Agenda 10/28/2014 Item #16A1810/28/2014 16.A.18.
EXECUTIVE SUMMARY
Recommendation to approve a $546,837 Work Order under Request For Quotation 14- 6213 -7
to Douglas N. Higgins, Inc., to construct the stormwater improvements in Golden Gate City
(20th Ct SW, 46th Terr. SW & 48th St. SW), Project No. 51029.
OBJECTIVE: That the Board of County Commissioners approve a $546,837 work order to Douglas
N. Higgins, Inc. to upgrade the stormwater management system in Golden Gate City.
CONSIDERATIONS: In 2010, the Collier County Stormwater Section contracted for the Golden
Gate City Stormwater System Inventory and Master Plan. This work inventoried the existing
stormwater system and divided Golden Gate City into four quadrants of approximately one square
mile each. Within these quadrants, the areas were further sub - divided into sub - systems. The
inventory analyzed the conditions of the existing stormwater structures and pipes and made
recommendations on a program to rehabilitate the existing stonmwater system. Most of the system is
50 years old and has passed its useful lifespan and is now functionally obsolete. The Board of
County Commissioners (BCC) adopted the 2014 Capital Budget that identified the requirements for
upgrading this stormwater system.
One of the segments of this stormwater system rehabilitation project is included in the attached
construction Work Order. In conjunction with a proposed FDOT LAP sidewalk that will be built
following the completion of this project, the County is constructing a stormwater management
system in the area of 20th Ct. SW, 46th Terr. SW & 48th St. SW.
Request for Quotation (RFQ) 14- 6213 -7, "Golden Gate City Stormwater Drainage Improvements In
Conjunction With Sidewalk Improvements (201h Ct. SW, 46th Tern SW & 481h St. SW)" was posted
on September 4, 2014, and distributed to all vendors under the Fixed -Tenn Underground Utilities
(Field/ Underground Utilities) Contract 14 -6213 via email. Four addenda were issued after the
posting date. Five of the six vendors submitted quotations by the September 29, 2014, deadline. The
quotations received are summarized below.
VENDOR
QUOTE
Douglas N Higgins, Inc.
$546,837.00
Enterprises USA, Inc.
$582,317.72
-Quality
Haskins, Inc.
$741,478.00
Mitchell & Stark Construction Co., Inc.
$747,530.68
Southwest Utility Systems, Inc.
$845,950.00
Staff and local engineering consultant, Q. Grady Minor, Inc., determined the lowest quote is fair and
reasonable, and recommend awarding the work order to Douglas N. Higgins, Inc. The quote is
approximately 12% percent below the project consultant's $624,882.50 opinion of probable cost
(Engineer's estimate). The Purchasing Department concluded that the quote was competitive and
representative of market conditions. The quote summary, Work Order, Work Order Back -up and
Engineer's estimate are attached (Attachments 1, 2, 3 and 4 respectively).
The request for proposal informed the respondents that there may be unforeseen conditions
associated with the project. The solicitation incorporated an allowance of $20,000 that included, but
was not limited to, undocumented underground infrastructure which may be encountered during
construction. The price for any additional work that would utilize this allowance shall be negotiated
Packet Page -1158-
10/28/2014 16.A.18.
prior to commencement in accordance with the county's Purchasing Ordinance and the terms of the
agreement.
FISCAL IMPACT: Funds in the amount of $546,837 are available in the Golden Gate City Outfall
Replacement project #51029. The source of funding is a transfer from the Unincorporated General
Fund 111 to the Stormwater Capital Projects Fund 325.
The stormwater infrastructure will have a functional lifespan of fifty years. The recurring costs for
periodic inspections and cleaning of all the stormwater system on a three to five year basis are
estimated to be $5,000 per cycle.
LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority
vote for Board approval. -SRT
GROWTH MANAGEMENT IMPACT: The project meets current Growth Management Plan
standards to ensure the adequacy and availability of viable public facilities.
RECOMMENDATION: That the Board of County Commissioners approve a $546,837 work order
under Request for Quotation 14- 6213 -7 to Douglas N. Higgins, Inc.; and authorize the Chairman to
sign and execute the work order after review and approval by the County Attorney's Office.
