Agenda 11/18/2014 Item # 16A 311/18/2014 16.A.3. EXECUTIVE SUMMARY Recommendation to approve a Resolution for final acceptance of the private roadway and drainage improvements, and acceptance of the plat dedications, for the final plat of Valencia Lakes — Phase 5 -A (AR -4205) and authorize the release of the maintenance security in the amount of $94,956.13. OBJECTIVE: To have the Board of County Commissioners (Board) accept final approve of the infrastructure improvements associated with the subdivision accept the plat dedications, and release the maintenance security in the amount of $94,956.13. CONSIDERATIONS: l) On June 23, 2006, the Engineering Services Department granted preliminary acceptance of the roadway and drainage improvements in Valencia Lakes — Phase 5 -A. A final inspection was recently completed and the improvements continue to meet County standards. 2) The roadway and drainage improvements will be maintained by the project's homeowners association. 3) The required improvements have been constructed in accordance with the Land Development Code. The Engineering Services Department has inspected the improvements and is recommending final acceptance of the improvements. 4) A resolution for final acceptance has been prepared and approved by the County Attorney's Office. The resolution is a requirement of Section 10.02.05 C.1 of the Land Development Code. A copy of the document is attached. 5) The Orangetree PUD which encompasses Valencia Lakes — Phase 5 -A has been found to be in substantial compliance. FISCAL IMPACT: The roadway and drainage improvements will be maintained by the project's homeowners association. The existing security in the amount of $94,956.13 will be released upon Board approval. The original security in the amount of $751,484.66 has been reduced to the current amount based on the previous work perfornied and completed and pursuant to the terms of the Construction and Maintenance Agreement dated September 25, 2005. GROWTH MANAGEMENT IMPACT: There is no growth management impact. LEGAL CONSIDERATIONS: This item has been approved as to fonn and legality, and requires a majority vote for Board approval. - SAS RECOMMENDATION: To have the Board accept final acceptance of the roadway and drainage improvements in Valencia Lakes — Phase 5 -A (AR- 4205), and authorizes; Packet Page -928- 11/18/2014 16.A.3. The Chairman to execute the attached resolution authorizing final acceptance of the improvements and plat dedications. 2. The Clerk of Courts to release of the maintenance security. Prepared By: John Houldsworth, Senior Site Plans Reviewer, Growth Management Division Attachments: l) Location Map 2) Bond Basis 3) Resolution Packet Page -929- 11/18/2014 16.A.3. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.3. Item Summary: Recommendation to approve a Resolution for final acceptance of the private roadway and drainage improvements, and acceptance of the plat dedications, for the final plat of Valencia Lakes - Phase 5 -A (AR -4205) and authorize the release of the maintenance security in the amount of $94,956.13. Meeting Date: 11/18/2014 Prepared By Name: HouldsworthJohn Title: Site Plans Reviewer, Senior, Natural Resources 10/6/2014 1:04:04 PM Approved By Name: BeardLaurie Title: Planned Unit Development Coordinator, Transportation Planning Date: 10/14/2014 3:16:16 PM Name: McKennalack Title: Manager - Engineering Review Services, Natural Resources Date: 10/23/2014 1:10:33 PM Name: PuigJudy Title: Operations Analyst, Community Development & Environmental Services Date: 10/23/2014 2:24:49 PM Name: StoneScott Title: Assistant County Attorney, CAO Land Use /Transportation Date: 10/23/2014 3:45:07 PM Name: MarcellaJeanne Title: Executive Secretary, Transportation Planning Date: 11/3/2014 11:34:55 AM Name: KlatzkowJeff Title: County Attorney, Packet