Loading...
Agenda 09/09/2014 Item #16C8 9/9/2014 16.C.8. EXECUTIVE SUMMARY Recommendation to approve a $298,400 work order under Request For Quotation 14-6213-3 to Douglas N. Higgins, Inc., to replace the Pigging Receiver Station at the South County Regional Water Treatment Plant,Project No.70030. OBJECTIVE: To maintain a reliable treatment process to meet the potable water demand, and remain in compliance with all regulatory requirements at the South County Regional Water Treatment Plant (SCRWTP),which serves customers throughout the Collier County water service area. CONSIDERATIONS: The proposed scope of work under Project No. 70030, "SRO Wellfield Restoration" is consistent with the Capital Improvement Program (CIP) contained in the Water, Wastewater,Irrigation Quality Water,and Bulk Potable Water User Rate Study approved by the Board of County Commissioners (Board) on June 10, 2014, as Agenda Item 11C. Funding for project 70030 is available in,and is consistent with,the FY2014 CIP Budget. The Water Department utilizes "pigs," or swabs, to periodically clean the insides of pipes. Typically, a pig, constructed of wrapped flexible polyurethane foam, is launched into a pipe and removed downstream at a pigging receiver station, along with any sediment or debris that was dislodged by the pig. The scope of this project includes the replacement of the pigging receiver station at the SCRWTP which is used as part of the reverse osmosis wellfield pipeline cleaning process. The existing nine-year-old equipment has reached the end of its useful life due to the highly corrosive brackish water conditions. Request for Quotation 14-6213-3,"SCRWTP Upgrades to Pigging Station,"was posted on July 10, 2014, and distributed to all vendors under the Fixed-Term Underground Utilities Contract 14-6213 (for treatment facilities) via the county's electronic quote process. All four vendors submitted quotations by the August 4,2014,deadline. The quotations received are summarized below. VENDOR QUOTE Douglas N Higgins,Inc. $298,400 Quality Enterprises USA,Inc. $372,772 Haskins,Inc. $428,593 Mitchell&Stark Construction Co.,Inc. $448,115 Staff and local engineering consultant, CDM Smith, Inc., determined the lowest quote is fair and reasonable, and recommend awarding the work order to Douglas N. Higgins, Inc. The quote is approximately one percent below the project consultant's $300,000 cost estimate. The Purchasing Department concluded that the quote was competitive and representative of market conditions.The quote summary, chart, engineer's letter of recommendation, and work order are attached (Attachments 1, 2, 3, and 4,respectively). The request for proposal informed the respondents there may be unforeseen conditions associated with the project. The solicitation incorporated an allowance of $4,000 that included, but was not limited to, unforeseen underground infrastructure which may be encountered during construction. The price for any additional work that would utilize this allowance shall be negotiated prior to commencement in accordance with the county's Purchasing Ordinance and the terms of the agreement. /"1 Packet Page-1613- 9/9/2014 16.C.8. FISCAL IMPACT: Funding is available in,and is consistent with,the FY14 capital budget approved by the Board on September 19,2013.Funds are available in the Water User Fee Fund(412).The total capital cost to implement this project is $298,400. This is a replacement project; therefore, operating costs are not expected to change. LEGAL CONSIDERATIONS: This item is approved as to form and legality,and requires majority vote for Board approval.