT permit application for the force main from MPS 306 to the SCWRF along state highway US 41. d. Prepare applications for SFWMD. Permitting fees will be paid by the County. Consultant shall prepare an Environmental Restoration Permit Application for the MPS 306. An Endangered Species study and wetlands delineation investigation is not required. The ERP will include a stormwater management plan. 3) Subsurface Soil Exploration. Consultant shall perform subsurface soil exploration for the new MPS 306 and the force main from MPS 306 to the SCWRF. The scope of services will include the following: • Conducting Standard Penetration Test (SPT) borings and auger borings to a depth of 15 feet for the new force main. Borings will be completed one every 500 feet along the proposed force main alignment. A total of 36 borings will be completed. The borings will include 6 SPT borings and 30 auger borings. • Conducting two (2) Standard Penetration Test (SPT) borings to a depth of 30 feet at the location of the MPS 306. A subsurface soil investigation report will be provided, which includes the results of the subsurface soil investigation and recommendations for site preparation and foundation design. The ground surface elevation at each boring location will be provided. B. DELIVERABLES All deliverables shall be furnished in MSWord or AutoCAD and Adobe pdf format. Deliverables include: 1. Project Management Plan 2. Progress Meeting Minutes 3. Outline of Field Data Collection Work Plan 4. Five (5) hard copy sets of draft Field Data Collection Work Plan for review by COUNTY 5. Five (5) hard copy sets of final Field Data Collection Work Plan. An electronic copy on CD of the Work Plan formatted in Word. 6. Five (5) hard copy sets of draft Existing and Theoretical Future Wastewater Flow Projections Technical Memorandum for review by COUNTY 7. Five (5) hard copy sets of final Existing and Theoretical Future Wastewater Flow Projection Technical Memorandum. Art electronic copy on CD of the TM formatted in Word. A-11 Packet Page-527- 1/8/2013 Item 10.E. 8. Five (5) hard copy sets of draft Hydraulic Model Construction Technical Memorandum for review by COUNTY 9. Five (5) hard copy sets of final Hydraulic Model Construction Technical Memorandum. An electronic copy on CD of the TM formatted in Word. 10. Five (5) hard copy sets of draft Pump Station Evaluation Report for review by COUNTY 11. Five (5) hard copy sets of final Pump Station Evaluation Report. An electronic copy on CD of the Reports formatted in Word. 12. Five (5) hard copy sets of draft MPS 306 Preliminary Design Report for review by COUNTY 13. Five (5) hard copy sets of final MPS 306 Preliminary Design Report. An electronic copy on CD of the Reports formatted in Word. 14. Five (5) hard copy sets of 60% complete Contract Drawings and Technical Specifications for review by the COUNTY. a. Contract 1: MPS 303 b. Contract 2: MPS 304 c. Contract 3: MPS 306 15. Five (5) hard copy sets of 90% complete Contract Drawings and Technical Specifications for review by the COUNTY a. Contract 1: MPS 303 b. Contract 2: MPS 304 c. Contract 3: MPS 306 d. Contract 4: Force Main from MPS 306 to SCWRF e. Contract 5: MPS Basin 306 Pump Station Improvements 16. Five (5) hard copy sets of final Contract Drawings and Technical Specifications. Provide electronic copy of Contract Drawings and Technical Specifications on CD for competitively bidding the work. a. Contract 1: MPS 303 Auk A-12 Packet Page-528- 1/8/2013 Item 10.E. b. Contract 2: MPS 304 c. Contract 3: MPS 306 d. Contract 4: Force Main from MPS 306 to SCWRF e. Contract 5: MPS Basin 306 Pump Station Improvements 17. Three (3) hard copy sets of signed and sealed Permit Applications and supporting documentation 18. Five (5) sets of Soil Investigation Report 19. Electronic copy of hydraulic modeling files and GIS Shapefiles on CD. C. SUBCONSULTANTS The following Subconsultants will be utilized on this Phase: 1. Q Grady Minor to assist in initial data gathering, perform pump station surveys, field verification survey for force main from MPS 306 to the SCWRF, and design modifications for MPS 302 2. Johnson Engineering to perform indirect flow monitoring and pressure monitoring 3. Ardaman and Associates to perform subsurface soil exploration A-13 Packet Page-529- 1/8/2013 Item 10.E. SCHEDULE B BASIS OF COMPENSATION TIME AND MATERIAL 1. MONTHLY STATUS REPORTS B.1.1 As a condition precedent to payment, CONSULTANT shall submit to OWNER as part of its monthly invoice, a progress report reflecting the Project status, in terms of the total work effort estimated to be required for the completion of the Basic Services and any then-authorized Additional Services, as of the last day of the subject monthly billing cycle. Among other things, the report shall show all Service items and the percentage complete of each item. B1.1.1 All monthly status reports and invoices shall be mailed to the attention of Craig Pajer, Principal Project Manager at Collier County Public Utilities, 3339 Tamiami Trail East, Suite 303, Naples, FL. 34112 2. COMPENSATION TO CONSULTANT B.2.1. For the Basic Services provided for in this Agreement, OWNER agrees to make monthly payments to CONSULTANT based upon CONSULTANT'S Direct Labor Costs and Reimbursable Expenses in accordance with the terms stated below. Provided, however, in no event shall such compensation exceed the amounts set forth in the table below. Task Phase I Tasks NOT TO EXCEED AMOUNT: 1 Project Management $147,850 2 Work Plan Development $43,428 3 Preliminary Engineering $180,769 4 Pump Station Evaluations and Reporting $536,700 5 Final Design and Permitting $961,721 TOTAL FEE (Total Items 1-5) $1,870,468 