Prepared by: Joseph F. Delate, ASLA, Senior Project Manager, Transportation Engineering, Growth
Management
Attachments: 1) Quote Summary; 2) Work Order; 3) Work Order Back -up and 4) Engineer's
Estimate
Packet Page -1159-
10/28/2014 16.A.18.
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.16.A.16.A.18.
Item Summary: Recommendation to approve a $546,837 Work Order under Request For
Quotation 14- 6213 -7 to Douglas N. Higgins, Inc., to construct the stormwater improvements in
Golden Gate City (20th Ct. SW, 46th Terr. SW & 48th St. SW), Project No. 51029.
Meeting Date: 10/28/2014
Prepared By
Name: DelateJoseph
Title: Project Manager, Senior, Transportation Engineering & Construction Management
10/1/2014 2:15:16 PM
Submitted by
Title: Project Manager, Senior, Transportation Engineering & Construction Management
Name: DelateJoseph
10/1/2014 2:15:18 PM
Approved By
Name: PutaansuuGary
Title: Project Manager, Principal, Transportation Engineering & Construction Management
Date: 10/1 /2014 2:57:32 PM
Name: Khawaj aAnthony
Title: Chief Engineer - Traffic Operations, Traffic Operations
Date: 10/2/2014 8:23:12 AM
Name: TaylorLisa
Title: Management/Budget Analyst, Transportation Administration
Date: 10/2 /2014 3:10:13 PM
Name: JohnsonScott
Title: Manager - Procurement, Purchasing & General Services
Date: 10/2/2014 3:39:31 PM
Packet Page -1160-
10/28/2014 16.A.18.
Name: KearnsAllison
Title: Manager Financial & Operational Support, Transportation Administration
Date: 10/2/2014 4:25:29 PM
Name: ShueGene
Title: Director - Operations Support, Transportation Administration
Date: 10/3/2014 8:59:27 AM
Name: EvelynColon
Title: Purchasing - Procurement Specialist
Date: 10/7/2014 11:55:31 AM
Name: LynchDiane
Title: Supervisor - Operations, Road Maintenance
Date: 10/8/2014 11:44:08 AM
Name: MarkiewiczJoanne
Title: Director - Purchasing /General Services, Purchasing & General Services
Date: 10/8/2014 2:12:39 PM
Name: LynchDiane
Title: Supervisor - Operations, Road Maintenance
Date: 10/10/2014 3:34:42 PM
Name: TeachScott
Title: Deputy County Attorney, County Attorney
Date: 10/10/2014 4:34:49 PM
Name: MarcellaJeanne
Title: Executive Secretary, Transportation Planning
Date: 10/13/2014 8:41:31 AM
Name: KlatzkowJeff
Title: County Attorney,
Date: 10/15/2014 2:23:32 PM
Name: UsherSusan
Title: Management/Budget Analyst, Senior, Office of Management & Budget
Date: 10/20/2014 9:43:12 AM
Name: UsherSusan
Title: Management/Budget Analyst. Senior, Office of Management & Budget
Date: 10/20/2014 10:03:22 AM
Packet Page -1161-
10/28/2014 16.A.18.
Name: OchsLeo
Title: County Manager, County Managers Office
Date: 10/20/2014 11:46:44 AM
Packet Page -1162-
10/28/2014 16.A.18.
"Golden Gate City Stormwater Draiange Improvements In Conjunction With Sidewalk Improvements"
20th Ct. SW, 46th Terr. SW & 48th St. SW
Quote Summary under RFQ #14- 6213 -7 (Underground Utility Contractors) Construction
Proposer
Amount
DN Higgins
$546,837.00
Quality
$582,317.72
Haskins
$741,478.00
Mitchell& Stark
$747,530.68
SW Utility
$845,950.00
Kyle
No quote
Packet Page -1163-
10/28/2014 16.A.18
RFP #.14- 6213 -7
WORK ORDER/PURCHASE ORDER
Contract 14 -6213 "Underground Utility Contractors"
Contract Expiration Date: July 7, 2016
This Work Order is for General Utility Contracting services for work known as:
Project Name: RFQ #14- 6213 -7 Golden Gate City Stormwater Drainage Improvements In
Conjunction With Sidewalk Improvements, 201h CT. SW, 46`h R TER SW & 48t ST. SW
Project No: 51029.4
The work is specified in the proposal dated September 29, 2014 which is attached hereto and made a
part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced
above, Request for Quotation #14- 6213 -7 and Addenda 1 -4, this Work Order/Purchase Order is
assigned to: Douglas N. Higgins, Inc.
