Agenda 04/08/2014 Item #16C14/8/2014 16.C.1. EXECUTIVE SUMMARY Recommendation to approve the $102,802 Underground Conduit Installation Agreement with Florida Power & Light Company (FPL) to supply power to South Reverse Osmosis Wells No. 5 and 6; and, approve and execute the documents necessary to convey an easement to FPL for the installation of electrical service related to Well/Plant Power Systems, Project 70069. OBJECTIVE: Maintain a reliable raw water supply for the reverse osmosis water treatment system at the South County Regional Water Treatment Plant (SCRWTP) that serves customers throughout the water service area. This action is to approve an agreement with FPL to provide electrical service to two raw water supply wells, and to convey an easement for installation of the underground infrastructure on county -owned property. CONSIDERATIONS: On June 24, 2008, as Agenda Item IOG, the Board of County Commissioners (Board) adopted the 2008 Water Master Plan Update that identified the requirements for power system improvements. The proposed scope of work is consistent with the 2008 Water Master Plan Update, Project 70069. formerly titled " NCRWTP Emergency Generator Switchgear Upgrades," Section 8, Table 8 -2, page 2 of 5, line 58; and with the 2010 Potable Water CIP (dated October 5, 2010) Update, page 2 of 4, line 61, as identified in the 2011 User Fee Rate Studv. The project scope was modified for FY2014 to consolidate all water plant and wellfield power system projects, including the South Reverse Osmosis (SRO) Wells No. 5 and 6, Electrical Modifications Project. The SCRWTP was constructed to supply 4,160 -volt FPL power to nine remote raw water supply (Wells No. 1 through 9) through a five -mile power distribution loop configuration. Cable failures have taken Wells No. 5 and 6 out of service. Instead of replacing portions of the power distribution loop to restore power, these wells can be quickly powered by separate, nearby FPL services. In this instance, the construction cost is less, but electricity rate is higher. Staff evaluated the options and determined that if Wells No. 5 and 6 are powered by a separate FPL service - instead of by replacing portions of the power distribution loop - approximately $622,000 in capital cost can be avoided. Operationally, annual power costs will increase by approximately $10,000 due to increased FPL rates. The rate increase is because Wells No. 5 and 6 will no longer be eligible for a reduced rate when they are no longer connected to the plant's power supply. The separate FPL service to power Wells No. 5 and 6 can be constructed 16 to 20 months sooner. (Reference Attachment 1. Business Case.) In 2013, Wells No. 7 and 8 were removed from the power distribution loop and powered directly from an existing, nearby FPL service. Staff plans to replace the portion of the distribution loop that serves Wells No. 1, 2, 3, 4, and 9 within the next two years. The end result will have the wells closest to the plant (Wells No. 1, 2, 3, 4, and 9) powered by the plant service through a shorter 2.3 mile distribution loop, and the wells furthest from the plant (Wells No. 5, 6, 7, and 8) powered by nearby separate FPL services. Additionally, back -up generator power will be available for all Wells No. 1 through 9. FPL will install conduit, cable, and associated materials in accordance with the Underground Conduit Installation Agreement (reference Attachment 2) and specifications attached to the agreement. An easement to FPL for the installation of additional underground distribution lines is required (reference Attachment 2). FPL has reviewed and approved the underground easement form. The FPL agreement includes conduit and appurtenance installation along the easement in the amount of $36,473 (included in the $102,802 total agreement amount). To determine if the FPL pricing was competitive, staff solicited Packet Page -1208- 4/8/2014 16.C.1. proposals from five contractors under the county's fixed term electrical contract. The lowest quote received was $46,520 with one contractor providing a no- quote. Because the FPL cost for construction is less than the lowest quote received, staff recommends utilizing FPL for this work, and has included this in the agreement. A purchase order will be issued for this work, and FPL will invoice on completion. In addition, an easement is required measuring approximately 0.43 acres, and is shown and described on Exhibit "A" to the Underground Easement. The county will not be compensated because the easement is a requirement for FPL to provide the facilities necessary for the wells. FISCAL IMPACT: Funding is available in, and is consistent with, the FY2014 Capital Budget approved by the Board on September 19, 2013. Funds are available in the Water User Fee Fund (412), Well/Plant Power Systems Project 70069. The estimated cost to implement the FPL portion of this project is $102,802. The total cost