Loading...
Agenda 05/27/2014 Item #16A 4 5/27/2014 16.A.4. EXECUTIVE SUMMARY This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Faith Landing Phase Three (Application Number PPLA20140000050), approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. OBJECTIVE: To approve for recording the final plat of Faith Landing Phase Three, a subdivision of lands located in Section 32, Township 46 South, Range 29 East, Collier County, Florida, following the alternative procedure for approval of subdivision plats pursuant to Resolution 99-199. CONSIDERATIONS: Engineering Services Department has completed the review of the construction drawings, specifications, and final plat of Faith Landing Phase Three. These documents are in compliance with the County Land Development Code and Florida State Statute Section 177. All fees have been paid. This project is within the Faith Landing PUD, Ord. 2007- 35. Security in the amount of 10% of the total cost of the required improvements, and 100% of the cost of any remaining improvements, together with a Construction and Maintenance Agreement for Subdivision Improvements, shall be provided and accepted by the County Manager or his designee and the County Attorney's office prior to the recording of the final plat. This would be in conformance with the County Land Development Code -- Section 10.02.04. F.2. Engineering Services Department recommends that the final plat of Faith Landing Phase Three be approved for recording. FISCAL IMPACT: The project cost is $461,354.00 (estimated) to be borne by the developer. The cost breakdown is as follows: a) Water& Sewer S119,904.00 b) Drainage, Paving,Grading $341,450.00 The Security amount, equal to 110% of the project cost, is $507,489.40 The County will realize revenues as follows: Fund: Growth Management Fund 131 Agency: County Manager Cost Center: 138327 --Land Development Services Revenue generated by this project: Total: $1 1,343.50 Packet Page -143- 5/27/2014 16.A.4. Fees are based on a construction estimate of$341,450.00 (does not include Immokalee Water& Sewer District improvements) and were paid in February, 2014. The breakdown is as follows: a) Plat Review Fee ($1,000.00 + $5./ac) $1,100.00 b) Construction Drawing Review Fee Water& Sewer(.75% const. est.) $ n/a c) Drainage, Paving, Grading (.75% const. est.) $2,560.88 d) Construction Inspection Fee Water& Sewer (2.25% const. est.) $ n/a e) Drainage, Paving, Grading (2.25% const. est.) $7,682.63 LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for approval. - SAS GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public Facilities prior to the issuance of the construction plan final approval letter. RECOMMENDATION: That the Board of County Commissioners approve the final plat of Faith Landing Phase Three (Application Number PPLA20140000050) for recording with the following stipulations: 1. Approve the amount of$507,489.40 as performance security for the required improvements; or such lesser amount based on work completed, and as is approved by the Engineering Services Department. 