Loading...
Agenda 06/24/2014 Item #16C56/24/2014 16.C.5. EXECUTIVE SUMMARY Recommendation to award Invitation to Bid number 14 -6290 in the amount of $207,850 to Gulfstream Petroleum Services, Inc., for Project Number 71066, "North County Regional Water Treatment Plant Diesel Fuel Storage Tank Replacement," and authorize a budget amendment in the amount of $200,000. OBJECTIVE: Replace two 20,000 - gallon aboveground diesel fuel storage tanks at the North County Regional Water Treatment Plant (NCRWTP) that no longer comply with National Fire Protection Association (NFPA) Chapter 30 regulations. CONSIDERATIONS: The proposed scope of work for Project 71066, "NCRWTP Technical Support Projects," is consistent with the 2010 Water Capital Improvement Project (CIP) Update, page 2 of 4, line 69, as identified in the 2011 User Fee Rate Study. Funding for Project 71066 is available in, and is consistent with, the FY2014 Capital Budget. The NCRWTP has two 20,000 - gallon aboveground diesel fuel storage tanks, which supply diesel fuel to four emergency generators that provide emergency power during utility outages. These tanks were constructed and installed in 1992 as part of the original plant construction. The Florida Department of Environmental Protection (FDEP) completed its annual Storage Tank Facility Compliance Site Inspection on October 30, 2012, and its subsequent report dated February 15, 2013, identified a non - compliant condition with the diesel fuel storage tanks. The existing fuel tanks no longer comply with NFPA regulations that require emergency venting of the secondary containment for double - walled, single compartment tanks. The scope of this project includes replacing the two non - conforming fuel storage tanks with tanks that comply with NFPA Code 30. Invitation to Bid number 14 -6290 was advertised on April 23, 2014, with 2,061 notices sent to vendors that provide the described services. Thirty -seven prospective bidders downloaded full bid packages, and four bids were received. Staff opened the four sealed bids on May 15, 2014. One bid was deemed non- responsive; the three qualified bids are summarized below. VENDOR BID Gulfstream Petroleum Services, Inc. $207,850.00 ECS, Inc. $214,695.00 Quality Enterprises $234,530.00 Staff and the project design engineer, CPH, Inc., determined the lowest qualified bid to be fair and reasonable, and recommend awarding the contract to Gulfstream Petroleum Services, Inc. The bid is approximately 15 percent below the project consultant's $246,360.25 opinion of probable cost. The Purchasing Department concluded bidding was competitive and representative of market conditions. The quote summary, quote chart, engineer's letter of recommendation, and contract are attached (Attachments 1, 2, 3, and 4, respectively). The bid documents informed bidders that there might be unforeseen conditions associated with the project. The project cost incorporates an allowance of $20,000.00 that includes, but is not limited to, additional costs to replace damaged communication/electrical wiring and piping that may become apparent during construction. The price for any additional work shall be negotiated prior to commencement in accordance with the county's purchasing policy and the terms of the agreement. Packet Page -1058- 6/24/2014 16.C.5. FISCAL IMPACT: Funding is available in, and is consistent with, the FY2014 Capital Budget approved by the Board of County Commissioners on September 19, 2013. The source of funding is Water User Fees (412). A $200,000 budget amendment is required from Carry forward General Fund (919010). Since this is a replacement project to comply with regulatory requirements, there is no change in operation and maintenance costs. LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote for Board approval — SRT. GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: That the Board of County Commissioners, Ex- officio the Governing Board of the Collier County Water -Sewer District, award Invitation to Bid number 14 -6290 in the amount of $207,850.00 to Gulfstream Petroleum Services, Inc.; authorize the Chairman to sign and execute the contract after final approval by the County Attorney's Office; and, approve the necessary budget amendment to transfer funds in the amount of $200,000.00 from Carry forward General to Project 71066, "NCRWTP Diesel Fuel Storage Tank Replacement Project." Prepared By: Tom Sivert, PE, Senior Project Manager, Public Utilities Planning & Project Management Attachments: Attachment 1 Bid Summary Attachment 2 Bid Chart Attachment 3 Engineer's Letter of Recommendation Attachment 4 Contract (Due to the size of the contract, a web link has be provided for viewing at Contract. A hard copy is also available at the County Manager's Office.) Packet Page -1059- 6/24/2014 16.C.5. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.C.16.C.5. Item Summary: Recommendation to award Invitation to Bid number 14 -6290 in the amount of $207,850 to Gulfstream Petroleum Services, Inc., for Project Number 71066, "North County Regional Water Treatment Plant Diesel Fuel Storage Tank Replacement," and authorize a budget amendment in the amount of $200,000. Meeting Date: 6/24/2014 Prepared By Name: SivertTom Title: Project Manager, Senior, Public Utilities Engineering 5/30/2014 1:51:01 PM Approved By Name: Steve Messner Title: Director - Water, Water Date: 5 /30/2014 2:29:02 PM Name: HapkeMargie Title: Recycling Coordinator, Solid & Hazardous Waste Management Date: 6/2/2014 9:11:53 AM Name: JacobsSusan Title: Operations Analyst, Public Utilities Division Date: 6/2/2014 9:42:29 AM Name: WardKelsey Title: Manager - Procurement, Purchasing & General Services Date: 6/2/2014 1:33:20 PM Name: MarkiewiczJoanne Title: Director - Purchasing/General Services, Purchasing & General Services Date: 6/2/2014 1:54:20 PM Name: ChmelikTom Title: Director - Public Utilities Engineering, Public Utilities Engineering Packet Page -1060- Date: 6/2/2014 4:51:00 PM 6/24/2014 16.C.5. Name: JohnsonScott Title: Manager - Procurement, Purchasing & General Services Date: 6/4/2014 8:44:49 AM Name: JacobsSusan Title: Operations Analyst, Public Utilities Division Date: 6/5/2014 12:04:13 PM Name: BrilhartBrenda Title: Procurement Specialist, Purchasing & General Services Date: 6/5/2014 12:43:14 PM Name: SunyakMark Title: Project Manager, Principal, Public Utilities Engineering Date: 6/5/2014 1:37:02 PM Name: Joseph Bellone Title: Director - Operations Support, Utilities Finance Operations Date: 6/5/2014 2:36:48 PM Name: YilmazGeorge Title: Administrator - Public Utilities, Public Utilities Division Date: 6/9/2014 8:27:53 AM Name: TeachScott Title: Deputy County Attorney, County Attorney Date: 6/9/2014 2:10:45 PM Name: KlatzkowJeff Title: County Attorney, Date: 6/11/2014 4:17:23 PM Name: UsherSusan Title: Management/Budget Analyst, Senior, Office of Management & Budget Date: 6/13/2014 9:47:43 AM Name: OchsLeo Title: County Manager, County Managers Office Date: 6/16/2014 9:47:52 AM Packet Page -1061- �r-.a -+ lD M v O � > N d m C N m O _o ° C v 3 � o 0 p o z too Y a C m d v c6 Q d Y C O ~ m N � t0 w d LL d N d a U Z m s > m` J (n 9 N d LL E O J O F 7 O N N .O H O C O O O O O O O O O O O O O O O O 0 > >} Y} Y> Y} C N ll: f�0 '-I' to w O t}' N N I, N N M F- N 14 to N t/f n in -(4 Vh U (3J L z 0 fn Cl N Cl m j :- E E w t3D f6 J J E O J O F 7 O N N .O H O C L E E Z +�+ C1 C1 �Y a E E w V X J J w O O tD V c m a cc fa Co .4- �o n N Q J bo 1n N O Q C lD tb M 1- p d a Y L to fn L u Q o c c w "Ell C I -4I�IN r c i � V � v � 3 � v c REF41F 1 Ric C C Ct1 