—SRT GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: That the Board of County Commissioners, Ex-officio the Governing Board of the Collier County Water-Sewer District,approve a$298,400 work order under Request for Quotation 14- 6213-3 to Douglas N. Higgins, Inc.; and authorize the Chairman to sign and execute the attached work order after final review and approval by the County Attorney's Office. Prepared By:Alicia Abbott,Project Manager,Public Utilities Planning&Project Management Attachments: Attachment 1 Quote Summary Attachment 2 Chart Attachment 3 Recommendation Letter Attachment 4 Work Order Packet Page-1614- 9/9/2014 16.C.8. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.C.16.C.8. Item Summary: Recommendation to approve a $298,400 work order under Request For Quotation 14-6213-3 to Douglas N. Higgins, Inc., to replace the Pigging Receiver Station at the South County Regional Water Treatment Plant, Project No. 70030. Meeting Date: 9/9/2014 Prepared By Name: Abbott Alicia Title: Project Manager,Public Utilities Engineering 8/18/2014 11:59:50 AM Submitted by Title:Project Manager, Public Utilities Engineering Name: AbbottAlicia 8/18/2014 11:59:51 AM Approved By Name: Steve Messner Title:Director-Water, Water Date: 8/18/2014 2:03:00 PM Name: HapkeMargie Title:Recycling Coordinator, Solid&Hazardous Waste Management Date: 8/18/2014 2:11:59 PM Name: JacobsSusan Title: Operations Analyst,Public Utilities Division Date: 8/18/2014 2:24:38 PM Name: randy Lewis Title:Plant Manager, Water Date: 8/18/2014 3:14:48 PM Packet Page-1615- 9/9/2014 16.C.8. Name: SunyakMark Title:Project Manager,Principal,Public Utilities Engineering Date: 8/18/2014 4:04:12 PM Name: Pam Libby Title: Manager-Water Distribution&Wellfield, Water Date: 8/19/2014 6:49:22 AM Name: JohnsonScott Title:Manager-Procurement,Purchasing&General Services Date: 8/19/2014 9:05:25 AM Name: HallSwainson Title:Procurement Specialist,Purchasing&General Services Date: 8/19/2014 9:56:22 AM Name: ChmelikTom Title: Director-Public Utilities Engineering,Public Utilities Engineering Date: 8/19/2014 11:02:01 AM Name: MarkiewiczJoanne Title:Director-Purchasing/General Services,Purchasing&General Services Date: 8/19/2014 11:44:34 AM Name: ZautckeLaura Title:Management/Budget Analyst, Senior,Utilities Finance Operations Date: 8/20/2014 11:22:11 AM Name: TeachScott Title:Deputy County Attorney, County Attorney Date: 8/20/2014 1:45:38 PM Name: YilmazGeorge Title:Administrator-Public Utilities,Public Utilities Division Date: 8/25/2014 10:34:00 AM Name: KlatzkowJeff Title: County Attorney, Date: 8/26/2014 3:32:18 PM Name: UsherSusan Title:Management/Budget Analyst, Senior,Office of Management&Budget Date: 8/28/2014 5:04:00 PM Packet Page-1616- 9/9/2014 16.C.8. Name: UsherSusan Title:Management/Budget Analyst, Senior, Office of Management&Budget Date: 8/28/2014 