Loading...
Agenda 07/08/2014 Item #16A 77/8/2014 16.A.7. EXECUTIVE SUMMARY This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Landings at Bears Paw, (Application Number PL20120002819) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the final plat of Landings at Bears Paw, a subdivision of lands located in Section 35, Township 49 South, Range 25 East, Collier County, Florida, following the alternative procedure for approval of subdivision plats pursuant to Resolution 99 -199. This procedure allows for the Board to approve the plat and associated construction documents for construction purposes and recording purposes concurrently. CONSIDERATIONS: The Engineering Services Department has completed the review of the construction drawings, specifications, and final plat of Landings at Bears Paw. These documents are in compliance with the County Land Development Code and Chapter 177, Florida Statutes. This project is within the Landings at Bears Paw PUD Ord. 2013 -66. All fees have been paid. Security in the amount of 10% of the total cost of the required improvements, and 100% of the cost of any remaining improvements, together with a Construction and Maintenance Agreement for Subdivision Improvements, shall be provided and accepted by the County Manager or his designee and the County Attorney's office prior to the recording of the final plat. This procedure is in conformance with Section l 0.02.04 F.2 of the Land Development Code. The Engineering Services Department recommends that the final plat of Landings at Bears Paw be approved for recording. FISCAL IMPACT: The project cost is $1,303,657.15 (estimated) to be borne by the developer. The cost breakdown is as follows: a) Water & Sewer $382,008.55 b) Drainage, Paving, Grading $921,648.60 The Security amount, equal to 1 10% of the project cost, is $1,434,022.87 The County will realize revenues as follows: Fund: Growth Management Fund 131 Agency: County Manager Cost Center: 138327 -- Land Development Services Revenue generated by this project: Total: $28,719.46 Packet Page -466- 7/8/2014 16.A.7. The Fees are based on a construction estimate of $921,648.60 (does not include City of Naples water & sewer facilities) and were paid in November, 2012. The breakdown is as follows: a) Plat Review Fee ($1,000.00 + $5. /ac) $ 1,070.00 b) Construction Drawing Review Fee Water & Sewer (.75% const. est.) n/a C) Drainage, Paving, Grading (.75% const. est.) $ 6,912.36 d) Construction Inspection Fee Water & Sewer (2.25% const. est.) n/a e) Drainage, Paving, Grading (2.25% const. est.) $20,737.09 LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval. - SAS GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public Facilities prior to the issuance of the construction plan final approval letter. RECOMMENDATION: That the Board of County Commissioners endorses staff's recommendation to approve the final plat of Landings at Bears Paw (Application Number PL20120002819) for recording with the following stipulations: Approve the amount of $1,434,022.87 as performance security for the required improvements, or such lesser amount based on work completed, and as is approved by the Engineering Services Department. 