Loading...
Agenda 10/28/2014 Item #16A 110/28/2014 16.A.1. EXECUTIVE SUMMARY Recommendation to approve final acceptance of the water and sewer utility facilities for Fairgrove at Talis Park PL20120001256 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the amount of $4,000 to the Project Engineer or the Developer's designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex- Officio Governing Board of the Collier County Water -Sewer District, approve final acceptance and unconditional conveyance of these water and sewer facilities and to release the Final Obligation Bond in the amount of $4,000.00, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004 -31. CONSIDERATIONS: 1) The Developer of Fairgrove at Talis Park has constructed the water and sewer facilities within dedicated easements to serve this development. (See attached Location Map) 2) Preliminary acceptance of these utility facilities was approved by the Engineering Services staff on September 20, 2012. At that time, the value of these utility facilities (assets) was $61,921.26 for the water facilities and $201,831.93 for the sewer facilities. (See attached Asset Sheets) 3) Staff recorded all preliminary utility conveyance acceptance documents in the public records of Collier County, which were reviewed and approved by the County Attorney's office as to form and legality. 4) The water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Engineering Services staff on July 24, 2014 in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Staff recommends final acceptance of the subject utility facilities and to release the Final Obligation Bond in the amount of $4,000.00. (See attached Exhibit A) 7) This final acceptance is in accordance with Collier County Ordinance No. 2004 -31, as amended. 8) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. However, approval of this Executive Summary will result in the Collier County Water- Packet Page -917- 10/28/2014 16.A.1. Sewer District receiving unconditional title to the utility facilities, which at the time of preliminary acceptance, had a total gross value of $263,753.19 (no depreciation applied). GROWTH MANAGEMENT IMPACT: Approval of this Executive Summary will have no growth management impact. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval. - SAS RECOMMENDATION: That the Board of County Commissioners, as Ex- Officio Governing Board of the Collier County Water -Sewer District, authorizes final acceptance of these water and sewer utility facilities for Fairgrove at Talis Park, PL20120001256, and authorizes the County Manager, or his designee, to release Final Obligation Bond in the amount of $4,000.00 to the Project Engineer or the Developer's designated agent. Prepared by: Jodi Hughes, Associate Project Manager, Growth Management Division Attachments: 1) Location Map; 2) Asset Sheet; and 3) Exhibit A Packet Page -918- 10/28/2014 16.A.1. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.1. Item Summary: Recommendation to approve final acceptance of the water and sewer utility facilities for Fairgrove at Talis Park PL20120001256 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the amount of $4,000 to the Project Engineer or the Developer's designated agent. Meeting Date: 10/28/2014 Prepared By Name: HughesJodi Title: Technician, Natural Resources 9/15/2014 8:07:25 AM Approved By Name: Steve Messner Title: Director - Water, Water Date: 9/16/2014 12:31:58 PM