Agenda 06/24/2014 Item #16A136/24/2014 16.A.13.
EXECUTIVE SUMMARY
This item requires that ex parte disclosure be provided by Commission members. Should a hearing
be held on this item, all participants are required to be sworn in. Recommendation for approval of
an excavation permit to allow offsite removal of up to 100,000 cubic yards of fill from property
described in the Lely Resort PUD as Lely Resort — Signature Club EXP- PL20140001110. The
excess fill is a result of previously approved development lake excavation within Lely Resort and
the material is also tied to current and proposed excavations.
OBJECTIVE: To approve the removal of excess fill from the last phase of the Lely PUD.
CONSIDERATIONS: The Lely Resort PUD is an older PUD without the current standard
provision for removal of excess fill from the site. The Lely Resort DRI (84 -3C) was approved as
a PUD on December 9, 1986. It covers 2,892.5 acres. The latest PUD Amendment was
Ordinance 92 -15 approved on March 10, 1992.
There are approximately 25 separate excavation permits, many with modifications, for projects
within the 2,892.5 acres of Lely Resort and many of them are for multiple lakes. Several millions
of cubic yards of fill have been excavated within Lely Resort and spread for roads and building
pads. There were two requests to allow the removal of approximately 75,000 and 700,000 cubic
yards of stockpiled fill that were previously approved by the BCC because Lely Resort is
running out of places to stockpile fill in the middle of residential neighborhoods.
The petitioner estimates that they need permission to remove up to 100,000 cubic yards of
excavated material. During the earlier phases of construction, the developers were able to
stockpile fill on cleared sites for later use, but that is becoming less of an option as the project
nears completion.
For reference, a ten -wheel dump holds the equivalent of roughly 14 cubic yards of compacted
fill, so 100,000 cubic yards represents about 7,150 truckloads. At roughly 12 trucks per hour
(one every five minutes) working ten -hour days, it would take approximately 60 days to haul
100,000 cubic yards of fill offsite.
The petitioner has requested a lake excavation depth of 12 feet (Code allows up to 20 feet of
depth). The attached construction plans are provided for reference.
A commercial excavation permit is needed because the 100,000 cubic yards of fill to be hauled
offsite exceeds the thresholds for development excavation permits. The offsite hauling shall be
conducted in accordance with the Collier County Excavation Regulations in Section 22 -106 et.
seq. of the Code of Laws.
The Collier County Planning Commission (CCPC) review is not required per Section 22 -110 (b)
(2) of the Code of Laws.
Packet Page -671-
6/24/2014 16.A.13.
FISCAL IMPACT: The petitioner has paid $3,662.69 to amend the existing Private Excavation
permit to a Commercial Excavation permit. The petitioner has also agreed to pay the road
impact fee of $5.62 per 1,000 cubic yards for the proposed removal of 100,000 cubic yards of
material ($562.00).
LEGAL CONSIDERATIONS: This item is consistent with Section 2.12 of Ordinance 92-
15, Lely Resort PUD, which allows for offsite removal of excavated fill subject to the
provisions of the Collier County excavation ordinance. This item has been approved as to
form and legality, and requires a majority vote for Board approval. - SAS
GROWTH MANAGEMENT IMPACT: There is no growth management impact. The northwest
section of Lely Resort accesses Rattlesnake Hammock Road and Collier Blvd (CR 951) from
Grand Lely Drive, so there is minimal traffic through local neighborhoods. Lely Resort is a
vested DRI.
RECOMMENDATION: That the Board of County Commissioners (BCC) approve Commercial
Excavation permit PL20140001110 to allow the offsite removal of up to 100,000 cubic yards of
fill within the Lely Resort PUD.
Prepared By: Jack McKenna P.E., County Engineer, Engineering Services Department Growth
Management Division
Attachment: 1) Location Map
2) Construction Plans (attachments 2 through 6)
3) Excavation Permit PL20140001110
Packet Page -672-
6/24/2014 16.A.13.
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.16.A.16.A.13.
Item Summary: This item requires that ex parte disclosure be provided by Commission
members. Should a hearing be held on this item, all participants are required to be sworn in.
Recommendation for approval of an excavation permit to allow offsite removal of up to 100,00
cubic yards of fill from property described in the Lely Resort PUD as Lely Resort - Signature Club
EXP- PL20140001110. The excess fill is a result of previously approved development lake
excavation within Lely Resort and the material is also tied to current and proposed excavations.
