Agenda 07/08/2014 Item #16A 47/8/2014 16.A.4.
EXECUTIVE SUMMARY
This item requires that ex parte disclosure be provided by Commission members. Should a hearing
be held on this item, all participants are required to be sworn in. Recommendation to approve for
recording the final plat of Mussorie Village at Fiddler's Creek, (Application Number
PL20140000591) approval of the standard form Construction and Maintenance Agreement and
approval of the amount of the performance security.
OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the
final plat of Mussorie Village at Fiddler's Creek, a subdivision of lands located in Section 14,
Township 51 South, Range 26 East, Collier County, Florida, following the alternative procedure
for approval of subdivision plats pursuant to Resolution 99 -199. This procedure allows for the
Board to approve the plat and associated construction documents for construction purposes and
recording purposes concurrently.
CONSIDERATIONS: The Engineering Services Department has completed the review of the
construction drawings, specifications, and final plat of Mussorie Village at Fiddler's Creek.
These documents are in compliance with the County Land Development Code and Chapter 177,
Florida Statutes. This project is within the Marco Shores / Fiddler's Creek Development of
Regional Impact (DRI). All fees have been paid. Security in the amount of 10% of the total cost
of the required improvements, and 100% of the cost of any remaining improvements, together
with a Construction and Maintenance Agreement for Subdivision Improvements, shall be
provided and accepted by the County Manager or his designee and the County Attorney's office
prior to the recording of the final plat. This procedure is in conformance with Section 10.02.04
F.2 of the Land Development Code.
The Engineering Services Department recommends that the final plat of Mussorie Village at
Fiddler's Creek be approved for recording.
FISCAL IMPACT: The project cost is $151,470.90 (estimated) to be borne by the developer.
The cost breakdown is as follows:
a) Water & Sewer $64,995.00
b) Drainage, Paving, Grading $86,475.90
The Security amount, equal to 110% of the
project cost, is $166,617.99
The County will realize revenues as follows:
Fund: Growth Management Fund 131
Agency: County Manager
Cost Center: 138327 -- Land Development Services
Revenue generated by this project: Total: $5,584.13
Packet Page -422-
7/8/2014 16.A.4.
The Fees are based on a construction estimate of $151,470.90 and were paid in February, 2014.
The breakdown is as follows:
a)
Plat Review Fee ($1,000.00 + $5. /ac)
$1,040.00
b)
Construction Drawing Review Fee
Water & Sewer (.75% const. est.)
$ 487.46
C)
Drainage, Paving, Grading
(.75% const. est.)
$ 648.57
d)
Construction Inspection Fee
Water & Sewer (2.25% const. est.)
$1,462.39
e)
Drainage, Paving, Grading
(2.25% const. est.)
$1,945.71
LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and
requires a majority vote for Board approval. - SAS
GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate
Public Facilities prior to the issuance of the construction plan final approval letter.
RECOMMENDATION: That the Board of County Commissioners endorse staff's
recommendation to approve the final plat of Mussorie Village at Fiddler's Creek (Application
Number PL20140000591) for recording with the following stipulations:
1. Approve the amount of $166,617.99 as performance security for the required improvements;
or such lesser amount based on work completed, and as is approved by the Engineering
Services Department.
2. Approve the standard form Construction and Maintenance Agreement and direct the
County Manager or his designee:
a. To withhold Certificates of Occupancy until the required improvements have received
preliminary acceptance.
b. To delay recording of the plat until suitable security and an appropriate Construction
and Maintenance Agreement is approved and accepted by the County Attorney's
office and the Board of County Commissioners or the County Manager or his
designee, or his designee on behalf of the Board pursuant to Section 10.02.04 F.2 of
the Land Development Code.
Prepared by: John Houldsworth, Senior Site Plans Reviewer, Engineering Services, Growth
Management Division, Planning and Regulation
Attachments: 1) Location Map 2) Plat Map 3) Opinion of Cost
Packet Page -423-
7/8/2014 16.A.4.
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.16.A.16.A.4.
Item Summary: This item requires that ex parte disclosure be provided by Commission
members. Should a hearing be held on this item, all participants are required to be sworn in.
Recommendation to approve for recording the final plat of Mussorie Village at Fiddler's Creek,
(Application Number P1-20140000591) approval of the standard form Construction and
Maintenance Agreement and approval of the amount of the performance security.
