Agenda 05/27/2014 Item #16C2 5/27/2014 16.C.2.
EXECUTIVE SUMMARY
Recommendation to approve a work order for $472,333 to Douglas N. Higgins, Inc., under Request
for Quotation #08-5011-115 for Underground Utility Contracting Services for the South County
Water Reclamation Facility Proposed 30" and 24" Force Main and Master Pump Station 306 Force
Main—Phase IV project,Project Number 70044.
OBJECTIVE: Meet demand, stay in compliance, serve customers efficiently, and improve reliability by
providing an alternative path for wastewater to flow from Master Pump Station (MPS) 302 to the South
County Water Reclamation Facility (SCWRF).
CONSIDERATIONS: The proposed scope of work for Project 70044 "Force Main Technical Support"
is consistent with the 2010 Water Capital Improvement Project (CIP) Update, page 2 of 4, line 56, as
identified in the 2011 User Fee Rate Study. Funding for project 70044 is available in and is consistent
with the FY2014 CIP Budget.
On September 11, 2012, the Board approved Contract #11-5782 for three design contracts for the
Wastewater Basin Program under Agenda Item 11E. The MPS 306 Force Main project is one of many
projects under design as part of the Wastewater Basin 306 Program. More construction projects are
planned as the program continues and as funding becomes available.
Wastewater MPS 306 is located near U.S. 41 and Thomasson Drive. Currently, MPS 306 discharges
through a force main to MPS 302 located at the intersection of Rattlesnake Hammock Road and Santa
Barbara Road. MPS 302 discharges through a 36-inch force main to the SCWRF. Approximately 80
percent of the south wastewater transmission system is conveyed through MPS 302 to the SCWRF.
Currently, there is no alternative path for these flows to reach the SCWRF; therefore, the 36-inch force
main cannot be shut down for preventative maintenance. Further, if the 36-inch force main were to fail,
approximately 80 percent of the south transmission system would be out of service with a high potential
for sanitary sewer overflows.
To address these vulnerabilities, a new force main is under construction from MPS 306 to the SCWRF.
This will provide an alternative path, allowing flow from MPS 302 to MPS 306 and then to the SCWRF.
Attachment six shows the locations of the existing and proposed facilities. Under current flow conditions
this project will directly benefit approximately 64,000 customers.
Rapid land development in this area necessitates force main construction in phases, as easements can be
acquired. This scope of work is Phase 4 of 7 required to construct the approximate 18,000-foot force
main from MPS 306 to the SCWRF. Phase 4 is approximately 1,300 feet. Phase 1 (2,000 feet) was
authorized by the Board on April 22, 2014 (Item 16C3). Phases 6 and 7, approximately 900 feet each,
were constructed in November and December 2013. The remaining Phases 2 and 3 are planned to he
constructed by the end of FY 2015.
The county distributed Request for Quotation, "SCWRF Proposed 30" and 24" Force Main & MPS 306
Force Main — Phase III" (Attachment 2). on March 7, 2014, to the five vendors under Fixed-Term
Underground Utilities Contract #08-5011. Four contractors submitted quotations by the March 24, 2014,
deadline. The quotations are summarized below and in Attachment 1.
Packet Page -815-
5/27/2014 16.C.2.
VENDOR PROJECT COST
Douglas N. Higgins $472,333.00
Quality Enterprises $ 541,420.00
Haskins, Inc. $ 715,000.00
Mitchell & Stark $ 825,000.00
Staff determined the lowest quote to be fair and reasonable and recommends awarding the project to
Douglas N. Higgins, Inc., the lowest responsive and qualified vendor. The quote is $1 17,667 (20 percent)
less than the engineer's cost opinion. The design professional, Hole Montes, Inc., recommends award to
Douglas N. Higgins,Inc., in its letter dated March 26, 2014 (Attachment 4). Douglas N. Higgins, Inc. has
a satisfactory performance and warranty record on previous, similar utility-related projects.