Meeting Date: 6/24/2014
Prepared By
Name: HouldsworthJohn
Title: Site Plans Reviewer, Senior, Natural Resources
5/28/2014 10:08:56 AM
Approved By
Name: PuigJudy
Title: Operations Analyst, Community Development & Environmental Services
Date: 5/28/2014 2:19:21 PM
Name: McLeanMatthew
Title: Project Manager, Principal, Operations and Regulatory Management
Date: 5/28/2014 4:27:57 PM
Name: McKennaJack
Title: Manager - Engineering Review Services, Natural Resources
Date: 6/5/2014 12:53:19 PM
Name: MarcellaJeanne
Title: Executive Secretary, Transportation Planning
Date: 6/10/2014 9:32:21 AM
Name: StoneScott
Title: Assistant County Attorney, CAO Land Use /Transportation
Date: 6/13/2014 8:17:54 AM
Packet Page -673-
6/24/2014 16.A.13.
Name: McLeanMatthew
Title: Project Manager, Principal, Operations and Regulatory Management
Date: 6/13/2014 8:30:03 AM
Name: FinnEd
Title: Management/Budget Analyst, Senior, Transportation Engineering & Construction Management
Date: 6/13/2014 9:10:48 AM
Name: KlatzkowJeff
Title: County Attorney,
Date: 6/16/2014 2:25:02 PM
Name: OchsLeo
Title: County Manager, County Managers Office
Date: 6/16/2014 2:47:14 PM
Packet Page -674-
6/24/2014 16.A.13.
Packet Page -675-
iU
l7
0'G
Ql
Ol
1
SDP AMENDMENT PLANS TO AR -2879 & PL-2009-0849
z
� ,(
ROA
J
W�7
SIGNATURE CLUB "A
= z ° e
�U
�if� mow,£ fi
PROJECT
LOCATION
H
PART OF THE PLANNED UNIT DEVELOPMENT FOR LELY RESORT (ORDINANCE #92 -15)
W z A�
COLLIER COUNTY PROPERTY IDENTIFICATION #55425002751
, z
PART OF SECTION 27, TOWNSHIP 50 SOUTH, RANGE 26 EAST
,>
COLLIER COUNTY, FLORIDA
PROJECT LOCATION MAP
PROPERTY INFORMATION
OWNER OEVE; OPMEf?l.t.C.
NANCE8811580} }y
uNrt oEVE�oPniENi mum
OWNED & DEVELOPED BY:
STOCK DEVELOPMENT, L.L.G.
2647 PROFESSIONAL CIRCLE, SUITE 1201
NAPLES, FLORIDA 34119
PHONE: (239) 592 -7344
PROJECT SITE MAP
RESIDENTIAL BUILDING 1
W
MW
W
Z
.J
F
Z
W
i
IL
o
W 21
y N'
W W'
>
�[ O
U U
0
F-
Z
W
J
U
0)
N
.p
N
O
D
W
ROA
�if� mow,£ fi
PROJECT
LOCATION
H
PROJECT LOCATION MAP
PROPERTY INFORMATION
OWNER OEVE; OPMEf?l.t.C.
NANCE8811580} }y
uNrt oEVE�oPniENi mum
OWNED & DEVELOPED BY:
STOCK DEVELOPMENT, L.L.G.
2647 PROFESSIONAL CIRCLE, SUITE 1201
NAPLES, FLORIDA 34119
PHONE: (239) 592 -7344
PROJECT SITE MAP
RESIDENTIAL BUILDING 1
W
MW
W
Z
.J
F
Z
W
i
IL
o
W 21
y N'
W W'
>
�[ O
U U
0
F-
Z
W
J
U
0)
N
.p
N
O
D
W
C-)
X—
(D
QJ
(D
LELY RESORT D L*PMENTSTANDARDS
RESIDENTIAL BUILDING
J
PUD ORDINANCES "--X-2 PARAMETERS z
GARDEN AP R-ENT
D-0-ND-
G
MjIN A.N.IgELV DRIVE - t7 N
D. ROW.) ---- 10-
PRO-
BOUNDARY o
U up
mYP.) It
0�7
Q mill
"NATURE z w w
W 10
w
7,
/PROJBOUNDARY PARKING SUMMARY ii
ECT ii
D
R:I.- =Z"' I.NAU -I `PA`� -E.