Scope of Work: As detailed in the attached proposal and the following:
* Golden Gate City Stormwater Drainage Improvements In Conjunction With Sidewalk
Improvements, 20 CT. SW, 46" TERR. SW & 48th ST. SW as described in the plans, bid form,
specifications, and Addenda l- 4 of RFQ 414- 6213 -7 as provided to all six contractors on annual
Contract # 14 -6213.
Schedule of Work: Complete work (Substantial Completion) within 90 days from the date of the
Notice to Proceed which is accompanying this Work Order. Complete final completion (Final
j Completion) within 120 days from the date of the Notice to Proceed which is accompanying this
Work Order. The Consultant agrees that any Work Order that extends beyond the expiration date of
Agreement # 14 -6213 will survive and remain subject to the terms and conditions of that Agreement
j until the completion or termination of this Work Order.
Compensation: In accordance with the Agreement referenced above, the County will compensate the
Firm in accordance with following method: Quotation as provided in the attached proposal.
TOTAL FEE S 546,837.00
Page 1 of 3
Packet Page -1164-
.y
RFP #146213 -7
PREPARED BY:
J ph F- Delate, Senior Project Manager
Transportation Engineering Department
APPROVED BY:
APPROVED BY:
Gary Putaansuu, P.E., Principal Project Manager
ay Ahmad, P.E� Director
.
Nick Cksalanguic fiAdrdin-ist,
Growth Management Division
10/28/2014 16.A.18.
!C) /
D to
' /�Y
Date
Date
Date
By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby
discloses, that, to the best of their knowledge and belief, all relevant facts concerning past, present, or
currently planned interest or activity. (financial, contractual, organizational, or otherwise) which
relates to the proposed work; and bear on whether the Firm has a potential conflict have been fully
disclosed.
Additionally, the Firm agrees to notify the Procurement Director, in writing within 48 hours of
learning of any actual or potential conflict of interest that arises during the Work Order and/or project
duration.
ACCEPTED BY: Douglas N. Higgins, Inc.
Brandy Bartolone, Vice President'/ Regional Manager
(Remainder of page intentionally left blank)
Packet Page -1165-
Date
Page 2 of 3
v
10/28/2014 16.A.18.
RFP #14-6213-7
IN WITNESS WHEREOF, the parties hereto, have each, respectively, by an authorized person or
agent, have executed this Work Order on the date and year fast written below.
ATTEST:
Dwight E. Brock, Clerk of Courts
e
Dated:
(SEAL)
First Witness
TType /print witness name'
Second Witness
TTypeiprint witness nameT
Approved as to Form and Legality:
Assistant County Attorney
Print Name
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORIDA
By:
Tom Henning, Chairman
Name of Firm: Douglas N. Higgins, Inc.