The quote specifications informed the bidders there may be unforeseen conditions associated with the
project. The quote amount incorporates an allowance of $55,000 for owner-directed additional work
which includes, but is not limited to, unforeseen work and costs associated with existing underground
piping, electrical wiring and conduits. The price for any additional work will be negotiated prior to
commencement in accordance with the county's Purchasing Policy and the terms of the agreement.
FISCAL IMPACT: Funding is available in, and is consistent with, the FY2014 Capital Budget approved
by the Board on September 19, 2013. The source of funding is the Wastewater User Fee Fund (414). The
project is expected to be complete by August 2014. There will be a minor increase in annual maintenance
costs for the additional force main.
LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote
for Board approval.—SRT
GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan
standards to ensure the adequacy and availability of viable public facilities.
RECOMMENDATION: That the Board of County Commissioners, Ex-officio the Governing Board of
the Collier County Water-Sewer District, approve a Work Order for $472,333 to Douglas N. Higgins,
Inc., under Request for Quotation #08-5011-115 for Underground Utility Contracting Services for the
South County Water Reclamation Facility Proposed 30" and 24" Force Main and Master Pump Station
306 Force Main — Phase Ill project, Project Number 70044; and, authorize the Chairman to sign and
execute the Work Order after final approval by the County Attorney's Office.
Prepared By: Wayne M. Karlovich, Senior Project Manager,Public Utilities PPMD
Attachments:
Attachment 1-Quote Tabulation
Attachment 2-Request for Quotes
Attachment 3- PPMD Analysis of Quotes
Attachment 4-Recommendation Letter
Attachment 5- Work Order
Attachment 6-Project Location Exhibit
Packet Page -816-
5/27/2014 16.C.2.
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.16.C.16.C.2.
Item Summary: Recommendation to approve a work order for $472,333 to Douglas N.
Higgins, Inc., under Request for Quotation #08-5011-115 for Underground Utility Contracting
Services for the South County Water Reclamation Facility Proposed 30" and 24" Force Main and
Master Pump Station 306 Force Main - Phase III project, Project Number 70044.
Meeting Date: 5/27/2014
Prepared By
Name: KarlovichWayne
Title: Project Manager, Senior, Public Utilities Engineering
4/1 7/2014 1 2:35:06 PM
Submitted by
Title:Project Manager. Senior,Public Utilities Engineering
Name: KarlovichWayne
4/17/2014 12:35:07 PM
Approved By
Name: NagySteve
Title: Manager- Wastewater Collection, Wastewater
Date: 4/18/2014 7:22:16 AM
Name: HapkeMargie
Title: Recycling Coordinator. Solid Waste
Date: 4/18/2014 9:38:53 AM
Name: JohnsonScott
Title: Procurement Specialist,Purchasing& General Services
Date: 4/18/2014 10:13:25 AM
Name: JohnsonScott
Title:Procurement Specialist. Purchasing&General Services
Date: 4/18/2014 10:13:34 AM
Packet Page -817-
5/27/2014 16.C.2.
Name: BrilhartBrenda
Title: Procurement Specialist,Purchasing& General Services
Date: 4/21/2014 9:53:22 AM
Name: JacobsSusan
Title: Operations Analyst,Public Utilities Division
Date: 4/22/2014 3:59:18 PM
Name: ZautckeLaura
Title: Management/Budget Analyst, Senior, Utilities Finance Operations
Date: 4/24/2014 8:01:40 AM
Name: JohnssenBeth
Title: Director- Wastewater, Wastewater
Date: 5/1/2014 11:12:16 AM
Name: PajerCraig
Title: Project Manager, Principal,Public Utilities Engineering
Date: 5/1/2014 8:30:11 PM
Name: ChmelikTom
Title: Director-Public Utilities Engineering, Public Utilities Engineering
Date: 5/9/2014 8:39:31 AM
Name: TeachScott
Title: Deputy County Attorney, County Attorney
Date: 5/9/2014 2:04:44 PM
Name: YilmazGeorge
Title: Administrator-Public Utilities, Public Utilities Division
Date: 5/12/2014 11:20:15 AM
Name: KlatzkowJeff
Title: County Attorney,
Date: 5/14/2014 4:08:52 PM
Name: UsherSusan
Title: Management/Budget Analyst, Senior, Office of Management&Budget
Date: 5/19/2014 11:56:05 AM
Name: OchsLeo
Title: County Manager, County Managers Office
Date: 5/19/2014 12:29:32 PM
Packet Page -818-
5/27/2014 16.C.2.