2. Approve the standard form Construction and Maintenance Agreement and direct the County Manager or his designee: a. To withhold Certificates of Occupancy until the required improvements have received preliminary acceptance. b. To delay recording of the plat until suitable security and an appropriate Construction and Maintenance Agreement is approved and accepted by the County Attorney's office and the Board of County Commissioners or the County Manager or his designee, or his designee on behalf of the Board pursuant to Section l 0.02.04 F.2 of the Land Development Code. Prepared by: John Houldsworth, Senior Site Plans Reviewer, Engineering Services, Growth Management Division, Planning and Regulation Attachments: 1) Location Map 2) Plat Map 3) Opinion of Probable Cost Packet Page -467- 7/8/2014 16.A.7. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.7. Item Summary: This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Landings at Bears Paw, (Application Number PL20120002819) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. Meeting Date: 7/8/2014 Prepared By Name: HouldsworthJohn Title: Site Plans Reviewer, Senior, Natural Resources 6/11/2014 8:19:26 AM Approved By Name: McKennaJack Title: Manager - Engineering Review Services, Natural Resources Date: 6/12/2014 11:29:32 AM Name: PuigJudy Title: Operations Analyst, Community Development & Environmental Services Date: 6/12/2014 2:59:27 PM Name: MarcellaJeanne Title: Executive Secretary, Transportation Planning Date: 6/13/2014 4:05:43 PM Name: StoneScott Title: Assistant County Attorney, CAO Land Use/Transportation Date: 6/24/2014 2:38:08 PM Name: KlatzkowJeff Title: County Attorney, Date: 6/26/2014 5:08:28 PM Name: IsacksonMark Packet Page -468- 7/8/2014 16.A.7. Title: Director -Corp Financial and Mngmt Svs, Office of Management & Budget Date: 6/27/2014 10:36:32 AM Name: OchsLeo Title: County Manager, County Managers Office Date: 6/30/2014 8:08:46 PM Packet Page -469- pf 7/8/2014 16.A.7. 16 1 a 15 14 Q� 13 C Ef 7 17 )6 r<Lo, �T ��\ I c o• z Z ::0 19 cc 24 j 19 20 .. 21 I` 41 Z OMfC),F- - -- - - -- - - - - -~ ----=----- C_ - - - -�= ---- - - - - -- ------ - - - - -- -- ccv IW XICZ, GOLDE.N O _ c��a TE PARk'V A Y J O \ \ \� / �� m 33 34 ----- -- - --- 3:i 'SE; 31 32 a 33 a ` 0 Q 00- 1 -- C \��� — \— ..... R A 0 1 0 .... F C A O J \\> .1 _ LJ O a I 4 5I I ___________ Z 1 LJ c, E [_ cc �� N 0 a Y ti a 5 � z 4 z _[_ I A V I L� s 8 iL V 1) — m a - - -- 1L�f� 31, - -- \� --- — �r --- -� - -�— - - --- I TAKER -- - - - ----- - ----- 1_, (_�► � �.tN'� a� +C) N NUM_'' N.T.S. Packet Page -470- 7/8/2014 16.A.7. N a84 p rn � �z o+z spry ° y a g pFB g w m o Z Jim � b [n kF Qf ¢ o z 4 !I a~a J ? o a�ya al < ���Ia Z �IC gaR9 g Sq g a WIN �trj O pa a 3� € �� e w�_o''-� Q+� oCLgah zao��za� §�aa7a xxQac R 5g£g Wa3y a ^SnI Nho �g ��� a ��� s sg � Rag nF _ W pq a g e N a £ � tg N� g°s Packet Page -471- �I Packet Page -471- Q� W a�I 4 � 5 ovlJ'as" E n I — I I I 8 I I I I O O � O O 11 111 In rR �� 0 81 I \ r 1fi � ' ¢, . -� �J�� , � \ • � e \ \\ 51555 \\ \,\ 1 r .510.