Signature
�y i.i «rt
TType/p"nt signature and title%
Packet Page -1166-
Page 3 of 3
��lv
10/28/2014 16.A.18
BID SCHEDULE
RFO,#14- 6213 -7
GOLDEN GATE CITY STORMWATER
DRAINAGE IMPROVEMENTS
IN CONJUNCTION WITH SIDEWALK IMPROVEMENTS
20TH COURT SW, 46TH TERRACE SW & 48TH STREET SW
IREVISED 9/19/14
Packet Page -1167-
DESCRIPTION
QTY
UNIT
UNIT PRICE
AMOUNT
1
Mobilization / Demobilization
i
L5
$50,655.00
$50,655.00
2
Survey Layout / Signed and Sealed Asbuilts
1
LS
$14,091.00
$14,091.00
3
Stormwater Pollution Plan
1
LS
$1,830.00
$1,830.00
4
Maintenance of Traffic
1
LS
$6,442.00
$6,442.00
5
Project Sign
2
EA
$563.00
$1,126.00
6
Misc. Storm Structure Demolition
45
EA
$232.00
$10,440.00
7
Misc. Culvert Demolition
2800
LF
$5.00
$14,000.00
8
Ditch Bottom - C -Box
14
EA
$1,255.00
$17,570.00
9
Ditch Bottom - D -Box
8
EA
$2,011.00
$16,088.00
10
Ditch Bottom - E -Box
3
EA
$2,005.00
$6,015.00
11
Type P Bottom Type C Inlet
8
EA
$2,865.00
$22,920.00
12
Type P- Bottom Type III Cover
1
EA
$2,335.00
$2,335.00
13
15" RCP Culvert
0
LF
$0.00
$0.00
14
18" RCP Culvert
312
LF
$44.00
$13,728.00
15
24" RCP Culvert
592
LF
$54.00
$31,968.00
16
42" RCP Culvert
754
LF
$128.00
$96,512.00
17
48" RCP Culvert
43
LF
$151.00
$6,493.00
18
12 X 18 ERCP
264
LF
$51.00
$13,464.00
19
14 X 23 ERCP
161
LF
$54.00
$8,694.00
20
19 X 30 FRCP
211
LF
$79.00
$16,669.00
21
24 X 38 ERCP
135
LF
$119.00
$16,065.00
22
16" PVC (Dir. Drill)
0
LF
$0.00
$0.00
23 1
Ditch Bottom (Type X)
0
EA
$0.00
$0.00
24 1
ME548" RCP
1
EA
$1,512.00
$1,512.00
25
Pipe Connection Exist.
10
EA
$1,403.00
$14,030.00
26
Pavement Removal / Replacement
600
LF
$5.00
$3,000.00
27
Sidewalk Removal/ Replacement
30
Sy
$43.00
$1,290.00
28
Driveway Removal / Replacement
420
Sy
$111.00
$46,620.00
29
Asphalt Overlay
3400
Sy
$23.00
$78,200.00
30
6" Double Yellow (Temp /Perm)
550
LF
$5.00
$2,750.00
31
12" White (Temp /Perm)
125
LF
$6.00
$750.00
32
24" White (Temp /Perm)
150
LF
$10.00
$1,500.00
33
4" Water Main Deflection
1
EA
$1,295.00
$1,295.00
34
6" Water Main Deflection
1
EA
$1,469.00
$1,469.00
35
8" Water Main Deflection
1
EA
$1,744.00
$1,744.00
36
4" Force Main Deflection
1
EA
$2,040.00
$2,040.00
37
10" Force Main Deflection
1
EA
$3,532.001
$3,532.00
38
Miscellaneous Contingencies Allowance
1
EA
$20,000.00
$20,000.00
Total Bid
$546,837.00
IREVISED 9/19/14
Packet Page -1167-
10/28/2014 16.A.18.
COLLIER COUNTY FLORIDA REQUEST
Quote /Contract 14-6213-7
Due Date: September 22, 2014
PROPOSAL PAGE
DUE DATE: C? Li"
The undersigned, as quoter, hereby declares that the firm has examined the specifications and
is informed fully in regard to all terms and conditions pertaining to the project and, if this
Proposal is accepted, to furnish same in full, according to the following:
IN WITNESS WHEREOF, WE have hereunto subscribed our names on this �l day of
September , 2014 in the County of Collier —, in the state of Florida
Douglas N. Higgins, Inc.
Firm's Complete Legal Name
239-774-3130
Telephone Number
239-774-4266
FAX Number
BrandyB(McInhiggins.corn
Email Address
4485 Enterprise Ave,
Address
Naples
City
Florida
State
34104
Zip
830666
Florida Certificate of Authority Document Number (wvmr.sunbiz.oraJsearch!htmI)
38-1807765
Federal Tax Identification
CCR
---------------
Signature
Vice President'Regional Mgr.
Title
Brandy Bartolone If /1;1.
Print Name Date
RFQ-CantradDriver)-01 012013
Packet Page -1168-
10/28/2014 16.A.18.