Packet Page -819-
5/27/2014 16.C.2.
QUOTE NO. 08-5011-115-30"&24"FORCE MAIN PHASE 1 -SOUTH COUNTY WATER RECLAMATION FACILITY
&MPS 306 Forcemain Phase III
DN Higgins Haskins Mitchell&Stark Quality
Item Estimated
No. Description Units Quantity Total Total Total Total
1 Perform all Contract Work described in the Lump Sum $417,333.00 $660,000.00 $770,000.00 $486,420.00
Contract Documents. —
2 Allowance Fund for Owners Use as
Directed. This fund will be used only at the
Owner's direction to accomplish work due to
unforeseen conditions as specified in
Section 01135. Inclusion of the Allowance
Fund as part of the Contract Price is not a —
guarantee that the Contractor will be paid
any portion or the full amount of the
Allowance Fund.
Lump Sum $55,000.00 $55,000.00 $55,000.00 $55,000.00
$472,333.00 $715,000.00 $825,000.00 $541,420.00
Packet Page -820-
5/27/2014 16.C.2.
Co l County
Addrninisrattve Services Division
Purchasing
REQUEST FOR QUOTATIONS FOR MULTIPLE PROJECTS UNDER CONTRACT#08-5011
"Annual Contract for Underground Utilities"
Date: March 10, 2014
From: Brenda Brilhart, Procurement Strategist
239-252-8446, Telephone Number
brendabrilhart(c�colliergov.net
To: Prospective Vendors
Re: RFQ #08-5011-115 —SCWRF Proposed 30" and 24" Force Main — Phase III & MPS
306 Forcemain —Phase III ($590k)
As provided in the referenced contract, the Collier County Purchasing Department is soliciting
quotes for the referenced project.
RFQ Due Date: 4:00 PM March 24, 2014
Non-Mandatory Pre-Quote Meeting 10:00 AM March 14, 2014
Purchasing
Pre-Quote Meeting Location: 3327 Tamiami Trail East
Naples, FL 34112
Q&A Deadline: 5:00 PM 3/18/14
Number of Days to Final Completion: 150 to Substantial, 30 to Final, Total 180
Plans and Specs: Included
Liquidated Damages: $1,591 per day
Payment & Performance Bonds Yes
Direct Material Purchase No
Your quotation response for this project is due no later than the date and time specified above. We
will not accept any quotation responses later than the noted time and date. If your firm is unable to
respond electronically, your quotation must be received in the office of the Purchasing Department at
the above referenced address no later than the time and date specified. We look forward to your
participation in this request for information/quotation process.
Firm's Complete Legal Name
Telephone Number/ Fax Number
Signature
Title
Print Name Date
C: Wayne Karlovich, Project Manager
RFQ 08-5011 -115
1
Packet Page -821-
----- ----
tio
ro
■
CU
o
as
CI. t i i I
I I
co 1
CO I
CL I
of cr
SI
0
LL
0
0
0 0 0 0
0
0
0
0
0
0
0
0
0
0
0 0
0
0 0 0 0
0
0 0 0
o o 0
o
o
o
NJ
rn
Ln
Lo
tn-
in-
Packet Page -822-
5/27/2014 16.C.2.
HOLE MONIES
ENGINEERS•PJ NNERS•SURVEYORS
950 Encore Way•Naples.Florida 34110• Phone 239.254.2000•Fax:239.254.20099
March 26, 2014
Wayne Karlovich, P.E., Senior Project Manager
Collier County Public Utilities
3339 Tamiami Trail East Suite 303
Naples FL 34112
RE: EVALUATION OF QUOTATIONS
SCWRF 30" & 24" FORCE MAIN PHASE 1 &
MPS 306 FORCE MAIN PHASE III
HM File No. 2013.051
Dear Wayne,
We have reviewed the four bids received by the County on the SCWRF 30" and 24" Force Main
Phase 1, County Quote No. 08-5011-115. The four bidders and their quoted price are identified
below as provided by the County Purchasing Department. The apparent low quote is from D.N.
