Loading...
Agenda 05/27/2014 Item #16A 2 5/27/2014 16.A.2. EXECUTIVE SUMMARY This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Fiddler's Creek, Marsh Cove — Phase 1, (Application Number PL20130002041) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the final plat of Fiddler's Creek, Marsh Cove — Phase 1, a subdivision of lands located in Sections 13, 23 and 24, Township 51 South, Range 26 East, Collier County, Florida, following the alternative procedure for approval of subdivision plats pursuant to Resolution 99-199. This procedure allows for the Board to approve the plat and associated construction documents for construction purposes and recording purposes concurrently. CONSIDERATIONS: The Engineering Services Department has completed the review of the construction drawings, specifications, and final plat of Fiddler's Creek, Marsh Cove — Phase 1. These documents are in compliance with the County Land Development Code and Chapter 177, Florida Statutes. This project is within the Fiddler's Creek / Marco Shores PUD, Ord. 2000-84. All fees have been paid. Security in the amount of 10% of the total cost of the required improvements, and 100% of the cost of any remaining improvements, together with a Construction and Maintenance Agreement for Subdivision Improvements, shall be provided and accepted by the County Manager or his designee and the County Attorney's office prior to the recording of the final plat. This procedure is in conformance with Section 10.02.04 F.2 of the Land Development Code. The Engineering Services Department recommends that the final plat of Fiddler's Creek, Marsh Cove—Phase l be approved for recording. FISCAL IMPACT: The project cost is $3.008,567.98 (estimated) to be borne by the developer. The cost breakdown is as follows: a) Water R, Sewer $1,764,";31.4 b) Drainage, Paving, Grading $1,744,036.53 The Security amount, equal to 110% of the project cost, is $3,309,424.78 The County will realize revenues as follows: Fund: Growth Management Fund 131 Agency: County Manager Cost Center: 138327 -- Land Development Services Revenue generated by this project: Total: $91,677.04 Packet Page -98- 5/27/2014 16.A.2. The Fees are based on a construction estimate of$3,008.567.98 and were paid in December, 2013. The breakdown is as follows: a) Plat Review Fee ($1,000.00 + $5./ac) $ 1,420.00 b) Construction Drawing Review Fee Water& Sewer(.75% const. est.) $ 9,483.99 c) Drainage, Paving, Grading (.75% const. est.) $13,080.27 d) Construction Inspection Fee Water& Sewer(2.25% const. est.) $28,451.96 e) Drainage, Paving, Grading (2.25% const. est.) $39,240.82 LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval. - SAS GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public Facilities prior to the issuance of the construction plan final approval letter. RECOMMENDATION: That the Board of County Commissioners endorse staffs recommendation to approve the final plat of Fiddler's Creek, Marsh Cove — Phase l (Application Number PL20130002041) for recording with the following stipulations: 1. Approve the amount of$3,309,424.78 as performance security for the required improvements; or such lesser amount based on work completed, and as is approved by the Engineering Services Department. 2. Approve the standard form Construction and Maintenance Agreement and direct the County Manager or his designee: a. To withhold Certificates of Occupancy until the required improvements have received preliminary acceptance. b. To delay recording of the plat until suitable security and an appropriate Construction and Maintenance Agreement is approved and accepted by the County Attorney's office and the Board of County Commissioners or the County Manager or his designee, or his designee on behalf of the Board pursuant to Section 1 0.02.04 F.2 of the Land Development Code. Prepared by: John Houldsworth, Senior Site Plans Reviewer, Engineering Services, Growth Management Division,Planning and Regulation Attachments: 1) Location Map 2)Plat Map 3) Opinion of Probable Cost Packet Page -99- 5/27/2014 16.A.2. f nT r 1171 1\ COTTNTV t'V LL1L <iV Vl\ 1 1 Board of County Commissioners Item Number: 16.16.A.16.A.2. Item Summary: This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Fiddler's Creek, Marsh Cove - Phase 1, (Application Number PL20130002041) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. Meeting Date: 5/27/2014 Prepared By Name: NouldsworthJohn Title: Site Plans Reviewer, Senior, Engineering&Environmental Services 4/22/2014 9:50:32 AM Approved By Name: PuigJudy Title: Operations Analyst, Community Development&Environmental Services Date: 5/1/2014 1:52:57 PM Name: McKennaJack Title: Manager-Engineering Review Services, Engineering&Environmental Services Date: 5/9/2014 10:43:35 AM Name: Stone Scott Title: Assistant County Attorney, CAO Land Use/Transportation Date: 5/9/2014 4:01:51 PM Name: MarcellaJeanne Title: Executive Secretary, Transportation Planning Date: 5/12/2014 8:44:39 AM Name: KlatzkowJeff Title: County Attorney, Date: 5/14/2014 3:20:08 PM Name: IsacksonMark Packet Page -100- 5/27/2014 16.A.2. Title: Director-Corp Financial and Mngmt Svs, Office of Management&Budget Date: 5/15/2014 9:19:32 AM Name: OchsLeo Title: County Manager, County Managers Office Date: 5/18/2014 1:20:32 PM Packet Page -101- 5/27/2014 16.A.2. —z(.„t' �� F,(r LJ y LJ 14 °!1 [!D4 g6)? �7� , KE __Amom ' _ T7T7777777777- 7T1>;:':' :�_4; \/(r( 'r ,�Li �� /1/1 _ \� I ;1 �, as R4_== o f -,,,,,,,„7:___ ___0,,,,_f :- \ g >7 / 1IE =7 / ! ' �, (if � ` ,, � f . ON -rt-q "Diet L /� ?/'uc �IIE r' to ��\1�P(Id JEx% HO y v� +�\S,�%.,/ ,� ,,' . . 1 IL.00.1a► ( ION C --- % Lemm,p.../ �Lw-- " T 10 , . 1....L.)11,...., • 1\s1 PO A Fp Hdclle-'s Creek Marsh Cove. ='hase 1 PL20130OC)2041 Packet Page-102- 5/27/2014 16.A.2. g:8=8,8-, r■ _8,, ,_,_,8,_, I L, t t Lgi E I L° IELiE 0 a r.$) ,Ett y :gs 1p.,3g_s, LER s ' '' l7,E',_ E ,q „?; ' p VT=8,8 — _ -1_ 2 arfr,. (- 1 --Eff0 rat A ii-c o o ,8,` fl'' WM 'EE8 8 q888, bt,. L 8 = • CO'g Li n L, .., 8888 ?8,888 E. . , ,8.888g 8 ,8 r4M L115. L÷i Z cr i'er,' `1,' -1 ie `,; ln(f) E='-1 L E 2: 2.88'.8 oc, 2 a 88. 8' . 1 , LrEl „ -,, E :,t, .,o qi og E V, 0 •_8! ES ,'.8.' n ,,-7,1 8a=2,z. 8)8 '.42 2 -sE ..t, su c' E-g4 gE. s ,T. r.'"" i' F7 1 El-,E 0 r ' - - .t,' ',8 8' 808 8e8 oi 84: V t E E E"E, Y8i 6- -r ! ' _ ' g E . . : EL - ' ; 8 8 :8 11 8 g8x :F 8 -. E-4- ,-. . < , :!. = , 'EF I' " 1,...... 