Loading...
Agenda 10/28/2014 Item #16A 210/28/2014 16.A.2. EXECUTIVE SUMMARY Recommendation to approve final acceptance of the water and sewer utility facilities for Brightling at Talis Park, PL20120002875, and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the amount of $4,000 to the Project Engineer or the Developer's designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex- Officio Governing Board of the Collier County Water -Sewer District, approve final acceptance and unconditional conveyance of these water and sewer facilities and to release the Final Obligation Bond in the total amount of $4,000.00, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004 -31. CONSIDERATIONS: I ) The Developer of Brightling at Talis Park has constructed the water and sewer facilities within dedicated easements to serve this development. (See attached location map) 2) Preliminary acceptance of these utility facilities was approved by the Engineering Services staff on February 27, 2013. At that time, the value of these utility facilities (assets) was $65,591.76 for the water facilities and $67,148.16 for the sewer facilities. (See attached Asset Sheets) 3) Staff recorded all preliminary utility conveyance acceptance documents in the public records of Collier County, which were reviewed and approved by the County Attorney's office as to form and legality. 4) The water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Engineering Services staff on July 29, 2014 in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Staff recommends final acceptance of the subject utility facilities and to release the Final Obligation Bond in the amount $4,000.00. (See attached Exhibit A) 7) This final acceptance is in accordance with Collier County Ordinance No. 2004 -31, as amended. 8) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. However, approval of this Executive Summary will result in the Collier County Water- Packet Page -931- 10/28/2014 16.A.2. Sewer District receiving unconditional title to the utility facilities, which at the time of preliminary acceptance, had a total gross value of $132,739.92 (no depreciation applied). GROWTH MANAGEMENT IMPACT: Approval of this Executive Summary will have no growth management impact. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval. - SAS RECOMMENDATION: That the Board of County Commissioners, as Ex- Officio Governing Board of the Collier County Water -Sewer District, authorizes final acceptance of these water and sewer utility facilities for Brightling at Talis Park, PL20120002875, and authorizes the County Manager, or his designee, to release the Final Obligation Bond in the amount of $4,000.00 to the Project Engineer or the Developer's designated agent. Prepared by: Jodi Hughes, Associate Project Manager, Growth Management Division, Planning and Regulation Attachments: 1) Location Map, 2) Asset Sheet, 3) Exhibit A Packet Page -932- 10/28/2014 16.A.2. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.2. Item Summary: Recommendation to approve final acceptance of the water and sewer utility facilities for Brightling at Talis Park, P1-20120002875, and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the amount of $4,000 to the Project Engineer or the Developer's designated agent. Meeting Date: 10/28/2014 Prepared By Name: HughesJodi Title: Technician, Natural Resources 9/16/2014 6:46:56 AM Approved By Name: Steve Messner Title: Director - Water, Water Date: 9/16/2014 12:32:29 PM Name: PuigJudy Title: Operations Analyst, Community Development & Environmental Services Date: 9/19/2014 2:23:13 PM Name: KovenskyKenneth Title: Manager Financial & Operational Support, Operations & Regulatory Management Date: 9/20/2014 5:32:51 PM Name: NagySteve Title: Manager - Wastewater Collection, Wastewater Date: 9/22/2014 3:11:33 PM Name: McKennaJack Title: Manager - Engineering Review Services, Natural Resources Date: 9/23/2014 1:41:32 PM Name: JohnssenBeth Title: Director - Wastewater, Wastewater Packet Page -933- 10/28/2014 16.A.2. Date: 9/30/2014 11:05:44 AM Name: Pam Libby Title: Manager - Water Distribution & Wellfield, Water Date: 10/3/2014 8:06:08 AM Name: SunyakMark Title: Project Manager, Principal, Public Utilities Engineering Date: 10/3/2014 1:40:34 PM Name: ChmelikTom Title: Director - Public Utilities Engineering, Public