Higgins in the amount of$472,333.00.
Bidder Bid
] Douglas N Higgins, Inc. $472,333.00
2 Quality Enterprises, Inc. $541,420.00
3 Haskins, Inc. $715,000.00
4 Mitchell & Stark Company, Inc. $825,000.00
D.N. Higgins, Inc. has successfully completed other construction projects for Collier County and
is on the County's list of approved utility contractors. The engineer's estimate is $590,000.
Therefore, we recommend award of this construction contract to D.N. Higgins in the amount of
$472,333.00 subject to a final review by the Purchasing Department of the quotation documents.
Please contact us if there are any questions about this quote evaluation.
Thank you,
HOLE MONTES, INC.
/
;Jerry R. fareska, Ph.D., P.E., B.C.E.E.
'Associat'e/Environmental Engineering Manager
JRT:dlh
Ha2013\2013051\EN\C Correspondence0Cl Client CorrspondenceA20140325 WK SCWRF 30 Inch Force Main Award Recommendation Itr
JRT.doc
Packet Page -823-
No;.-.)[es earl r,iyers
-__- 5/27/2014 16.0.2.
WORK ORDER/PURCHASE ORDER
Contract 08-5011 "Annual Underground Utility Contractors"
Contract Expiration Date: September 10, 2014
This Work Order is for professional underground utility construction services for work known as:
Project Name: SCWRF Proposed 30" and 24" Force Main — Phase 1 & MPS 306
Forcemain—Phase III
Project No: 70044.6.4
The work is specified in the proposal dated March 24, 2014 which is attached hereto and made a part
of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above,
this Work Order/Purchase Order is assigned to: Douglas N. Higgins,Inc.
Scope of Work: As detailed in the attached proposal and the following:
* Task I Perform all Work as described in the Proposal
* Task II Owner Directed Allowance Work
Schedule of Work: Complete work within 180 days from the date of the Notice to Proceed which is
accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond the
expiration date of Agreement 4 08-5011 will survive and remain subject to the terms and conditions
of that Agreement until the completion or termination of this Work Order.
Compensation: In accordance with the Agreement referenced above, the County will compensate the
Firm in accordance with following method(s): ZNegotiated Lump Sum (NLS) (Lump Sum Plus
Reimbursable Costs (LS+RC) ®Time & Material (T&M) (established hourly rate — Schedule A) n
Cost Plus Fixed Fee (CPFF), as provided in the attached proposal.
Task 1 $417,333.00 NLS
Task II $55,000.00 T&M
TOTAL FEE $472,333.00 `
PREPARED BY: V)St`11
Waynrlovich, Senior Project Manager Date
J g
APPROVED BY:
Craig PajeAdat cipal P ject Manager Date
APPROVED BY: f i !, /
Torn Chmelik, PPMD Department Director Date 1
Page 1 of 2
b�
Packet Page -824-
5/27/2014 16.C.2.
APPROVED BY: A if-n-1-c
Steve Nagy, Collecti s System Manager Date
APPROVED B : < /7
Bet ohnsse , Wastewater Director Da e
APPROVED BY: ^ -- - i l -, -- 4/_/' k
N \ Dr. George Yilmaz, Public Utilities Administrator Date
\ APPROVED BY: /1A914-4-`
$renda Brilh. Procurement Strategist Date
ATTEST: BOARD OF COUNTY COMMISSIONERS
Dwight E. Brock, Clerk Collier County, Florida
By: By:
Deputy Clerk Tom Henning, Chairman
ATTEST: D• _ . - :: ,
Bye )(i.,7nw1" <h-A.:1- By: _ _
13 rna, L s .;i /45'.:s+ -Sec c<C49rLA9 B —r-, c,.-,-
(Print Name/Title (Print Name/Title)
(.- G /o..._,4) ter, 6K7
Approved as to Form and
r.ci,t,y:
4 IC 44...... 1.--.
Assistant-County Attorney
Cllr"4t-1
Page 2 of 2
CIID
Packet Page -825-
5/27/2014 16.C.2.