4 Z ! a -ff I-Z C"..J OZ'S qa L•,a4, '28, 8_ ,O', -,g 8, .T. C\7C'n.1L) 8 E 8. 28 .8E 0 8 VF=. Wi L.4i 8888.8 i ' r ( ' C....tE - Z f2482, LE 8 •8 `,12:- ,' .,,, c.,. ....) cni -.:.: :-,,-- r f e, _ - H- ,1,-, Z ,;.-='," ,;•;,:E" ,k';,-,' :-,-,'_'E, ,--F, glwl - 0 8=8 8'8= C.--pc::, _,. 0 —• '88 88 `8 ,888,8: 8-08-8="8,8 8 .=88 , O. '=== 0 '''8j8 ',:.,j:;-ei HT, f'-6F-:. '.:-, '''.: f-,,,,,, ''' 8E88 88888 88- 88-8 -8 -8, 88 ,. 88-,; , 88 ■=.•-•■r.8.:--=', c.,881 88 4 • • . —, --- - „ - UD - Ci In 0 2.`-•CO C) 1 C.)EC:1 : _ L4 -ckE•-•7- 8e c•\.?E.-)-d "888 ¢a. , E Ess r ZEE— !;'., „...z„; c„--- ,--,, :7 ,a aa=a, 'a4a,;a4ai==a1,a,aa' -aaaaa47,aaaaaaaaaaaalSiaaa'ajaaaaar.a ',.."' U..i :1 ''''-': 0 RUJ-,1F.-.,:.-A 3,F,-A-,,‘,-:.',,,,.=:..,-"_•; 0 LD 7,ii,L 71 '2,8.A:':'"A t8.,•..-,==8.-;,. E8:,';7,r-,-..!,,;',:,':8';,E-=8:=--,::8;,f..•f8,—,8E88,-'88A',,,,88:!,8,LU0=8":.,.b,88='=wt865.:8:i.E.;fE8,-i.,f.,,8.,.7.:,7-.,88',,T'"=,88-,8E=8-.=.f=-_8'_8,8aA8"88.f,e.,:888868,-..:!e;'8."1:-.<:88,,8:_88E8,,-88:,8:,,A8;,f,8:E,--:E,-..8'0. 888 , _. , .,. Z r ),,---...?,=, oi.:. ., UJ 88 =E88,"88 .88882•Y8P8=808.18888.88:',88=7:88888:0888.8S8:8e8=88.89: <LI 80 8'.,' ,8 1 Cl.) e..- , ,=, ,' 7 , :'' ,1',' , : Z-1' ;;N, ''-'r-'-' ' — Z.", e-4%Ec-.)E-- C);',. -.cm.., <C---; _ iie.:. E-, E_,-' .. '5,' ,, ';" L, ..,,:,,4 .7,--E5---E 1---•. ,E.1-----,,s' ,LE 1:',2 -.' ,,:t 'E'T', SE' = •!,,E","1 -.',. ="a,=.", 2 --." a= ge C) a , Lll :''' -ai' %11 Cl) a KF 7`.='; g',' al =L': a`!!' .-,'I% '==t1. "='..-4 ''' C- 8 „ 1 ';' ''''. ''-) '' ') ra='Z " IlLa : 5 r.=:' 'a a'i ' L'a i a: ==_4= .a.a== L4' a.E=W4a,8 ==aaa 'r.a. a L;.-. -: -,i-, '7 ! „ CD l'.= '1' '2.:.,=° := '!-.,= ,, ■I-., ,.E. '''': - '4 E.="1,'_ -4'-§ ,,i,.f.--,..: :1,,, -;.:,z ..:,. .,- ,,,,,, '22::, '.:-.;;E,g, 11 L'. ..', -.,= ,_-. L" =.'EF, EFE E- E' , .: ,7■ ',-,-tE, 6 ':'.,:'6,,S ,".7''E=E ---.YEEE. ; 7,-; ,-,-:.'z ?-, z,,, 1 ,_:-„, 1 ,,-,,,, ,,-,, . 0,,T,. ,, 1 = '-a . ?, -7=C--) C.)== __il: , -,I, . , 7 ,;:=-=;" „.;',;;; T-,HEI' =: ;'',1 ZE l_LI; ,, , — .:,1 ,,, , , :,. L,-,:„ Packet Page -103- 5/27/2014 16.A.2. w� o W CC-..W 0 _ m a ,0 Wpm a a-N d d d LL-, LI o an a> x o O w d m F- m W Hg x Z. [n _ 7 0 ! Z Q a OE S s .$ k: M 2 i (` £ 4 ': g w� . .T_. J i 3 ; } k r f ;,71--.4 ; _ F.Z>... J <G E4i Up E_, CO 0 W a s 6 - WdRi U R c� �'� _ _ ° sQ L.7gW to sr - g Lam 0 v � CD 1 07 w dE-+U _ - Z e 11 =..' 1 C , �t � /-∎n O A% '° I 0 x per, �\ N L" , 4�1 ; - . o � ". i �.� ` ,gyp/ \ .,,,,,,, ,\\\ Ty /// Q. . -cl VD 7 C]d --7 4,., . Ga.--� 1� 'ems — WW a // /� 11 ... /Z o E-•w... L—� i �� u *- 0 o y, _ / / ii U 1 ,� ,� d Zo' / / Packet Page -104- = 8 �" mf e , 5/27/2014 16.A.2. QLu MWh I " " 8_ .""" � mow- , °' n,,; �� $ ��N7,7▪2'721'8'. • - .Iel:B.�F r�_ r r - '^��BPS I-I W V)192 n. o E' azl=I= 1� '"°' S=IN g 4,:21 7I A.,.'sn8�i.„ lm IF I I ' to ^ o M F 1 11, 1 ii 3LL m° �e� k� CI " a 46 �L"� � � „� ��r�' ��� , �`I f � P" sal- 1R • g� �a I I. ZD LJ a in ; rLL :^oa m �o I zQ z- omtid «Iml""h� h neie "m� �In&�m„ao _ .. 8i hhl -r _r al. �-�I<k«'n° "titi oh � �eml6 F- „ m 2 I 11 I I 1 1 1 (^o�w = JK 5'8.°88 1888 is .88 68188188 1.888 8 1 8.88 8 8 8 k88 ,� i a r,l� ,._ "1"--'” I, ”""I" ""NN rNln" r h�, " 18 Al —,..°7-j 1 5"3-,'3" ---- 3Jt" rza3"�8"S° 62^ :,k X186 86 - '"e'"'" E-■" F-'Z ravmos,m's d� "" �W C�2 W CJ ▪ ro-z a• i -L�. -rsa _ � u c n.or,+cs,u \ c � Za..a d `. 0.' --%..1L) -iW 84 f" rso s oi 'y ro do I'0. --- h " "�� � 3c 4i6O%-,s?so h9d i " zz "8� <ro .tee r-___. _s1-7- _� °s 9-7c 3r,d'8ii _--_-PE �_ -. „ . /p' ∎ '!:" ` c co .Ji - � . i ' � ej 'k'O 1 1 •,81� ,, Ivtl HON i c' -\ �. c ' Ps,I4 o2S8ab `" w� W K� �i rZ] .� 3° .\. .-y 55 /,,,,," o �th �ml r�ry va 9 "'y°s .°� F "t" -_t-_-e, MI _ ," c r o 0..Gl - - rS"� � r�. '7,-'-,: �- hi. s J he r°a "" of r?.a� °"H ' " /$� '- b`y O 15'I�=7117a3nn W Ne 7 c.1 ��,,,■ co E GI.1 8 �,:;\`J° .a ee �- t- 'cro E�C7 .c« oz 6''' .'',:,-.''‘'04,ro '� �O^, b oh CA2Udr .e. _ � <z c�Z ti � ca C,�'cD " 'i '/ �. / �" y„,,,, � d .-ti� • 2• '�' alb N /`,/ �' y a'h in sN F, x _ " —� --- — - - _ /f�— — ' wee°h\ �� ___I CC N � �5 Gz, ,\ ao3 '�C j '' Z � nc , E.°N • ,� / O= ° r-:C:4 P to -� I■ � m ehh �I F / y 6 n � �y ' a k u I , o °I{ dy=y / e I� r Q n nm♦C4 I n" v • nn"m g nn "n nn W w ,s d\ i C� �a J 15 W _nom '3�`ry b n bl ne qN bF T 'C7 O';4 JAS - C7 =o d U ,� -im" �-, '-' "' p.W° /ry �htiL5.21551.5_� �� o<".mlc,Trm,°.�� _mm:a dq a. w Qp a " , 8f .511 . .8 8 �s ZU ., r„- ---- - I�� I� I �.r I , I• is mmom I I°S d '�a3"""""""".,"r333�33"""""" " 7—.WHIN' u. Packet Page -105- L L I eL Lgg L 1- I \' 5/27/2014 16.A 2. w I " �` rg81°B Q"w g7:,� 0 11 1 1 W I WI 6 Flx ;?,,ti.,,•I k h I. h 1.1 h h B1.9 l rg 1RR 71R r 1 1In �� �, �° a a —• o °P. t2I4 1 r- ml° Imlm rh^�^ tzh"I° ' i1� I„,�!: . ^ <r °r I8 _ to LL v €-.i ! E r 1.1 1-I Ib 6 181 r 1° • Iml r. tgr :`5. ImS Z 7•im m w [sl ll �g n ++Ilm .,„� «�� mml_.„, ,-��„,. �3_ InI nl.,�r .. € -� X17 ,11111 �� W� W 1 I €gin � 1 18 �R l 8� [ PR� R G�. ',,o c a to to to O w <I8 °I'R„ ^ . . „I I,tilr, 1 -e ,...,,-,g..; S E E _m 2 ,,,p - O. •-1- - -g tie��„ °h �I_ Cm__$� R8, s I em sE pad` O W 'i . I. e =I-- 04 _g III--°[a si9 ...r21-0-8 I8 8 1818r 8 8888 21-2;21'2.221'212 1 81818 .888 I8 ~ �i} E ,21121 .1 1_lc „Irl .,�.. r .,!.,�7 �s Ohl I_h h nl� h�l„nl W,�... i �l __ SBe -- �.�� — p p I-a 3 Ho,„g Er�' r� Z cb t g\.�� �9b ° cn O ,62e 1 / 8._: "�a u l�wU 5� N I (� a" N �\ w Hoses c 8! ., J "�����m�,� [Ar "..w w U ./° 5 1...4-.C y �m N I o u l - - - rIW E.rL)O r■ \w b,R��."2 —W C3 a,nKnuzsz�7 m I C� _3 rO��a s �a .a9 I °a' c �i F-'Id s, , al �J w cn �I < N i Q=a' Q1 .�7,„ �' ,r aO , [ w 10160 � P ¢ BI I 0,6 .3 I Q 11 ' z a� 1 � b „ I I ��'�y xvzzx- ° \� rl, ...X, „ ,596 a oz1N a �E.. �g g$ef°� _ iFSA;�; liw I I I �," , �� F Ip nli- ate\ ary/� / , =I�. �Cz.,_, d I°rInMI 1 s „ \ go 6t / o(: /',0 818 8 8 8 818 8 iiI ?e .1 II '/ �m was 5 Ldp 1 I [ �' / W. W.�w s�i�a�of R� �� -- --- -- ���e -� -- e e ��, _11 E�Gs E A - — h s �� L 1 Fc ° tn_ )w• 2 „ 7�w I erC o � IR gr= I .- 7,):- `o-e � m zls r 0s ,) o. 21 I I mT ' 4 / \ w� rsl sla ssssl� IB m n I „ 8?