Agenda 12/09/2014 Item #16C1 12/9/2014 16.C.1 . EXECUTIVE SUMMARY Recommendation to approve a Change Order in the amount of$42,627.50 and to add an additional 158 days to Contract 11-5708, "Construction Engineering and Inspection Services for Master Pumping Station 312 Rehabilitation,"with Q. Grady Minor,Project 72549. OBJECTIVE: To compensate engineering and inspection firm Q. Grady Minor (QGM) for additional inspection services, add additional contract time to match the construction time extensions, and allow engineering assistance during the construction warranty period. CONSIDERATIONS: The proposed scope of work under Project Number 72549, "Construction Engineering and Inspection Services for MPS 312 Rehabilitation," is consistent with the Capital Improvement Program (CIP) contained in the Water, Wastewater, Irrigation Quality Water, and Bulk Potable Water User Rate Study approved by the Board of County Commissioners (Board) on June 10, 2014, as Agenda Item 11C. Funding for Project Number 72549 is available in, and consistent with,the FY2015 CIP Budget. On July 24, 2012, as Agenda Item 16C6, the Board of County Commissioners (Board) approved a contract with QGM for construction engineering and inspection services for the Master Pumping Station (MPS) 312 Rehabilitation Project. These services commenced March 27, 2013, with an approved completion date of October 24, 2014. The corresponding construction project commenced March 27, 2013,with completion planned for March 27,2014. However, due to several unforeseen conditions in the field, the substantial and final completion dates were extended to March 6, 2014, and December 2, 2014, respectively. Some of the unforeseen conditions included an alternative fuel piping system to meet Collier County's Pollution Control Department standards; removal of the bypass system's piping and valves was delayed due to the inability to isolate the associated irrigation quality water main due to demand; and the odor control bioxide system delivery was delayed from the supplier. Due to the construction project's final completion date being extended, QGM's construction engineering, and inspection contract needs to be extended by 158 days for the additional inspection services and warranty assistance that is required, which shall be retroactive to the original contract expiration date of October 24, 2014. The additional inspection services result in an increase to the contract of$42,627.50, and an extension of the contract time to March 31, 2015. FISCAL IMPACT: Funding is available in, and is consistent with, the FY2015 Capital Budget approved by the Board on September 18, 2014. The source of funding is Wastewater User Fees, Fund(414). LEGAL CONSIDERATIONS: This item has been approved as to form and legality and requires a majority vote for Board approval. -ERP GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the viability of public facilities. RECOMMENDATIONS: That the Board of County Commissioners, Ex-officio the Governing Board of the Collier County Water-Sewer District, approve a Change Order in the amount of$42,627.50 and add an additional 158 days to Contract 11-5708, "Construction Engineering and Inspection Services for Master Pumping Station 312 Rehabilitation,"with Q. Grady Minor,Project 72549. Prepared by:Peter Schalt,Senior Project Manager,Public Utilities Planning and Project Management Department Attachment: Change Order Packet Page-1506- 12/9/2014 16.C.1 . COLLIER COUNTY Board of County Commissioners Item Number: 16.16.C.16.C.1. Item Summary: Recommendation to approve a Change Order in the amount of $42,627.50 and to add an additional 158 days to Contract 11-5708, "Construction Engineering and Inspection Services for Master Pumping Station 312 Rehabilitation," with Q. Grady Minor, Project 72549. Meeting Date: 12/9/2014 Prepared By Name: SchaltPeter Title: Project Manager, Senior, Public Utilities Engineering 10/17/2014 2:44:02 PM Approved By Name: HapkeMargie Title: Recycling Coordinator, Solid &Hazardous Waste Management Date: 10/17/2014 3:40:07 PM Name: HerreraSandra Title: Manager-Procurement,Purchasing&General Services Date: 10/19/2014 4:15:41 PM Name: MarkiewiczJoanne Title: Director-Purchasing/General Services, Purchasing&General Services Date: 10/20/2014 9:29:33 AM Name: JohnsonScott Title: Manager-Procurement,Purchasing&General Services Date: 10/20/2014 9:45:21 AM Name: PajerCraig Title: Project Manager, Principal,Public Utilities Engineering Date: 10/20/2014 2:30:25 PM Name: JacobsSusan Title: Operations Analyst,Public Utilities Division Packet Page -1507- 12/9/2014 16.C.1. Date: 10/22/2014 10:33:39 AM Name: HallSwainson Title: Procurement Specialist, Purchasing&General Services Date: 10/23/2014 9:07:00 AM Name: JohnssenBeth Title: Director-Wastewater, Wastewater Date: 10/29/2014 12:24:03 PM Name: Joseph Bellone Title: Director-Operations Support,Utilities Finance Operations Date: 10/31/2014 11:22:10 AM Name: ChmelikTom Title: Director-Public Utilities Engineering, Public Utilities Engineering Date: 11/10/2014 12:56:06 PM Name: TeachScott Title: Deputy County Attorney, County Attorney Date: 11/10/2014 3:48:33 PM Name: YilmazGeorge Title: Administrator-Public Utilities, Public Utilities Division Date: 11/19/2014 9:50:09 AM Name: KlatzkowJeff Title: County Attorney, Date: 11/21/2014 10:45:03 AM Name: UsherSusan Title: Management/Budget Analyst, Senior, Office of Management&Budget Date: 11/24/2014 1:49:06 PM Name: OchsLeo Title: County Manager, County Managers Office Date: 11/30/2014 7:55:45 PM Packet Page-1508- 12/9/2014 16.C.1 . ' Purchasing Department Change Modification Form Z1 Contract Change Request 0 Work Order Modification Contract 4: 11-5708 Change#: 3 PO/Work Order#: Project Name: MPS 312 CEI Services 4500142944 Project#:72549 Project Manager: Peter Department: PPMD Contractor/Firm Name:Q. Grady Minor I Schalt, PMP Original Contract/Work Order Amount $ 265,888.25 7/21/12, 1606 Original BCC Approval Date;Agenda Item# Current BCC Approved Amount $ ' 255,888.25 7/24/12, 16C6 Last BCC Approval Date;Agenda Item# Current Contract/Work Order Amount $ 265,888.25 10/24/2014: SAP Contract Expiration Date(Master) Dollar Amount of this Change $ 42,627.50 16.03% Total Change from Original Amount Revised Contract/Work Order Total $ 308,515.75 16.03% Change from Current BCC Approved Amount Cumulative Changes $ 42,627.50 16.03%_ Change from Current Amount Completion Date,Description of the Task(s)Change,and Rationale for the Change Original completion date:7/20/14 Last approved completion date: Revised completion date(includes this 10/24/14 change): 3/31/15 Number of days added:This CO Each step on the contract modification checklist form has been reviewed prior to me No.3 adds158 submitting for approval (this box must be initialed by Project Manager) 10 Add new task(s) 0 Change task(s) 0 Delete task(s) Other(specify):Add Overtime Inspection Services reimbursement to inspection firm. 1. Provide a detailed and specific explanation of the requested change(s) to the task(s) and/or the additional days added: This change order adds additional inspection services due to unforeseen conditions encountered in the field during the construction of the Master Pumping Station 312 Rehab. The construction contract time was extended due to several latent unforeseen conditions encountered in the field once construction commenced. Some of these were: An alternative fuel piping system was proposed and utilized to meet Collier County's Pollution Control Department's standards; the final removal of the bypass system's piping and valves was delayed due to the inability to isolate the associated irrigation quality water main due to demand; and the odor control bioxide system delivery was delayed from the supplier. Therefore, due to the aforementioned, QGM's contract has to be extended by 158'days for the additional inspection services required and for the one year warranty assistance which expires March 6,2015. 2.Provide detailed rationale for the requested change:The original contract did not anticipate the unforeseen latent conditions encountered and resultant additional inspection hours needed prior to construction award. The original contract also did not include the one year warranty assistance that is needed until warranty expiration. 3.Provide explanation why change was not anticipated in original scope of work: It is impossible to foresee latent conditions prior to excavation and construction activities. The construction inspection is required for the impacts of these unforeseen conditions. 