Ter Comfy
Administral>ive Services Division
Purchasing
REQUEST FOR QUOTATIONS FOR MULTIPLE PROJECTS UNDER CONTRACT#08-5011
"Annual Contract for Underground Utilities"
Date: March 10, 2014
From: Brenda Brilhart, Procurement Strategist
239-252-8446,Telephone Number
brendabrilhart(a�colliergov.net
To: Prospective Vendors
Re: RFQ#08-5011-115—SCWRF Proposed 30" and 24" Force Main—Phase III & MPS
306 Forcemain—Phase III ($590k)
As provided in the referenced contract,the Collier County Purchasing Department is soliciting
quotes for the referenced project.
RFQ Due Date: 4:00 PM March 24, 2014
Non-Mandatory Pre-Quote Meeting 10:00 AM March :14, 2014.
Purchasing
Pre-Quote Meeting Location: 3327 Tamiami Trail East
Naples, FL 34112
Q&A Deadline: 5:00 PM 3/18/14
Number of Days to Final Completion: 150 to Substantial, 30 to Final, Total 180
Plans and Specs: Included
Liquidated Damages: $1,591 per day
Payment& Performance Bonds Yes
Direct Material Purchase No
Your quotation response for this project is due no later than the date and time specified above. We
will not accept any quotation responses later than the noted time and date. If your firm is unable to
respond electronically, your quotation must be received in the office of the Purchasing Department at
the above referenced address no later than the time and date specified. We look forward to your
participation in this request for information/quotation process.
Douglas N. Higgins. Inc.
Firm's Complete-Legal-Name__
•- 74-3130/239-774-4266
Telap• Number/Fax Number
Signatu -
Vice President/Regional Mgr.
Title I �//,`r
Brandy Bartolone / l
Print Name Date
C: Wayne Karlovich, Project Manager
RFQ 08-5011 -115
Packet Page-826-
5/27/2014 16.C.2.
Colter County Email: evelyncolon @colliergov.net
Telephone: (239) 252-2667
Administrative Services Division FAX: (239) 252-2810
Purchasing
ADDENDUM '1
Memorandum
Date: March 11, 2014
From: Brenda Brilhart, Procurement Strategist
To: Interested Bidders
Subject: Addendum#1 RFQ 06-5011-115—SCWRF Proposed 30" and 24" Force Main —
Phase III & MPS 306 Forcemain—Phase III
CHANGE: The pre-quote meeting scheduled for 10:00 AM March 14, 2014 will not be held. Place
all project related questions on line at www.colliergov.net/bid
If you require additional information contact me using the above contact information.
cc: Wayne Karlovich, Project Manager
Addenduml RFQ 08-5011-115
Packet Page-827-
r_
- 5/27/2014 16.C.2.
761" County Email: evelyncolon @colliergov.net
Telephone: (239) 252-2667
Administrative Services Division FAX: (239)252-2810
Purchasing
ADDENDUM 2
Memorandum
Date: March 11, 2014
From: Brenda Brilhart, Procurement Strategist
To: Interested Bidders
Subject: Addendum#2 RFQ 08-5011-115—SCWRF Proposed 30" and 24" Force Main—
Phase III & MPS 306 Forcemain—Phase III
CORRECTION: - - - : •- - --- - ' -= - - --- -- -Rat-be-held-, Pre Quote meeting will be held at 10:00 am March 14, 2014.
If you require additional information contact me using the above contact information.
cc: Wayne Karlovich, Project Manager
Addendum 1 RFQ 08-5011-115
Packet Page -828-
ra
5/27/2014 16.C.2.