„e °°el m C o ', e C 4 �v •er -5. =rg, I I - a o:U ,, F.., ° U 4 ° _ r',bw as , a . e 4'y Packet Page -106- `� m� � m� � ��� . . � eo � _�m 5/27/2014 16.A.2. o m w W f) r'-c C = a a -Nj l m � ;m mm °m-jm oQ 111 °I.wi.1-W w w 313. w ; =3 3 3 3 W — ��������1��� mis+�^ r N m m�a -�g'2;PPt o 0'2:a ate• Et a bVN '^NI'm Nlb Nt2 g�b�� N a 1-0 NI III =Iml I e 8rs a slr n nf m� i u ��r.re hI a ~��~ cn v)ol�eolmin a °$^ okoI ii=i"� m "o _CD F m �� f �tl i _I � Ie =_�^•d r 10 8�808818 8°.188 8i i8 ok 88°15�, 88$ Sw Cs:= 216 r1mhe88M.mmm§hEghg $ASS eele °2172., 4 C4 O ;� -fig° r2� -`J: L."' 1,5 W C Q C/D C5=G4 d a W U I PLO Fx p' m� z o�s°SO c =Up �b I w O •--' "q,c z m �VD s I, a nra °j s c o rkU1 LT"E.-""-" t`; 0 O �'C SCu _ r, W M - }, d"F'C.7 d C'42.• 3 .7.--'-' ., .._-_.�-" °_,err° "�-�`.`_.___„” ° ', H d �- ">fi° I,; \I 9 Fil vD w z E \ nr \-rs //,�y j j., O Ga m .a, row rrs ,°" z�� m .`2!� %6 JGw J W E� s.,-,',,,,,q,,,, ''e'eP P i'\'3 d C7 M z 4 55rn'apo ,rte`� > ^ E. da a q� W ,1 d_ < b. .,c ,''''',:'s''''‘ tC • �E Packet Page -107- 5/27/2014 16.A.2. Pisir m 1 �� E�4� of G l �� I m� � 1 1� 1 1 f r r� I pup w w § cl � a 4„ m" 'al 6I r�oI x �I I I Im"„. m -8! H ∎ N_N_I"I"" 1 �s N � l . s kl H l Ihh� • 1.• I f 1 . . . rsJ o i 2P-.21741.1:2:;r11,1.. 2 a - = = = I1 - °aj gee2 EM:il" N ==Zt I! I I 00 ==0 "- .-00p N. ITA„. <,..: 0 mo I= ,__'-c 7� 0 S a ;�I.1rd R + . mI :... n °IoI; gp-,m0,o"I"R ,-,2 � '27goPsi� BIS .1221• U.:= wa ¢. N N N Z L Ip II. Z Q ICI f : rvl L2 ,g8 ' 4 �- rl " �I 1E k �lSB "' No u Y Iloi� I$: n:-Y3m° ply a Im�I I I I I nl I I ah Ie r- — �+ 15'I81888818r88. 188[888 44- 8 81 881`4 8 8 8 18818.8 a 8 818888,8 88 .8 .8.81818 818 88.88, i= ��'�griMEIF2sE lsWa rhsa „ .L I ,"I!, UIM s _ry i a „ry 1 ���• R§al§l — F- U=F~ co 0 C■2-7 U Cr) i W,d,: ■ = 0 a orsrce w z1., ..TW z sE sn c v r r a. _ ` H aa.PAM,- m. a ' _, , , -. _rc., u . t 3H 3� Cj E ''oo, 'Ft, I r- 4 r7 6060[1 iE L � VAV I OWC7 U 1 I1 r x G. 7,X,,Xa i� - 4" ��r '\ U NON 1 1 oo-ce W v T /' /” i ..., c\,�� i �, /4, :::' '7 E-y \ `°o- Ha "04, 4-Y,/ to k:'Z 2 '',r1''', , ' ,,,' CI L q m/ O ^�Z� '" ' o / u (h 1��l O Ck L ^ L'- M r �H E.E~ !� HJ$ � /' C hr o/ \ 'e c.\ a 1_ .,] .;]c>F , '�E y 0.1 a ry O �e \ �O E-1 1 \.✓ ad ` . ..a , „o r na "E - z a o '' E4' _. N a,-12,, 04 0-‹U ^ "y. lI e y Packet Page 408- 5/27/2014 16.A.2. o a I.I� _m� r I _ m: _ l� ,orl n ___ "I • 87: = l d a P `a wi d o F , ' kw 6f M8 m h : o 44 ao I I �1 ,1 i oskgm ,31415 i m rm44T e.;;IgOli7.).__I I =611-- ==I==1==I=m1== m m lm-I-m=—=1=1m m=I=I=I=; =m= ==F=I=!m=i=I==1=I==mml=Im=I o 1 W gW s sr s <I 1 m N w8 Ex I m m 8 I� N V1 Z Z. I�rr F r L• m'. z��� �IY4N-ry��lp, nr,2_ Hlbo'_ rl-bmb,,j I_ I ,n Ino NIN n T=�JR .�Q 15I8 818' 8 81881-18 8 88,88888 081 8,$ S 88 I. 888 ,18181°8 -, _1088 z- t§ ?p,R.;,, _-2121 .,, FA--Iee n,� ss sl§§, _ c 'Enl-lQE•is 4-1 5?--- .9la m"R$cF,°iIrl ,7k 26, E4!n mmFal w C'J,'� 's,D s c<o r- z - , ry M W� er'" srd Nn E—‘U O 55 czaz Z - „ -- -:::O I Q x i� �r� of �HWW ° - �'`'zj �Ud , W ZE H cV < < s` O �• 1'eo"s" �a ;17� m n up.12 o- ", m • tia-� moo,- �� 2 rzo '‘',,'•'H ,, rn eno n ■ \ s\°zw /o � = 121 x I \ \ 4 4.�e n FAQ L `rte J NON .� w c_)E., ' / %% �¢ � ` o ri , c7.-.1 o= 3"s'3 r�HE a w¢o a wEy tn W o we 'I 7 Packet Page -109- ,1 1 ! � � [ ' j ! I 5/27/2014 16.A.2. , nl 3 311 a w h o n� 3 �� �a w -o▪5. M I m� wl I. 1 u- g" eh�l • m k r• 8r�° � a d — r l� f m �z r>d N s m� o m Q Y Li I— I-1.� �I� �I l l i •• F; I ��I• II= ez -.,,.� 1- I 1 _a�O r-' u4 r, �818� 8�8�8� �° �5�888,�8f888 S � 1888 881 2I la Iele 21 I a In�slla a als p Z= Isla I� alVI! - �IaI� "rII��IRI 6.,x °¢^° ` O _ _ _ o�lo - r i . i I°a a i ° E'' 8i� °/ a .f 1 S E.y=8 �f,V '1'•5N�P ._% .. /J m W v 0:- ..: 1 �,.6 x g � E acz 3r NON a.a.7 o ' / .--1 W C� -"' S �'t 5'E R'19. Q.••••• NON R'Dil,t UyD E"' pj N 0 H S 0 NON 0.A0IAL p W e - N ''',X.Iw �.._ _i"2 ■ L W ZE-+E-+ s tNa�a∎ow.e,e�� m 'r,‘„,„,. ,, d q d �zo N Cam. 7.„ c�CDx °' �a� Sao, ,,„ , „,, H� '' Z N 9F, ��O Ca N 'a:-- ;r ----�' 'NSF a�,P� ZzzQ /��o, o O...O 3 ./ 0,v-,, N —+ �� O F � 88"12 < m �i N 1LL wlw sls � w,w wlw-ww.WA 1� � � 18 • a 8la e.■ I.z,.. • 1 I E-+ � I I C H .17y N ro ti I L I▪ I alb 8 k8,11818 4, 8 LL 1 I I I8R I ZE-'P'' • I I IB " ma a - "1"° ph �I° - o w I 1 1 1 I 1 I� xd0 v � 1 11 �• �I• Z, 4, "3 li �el - 8 �,r ▪ ,�, a r� 11 1 Ib._ C� 01--11-1 R 1 l 0 818 X88 810 °8.8188188128 2I a. 118 81818 7 �ti x Packet Page -110- 5/27/2014 16.A.2. W O ry U W _= a cffw w¢_ o a , •E 2NLL °- • E r ..2_ N;i N Y 0 Q Y O 3.l b C.L. O CO 1.-- 'dN 0 C,B V- W /,e' Z fi W N FC -' N N Z- 0c t, � ZQ O NO W 2 �x Gj.'�. _i 5 _ c.i. N- —w z qw c'.i O co o I r cn��x s Kt �Cia R " / • �' -f - 5 F+.1 ' o o�- ---,- i o r I' o a, cr)«c c_ - o., m Im8 �" 0 �� - .E 'a ''' . I ��a RADIAL S rn v1S 1 ` 1 3 U� ,-- ' it 1 ,1 ICI NON RAM, r� azi _ �_ Rle C� _�. Y• I▪ mlw P ii ,zesa ', � j a� o �n ryl W r R-. n l� B oda NON oio Z �• i� WG O— c ti / / H$ 1 8 CB8I881 p rOZQ "r�,.i ra�N h l�\l /U• a : g, _n 1'61 1 In__nnp.i GrO�- , N (� nl�t�c+uuuuuucruuoci t��+r�uoP ,,,,.-:,,r4 o c_1 ,9uu;," E-' U ,' c� ¢o ,.Bt G, �zQ / _ %7/` // \_ �'����C/ e cv 1 1 zzw ' �� I �W¢ � / e a I �Ii H1H I I I q. e U E•E-4 h I � �/ � 4E— c, an o i � 2 ›..,,:,= � / N � I I I m II 1 I 11 tm J a` � � a, I_' s / dl ia.,m am . __ " ry va [ I I • � �� U w° 3 �ti 1 N da ° !: - I e B ° 4 �� � • I o 9, 1 •� e 7—"•01141U1 Packet Page -111- 5/27/2014 16.A.2. - *. W � W - - < WMm Y o I ..i„I„I°1 0 „a 3= o I I wwW 3 �cc o cc iii3iaN�k1alwt,Nlr:�W_.s�!.cPm w W I .”' Vag 5 W IUlei NIS h i�NIN�t��=1 NIt i z a 0 E ala �.SO.SI 6 -'SRI .' I - N J ,, g iI mP I aia =~ =w g 111 .1 tI ,I E-,Ga-, t'n�8 S;818 o$i eln°S 3«�m^ � � =I,la-21Bo ^I^ 531u=3 � WO U] — L-',.� 3 xx0 W U ..ti W VD —�W C7 Ca O G.L x OpL� O �` r W h2U-‹ d O.., c o o c„,`I .. 1. Z F, O U E. WO WozQ ZOCa x x t T�d, V_ 1d0� --4cE,E 1 O scc +EE �OO ,�Wd0 • Q ¢ a,, c. -<xz v E „i`t Sv F. 0= _ 'E'cHEE'-'' Z o 0 i = U d 7 Packet Page -112- 5/27/2014 16.A.2.o m wn 8 W o a ° l �e� as . m� §II N - 2o dm-ea } Y - iI1 ,m� i � lli 3x Z D m ,_,w WIw!m La a N Rh1'0;it"gj R s W ' I I� V O Im rI L- E a ' II ~~ P ° I W . , I OO d � cf g1bryle� FZw 'Sg818S&S 88�., o U,Z� 2s^IRmnm lm sEEM E H ,, ' 11 x o o = C C'_ .