Loading...
Agenda 06/10/2014 Item #11B 6/10/2014 11.B. EXECUTIVE SUMMARY ■, Recommendation to approve and authorize the Pelican Bay Services Division to prepare, sign and submit a Nationwide Permit for the maintenance dredging of Clam Pass due to concerns about the critical condition of the Pass, approve necessary budget amendments, and make a finding that this project promotes tourism. OBJECTIVE: For the Board of County Commissioners to approve and authorize the Pelican Bay Services Division to prepare, sign and submit a Nationwide Permit for the maintenance dredging of Clam Pass due to concerns about the critical condition of the Pass. CONSIDERATIONS: On December 11,2012,the Board of County Commissioners clarified and reaffirmed that the Pelican Bay Services Division has the sole responsibility for advising the County on dredging and maintaining Clam Pass and will manage such activities for the County. (Ordinance No. 02-27, as amended). Periodic hydraulic and physical monitoring of the Clam Pass has been undertaken since the March 2013 dredging to monitor the inlet dynamics and its stability. The data and analysis of the 12 month post dredging conditions indicate shoaling and flow restriction has occurred in the interior portion of the pass to such an extent as to threaten the inlet stability. Due to concerns of this critical condition, PBSD consulting engineer and biologist has recommended to the PBSD n Advisory Board to authorize maintenance dredging of the pass. ADVISORY COMMITTEE RECOMMENDATIONS: On May 7, 2014, the PBSD Advisory Board voted to prepare for submittal of a permit application that would allow for maintenance dredging of Clam Pass to include areas not eligible to be dredged in the emergency reopening that occurred in March 2013. The proposed maintenance project is intended for dredging the interior sections of the Pass (Sections B & C of the dredging template previously dredged). In order to cover all contingencies that may be in place by the time the maintenance dredging permit has been reviewed and approved, which could be two months from now, the permit application will include dredging all three Sections with a final determination of the actual dredge area made at the time of bidding for the project. (See attached exhibit). On May 29, 2014 Administrator Neil Dorrill appeared before the Tourist Development Council requesting approval of the maintenance dredging for Clam Pass. The board voted unanimously to approve funding of$34,500 for the application and design. The TDC requested that the construction cost(s) be returned to the TDC for a recommendation. FISCAL IMPACT: Funding is not presently in place and will require a budget amendment. The estimated cost for permit& design activities is approximately $35,400 and the construction cost estimate is $343,900. A budget amendment reducing TDC Beach Renourishment and Pass Maintenance Fund (195) reserves and increasing the Clam Pass Dredging project budget by a total of$378,400 is required. The breakdown of project activities is as follows: Packet Page-343- 6/10/2014 11.B. Activity Amount Firm Prepare & Submit Application $ 18,100 THA/H&M Coordinate with USFWS (if necessary) $ 1,400 THA Design&Plans $ 15,000 H&M Construction(Engineer's Cost Estimate attached) $343.900 TBD Total $378,400 LEGAL CONSIDERATIONS: Ordinance No. 92-60, as amended, provides that pass and inlet maintenance is an authorized expenditure for tourist development taxes. The Board of County Commissioners must make a finding that this expenditure of tourist development taxes promotes tourism. The Board may accept the recommendation of the TDC or the Board may make its own finding and recommendation. This item has been approved as to form and legality and requires majority vote for approval. -CMG. GROWTH MANAGEMENT IMPACT: None RECOMMENDATION: For the Board of County Commissioners to approve and authorize the Pelican Bay Services Division, through its Administrator, to prepare, sign and submit a Nationwide Permit for the maintenance dredging of Clam Pass due to concerns about the critical condition of the Pass, approve necessary budget amendments and make a finding that project expenditure promotes tourism. Prepared by: Neil Dorrill,PBSD Administrator tTh fl Packet Page-344- 6/10/2014 11 .B. COLLIER COUNTY Board of County Commissioners Item Number: 11.11.B. Item Summary: Recommendation to approve and authorize the Pelican Bay