Loading...
Agenda 11/18/2014 Item # 16A 411/18/2014 16.A.4. EXECUTIVE SUMMARY Recommendation to approve a Resolution for final acceptance of the private roadway and drainage improvements, and acceptance of the plat dedications, for the final plat of Valencia Lakes — Phase 7 -A (AR -5749) and authorize the release of the maintenance security in the amount of $56,919. OBJECTIVE: To have the Board of County Commissioners (Board) accept final approval of the infrastructure improvements associated with the subdivision accept the plat dedications, and release the maintenance security in the amount of $56,919.00. CONSIDERATIONS: I ) On June 23, 2006, the Engineering Services Department granted preliminary acceptance of the roadway and drainage improvements in Valencia Lakes — Phase 7 -A. A final inspection was recently completed and the improvements continue to meet County standards. 2) The roadway and drainage improvements will be maintained by the project's homeowners association. 3) The required improvements have been constructed in accordance with the Land Development Code. The Engineering Services Department has inspected the improvements and is recommending final acceptance of the improvements. 4) A resolution for final acceptance has been prepared and approved by the County Attorney's Office. The resolution is a requirement of Section 10.02.05 C.l of the Land Development Code. A copy of the document is attached. 5) The Orangetree PUD which encompasses Valencia Lakes — Phase 7 -A has been found to be in substantial compliance. FISCAL IMPACT: The roadway and drainage improvements will be maintained by the project's homeowners association. The existing security in the amount of $56,919.00 will be released upon Board approval. The original security in the amount of $441,507.48 has been reduced to the current arnount based on the previous work performed and completed and pursuant to the terms of the Construction and Maintenance Agreement dated September 27, 2005. GROWTH MANAGEMENT IMPACT: There is no growth management impact. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval. - SAS RECOMMENDATION: To have the Board accept final acceptance of the roadway and drainage improvements in Valencia Lakes — Phase 7 -A (AR- 5749), and authorizes; Packet Page -941- 11/18/2014 16.A.4. 1. The Chainnan to execute the attached resolution authorizing final acceptance of the improvements and plat dedications. 2. The Clerk of Courts to release of the maintenance security in the form of Performance Bond No. 104585385. Prepared By: John Houldsworth, Senior Site Plans Reviewer, Growth Management Division, Planning and Regulation Attachments: 1) Location Map 2) Bond Basis 3) Resolution Packet Page -942- 11/18/2014 16.A.4. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.4. Item Summary: Recommendation to approve a Resolution for final acceptance of the private roadway and drainage improvements, and acceptance of the plat dedications, for the final plat of Valencia Lakes - Phase 7 -A (AR -5749) and authorize the release of the maintenance security in the amount of $56,919. Meeting Date: 11/18/2014 Prepared By Name: HouldsworthJohn Title: Site Plans Reviewer, Senior, Natural Resources 10/6/2014 1:10:23 PM Approved By Name: BeardLaurie Title: Planned Unit Development Coordinator, Transportation Planning Date: 10/14/2014 3:26:36 PM Name: McKenna-Tack Title: Manager - Engineering Review Services, Natural Resources Date: 10/23/2014 1:10:45 PM Name: PuigJudy Title: Operations Analyst, Community Development & Environmental Services Date: 10/1-3/2014 2:51:52 PM Name: StoneScott Title: Assistant