Utilities Engineering Date: 10/8/2014 11:02:28 AM Name: StoneScott Title: Assistant County Attorney, CAO Land Use/Transportation Date: 10/8/2014 1:39:04 PM Name: MarcellaJeanne Title: Executive Secretary, Transportation Planning Date: 10/13/2014 9:09:10 AM Name: FinnEd Title: Management/Budget Analyst, Senior, Transportation Engineering & Construction Management Date: 10/14/2014 9:25:19 AM Name: IsacksonMark Title: Director -Corp Financial and Mngmt Svs, Office of Management & Budget Date: 10/15/2014 1:05:48 PM Name: KlatzkowJeff Title: County Attorney, Date: 10/15/2014 2:37:06 PM Name: DurhamTim Title: Executive Manager of Corp Business Ops, Date: 10/18/2014 5:02:12 PM Packet Page -934- 10/28/2014 16.A.2. I v ■ v �r � 1 Q W cn a J Q TIJC Ol lOM / 7 'Q^^ V Z J I= V iket Pa e -935- ■ S�s m LL Q z 0 F— Q U O °Sm m SCg 9�3 88 rc .. ONVI3Y108 Ntl'JOl O pp Nis N3Y if m n It 11 g atvisauw 3� I �gggm I��, pp aa C LIVING$TO N 0.d.D 4Il1y]II11 C �CCCC �a NlJR3d C F- Z I nr. yq5 �ayY lip W it �5 E OYOa NOISVNINI O I oroa �I+mnraaoarry uoona lip 0 a 0 t �� � q na 72 Ontl Yrypet3LL31000� n OYOY 3L1] =1» n 31DY OJC iket Pa e -935- ■ S�s m LL Q z 0 F— Q U O 10/28/2014 16.A.2. MON OF CONTRIBUTORY ASSETS - COUNTY PROJECT NAME: Brightiing at Talis Park a LOCATION: Section 12, Township 48S, Range 2SE COLLIER COUNTY FLORIDA NAME & ADDRESS OF OWNER: KE Talis Park Properties 16980 Livingston Rd. Naples, FL 34110 TYPE OF UTILITY SYSTEM: POTABLE WATER (MATERIALS ONLY) ITEM QUAN. UNIT COST TOTAL 8" DR -18 488 a LF $11.63 $5,675.44 10" DR -18 2,304 LF $14.58 $33,592.32 8" Gate Valve 1 EA $913.00 $913.00 10" Gate Valve 3 EA $1,347.00 $4,041.00 Air Release Valve 1 EA $827.00 $827.00 Permanent Sample Point 1 EA $960.00 $960.00 Fire Hydrant 5 EA s $2,555.00 $12,775.00 Single Water Service 5 EA $292.00 $1,460.00 Double Water Service 14 EA ' $382.00 $5,348.00 TOTAL COST $65,591.76 I do hereby certify that the quantities of material described above are a true and accurate representation of the system being contributed to Collier County Utilities, Inc. CERTIFYING: Jeremy Arnold, P.E. FL License # 66421 OF: WALDROP ENGINEERING 28100 Bonita Grande Dr. Naples, FL 34109 i I do hereby certify that the quantities of material described above are true and an accurate representation of the as- installed system. CERTIFYING: OF: Guymann Construction Inc. 305 SW 3rd St. Cape Coral, FL 33991 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The forego in t ent was sig and ack re nee t#�is� 'day ofJ �l �i. � �} er Notary Public State of Florida 20 b f � C'c C S " , o is ersonall kPown to and who did Keiji S Sullivan Y Personally -�r►le my Commission EE076714 take an oath. add Expires 09112!2013 1 r. SEAL: —� Packet Page -936- 10/28/2014 16.A.2. CERTIFICATION OF CONTRIBUTORY!! ASSETS - COUNTY PROJECT NAME: Brightling at Talis Park LOCATION: Section 12, Township 48S, Range 2SE RIDA COLLIER COUNTY FLO NAME & ADDRESS OF OWNER: KE Talis Park Properties 16980 Livingston Rd. Naples, FL 34110 TYPE OF UTILITY SYSTEM: SANITARY SEWER (MATERIALS ONLY) TOTAL ITEM QUAN. UNIT COST MANHOLE 6 EA $3,992.08 $23,952.48 SINGLE SANITARY SERVICE 3 EA $280.00 $840.00 DOUBLE SANITARY SERVICE 15 EA $290.00 $4,350.00 SINGLE CLEANOUT 1 EA $75.00 $75.00 8" SDR -26 1,863 LF $20.36 $37,930.68 TOTALICOST $67,148.16 I do hereby certify that the quantities of material described above are a true and accurate representation of the system being contributed to Collier County Utilities, Inc. CERTIFYING: Jeremy Arnold, P.E. FL License # 66421 OF: WALDROP ENGINEERING 28100 Bonita Grande Dr. Naples, FL 34109 I do hereby certify that the quantities of material described above are true and an accurate representation of the as- installed system. CERTIFYING: OF: Guymann Construction Inc. 305 SW 3rd St. Cape Coral, FL 33991 STATE OF FLORIDA SS: COUNTY OF COLLIER ) Th foregoip� instrument was signed and acknowledged before me this day of kla'l' ,. by _ who did not take an oath. yA� Ndsry Public Stets of Florida K+lli S an Corr EE0T5714 p� EVjM;l09112/2013 Packet Page -937- 10/28/2014 16.A.2. Exhibit A .. Utilities Performance Security (UPS) and Final Obligation Bond Brightling at Talis Park The 10% UPS Bond, if applicable, is based on the total amount of the water and /or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of 'Materials, not labor and