" r Services D€vison
Memorandum
Email: joedelate @coihergov,net
Telephone: (239) 252 -5821
FAX: (239) 252 -5885 ,
ADDENDUM #1
Date: September 17, 2014
From: Joseph Deiate, Senior Project Manager, Transportation Engineering
To: Potential Proposers
Subject: Addendum #1 — RFQ #14- 6213 -7 Golden Gate City Drainage Protect
The following clarifications are issued as an addendum identifying the following changes for the
referenced solicitation:
- Deadline for RFQ (Quotes) has been extended to Monday, September 29 at Sa.m.
-in response to questions from several vendors, please see the following responses:
1.) Is laser profiling or videoing of the new storm drain pipe required? Yes to both, per FDOT
standards.
2.) Can a pay item for sod restoration be added? No, that is Contractor's responsibility.
3.) Cana pay item for utility pole holding or relocation be added? No. if in R.O.W. or County
easement, it's on utility company.
4.) Can the directional drills be changed to open cut if rock is encountered? Will you create an
alternate pay item for this? If so, how are we to be paid for the installation and restoration? We are
looking at this now. Our Engineer is determining whether the work associated with these
directional drills is necessary. Addendum # 2, which is forthcoming, will address this issue.
5.) Can the material for the directional dri €ls be HDPE pipe or fusible PVC pipe? See answer for # 4
above.
6.) The Technical Specs require that the permits are the responsibility of the contractor. Will the
contract time start once all permits are received or can additional contract time be added for the time it
will take to get the permits? Goal is to have low bidder begin permit process immediately once
bids are open and low bidder identified. Work Order has to go to BCC for award so it will take
some time for that process. Contractor can get started on dewatering permit ROW permit,
and any other necessary permits during that process. Time can be added by Change Order, or
beginning of project delayed, to account for time expended to acquire permits.
-The following note is hereby added to the project:
ROCK NOTE:
IT HAS SEEN THE EXPERIENCE OF THE DEPARTMENT WITH PROJECTS CONSTRUCTED
WITHIN THIS GENERAL GEOGRAPHIC AREA THAT, ALTHOUGH PRELIMINARY BORINGS DID
NOT 114DICATE A CONTSTANT PRESENCE OF ROCK, ROCK WAS ENCOUNTERED WHILE
PERFORMING UNDERGROUND INSTALLATIONS. THEREFORE, THE CONTRACTOR SHOULD
CONSIDER THE INCREASED COST OF ALL UNDERGROUND WORK ACTIVITIES WHILE
PERPARING THEIR BID. ALL COSTS OF ROCK EXCAVATION SHALL BE INCLUDED IN THE
Packet Page - 1169 - i F
10/28/2014 16.A.18.
APPROPRIATE ITEMS OF WORK CONTAINED WITHIN THE CONTRACT. NO EXTRA
COMPENSATION OR TIME EXTENSION, WILL BE ALLOWED FOR ADDITIONAL WORK
DIRECTLY ASSOCIATED WITH THE SPLITTING, EXCAVATION, CRUSHING, DISPOSAL,
REPLACEMENT OF DISPLACED VOLUME OF EXTRACTED ROCK WITH FILL MATERIAL, OR
SPECIAL HANDLIONG OF ROCK.
If you require additional information please post a question on the Online Bidding site or contact'me
using the above contact information.
c: Evelyn Colon, Purchasing
Packet Page -117Q-
10/28/2014 16.A.18.
C:,tf1�ir County
Acir ninisbalh a SeMmis
Purwasir4
Memorandum
Email: joedelate@colliergov.net
Telephone: (239) 252 -5821
FAX: (239) 252 -5885
ADDENDUM #2
Date: September 18, 2014
From: Joseph Delate, Senior Project Manager, Transportation Engineering
To: Potential Proposers
Subject: Addendum #2 — RFQ #14- 6213 -7. Golden Gate City Drainage Project
The following clarifications are issued as an addendum identifying the following changes for the
referenced solicitation:
- Directional drilling (16" PVC pipe) and Ditch Bottom type "x" boxes have been removed from
the bid (Bid items # 21 and 22). This work associated with these items will not be performed
with this project.