County Attorney, CAO Land Use /Transportation Date: 10/23/2014 3:49:03 PM Name: MarcellaJeanne Title: Executive Secretary, Transportation Planning Date: H /3/2014 11:35:08 AM Name: KlatzkowJeff Title: County Attorney, Packet Page -943- 11/18/2014 16.A.4. Date: 11/3/2014 2:31:07 PM Name: IsacksonMark Title: Director -Corp Financial and Mngmt Svs, Office of Management & Budget Date: 11/4/2014 9:40:00 AM Name: FinnEd Title: Management/Budget Analyst, Senior, Transportation Engineering & Construction Management Date: 11 /4/2014 12:46:59 PM Name: OchsLeo Title: County Manager, County Managers Office Date: 11/6/2014 3:43:57 PM Packet Page -944- L. 0 (:� AT 10, PSI IM A P VALENCIA LA Packet Page -945- 11/18/2014 16.A.4. Valencia Lakes Phase, 7'•-,4 Gonstuctic►n Costs Project Costt aurnm&ry ,Description Site Fill' Roadmay ConstrUCtion Drainage INater /Seviter (:c)n;il;ilJc.ti,c,n 'C:!�, Sts Bond Amount. far 111 0,r%6 of Total 11/18/2014 16.A.4. Prepared by: Sheng Hu Davidson Engineering, Inc. 3; 115,434.00 134, 593.18 $' 45,329.90 $ 146,150.40 .441,507.48 Davidson EngirYeeriiig, InC. PE. Registrafi6n•No. 47161 ccnr;pQh e' g. No. 00009496 \\ Davi�sonsE :rvf�rlcOiT►c2iny'u�ctive Project,SVAValencia Lakes'BE! azer Homes 01- {)049\Valenda Lakes Phase 5 -A & 7- A,\Engineerin( Calculati0ns \C)i)inion of P, obable Cost 7- .A(RE:`)1 }.xls Page 1 Packet Page -946- Valencia ILakos Phaise 7-,A Con stuction Costs Rlo_a,dllnrar C_:i ns4ruci:ion '1 1/2" Asphraht (2..3/4.,, Type . >. -3 Lifts) 6" Li merock 1- <ase 1;2" St,abilizE:d SubgradeE 24" Valley Gutter Type, "F -" Mod. C ;urb 1,1 .y,F)e, "f1" Mod. Curb Sidewalk 1' S od SE:E:d & MW eh Signing & Nlarkiing Temp. turn around Canned, t0l E:xi3tiing Street, Light Rl''P's C onduii: ,Grub roEidvvay ��ubi;ot,al Contingency '1101% TOTAL COY' timl- 5419 SY 5690 5961 2032 20320 4517' 0.5 0.5 1 8 0.5 0.5 5 S`( SY LF- LF LF SF SF LS L5S EA L' E 4k LS ; LS AC Packet Page -947- 11/18/2014 16.A.4. prepared by: Sheng Hu Davidson Engineering, Inc. COST TOTAL 4.76 ;$ 25,794.44 4.:20 ;$ 23,898.00 1.60 ;6 9,537.60 4.90 ;6 - 7.00 ;6 14,224.00 7..00 $ - 1!.,50 S 30,480.00 0. 1120 :6 923.40 500.00 250.00 750.00 IS 375.00 1, 1500. GO Si - 500.00 S> 500.00 1, 500.00 9; '12,000.00 3,000.00 $ 1,500.00 7'60.00 1; 375.00 500.00 1► 2,500.00 $: 122,357.44 3; 12,235.74 :6 134,593.18 Valencia Lakes, Phase! 7 -A Cons,itiaction C ostS Jr,ainaale IrYt bE!111E!In11::5 Descrit)tion '11)" ReiinfoirrE:d C ono —ete Pipe '18" fReinfc►1 -ced Concrete Pipe : ?4•" R.einf0rced C onc:rete Pilpe 30" Reinforced Concrete Pilpe 35" R.einf0rc,e(J Concrete Pipe 42" Reinforced Concrete Pipe C catch Basin \/alley C3 "Lifter Inlet Junction Box FDC')T "rypE: C' Control ;ibuic; hare: 143" Flared End 24" Flared End 412" Flared End autabataI! ;ontinclency '10% TOTAL QTY UNIT 342 ?1'7 61:? LF LF L.1= L.1= L.F L.F 11/18/2014 16.A.4. Prepared try: Sheng Hu Davidson Engineering, Inc. C 01ST TOTAL 19.100 $ 6,498.00 :23.00 $ 4,991.00 ?.0.00 $ 18,360.00 ?>.00 $ - 40.00 $ - 4.`i.1)0 $ - 6 EA, 960.00 $ 5,760.00 EA, 1,000.00 $ - :3, 1_:A 1,200.00 $ 3,600.00 EA. :2,500.00 $ - 2 EA 600.00 $ 1,200.01) 1 I = ;A, 800.,OC) $ 800.00 EA 1,250..00 $ - Packet Page -948- $ 41,209.00 $ 4,120.90 $ 45,329.91) 0 11/18/2014 16.A.4. Valencia Lakes Phase T -q. Constuction Costs F'repared by: Sheng Hu Davidson Engineering, Inc. Potatb_lefFire Water Svste m 10" )m M 8" 'W M (3" 'A'N1 Firje Hydrant Assembly 10" gaitE; vak,e 8" Date valve. 