B.2.2 Direct Labor Costs mean the actual salaries and wages (basic, premium and incentive) paid to CONSULTANT'S personnel, with respect to this Project, including all indirect payroll related costs and fringe benefits, all in accordance with and not in excess of the rates set forth in the Attachment I to this Schedule B. B.2.3 With each monthly Application for Payment, CONSULTANT shall submit detailed time records, and any other documentation reasonably required by OWNER, regarding CONSULTANT'S Direct Labor Costs incurred at the time of billing, to be reviewed and approved by OWNER. B.2.4 For Additional Services provided pursuant to Article 2 of the Agreement, OWNER agrees to pay CONSULTANT a negotiated total fee and Reimbursable Expenses based on the services to be provided. The negotiated fee shall be based upon the rates specified in Attachment 1 toiak this Schedule B and all Reimbursable Expenses shall comply with the provisions of Section B-1 Packet Page-530- 1/8/2013 Item 10.E. 3.5.1 below. There shall be no overtime pay on Basic Services or Additional Services without OWNER'S prior written approval. 3.2.5. The compensation provided for under Sections 2.1 of this Schedule B, shall be the total and complete amount payable to CONSULTANT for the Basic Services to be performed under the provisions of this Agreement, and shall include the cost of all materials, equipment, supplies and out-of-pocket expenses incurred in the performance of all such services. B.2.6 Notwithstanding anything in this Agreement to the contrary, CONSULTANT acknowledges and agrees that in the event of a dispute concerning payments for Services performed under this Agreement, CONSULTANT shall continue to perform the Services required of it under this Agreement, as directed by OWNER, pending resolution of the dispute provided that OWNER continues to pay to CONSULTANT all amounts that OWNER does not dispute are due and payable. 3. SCHEDULE OF PAYMENTS: B.3.1. CONSULTANT shall submit, with each of the monthly status reports provided for under Section 1.1 of this Schedule B, an invoice for fees earned in the performance of Basic Services and Additional Services during the subject billing month. Notwithstanding anything herein to the contrary, the CONSULTANT shall submit no more than one invoice per month for all fees and Reimbursable Expenses earned that month for both Basic Services and Additional Services. Invoices shall be reasonably substantiated, identify the services rendered and must be submitted in triplicate in a form and manner required by Owner. Additionally, the number of the purchase order granting approval for such services shall appear on all invoices. 3.3.1.1 Payments will be made for services furnished, delivered, and accepted, upon receipt and approval of invoices submitted on the date of services or within six (6) months after completion of contract. Any untimely submission of invoices beyond the specified deadline period is subject to non-payment under the legal doctrine of "laches" as untimely submitted. Time shall be deemed of the essence with respect to the timely submission of invoices under this agreement. B.3.2. Invoices not properly prepared (mathematical errors, billing not reflecting actual work done, no signature, etc.) shall be returned to CONSULTANT for correction. Invoices shall be submitted on CONSULTANT'S letterhead and must include the Purchase Order Number and the Project name and shall not be submitted more than one time monthly. B.3.3 Notwithstanding anything herein to the contrary, in no event may CONSULTANT'S billings, on a cumulative basis, exceed the sum determined by multiplying the applicable not to exceed task limits set forth in the table in Section 2.1 by the percentage Owner has determined CONSULTANT has completed such task as of that particular monthly billing. B.3.4 Payments for Additional Services of CONSULTANT as defined in Article 2 hereinabove and for reimbursable expenses will be made monthly upon presentation of a detailed invoice with supporting documentation. 6.3.5 Unless specific rates have been established in Attachment 1, attached to this Schedule B, CONSULTANT agrees that, with respect to any subconsultant or subcontractor to be utilized by CONSULTANT for Additional Services, CONSULTANT shall be limited to a maximum B-2 Packet Page-531- 1/8/2013 Item 10.E. markup of 5% on the fees and expenses associated with such subconsultants and subcontractors. B.3.5.1 Reimbursable Expenses associated with Additional Services must comply with section 112.061, Fla. Stat., or as set forth in the Agreement, be charged without mark-up by the CONSULTANT, and shall consist only of the following items: B.3.5.1.1. Cost for reproducing documents that exceed the number of documents described in this Agreement and postage and handling of Drawings and Specifications. B.3.5.1.2. Travel expenses reasonably and necessarily incurred with respect to Project related trips, to the extent such trips are approved by OWNER. Such expenses, if approved by OWNER, may include coach airfare, standard accommodations and meals, all in accordance with section 112.061, F.S. Further, such expenses, if approved by OWNER, may include mileage for trips that are from/to destinations outside of Collier or Lee Counties. Such trips within Collier and Lee Counties are expressly excluded. B.3.5.1.3. Permit Fees required by the Project. B.3.5.1.4 Expense of overtime work requiring higher than regular rates approved in advance and in writing by OWNER. B.3.5.1.5 Expense of models for the County's use. B.3.5.1.6 Other items on request and approved in writing by the OWNER. END OF SCHEDULE B. B-3 Packet Page-532-