Page -930- 11/18/2014 16.A.3. Date: 11/3/2014 2:30:59 PM Name: IsacksonMark Title: Director -Corp Financial and Mngmt Svs, Office of Management & Budget Date: 11/4/2014 9:39:29 AM Name: FinnEd Title: Management/Budget Analyst, Senior, Transportation Engineering & Construction Management Date: 1 l /4/2014 1:10:24 PM Name: OchsLeo Title: County Manager, County Managers Office Date: l l /6/2014 3:49:45 PM Packet Page -931- L.0c..A'TI0N IMAP VALENCIA LA Packet Page -932- 11/18/2014 16.A.3. .w 9 IDescri pt:inn Road'Aray C;onst%IC -tion iDrainacle 0 Valencia Lakes PhaS.E., :5••,A Constucticoin Costs Piraject: Cost aurnmairy Wate1-/SE1)nrer C 011SITUctian 1" ;a ;its li otal Bond Amount f'or 1110%', 11/18/2014 16.A.3. Prepared by: David Walker Davidson iEngineering, Inc. 260, 557.48 $ 118,205.19 :$ 304,405.20 ,6 683,167.87 $751,484.66 / 01 / Jeff L. D+wklson, P.E. DmIdscn Erigineering, Inc. Ejc; r I'VE. Pegistraiion No. 47161 1 1 ��i/19 lrrp�7rvy Re:f�, NO. 00004496 ',.\ D,:vi (isonserve!r \ccrnpany\Atc;l:ive Pr•oje:ctsAV\Valenoia L.akeEAEIeazer Homes 01- 0049 \'Valencia Lakes Phase 5 -A & =r eineering C;alcula::ions \Opinion of probable Cost 5 -A Bond.03 Pages 1 Packet Page -933- Fill i • Valencia Lakes Ph11,13S) r,;,-,A Con.- stuction Owrt's altbt01A1 Canting�e�ncy 10 °,0 TOTAL Mte Fill QTY Unit 4-2400 COY Packet Page -934- 11/18/2014 16.A.3. F'repared by: David Walker Davidson Engineering, Inc. C,l_�ST TOTAL 4.50 $ 190,800.00 $ 190,800.00 $ 19,080.00 $ 209,880.00 . • � 11/18/201416.A.3. Valencia Lakes Phase 5, -.N Constuction costs Prepared by: David Walker Davidson Engineering, Inc. Packet Page -935- 93TY UNIT; COST TOTAL - '1 1/.2" Asphalt 1'11931 5Y 4.76 $ 53,278.68 (2 -3/4" T.Jpe ;> 3 Lifts) 8" UME:rock 13;.sEe,, 11119:3 SY 42C► ;6 .47,010.60 12" E ;tabili;�e�d 1SubgredE: 13432 mil' 11..60 ;6 2'1,491.20 24" Valley C3u,ttE1.r 8395 L 4.90 .6 41,135.50 T'ypq; "F'" NI(x1. Curb 0 LlF 71.00 > TYPE ''',a►" MOCL Curb 0 LI= i'.00 S) - Sidewalk 41975 S,F' 1.;70 $> 62,962.50 1' ,god 8395 SIF CI.20 $> 1,679.00 S(aed ER 1� UIC11 1 LEI 5,OC'.00 $ 500.00 ,5lignim & 1 ark:ing 1 L;3 750.00 $ 750.00 TE.m�). turn ,around 0 j =A, 1,5001.00 $ - Cormec:t to existind 2 1'_:i 7500.00 $; 1,000.00 :3trE.et I_nght 115 l =.A 1,500.00 $1 22,500.00 I_;i 3,1)0I).00 $ 3,000.00 Conduit 1 I_;i 75O.D0 $1 750.00 (grub roadway 9 AC, 1500.,CiO $ 4,500.00 S)ubtot.dI $ 260,557.48 Packet Page -935- 0 . I* Valencia Lakes Phase ! .-A Constuction Costs Drairtac e► Im rc�Weime�ni_ Drascrig)-tion 'I 5" Rc:inforc,ed C;ancrete Pipe 118" R.einforce(i C;oncr rte Pipe 24" Resi11fC11'CEd Coons e-te Pipe 30 "' Red nforce:d ('fonc.rete Rpe 236" Reinforced C:oncrete Rpe 42" RE)in- forced C,orncrete Ripe Catch Basin Valley Gl'utter InIE.It Junction BOX FDOT Types C Control S;t:ucture 18 " Flared End 241" Flared Endl 42" Flared End) Su b toitral 11/18/2014 16.A.3. Prepared by: David Walker Davidson Engineering, Inc. QTY IJIINrr t (0 'a TOTAL 700 L.F 19.00 $ 13,300.00 752 L.F 23.00 $ 17,296.00 363 1-A 30„00 $ 10,890.00 0 E.A 35,.00 $ - 125 E:A 4CL.00 $ 50,120.00 I) E.A 45.00 $ - 20 EA 96-0.00 $ 19,200.00 0 EA 1,000.00 $ - 'I EA 1,199'.1', 9 $ 1,199.19 0 E=A 2,500.00 $ - 9 EA 600.00 $ 5,400.00 1i E.A 800.00 $ 800.00 0 EA 1,250.00 $ - $ 118,205.19 Packet Page -936- ualerincia Lakes Phases 5 -A Constucaion Costs 11/18/2014 16.A.3. Prepared by: David Walker Davidson Engineering, Inc. Sanit.a�r3i�Seyy�E:r ���ur:r�E!�t3 12" FM CII1( !LI IM ILI COST $ TOTAL Poi;at►le�/ irE� r a'Y�stei q LF 115.00 - '10" 1NMI 14190 LiF '14.00 $ 20,300.00 WAN 2600 LIF '12.00, $ 31,200.00 E3 "'VU'IV1 O LF '10.00 $ - Fire Hydrant )%SSEa IUL ' '13 EA 2,500.00 $ 32,500.00 1 Ci''' date! v,alvE; 2 EA 1,200.00 $ 2,400.00 8" c)ate vat \��� 1► IE. 9010.00 $ 4,500.00 Ei" gate: valve' 0 EA 7110.00 g• - Air rE:iea; >E Valve C1 EA 1,,300.00 $� - WatE!r Service Double 47 E.A. 350.00 $ 16,450.00 WatE!r SE!I"' ✓i��E! :3iinglP 14 Eft 300.00 $: 4,200.00 'Miter Subtotell 10 EA, 300.00 ,s 1111,550.00 Sanit.a�r3i�Seyy�E:r ���ur:r�E!