Services Division to prepare, sign and submit a Nationwide Permit for the maintenance dredging of Clam Pass due to concerns about the critical condition of the Pass, approve necessary budget amendments and make a finding that this project promotes tourism. (Neil Dorrill, Pelican Bay Services Division Administrator) Meeting Date: 5/27/2014 Prepared By Name: BrockMaryJo Title: Executive Secretary to County Manager, County Managers Office 5/20/2014 8:55:13 AM �-. Submitted by Title: Executive Secretary to County Manager, County Managers Office Name: BrockMaryJo 5/20/2014 8:55:14 AM Approved By Name: OchsLeo Title: County Manager, County Managers Office Date: 5/20/2014 3:51:35 PM Packet Page-345- 6/10/2014 11 .B. r 4�,• - �on°iv E li O1 N t o - a . !--- _ - 7_7:— = 2,2,v,,,r4.' • -'-'--,.:31,1 '-'-'2'-''''F.er+fi„,."ri•A' , . ' --:''.- - 0 CV 1(IZ4 a 3 *+� x o �`' let r N O t4. Ln CP• ZZ M,�. z �jp 4LJ Z(— w0 Z c � 0 p La CI P m �_ s., .� e b sa \m N Z N o Q o Z �— } i,... O �� O Q co „), , .:4,',,L. , \F �1- .fir o P1yt' _ 3.61.5 ;- I'ry r v I . '-6.-.11. ,..,, ,...< ),. - w, r. . ow ...,,;.... _._ v- 4 Q 4 s �W p '* 1+50 - ® 1+00 F — ®•• 0+50 • § t ■ +x r_4- } £�k i 'S-'� .0 : x 4,5 i' s. 6 � r,k 4:1 �. .4 f as l ,4-, c I +A ,.'. '4 ,sr kp „i"-v-1 c`ry� n`' - i� .ti. 3. yd x- 1, x r :5!,..._;;;',::::;.„.„,!-_-t ._:::....,+,..,-,€°x4",k XSS- "'t +�ia Y'�t` it -" y 'i �is.#n s �,.%,"--,...-4'*-. m »� ;fir„ -` ,-:: S � ��,,' � ,„�,� �xm g ,fir,-;--,- �Ez? � f m Y LL 4- o an z ( I� gn cF.>-74 ttoA "---\_ - W aRjOJt JN�W C_ ttzo Ul o -,aa a Packet Page-346- T T ^ 6/10/2014 11 .B. H V MIS 1 T` N 5679 STRAND COURT MOORE NAPLES,FLORIDA 34110 "4" 4 FAX 239 594 2025 lz ENGINEERS PHONE:239 594 2021 COASTAL : I ENGINEERING DESIGN AND PERMITTING May 19,2014 Sent Via E-mail MEMORANDUM: To: Neil Dorrill Administrator, Pelican Bay Services Division From: Mohamed Dabees, Ph.D., P.E. Regarding: Opinion of Probable Costs for 2014 Clam Pass Maintenance Dredging This memo provides an opinion of probable construction costs for the proposed 2014 maintenance dredging of Clam Pass. The attached bid schedule provides itemized cost estimates with a recommended construction cost budget of $350,000. This estimate is based on previous costs of maintenance of Clam Pass with adjustments for the Consumer Price Index. We have included a 15% contingency to allow for additional shoaling that may occur between when the condition survey was done and the start of dredging. The proposed dredging template includes the inlet channel (Section A), and interior flood shoal Sections B and C.The proposed dredging includes the interior part of section C which was not dredged during the previous 2013 dredging. The referenced permit plans indicate the dredging cross-sections and volumes as documented by the March 2014 survey. The following table provides the breakdown of the available material to be dredged out of each the three sections of the dredge template based on the survey of March 2014. Table 1. Dredge quantities for each template section based on March 2014 survey Template Section Volume (CY) Section A 2,800 Section B 4,500 Section C 5,700 Total i 13,000 The means and methods of dredging will be up to the contractor and may involve hydraulic, mechanical or a combination of methods as determined by the contractor. The permit review will determine construction limitations for this interim maintenance dredging project. Once those limitations are determined, plans and specifications will be finalized for bidding this project. Attachment Packet Page-347- 6/10/2014 11.B. COLLIER COUNTY BID SCHEDULE WITH PRELIMINARY COST ESTIMATE COLLIER COUNTY CLAM PASS MAINTENANCE DREDGING-2014 May 19,2014 COST ESTIMATE HUMISTON AND MOORE ENGINEERS FILE NO.13-078 Estimated Unit Total Item Quantity Unit Cost Cost 1. Mobilization and demobilization 1 Job L.S. $ 75.000 2. Survey control and progress surveys 1 Job L.S. $ 10,000 3. Dredging of Sections A,B,and C 13,000 cy $_14_ $182,000 beach fill placement and grading 4. Turbidity monitoring 1 Job L.S. $ 10,000 5. Removal of non-beach compatible material resulting from Sections A,B&C1 100 cy $ 30 $ 3,000 6. Final grading&tilling 1 Job L.S. $ 8,000 7. Restoration of construction access and staging area 1 Job L.S $ 5,000 8. Payment and 1 Job L.S. $ 6,000 Performance Bond 9. Contingency 15 % L.S. $ 44,850 Total Base Bid $343.850 1 From within the allowable dredge cut Packet Page-348-