5:04:11 PM Name: OchsLeo Title: County Manager,County Managers Office Date: 8/30/2014 1:01:33 PM Packet Page -1617- 9/9/2014 16.C.8. E 2 2 2 o O O O 0 N O 00 § 2 N O O O O O 0 0 0 D Q 0 0 O O 0 0 + V ° ° U a U e • e H a O E w w w p L ° ry Ku O E E E E - E a• o o o V U O a E E E E Em E 3 3 3 3 2 C O O O O O O O m Op O 0 ° O Ooi O m ^ N O E O ll] e Q w a. co u w N w w w w 0 °o °o °o � o °o O N ° O < C W U n ^ • g g a O w w w w w w ma a l a E E E E -- E a w •C (n y fq tl) U) m ~O 3 3 3 3 3 z.f • tG O O O b O N E = < N o O Q cn N W K M M O O O O O O O O O O g G O E N E G N W O O W .d.. U Ot O N to O N O W = O 0 m n - c) d o_ E E E E - E y a ▪ (o co (o a'1 ° fA m O E E E > E E 3 3 3 3 3 2 ° O O E O O O O O O 0 O O O O° Q m ry N N w w N °o o °o, E °o °o - -- 0 0°o o ° ° O O ° O O ° ■U 0 ° O O O O O ® U N N a M O E i Wa c m E E E E -- E a m a Cl) T. y U f G A m ° 0 6 to G m N E E E E E E m 3 3 3 3 3 R v c N o j m 1 6 o ff O o°y Q a t o m 0 o m E d ° `o n > = r7) G c u N o m m m _ a i ° m o > C b O Q g ? O O t Ip E E 0 • y L a .3 a = _ zo "A.y a o w m o E E y 3 m n § " � o � y a > m o— `o 0 3 y a > m o g 3 ° n m m Q ° o 0 M 5 N h d 3 d a w o o c m J c a °m o 0 ,� v — m o a a_, a E c o O LL « Packet Page -1618- 9/9/2014 16.0.8. Bid Results for RFQ 14-6213-3 SCRWTP Upgrades to Pigging Receiver Station $500,000 KEY: $450,000 Dashed Green- $400,000 AVERAGE BID $350,000 Dashed black- +/-1 std dev ——— ———— ofavgbid $300,000 Dotted red- $250,000 +/-20%of eng estimate for $200,000 horizontal min construction $150,000 $100,000 $50,000 MI$0 Eng Est Douglas N.Higgins Quality Enterprises Haskins Mitchell&Stark Packet Page-1619- 9/9/2014 16.C.8. CDM Smith 2180 W.First Street Suite 400 Fort Myers,Florida 33901 tel: 239 938-9600 fax: 239 339-6418 August 7,2014 Ms.Alicia Abbott Public Utilities Planning and Project Management Department 3339 Tamiami Trail East,Suite 303 Naples,FL 34112 Subject: RFQ#14-6213-3-SCRWTP Upgrades to Pigging Station Request for Quotation under Contract#14-6213 Low Quote Evaluation-Recommendation for Award Dear Ms.Abbott: On August 4, 2014, quotes were received by Collier County for the SCRWTP Upgrades to Pigging Station project. Four quotes were received and the apparent low quote was submitted by Douglas N. Higgins, Inc.in the amount of$298,400.00 for Base Schedule 1 and the identified project allowance ($4,000). The second low quote was submitted by Quality Enterprises USA,Inc.in the amount of$372,772.00. The quote tabulation summary is attached. CDM Smith has reviewed the quote submittal of the low bidder. The quoted price is less than one percent below the engineer's estimate of$300,000. Douglas N. Higgins, Inc.is on the County's Annual Contract for Underground Utility and General Contractors"and as such should be qualified to properly perform the work on this project. In summary,we believe that Douglas N.Higgins,Inc.is the lowest, responsive,responsible vendor and is qualified to perform the construction of the SCRWTP Upgrades to Pigging Station project. CDM Smith recommends that Collier County award the project for the total for Base Schedule 1,plus the project allowance. Should you have any questions or wish to discuss the quote further,please do not hesitate to call