- Quantities in the bid schedule have been revised to reflect correct quantities of materials for
Bid Items # 10, 12, 13,15, 16, 17, 18, 19, 20, 21, and 22.
-Bid form has been revised to reflect these changes (see attachment). Please only use this
revised bid schedule, and not the original bid schedule or the bid schedule in the
specifications that were previously emailed.
- Revised plans will not be issued until after bid opening
- Submittal deadline is still Monday, September 29 at 8a.rn. due to the BCC Agenda deadline for
award.
-Bid may be submitted via email, or dropped off at 2885 South Horseshoe Drive office of
Transportation Engineering, prior to the bid deadline.
If you require additional information please post a question on the Online Bidding site or contact me
using the above contact information.
c: Evelyn Colon, Purchasing
Packet Page -1171-
10/28/2014 16.A.18.
a Je r Ccx�
Administt�e Services Division
Purchasing
Memorandum
Email: joedelate @cotliergov.net
Telephone: (239) 252 -5821
FAX: (239) 252 -5885
ADDENDUM #3
Date: September 19, 2014
From: Joseph Delate, Senior Project Manager, Transportation Engineering
To: Potential Proposers
Subject: Addendum #3 — RFQ #14- 6213 -7, Golden Gate. City Drainage Proiect
The following clarifications are issued as an addendum identifying the following changes for the
referenced solicitation:
-Bid schedule (bid form) has been revised to reflect that Bid item (Pay item) #2 includes:
Construction Survey Layout, and Signed and Sealed As- builts (see attachment).
- Please only use this revised bid schedule (bid form), and not the original bid schedule or the
bid schedule in the specifications or those that were previously emailed.
-In response to Proposer's question concerning swales:
Could we put a line item in this bid for swales per LF?
Also a detail of the swale?
No. Please see PROJECT DESCRIPTION in the Technical Specifications where Site
Restoration is defined and is the responsibility of the Contractor and is included in his bid.
Following final completion of this drainage project, the County will begin a separate sidewalk
project that includes in its scope the regrading of the entire swaie.
- Submittal deadline is still Monday, September 29 at 6 a.m. due to the BCC Agenda deadline for
award.
-Bid may be submitted via email, or dropped off at 2885 South Horseshoe Drive office of
Transportation Engineering, prior to the bid submittal deadline.
If you require additional information please post a question on the Online Bidding site or contact me
using the above contact information.
c: Evelvn Colon, PUrChaSin-o
Packet Page -1172-
10/28/2014 16.A.18.
Adrrrasrative Servroes Dnrrsxiri
Memorandum
Email: joedetatei@coiliergov.net
Telephone: (239) 252 -5821
FAX: (239) 252 -5885
ADDENDUM #4
Date: September 23, 2014
From: Joseph Delate, Senior Project Manager, Transportation Engineering
To: Potential Proposers
Subject: Addendum #4 — RFQ #14- 6213 -7 Golden Gate Cit Dralna a Pro'ect
The following clarifications are issued as an addendum identifying the following changes for the
referenced solicitation:
-In response to Proposer's question concerning road crossings (open cut restoration):
Are we to be using flowable fill on these road crossings?
The open cut road restoration design detail In the plan set calls for a conventional road
crossing restoration utilizing compacted backfill and compacted limerock with an asphalt
overlay on local roads, which this project entails. However, the contractor may use ftowable
fill for the open cut restoration in accordance with the design detail in the plan set if he
desires.
- submittal deadline is still Monday, September 29 at 8 a.m, due to the BCC Agenda deadline
for award,
-Bid may be submitted via email, or dropped off _at 2885 South Horseshoe Drive office of
Transportation Engineering, prior to the bid submittal deadline.
If you require additional information please post a question on the Online Bidding site or contaot me
using the above contact information.
c: Evelyn Colon, Purchasing
Packet Page -1173-
10/28/2014 16.A.18.