Colter County Email: brendabrilhart @colliergov.net
Telephone: (239) 252-8446
Administrative Services Division FAX: (239) 252-6697
Purchasing
ADDENDUM 3
Memorandum
Date: March 19, 2014
From: Brenda Brilhart, Procurement Strategist
To: Interested Bidders
Subject: Addendum#3 RFQ 08-5011-115—SCWRF Proposed 30"and 24" Force Main—
Phase III & MPS 306 Forcemain—Phase Ill
CHANGE:
DRAWINGS
Hole Montes Drawing Sheets 7 and 12:
Items to be Change:4"ARVs with flange connections and 4"piping,valves and fittings.
Change to: 3" ARVs with threaded connections and 3" piping, valves and fittings. See
attached Drawing Sheets 7 and 12.
All Drawings: At each plug valve 24" and Larger add the following Note:
Plug valves 24" and Larger shall be supported on a precast concrete slab placed under the
valve to help distribute the total weight of the valve and reduce line sagging.
FACT SHEET
Under Scope of Work revise the second paragraph to read as follows:
Collier County will be pre-purchasing piping, plug valves, and fittings, from Ferguson for use
by the successful contractor. A list of county-supplied materials will be distributed with the
bidding documents or in an addendum. Contractor shall provide all materials not included
on the list.
As indicated on the FACT SHEET, attached is the list of county-supplied materials.
SPECIFICATIONS
Add the following to Specification Section 330523.13 Horizontal Directional Drilling, 1.4—
Submittals:
F. Submit a horizontal directional drilling contingency plan and include a list of personnel to
notify with emergency telephone numbers. The plan shall also include emergency contact
information for other personnel, equipment, and materials needed but not maintained on the
1
Packet Page-829-
- - 5/27/201416.0.2.
project site. The contingency plan shall include the proposed measures employed for the
condition when:
1. Spoils do not settle/separate with slurry separation equipment on site.
2. Drill steel/pipeline is unable to be advanced or retrieved with drill rig.
3. Drill tool lost in the hole.
4. The location control system fails to provide accurate information. Describe which
operational parameters are observed/measured/recorded so that it can be determined
if the above is occurring or has just occurred.
5. The installation forces start to move up rapidly and reasonable concern exists for
completing construction.
6. A swivel breaks during carrier pipe installation.•
7. Inadvertent returns occur when under the crossing. Include measures to control
turbidity and contain drilling fluid and surface returns in the waterway.
8. An inadvertent return occurs where slurry fails to return due to subsurface ground
conditions, i.e., encountering a gravel bed that serves as an aquifer.
9. The pilot hole or ream intersects a subsurface interface and directional steering is
unable to keep the drill path along the intended route. Describe which operational
parameters are observed/measured/recorded so that it can be determined if the
above is occurring or has just occurred.
10. Loss of directional steering information. Describe which operational parameters are
observed/measured/recorded so that it can be determined if the above is occurring or
has just occurred.
11. Loss of steering, inability to steer. Describe which operational parameters are
observed/measured/recorded so that it can be determined if the above is occurring or
has just occurred.
ADD: the following to Specification Section 330523.13 Horizontal Directional Drilling:
3.7 ENVIRONMENTAL REQUIREMENTS
A. Dispose of all drilling fluids and spoils in compliance with all relative environmental
regulations, right-of-way and work space agreements, and permit requirements.
B. The HDD operation shall be a closed loop slurry system maintained to eliminate the
accidental discharge of water, drilling mud, or spoils. Provide equipment and procedures to
maximize the recirculation of drilling mud and to minimize waste.
C. All inadvertent returns to the surface shall be cleaned up upon discovery and before the
end of the shift. The surface area shall be washed and returned to the original condition. If
the amount of surface returns exceeds the capacity of the small sumps being used for
2
Packet Page -830-
5/27/2014 16.C.2.
collecting and containing surface returns, drilling operations shall be discontinued. Drilling
shall not resume until contingency plan is implemented.
D. All construction-related activities involving fuels and lubricants, such as vehicle refueling
and equipment maintenance including draining and pumping of lubricants, shall be
conducted at a sufficient distance from the water channel to eliminate contamination in case
of a spill. Double containment during fueling or greasing operations shall be implemented.