Meeting Date: 7/8/2014
Prepared By
Name: HouldsworthJohn
Title: Site Plans Reviewer, Senior, Natural Resources
6/3/2014 8:42:38 AM
Approved By
Name: McKennalack
Title: Manager - Engineering Review Services, Natural Resources
Date: 6/5/2014 1:05:56 PM
Name: PuigJudy
Title: Operations Analyst, Community Development & Environmental Services
Date: 6/6/2014 10:41:47 AM
Name: StoneScott
Title: Assistant County Attorney, CAO Land Use /Transportation
Date: 6/6/2014 1:55:22 PM
Name: MarcellaJeanne
Title: Executive Secretary, Transportation Planning
Date: 6/10/2014 9:07:16 AM
Name: KlatzkowJeff
Title: County Attorney,
Date: 6/13/2014 1:10:09 PM
Name: IsacksonMark
Packet Page -424-
7/8/2014 16.A.4.
Title: Director -Corp Financial and Mngmt Svs, Office of Management & Budget
Date: 6/27/2014 10:13:26 AM
Name: OchsLeo
Title: County Manager, County Managers Office
Date: 6/30/2014 8:03:25 PM
Packet Page -425-
im
SILVER' LAKE:
i C),U THl D'S
),U -�
7/8/2014 16.A.4.
MIJSSORII VILLAGE AT FIDDLER'S GREI'_K
F,ib,,F.ADISE
I-' CSI N TE
FO RST
F*IDDLI.R'S CI<:EE:Kk
DkSl' TRAIL
FR,I.TE T JR 11 P' AR K
1,71
MARCO `SI- AC)RES
- ------ -----------
LOCNAT"ION MAYO
NO T TO SCALE E
7/8/2014 16.A.4.:
--
��
So�WeMEoU
gam
O 1-4 Y. -
O
p`�„ °z?awom � � :, �� INS �. i I ��'�; e•# I a� � ��eb 8 ° °� � N
°QFQ gg ggz ae r fee
�a�2 OtR�S �a�
Fo i 'owa i'o 6 �� �i� C o i icy io III$ i a
Z 'o 'm 4 €�o I�� € x €b " €bbd "a7h,b�
U °
Con
VJ L U W ^ b �� g e r 8u7
t3R Inv;
�L6 `\
WN
, a��e "- zee$ ff� a
S Sa'^ gig mob dab �C��`� k ia� 4
°o a �'Vv m�a4o�
U
Q2�
� �oz
U
r/� O
V1 �
Q �
2
€6
5 b
i
Imo gib h
-9 a
A N 3 $ ry �� Y ¢aa .o �8cg� i3 'i E li "i CCCCZYd
Packet Page -427-
w
OQ
N �
Lu'
x
W W Y
0.l N
d
d
U Q
O
0
J
J
UAW
i h =
to �
" h
U
W2
rOn O C�
Z
Q J
333W3m
w�xxzxzz
WWOwnenw
yam °zs:s
t, r
n`.
5
J N 0 %7'497'49
' N
raacr
r.
'i
C
2
a I�g
o �
7/8/2014 16.A.4.
L��
POW,
W,
€nqr So
3
333
3;
3
33
;3
;33
33;
3333
W3
W333
;;
3 is
s4
W3 W333W
W3
$hey
y�
:'•oti��,•>;�'�_
•
^R
_
°'
^.:.5"�.o�-
R$:F-
�8�8RoH��"
�R$•,-
�e
'�=
-7��'F
"..Pn�'h
°aRho�;4e;�a
°- ^ems=
no "e�mR
zzxxxxzxzxzxz
Cif
zzzzzzzxz
N 157TH.
zxzxzzzz
CT4
CTS
CS7
zzzz
zzz
zzzzzzzzzxz
F,
CT7
CTB L
C44 L5 45 iOjS
txN'
__
U
ae.ham,'
-R
bbt
es
e"oRS�:�eBe
a
AA
as >^
r:�emas�aeO:;a
>a
^r�
s
skaa
8e
e' ga'
ga
a
8'seg
"saaaesase8aeaa8asa$8eaga8
7/8/2014 16.A.4.
L��
POW,
W,
€nqr So
Packet Page -428-
DOW
`TI 3�Dl,6f.0A'
in ij
N
u
3
3 is
s4
y�
•
^R
iv
Cif
°
N 157TH.
CT4
CTS
CS7
IJ745
F,
CT7
CTB L
C44 L5 45 iOjS
txN'
__
U
e ;o
AA
Packet Page -428-
W
d
a�
O
M
x �
w
U)
F
a
a
a
71Qi ')nI^ 16.A.4.
o
O
U�
a�
0
m�
W WWWW333l333333l333
3
W33W
W3333W
U
U1 J
4151. -" `rcl3) '9. z
..