+1J'a9" E 125117 O 1]5.9 LT, 2 u i_111TISW f 17 Lon 55j gJ _J I • � uocaL' °a �� �� I "� z \ \ � s59c '' \ 00 Ja I' ti �I 51550 \ \J laiu� _ � I �Y •:SA.��, .;� J.9s.rf �x 8 '116 . )__ _____. - 7/8/2014 16.A.7. rJVn 'so0s xtxm ( F N m CJ � N 00J605 E 662.27' ' 1xMJ5Y3 �M f0 IWN' � � Y EOxO6EM �IEi � 3�3 >LLZ" rJVn 'so0s xtxm ( F i� Y N 00J605 E 662.27' ' 1xMJ5Y3 �M f0 IWN' � � Y EOxO6EM �IEi � a I hA 4ya= h Packet Page -472- g� s� g J Leo m p Alkk )I 4111111111110 U �� �� F-[� |r~~ �� ��~�-��U� U�~~ ^� ,U"�" RAN!) ��������|| ^�����|��K�`����n 7/8/2014 16.A.7. THELANCi|NG:jS AT BEAR'S PAVV COST ESTIMATE FOR COLL|ER�OUNT`/PPLAPPLICATION PROJECT SUMMARY Erosion Control $7,594.20 Earttwork $323,870.00 Paving Landscape $52,500.00 Drair,age $1189,181.00 Lighting $70,400.00 Totaill Estimated Site! Infrastructure Costs $921,648.60 NOTES: 1) Costs providlEtd in this estimate, are based on rocent contract prices, mlbeangineors'k�t krOW11 Lnit costs. I'hese costs cannot be guaranteed due b tin pmdk-.tab|n and uncontrollable increases im the coo cfoononello pohoeum'or the availability nfmoterols and labor. 2) TKs estimate does not include materials and labor costs for installiltiOn Of SpV,1'50 utilities such as communications, electrical, etc. Only those items |isteU are included inINscost estniu[e. 3)Thio estimate does not include moberiob and labor cost for the nui|diny.sitewm||m. site furmiuhinyn.pmpar) signs, gates, entrance features, boardwalk or gazebos, boat docks, etc. 4l Does not include enhanced landscaping; ooUmata shown is for Code Minimom|ondaoapingonly. 5� Project ix|000\nd wilhin the QtY Of Napliecs;Lltili� Service Area. This cost estimate does not include cost of utility infrastructure. PPLPL20120002819 REV:1 LANDINGS AJ BEAR PAW DATE: 4)20/13 Page 1cf3 E Packet Page -473- =Omni J. R. E'VANIS E_: NI E Nj E: E ! ?l1\1 7/8/2014 16.A.7. THE LANC4NGS AT BEAR'S PAW COST ESTIMATE FOR COLLIER C:OtJNTY' PPL APPLICATION APRIL 2013 — - -- ------- - - Erosion Control - - -- ---------- - - - - -- - - - - -- ti_NIT IRt+�E; — f' DESCRIPTION 1JN11'r_tr �!1�f� _1JNIT- PF211,E $34,500.00 Silt Fence I_F I 7,014 503D $5,611.20 Floati Turbidity Barrier I_I= — 1_322^ $11.00 $1.50 $1,983.OD - - - - - - -- Sy -- - - - - -- :1,37C ----- ---- -- $11Q9, ,,DD SUBTOTAL Ra p Access Road — _--- __— _ - -___ $7,594.20 -------------------------------------------- Eartllwork - - - - -- ---- .,.