Agenda 05/27/2014 Item #16C5 5/27/2014 16.C.5. EXECUTIVE SUMMARY Recommendation to approve a work order for $207,790 to Douglas N. Higgins, Inc., under Request for Quotation #08-5011-116 for Underground Utility Contracting Services for the Thomasson Drive 24" Force Main,Project Number 70044. OBJECTIVE: Meet demand, stay in compliance, serve customers efficiently, and improve reliability by providing an alternative path for wastewater to flow from Master Pump Station (MPS) 302 to the South County Water Reclamation Facility(SCWRF). CONSIDERATIONS: The proposed scope of work for Project 70044 "Force Main Technical Support" is consistent with the 2010 Water Capital Improvement Project (CIP) Update, page 2 of 4, line 56, as identified in the 2011 User Fee Rate Study. Funding for project 70044 is available in, and is consistent with, the FY2014 CIP Budget. At its regular meeting on September 11, 2012, under Agenda Item IIE, the Board of County Commissioners (Board) approved Contract#11-5782 for three design contracts for the Wastewater Basin Program. The MPS 306 Force Main project is one of many projects under design as part of the Wastewater Basin 306 Program. More construction projects are planned as the program continues and as funding becomes available. Wastewater MPS 306 is located near U.S. 41 and Thomasson Drive. Currently, MPS 306 discharges through a force main to MPS 302 located at the intersection of Rattlesnake Hammock Road and Santa Barbara Road. MPS 302 discharges through a 36-inch force main to the SCWRF. Approximately 80 percent of the south wastewater transmission system is conveyed through MPS 302 to the SCWRF. Currently, there is no alternative path for these flows to reach the SCWRF; therefore, the 36-inch force main cannot be shut down for preventative maintenance. Further. if the 36-inch force main were to fail, approximately 80 percent of the south transmission system would be out of service with a high potential for sanitary sewer overflows. To address these vulnerabilities, a new force main is under construction from NIPS 306 to the SCWRF. This will provide an alternative path, allowing flow from MPS 302 to MPS 306 and then to the SCWRF. Attachment six shows the locations of the existing and proposed facilities. Under current flow conditions, this project will directly benefit approximately 64,000 customers. Rapid land development in this area necessitates force main construction in phases, as easements can be acquired. This scope of work is Phase 5 of 7 required to construct the approximate 18.000-foot force main from MPS 306 to the SCWRF. Phase 5 is approximately 2,000 feet. Phase 1 (2.000 feet) was authorized by the Board on April 22, 2014(Item 16C3). Phase 4(1.300 feet)is also on the May 27. 2014, Board Meeting Agenda for approval (Item 16C3). Phases 6 and 7, approximately 900 feet each, were constructed in November and December 2013. The remaining Phases 2 and 3 are planned to be constructed by the end of FY 2015. The county distributed Request for Quotation, "Thomasson Drive 24" Force Main- (Attachment 2), on March 10, 2014, to the five vendors under Fixed-Term Underground Utilities Contract #08-501 1. Five contractors submitted quotations by the March 28, 2014, deadline. The quotations are summarized below and in Attachment 1. Packet Page -842- 5/27/2014 16.C.5. VENDOR PROJECT COST Douglas N. Higgins $ 207,790.00 Quality Enterprises $ 261,805.00 Mitchell & Stark $ 269,910.00 Kyle Construction $ 273,684.00 Haskins, Inc. $ 319,780.00 Staff determined the lowest quote to be fair and reasonable and recommends awarding the project to Douglas N. Higgins, Inc., the lowest responsive and qualified vendor. The quote is $62,210 (23 percent) less than the engineer's cost opinion. The design professional, Johnson Engineering, Inc., recommends