2. Approve the standard form Construction and Maintenance Agreement, and a. That no Certificates of Occupancy be granted until the required improvements have received preliminary acceptance. b. That the plat not be recorded until suitable security and an appropriate Construction and Maintenance Agreement is approved and accepted by the County Manager or his designee and the County Attorney's office. Prepared By: John Nouldsworth, Senior Site Plans Reviewer, Engineering Services, Growth Management Division, Planning and Regulation. Attachments: 1) Location Map, 2) Plat Map, 3) Engineer's Opinion of Probable Cost Packet Page -144- 5/27/2014 16.A.4. COT I IFR C(ITTNTV Board of County Commissioners Item Number: 16.16.A.16.A.4. Item Summary: This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Faith Landing Phase Three (Application Number PPLA20140000050), approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. Meeting Date: 5/27/2014 Prepared By Name: HouldsworthJohn Title: Site Plans Reviewer, Senior, Engineering&Environmental Services 4/30/2014 6:46:40 AM Approved By Nance: PuigJudy Title: Operations Analyst,Community Development&Environmental Services Date: 5/5/2014 3:17:31 PM Name: McKennaJack Title: Manager-Engineering Review Services, Engineering&Environmental Services Date: 5/9/2014 10:53:33 AM Marccii eaiiiiC Title: Executive Secretary, Transportation Planning Date: 5/12/2014 9:09:09 AM Name: StoneScott Title: Assistant County Attorney, CAO Land Use/Transportation Date: 5/13/2014 9:19:10 AM Name: KlatzkowJeff Title: County Attorney, Date: 5/14/2014 4:09:19 PM Name: OchsLeo Packet Page -145- 5/27/2014 16.A.4. Title: County Manager, County Managers Office Date: 5/1 8/2014 1:08:07 PM Packet Page -146- 5/27/2014 16.A.4. _ . , ......., , ........ ___: ------ ....-.------ -- - .......,_- --...... • ,y, 11 111 I ...........` 6 0 I 0 1• ' ;,---...... ....0....... .., , .....0. ------- ---- - 14 13 17 g 16 is '4 CE lf E 1 23 24 '9 1 20 21 22 :12 , 1 ] 1 IMMC K A LE: : fr --.- 26 25 11C 19 29 27 76 1 , .---1 ---------L---v----------7-----------—-----_ SN i \ F'FI 0 J E CT .../ \,Th 6_ _. 1 C R 4190 3; a■••'....'13\ 1_0 C AT 10 NI 35 311 31 F-- .,,,\ ---, 1R AFFOR D S, N. 'I _/ .... 514IN 13T. 3 0.9 4146 -------— 6 5 ...., 4 -r. 1 1% \ 1 1 \ .-' St,, 11 li 7 a 5 17 \'S 11\ •%, ■,.. 's,_ 1 __, ■ 14 1 13 16 17 16 15 14 1 i 23 24 19 10 21 22 23 !II : ....i. C.R. 54E, ____.......... .......,., LOCATION MAP FAITH I Packet Page -147- 5/27/2014 16.A.4. zw - c =o< Z- z�- - E. - w Zw- -;C f £ _ a 4 \ dWaE rif 1 T E d �� C W xt G V - F. '-3::'— _ z 33 3 j /a= V F17� � _3 z z z =Y °F c ru Vi <� oaa l y ?— 5� ,:!=-, v< _u¢4 ! C 1 V _ _ _ =: -ri _ - w w I n _ = p c 1 :='-61..E. c _ - c 6g L',,' Packet Page -148- 5/27/2014 16.A.4. - N -_ r Z' v a 1, w o rz L 1 r oI ce t� m � i" "i os- a �- ,os w --zt t N r a ` 9.5�� '�: —w.LflBN1SHIR1H.L210N - . -— - o> „ .c ez L el in l% L ,. _` tw Al w`�C 6. c a, �� �- �_. �.. � ' i, , z j � \1 V F=11 z 1 ° - r .1 1 `yl �n Al j_,-,-. ir—,: ,,,,,z: II ,. a _ w . IF G'1 o v 1 pil 41 W I v u z I o c ,I .1.. J _ n l F r, _ I X.H., xly Lx c a _ 1 _ l a _ s n I I e I ,,,..Los_ _� I I a W I I P. I 1 - I 1. I Packet Page -149- i 5/27/2014 16.A.4. Faith Landing Phase 3 (41 Units), Engineer's Opinion of Probable Costs-January 3,2014 Habitat for Humanity of Collier County-JE.I 120076B 33 Part 1-GENERLI ITEM DESCRIPTION UNIT OLIANIT. UNIT COST] COST I MAIIQTENANCE 0.:TRAFFIC LS 1 $4,530.00 94.E03.00 I MOEIIL2STION LS 1 $ 6210003 $16,00C 00 STAKED SILT FENCE,TYPE Ill _F 39E0 $1.