° °I I ,c..0 W� U W WC7d�0.W d 'a AJ =xo _W i 8f2°588 E"m825,,RI, '13w a ��bs _ss yr sIkr, 0vo Gw x in. NQ of F q co r ..a W „:E—C..7 ZE-I <W CZ s zox ,j. of -,..,\ o-- 11 I �° ^^ �Wx U E..,E"' ^ UP 2 O " s� cy =E- r te <dZ L. v U) o HZ Z 0 x dU , Z---■r ;' Packet Page -113- 5/27/2014 16.A.2. � W W � ` 0 Q w _ am^l=8ia �I���n.""' ,�m 8: 8m.2 ea Na 1 NI O Z w 5t8 i8° 13� '�mc ce ml a �B " P��W c. ZQ ° lit' ja 8 nJ�1 1▪a2nk °'a —M 2 �ItirIR3I3' p, Iq I"d `4 Sg 1 , Si- 21:4 �= „� - '1175151 - i "m ,,,;:. 'a>'''428'''.:',P'n'� sR a — W �° `ma�° „"m8r°qe;�m o-.�� a�cn�o�o� zoo _,a.mk'I: 'l' "-he o�,�e�.-l- a- - __" w E, S'181.8 81-8 8I-Sig 81�80$86°g'S C88�888888.88�° 88 � � ? sa j�a a" � mm °n o4° n. • aa�3ac '■-4 ,z- W��O W,C,,,x r- 0 ;3a� W U a F-.C_i-- .ii! n cn cr.'- o /x� -/_ i. 1 2 ,..f; '344, x� i rD Sa- ,,,„ ` ti__ . � Iv N \ " C1 V . / t ads n��`/ i \�'.CS F J+/ \ ;')-,:)..,/,),-I N H�5 Hd 'or 'eo.e,. V! xp ^1 Rte o .<ss,; ` x H. { +'P III ' o zw �/ .o WW F-' :)';L) ' v F, g oo. r �o— C a w� dxZ c2 dq a ° o a d U Zc —wFli46 Packet Page -114- hf • Ih 5i3 I h Finu 5/27/2014 1 6 .A.2. a _mid 2e „s W"m ;e R� ° w I 2Wwl3w h oeN ' = 1 ;ryi a>Y '" m��a'..,31.7:;1'8-axYrF<e'r h n :1R `F o8afme 1 0 - . m 'o` 2It:,"N ! `n ' o ""- "° .-in m o u_} mXgm _I_cibinl1o' 'a,1 nm al I-(52- Wuz zzm Zmm mm mmzz mz zlzm m�zlmmm✓+z zzz zzzzl�n in inm W nx §! I fm I I � • .g d n wl I{ 11"'1. a 7_r r _Pf ofo-=1'n or�mprra �� ww 181'8218 i1 _8 8 r'3'F !2 ml Tnem NN Z- o^ s18R�8 u II L diNl. . _i „- Z Q O Es rl ss ��-'m of tom�F' War.f� !o� -2�w r �..9�1 BRFo� �so 4:TI.Ao�n21;2'""2In.o�PO[ _� of W `,t= 1,,° "t,o Is�nna�gl V°I.. =w i�;rmmm ° llml„��,: �lomml��:e tim° ____ mI I�IN elFFole „, Li z= - 15'8881888'8888 880$ 1.8 8888888 0,'88881 8888 00 :g' 2§��r X0,3? S g1 I�.,„rlal„ I s^:U mlmlma a _ w z Cn co O C\2 -T-;U txW d �.a = o W U . b � �E _ �, 6 g _ m X30, yF "�'��� C V O 5� � 3'0 O CID coo”. `,,- 1 124 w r u.i= _a W°-° r} H L. ~�F- U o w rt ���b J- g1 , BITS H �0I ��HC7 �., 8 zFF- a �,a Q ' a N � fi C: m .,E \\\ '','-'_) 2\\\,,,,, 12d�. Q0., ..._..)`,.S\ o� 0 F. WCl1�Z �_ r �. c 1 z.O --e 1,',.;',.,--;---/-:aa a < 'i Q ai' I-7311n AcT o! kE d ,.I W a c,. a� —Z-3 IT I —Z:�dad —macs-_ _ -dam. 3, aa ��TT�� o ' 3. F�2'~m W i W a 1 OCYid o wv (y 0. mi� ..r C7 < �J� r ' -'H of d W Z,. d. dU U d Packet Page -115- 13,":3���1,►unilurrrr$,, 5/27/2014 16.A.2. Cvt 1 •'C) 7X e s A}I (t i+ ., y.rrt ( .1 r. C) (_):: 'P:- `-.:-....4_ <7 .e. _J •-•:: ,5 � 3•a r Cl).. C1r4 �' ( 4... N r r t i t u!ut�11 cr CO 11 1 1 11 11 Q I 1 i 1 v - I I __ 1 1 1 1 cDW •- i CD V <Y 1 1 1 MV) Q � 2 T 1 Nibs. N . I M J W �7 I 1I 1___ _. - I W r 0) v) ICD CC CC h. CL J I _ __ V) I uD 9 ° c I o f o' c C) CC CC) I C) Co I,-1 CA V O v o °• •0 I 01 CZ a) IC) C �C) vi -- p 0 H. W o C� 0 <D co Ht ] d'I (A [J Cr)I 'IT n) CC v cq r- it u�;, ? 01 ; r c� t 'u) Cr Q. LL 0 J ti 1 1� ,1 10] (P I C) n.. Q -cI -- ::CO ■ , C) Cl I Cl (J CC P-' �CC C') C'1 F- � In u7 11, i» :- 0 U I _ r 0 11 cd CI) 1 O �) 69 C. `c1 e9 E9 �) v1 _ _-� N3 IIr 1, 09 '1111 69 � I �._ mI 1I_ -- p' 1,CSI Cif ni 11 IC' 1 O al 1 ■V 1 1 rJ: I.-11 I� , 1 Q) -' 'D lD I I a)i Cr, .-r.W ' N- ✓) 7,1 1-1' i a) .,, v), 1 w'S I a Z V)). 1I,s, .n.1 : 1 111 r` 2 I 1 all 1--lel(")i 011 W cr o - -� -- r) _—._ o I 7 0 11 c) x1 1 W V) 1D _ IC... x I(7 1 C) co 0 1 0.1 �i �? a'; 10 1 c) I is m - V I 7 .D In I- al 1, N- 'CC 1�. ID 1, U 'CC ll l'�J 1 NJ L I n1 C 1 ,L.1-11c,f K �1 I f. I•CL 1y �1,-1 I I (g I x QI of (� II- S N N 0 O co O 0-i". W i --- — CV 'E -- 1 /0 C) I r 1 I r\I I 1^) �, (o u) >IZ' ° Z r O I O'm 1 u cy) a I ,-i I (0 0D. _ H ZIOI�I'' Q m s, IN- ni' ! j ail I W I al CC I` J "I I 1 N • S Q y� v) v.'1 ti vl C.1 v} 'n 1 �01i _ I- 0 �n I - �. U O F [Y o io Io o I Iv) r t CO W 1 W c"■ c) cI ID I° ,r1 1 CC - cu Z W 11MI co lD 0) 1 co 'CC u)I ��) 1f) j 7 z r) o0 IQ) in it xi < n v y:Z7 T Im al I U I- : .-i1 1 oi) d ni 111 rd 1.5 1 E' (U C W W (n l v>• v}. n 1 I CI l is c7 I 10 JI 1 0I--' --. I0!--. 'C )1 C) I N1' C - I ` D 'LL 11 0 C)I a) C) J) 1 I CC C 1 Cl..I 0 I �C1 NC 1 I C' (c CC 1 N CC C) ,- d 1 _ _a CO 00. L'I r• Crl l[ 1 , CU Q N- C)I III 1 �CC T �-1 C/1 �� ! CI''. `o cej F- j I I 1I 1 r7 - o � C' O--- -. o I ' ' - >, c 1 1 ) C (o v O Ili 1 1 1 11 ID 1 �i 1 u c C �' a)•1 IZ - j 11 C: I''''... Cl C f- Co 1 1 I 11D •.0 1 Cl) a , ,- -m III 1 1 1'1 I(9 I c 2,), ai W_ C ! r15 I I C', .1. Cn GI 1- O (9 i 0 1v al .I 1 Ci F=, IIlJ .7 ''I O) v -II in I 'TI I ;)': 'r 1-- I W r,� I c_ I c,I I ci CI 0 V 1 D .... Iu i,Q I ' :C ','_-1. E j V1 c9I CL C_ CD .J Q 1 1 < Z C_ ,, I) _> I,, C.1 N l I 1 II 0 IY ul .2 1 I n o 1 v)1 V1 I 1(3 I� CC °II ui i W', I . C I W I (7 (0I m. E Ci F- IU /1 c-I o C) N "1 . n'1 C' 9 -- :)� C,) 1 1 F• ?I > < Z' 'i 2:1 ,s c c: (Y I X11 69 u) In •a. [L I I C. 1'n I ,(7 I A II ii_ Packet Page -116- 5/27/2014 16.A.2. ELIgirleCT's Opinion 0', PrCbali'e CoSI: FIDDLER'S CREEK - MARSH COVE, PHASE 1 (PlIARSH ik. PERIWINKLE DR) 11 IvL1t 2013.076 Date: 0:3,1186/201.4 !Overall Total , Description Quantity , Units J Unit Cest- Total ISurnmary GRAVITY SE WAGE COLLECTION SYSTEM ■ I . 8" PVC Gravity Sewer s'-10'Cut 473 LI- 54,5.00 $21,2,35.00 8" PVC Gras ity Sewer 1042'Cu: 914 LE ;$65.00; $60,3.24.00 .._ 1 8" PVC Gravity Sewer 12AL,'Cult 187 Li: 1 $30.00,i $14,960.CO! Manhole 3'40'Cut, IET Lined 2 EA : $6,803.00[ $1:3,600.00 Manhole 13-12'Cu:, IET Lined 5 EA $8,003.00 i $40.000,00 Manhole 12.-14'Cut, IET Lined 1 EA 1 $10,003.00] 5:10.000.001 6" PVC Lateral 0 1- LF I $20.00 $0,001-- 6" Single Clean-out C EA $250.00 SO,00]__ -,, Video Gravity Sewer 1,574. LF $2031 '33 148.00' Video Gravity Sewer(1 y-. alter accept) 1,574 LF $2.03 $3,143..00 Su ototal Gravity Sewage System $1155,465.00' FORCEMAIN Pump Station (PS-15)8' Diameter LE LS $120,300.001 $120,000.001_ 10 PVC Force Main D318 799 I LF $28.301 $22,372.00 10" PVC.Force Main 0814 119 LF $34.001 $4,045.00 I 4" PVC =orc e Main DR:13 27 LF $10.00! 5270.001 4'' PVC l'orce Main 0814 14 LF $11.001: 5154.00; Air Release Valve(sewage) "I' EA $4,500.00! $9,003:00[ 4" Plug Valve , $1,001001 10" Plug Wive ' 2,. EA $,2,500.0C $5,000.00 I subtotal L I $161,342.00 [ ! , WATER DISTRIBUTION SYSTEM ! , 16" PVC Water in 01125 ! 1,019 LF $?,0.001 $30,570.01-12" PVC Water Main 01113 13 [ 473 I LF $5.001 $2.,390.00 ,_ 12" PVC Water Main 0814 73 EA $2,000.001 $146,DOC.001- 10" PVC Water Main DR1B 31 IF $28.30] .