�t3 12" FM t) LF 1(3.50 $ - '10 "' FMI q LF 115.00 - 8" FIM 0 LF 13.50 $ - 6" F IM 0 L F 12.00 1$ - 4" FW1 0 LF '10.00 ;$ - 8 "'Gravity Nbin <:'10" DE!ep 3177 LF 20,00 ;$ 613,540.00 8" (.cavity Ml,sin =10' Deep 41'10, LIF 42.00 $ 19,992.00 Manhole <10' Deep 15 E:,dt 3,500.00 1) 52,500.00 Mlanhoile >'I0' Ds-(?p, 2 EA 4, 5,00.010 Si 9,000.00 8 " plug va1v(. 0 EA 1,200.00, Si - 6" Flug wiahbB 0 0, 9010.00 $ - Sew(3r Double 49 EA, 3:910,.00 $ 17,150.00 SE:ww ervic:e "Single 10 EA, 300.00 $ 3,000.00 4" Plug valves 0 EA '7;50.00 1; - Lift t3tzition S' :5HP C1 EA 55,000.00 $ - ,E,mitar Y;3,uLltotal $ 165,182.00 ,3 ut it:ot,s1 Contin( enc,y 10°io TOTAL. Packet Page -937- $ ;276,732.00 $ 27,673.20 :$ 304,405.20 • • 11/18/2014 16.A.3. Valencia Lalk;es Phase 5,•,A Colllier County, Review IFees Prepared by: David Walker Davidson (Engineering, Inc. Roadway, DrainagE ►, Excavation Coosts "178,762.67 Utility Constriction C;crsts ,$ 304,405.20 Fees Acres Flat Review ($10C►0 1st acre + $5 E;,a aldd'I) 3'3.9 $1,115.00 Clearing aring Fees 9.0 $ 550.00 Fees Roadway, Drainage, Excavation COr1StMCU011 DOCUnlellt R,--Vif3W 0.75109/0 _ $ 2,840.72 Colin,stn.lction Inspection 2.250910 _ .6 8,522.16 Utiliity Con,stiucticon DoCLIITI, -zflt 1Rf3ViE?'W C1.75091C, :_. Iii /'A COMS:r11cticirl Inspection 2"250 0,✓a Additional Fees Daitzi C- Ionversion ;$ 25.00I 25.00 Pre; F,'evievi Fee: 1 G 9i 100.00 Total Collier COL111tyf RG.-IdWely & Utility Fees, ;613,152.88 Packet Page -938- 11/18/2014 16.A.3. RESOLUTION NO. 14- A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA AUTHORIZING FINAL ACCEPTANCE OF CERTAIN ROADWAY AND DRAINAGE IMPROVEMENTS IN VALENCIA LAKES — PHASE 5 -A, ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 44, PAGES 78 THROUGH 81; RELEASE OF THE MAINTENANCE SECURITY; AND ACCEPTANCE OF THE PLAT DEDICATIONS WHEREAS, the Board of County Commissioners of Collier County, Florida, on May 24, 2005, approved the plat of Valencia Lakes — Phase 5 -A for recording; and WHEREAS, the Developer has constructed and maintained the roadway and drainage improvements in accordance with the approved plans and specifications as required by the Land Development Code (Collier County Ordinance No. 04 -41, as amended); and WHEREAS. the Developer is requesting final acceptance of the roadway and drainage improvements and release of his maintenance security. and WHEREAS. the Engineering Services Department has inspected the roadway and A rainage improvements, and is recommending acceptance of said facilities. NOW, THEREFORE. BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA. that final acceptance is hereby granted for those roadway and drainage improvements in Valencia Lakes — Phase 5 -A. pursuant to the plat thereof recorded in Plat Book 44, pages 78 through 81, and the Clerk is hereby authorized to release the maintenance security. BE IT FURTHER RESOLVED AND ORDERED that Collier County hereby accepts the dedications of casements made on the final plat; and that the roadway and drainage improvements within Valencia Lakes — Phase 5 -A will be maintained privately in the future by the Valencia Lakes at Orangctree Homeowners` Association. Inc., and will not be the responsibility of Collier County. This Resolution adopted after motion, second and majority vote favoring same, this day of 2014. ATTEST: DWIGHT E. BROCK. CLERK Bv: Deputy Clerk BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA TOM HENNING, Chairman (14- EIS - 02819/1122268/11 3 1 of 2 Packet Page -939- , O-A 0 Approved as to Corm and legality: Scott A. Stone Assistant Collier County Attorney 11/18/2014 16.A.3. [14- EIS - 02819!1122268/1] 3 2 of 2 Packet Page -940-