Name: KovenskyKenneth Title: Manager Financial & Operational Support, Operations & Regulatory Management Date: 9/20/2014 5:23:17 PM Name: NagySteve Title: Manager - Wastewater Collection, Wastewater Date: 9/22/2014 3:l 1:12 PM Name: McKennaJack Title: Manager - Engineering Review Services, Natural Resources Date: 9/23/2014 1:41:22 PM Name: PuigJudy Title: Operations Analyst, Community Development & Environmental Services Date: 9/26/2014 9:48:27 AM Name: JohnssenBeth Title: Director - Wastewater, Wastewater Packet Page -919- 10/28/2014 16.A.1. Date: 9/30/2014 11:04:42 AM Name: Pam Libby Title: Manager - Water Distribution & Wellfield, Water Date: 10/3/2014 8:05:50 AM Name: SunyakMark Title: Project Manager, Principal, Public Utilities Engineering Date: 10/3/2014 1:43:38 PM Name: ChmelikTom Title: Director - Public Utilities Engineering, Public Utilities Engineering Date: 10/8/2014 11:02:15 AM Name: StoneScott Title: Assistant County Attorney, CAO Land Use/Transportation Date: 10/8/2014 1:38:21 PM Name: MarcellaJeanne Title: Executive Secretary, Transportation Planning Date: 10/13/2014 9:08:55 AM Name: FinnEd Title: Management/Budget Analyst, Senior, Transportation Engineering & Construction Management Date: 10/14/2014 9:24:51 AM Name: IsacksonMark Title: Director -Corp Financial and Mngmt Svs, Office of Management & Budget Date: 10/15/2014 1:04:56 PM Name: KlatzkowJeff Title: County Attorney, Date: 10/15/2014 2:36:51 PM Name: DurhamTim Title: Executive Manager of Corp Business Ops, Date: 10/20/2014 8:19:57 AM Packet Page -920- CAMO 06OW -IT tSS R 3N.1 V GVN Nmsown mw 10/28/2014 16.A.1. 1 21101 I ; 1p; og log tl wo H gad CAMO 06OW -IT tSS R 3N.1 V GVN Nmsown mw 10/28/2014 16.A.1. 1 21101 LU to CL CQ z 0 C) 0 -.j Y fY a. O LL I ; 1p; og log tl H gad jig gg ��y�NaSTON POLO a w3aw oil RC 0 0 CL a 21�1 �111!g O;b Packet Page -921-jg 3WW M LU to CL CQ z 0 C) 0 -.j Y fY a. O LL • 10/28/2014 16.A.1. Certification of Contributory Assets PROJECT NAME: FAIRGROVE AT TALIS PARK LOCATION: Section 12 Township 48S Range 25E NAME AND ADDRESS OF OWNER: KE Talis Park Properties 16980 Livingston Rd. Naples, FL 34110 TYPE OF UTILITY SYSTEM: Water (Material IDnly) TYPE OF UTILITY SYSTEM: POTABLE WATER (EXISTING) ITEM SIZE QUAINT. UNIT COST TOTAL PVC Pipe 10" 2284 LF $ 14.58 $ 33,300.72 Gate Valve 10" 3 ' EA $ 1,347.00 $ 4,041.00 Fire Hydrant $162.00 5 EA $ 2,555.00 $ 12,775.00 EA TOTAL $ 50,116.72 -cxrsung mtrastructure constructed oy previous developer and contractor. `Unit pricing based on market price as of June 2012, I do hereby certify that the quantities of material described above are a true and accurate representation of the as- installed cost of the system. CERTIFYING: OF: Guymann Construction of Florida, Inc. Packet Page -922- TYPE OF UTILITY SYSTEM: POTABLE WATER ITEM SIZE QUANT. UNIT COST TOTAL PVC Pipe 10" 278 LF $ 21.43 $ 5,957.54 Single Water Service 6'• EA $162.00 $ 972.00 Double Water Service IT EA $375.00 $ 4,875.00 TOTAL $ 11,804.54 I do hereby certify that the quantities of material described above are a true and accurate representation of the as- installed cost of the system. CERTIFYING: OF: Guymann Construction of Florida, Inc. Packet Page -922- /Mt�. 