$877.301_ 10" PVC Water Main 0814 159 1..F $29.95 $4,762.05: 8" PVC Wa:er Main DR13 0 LF 5,2,t7.4.cd $0.00; 8"PVC Waver Main 0814 0 ; LF $19.00 $CL001, 16" Butted ly Valve 2 EA j $300000 $6,000.301- 12"Gate Valve and Box 1 EA I $2.500 001 $2,500.30 10"Gate Valve and Eco. 4 EA ' S1.200.00 $4,800.00] 8"Gate Va ve and Box 0 FA S1.250.00 $0.00 Fire Hydrant Assembly 3 ! EA I33.000.00 $9,000.00 f Air Release Valve 1 1 EA $1,250.00 $1,2$0.00: ESP(permanent) 1 EA $2000.00' .52,000.001 Water Vlain Auto 'TILsit Devi-te(AID) 0 I EA $5,003.00 5O.00 relocate Temp. Backfl ow Fre■denter 1 ' EA : '.$ ,003.00 55„00().00 Temp. Gap Configiratkin 1 1 EA , .$2,503.00r 52...500.001 1"Single Water Service i 1 EA $250.00 $250.00 FC roARsH CC'VE, PHASE 1- COST ESTIIVIATE(MARSH PEP IW,NKLE DR) 140013>1;x Packet Page -117- 5/27/2014 16.A.2. Engineer's Opinion of Probable Cost FIDDLER'S CREEK - INIARSH COVE, PHASE 1. (MARSH Elt. PEIRIWINKLE DR) 7 HI# 2013:076 Date: 03/136/20A Overall Total Description i Quantity I Units Unit Coft Total i Summary Connect to existing Water Main 1 l EA 1 !33,500,00 $3,500.001 4" Condit(furnished&installed) T 600 1 LI: $10,00 $6,000.001 , Su Otoal 'Miter Main System' <22r7•,c)c)3 1 IRRIGATION SYSTEM L 6" PVC Irrigation Main IDF.18 362 ' EA 513 2..01 04,778.401 . 1-- 6" PVC Irrigation Main DR1.4 39 1 EA $5100 I $195,00: 20 PVC Irrigation Main Sch 40 0 1 EA : : .50.00 36.00! - ; 6"Gate Valve and Box 1 1 EA L $Laso.00r ,:;1,050.C101 4"Gate Valve and Box C 1 T'A S950.001 $0..00 2"Gave Valve and Box 0 1 EA : 01500.00! $0.00 ._ Air Release Valve 2 EA 1 $1,250.031 $2,500.00 SubtotEl Irrigation System ir , I ..4 :33,523.40' LANDSCAPING ' r 20'Wide Landscape Beier ' LF $50.00 $0.001 1 i t i DRAINAGE d :H 48"RCF 206 I I LF $155.001 $31,930.00 , 418" Flared'End Section' 2 EA $7,500.001 $15,000.00F i- 15" RCF. 1.L9 LF $2S.001 $3,332.00' 15'' Flared End Section I :L. I EP, $L,100.001 $1,100.001 12" Flared End Section' 0 : EA $ 000.0C1 $0.031 : Rip-Rap at Temp. Pipe End r 0 ON $55.00. 50.001_ Valley Gutter Inlet - EA $3,000.00, $E,,70C.00! FO PIARSH COVE, PHASE 1- ZOS-7 ESTIMATE(MARSH PERIWINKLE OR) 140313.xlsx Packet Page -118- 5/27/2014 16.A.2. Eng:neer's Opinion of Proba'ale Cost FID D L E R.'S C IRE EK - M A RS H COVE, PHASE 1. (MARSH & PE FLIIII/IIVI KLE !DR) HM# 2017:L(376 Date: O./1136/2014 lOverall Total Description Quantity 1 Urifts Unit-Cost r rota,' j Summary 1 ! Subto':al Drainage(Rdwy) System 1 $57,6Ei2,CC1 i .1 1 1 : ROADWAY DAVEMENT . 1 1 i 3/4"Asphalt Paving-Type S Ili (1st Lift) 5,655 SY $4.25i 924,033.79 3/4"Aspha't Paving-Type S III (2rd Lift) , 5,655 5Y $4.45 $25,a.6475 8" Prime Lirnerock Base I 5,655 SY $8.03 045,240.00 Prime Lme-ock Base 5,655 SY $C.501 $3,393.001 12"Stabilized Subgrade 1 7,172 SY $1.35 013,268.20 Valley Gutter(2"wide) I 1,91.9 LF $10.30 Type F curb • 578 LF L $12.00_1 $5,935.00 Type E(Modified) 2,259 LF $9.001 $20,3:31,001 _ 5'Wide Concrete siciew;al<(4"thick) 578 IF $1L.501 $8,331.001-1 6'Wide Concrete Sidewalk(A' Thick) 1,617 LF $19.50 $135,431.501- 1'Sod Strip : 4,756 LF $,0.301 $1,426.80 Seed ar d Mulch 1 1.60 AC $1,500.00' .1. 02,400.031 Right-o'-Way Grading 1 6,1.66 SY J 01.001 $6,156.03i Subtotal Roadway Pavementl EA $211,352.031_ SIGNAC.E MARKING a LIGHTING , Stop Signs 1 EA S200.001 $200.30i 9 Button Reflectors Signs 0 EA j $1.70.00J $0.001 Speed/Traffic Signs 9 1 EA $.2.00.00_1 $1,800.30; Street Signs(name) 0 EA $200.001 $0.301 24"Stop Bar,White(thermoplastic) 0 LE 030.001 $0.30 6'wide special empl)asis CTOSSWak White(EV) 4 EA 0200..001 5800.001 12"wide White for Crosswalk(thpl) 470 1 Li' _I $15 CI()1 07,050.001 6"Solid Yellow Striping I 100 ; LE 93.50 $350.001 E - 6"Solid Waite Striping 190 i 1-1: 90.40 $76.001 Directional Arrows/Mar1cers 4 EA $100.00 $400.001 Fire Hydra at Markers 3 EA 515.00 $45.001 Street Lighting(Single)[assumed :200'spacing] 3 LA . $3,000.00 $9,000.00 : Street Lighting (Double)[assumed 2001•soncing] 14 EA $4,003.00 056,000,00 'Street Light Service 1 EA $1,003.00 $1.000.001 Guardrail-furnish& in.; al 3E6 LF 0.25.00 I 58.950.001 Guardrail end anchorage(Type II) ; 4 93.920.001 EA 9930.00! Subtotal Signege Marking& Ligritir gl 1 5813,591 00; SITE GRACING&EARTHWORK 1 Silt Fencing 3,500 LF 92.031 $7,000 00 Turbidity harrier 25 LF $7.501 5187.501 Rough Grz ding(-i-/-0.2:'toleranee)(Cirg. .Area i Lake Areas) 1 1 AC: $650.30 $650.001 Subtotal Site Craclag&Earthwork $7,837.501 TOTAL. $930,332.251 L I , 1 . . FC MARSH COVE.. PHASE 1 -COST ESTIMATE i;MARS'-I PERIWINKLE DR) 140318.xlsx Packet Page -119- . . . 5/27/2014 16 A 2 Eng in:2er's Opinion of Probable Cost FIDDLER'S CREEK - MIARSH COVE, PHASE 1 (TRACT 32) HM4 201:3.076 Date: 03/18/2014 0,a2rall Total Descript,on QUallilly ar7.it3 1 1.41t COSt Tbtai 1 SUMM a l'y GRAVErt SEWAGE COLLECTION SYSTEM 1 ! 1 8" PVC Gray ty Sewer C-C Cat Eu j LP 1 $30.001 $?..0,13C.00 r r , 8" PVC Gray ty Sewer E-8,'Cut 207 1_, 1 $35 OOLL $7,245.01 8" PVC Gray ty Sewer 8'-10'Cut 37 Li' 1 $4.5.001 $1,E,ES.771 —— — Manhole 0'-'5'Cut,1ET Lined i ,„, L.A $3,000.00 i 015,000.DDL Manhole 6'-3'Cut, IET Lined 1 J E8 1 --'',970.00 $3,900.73' 6" PVC Lateral 589 OF $23.001 00]:780.00 Single Clean-out 3 EA ! $250.00, $750.00 _ double Clea r-out 11 EA $400.00 $4,400.001 Video G ravity Sewer 9:3 LF $2.00 $1,830.00 L 4- Video G ravny Sewer(1 or.after a:neot) 9'15 LF $2.00 $1,830.001 Subtotal Gravity Sewage System $37,530.00 t WATER DISTRIBUTION 5YSTEM 1 1 10"PVC Water Main 0818 _1 195 LF : $28.30 i $5,513.5C1 10"PVC Water Main DP 1z- : 0 LF $29.931 SO.CC1 8"PVC\Natal-Main DF18 524 LF $17.40 $9,117.EC 8"PVC Wat: r Main DF.1.4 200 LF L $19.00 $3,800 CC ; T 10"Gata Valve and Box 0 EA 1 S2,5CC.00 . .._ 1_ 8"Gate Value and Box . 2 EA $1,200.071 $2,400 00 --, Fire Hyclran':AssemOly ,r 4 IL EA 53,CC'O.D4 $12,000 001 Air Release Valve EA S1,2S,O.D0 $0 001 1 -I : - ----- BSP(pe-ma nent) EA $2,000.79, $2,00.3.00 - Water Mair Auto Flu sn Device(A.FD) : 2 EA 35,000.00; $10,077.00 Single VJate r Service 3 EA , E2S0.00! $2,253.001 EC MARSF- Cr;VE,PHASE 1 - COST ESTIMATE(11-34C1 321 140318.xlsx Packet Page-120- 5/27/2014 16.A.2. ,EEngineer'S Opinion of Probable Cost FIDDLER'S ClkEEIK: - KARSIFI COVE, PIFIASE 1 (TRACT 32) HNI# 20:1:3.076 Date: 03/18/2014 •Ove.