E. Provide sanitation and garbage facilities on both sides of the crossing. Waste shall be
collected and transported offsite for disposal.
F. Damage to pond liner or bulging of the liner from inadvertent returns beneath the pond liner
shall be repaired by Contractor at his expense. The work shall include at a minimum
dewatering and isolating damaged area or bulge area with hydraulic dams, removal of the
damaged or bulge portion of the liner, replacement of damage or bulge liner with a new 60
mil HDPE liner, spark test repair, and submit results to the County and the Engineer for
approval.
ADD the following to Specification Section 330502 High Density Polyethylene(HOPE) Pipe
and Fittings, 3.2—Heat Fusion Joining:
B. Use a data logging device with the pipe joining equipment to record fusion parameters of
pressure,temperature, and time for each joint.
If you require additional information contact me using the above contact information.
cc: Wayne Karlovich, Project Manager
Enc: 1
3
Packet Page -831-
5/27/2014 16.C.2.
COLLIER COUNTY QUOTE NO. 08-5011-115
30" &24" FORCE MAIN PHASE 1 -SOUTH COUNTY WATER RECLAMATION FACILITY
& MPS 306 Forcemain Phase Ill
COLLIER COUNTY PUBLIC UTILITIES DIVISION
Item Estimated
No. Description Units Quantity Total
1 Perform all Contract Work described in the
Contract Documents. —
Lump Sum 417,333.00
2 Allowance Fund for Owners Use as
Directed. This fund will be used only at the
Owner's direction to accomplish work due to
unforeseen conditions as specified in
Section 01135. inclusion of the Allowance
Fund as part of the Contract Price is not a —
guarantee that the Contractor will be paid
any portion or the full amount of the
Allowance Fund.
Lump Sum $55,000.00
TOTAL PRICE FOR ITEMS 1 AND 2 $ 472,333.00
Packet Page -832-
5/27/2014 16.C.2.
QUOTE NO. 08-5011-115-30"&24"FORCE MAIN PHASE 1 -SOUTH COUNTY WATER RECLAMATION FACILITY
&MPS 306 Forcemain Phase III
(tern Estimated
No. Description Units Quantity Total Total Total Total
1 Perform all Contract Work described in the Lump Sum $417,333.00 $660,000.00 $770,000.00 $486,420.00
Contract Documents.
2 Allowance Fund for Owners Use as
Directed. This fund will be used only at the
Owner's direction to accomplish work due to
unforeseen conditions as specified in
Section 01135. Inclusion of the Allowance
Fund as part of the Contract Price is not a —
guarantee that the Contractor will be paid
any portion or the full amount of the
Allowance Fund.
Lump Sum $55,000.00 $55,000.00 $55,000.00 $55,000.00
$472,333.00 $715,000.00 $825,000.00 $541,420.00
Packet Page -833-
5/27/2014 16.C.2.
...._ - .
..- .
, I 1 3: y'-, \ .
, \ ••
i A • t
.... ■ sik
•• -\
, ----5:---
- - _
..-
, -•
- g --
47+
>7 CL c:
LLI Z
=T:
J_ • ' - -
_ •
- • 73 -`-7.E
•
I
C ,13.1ri I ••
I.... •,-: • C.^
(13 v 1 1 .
±: • -
E
-: • '
I
L.. .0 ■ 4 -
U.
X -..
• "--
VD W y
CD -,-.
fel C c.
0 c„.
■••■ --u
.4■1 (..)
sa) 0 : n_
E rk,6-
,... _
-
U
• -,R
fa U-I
I .
Z .
■
•
. e
•
• c..
I *
4 •
I
I I •.. 1
I •
.•:_- .=
— .-- _
_ , ..„...-
C) a..) = •—
- --
C) E.) 7 0
13 0 cn N
ca
0 m
= - A .7'_. cn ■","
- 0L In -c";) .r ^ ci) = i
0 .
L >•'' .,,, ,t -, 2 .2
- 0. 2 ■rrJ r■- Z., w
Packet Page -834-