award to Douglas N. Higgins, Inc., in its letter dated April 1, 2014 (Attachment 4). Douglas N. Higgins, Inc., has a satisfactory performance and warranty record on previous, similar utility-related projects. The quote specifications informed the bidders there may be unforeseen conditions associated with the project. The quote amount incorporates an allowance of $10,000 for owner-directed additional work which includes, but is not limited to, un-located utilities and unforeseen site conditions. The price for any additional work will be negotiated prior to commencement in accordance with the county's Purchasing Policy and the terms of the agreement. FISCAL IMPACT: Funding is available in, and is consistent with, the FY2014 Capital Budget approved by the Board on September 19, 2013. The source of funding is the Wastewater User Fee Fund (414). The project is expected to be complete by October 2014. There will be a minor increase in annual maintenance costs for the additional force main. LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote for Board approval.—SRT GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: That the Board of County Commissioners, Ex-officio the Governing Board of the Collier County Water-Sewer District, approve a work for$207,790 to Douglas N. Higgins,Inc., under Request for Quotation #08-5011-116 for Underground Utility Contracting Services for the Thomasson Drive 24" Force Main, Project Number 70044; and, authorize the Chairman to sign and execute the work order after approval by the County Attorney's Office. Prepared By: Wayne M. Karlovich, Senior Project Manager,Public Utilities PPMD Attachments: Attachment 1-Quote Tabulation Attachment 2- Request for Quotes Attachment 3-PPMD Analysis of Quotes Attachment 4- Recommendation Letter Attachment 5- Work Order Attachment 6-Project Location Exhibit Packet Page -843- 5/27/2014 16.C.5. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.C.16.C.5. Item Summary: Recommendation to approve a work order for $207,790 to Douglas N. Higgins, Inc., under Request for Quotation #08-5011-116 for Underground Utility Contracting Services for the Thomasson Drive 24" Force Main, Project Number 70044. Meeting Date: 5/27/2014 Prepared By Name: KarlovichWayne Title: Project Manager, Senior,Public Utilities Engineering 5/2/2014 12:43:24 PM Submitted by Title: Project Manager. Senior, Public Utilities Engineering Name: KarlovichWayne 5/2/2014 12:43:2.5 PM Approved By Name: HapkeMargie Title: Recycling Coordinator, Solid Waste Date: 5/2/2014 2:44:33 PM Name: PajerCraig Title: Project Manager,Principal, Public Utilities Engineering Date: 5/2/2014 8:44:48 PM Name: BrilhartBrenda Title: Procurement Specialist,Purchasing& General Services Date: 5/5/2014 8:21:39 AM Name: JohnsonScott Title: Procurement Specialist, Purchasing&General Services Date: 5/5/2014 10:53:57 AM Packet Page -844- 5/27/2014 16.C.5. Name: JohnsonScott Title: Procurement Specialist,Purchasing& General Services Date: 5/5/2014 10:54:06 AM Name: NagySteve Title: Manager-Wastewater Collection, Wastewater Date: 5/5/2014 11:32:48 AM Name: Joseph Bellone Title: Director-Operations Support,Utilities Finance Operations Date: 5/8/2014 4:46:57 PM Name: ChmelikTom Title: Director-Public Utilities Engineering, Public Utilities Engineering Date: 5/9/2014 8:34:58 AM Name: JohnssenBeth Title: Director- Wastewater, Wastewater Date: 5/9/2014 10:34:17 AM Name: TeachScott Title: Deputy County Attorney, County Attorney Date: 5/9/2014 1:47:05 PM Name: YilmazGeorge Title: Administrator-Public Utilities, Public Utilities Division Date: 5/12/2014 11:40:20 AM Name: KlatzkowJeff Title: County Attorney, Date: 5/14/2014 3:45:07 PM Name: UsherSusan Title: Management/Budget Analyst, Senior, Office of Management&Budget Date: 5/19/2014 12:03:01 PM Name: OchsLeo