�ESCF :iPTIO!'d+ --7 wr. Ct�^r� ti_NIT IRt+�E; "fTta'�'i0.t;''1 1;E� Clearing & Grubbing — AC� - - -- — — 11.5 — - - - - -- —__ $3,000.00 - - -- $34,500.00 Gane•al Site Grad n0 _ A0 11.5 _ —3,550 $3,500.00 $40,250.00 Rater bon Areas C,Y 8,740 -- - - - - -- $11.00 $39,050.00 --- - - - - -- ---- --- - -- Rip-Rap Shoreline_ - - - - - - -- Sy -- - - - - -- :1,37C ----- ---- -- $11Q9, ,,DD $117,950.00 Ra p Access Road — _--- __— _ - -___ _ ,;Y 885 - -- $3Ewml $92,120.00 Type 2 Curb - - -- ----------- - - - - -- SUBTOTAL $323,870.00 Paving F Cf�____ 3�IT�C r pESCRIPTIOP 314'"As2halt CTncrete t re: S -Il 21d Ilift _ - - -- _ SY _ 13,460 $5.25 $44,415.00 314 Aas hp alt ConcrE_i:e_ IY22 S-11111st lifi: S Y _ 8,46 -0 _ — __-- _$5.00 $42,300.00 6' Limerock Ezse'campact& rimej — _ - - - -- — - - -- ,�Y - - -- -- 8,62'1— -- ---- -- —__ -- $9.D0 - $77,589.00 1T Stabilized Sub2rade — - - -- ---------- - - - - -- Sy - - - - --- 8,740 -- - - - - -- $.00 $26,220,00 4" Reinforced Concrete Sidewalk SY_ 8815 $32,302.50 4" Limerock Ease_,' :ornpac :t FL priniei Sidewalk — - -- - -- -- -- - -- _ Sy - - -- - 885 - -- _ _ _$16.50 —_ -- $9.00 — $7,965.00 Type 2 Curb - - -- ----------- - - - - -- I_F - - - - - -- - ,?,0 -99 --- - - - - -- $10.00 --- - - - - -- $20,990.00 Type "A" Curb LF 87 31:3.DD $1,131.00 valley Gutter - - - -- ---------- - - - - -- Lr - - - - - - -- 2,817 -- - - - - -- -- _$7.70 $21,690.!)0 Traffic, Signacle and Striping 1 -S 1 $3, 10.00 F_-_ $3,500.00 SUBTOTAL $278,103 CIO Landscape - ---- -- ---- --- -- == IDESCF :1PT10Iil ; UAIIT. QTY:; 1JN11TFR1:E, ° 4T0 CE, . �': Code Minimum. Estimate rLAcc�ess RwLd — ---- ---- -- LS - - - - - - -- I -- - - - - -- $20,000.00 — $20,000.00 Code Minimum Estimate LZesidential SitEI' _____ _ LS —__ 1 ;615,000.00 $15,000.00 Planting Stabilization, Eicj 3:1 9, R2s— _ —__ —_ LS __ '1 _ -- :615,011(1.00 $15,000.00 Saopen -space areas on�) SY 2500 $11.00 $2,500.00 SLIBTOT,AL $52,500.00 Page 2 of 3 Packet Page -474- /00+04`\ Milli► �� n11P� 7. 7/8/2014 16.A.7. THE: LANDINGS AT BEAR'S PAW COST ESTIMATE FOR COLLIER COUNTY PPL APPLICATION APRIL 2013 -_- - - - - -- Drainage — - -- ,,. DESCRIPTION, I.1(ullf`P 18" RCP LF 114 $38.00 $4,332.00 24" RCP LF 549 --- - ----- $45.00 --- - - - - -- $24,705.00 — -------------------- -- - - -- 30" RCP --- - - - - -- LF 7411 $54.00 $40,014.00 24" Mitered End 1 -A. 2 $1,000,00 $2,000.00 Junct on Box I -A. 2 $2,200.00 $4,400.00 v ! Gte -In-e--t 1=A 8 $20,000.00 T "C" Inlet; _ _ _ _ _ 1 =A _ 8_ —__ _ $2,500.00 $20,000.00 Modified TypE; "D_Inlet Control Stitc ure —_____ EAR___ _— 2 $4,000.00 $8,000.00 8' N2221!21 1!2e -_ __ _ _ LF �LF 1197 _ $20.00 $7,940.00 12 " PVC Drainage_-- _--- __-- _ —_ —__ — - -- — 690 - - - - -- 930.00 — -- $20,700.00 15 " PVC Drainage____— ___ - -____ _______ — _ LF _ —_ 744 _$35.00 — — $26,040.00 Yard Drain EAM 17 - - - -- $Ei',i0.00 - ---- $11,050.00 — -------------------- - - - - -- ---- - - - - -- ---- - TOTAL. SUBTO'CAI. $189,18L00 Packet Page -475- Page 3 of 3 00006FA4 '1111► �� VIII /•7 