for recording and obtaining copies of the easement document will not exceed $50. The table below reflects the operating budget impact of the completed project. The operating funding source will be the Operating User Fee Fund (408). However, as shown in the Business Case, the increase in operational cost is offset by capital construction cost avoidance of approximately $622,000. Elements FY 2014 FY 2015 FY 2016 - FY2023 -Capital Outlay $102,802 $0 $0 Capital Cost Avoidance $621000 $0 $0 Operating Cost $0 $10,000 $80,000 LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote for Board approval. —SRT GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: That the Board of County Commissioners, and, as the Ex- officio the Governing Board of the Collier County Water -Sewer District, 1. Approve and authorize the Chairman to execute Underground Conduit Installation Agreement after approval by the County Attorney's Office; 2. Approve and authorize the Chairman to execute the FPL Underground Easement: and, 3. Authorize the County Manager or his designee to proceed to follow all appropriate closing procedures and record the aforementioned documents in the Public Records of Collier County, Florida. Prepared By: Alicia Abbott, Project Manager Attachments: Attachment 1- Business Case Attachment 2 - FPL Agreement and Easements Packet Page -1209- 4/8/2014 16. C .1. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.C.16.C.1. Item Summary: Recommendation to approve the $102,802 Underground Conduit Installation Agreement with Florida Power & Light Company (FPL) to supply power to South Reverse Osmosis Wells No. 5 and 6; and, approve and execute the documents necessary to convey an easement to FPL for the installation of electrical service related to Well /Plant Power Systems, Project 70069. Meeting Date: 4/8/2014 Prepared By Name: AbbottAlicia Title: Project Manager, Public Utilities Engineering 2/5/2014 3:03:29 PM Submitted by Title: Project Manager, Public Utilities Engineering Name: AbbottAlicia 2/5/2014 3:03:30 PM Approved By Name: Pam Libby Title: Manager - Water Distribution & Wellfield. Water Date: 3/17/2014 7:52:00 AM Name: Sunvak-Mark Title: Project Manager, Principal, Public Utilities Engineering Date: 3/17/2014 8:36:11 AM Name: HapkeMargie Title: Recycling Coordinator, Solid Waste Date: 3/17/2014 8:51:43 AM Name: CampSkip Title: Director - Facilities Management, Facilities Management Packet Page -1210- Date: 3/17/2014 9:34:08 AM Name: BrilhartBrenda Title: Procurement Specialist, Purchasing & General Services Date: 3/18/2014 7:51:52 AM Name: Steve Messner Title: Director - Water, Water Date: 3/18/2014 12:36:12 PM Name: HerreraSandra Title: Procurement Specialist, Purchasing & General Services Date: 3/18/2014 2:39:46 PM Name: MarkiewiczJoanne Title: Director - Purchasing /General Services, Purchasing & General Services Date: 3/20/2014 2:10:00 PM Name: Joseph Bellone Title: Director - Operations Support, Utilities Finance Operations Date: 3/20/2014 2:27:48 PM Name: ChmelikTom Title: Director - Public Utilities Engineering, Public Utilities Engineering Date: 3/20/2014 2:30:50 PM Name: WardKelsey Title: Manager - Procurement, Purchasing & General Services Date: 3/20/2014 3:42:58 PM Name: MottToni Title: Manager - Property Acquisition & Const M, Facilities Management Date: 3/20/2014 4:24:14 PM Name: YilmazGeorge Title: Administrator - Public Utilities, Public Utilities Division Date: 3/21/2014 5:47:51 PM Name: TeachScott Title: Deputy County Attorney, County Attorney Date: 3/24/2014 7:57:06 AM Name: KlatzkowJeff Title: County Attorney, Packet Page -1211- 4/8/2014 16.C.1. Date: 3/31/2014 9:40:46 AM Name: UsherSusan 4/8/2014 16.C.1. Title: Management/Budget Analyst. Senior, Office of Management & Budget Date: 3/31/2014 9:41:04 AM Name: OchsLeo Title: County Manager, County Managers Office Date: 4/1/2014 5:57:36 PM Packet Page -1212- 4/8/2014 16.C.1. BUSINESS CASE: Option 1 —.Separate FPL service to Well Nos 5 and 6 Capital Outlay: $162,802 ($102,802 FPL cost plus $60,000 other electrical cost) Operational Cost Change: $10,000 (estimate) annual increase for separate rate Schedule: Approximately 3 -4 months Option 2 —Well Nos. 5. and 6 service included with new cable for Well Nos 1 2 3 4 and 9 Capital Outlay: $785,000 (estimate) Operational Cost Change: $0 Schedule: Approximately 18 -24 months Conclusion Option 1 is the most cost - effective solution to power Well Nos. 5 and 6 even though it includes increased operational cost. While there is no change in operational cost with Option 2, it would take over 60 years to payback the increased capital cost of approximately $622,000. Option 1 also makes Well Nos. 5 and 6 operational over a year sooner than Option 2. Packet Page -1213- i FPL NOTIFICATION OF FPL FACILITIES CustomerrAgency: Collier County Developer /Contractor Name: Collier County Location of Project: City Gate FPL Representative: Troy Todd Developer /Contractor Representative: Alicia Abbott 4/8/2014 16.C.1. - WR. #5319499 (UG) Date of Meeting/Contact: 2013 ProjectNumber/Name: City Gate City: NapiesiCollier Phone: (239) 353 -670 FPL Work Request # /Work Order #: 5319499 FPL calls your attention to the fact that there may be energized, high voltage electric lines, both overhead and underground, located in the area of this project. It is imperative that you visually survey the area and that you also take the necessary steps to identify all overhead and underground facilities prior to commencing construction to determine whether the construction of any proposed improvements will bring any person, tool, machinery, equipment or object closer to FPL's power lines than the OSHA- prescribed limits. If it will, you must either re -design your project to allow it to be built safely given the pre- existing power line location, or make arrangements with FPL to either deenergize and ground our facilities, or relocate them, possibly at your expense. You must do this before allowing any construction near the power lines. It is impossible for FPL to know or predict whether or not the contractors or subcontractors, and their employees. will operate or use cranes, digging apparatus or other mobile equipment, or handle materials or tools, in dangerous proximity to such power lines during the course of construction, and, if so, when and where. Therefore, if it becomes necessary for any contractor or subcontractor, or their employees, to operate or handle cranes, digging apparatus, draglines, mobile equipment, or any other equipment, tools or materials in such a manner that they might come closer to underground or overhead power lines than is permitted by local, state or federal regulations, you and any such contractor or subcontractor must notify FPL in writing of such planned operation prior to the commencement thereof and make all necessary arrangements with FPL in order to cant' out the work in a safe manner. Any work in the vicinity of the electric lines should be suspended until these arrangements are finalized and implemented. The National Electrical Safety Code ( "NFSC ") prescribes minimum clearances that must be maintained. If you build your structure so that those clearances cannot be maintained, you may be required to compensate FPL for the relocation of our facilities to comply with those clearances. As such, you should contact FPL prior to commencing construction near pre- existing underground or overhead power lines to make sure that your proposed improvement does not impinge upon the NESC clearances, It is your responsibility and the responsibility of your contractors and subcontractors on this project to diligently fulfill the following obligations: 1. Make absolutely certain that all persons responsible for operating or handling cranes, digging apparatus, draglines, mobile equipment or any equipment, tool, or material capable of contacting a power line, are in compliance with all applicable state and federal regulations, including but not limited to U.S. Department of Labor OSHA Regulations, while performing their work 2. Make sore that all cranes, digging apparatus, draglines, mobile equipment, and all other equipment or materials capable of contacting a power line have attached to them any warning signs required by U.S. Department of Labor OSHA Regulations, 3. Post and maintain proper warning signs and advise all employees, new and old alike, of their obligation to keep themselves, their tools, materials and equipment away from power lines per the following OSHA minimum approach distances (refer to OSHA regulations for restrictions): *PoNver Line Voltages Personnel and Equipment Cranes and Derricks * *Eauinmcnt. Crane & Derrick Travel . under or near Power Line ( * * *29 CM 1910.333 and 1926.600) (29 CFR 1926.1407, 1408) (29 CFR 1926. 600 — Equipment )(1926.1411 — Cranes and Derricks) 0 - 750 volts 10 Feet 10 Feet 4 Feet 4 Feet 751 - 50,000 volts 10 Feet 10 Feet 4 Feet 6 Feet 69,000 volts I t Feet 15 Feet 10 Feet 10 Feet 115,000 volts 13 Feet 15 Feet 10 Fcct 10 Feet 138,000 volts 13 Feet 15 Feet 10 Feet 10 Feet 230,000 volts 16 Feet 20 Feet 10 Feet 10 Feet 500,000 volts 25 Feet 25 Feet 16 Feet 16 Feet *When uncertain of the voltage, maintain a distance of 20 feet for voltages up to 350,000 volts and 50 feet for voltages greater than 350,000 volts, * *On Construction Sites, with no load. * * *For personnel approaching insulated secondary conductors less than 750 volts, avoid contact. 4. All excavators are required to contact the Sunshine State One Call of Florida, phone number 1 -800- 432 -4770 or 811 a minimum of two working days (excluding weekends) in advance of commencement of excavation to ensure facilities are located accurately, 5. Conduct all locations and excavations in accordance with the Florida Statute 556 of the Underground Facilities Damage Prevention & Safety Act and all local city and county ordinances that may apply. 