Title: County Manager. County Managers Office Date: 5/19/2014 12:29:45 PM Packet Page -845- 5/27/2014 16.C.5. E a N- m m °a QN- n N v r r - g e — m N 0 N w M O . w w w w w w w w w w w w w w w w w Y U Q o E g E E 0 0 o O E O o m ° ° ° ° M ° g Z 4) N e c [8 N O E E a 0 0 J co; M e u� u-i < N N> M N < A M M N Q f...;;' - f 7. N 0 F- J w w w w w w w w w N w w w w w w w w w } o 0 O 0 o w w w w w Z w w w w w w w O w w 0 ,E, 0 o o a °o J • o N n n M m d N a r It N a cc• 0 a CO ,a w w w w Al w w w w w w w w w CO w w w w J J w 8 E E E SEES S °o E E E °o I o o O o m o m o F F- ? • • m w w w w w w w w w w w w w w w •c m a CO CO ce CO CO CO m M e N- r m n m m - - i M r m 0 m8 ....7 LL C w w w w w w w w w w w w w w w w w w w w w w w w J �,O W = n > 0 mo it,O 2 w . w w w O0 7 w w w w w w w w w w CO N co E O O O J e• m N N N N m m r N N n r m N vl r F Q N 0 H U w w w w w w w w w w w w w w w w 3 U' 0 EE EE O o e- N M V S o e- N 00 M < C C C C C M Om C O F o C O_ O_ O_ O F- N• CO o o O 0 o g 0 V! 1.1 Q N VOi U) J J J 1 Z Q J ,` c-- w w w w C ¢O w w w w Q w O O O O O O O m m m m J J W W J W W -i -� .J W 0 N Ul UJ U) } O - N N N N N N O N — N o a U ou.. 2 rn = o c o. c 17,:r° a t.,2.-, -a o g L R o o o ac o ` ; 0 m - O a E N CU ❑ r.N O ` a a F m F 2.j' C . C L M O ❑ _ , u G - U U 0 O c O E E E a U o - o ° ¢ o a a ¢ W2. E F- c 2 > m ,. i o =_ _.. - ` m N 0 0 ° m w 5 u F y5 = c 2 2 t2 g v O ❑ 7.i i o U o w ". a P a C i N 'a a �, o 22' w y.c. a v o j c rn m m c 0 o - p T ' rn o - c 9 E m 3 .. a c m ov _ c c S m A c A « c a o -a= ;,IT, ` i g a c w N U O n rn o O o 0 N 0 L Q� n n v o - N M a . .o m m Packet Page -846- 5/27/2014 16.C.5. Co#e-r Cermity Administathie Service Division Purchasing REQUEST FOR QUOTATIONS FOR MULTIPLE PROJECTS UNDER CONTRACT #08-5011 "Annual Contract for Underground Utilities" Date: March 10, 2014 From: Brenda Brilhart, Procurement Strategist 239-252-8446, Telephone Number 239-252-6697, Fax Number brendabrilhart(a�colliergov.net To: Prospective Vendors Subject: RFQ #08-5011-116—Thomasson Drive 24" Force Main ($270K) As provided in the referenced contract, the Collier County Purchasing Department is soliciting quotes for the referenced project. RFQ Due Date: 4:00 PM March 28, 2014 Non-Mandatory Pre-Quote Meeting N/A Q&A Deadline: 5:00 PM March 25, 2014 Number of Days to Final Completion: Substantial 60, Final 30 Total 90 Plans and Specs: Attached Liquidated Damages: $1,215 Per Day Payment & Performance Bonds Yes Direct Material Purchase No Your quotation response for this project is due no later than the date and time specified above. We will not accept any quotation responses later than the noted time and date. If your firm is unable to respond electronically, your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specified. We look forward to your participation in this request for information/quotation process. Firm's Complete Legal Name Telephone Number/ Fax Number Signature Title Print Name Date C: Wayne Karlovich, Project Manager RFQ 08-5011 -116 1 Packet Page-847- 5/27/2014 16.C.5. CUa N U > v i C CU C7 [a v -0 „.. O O r� 0 -0 'a_ QJ O QI - u 3 Q '9 + p -0 - C i tip r C L i-i > .-� N E .N in O Q cn + O 0 + N t OU ■ Y N I I U ii II I I I 'a� t0 •••+ I I z r-I C I I z � • I I ° r�-I 1 I I I j O C) 11 I >. °; L!1 V I = .a I f O LL I 1 I I i w N 1 1 1 0 i L ; ! -. O i II I U I 0 N ,k,. , I I = ; V i ; 1 1 ; ( 1 i I f I i 1 i . .,. f I 0 0 0 0 0 o o o 0 o l I O O O C C O O o ■ 0 0 0 0 0 0 0 in j 0 0 0 0 0 0 0 1 6 6 6 6 6 0 6 Ln, rfl m N ("J .