10/28/201416.A.1. STATE OF FLORIDA ) 6 SS: s COUNTY OF COLLIER) The fore signed and acknowledged before me this �'� day of�l 2012 by ho is personally know to m and who did{not take an oath. Keo Li--- SEAL: LNaery Pubib Stets d 1`10*1s Kell+ S Sullivan � My Commisebn EE0757'14 � EM._ 09/12f2013 Packet Page -923- 10/28/2014 16.A.1. Certification 6f Contributory Assets PROJECT NAME: FAIRGROVE AT TALIS PARK LOCATION: Section 12 Township 48S Range 25E NAME AND ADDRESS OF OWNER: KE TaliS Park Properties 16980 Livingston Rd. Naples, FL 34110 TYPE OF UTILITY SYSTEM: Sanitary Sewer (Material Only) TYPE OF UTILITY SYSTEM: SANITARY SEWER (EXISTING) ITEM SIZE QUANT. UNIT COST TOTAL Sanitary Sewer 8" 2511 LF $ 20.35 $ ! 51,098.85 Force Main 4" ` 506 LF $ 8.52 $ 4,311.12 Sanitary Sewer Service 6" ` 18 EA $ 280.00 $ 5,040.00 Manhole (0/6) 23 1 EA $2,066.00 $ 2,066.00 Manhole (6/8) 2 1 EA $3,059.00 $ 3,059.00 Manhole (8/10) 1 3 EA $3,668.00 $ 11,004.00 Manhole (10/12) $ 105,573.96 1 EA $4,282.00 $ 4,282.00 Manhole (12/14) 2 EA $4,892.00 $ 9,784.00 Manhole (14/16) 1 EA $5,613.00 $ 5,613.00 TOTAL $ 96,257.97 - txisting infrastructure constructed by previous developer and contractor. `Unit pricing based on market price as of June 2012. TYPE OF UTILITY SYSTEM: SANITARY SEWER ITEM SIZE` QUANT. UNIT COST TOTAL Single Sewer Service 6" : 1 EA $441.00 $ 441.00 Double Sewer Service 6" . 1 EA $523.00 $ 523.00 Modification to Existing Laterals 6" 18 EA $113.00 $ 2,034.00 Force Main 4" 23 LF $ 6.52 $ 149.96 Cleanouts 2 EA $ 77.00 $ 154.00 Lift Station 1 EA $ 102,272.00 $ 102,272.00 TOTAL $ 105,573.96 I do hereby certify that the quantities of material described above are a true and accurate representation of the as- installed cost of the System. CERTIFYING: ;�Iv OF: Guymann Construction of Florida, Inc. Packet Page -924- i r 10/28/201416.A.1. STATE OF FLORIDA ) COUNTY OF COLLIER) The foregoing instr ument was signed and acknowledged before me this 1.x.2 -_ dayofJ� 2012 by ho is personally know —t&jne and who did not take an oath. N S L �... Nola Pu Kem S SWiven a' as f oy'0 0° �E3075714 °s Packet Page -925- 10/28/2014 16.A.1. Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond Fairgrove at Talis Park Amount Receipt Number 10% UPS Bond Final Obligation Bond w /plat $4,OO i 2012068289 Total Amount $4,00000 k The 10% UPS Bond, if applicable, is based on the total amount of the water and /or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004 -31 Attachments: I. Verification of Final Cost 2. Receipt of Payment cket Page -926- i 10/28/201416.A.1. VERIFICATION OF FINAL COST PROJECT NAME: FAIRGROVE AT TALCS PARK LOCATION: Section 12 Township 48S Mange 25E NAME AND ADDRESS OF OWNER: KE Tak, Park Properties 16980 4ivingston Rd. Naples,:jFL 34110 ti TYPE OF UTILITY SYSTEM: Water (Material and Labor) TYPE OF UTILITY SYSTEM: POTABLE WATER (EXISTING) ITEM SIZE QuANT. UNIT COST TOTAL PVC Pipe 10" 2284 LF $ 22.58 $ 51,572.72 Gate Valve 10" Single Water Service EA $ 1,797.00 $ 5,391.00 Fire Hydrant $ 4,194.00 S EA $ 3,305.00 $ 16,525.00 $1,033.00 TOTAL $ 73,488.72 *Existing infrastructure constructed by previous developer and contract6r. h *Unit pricing based on market price as of June 2612. I do hereby certify that the quantities of material and services described above are a true and accurate representation of the as- installed cost of the system. CERTIFYIN �:,, r OF: GWMANN CGWMUCn0N OF FLORIDA, k& 305 SW GRD SST STATE OF FLORIDA) CAPE CORM;, FL 33991 } SS: COUNTY OF COLLIER) he foregoing instrument wes- ' d acknowledged before me this 2!r� day of 4899 by w o is personally know tp me and who did not take an oath. ZtD (2 �40 ►ty Notary PuUie StAte of