7/8/2014 16.A.7. THE LANDINGS AT BEAR'S PAW (:OST ESTIMATE FOR UTILITIE =S (REFERENCE ONLY, PROJECT IN Cll"Y OF NAPLES UTILITY DISTRICT) PPL REV01 FEBRUARY 2014 PROJECT as "UMIIIIaRY�_�_�_�_ ___��_ Potable Water! Fire � $144,338.38 ------------- - - - - -- Wastewater ------------ - - - - -- --- - - - - -- - -• $237,670.17 10" CL 150 Pvc (DR18) - - - -- ------- - - - - -- Total Estirnater! Cast -• $382,008.55 NOTES: 1) Costs provided in this estimate are based en recent contract prices, or the engineer;' latest known unit costs. 'these: costs cannot be guaranteed due:l:o unpredictable and uncontrollable ircreaseS in the cost of concrete, petroleum, or the availability of rnaterials and labor. ----------------- - - - - -- - --------------- - - - -- Potable Water! Fire - - -- DESCRIPTICIN -- - -- LINIT - -- -- QTi - -- UMTPRRICE TOM PRICE.,`,. 10" CL 150 Pvc (DR18) - - - -- ------- - - - - -- LF - - -- - 1,360 $26.15 -- - - - - -- -_— $48,639.00 10" CL 200 PVC DF114 --- LF ---- 100 --- -- - - - - -- $28.77 - - - -- $2,877.00 8" CL 150 PVC DR16 LF 1,375 $2182 $30,002.50 8" CL 200 P \ /cO DR1A ..... LF 122 __ —$23 .�A _— $2,920.68 6" CL 200 F' \/(-' DR14• LF _ _60 _ _ — — _ -- $14,62 - -- $877.20 10' Gate Valve EA _ 3 $1,8130 00 $5,640.00 _ _ ------------------ 8" Gate Vales — -- L.F� 5 $1,380.00, $6,900.00 -------- - - - - -- _ Water Serv;ce _EA_ EP -- 'I0 - - -- $675,00 - $10,800.00 --------------- - - - - -- Permane:rt FlushaSys itern- - - -_ -- - - - -- - - - - -- - -- EA. - - - - -- ---- - - - - -- 1 — - -- --- - - - - -- :64,800.00 - - - - -- - $4,800.00 Tem vary Eacterial Sarnple Point EA —__ _— _— _2 $206.00 _ $412.00 Permanent Bacterial Sarnple: Point EA, 1 $1,350.00 $1,350.00 - - -- --------------- -- Fire H drart EA, _ 7 $4,160.00 $29,120.00 ------------------— - - - - - -- ----- - - - - -- -- - --- — SUBTOTAL $144,338.38 ------------------- - - - - -- ---------------------------- Wastewaiter DiEsSt`'RIPT1101� UNIT '' QTY . ll_NIT- i >RICE "TpTAL =PRaCE` ". Manhole U-6' cut EA 5 — 1$3,840.(Ki $19,200.00 - - -- --------- - - - - -- Manhole U •8' cut - - - -- EAR -- - - - - -- 2 -- - - - - -- 164,510.(10 $9,020.00 - - -- ---------- - - - - -- 8" PVC SCIR 26 U -3 cut - - - - -- LF ^ ---- - - - - -- _ —_ 967_ - -- -- - - - - -- - - - -- $17.59 -- $17,009.53 8" PVC SDR 26 6'-8' rut ___— _____— LF 166 $22114. $3,791.44 6" Services w. Clearouts EA 1:2 $700.00 $8,400.00 - - - -- ------------- - - - - -- Pum - - - -- EA ---- - - - - -- 1 - - - - -- 1145,000.00 - _ $145,000.00 4" PVC Force Main CI -150 PV3 DR 18 - - - - - -_ -- L.F� - -- 2,560 - - - -- $12.54 — _ — $32,353.20 4" PVC Force Main C_ 200 (DFt 14) LF_ 75 $13.28 $996.00 — ----- - - - - -- [jLE!92 Valve EAR -- -- - -i - -- - - -- $950.00 —_ $1,900.00 ----------------------- E31.113701 "AL__ _ $237,670.17 PPL- PL2.0'120002:f3IS' REV:2 UVNIDIINGS AT BEAR PAW DATE: 2 -24 -2014 DUE: 3- 24- 2:014 Page 1 of 1 Packet Page -476-