-all Total Description ' Quantity li Ill tS Lint Cost j lot& SUM ri3ry double Water Service E EA 8400 CiCil 53,2C0.00 I 1"Single meter 25 AT 8600 001 8L5,00C20 01 4"Conduit( urnished a irr>taleci) 5C0 L= j 810.001 85,000.00I Subtotal Water Main System 570,226,.1D' IRRIGAT ON SYSTEM I [ 6" PVC Irrigetion Main DR:38 789 LF .$13.20_1 8.L0,414,.801 6" PVC I TigE,tion Main D014 SD (F 314.25 $855.001 6" Gate Valve and Box .:, - EA 5,1,250.00 $31.50.001 4"Gate Val■e and BOX ''' ,. EA : $950.00 $1„900.00i Air Release Valve 0 EA 51,250.00 $0.00 StiD tOta 1 1:71 igatio rl System I $15,519,801 LANDSCAPING ' 1 20'Wide La idscape buffet 0 LF $50.00 $0.00 DRAINAGE 15"RCP 461 LF ; $28.00 L $12,908.CC1 18"RCP :32:3 LF I $42.001 $9,576.CC 24"RCP 812 IF $55.00 $28,160.CC 24"Flared End Section :3 EA 81,5C0.00 $4,500.CC1 Valley Gutter Inlet .) 5^ , i !:3,CCO.031- $15,000.001 Type"8'Catch Basin .) EA 1 8:3,C00.3Dr $6,000.00' t_ Junction BOK 1 EA 1 1_ 8:3,000.00 $3,000.00] 8"SDR35 PVC yard D- in :790 I LE $15.D3 I $11,350.00! 10"SDR PVC Yard Drain 230 IF $20.90 $5,600 00_1 12"SDR PV Yard Drain 1.23 IF I $12_50 $2,330 00 r Yard Drain Inlet ,3 EA I $E:00.001 $4,000 00 FE .('14135--I COVE, PHASE 1- COS ESTIMATE FRA2T 32)140.313.›.1:»: Packet Page -121- 'i . 5/27/2014 16.A.2. Eng Tleel'S Opinior of Probable Cost FIDDLEIR:S CREEK - MARSH CDV1E, PHASE I (TRACT 32) 1-ill# 2C13.9 Date: 03/18/2014 javerall Tcyial Description 1 ,.21,aptly Units 1- Unit ast I Thai ,Su niTary . i _ Subtotal Draigage 5ystem 1 $1E3,474.001 _ t -r 1 ROADWAY pAVEMENT , . 3/4"Asphalt Paving:-Type S III (1>t JO) co, 3 I _ S4.25I S14,462.75' i 3/4"Asphalt Paving -Typo 5 III (2gd Lift) 3,403 ii, , 54.45:r 515,143.35 .._ — 6" Limerock Base 3,403 Sy ] $6.5c1 5.22,119.50 Prime Limerock Base 3,403 SY I $0.CC:1 $2,041.80 12' Stabilized Subgracie 4,030 SY I 81.85 $7455.50 , 7 7 Valley Gutter(2"wide) 1,343 _I= ! 510.00 $1.9,480.00. Type A 314 :..1= SII.0.00 I $3140.00, Type E(Moc ified) 81 LIE $9.00 $729.00. 1'Sod Strip 2.,343 LE I $0.30 $7C2.90 Seed and MIJIch 2.0C A: 7 i $1,900 00, 53,0GC.00 I Sutton! Roadway Pavement I I $88,274.30 I 1 i 1 . I SIGNAGE MARKING 8, LIGHTING 1 i I Stop Signs 2 2'4 I $200.00 $400.D31 Speed/Traffic Signs 1 E4 1 $200.001 $200.00 Street S gns(name) 2 _ EA _i $200.00: $400.001 24"Stop Be ,White(the rmoplastio) 23 LF : -30.00 $750.001 6'wide Epedal emphasis Crcsswalk Wr de it))) 0 LF ' 5200.00 $0.00: 7 :, t. 12"wide White for Crosrswalk ff LF hp11 0 _. $15.00 $0.001 __ _ _ _ _ 6"Solid Yellow Stripirg 100 LF $3.50 $455.00' Piro Hycran: Markers 4 EA $15.00 $60.001 Street Lighting (Single 'assumed 200'Eva-ring i 6 EA $8,000.00 :$13.000.00i i-- Street L ght Service : g EA $2,500.001 52,500.00' Subtot a 3:E rage Marking 8;L E htingl ' . $22795.00 SITE GRADING&EARTI-IWORK I i Silt Fencing j 1,7E,0 LF : $2.00 I $3500 CC I Turbidity BE rrier I 75 LF $7.50F $562.5Ci . Rough Grading(+/-0.0 tole'a nc e):Clrg.Awn- I . - r Lake Areas) 1C AC: $650.001 56,500.CE:11 Subtotal Site Grading Et Earhworkl I I $10,562.50I TOTAL $37924'2",'0 . , 41 -- --- - - - , 1 IL 1 , FC MARSH COVE. PHASE 1- COST EST MAT E iTRACT 22) 140ES13.xlsx Packet Page -122- . • 5/27/2014 16.A.2. Engineer's Opinion of Probab.le Cost FIDDLER.'S CREEK - MARSH COVE, 'PHASE 1 cfRACT 36) 1_21,1-4 -in-i n--,r. Date: 03/1B,D01,4 Overall Total I I•il-.- L.Q.L.J.Vi, Description Quantity 1 tints Unit Cost Total 1- ,:>ummary GRAVITY SEWAGE CO_:_ECTION SYSTEM 1 1 8" PVC Gravity Sewer 0'-15I Cut 374 1-1: L $30,00 525,2210D: 8" PVC Gravity Sewer E'-3 1 Cut 421 LI= I $35.00 514,735.00 8" PVC Gravity Sewer 8'-10'Cut 1 172 I LF I $45.00 l $7,740.00 :- Manhole 0I-6 Cut, IET Lined i 5 EA ; $3,000 00 l $15,0)0.00 I Manhole 6'-8'Cut, IET Lined 1 EA : $3,900.00I 63,930.00' -I- Manhole 8'-10' Cut, IET Lined 2 I EA 56;800.001 $13,600.001 6" PVC _ateral 500 LF I 520.00L $12,000.00] Single Cleao-out 2 EA _4_ $250.00 $500.00 double Clean-out 14 EA I $400.00 I $5,500.00 Video Gravity Sewer 1,467 1 LF : : $2.00' --: $2,934.00: 1- Video Gravity Sewer(I.yr. after accept) 1, LE 467 $2.03: $2,934.COI --:: Subtotal :EraviTy Sewage 5:ystern: J I 510E:463.001 WATER DISTRIBUTION SYSTEM 10" PVC Water Main DR LB 382 LE t S28.30 510,810.60 l 10" PVC Water Main 0814 58 LF : $29.95.1 $1,737.10: 8" PVC Water Main 3R13 : 506 LF j $17.401 $1.5,764.z-0 8" PVC Water Main 051 t4 96 LF I 519.00T $1,824.00 10" Gate Valve and Bcx 2 EA I $2,000.3C $4,000.00 8" Gate Valve and Box 1 EA : S1,200.00I $:.,200 00 jFire Hydra at Assembly 6 EA $3,000.301 S18,000.00 Air Release Valve 1 EA : $1,250.00: $1,250 00. BSP(permanent) 1 EA 1 $2,000.00 $2,000.00: _ ..._ Water Vlain Auto Flash Devi:e. (AEU) 2 . EA : $5,3CCi.M 510.000,001 Single Water Service 12 , EA $250.00J $3.000.00I — EC I\4ARSH COVE, PHASE 1 -COST ESTIIVIATE (TRACT 36) 140318.xisx Packet Page -123- 5/27/2014 16.A.2. Engineer'S Opinion of probable Cost FIDDLER'S CREEK -• MA COVE, PHASE 1 (TRAC _____T ..•6) ., Hm# 2013.c.:76 Date. 03/13P014 .3verall Total - Description Quantity i tints Unit C:cst Total .Summary double Wad r Service L. .3 1 EA $400.00 $3,600.001 r Connec.:to existing Water Ma n 1 0 EA $3,500.00 $0.001 -- -- - - . Single meter I 2,0 EA $600.00, 5.13,000.001 ..L 4" Conduit(furnished &irstalled) 1,000 LF ;7l0 001 510,030.001 Subtotal Viater Main System i . , I 101,1B6.1C IL , IRRIGATION SYSTEM L _I 6" PVC rrigation Main EMS i 1,076 LE- 113.2131 $14,202.201 6" PVC Irrigation Main [R14 135 I LF $14.25 i $1,322..751 4" PVC Irrigation Main D118 I 3E,2 LF 510.031 $3,520.001 - - 4" PVC Irrigation Main DR14 ao. 1 - LF $11.0). $220.001 2" PVC Irrigation Main Sch 40 ' 0 EA $5.001 $0.00 6" Gate Valve and Box 2 EA 51,050.001 $2.,100.00 4" Gate Valve and Box 1 EA $9. 0.0D 4" Blowoff Valve and Box 2 EA $1,000.001 $2,CC10.001 Air Release Valve 2 EA $1,250.001 $2,500.00 Subtotal Irrigation System $27A1.6.95 LANDSCAPING I 20' Wide Landscape Buffer I 0 l F ;50.00 $0 00. i---- ----- — , F DRAINAGE - 15" RCP 676 L LI- $25..005 ,78 9213.C)0! 18" RCP 33 LE $42.00i $1,21,86.001 24" RCP 483 IT $25 $55.00i .840.00; — - - — 24" Flared End Section 2 EA $1,500.00j. $3.000.001 18" Flared End Section 2 - EA , $1,200.00 1 0 2,11 0 10 0 (..' i - ; - — ----- 101 Flared End Section $800.00 $800.001 Valley,Sutter Inlet 7 EA I $21,000.CIO, 521,00100i Type"B" Catch Basin 1 , EA $3,000.00 I 53,000.001 — FC 41,USH COVE, PHASE 1.