us. Respectfully, Jason A.Sciandra, P.E. Senior Project Manager CDM Smith Inc. ti Packet Page-1620-NMENT+TRANSPORTATION+ENERGY+FACILITIES I 9/9/2014 16.C.8. Y 0 p S S o o C O O 0 O O [) IS ' p pp 0 N 0 H S o in O CO Q F- < er of i- ll _ w w^ w X as S 0 S 0 S 0 0 w U P < R o N co E w w w h S Oo 8 S o S o 8 q o E m N g a n N N W 4- O y C IA Y H H 3 W O O S O S O O j 0 0 O Q th aD O O O C V pp m N 0 O O U ho In n N N N W N O S S S O o O S O N Q S 0 •N = 0 O V co O 8 ti r G t Q) In O a0 Q N Q) N N f9 N M w M .. V, C p W S S 0 0 0 O S >. 01 O 0 0 O CD 0 M CC O 0 O 73 U of V )f) to m V a 4, 2 3 p 2 2 N O 8 O 8 O 8 O 8 O O S O CO 0 0 O. y 0 0 o v 0 0 a T C Q o) T N 0 N N 3 Si .� w 4- w Vw ND Oi N • S o O 8 _ _ °o, 0. °o, 0 0 2 o S 0 8 c o 0 d L. • 0 00_ 0 0 Q 0 0 00 • Q Um C) N O V N V to �w w w d i w F- 7 W F- c U Tel W 0 • w O 0 LL U V Ill L E LL N _ > > > > 0 3 C a — Cl) CO CO Cl) U (n m •c m C n 4 O. O. .. 0 O N -.I• J J = ' J ~ 2 F H d O 8 a O m c c .0 isi N 0 8 c 0 a a O •N O D 1 N o 0 0 .E ° 5 o o 8 W C ) C o Q a N m Of 2.). N CV co CD vb V 7 N CI � W C) C N • > a j • O. 3 -c n >•v) m o o 0 m c° E axi rn m_ 0 > a > 3 m ■`0 0. g -- O c N d N N ; 3 5 C � O O N d C > >� U N f/) �\ O in O. N N a C N os y t @ 0 0 v = o x = 0 � m v v — d 0o , Cu 7 - ='S� cc b ° G 2US m O c as 8 m a 0 a E d N M v IC) O a — .0 LL 0 CC CO Packet Page-1621- i 9/9/2014 16.C.8. I P_F P 41,4-6213-3 / WORK ORDER/PURCHASE ORDER Contract 14-6213"Underground Utility Contractors" Contract Expiration Date:July 7,2016 v' This Work Order is for General Utility Contracting services for work known as: Project Name: RFQ#14-6213-3 SCRVVTP Upgrades to Pigging Station Project No: 70030.5 ✓' The work is specified in the proposal dated August 4,2014 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above. Request for. Quotation #14-6213 and Addendum 1, this Work Order/Purchase Order is assigned to Douglas N.Higgins,Inc. ✓ Scope of Work: As detailed in the attached proposal and the following: * Task I Mobilization/Demobilization * Task II Concrete Work(New pads,new supports and removal of supports) • Task III Backflow Preventer with adjustable Supports * Task IV Ductile Iron Pipe and Fittings * Task V 30"Gate Valves * Task VI Pig Receiver with 6"Plug Valve,2"ARV and 6"Disconnect * Task VII Project Allowance Schedule of Work: Complete work within 210 days from the date of the Notice to Proceed which is accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond the expiration date of Agreement# 14-6213 will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. ✓' Compensation: In accordance with the Areement.referenced above,the County will compensate the Firm in accordance with following method(s): ®Negotiated Lump Sum (NLS) ❑Lump Sum Plus Reimbursable Costs(LS+RC) EITime& Material(T&M) (established hourly rate—Schedule A) ❑ Cost Plus Fixed Fee (CPFF), (define which method will be used for which tasks) as provided in the attached proposal. Task I $ 9,000.00 LS ` Task II $ 29,000.00 LS Task III $ 12,000.00 LS Task IV $ 110,400.00 LS Task V $ 72,000.00 LS l Task VI $ 62,000.00 LS f Task VII $ 4.000.00 T&M 1` TOTAL FE / $ 298,400.00 LS &T&M t k,,0 gli PREPARED BY: * � t0: :; ' f U- Alicia Abbott,Project Manager Planning&Project Management