6. When an excavation is to take place within a tolerance zone, an excavator shall use increased caution to protect underground facilities. The protection requires hand digging, pot holing, soft digging, vacuum methods, or similar procedures to identify underground facilities. A copy of this notification must be provided by you to each contractor and subcontractor on this project, to be shared with their supervision and employees prior to commencing work on this project. ATTN: Alicia Abbott Means by s notification was provided to customer and /or contractor Address FPL Representative Signature Date CustomenDeveloper /Contractor Representative Signature Date n Packet Page -1214- �^ 4/8/2014 16. C.1. WR #53194:99 (UG) FPL UNDERGROUND DISTRIBUTION FACILITIES INSTALLATION AGREEMENT This Agreement, made this day of . 201�, by and between Collier County (hereinafter called the Customer) and FLORIDA POWER & LIGHT COMPANY, a corporation organized and existing udder the laws of the State of Florida (hereinafter called FPL). WITNESSETH: Whereas, the Customer has applied to FPL for underground distribution facilities to be installed on Customers property known as City Gate Dr located in Collier , Florida. That for and in consideration of the covenants and agreements herein set forth, the parties hereto covenant and agree as follows: 1. The Customer shall pay FPL a Contribution in Aid of Construction of 1102.802 (the Contribution) to cover the differential cost between an underground and an overhead system. This is based on the currently effective tariff filed with the Florida Public Service Commission by FPL and is more particularly described on Exhibit A attached hereto and as follows: INSTALL (2) 150KVA (277/480V) THREE PHASE PAD - MOUNTED TRANSFORMERS, UNDERGROUND PRIMARY, 5" CONDUIT, AND TRENCH 2. That a credit of g0.00 shall be provided to the Customer for trenching, backfilling, installation of Company provided conduit and other work, if applicable, and approved by FPL. If such credit applies, the resulting Contribution cash payment shall be $0 3. The contribution and credit are subject to adjustment when FPL's tariff is revised by the Florida Public Service Commission and the Customer has requested FPL to delay FPL's scheduled date of installation. Any additional costs caused by a Customees change in the Customer's plans submitted to FPL on which the contribution was based shall be paid for by the Customer. The contribution does not include the cost of conversion of any existing overhead lines to underground or the relocation of any existing overhead or underground facilities to serve the property identified above. 4. That the Contribution provides for 277 /480V underground electrical service with facilities located on private property in easements as required by FPL. The contribution is based on employment of rapid production techniques and cooperation to eliminate conflicts with other utilities. Underground service, secondary, and primary conductors are to be of standard FPL design, in conduit, and with above-grade appurtenances. 5. That the payment of the Contribution does not waive any provisions of FPL's Electric Tariff. If the property is subject to an underground ordinance, FPL shall notify the appropriate governmental agency that satisfactory arrangements have been made with the Customer as specified by FPL. Title to and ownership of the facilities installed as a result of this agreement shall at all times remain the property of FPL. 6. That good and sufficient easements, including legal descriptions and survey work to produce such easements, and mortgage subordination required by FPL for the installation and maintenance of its electric distribution facilities must be granted or obtained, and recorded, at no cost to FPL, prior to trenching, installation andr'or construction of FPL facilities. FPL muy require mortgage subordination when the Customer's property, on which FPL will install its facilities, is mortgaged and (1) there are no provisions in the mortgage that the lien of the mortgage will be subordinate to utility easements, (2) FPL's easement has not been recorded prior to the recordation of the mortgage, (3) FPL's facilities are or will be used to serve other parcels of property, or (4) other circumstances exist which FPL determines would make such a subordination necessary. a) The Customer shall furnish FPL a copy of the deed or other suitable document, which contains a full legal description, and exact name of the legal owner to be used when an easement is prepared, as required by FPI,. b) The Customer shall furnish drawings, satisfactory to FPL, showing the location of existing and proposed structures on the Customers construction site, as required by FPL. C) Should for any reason, except for the sole error of FPI, FPI: s facilities not be constructed within the easement, FPL may require the customer to grant