are based on the assets of which the county will be owning and iinaintaining. Final Obligation Bond, if applicable, irraccordance with Utility Ordinance 2004 -31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment Packet Page -938- Amount Receipt Number 10% UPS Bond w /Plat N/A Final Obligation Bond $4,00j.00 2013098817 Total Amount $4,000.00 The 10% UPS Bond, if applicable, is based on the total amount of the water and /or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of 'Materials, not labor and are based on the assets of which the county will be owning and iinaintaining. Final Obligation Bond, if applicable, irraccordance with Utility Ordinance 2004 -31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment Packet Page -938- 10/28/2014 16.A.2. VERIFICATION OF FINAL COST - COUNTY PROJECT NAME: Brightiing at Talis Park LOCATION: Section 12, Township 48S, Range 2SE COLLIER COUNTY FLORIDA NAME & ADDRESS OF OWNER: KE Talis Park Properties 16980 Livingston Rd. Naples, FL 34110 TYPE OF UTILITY SYSTEM: POTABLE WATER (MATERIALS AND ITEM QUAN. UNIT COST TOTAL 8" DR -18 488 LF $19.63 $9,579.44 10" DR -18 2,304 LF $22.58 $52,024.32 8" Gate Valve 1 EA $1,313.00 $1,313.00 10" Gate Valve 3 EA $1,797.00 $5,391.00 Air Release Valve 1 EA $1,327.00 $1,327.00 Permanent Sample Point 1 EA $1,560.00 $1,560.00 Fire Hydrant 5 EA $3,305.00 $16,525.00 , Single Water Service 5 EA i $517.00 $2,585.00 Double Water Service 14 EA $632.00 $8,848.00 TOTAL COST $99,152.76 I do hereby certify that the quantities of material and services described above are a true and accurate representation of the system being contributed to Collier County Utilities, Inc CERTIFYING: Jeremy Arnold, P.E. FL License # 66421 OF: WALDROP ENGINEERING 28100 Bonita Grande Dr. Naples, FL 34109 I do hereby certify that the quantities of material described above are true and an accurate representation of the as- installed system. CERTIFY[NG: OF: Guymann Construction Inc. 305 SW 3rd St. Cape Coral, FL 33991 STATE OF FLORIDA ) SS: COUNTY OF COLLIER) of Florid* �rx +u�, NotRrY Public Sbte 'h Kell! S SUI8 MEE075714 l` The f regoin�j fi.) ent was sig�need and acknowledged before me this day o$ My c 20 by �b �� C wt who is personallt known to me and who did a �� ExP" o not tal fi oath SEAL: Packet Page -939- N 10/28/201416.A.2. VERIFICATION OF FINAL COST COUNTY PROJECT NAME: Brightling at Talis Park LOCATION: Section 12, Township 48S, Range 25E COLLIER COUNTY FLORIDA C NAME & ADDRESS OF OWNER: KE Talis Park Properties' 16980 Livingston Rd. Naples, FL 34110 TYPE OF UTILITY SYSTEM: SANITARY SEWER (MATERIALS AND LABOR) ITEM QUAN. UNIT COST TOTAL � MANHOLE 6 EA! $4,913.86 $29,483.16 SINGLE SANITARY SERVICE 3 EA` $420.59 $1,261.77 DOUBLE SANITARY SERVICE 15 EA' $432.50 $6,487.50 SINGLE CLEANOUT 1 EA $99.20 $99.20 8" SDR -26 1,863 LF `• $52.18 $97,211.34 TOTAL COST $134,542.97 I do hereby certify that the quantities of material and services described above are a true and accurate representation of the system being contributed to Collier County Utilities, Inc CERTIFYING: Jeremy Arnold, P.E. FL License» 66421 OF: WALDROP ENGINEERING 28100 Bonita Grande Dr. Naples, FL 34109 I do hereby certify that the quantities of material described above are true and an accurate representation of the as- installed system. CERTIFYING: OF: Guymann Construction Inc. 305 SW 3rd St. Cape Coral, FL 33991 STATE OF FLORIDA ) ) S5: COUNTY OF COLLIER) ''_qq._ The forego' g instru ant was signed and acknowledged! before me this �Zf tlay of 1 20L 7iby S f �� who i -d n0 a v Notary Publio Stets of Floods �S%fi S Sullivan ,mmission EE075714 Exo s 09112fY013 Packet Page -940- 10/28/2014 16.A.2. Growth Management Division 2800 Horseshoe Drive N. Co*erc-louvity Naples, FL 34104 239- 252 - 2400 r Receipt Number: Transaction Number: Date Paid: Amount Due: Payment Details: Amount Paid: hange / Overage: ontact: FEE DETAILS: F�gDescd2tion Refundable Bonds Cashier Name: Batch Number: Entered By: RECEIPT OF PAYMENT 2013098817 2013-001700 01/15/2013 $4,000.00 Payment t4eth2# Check Amount Pa id =heck Number $4,000.00 74501306 $4,000.00 $0.00 KE TALIS PARK PROPERTIES LLC 4500 PGA BLVD s*rE 400 PALM BCH GDNS ` , FL 33418 Reference, umbgr Original Ess PL20120002875 $4,000.00 LeaDerence 2912 hughes^j Packet Page -941- Amount GL Account Pi $4,000.00 670 - 000000 - 220113