Department Pagelof3 CDPacket Page-1622- 9/9/2014 16.C.8. R.FP#'14-6213-3 4 APPROVED BY: Mark J. Sun .E.,Principal Project Manager Date Planning&Proje anagement Department F-14 - 8 APPROVED BY -P.44)60 Randy L 4vis, SCRWTP Manager Date APPROVED BY . {.f.,r : ;I L-0 r PLibby,Water D} button Manager Date APPROVED BY Shilbq Steve Mes r irector Date j APPROVED BY: '(� 1"`,1 Toro Chmelik,P.E.,Director Date Plannibg 8 `Project Management Department APPROVED BY », �-----_'° -..._, ra /I/ ; Joe Betlitilities Operations Support Director Date APPROVED BY 97121-4. '6/ 644' L/i / ' f Swatnson:Hall,Procurement Strategist Date APPROVED BY: r=--� ,�. - /v t George Yilmaz,Public Utilities Administrator Data By the signature below, the Firm(including employees, officers and/or agents) certifies, and hereby discloses,that,to the best of their knowledge and belief, all relevant facts concerning past,present, or currently planned interest or activity (financial, contractual, organizational, or otherwise) which relates to the proposed work; and bear on whether the Firm has a potential conflict have been fully disclosed. Additionally, the Firm agrees to notify the Procurement Director, in writing within 48 hours of learning of any actual or potential.conflict of interest that arises during the Work Order and/or project duration. ACCEPTED BY: Do9,g1iggins.Ine,._.� Name&Title of Authorized Company Officer Date (Remainder ofpage intentionally left blank) Packet Page-1623- 9/9/2014 16.C.8. RFP 414-6213-3 IN WITNESS WHEREOF,the parties hereto, have each,respectively, by an authorized person or agent, have executed this Work Order on the date and year first written below. ATTEST: BOARD OF COUNTY COMMISSIONERS Dwight E. Brock, Clerk of Courts COLLIER COUNTY, FLORIDA By: By: Tom Henning,Chairman Dated: (SEAL) Name of Firm:Douglas N. Higgins,Inc. First Witness Signature 1'Type/print signature and titlel' TType/print witness name' L � Second Witness ._e/41 TTypeiprint witness namel` Approved as to Form and Legality: Assistant County Attorney Print Name C6) 0 Page 3 of 3 Packet Page-1624- 9/9/2014 16.C.8. t %t F L4z N yeas y,.a ry r t ex I.,3 .a� , L r f r'..,:.:,,:-.:-:.;;;': t 1( ! � g .mot. Y : 1� , . 'fu i f �'S REQUEST FOR Q–.,OI 'AflO]S'F;3 U�IE PROJECTS UNDER CONTRACTS '!4-6213 ' "Annual Contract for Urtd`erground Utiliti[+rs General Contractors" Date: July 10, 2414 ' From: Swainson Halt�,Pi entSt tegtst 2 7.�Rrer ,. 239-252-6334;.ftEtt `umber{ • Swainsbnfalt iii etrnet'i ti To: Prospective Vendors Sub- . RFQ#14.6213-3s=,SC�. gra,. ..a P.gins Station($300k) , As provided in the referenced contract, the Collier County Purchasing Department is soliciting quotes for the referenced project. RFQ Due Date: 4:OO PM 14/1:4 W, 1O tmAM7a( .4 z Pre-Quote Meeting SCRAP 3S5 to Drive - Q&A Deadline; 5:00 ptr� 4'4 180 days substa(l'al/30 days final/210 • Number of Days to Final Completion: total rt Plans gill!Specs: Yes _ ti' .'Damages: $1,520 per day Pa Performance Bonds Y Direct.tl at ai P rr�chase Nss:` x k; 3'rour qu r+tation r lnsefor this project is date no later"'han the date and tiinetsparafied abpve.We i any quotation r onse 3a tatx` to time and date.If your�rtn is unable to nicaliy,youi qu n,m the office of the.Purchasing Department at ti - _ , a'bo r''efeteenced ad ariret a?n ;d tte specified.We look forward to your on In this regaestfc* -4. i . ;r:',,,,,:,....on process• Douglas iogf no g.' : 130 ' 4 4 iif--- —_- g,` '• ...