_. ____ • C11
M-
•r
22221222222
�R;:e4
C_17 7
CJB'
055
-
5,. _ - - --- `
88=
Rh,'�=
mnh�cem
yY
cb cam, - 'CIS "� C1B
4
i 22222222222
^:mbn�;R=
u
Q ti
C�
:F
1222222222222
F1is 0
1g, 11
i"
(� �f
h TRACT 'OS -1"
V ('r-SPCC, D.E/
��ion
mb�aagq
unn
h�vn
m
1
U
Q
m�mbbh��n�
O
AS
OO
v
OO
8999
- �l __L ____._,
Q
�`r�� " ^,;C7` ��• 477: � �+4iN
5.5g15yI
.n
_yRo
��'hS}N
rR "nrm,h
n'Rn3�eR,m
,_
$8$$$gg$8
88$8$$$8$$
&088$$
4.
mmn5:8hh:,
�`,BYi
.^,8h8eee
__
a�
0
m�
33!
3
W33W
U
U1 J
4151. -" `rcl3) '9. z
..
_. ____ • C11
M-
•r
22221222222
C_17 7
CJB'
055
-
5,. _ - - --- `
h
yY
cb cam, - 'CIS "� C1B
4
u
Q ti
C�
:F
'C
�m
150.91' C
F1is 0
1g, 11
i"
(� �f
h TRACT 'OS -1"
V ('r-SPCC, D.E/
C5 CI
U
Q
O
AS
OO
v
OO
8999
- �l __L ____._,
Q
�`r�� " ^,;C7` ��• 477: � �+4iN
5.5g15yI
.n
_yRo
a�
0
m�
Packet Page -429-
33!
3
W33W
�m Cam,.
U1 J
4151. -" `rcl3) '9. z
..
_. ____ • C11
22221222222
C_17 7
CJB'
055
-
5,. _ - - --- `
yY
cb cam, - 'CIS "� C1B
4
t C144 L5
m ,
C5 CI
Packet Page -429-
�m Cam,.
U1 J
4151. -" `rcl3) '9. z
..
_. ____ • C11
C25
C_17 7
CJB'
055
-
5,. _ - - --- `
yY
cb cam, - 'CIS "� C1B
4
t C144 L5
m ,
C5 CI
8999
- �l __L ____._,
�`r�� " ^,;C7` ��• 477: � �+4iN
5.5g15yI
.n
_yRo
Packet Page -429-
CarC5 l�I Tss e i 9 •'' � ` a h_' � f� . L c { ' 6 'h � ^
ro - m a I u
o^PoN -s< n'3
ry o
8 8 O 1.m po 0S�5O oo6 1 1'v 9OFrr N a' , 6 .
8OOa
o
�N t W 'S'06;
9rOSN - e- l ' C
W ti N W
IN
s�°
^ P 80
4" :
r o .D OS! i
. "
-
_
2
I I
7/8/2014 16.A.4.
d
a
zn �w
�
:8
=
m
d
a
�\ h
m
c Rb
N ry
�
w3W333
S>
Ltl0<tc � �� w
°$
� •''h Y
-�.
.cc'09t
j 2 i x 2
bl
3rvn 3,9r,6C. /cN 3
U
5
.Hh I ^0
X4'1
`�' ��N 15RI 5f.9t __i iti
solo
C
L78
U 5, :E
S
O
„' •`$ ^�.v �'f5
u _
U
^
yr "� 2 z - /
N v `eN•�I y
�
\ `'� WO _
J.
W 3333333333333WWWWWWWW33333 W33
J. - -
(,
W137 p£.i�_``ri.
u
�8 ^088�_�6zR68:�o�fi�SCe
5-
�{ [ofP
U s
^8887Re8�6
zzxzzz2zzxzxxxzzzxzxxzxxzxxzx xxz
5, W
L77a
W
� ^ Wa g1•�5p.190
9i
U � m . � N
h
<
pNWm
52 °o�°8a�y�ys8�ry, m y �:8 g��^,�28 ' g'ce h28�W8 aoz3o2w8 e 8�" h 2h 38 ' ^g32&a88;�'a_23 $+,$8�P 2e;8 $ n�r.32 .8 8 oBn en3 F88p'^^W2e" o:gry R,tiN23 E3 Owh � n P238 e82,"^"" 3 P$1R;P2he;$ omsB m P2q 38 ' >8^P w8 $N W �2yo 8 �P2W8$Rxh23 $B8�2mn3 $^N2en38$8p2es38
8,nrv�2 e�38 8an 3ha� 3$ •oR8w 3$ 8kaNe 38
8e r W P2ry =
. $
H'/"2W8+8RWh 2r� 8 o n W l°2 e "v 8
o�R
Packet Page -430-
U
5
o�R
Packet Page -430-
Packet Page -430-
willb P,
7/8/2014 16.A.4.