a+ W Q tv Co w C O C o c o E N � U 0 0 0 C 0 � o � O N N M O O 0 O O N to C O 3 u Cu C N o E z c0 L061 p Y Z j i v� O c i C + O N > c i u c 0 i � O O � a v C i Y H 0 C c O v fU C i O O v f H �_+ t1J ' f mc E E O l C C f +O w O O � H 0 f 3 G d C d 3 X '6 l30 p Y f v v z `o o ma'r 3z LL L a+ U.ac Z o-c y o Q E w O r U O U a 3 o a Y Y } }} Y Y Z Y 11111111 O O O O O O to O O fn O E O C N ll: f�0 n -:t M O [1 N tD N N N N to to to t/f V). L E E Z +�+ C1 C1 �Y a E E w V X J J w O O tD V c m a cc fa Co .4- �o n N Q J bo 1n N O Q C lD tb M 1- p d a Y L to fn L u Q o c c w "Ell C I -4I�IN r c i � V � v � 3 � v c REF41F 1 Ric C C Ct1 a+ W Q tv Co w C O C o c o E N � U 0 0 0 C 0 � o � O N N M O O 0 O O N to C O 3 u Cu C N o E z c0 L061 p Y Z j i v� O c i C + O N > c i u c 0 i � O O � a v C i Y H 0 C c O v fU C i O O v f H �_+ t1J ' f mc E E O l C C f +O w O O � H 0 f 3 G d C d 3 X '6 l30 p Y f v v z `o o ma'r 3z LL L a+ U.ac Z o-c y o Q E w O r U O U a 3 o a Y Y } }} Y Y Z Y 11111111 Packet Page -1062- 6/24/2014 16.C.5. O C > fU E U O v (3J Cu L t3D a 3 O c `o fU C O a_ fL �^ C d L1 O O to � C O m GaJ E eY C O (U N u -O C (U U 0 to C 3 � u o 7 N C 0 > � oo ' w y C y a`O+ u v L Q J d C M w a a 3 C fo C O s R Y O y C C m w c o a F a E c o c m o a3 en (U E E 2 o 0 3% c E m (SO uu c w o a"? Co a z V a m fn n E o m a F L m Cu m w m m "0 C C Co m Packet Page -1062- 6/24/2014 16.C.5. $350,000 $300,000 $250,000 $200,000 $150,000 $100,000 $50,000 $0 6/24/2014 16.C.5. Bid Results for ITB It 14 -6290 (NCRWTP Diesel Fuel Storage Tank Replacement) Eng Est Gulfstream Petroleum ECS, Inc. Quality Enterprises Services Packet Page -1063- KEY, Dashed G reen- AVERAGEBID Dashed black - + / -1 std dev of avg bid Dotted red- +(- 20% of eng estimate for horizontal construction Architects Environmental M /E /P Surveyors May 22, 2014 Engineers Landscape Architects Planners Transportation /Traffic Mr. Tom Sivert, P.E. Senior Project Manager Collier County 3339 Tamiami Trail E., Suite 303 Naples, FL 34112 Re: North County Regional Water Treatment Plant Diesel Fuel Storage Tank Replacement ITB No. 14 -6290 Engineer's Bid Review Dear Mr. Sivert: 6/24/2014 16.C.5. Suite 240 Tampa, FL 33609 Phone: 813.288.0233 Fax: 813.288.0433 The County received bid packages from four (4) contractors for the North County Regional Water Treatment Plant (NCRWTP) Diesel Fuel Storage Tank Replacement. One of the bidders was deemed non - responsive for missing information in their bid package. This project involves the replacement of the two (2) existing 20,000 - gallon diesel fuel storage tanks, replacement of the existing aboveground fuel piping, and reconnection of the associated electrical and controls equipment. The bids provided by the County are detailed below. Lowest Bid Bidder's Name Total Bid 1 Environmental Compliance Services, Inc. $214,695.00 2 Gulfstream Petroleum Services $207,850.00 3 Quality Enterprises USA, Inc. $234,530.00 All bid packages received, appeared to be complete and contain the required documents per the Request for Quotes. Based on our review of the big packages we have no objection to the County proceeding with the award of the bid to Gulfstream Petroleum Services in the amount of $207,850.00, which includes the County's $20,000.00 allowance. CPH called on the references listed in Gulfstream's bid package and each of the individuals spoken to were satisfied with the quality of work. The engineer's opinion of probable construction cost was $246,360.25. Each of the responsive bidders was within 15% of the estimated construction cost; therefore, all bids should be considered equal. Please contact us if additional information is needed concerning the above. Sincerely, CPH ENGINEERS, INC. W. Wade Wood, P.E. Vice President Packet PaFe -1064 - W W W. C h n v r p c 0 m