-COST ESTIMATE (TRACT 36) 140318.xlsx Packet Page 424- 5/27/2014 16.A.2. Engineer's Opinion of Probable Cost FIDIDLIER'S CREEIK - MARSH COVE, PHASE 1 (TRACT 36) Hv# 201:1.076 Date: 03/18/2011 'Overall Total DescripiYon j Quantity Units F Unit'Cost Total Summary 8" SDK=5 PVC yard Drain 1 518 L. : $15.00I $7,'77C.00 10" SDF, PVC Yard Drain - I ID 00 L.F $20.001 $12,030.30 Yard Drain Inlet 7 EA $500.00 $3,500.00.1 Subtotal Drair age 5ys':ern I 5100,324.0( ROADWAY PAVEMENT' 3/4"Asphalt Paving-Type S III (131: Lift) 1 4,969 SY 54.25 $21,118.25 3/4"Asphalt Paying-Type S III (2nd Lift:, 1 4,069 F SY $4.45 522,112.051 6" Limerock Base 4,969 SY $6.50 532,298.50i Prime Limerock Base 4,969 SY $0.60 $2,981.4( 12" Stabiliaed Subgrade 5,96,4, SY . 1.351 $10,922.40-Valley Gutter(2"wide) 3,030 1 LF $10.00 $30,300.001 Type A 314 LF $10.00 $5,1L.0.00 Type E (Modified) 107 LF S9.0C! $563.00 1'Sod Strip 3,451 LF 50.30 $1,035.30 Right-of-Vvay Grading 3,850 SY $1.00, $3,E50.00 Subtotal Roadway Pave rnentL $128,720.90, SIGNAGE MARKING & LIGHTING ] 1 — Stop Signs 11 3 EA `. 200.00 ! 5600.00 Speed/Tra'tic Signs 1 EA 5200.001 $200.001 Street Signs(name) 2– EA $200.001 $400.00L 24"Stop Bar, White (tharmoplastic): 40 LE J $30.CCI $1.200.00 6"Solid Yellow Striping 153 LF $3.501 ,.-523.001 Fire Hydrant Markers 6 1 EA $15.00 590.00 Street Ligtting (Sincile) [assumed 2C0'spacing] 7 EA $3,000.001 521,000.001- Street Ligtt Service 1 EA : $2,500.00 I $2,503.00 1 Subtotal Signage WIarking& Lighting , 526,515.001 r , SITE GRACING & EARTHWORK Silt Fencing 3,399 LE $2.00 55,798.00 Turbidity Barrier 125 LF $7.50 5937.501 Mass(lea ing &Grubbing 5 A $4,000.00 S20,000.00 Rough Grading(+/-0.2'tolerance)(CIrg. Area- . I Lake A-eas) 14 : AZ $65000 $9,130.00 Subtotal Site Grading it Earthwork. ! L ! $36,335.50 TOTAL I 3526,461A51 _. I 1 1 H. 1 , I 1 FC,MARSH COVE, PHASE 1 -COST ESTIMATE (TRACT 36) 14031.8.xt»< Packet Page -125- . . : . 5/27/2014 16.A.2. - Engineer's Op PrObable on of CoS'- _ FEDDIER'S C - MARSH CC)VEE,, PHASE 1 (TRACT 37) hi v;-t 2013.o76 Date: o'v-i Ev?0-1 4 Overall Total Description 1 Qu3ntity Units I Unit Cost Tots! GRAVIT(SEWAGE COLLECTION SYSTEM I 1 ;Summary 8" PVC Gravity Sewer C'-6' Cut '..)14 I, . I Li: 1 $30.00] $15420.00 _ 8" PVC Gravity Sewer 6'.-8' Cut l 427 1 LE $2,5.001 $14,945.00 8" PVC Gravity Sewe7 840' Cut I 239 1 LE : $L5.00 I $11,655.001 .._ Manhol a 0'-6 Cut, IET lined l 3 1 EA 5,zLC00.00: 09,000.00 t Manhola 6'-8' Cut,IFT ,ined 2 1 EA $9,500.00 $7,802.001 Manhole 340' Cut, I ET Lined 1 1 1 EA $6,800.00 $5,800.001 6" PVC Lateral J 750 LE $20.00 $15,000.00' Single Clean-out 10 $250,001 $2,500.001 EA ,_. Double Clean-out 8 EA 1 $4.00..00 $3,200.00i Video Grayly Sewer 1,200 . LI: $2,001 $2,400.001 Video Gravity Sewer(1 yr. after accept) 1,200 l LI: 1 $2.00 52,420.001 Subtotal Gravity Sewage System 1 1 $91,12C.001 WATER DISTRIBUTION SYSTEM 1- , , 1 I 10" PVC:Water Main IDF.:.3 585, i_. LF $28.301 $16,555.50' _1 10" PVC Water Main IDRL4 20 1 LF $29.9'.3 0599.00 8" PVC Waver Main DR18 _1 492 ' LE I $17.401- $8,560.80; _ • 8" PVC Na:er Main ()Rill 1 50 LF $19.001 S95C1.001 10" Gate Valve and BOX 0 1 EA S2,000.001 0.001 1 1- 8" Gate Vs ve and Box , 1 S1,201001 $1,20CLCO . Fire Hydrant Assembly l 5 I EA S3,000.00 $15,000.001 - . Or Release Valve 2 ' FA $1,250.021 $2,500.CO [ --- --- BSI,'(permanent) 1 EA $2,001021 $2,000.00 I __._. Water Mail Auto Flush Device OF[31 1 I EA $5,000.001 $5,00CLOO I 1 : - - -- 1 — Single Water Serv"ce 15 ' EA S250.001 Sz-.,C00.00 double Water Service 10 EA 5400.001 SL,C00.00i Connect to existing Water Mail 0 I EA I $3,50C.00 I $0.00 _ FC MARSH COVE, PHASE 1 - COST ESTIMATE(TRACT 37) 140318,xkx Packet Page -126- 5/27/2014 16.A.2. . _ EnQineer's Opir i3ri of Probable Cost FI DID LIER'S CREEK - MARSH COVE, PHASE 1 (riterzr 37) HI ft 2(113.07(. Date: C3/11317C14 Overall Total . ._ Description j Quantify Units Unit Cost r Total Summary Single meter 1 2(5 " EA L s.600.00I $15,600.081 4" Concuit(furnished & irstal1ed) 1 750 1 LF $10.001 $7,300.361 Subtotal Water Main !System: t :583,465.30j 1 I IRRIGATION SYSTEM — ,- 6" PVC irrigation Main DR18 1 1,711. LF $:13.23 $22,580.20 6" PVC Irrigation Main DRizr 40 LF $14.251 $570.00 2" PVC Irrigation Main Sch 40 50 EA $6.001 $300.60' 6" Gate Va ve and Box 1 I EA $1,050.00t, $1,0c0.01, 4" Gate Va ve and box 1 EA $,;9.50.00 $950.00 4" Blowoff Valve 'arid Box 0 EA $1,000.00 $0.001 2" Gave Valve and Box : 1 EA 8506.001 $500.001 . _., Air Release Valve 1 2 1 EA r $1,250.00 $2,500.00 Subtotal Irrigation System, i $28,455.20 LANDSCAPING I i -f 20 Wice Landscape Buffer 0 LF j $S000: $0.00 DRAINAGE 1 15" RCP 58 L.F $28.0Ci1 $1,624.001 18" RCP 397 LE $42.001 $16,674.001 24" RCP - LF: $55.001 $22,440..001 30" RCP 446 LE j $75.001 $33,.z,50.00 36" RCP 185 LE $105.00i $19425.001 36" Fla:ed End Secic n 1 EA $2,500.001 $3.500.00 - 10 Fla:ed End Seddon 2 E'A j $800.00 .5..L.600.00 Valley Gut:er Inlet 6 j EA jJ $F:,300.001 $13„000.00 _ ,-- Type "B" Catch BE1Si 11 FA $3,000.001 56,000.00' Junction B DX 2 I EA $3,600.00' 56,000.00i 8" SDR35 PVC yard Drain 135 , 1E $1.5.00: $2,775.00 FC MARSH COVE. PHASE 1.- 00:31-ESTIVATE(TRACT 37) 1403:13.xlsx Packet Page -127- . , 5/27/2014 16.A.2. Engineer's Opinion of R-obable Co.;': _ F:IED,DILER'S 'CREEK - MARSH CE (W , IPH,ASE 1 (TRACT 37) t 2013.075 Data: i-) /1 8r2o-i4 Overall Total , , 7 ,, ;,. - , Description Quantity L.,171.15 1 u17,E.G9St Total Summary 10" SDR PV:Yard Drain 927 I III $20.001 $1I3,540.00 ,-- 12"SDR RV:Yard Drain 701 ! Li: $22.50 $13,772.50 ... - --- --- - Yard Drain Inlet 14 1 EA 1 $500.001 S17,003.00 Su atota. Drainage System n $::72,803.501 - , _ _ 1 ROADWAY PAVEMENT 3/4"Aspha t Paving- Type Si) (1st Lift) 3,647 SY $4.2.5 515,499.75 T 3/4"Aspha t Paving-Type S II. (2nd Li't) 3,647 SY $4.L5 S16,229..15I 6" Lime-ocIt Base 3,647 Sy $5 50- S23,735.501 . Prime Limerock Base 3,647 SY SO 601 $2,1B8.20 12"Stabilized Subgrade 4,369 SY $.L 851 $8,082.351 Valley Cutter(2"wice) 2,346 LF $1000 $23;466.00, Type A curb 157 r L.-= $10.00 $1,570.301 -.