P 1".
R03- R-IRED P-ED PR-L-11-
LI
N
N
11 T, - r-- -'s;
"GPLAYER..LUI.
614ED P.U.O. RESORT CEWEW1FIE9MkNf1AQ.
Lai
LAKEXI
V
- W-1
V,
LDG
G
LIJ
BLIJ
15A
SIGNATURE CL . .-L.
T
EXIS NGLAKESIO
(ZONED P.U.D.
WATER MANAGEMENT)
BOUNDARY
EXISTING GREENLINKS
(ZONED P.U.D. RESORT CE
NTM
GENERALSITENOTIE
U
J
z
J w
U I L
a. w
LLI 0
W
W
U z
Z 0 0
N
z
W
J
U
AN
N)
0
ICY)
LO
(D
rn
(D
90
=-77
HASE3CONSTRUCTION
Limme GRAND LELY DRIve
BOUNDARY 7HASEACONSTRUCTIONA STVP
mp.)
Si
44, 1 grlu d3p5�Fr
/� \X PHASE
E 4
7 N UCTION I
API4ASi4C6I4iTR6CTl0N"
"It" ll LIMITS
lo
APHASE I CS
GENERALDRAINAGENOTES
,lT
PHASE 2 ONSTRuCno,,I&
s
7E
- ''-' I , \ " \ CG14I � 5TR C2pI I MNG PLAYERS CI-618
l PROJECT
%
BOUNDARY�,
rl
Xi
NZ
EXISTING I-AKE 0 10
i r
AOHAS; 'lDNS,
E 2
'LIMITS—_
LITTORAL SHELF PLANTING AREA NOTES
FN
A—V f
To N.
G.V.D.
CONVERSION TABLE
A
IELEVATION 1C.—
SURFACEWATER
MANAGEMENT SUMMARY
PARAMETERS
IBASIN A2
HIGH VISIBILRY STANDARD
NOTES:
TYPICAL PEDESTRIAN CROSSWALKS
0
jL F
3 Z
j 0
W
O Ng
0
z z
IK
z
,W. - ;
W
z
U)
u
J
J z
F: I
Z (L
w w
1 0
I <
0 z
W
>
W
Z
U <
o IL
It
W
F-
z
W
-j
U
0)
N
►p
NJ
CD
VJ
(D
orcl
(D
I
cr)
1p
7
Rl-
D Z
SURFACE WATER POLLUTION
0
------------
W
Z'
--------------
01
z III it
W w
1010 z
W�
u
—. 7gr,.
A
PLAN E�—ONI
I—S
BARRIER FOR PAVED DITCH
ppkYp B
-j"
BLDO
PROJECT
BOUNDARY
PREVENTION NOTES:
D Z
SURFACE WATER POLLUTION
0
W
Z'
01
z III it
W w
1010 z
W�
u
—. 7gr,.
PLAN E�—ONI
I—S
BARRIER FOR PAVED DITCH
-V
GRAVEL CONSTRUCTION ENTRANCE
,LLATiONS AT w
,rRUCTURES fy
PROJECT-
G..ENLI.KS BOUNDARY .....
y EXISTING ce
—i tt�:
7
BALES BACKED By FENCE
PLAN
i Me TYPE III SILT FENCE •
ELEVATION ELEVATION PLAN
PLAN
BARRIERS FOR FILL SLOPES
EIALED HAY OR STRAW BARRIERS AND SILT FENCES STAKED TURBIDITY BARRIER
ELEVATION ELEVATION LT FENCE PROTECTION TYPEIHSILTFENCE
LEGEND TYPE Ill., •
TYPE II TYPE I
BARRIER FOR UNPAVED DITCHES
—'l, SILT FENCE APPLICATIONS
TYPE
NOTES:
81 4
um No—.