(I0 $3,082.00 SOIL TRACKING PREVENTION DEV CE(50'.X.20') EA 1 $2,030.00 52,002.00 SIT LIGHTING EA 1,', $1.070.00 $15.00C.00 ---,,- ESTIMATED SUFI-TOTAL 541,48(.00 --...........-,- Fart 2.•ROADWAY ITEM DESCRIPTION 1._ UNIT WANT, UNIT COSI-1 COST STABILIZED SUBGRADE(12"DE'TH,LBR,,O) ,3Y 5050 83.6C $18,324.00 6"L ME.ROCK BASE,LBR 100 1 EY 4067 $10 DO $40 570.00 —i-.. 1- I 1.f.;"A SPHk_TIC CONCRETE""YPE S 3.1' 4067 SE.0C $32,536.00 4''L ME RCCK BASE:,LER 40(SIDEWALK) 1 Sr 11531 SE.0C $13,046 00 4"CONCRETE EIDEWAJC(REINFORCED; 51 11531 $22.00 53,5,882.00 2'VALLEY GUT-I-P.R.CURB i LP 30-E SE.0C $24.141.00 SIGNAGE AND SIFIPING ± 03 1 $5 000.00 SE,OCO 00 • ---......... ESTIMATED S1)9.70'141. $1E8,604.00 t ...........m Part 21-SANITARY SEWER IMUI DESCRIPTION UNIT QUART, UNIT COST I COST --1-- ,'SAN,TARY-Mi,NHOL.E(3-6 DEE"; EA 3 34.203.00 312,600_00 E"PVC-SCR 26(3-Er DEEP: L. 4,04 0230) i 31 1,424.00 DOUBLE SAN I TAW(SE RIVI C 0/CL E ANCLIT EN 14 $1300.00 I $1 1.2D0.00 ----.....m, ESTIMATED 31113-TOTAL $35,224.00 --- — PPLA-PL201.4000005D REV:1 FAITH LANDING PHASE 1 D/CE: 2/28/14 1 of 2 DUE: 3/28/:.4 Page Packet Page -150- : • : 5/27/2014 16 A 4 - Fart 4-WATER MAIN TEEM DESCRIPTION UNIT [ QUAINT. UNIT COST COST 8"PVC WATER MAIN(DR- 8) _I' 17E3 520.00 $3(0)60 DD — 8"PVC WATER MAN(DR-'4) s 6c, $22.Do $1.520.00 6"TAPPING SADDLE EA 1 $4,031100 54,000.00 8"GATE VALVE EA 2 $1,200330 $20D00 -- 8"TEE EA 1 :PICO 00 $400.00 8"X 6"REDUCER EA 1 $4C0 00 $40000 FIRE HYDRANT ASSEMBI_M UV/GATE VALVE EA 4 53.630)0 $14.402 00 EAMF LING POINT ASSEMBLY 1 EA 1 $1,503.30 51,E00 00 -.— AUTOMATIC F_USHING DEVICE AS REM3L"AV VALVE CA 1 56031)00 56,000 00 DOUBLE WATER 5 ER•VIC E :RA 12 6)2020 SE.600 00 SINGLE'ASTER-SERVICE I EA II I 3620 CO 58,60000 — ...,...----- ESTIMATED'SUB-TOTAL $84,580.00 '.-.....e.----■ Part EI-DRAINAGE '- ITEM DESCRIPTION IJNF1 WANT. UNIT COST COST TS PE"C'-NLET EA 3 32834)34) SE,4C0 00 1 TYPE"C'INLET(DOG-IOUS E STYLE OVER E.X.PIPE) EA 2 $3$oo.oo $7,000 00 JUNCTION 306 EA 2 56 000.30 51:2.000 00 VALLEY GUTTER INLET EA 4 53 500.00 81-4,00000 I BUILD'JP STRUCTURE ANC ADD MANHOLE TCP L EA 3 51 500.00 SA,SCO 00 IRE NC F DRAIN LE 5 asap) 5230.00 ADE YARD DRAIN L '1•A 4 51 200.00 IN'.820 00 15"PVC LE 28 5220) 6610.00 -,— I- 18"PVC Ls ,SD 325 00 $1 1750.00 --- 18"RE NFORC ED CONCRETE PIPE L= '10 330 DO • 512,300 00 -k------ :4'REINFORCED CONCRETE PIPE L= 543 5400) i 513,720 00 , IC"REINFORCED CONCRETE PIPE L' 5)1 453 00 L 52,820 00 36'REjNIFOR C EC CONCRETE PIPE LR SO 570.0) $4,200 OD '2"REINFORCED CONCRETE: IPE L= 177 5930) 515.93(100 ESTIMATED:31)13-TOTAL 5'111,266.00 ----.. Per. ):-LANDSCAPE: ITEM DEISCRIP110 V UNIT QUAINT. Ul!T COST F COST SEED AND MULCH SY 1)120) SO 30 F9,100.00 ------..... ESTIMATED 31.113--TCTAL 59;100.00 PHASE.3 ESTIMATED ICTALF 5;074 00 •. ,. . PPLA.-PL201400_0 ()SE REV:1 Page 2 of 2 FAITH LAN.DIN6 F -1 DAT,=: 2/2S/1°- DjEl 3/28/14 PHASE 1 Packet Page -151-