MUSSQRGE AT F�DDEER'S CREEX
Waldrop Engineer File No.: 366 -02 -01 Rev OO
Fee Calculation
OPC Summary
Wastewater
$ 28,575.00
Potable Water
$36,420.00
2.25% for (Inspection Fee
Sub-Total $64;995:00 ?
E.a rl:hwork
$3,609.00
Demolition
$5,290.00
Paving
$77,576.90
0.75% for (Review Fee
Sub -Total $86,475:90
2.25% for linsped:ion Fee
Total 151,470.90
Fee Calculation
Utility Plan Review & Inspection Fees
0.75% for (Review Fee
$487.46
2.25% for (Inspection Fee
$1,462.39
Sub-Total
$1,949:85
Paving, Grading, & Drainage Review &
inspection Fees
0.75% for (Review Fee
$648.57
2.25% for linsped:ion Fee
$1,94531
Sub-Total=
$2,594.28`
Total := .
Notes:
:1) This Opinion of Probable Cost (OPC) shall be used for budgeting purposes oniy.
2) This OPC is based on the engineer's understanding of the current rules, regulations, ordinances, and
construction costs in effect on the date of this da_urnent:. Interpretations of these construction costs may
affect this OPC, and may require adjustments to delete, decrease, or increase portions of this OP(-.
31 All costs provided in this OPC are based on recent contract prices, or the engineer's latest known unit costs.
These costs canna+: lae guaranteed at this time due to unpredictable and uncontrellabie increases in the cost of
concrete, petroleum, or the availability of materials and lat-cr..
4) Does not include permit fees or soft costs.
51 Does not: include enhanced landscape or harciscape features.
" M
A. (V, c� ✓ .
Bread' *Q,". Sloan, P.E. L'
r r
Tate
Florida R�±cf'1 ;e
N A" ICP -- PL.20140000367 REV 1
��lrtrsctt
Mussorie at Fiddlers Creek
1:136E.02 (Fiddlers �.reeic) MussornVzxxc9kCjFC Rev06 DATE: 2 -•24 -2014
Packet Page - 431 - DUE: 3 -03 -2014
U-. r►
7/8/2014 16.A.4.
"I -1
Shallow Manhole
5
EA _
$2,300.00
$11,500.00
VMI -2
1.5" Single Sewer Service
7
EA .$565.00
$3,955.00
WMf -3
1.5" Double Sewer Service
8
EA
$E;Z(m0 _
$5,120.00
WW -4
Modified Sewer Service
1.6
_
EA
$5(K).00
$8,000.00
SUBTOTAL _
..° $28,575.00
POTABLE WATER
W -1
Single Water Service
1.6
EA _
$950.00 _
$15,200.00
W 2
Doti Ne•Water Service
1.1
EA
$L,200. -00
$13,200.00
W 3
Modified Water Service
5
_
EA
_
$- ,;(X).00
$2,500.00
W -4
8" PVC (DR -1.4) Water Main
120
_
LF
$21.00_
$2,520.00
W 5
Re60c41te Existing Fire Hydrant
5
EA _
$500.00 _
$2,500.00
W -6
Relocate Existing Permanent Bacterial Sample Point
1
EA
$500.00_
$500.00
_
SUBTOTAL =
$36,420.00
EARTHWORK
E -1
2' Silt Fence (Single Row)
3,609
LF
$1.001
$3,609.00
SUBTOTAL =
53;609:00 °
DEMOLITION
X -1
Remove Existing; 2" PVC Water Line
280
LF
$5.00
$1,400.00
X -2
Remove Existing; Water Service
9
_
EA
$100.00
$900.00
X -3
Remove Existing; Valley butter
60
_
LF
$8.00__
$480.00
X -4
Remove Existing; HDPE Rear Yard Drainage
155
_
LF
510.01)_
$1,550.00
X -5
Remove 8" PVC Water Main
120
_
LF
58.00
$960.00
_
SUBTOTAL=
;" $5,290.00
PAVING.
P -1
3/4" Asphatic Concrete (Type S -III) Final Lift
7,842
SY
$4.45
$34,896.90
P -2
Valley Gutter
60
_
LF
$8.00
$480.00
P -3
6' Concrete Sidewalk (Reinforced 11
1,340
_
SY
$30.00
$40,200.00
P -4
Signing; and Marking
1
_
LS
_w
52,•000.00
$2,000.00
_
SUBTOTAL =
$77,576.90
TOTAL=
$151;470.90
Packet Page -432-