6" gate valve Air release: Valve. WEitor 1'-Service, IC)IOUble 11Vate,r :5iervice, Single Water 13ubtata1 SariitrirY Se_wi,sr : vsvterri 12 "" FM 10, "' F%4 8 " RA 6" FPS' 4" FM 8" (Dravity Malin <10' Deep 8" c.iravity Main :> 110' Deep Marihole <110' C(eE:p ManholE' >110' C(eep 8" plug v,alVe Ei" Plug wilve Sewer Fervice, I )OUble Sewor ,_Service ,5iin(0le 4" Plug valve Lift StEition S' 5HF' :- ,wdteui/ Subtotal ,5;ubto -t,al C,oritini0eincy 10% 'rn SAL. ox !Liturr. !C:iDST; TOTAL L F 14.00, S - 203:2 LF 12:.00, S 24,384.00 LF 10.00, Si - i' EA 2,:500.00 Si '17,500.00 EA 1,200.00 $ - 3 E4 900.00 $ 2,700.00 EA l',i0A0 $ - E A 1,3010.00 $ - 29 E k 3150.00 $ -10,150.00 EA 300.00 $ - $ 54, 734.00 L1= 11(5.50 $ - LF 115.00 $ - LF 13.50 $ - LF 1' :2.00 $ - L.F 10.00 1; - 1914 9 LF 20.00 1; 38,980.00 LF 42.00 $ - B EA, 3500.00 $ 28,000.00 EA 4,500.00 $ - EA I "'no. CIO gi - I_:a. 900. C(0 gi - 25 1 A, 350.00 1; 8,750.00 300.00 $ 2,400.00 E.A. 75)0. -00 $ - EaA. 55,000.00 $ - $ 78,130.00 Packet Page -949- $ 132,864.00 $i 13,286.40 146,150.40 11/18/2014 16.A.4. r Valencia. Lakes Phase 7 - -A Cr o'llstuctio ll Costs Fill Prepared by: Sheng Hu Davidson E:nclineering, Inc. Site Fill (D!T)( unit (,:(:I:EiT TOTAL 2:3:3 .'2:0 C)" 4.:i0 $> '104,940.00 0 L bt0t3l S '104,940.00 Cloritiruae:ncy 10°i� $; 10,494.00 7rolrtiL. $> 1115,434.00 Packet Page -950- 0 0 Valencia Lakes Phase T-A Collier Cl unty Review (Fees 11/18/2014 16.A.4. prepared by: Sheng Hu Davidson Engineering, Inc. FE'Ela AcmS Flat ReViE:wr (;61000 1st acre + $5 ea acldl1) '1 Ei „3 Total Collier County Roadway & U ililhy Fees Packet Page -951- $ 1,140.00 $1,140.00 11/18/2014 16.A.4. RESOLUTION NO. 14- A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA AUTHORIZING FINAL ACCEPTANCE OF CERTAIN ROADWAY AND DRAINAGE IMPROVEMENTS IN VALENCIA LAKES — PHASE 7 -A, ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 44, PAGES 82 THROUGH 86; RELEASE OF THE MAINTENANCE SECURITY; AND ACCEPTANCE OF THE PLAT DEDICATIONS WIIEREAS, the Board of County Commissioners of Collier County, Florida, on May 10, 2005, approved the plat of Valencia Lakes — Phase 7 -A for recording, and WHEREAS, the Developer has constructed and maintained the roadway and drainage improvements in accordance with the approved plans and specifications as required by the Land Development Code (Collier County Ordinance No. 04 -41, as amended), and WHEREAS, the Developer is requesting final acceptance of the roadway and drainage improvements and release of his maintenance security; and WHEREAS, the Engineering Services Department has inspected the roadway and drainage improvements, and is recommending acceptance of said facilities. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that final acceptance is hereby granted for those roadway and drainage improvements in Valencia Lakes — Phase 7 -A,. pursuant to the plat thereof recorded in Plat Book 44, pages 82 throu(-1h86, and the Clerk is hereby authorized to release the maintenance security. BE IT FURTHER RESOLVED AND ORDERED that Collier County hereby accepts the dedications of easements made on the final plat; and that the roadway and drainage improvements within Valencia Lakes -- Phase 7 -A will be maintained privately in the future by the Valencia Lakes at Orangetree Homeowners' Association. Inc., and will not be the responsibility of Collier County. This Resolution adopted after motion, second and majority vote favoring same, this day of 2014. ATTI=,ST: DWIGIIT E. Blv)OCK. CLERK Deputy Clerk [14- EIS - 02819!1122269(1] 4 BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA Bv: TOM HENNING., Chairman 1 of 2 Packet Page -952- (7AC Approved as to form and legality: Scott A. Stone Assistant Collier County Attorney 11/18/2014 16.A.4. [14- EIS - 02819!1122269/1] 4 2 of 2 Packet Page -953-