4.Describe the impact if this change is not processed:The CEI firm's contract would expire and therefore they:ouid not be compensated for services rendered. Type of Change(Modification 0 1. Planned/Elective 0 2. Unforeseen conditions/circumstance 3.Quantity or price adjustment 4. Correction of error(s) ®5.Value added 1 6.Schedule adjustment Change Requested By 0 Contractor/Consultant 0 Owner 0 Using Department _0 Design Professional 0 Regulatory Agency(specify): D Other(specify): Purchasing Professional Participated in Negotiation of Change/Modification: 0 Yes No .7 .e4 ,y Approved by ,/,, ,% !%j, Date: Name and Title:Tbm Chmelik, P.E., PMP, PPMD Director Reviewed by: - _ i Date: Procurement Strategist's Name: Swaison Hall Reuhsed:7:26113 1 Packet Page -1509- 12/9/2014 16.C.1 . Page 1 of 3 CHANGE ORDER CHANGE ORDER NO. 3 CONTRACT NO. I 1-5705 BCC Date: Agenda Item: TO: Q. Grady Minor DATE: September 22,2014 PROJECT NAME:MPS 312 CEI Services PROJECT NO.: 72549 Under our AGREEMENT dated July 24, 2012 Yon hereby are authorized and directed to make the following change(s)in accordance with terms and conditions of the Agreement: Add $42,627,50 to the contract and add 158 additional days to the contract. FOR THE Sum of: $42,627.50; Forty Two Thousand Six Hundred Twenty Seven Dollars and Fitly Cents. Original Agreement Amount $265,888.25 Sum of Previous Changes $ 0,00 This Change Order. $ 42,627.50 Present Agreement Amount $308,515.75 The time for completion shall be increased by 158 calendar days due to this Change Order. Accordingly, the Contract Time is now 734 calendar days.The final completion date of this contract is March 31, 2015. Your acceptance of this Change Order shall constitute a modification to our Agreement and will be performed subject to all the same terms and conditions as contained in our Agreement indicated above, as fully as if the same were repeated in this acceptance. The adjustment, if any, to the Agreement shall constitute a full and final settlement of any and all claims of the Contractor arising out of or related to the chance set forth herein, including claims for impact and delay costs. Prepared by: if Date: 4/1/4-2-2-7/.4 Peter Schalt,PI04P `enio Project Manager PPMD Accepted By: Date: etz2 Mark Minor, P.: ,President Q. Grady Minor Packet Page-1510- 12/9/2014 16.0.1. • Page 2 of 3 \ Pit()1i. "•-; CI:1 Services ( ‘ti7Ofil - -, it:4614. V - -!-' 3 eA6-67 3 • • ;- Packet Page-1511- . _ . 12/9/2014 16 C 1 Page 3 of 3 CI IA r`‘IGE ORDER NO.3 CONTRACT NO. 11-5708 BCC Date: Agenda Ilern: TO: Q. Grads'Minor :;•1 DATE: September 22,2014 PROJECT NAME: MPS 312 CEI Services •I • ,•; ‘,1 I lS5 1.41 1 EREor.the Contraztor and ihe County base each. r',.S171X 11 el All authorized iicr,rtio or at:elit hr id r thyir hands and i iii he clate( )indicated h lott AccenNd 11) - - OWNER 110ARD OF COUNT.,"CONIMISSIONFW, _ Irrtit F liro.k.Cltrk COLLIER COUNTY FLORMA _ Tutu t relining.Chairman • t .1( r pRojEct MANAGER • rietrAt, 1 P 0. eter Schalt, NIP. Senior Promo Managct nor. FC. ;dm) 1)11 \R 1\11 1/4-,1 OW( Ti 2 t'onir Fir%;Witne s Bs '&11 . ee.c. . . Beth hiassea,PUD- astewater , ty rue 11Ie DR ISitiN k DNIINISYRATOR • •IL .uer Sot: n li‘ Dr Georee Yilmilz. PhD FUll Irp,t1prrrit v. name OCI.REMEN1'Si RATECIST ,1 or tr tr rr tis• -14--jaktkthaftz S. :n.inson Halt fitTrchasing oktnt‘ aft Packet Page -1512- 12/9/2014 16.C.1 . • , M Grad Minor (,ivil Engineers • Land Surveyors • Planners • 11andscape Architects li September 26,2014 Mr.Peter Schalt Collier County Public Utilities 3339 E.Tamiami Trail,Ste.303 Naples,FL 34112 RE: Master Pump Station 312 Rehabilitation CEI Services(PO No.4500142944) Request for Change Order Dear Mr. Schalt: As you are aware, during rehabilitation construction of Master pump station 312 several unforeseen conditions affected the contractor's performance and delayed the Substantial and Final Completion of the project. Some of the unforeseen conditions that delayed the project included a supplier delay for the odor control system and MCC's, an alternative fuel piping system design change, and delays associated with the bypass pumping. In an effort to regain schedule,the contractor chose to work overtime on the project at various stages. This overtime construction work required theGradyMinor site inspector to perform inspection services beyond the 40 hour work week on an overtime basis as well These inspection services performed on weekends, night