-r/Fax Number �. Signature . Regional Mart�fice President Title Brandy Bartolone ' 1. Print Name .,:.Date. C: Alicia Abbott,t'roject Nfamag-er RFQ 14-6213.3 • Packet Page -1625- 9/9/2014 16.0.8. L , t c v Q o 4 o u Q 0- '''''" r t'6 6% =7t- - - -vr -ys- - 'I k o cz t, o b a O O 0,: ' U o '--- _ . ' a ._ u: 4 ca i c .- t- r r- _ c- r N id■ ■ to t/S a Q A m a) C!) U1 � Cl) cu ' :#-�. _ 1.3 3 EE EEE Ecu — m ' -.1 —' —' U I t.) C 1 0 c � 0 o 4. ...i C C cTl'li� o c tr,' 0 a CD 13 t3 • c I a o > .- o o ca °> =' I E C ¢u �o u) Co >ft) a) 0) a C - Cu LL a < > -> ,w Cr;O C C 0.=' t1 : U3 _ • - _ • an 4 : Cu.a c) c � N C axj 3' N • to -- C D. o i n. = ? o � 1 o ` ■ c �. -"r-'-sa' a) Qccc f: , T c 3 0 u L�.. tr m` �r:.a m 0. r U CO n i j 0_'Q v v et C) * E - N c V. a .E r \"' t T t.-` r r u — N Packet Page -1626- 9/9/2014 16.C.8. Email: SwainsonNall@colliergov.net I C, lei' C014314Y Telephone: (239}252-8935 Adrrirtistretitigt SE feces Division FAX:(239)252-6334 Purcitasin ADDENDUM#1 Memorandum Date: July 29,2014 From: Swainson Hall,Procurement Strategist To: Potential Proposers Subject: Addendum#1 —RFQ#14-6213-3 SCRWTP Uporades to Pigging Station{$300k) The following clarifications are issued as an addendum identifying the following changes for the referenced solicitation: CHANGE: In the Specifications: 1.Specification No.4 on G-1 Replace paragraph as follows: °4 Flange adapters or like devices will not be permitted,All below grade piping shall be restrained mechanical joint and all above grade piping shad be.flanged.' 2.Specification No.6 on G-1 Add paragraph as follows: "For manual gear actuators on gate valves,manual operator input effort to the hand wheel shall be a ma)amum of 40 ft-lbs for operating the valve.from full open to full close, under an;t+conditions. Gear actuators shall indicate valve position and have adjustable stops. Maximum hand wheel size shall be 24-in diameter.' 3.Specification No.7 on G-1 Add paragraph as follows: "7.Contractor to install a 10-ft wide strip of Grout-Filled Rubble(Bank and Shore Protection)per FOOT Specification 530-2.2.1 from three feet beyond the ponds edge of bottom to three feet beyond the drip line of the discharge pipe. Grout must meet the follow specifications a.The groutfofthe riprap shall be afire aggregate concrete consisting of a mixture of Portland cement,fine,aggregate,and water proportioned and mixed as to provide a m ble sl pozzolan may be used with the pu pa slurry.AdtriixEures and/or approval of the Engineer. 1 Packet Page -1627- 9/9/2014 16.C.8. \ \ \ - - - ` - L5 78. ) 2 2 S \ § k } \ } } ) .c ; j/ _ r , _ ) u0). ƒ ) ` / 2� 3 3 3 \ = \ kk \ \ ®\ \ \ / \. E ] i • a-5 To"\ 0 } \ \ \ \ \ E. } _ � y/\ - , - , , - , _ / ) / // ) ` j 7! { { = { )/ \ \ g a k _ - . Lb N- • ` § )§ } } ! K k ' ® ® ƒ\ ) '8 ) ) ) ƒ ` ) :. 3 3 3 { = \ )k ! ,09 8 E a E k6,<Tc Rd, . _ ,. 4. Lb E f! _ , _ _ , , , _ ( Cl) f / ) , / :: 1. 3 3 3 \ = 3 Eco LI { ; )! B. 93 - : a ( . \/ \ t _ � � \ \ 2 f , \ ] } :) �� > : , a a o E : N m .. , m 2 Packet Page -1628-