"Golden Gate City Stormwater Draiange Improvements In Conjunction With Sidewalk Improvements"
20th Ct. SW, 46th Terr. SW & 48th St. SW
Quote Summary under RFQ #14- 6213 -7 (Underground Utility Contractors) Construction
Proposer
Amount
DN Higgins
$546,837.00
Quality
$582,317.72
Haskins
$741,478.00
Mitchell& Stark
$747,530.68
SW Utility
$845,950.00
Kyle
No quote
Packet Page -1174-
10/28/2014 16.A.18.
ENGINEER'S COST ESTIMATE
GOLDEN GATE CITY STORMWATERDRAINAGE IMPROVEMENTS
IN CONJUNCTION WITH SIDEWALK IMPROVEMENTS
20TH COURT SW, 46TH TERRACE SW & 48TH STREET SW
r
'.
!D.BrAi-t ` iSon, P.E
I`lorida Reg:No. 7061f
Packet Page - 1175 -
ft',I-
f; "t
DESCRIPTION
QTY
UNIT
UNIT PRICE
AMOUNT
1
Mobilization / Demobilization
1
LS
$20,000.00
$20,000.00
2
Survey Layout / Signed and Sealed Asbuilts
1
LS
$12,000.00
$12,000.00
3
Stormwater Pollution Plan
1
LS
$1,500.00
$1,500.00
4
Maintenance of Traffic
1
LS
$10,000.00
$10,000.00
5
Project Sign
2
EA
$2,000.00
$4,000.00
6
Misc. Storm Structure Demolition
45
EA
$250.00
$11,250.00
7
Misc. Culvert Demolition
2800
LF
$10.00
$28,000.00
8
Ditch Bottom - C -Box
14
EA
$3,000.00
$42,000.00
9
Ditch Bottom - D -Box
8
EA
$3,500.00
$28,000.00
10
Ditch Bottom - E -Box
3
EA
$3,900.00
$11,700.00
11
Type P Bottom Type C Inlet
8
EA
$3,000.00
$24,000.00
12
Type P Bottom Type III Cover
1
EA
$5,000.00
$5,000.00
13. .
1"' RCP .t✓ia Ivert. , .:
0.;
l
$4 t)13
14
18" RCP Culvert
312
LF
$65.00
$20,280.00
15
24" RCP Culvert
592
LF
$85.00
$50,320.00
16
42" RCP Culvert
754
LF
$200.00
$150,800.00
17
48" RCP Culvert
43
LF
$240.00
$10,320.00
18
12 X 18 ERCP
264
LF
$50.00
$13,200.00
19
14 X 23 ERCP
161
LF
$75.00
$12,075.00
20
19 X 30 ERCP
211
LF
$100.00
$21,100.00
21
24 X 38 ERCP
135
LF
$150.00
$20,250.00
'L'F.
23.:.;
Ditch Bottom" (Type X) >:
•'" . 0 ".. _
....:EA .
........
.$0 00,"
24
MES 48" RCP
1
EA
$4,000.00
$4,000.00
25
Pipe Connection Exist.
10
EA
$500.00
$5,000.00
26
Pavement Removal / Replacement
600
LF
$60.00
$36,000.00
27
Sidewalk Removal / Replacement
30
SY
$40.00
$1,200.00
28
Driveway Removal / Replacement
420
SY
$50.00
$21,000.00
29
Asphalt Overlay
3400
SY
$6.00
$20,400.00
30
6" Double Yellow (Temp /Perm)
550
LF
$2.00
$1,100.00
31
12" White (Temp /Perm)
125
LF
$3.50
$437.50
32
24" White (Temp /Perm)
150
LF
$7.00
$1,050.00
33
4" Water Main Deflection
1
EA
$2,000.00
$2,000.00
34
6" Water Main Deflection
1
EA
$3,500.00
$3,500.00
35
8" Water Main Deflection
1
EA
$4,900.00
$4,900.00
36
4" Force Main Deflection
1
EA
$2,000.00
$2,000.00
37
10" Force Main Deflection
1
EA
$6,500.00
$6,500.00
38
Miscellaneous Contingencies Allowance
1
EA
$20,000.00
$20,000.00
Total Bid
$624,882.50
r
'.
!D.BrAi-t ` iSon, P.E
I`lorida Reg:No. 7061f
Packet Page - 1175 -
ft',I-
f; "t