operations, and general work beyond 40 hours per week were necessary to provide Collier County with the proper CEI services to document the project's construction. This equated to an extra 501.5 hours of additional engineering and inspection services or 542,627.50 of added fees incurred. Attached for your review,is the Summary of the Original Budget, Amounts Billed to Date and a Revised Contract Amount. I The proposed increase in contract amount is$42,627.50 The proposed increase in contract time is; 158 days Wrpor •ur review if you have any questions please let us know. V-r, • yours, k W Minor,P.E. Pr ident MWMiii r) Grady Minor&ssoc1aL:s.P.A. Pit.n9-047-1144• Px: 239-047-W175 3800 Via D gCey Eli 1)005151 •Lii 0005151 • r.t: 2t1111102i,t+ Bonita Springs.FL 34134 www.grar3Nirrinor(mm Packet Page-1513- ._— --- 12/9/2014 16.C.1 . 1 , n k C W N N N N N N .•i F L. .A La 1., •-` a 'r,o LI fT. in A. Lk iJ •-• X.- •Sy co ,° 9 ❑ nfl ?: o 5 G�G ° `' fib+ ° Q ° 1 .0yq�. G (Q'] •d p rOw 0..', p1. CT y w g a IAo° n Imo. ■ �. R`. 0 o. n .9a. a 9Y', 'aC g' D tai b- .7�' Jr O Cam' Et. O o 7 �° R. r . 1 i r:cA' _ a : laiDER il 5 if. i g .,5 a g da. oP, M 2, 1 B "i� d d o F 4 4 cv ° 4 CA tt. N $ Y 5.1 ° `� ° e R r r. v 403 �\ iN VS ` LA \ N ` \ l SA ' 4'9 F 3 Z O\ SA 4A ON 49 4A N 4A O 4A'i^ N, 1J !A V/ N N I 4, N V. to 'C N 'O 0 ... W N 4i a... L.P. 'C 0A W 0 i» ib,,A i., in in Oo i-. lA o iA - U.In v. v. 00 oO .a W 00 .al A p µ N 0 00 0 J 0 O 0.3 b- 00 0 0 IA N O. -- -- A N N In 0 t,, 0 0 0 0 O „� lJ io a in N LA CO U lJ V :J U a in 4 L3 O iJ uto a woo o tti u. UOOOOV. o 0 0L I `EA a 0, Oh 4A H, rn .n 4A fA N 4A 0 4s 4A 4A N 4.,, 4A . N �.+ tA w w N In LA ‘.0 N `D 0 -• w N w V. O . U Q N O, ON N .-• Oi 4 t,, W W O O ,P 4 '0 LA 'Q ,O O 0 N pNp N. op aD O A W ca -.I JJp U. 00 00 .pP . Do {.3 w 0 0 0 O O O 0 0 0 O 0 O O OHO 0 0 0 0 0 S. C t, ` a t SA to A 0. N 4n �, 4n c.. 4A 4.a t C,. EA 7 O' W W LA 4A 4A 4A 1J "EA 4A IN) MI CO OS 00 O w 00 0 a 0 NO u, .a. w CA i:'i kJ a, n° -i i4 0 o in -4 L, In 0 1.4 -4 -J o 0 In o i., 0 0 N Lc, O O O L. O co U. '4!. U. O O O O U 0 to .n 4.4 N S3 4.N 4.4, c0 v N N N I 7y(A2 y ..] -,3 .-4 I 0 0 in in 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 010 01 41< < � rs Yp Li iR K 4" 4�..i c b9 4y4 4A 4n 1.... 1 1, Z Z I O 4A 4A Ch M M N 4'4 .A 4A b4 FA N 4A H A N 1 0 obi r11 CIO W 1+., N VI V. ,O N 'O N .-. ty N 14., .••' SA 'D 1f] N l., 1 .Z u. S., - 1 i'' -- 'CO vin a in 1- in in it in O, oO 1 2 >' O -J W oe -.1 A A 0. -r J 0 00 0 '-t Q9 0 J 0 "1 SA 0 0 SA N O+ .p- -- A O N 1... O 4V O 0 U. t3 O 0 U. O 0 0 in U U. U. 0 in 0 0 Lp 0 V. 0 0 0 t... 1 Packet Page-1514 ___ __ - _. 12/9/2014 16.C.1 . Q. Grady Minor Change Order Number 3 for MPS 312 Rehabilitation CEI Services—Cost Breakdown Item Description from Change Order Justification Amount Additional inspection services and time due UNFORESEEN $25,275.00 to unforeseen conditions encountered in CONDITIONS/CIRCUMSTANCE: the field during construction. The original contract did not anticipate the unforeseen latent conditions encountered and resultant 1 additional inspection hours needed prior to construction award. The original contract also did not include the one year warranty assistance that is needed until warranty expiration. Additional inspection time was required due VALUE ADDED: The additional $4,050.00 to the need to change the underground inspection services ensured that the 2 diesel fuel piping to Pisces double wall construction and end product piping to meet FDEP's and CC Pollution complied with the contract documents Control's requirements, and to be able to and with the permitting requirements. activate and place this system into service. Additional inspection time was required for VALUE ADDED: The additional $13,302.50 constructing and dismantling the diesel inspection services ensured that the pump bypass system because due to construction and end product permit requirements, this work had to be complied with the contract documents performed after 6:00 PM and cease before and with the permitting requirements. 3 6:00 AM the next day for safety reasons. The system was immediately adjacent to traffic on Davis Boulevard, therefore it had to be worked on during low traffic conditions for the public's and worker's safety. Total $42,627.50 Rev November 10, 2014 HPS Packet Page-1515-