FLOATING TURBIDITY BARRIERS TURBIDITY BARRIER APPUCATIONS—'-----a^ -,-lARlIALINLET C.MPLETEDINLET ITCH BOTTOM INLET
ELEVATION SEClU)H
GENERALNOTES LyI
PROTECTION AROUND INLETS OR SIMILAR STRUCTURES TYPE III SILT FENCE
BARRIER
0)
NA
CD
0)
r)
77
M
rt
orq
M
(�n
00
9
TYPICAL EXISTING LAKE SECTION
Sq
LAKE EXCAVATION CHART
TYPICAL LAKE SECTION
I.SPA PLANTING SPECIES
1=0RA1_ PLANTING CALCULATIONS
PLANTNGSIN LITTORALSHELF PLAWINGAREA LRTORAL SHELF PLANTING AREA NOTES:
EA
WrINW."-
.22-61. m7m."NE
Te
LITTORAL SHELF PLANTING AREA
TYPICAL LAKE SECTION WITH LITTORAL SHELF PLANTING AREA,,
NOTES
unw.Gara --- 7
LITTORAL SHELF PLANTING AREA SIGN DETAIL
TYPICAL PAVING SECTION
TYPICAL CONCRETE SIDEWALK DETAIL
—LEY GUTTER
CONCRETE CURB NOTES:
CURB AND CURB AND
GUTTER DETAILS
1
LIME
TYPICAL PAVER BRICK SECTION
NOTES:
TYPICAL PAVER BRICK SECTION
LIMEROCK & SUBGRADE NOTES.
TEMPORARY TURN-AROUND DETAILS,
D Z
0
x* '
7 z 8
o
U
uw 1-9
w
z
w I'll
z i
ag
�;
&A
a)
Z
J w
U I
(L
W 0
j
w
w
u
Z 0
0 U)
ui iz;
w
D
U
(n
_j
w
QZ
Z
a.
cy)
N
C)
41.
6/24/2014 16.A.13.
COLLIER COUNTY
Growth Management Division
Engineering Services
June 25, 2014
Keith Gelder
Stock Development LLC
2647 Professional Circle Suite 1201
Naples, FL 34119
Re: Commercial
Excavation Permit No. 60.106, PL20140001110
"Classics Cay"
Section 27, Township 50 South, Range 26 East
Collier County, Florida
Dear Mr. Gelder:
THIS IS YOUR PERMIT AND MUST BE POSTED ON SITE
In accordance with the authority given in County Ordinance No. 04 -55, Section 2.E., Article IV, Sections 22 -106-
22 -119, as amended, your application for a "Commercial' Excavation is hereby approved subject to the following
stipulations:
1. The excavation shall be limited to a bottom elevation of -7.4 ft. NGVD. All disturbed areas proposed for
lake excavation shall be excavated to a minimum elevation of -1.4 ft. NGVD.
2. The lake littoral zone shall be created and planted as indicated on the Plan of Record and in accordance
with County Ordinance 91 -102 Section 3.05 -10 as amended.
3. Off -site removal of material shall be limited to 100,000 CY.
4. All provisions of Collier County Ordinance No. 04 -55, Section 2.E. shall be adhered to.
5. Where groundwater is proposed to be pumped during the excavating operation, A Dewatering Permit shall
be obtained from the South Florida Water Management District, and a copy provided to Engineering Review
Services for approval prior to the commencement of any dewatering activity on the site.
6. No blasting will be permitted unless issued a separate permit by Collier County Engineering Services
Department.
7. If trees are to be removed as a result of the excavating operation, a Vegetation Removal Permit, required
by Land Development Code, Division 3.05 as amended shall be obtained from Collier County
Environmental Services Department before work shall commence.
8. A 20 ft. maintenance easement shall be provided around the perimeter of the lake and a 20 ft. access
easement to it shall be provided from a right -of -way. The easement shall be accessible to all maintenance
vehicles.
9. Stockpile side slope shall be at a maximum of 4:1 unless fencing is installed around the entire perimeter of
the stockpile area.
Packet Page -681-
6/24/2014 16.A.13.
10. Any stockpile in place for a period exceeding 60 days shall be seeded and mulched and erosion control
devices installed.
Since we are in receipt of the excavation cash bond check #21258 in the amount of $39,240.00 and the
permit/review fee in the amount of $1,426.76, this letter is your authorization to proceed with the excavation
project in accordance with your plans and the above - mentioned stipulations.
This permit is valid for (1) year and must be renewed on the anniversary date of permit issuance.
The Plan of Record for this excavation is titled "Classics Cay" Sheets 1 -17 prepared by Mitchell Engineering
Group, signed and sealed by Chris Mitchell.
Should you have any further questions regarding this matter, please feel free to contact me at (239)- 252 -8279
Sincerely,
Matthew McLean P.E.
Principal Project Manager
Engineering and Environmental Services Department
cc: EX 60.106, PL20130002172 File
Packet Page -682-