--I c-I -Lc)- Packet Page -848- OH5/27/2014 16.C.5. N S �� SINCE 1946 ENGINEERING April 1, 2014 Mr. Wayne Karlovich Collier County Public Utilities 3339 East Tamiami Trail, Suite 303 Naples, Florida 34112 Re: Collier County - Thomasson Drive 24-inch Force Main from the Future 306 Pump Station to Hammock Cove RFQ #08-5011-116 Low Bidder: Douglas N. Higgins, Inc. Dear Mr. Karlovich: The bid opening for the above-referenced project took place on Friday, March 28, 2014. Collier County provided the results of the bid opening to Johnson Engineering on April 1, 2014. Johnson Engineering perfointed an evaluation of the results and our recommendation is contained herein. Collier County received five (5) bids by the deadline established on the hnvitation to Bid. The bids received at the bid opening performed by Collier County listed below are from lowest to highest: BIDDER BASE BID AMOUNT Douglas N. Higgins, Inc. $207,790.00 Quality Enterprises, Inc. $261,805.18 Mitchell & Stark Construction, Inc. $269,910.00 Kyle Construction, Inc. $273,684.00 Haskins. Inc. $319,780.00 For comparison purposes, Johnson Engineering provided Collier County with an Opinion of Probable Construction Cost on February 6, 2014 to be approximately $276,780.00. Following the bid opening, Collier County prepared the enclosed Bid Tabulation Analysis, which includes an analysis for mathematical errors. No mathematical errors appear to have been found and the results show Douglas N. Higgins, Inc. as the low bidder. Internet Research From the Florida Department of State, Division of Corporations website_ Douglas N. Higgins, Inc. is an active Foreign Profit Corporation under Document Number 830666, FEI Number 381807765 filed on August 1, 1973. Their principal address is 3390 Travis Pointe Road, Suite A, Ann Arbor, MI 48108. There are six (6) officers/directors listed for the corporation 2122 Johnson Street.Post Office Box 1550.Fort Myers,Florida 33902-1550 (239)3 Packet Page-849-"4-3661 5/27/2014 16.C.5. Mr. Wayne Karlovich Re: Bid Recommendation for RFQ #08-5011-116 Thomasson Drive 24-inch Force Main from the Future 306 Pump Station to Hammock Cove April 1, 2014 Page 2 with two (2) operating out of 4465 Enterprise Avenue, Naples, FL 34104 and four (4) operating out of 3390 Travis Point Rd., Suite A, Ann Arbor, MI 48108. Based upon our review of the analysis, the low bidder, Douglas N. Higgins, Inc. appears to be a reasonable and responsive bid. Subject to concurrence with Collier County's Purchasing and Contracts Division, and the contractor furnishing the appropriate bonding and other required insurances, we believe selection of Douglas N. Higgins, Inc. by Collier County for the intended work contained within the bid documents to be an appropriate choice. Should you have any questions, or require additional information,please let me know. Very truly yours, JOHNSON ENGIN-TERING, INC. Mi hael S. Dickey. P.E. Director of Utility Services MSD/ljb cc: File 20149700-001 Packet Page -850- 5/27/2014 16.C.5. WORK ORDER/PURCHASE ORDER Contract 08-5011 "Annual Underground Utility Contractors" Contract Expiration Date: September 10, 2014 This Work Order is for professional underground utility construction services for work known as: Project Name: Thomasson Drive 24-inch Force Main Project No: 70044.6.3.5 The work is specified in the proposal dated March 28, 2014 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above, this Work Order/Purchase Order is assigned to: Douglas N. Higgins, Inc. Scope of Work: As detailed in the attached proposal and the following: * Task I Perform all Work as described in the Proposal * Task II Owner Directed Allowance Work Schedule of Work: Complete work within 90 days from the date of the Notice to Proceed which is accompanying this Work Order. The Contractor agrees that any Work Order that extends beyond the expiration date of Agreement # 08-5011 will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. Compensation: In accordance with the Agreement referenced above, the County will compensate the Firm in accordance with following method(s): Negotiated Lump Sum (NLS) Lump Sum Plus Reimbursable Costs (LS+RC) ®Time& Material (T&M) (established hourly rate — Schedule A) Cost Plus Fixed Fee (CPFF), as provided in the attached proposal. Task I $1 97,790.00 NLS Task II $10,000.00 T&M TOTAL FEE $207,790.00 (Li r l 0 �..