- Type E(Modified) curb 10 LT- $9.00 $90.301 Type F c:urLI 128 LF I $:L2.00 $1,536.00 1 Sod Strip 2,641 L 50.301 I>792.30j 1 — Right-ol-W ay Grading 3,600 SY S1.001 $3,500.001 : — Suototal Roadway Pavement $9E,755.55 SIGNAGE MARKINS & LIGHTING , r Stop Signs 1 tEA $200.031 $200,061 . --k 9 Button Reflectors Signs a 54 $:L 70.001 $510.001 , - - — -- - — 3peed/Traffic Signs 1 54 $203.001 $200.001 Street Signs (name.) 1 7.4, $200.0311 200.00, --1 24"Stop Bar,While (thermoplastic) 'IS LF 533.03 $450.00 —11 — ---- 12"wide White for Crosswalk ,:thpl) 110 LF S15.031 $1,650.001 -I--- -- -- -- -- - 6" Solid Yellow Stripinc: : 100 LF $3.531 $350.00! Directional Arrowsitilerkers 0 EA. $103.1.21 10 CIO1 ., . Fire Hydrant Markers 4 EA S15.00 $50.00: Street Ligh:ing (Sing e) assumed 203' spacing] 5 1 EA $3,000.00 $15,C00.001 — H'.:.' MARSH COVE.,PHASE 1 -- COST ESTIMATE(TRACT 37) 140318.xlsx Packet Page -128- .. . 5/27/2014 16.A.2. Engineer's Opinion of ProbE6e Cost FIDDLER'S CREEK - MARSH COVE, .PIFIASE :1. (TRACT 37) Fisii# 2013.076 Date: 02/18/2D4 lOverall Total Description I Quantity Units Unit ast Total 11-Summary GuardrEil-i'urnish & nstall 130 IS $25.00 $3,250.00_, Guardrail eild anchorage(Typo I) 2 , EA i $580.00 i $1,950.00 I . Subtotal 5*nagia Marking ig, Lighting 1 823,330.001 . i SITE GRADING& EARTHVVORK i I I i Mobilization 1 r LS $1.0, . :;io,poo.00 _. 00000 L 7 Silt Feni:ing 2,000 ! LF 52.001 $4,000.00 Turbidity Barrier j 75 LF 7.50i 5.562.50j Mass Clearing& Grubbing, C AC $4,000.001 $0.001 Rough Grading(+/-0.2 tolerance)(Clrg.Area- 1 i Lake Araas I 10 AC $650.00 $6,500.501! Subl:otal Siite Grading &. Earthwork $21,052.501 TOTAL $517,487.0.5 FTC MARSH C0A/1-1:, PHASE 1- COST ESTIMATE(TRACT 37) 14031S.:idsx Packet Page -129- 5/27/2014 16.A.2. -1- --- Engineer'S Opinion Of Probable.CoSt PI D ID LER.'S ICRIE K - FliP■RSII-il COVIE, PHASE 1. (TRACT 4■01) . . .,:. M > b raii-z n7r, N.-4.p. nil R/71014 Overall Total _ - ,- -- - - Description Quantity , .Linits ' bnit Cost Total Summary , GRAVITv SEWAGE COLLECTION SYSTEM I ' 8" PVC Gravity Sewer 0'-6 C:ut 595 i LF , 0)00 S17,850 00r . . 8" PVC Gravity Sewer 61-8'C,Lit 332 1 LF 5,;33.00L sll,620.001 8" PVC Gravity Sewer 3',-10:' Cu: 103 LF $43.00 t $4,77J.001 . -- - - Manhole 0'-6'Cut, Er Linec 4 EA 03,000.001 012,000.00[ ----- ,- Manhole.6'-8'Cut,ET Lined 1 j EA 03,900.001 33,900.001 Manhole .340' Cut, '1E7 Lined 1 1 EA 05,E300.00 3.6,800.001 L . 6" PVC Lateral 1,000 1 LE $20.001 320,000.00 single C earl-out 7 EA S2130.001j $1,750.00 double fleE:n-out 12 j EA S403.00' S4,8D0.01 Video Gravity Sewer 1,033 1 LE $2.00, $2,066.031- Video Grav:ty Sewer (1 yr.after accept) 1,033 1 LE I $2.031 52,066.0Di Subtotal Gravity Sei.vage Sys:em $87,622.001 WATER DISTRIBUTION SYSTEM 1 1 1 4-- 10" PVC.Water Main DR18 ' 708 LE $28.301 $20,036.40' 10" PVC:Water Main DR14 1 20 LE $29.951 $599.001 . — 8" PVC'Nater Main DRIB 703 LE $17.401 $12,232.201 8" PVC•Nater Main DR14 , 65 , 1_1' $19.001 01,238.00 10' Gate Valve and Pro: 2 1 EA $2,000.001 $4,000.00. 8"Gate Valve and Box 1 EA $1,200.001 81,200.001 - — 7 — Fire Hydrant Assembly c EA $3,000.00 S15,000.00.: Air Release Valve 0 EA $1,25 0.0C 3SP(permanent) 1 1. EA ' $2,0CC1.001 82,000.00 , — Water Main Auto I=lust DEVI: (AED) 1 - EA 1 $5,000.0 $10 0 00.0 0 1 . __ . _ _......._ . ___. Single Water Service 1 27 EA 1 $250.00, 86,780.00; EC MARSH COVE, PHASE 1- COST ESTIMATE(TRACT 40i 131.2:113.)ilsx Packet Page -130- 5/27/2014 16.A.2. Engireer's ObinLor of Probable Cost: FIDDLER'S CREEK - MARSH COVE, IP'HASE, 1 (TRACT ,1 )) — 1-4,1vk 2013.076 DA1.D': 031180014 , . Overall Total Descrip.!ion Quentlij: lints. Uni t Co.7, !, Total Summary double Wa:er Service 11 2 EA 13400.0Di $800.001 --, Single meter 1 31 EA $600.001 $18,600.00 4" Conc uit(furnished &in.-stalled) 1,000 LE $10.001 $10,000.00 Subtotal Water Man Sys-ten-1j 1 :$102,452.601 IRRIGATION SYSTEM L 6" PVC ,rrigation Main CF108 723 LI $13.2C -, 6" PVC Irrigation Main DK04 237 ._,F.- , $14.251 $3,377.25 , -----' ........ 4" PVC Irrigation Main DR:1.3 238 LF $10.06,1 $2,3S0.00 4" PVC Irrigation Main DR:14 0 LF ' $11.00 $0.00 2" PVC Irrigation Main Sch 40 600 EA $6.00 $3,600.00_1 6" Gate Va ve and Box 1. EA $1,050.00 $1,050.00 4"Gate Va ve and Box 1. EA $9S0.00, $950.00 4" Blos,yoff Valve and Box 3 EA $1,000.001 $13,000.00_, Air Release Valve 3 EA $1.,250.00 $1:3,750.Ci0 Subtotal Inigaton System L .J $28,442.25; LANDSCAPING I . 20'Wice Landscape Buffer 0 LF $50.00 $0.00 L , DRAINAGE 15" RCP 936 LF $28.00 $26,208.00 18" RCP 4:.0 LF 1 $42.0[0, $17,220.00 ,_. 18" Flared End Section 0 7-A _ $1,200.00 $1,200,00 15" Fla-ed End Section f 3 EA F $1,1.00.00 $3,300.00 Valley Gutter Inlet 6 EA. $3,000.00 $113,000.00, Junction Box L EA. $3,000.00 $3;000.00 Subtotal Drainage System $68923.00 ROADWAY PAVEMENT 3/4"Asphalt Paving-Type S III (1st Ii t) 5,1.29 SY $4.25 $21..793.25L 3/4"Asphalt Paving -Type S III (2nd Lift) 5,129 SY $4..45 $22..824.05 6" Limerock Base 5,7.29 SY• 56 501 $3.3,333.50 Prime Limerock BaSe 5,129 SY 50.60 53,07-7.40! 12"Stabilized Subgrade 5,.942 SY 51.851 $10,992.70 Valley Gut:er(2"wrde:. 2,.312 . IF 510.00 $23,1120.00 1- Type A 863 LF $10.001 138,630100 Type E(Modified) 93 LF A.001 $837.001 -1- 1'Sod Strip :3,273 : LF 50.301 $931.90, Subtotal Roadway Pavement , 5125,649.801 _ SIGNAGE MARKING& LIGHTING r Stop Signs 4 EA $20).001 $800.001 Speed/Traffic Signs 1 EA 5200.00 5200.03 _ . Street Signs(name) 2 EA $200.001 $400.03 1 24"Stop Ear,Mlle(tl-Lrmoplastic) 57 LP 530.00 '1,710.031 -f _4 6"Solid Yellow Striping 150 LF _I $3.50 t 13525.00 Fire Hydrant Markers 5 EA $15.001 $75.00 Street Lighting (Sirgle)[assumed 200'spacing] B EA I $3,000.001 $24,000.00 Subtotal Signage Marking& Lighting; , $27,7101.30 IC MARSH COVE, PHASE 1- COST ESTIW,ATE(TRACT 40) 13121.6.xlsx . Packet Page-131- i 4' 5/27y2014 16.A.2. ` | -- — Er i eer's Opinion cf Probable Cost FJEDDI_EIR'S CREEK - MARSH COVE,, PHASE 1. (TRACT 40) !!. ,erall Total Descripi'ion Quantity / Units Unit cost i:sarnmary ' ---_____--� 3,630 SITE GRADING& EARTHWORK . Silt Fencing --------�-�-------- --�--�-�-' �F F�- �7 5� S-750.! DO . 100 '---- �----- ----��-�- Mass i |oss Oca�ng�sru bbi n� C AC �«/ `oon —oo �o� T - - -- Rough s��xnQ�/ 0.2 meran*c>(cirn.Area � : | 13 AC S5s[/0Oi $�45o.DOi�_ Lake --- $16,400.00, �uhz �|5iteG�dmO& Ea�moo� ' _ � -- - ------�- -- ----- - ! � �4�7z�s TOTAL . .2s 1��___ ---�--- -���- -�-��---�-- -- _| [� - -- �� ---�--'- ----- ---� -----��--�L | / --��� _- -�_-_��-- /---- --�� ----�-�-- |----��— --�--- - ---------- | ! ! | ! =C.MARSH COVE, PHASE:_ COST EET|xxxTE!;TnxcT40zs:oz6.xisx Packet Page -132-