Florida p Keili S Sullivan a�J` -"' SE L�`t� Ere Commission 1 E3075714 Di t� Packet Page -927- TYPE OF UTILITY SYSTEM: POTABLE WATER ITEM SIZE QUANT. UNIT COST TOTAL PVC Pipe 10" 218 LF $ 31.43 $ 8,737.54 Single Water Service EA $699.00 $ 4,194.00 Double Water Service 1s EA $1,033.00 $ 13,429.00 TOTAL $ 26,360.54 I do hereby certify that the quantities of material and services described above are a true and accurate representation of the as- installed cost of the system. CERTIFYIN �:,, r OF: GWMANN CGWMUCn0N OF FLORIDA, k& 305 SW GRD SST STATE OF FLORIDA) CAPE CORM;, FL 33991 } SS: COUNTY OF COLLIER) he foregoing instrument wes- ' d acknowledged before me this 2!r� day of 4899 by w o is personally know tp me and who did not take an oath. ZtD (2 �40 ►ty Notary PuUie StAte of Florida p Keili S Sullivan a�J` -"' SE L�`t� Ere Commission 1 E3075714 Di t� Packet Page -927- 10/28/2014 16.A.1. VERIFICATION OF FINAL COST PROJECT NAME: FAIRGROVE AT TALIS PARK LOCATION: Section 12 Township 48S Range 25E NAME AND ADDRESS OF OWNER: KE Talis�Park Properties 16980 Uvingston Rd. Naples, FL 34110 TYPE OF UTILITY SYSTEM: Sanitary Sewer (Material and Labor) TYPE OF- UTILITY SYSTEM: SANITARY SEWER (EXISTING) ITEM SIZE QUANT. UNIT COST TOTAL Sanitary Sewer 8" 2511 LF $ 52.18 $ 131,023.98 Force Main 4" 1 506 LF $ 16.52 $ 8,359.12 Sanitary Sewer Service 6" a 18 EA $ 430.51 $ 7,749.18 Manhole (0/6) 23 1 EA $2,252.89 $ 2,252.89 Manhole (6/8) f 1 EA $3,316.25 $ 3,316.25 Manhole (8/10) 1 3 EA $4,370.87 $ 13,112.61 Manhole (10/12) $ 145,282.36 1 EA $5,429.87 $ 5,429.87 Manhole (12/14) 2 EA $6,484.90 $ 12,969.80 Manhole (14/16) 1 EA $7,628.40 $ 7,628.40 TOTAL $ 191,842.10 Y F- 1.11U dLLUF *Quantities provided by the engineer of record `Unit pricing based on market price as of June 2012 TYPE OF UTILITY SYSTEM: PROPOSED SANITARY SEWER ITEM SIZE QUANT. UNIT COST TOTAL Single Sewer Service 6" 1 EA $1,154.00 $ 1,154.00 Double Sewer Service 6" 1 EA $1,286.00 $ 1,286.00 Modification to Existing Laterals 6" 18 EA $494.00 $ 8,892.00 Force Main 4" 23 LF $ 16.52 $ 379.96 Cleanouts 2 EA $ 99.20 $ 198.40 Lift Station 1 EA $ 133,372.00 $ 133,372.00 TOTAL $ 145,282.36 �l do hereby certify that the quantities of material, and services described above are a true and accurate representation of the as- installed Bost of the system CERTIFYING: p OF: (MANN Ca,, uC . OF Flop, W- 305 SW 3PD SCI W CAPE Cma. FL 33991 Packet Paize -928- 10/28/2014 16.A.1. STATE OF FLORIDA ) ' ) SS: COUNTY OF COLLIER) The foregoing instrument was signed and acknowledged before me this2day o "2012 by who is personally know to me and who did not take an oath. m SEAL: NOWY Public State d Florida KsIN S Sulkm 4_ y $ My commis i EE075714 Or 5"v Ex*** 0911212015 F i i Packet Page -929- Receipt Number: Transaction Number: Date Paid: Amount Due: Payment Details: Amount Paid: Change / Overage: Contact: FEE DETAILS: Fee Description Refundable Bonds Cashier Name: Batch Number: Entered By: - 10/28/2014 16.A.1. i Growth Management Division 2800 Horseshoe Drive N. i Naples, FL 34104 239- 252 -2400 RECEIPTbF PAYMENT 6 A 2012068289 2012 - 017150 06/05/2012 $4,000.00 Payment Method Amount Paid Check $4,000.00 $4,000.00 $0.00 KE TALIS PARK PROPERTIES LLC 4500 PGA BLVD STE 400 PALM BCH GDNS , FL 33418 check Number 74500772 Reference Number Oriinai Amount GL Account Fee Paid PL20120001256 $4,000.00 $4,000.00 670- 000000 - 220113 EvelynTrimi no 2602 hughes_j Packet Page -930 -