�1 � ) f ' /'tom'PREPARED BY: Le `� � 1 Wayne }arlovr i h, Senior Project Manager Date / / { i APPROVED BY: '�- _ ` - 1 2 6 4 Craig Pier, 'rinci lit Project Manager Date APPROVED BY: / 64 A. �z 7 , 1-4 To Chmelik, PPMD Department Director Date APPROVED BY: 4/11 ‘71- 1-74/ Steve Nagy, Collections System Manager Date Page 1 of 3 Packet Page -851- C.) 5/27/2014 16.C.5. t, APPROVED Bry: 2�'44 , C...-- //' 9, Bet h/Johnssen astewater Director Date APPROVED BY: , � � ,�s � _.a. _i7�t,_ C C. f J���. �.,L/ Dr. George Yilmaz, Public Utilities Administrator Date APPROVED BY: � ' Brenda Brilhart, Procurement Strategist ' Date By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby discloses, that, to the best of their knowledge and belief, all relevant facts concerning past, present, or currently planned interest or activity (financial, contractual, organizational, or otherwise) which relates to the proposed work; and bear on whether the Firm has a potential conflict have been fully disclosed. Additionally,the Firm agrees to notify the Procurement Director, in writing within 48 hours of learning of any actual or potential conflict of interest that arises during the Work Order and/or project duration. ACCEPTED BY: Douglas-N Higgins; Inc. — Name & Title of Authorized Company Officer Date (Remainder of page intentionally left blank) Page 2 of 3 Packet Page -852- CD 5/27/2014 16.C.5. IN WITNESS WHEREOF,the parties hereto, have each, respectively, by an authorized person or agent, have executed this Work Order on the date and year first written below. ATTEST: BOARD OF COUNTY COMMISSIONERS Dwight E. Brock, Clerk of Courts COLLIER COUNTY, FLORIDA By: By: Deputy Clerk Tom Henning, Chairman Dated: (SEAL) Douglas�Tn.a?nc. First Witness % Signature , �, Ic; ��_ L a-t(I:iL ��, TType/print signature and titleT TType/print witness name7T Secc> t erIss TType/print witness nameT Approved as to Form and Legality: Assistant County Attorney Print Name Page 3 of 3 Packet Page -853- 5/27/2014 16.C.5. {.ern? "I " u'. %ai,i11_ 1 Adm ristr t:v 8 Se.rvica s Ci'vit.ic n =ur_hasing REQUEST FOR QUOTATIONS FOR MULTIPLE PROJECTS UNDER CONTRACT#08-5011 "Annual Contract for Underground Utilities" Date: March 10, 2014 From: Brenda Brilhart, Procurement Strategist 239-252-8446, Telephone Number 239-252-6697, Fax Number brendabrilhart(a�colliergov.net To: Prospective Vendors Subject: RFQ#08-5011-116—Thomasson Drive 24" Force Main ($270K) As provided in the referenced contract, the Collier County Purchasing Department is soliciting quotes for the referenced project. RFQ Due Date: 1:00 PH Hai : :'t _ . Non-Mandatory Pre-Quote Meeting Al.‘-,, Q&A Deadline: i0 hn,'l i\is : ?,:.. . Number of Days to Final Completion: , ;r,rj:?I HO, i Plans and Specs: Liquidated Damages: $1,115 Hz : Payment& Performance Bonds Direct Material Purchase ,`1-; Your quotation response for this project is due no later than the date and time specified above. We will not accept any quotation responses later than the noted time and date. If your firm is unable to respond electronically, your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specified. We look forward to your participation in this request for information/quotation process. Douglas N. Higgins, Inc. Firm's Complete Legal Name 239-774-3130/239-774-4266 Teleptrobre-1 umber/Fax Number _ - �_ -- n sere---_-_____.