Loading...
Agenda 06/24/2014 Item #16A216/24/2014 16.A.21. EXECUTIVE SUMMARY Recommendation to approve the consultant rankings by quadrant for Request for Proposal 14 -6190 Golden Gate Stormwater Drainage Improvement Project Design and authorize staff to negotiate contracts with the top ranked firms for subsequent Board approval. OBJECTIVE: To obtain professional engineering services to upgrade the stonmwater management system in Golden Gate City. CONSIDERATIONS: In 2010, Collier County Stonnwater.Section contracted for a Golden Gate City Stormwater System Inventory and Master Plan. This work inventoried the existing stormwater system and divided Golden Gate City into four quadrants of approximately one square mile each. Within these quadrants, the areas were further subdivided into sub - systems. The inventory analyzed the condition of the existing stonmwater structures and pipes and made recommendations on a program to rehabilitate the existing stormwater system. Most of the system is more than 50 years old and has passed its useful lifespan and is now functionally obsolete. The Board of County Commissioners (Board) adopted the 2014 Capital Budget that identified the requirement for upgrading this stormwater system. On March 25, 2014 (Agenda Item 16A16), the Board authorized staff to negotiate contracts with the top ranked four (4) firms as this solicitation anticipated the selection of four professional engineering firms to conduct the referenced professional services for four specific quadrant boundaries (one finn for each quadrant), namely, the following: 1. Northwest Golden Gate City; 2. Northeast Golden Gate City; 3. Southwest Golden Gate City; and 4. Southeast Golden Gate City. The assignment of each quadrant was to be assigned in order of final ranking with each firm assigned a quadrant based on size and scope complexity. During agenda preparation and review, staff identified that the Selection Committee had not ranked the four top firms within each project quadrant pursuant to Florida Statute 287.055; thus, the Board had not approved those rankings for contract negotiation purposes. On Tune 3, 2014, the Selection Committee was reconvened and each of the four (4) qualified consultants was ranked by quadrant as depicted on the attaclunent. Staff recommends that the Board review and approve the consultant rankings by quadrant for Request for Proposal 14 -6190 Golden Gate Stormwater Drainage Improvement Project Design and authorize staff to negotiate contracts with the top ranked firm for subsequent Board approval; should negotiations not be completed with the top ranked firm, staff will commence negotiations with the second most qualified firm with the quadrant ranking pursuant to the CCNA process outlined in Florida Statute 287.055. Packet Page -862- 6/24/2014 16.A.21. FISCAL IMPACT: Funding is available in the FY14 Capital budget. The source of funding for this project is a transfer from the Unincorporated Area General Fund 111 into the Stormwater Capital Projects Fund 325. The implementation of the multi -year project will be subject to funding availability in Project 50129. The replaced stormwater infrastructure will have a functional lifespan of fifty (50) years. The recurring cost for periodic inspection and cleaning of all the stormwater system on a three (3) to five (5) year basis is estimated to be $5,000 per cycle. LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote for Board approval. —SRT GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management Plan related to this action. RECOMMENDATION: That the Board of County Commissioners approves the consultant rankings by quadrant for Request for Proposal 14 -6190 Golden Gate Stormwater Drainage Improvement Project Design and authorizes staff to negotiate contracts with the top ranked finns for subsequent Board approval. Prepared by: Joseph F. Delate, ASLA, PLA, Senior Project Manager, Transportation Engineering Department. Attachment: 1) Selection Committee Quadrant Rankings: 6/3/2014 Packet Page -863- 6/24/2014 16.A.21. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.21. Item Summary: Recommendation to approve the consultant rankings by quadrant for Request for Proposal 14 -6190 Golden Gate Stormwater Drainage Improvement Project Design and authorize staff to negotiate contracts with the top ranked firms for subsequent Board approval. Meeting Date: 6/24/2014 Prepared By Name: DelateJoseph Title: Project Manager, Senior, Transportation Engineering & Construction Management 6/4/2014 11:44:16 AM Submitted by Title: Project Manager, Senior, Transportation Engineering & Construction Management Name: DelateJoseph 6/4/2014 11:44:17 AM Approved By Name: ShueGene Title: Director - Operations Support, Transportation Administration Date: 6/4/2014 12:01:30 PM Name: LynchDiane Title: Supervisor - Operations, Road Maintenance Date: 6/4/2014 12:21:57 PM Name: Evelyn Colon Title: Purchasing - Procurement Specialist Date: 6/4/2014 12:36:34 PM Name: MarkiewiczJoanne Title: Director - Purchasing /General Services, Purchasing & General Services Date: 6/4/2014 12:47:06 PM Packet Page -864- 6/24/2014 16.A.21. Name: AhmadJay Title: Director - Transportation Engineering, Transportation Engineering & Construction Management Date: 6/4/2014 2:47:45 PM Name: JohnsonScott Title: Manager - Procurement, Purchasing & General Services Date: 6/5/2014 1:06:09 PM Name: TeachScott Title: Deputy County Attorney, County Attorney Date: 6/5/2014 1:37:26 PM Name: MarcellaJeanne Title: Executive Secretary, Transportation Planning Date: 6/10/2014 9:16:38 AM Name: KlatzkowJeff Title: County Attorney, Date: 6/13/2014 11:26:43 AM Name: UsherSusan Title: Management/Budget Analyst, Senior, Office of Management & Budget Date: 6/13/2014 11:27:12 AM Name: OchsLeo Title: County Manager, County Managers Office Date: 6/16/2014 12:03:57 PM Packet Page -865- G'.o�ier Courtly -P #: 14 -6190 Ale: Golden Gate City Stormwater Drainage Improvements Project Design Northwest Quadrant Notes Selection Committee Final Quadrant Ranking Sheet 6/24/2014 16.A.21. Northeast Quadrant Notes Final Rank Commutes Gary Margaret Shane Vanessa Diana for Name of Firm Putaansuu Bishop Cox Caporale Dueri Average Southwest Putaansuu Bishop Cox Caporale Dueri . Northwest CH2M Hill 1 1 1 1 1 1 Quadrant A noli Barber and Brundage 1 1 1 1 1 1 1 Johnson Engineering 2 21 2 2 21 2 2 CH2M Hill 31 31 31 31 31 3 3 RWA Consulting 41 41 41 41 41 41 4 Northeast Quadrant Notes Southwest Quadrant Notes Final Rank Commutes Gary Margaret Shane Vanessa Diana for Name of Firm Putaansuu Bishop Cox Caporale Dueri Average Southwest Putaansuu Bishop ; Cox Caporale Dueri . Northeast CH2M Hill 1 1 1 1 1 1 Quadrant Johnson Engineering 1 1 1 1 1 1 1 CH2M Hill 1 2 21 2 3 31 2.4 2 A noli Barber and Brundage 1 41 41 31 21 21 3 3 RWA Consulting 31 31 41 41 41 3.6 4 Southwest Quadrant Notes southeast Quadrant Notes and Instructions Final Rank Commutes Gary Margaret Shane Vanessa Diana for Name of Firm Putaansuu Bishop Cox Caporale Dueri Average Southwest Final Rank Gary Margaret Shane Quadrant CH2M Hill 1 1 1 1 1 1 1 RWA Consulting 2 2 2 2 4 2.4 2 Johnson Engineering 41 41 31 31 21 3.21 3 A noli Barber and Brundage 3 3 4 4 3 3.4 4 southeast Quadrant Notes and Instructions 6/3/2014 Purchasing Representative: Joanne Markiewicz, Director, Procurement Service; Evelyn Colon, Procurement Strategist Packet Page -866- Commutes Final Rank Final Rank Gary Margaret Shane Vanessa Diana for Name of Firm Average for Putaansuu Bishop Cox Caporale Dueri Southeast Quadrant Southeast _ Quadrant RWA Consulting 1 1 1 1 1 1 1 1 A noli Barber and Brundage 21 2 4 4 2 2.81 21 2 Johnson Engineering 31 3 21 31 3 2.81 21 3 CH2M Hill 41 4 31 21 4 3.41 41 4 6/3/2014 Purchasing Representative: Joanne Markiewicz, Director, Procurement Service; Evelyn Colon, Procurement Strategist Packet Page -866-