--- ._-_ Vice President --_ _ Title Brandy Bartolone Print Name Date C: Wayne Karlovich, Project Manager RFQ 08-5011 -116 1 Packet Page -854- ,u 5/27/2014 16.C,5. RFQ 08-5011-116 Thomasson Drive 24-Inch Force Main ITEM DESCRIPTION QTY UNITS UNIT TOTAL Section 1: General 1 Mobiiization/Demobnization 1 LS $ 21,000.00 $ 21000 2 Maintenance of Traffic 1 LS $ 4,000.00 § 4,000 3 Pre-Construction Video 1 LS $ 800.00 $ 800 4 Survey Layout&Record Drawings 1 LS $ 3,700A0 $ 3,700 SUBTOTAL Section 1 $ 29,500 Section 2:Force Main 5 24"C905 PVC(Labor Only) 2,040 LF $ 37.00 $ 75,480 6 Install 24"Plug Valves(Labor Only) 2 EA $ 1,400.00 $ 2,800 7 Connect to Existing Force Main 1 EA $ 1,800.00 S 1,800 8 Open Cut 42"Steel Casing(Labor Only) 141 LF $ 110.00 $ 15,510 SUBTOTAL Section 2 $ 95,590 Section 3: Drainage Modifications 9 Drainage Structures-Manhole Type P-8 2 EA $ 5,400.00 $ 10,800 10 Drainage Structures-Manhole Type J-8 2 EA $ 4,800.00 $ 9,600 11 Drainage Pipe 15"RCP 12 LF $ 100.00 $ 1,200 12 Drainage Pipe 30"RCP 12 LF $ 150.00 $ 1,800 SUBTOTAL Section 3 $ 23,400 Section 4;Restoration 13 General Restoration 2,100 LF $ 13.00 $ 27,300 14 Roadway Crossing Restoration 2 EA $ 11,000.00 $ 22,000 15 Allowance to cover unanticipated costs including but not limited to:un-located utilities and unforeseen site conditions(No additional payment shall be made for rock excavation, 1 T&M $ 10,000.00 $ 10,000 replacement of fill material or dewatering). Use of allowance must be approved by the County prior to the execution of the work. SUBTOTAL Section 4 $ 59,300 SUBTOTAL Section 1 $ 29,500 SUBTOTAL Section 2 $ 95,590 SUBTOTAL Section 3 $ 23,400 SUBTOTAL Section 4 $ 59,300 TOTAL $ 207,790 Packet Page -855- 5/27/2014 16.C.5. jotter County Email: BrendaBrilhart @colliergov.net mo=t T- Telephone: (239)252-8446 Administrative Services Division FAY. (239)252-6697 Purchasing ADDENDUM #1 Memorandum Date: March 26, 2014 From: Brenda Brilhart, Procurement Strategist To: Awarded Firms 08-5011 Annual Contract for Underground Utilities Subject: Addendum#1 —RFQ#08-5011-116—Thomasson Drive 24"Force Main ($270K) The following clarifications are issued as an addendum identifying the following changes for the referenced solicitation: CLARIFICATION: Sheets 04, 05, 06, 07: At each plug valve add the following Note: Plug valve shall be supported on a precast concrete slab placed under the valve to help distribute the total weight of the valve and reduce line sagging. If you require additional information please post a question on the Online Bidding site or contact me using the above contact information. c: Wayne Karlovich, Project Manager _ 1 Packet Page -856- 5/27/2014 16.C.5. 8 8 N 0 g. N r o 0 8 4 F. g° 8 8 8 ° � 8 ° o i G: (0 Y »» ■» p p 8 p 8 p pp » « « « » a « « ». I 8 8 8 8 O 8 8 8 8 O 88 8 t 8 0 2 2 i g n 2 _ ° I z » ..r _ g g s g 4. s g g I i - EEE2 EE g s $ o s s 8 8 8 8 8 8 8 8' 8 8 8 8 88 g 0 8 8 E » g g l g E » S 0 V.Z w « « « « » » » a M o F, 0 8 ;tl o § g 8 F & E °s-' m g o 3 3 2 m. K 0 Q 1 W 8 8 8 8 Q 8 8 8 8 8 8 8 » « r o n rx O ,X 0 g o d S 8 g e �i n < ♦ o r 7: o » 0 S 6 R V , W r _ ^ 7- ^ : 3 n » 3 r u 8 O I-. - .. « « » « 8 S $ ° m 0008 o g y Q 0 o o o c N Q• 8 8 B c $ g 0 o - « X ' »Q r I I o o E g o § g g s: : : » » i c °d n m Iw W 5- 6 6 5 ' 6 6 5 S E uQ J d m w c�D W 'm r O N N N N 0 CC — `E C C sEsw zi�r i R 2$9 a w e C 5 z i, o r c �a �s m iys ss a 1 F a O c c ig ,s c °° 1 — t 73(i2,2e2 IC"a O u s y_ f O 9. 4 W g E S ° , . a s Z $ Yr¢:°o uu JI11: ' E Diii O G i "n Packet Page -857- 5/27/2014 16.C.5. - - --- • ,-, ...•- -N. •• N .. I N .. \.... A • '\ ._....., - _..., - , • ' f__ •E, 4 , , • . ., _., '`-. • .- • C ,1,111 i d • .7, .- r_ -••• "--) 1 .m. .=.: • __. , _ _ Z _ U..• -c o 4, (1) 0 .. -I --: z E " a. , • 1 c„ 1, = U .... tf, uJ RI All, - I 4 ,_ 1, 1 1 t. 1 :: I 1 1 . •- - 5 .E q.., ,,,, _ _.. ...., - > ... .. _ o o .- .7. .z... --) P 0 c-, ., - - ,-----_ - , 2 5 .6 CIJ ■=4 E --= — < I) r,-.1 - ,– ,c (8 fel *= 'Z" 0 '.= ,..0., C.0 ti) J, V. .-- .... o 0 F .- ,.. x _ .., Packet Page -858-