new easements and obtain any necessary mortgage subordination to cover FPL's installed facilities, at no cost to FPL, and FPL will release the existing easement. Mortgage subordination will be necessary in this context when: 1) the Customers property an which FPL will install its facilities is mortgaged, 2) there are no provisions in the mortgage for subordination of the lien of the mortgage to utility easements, or 3) FPL's facilities are or will be used to serve other parcels of property. Before FPL can begin its engineering work on the underground electric distribution facilities, the Customer shall provide FPL with the following: a) Paving, grading, and drainage plans showing all surface and sub - surface drainage satisfactory to FPL, b) A construction schedule, C) An estimate of when electric service will be required, and d) Copies of the Customer's final construction plans as well as other construction drawings (plot, site, sewage, electrical, etc.) requested by FPL plats provided by the Customer must be either recorded by the circuit clerk ar other recording officer orprepared and certified as meeting the requirements for recording (except approval by the governing body) by a registered land surveyor. Packet Page -1215- 4/8/2014 16.C.1. WR# 5319499 (UG) FPL 8. Prior to FPL construction pursuant to this agreement, the Customer shall: a) Clear the FPL easement on the Customer's property of tree stumps, all trees, and other obstructions that conflict with construction, including the drainage of all flooded areas. The Customer shall be responsible for clearing, compacting boulder and large rock removal, stamp removal, paving and addressing other special conditions. The easement shall be graded to within six inches offinai grade with soil stabilized. b) Provide property line and comer stakes, designated by a licensed surveyor, to establish a reference for locating the underground cable trench route in the easement and additional reference points when required by FPL. Also, the Customer shall provide stakes ideritify g the location, depth, size and type facility of all non -FPL underground facilities within or near the easement where FPL distribution facilities will be installed. The Customer shall maintain these stakes, and if any of these stakes are lost, destroyed or moved and FPL requires their use, the Customer shall replace the stakes at no cost to FPL, unless the stakes are lost, destroyed or moved by an agent, employee, contractor or subcontractor of FPL, in which ease FPL will pay the Customer the cost of replacing the stakes, c) it is further understood and agreed that subsequent relocation or repair ofthe FPL system, once installed, will be paid by the Customer if said relocation or repair is a result of a change in the grading by the Customer or any ofthe Customers contractors or subcontractors from the time the underground facilities were installed; and, that subsequent repair to FPL's system, once installed, will be paid by the Customer if said repair is a result of damage caused by the Customer or any of the Customers contractors or subcontractors. d) Provide sufficient and timely advance notice Cadays) as required by FPL, for FPL to install its underground distribution facilities prior to the installation of paving, landscaping, sodding, sprinkler systems, or other surface obstructions. In the absence of sufficient coordination, as determined by FPL, by the Customer, all additional costs for trenching and backfilling shall be paid by the Customer, and none of the costs of restoring paving, landscaping, grass, sprinkler systems and all other surface obstructions to their original condition, should they be installed prior to FPL's facilities, shall be bome by FPL. e) Pay for all additional casts incurred by FPL which may include, but are not limited to, engineering design, administration and relocation expenses, due to changes made subsequent to this agreement on the subdivision or development layout or grade, f) Provide a meter enclosure.. downpipe and ell which meet all applicable codes and FPL specifications and which will accommodate FPL's service cable size and design. These items must be confirmed with FPL prior to purchase. FPL will not be responsible for costs involved in modifying or replacing items which do not meet the above criteria. 9. FPL shall: a) Provide the Customer with a plan showing the location of all FPL underground facilities, point of delivery, and transformer locations and specifications required by FPL and to be adhered to by the Customer. b) Install, own, and maintain the electric distribution facilities up to the designated point of delivery except when otherwise noted. c) Request the Customer to participate in a pre - construction conference with the Customer's contractors, the FPL representatives and other utilities within six (6) weeks ofthe start of construction. At the pre-construction conference, FPL shall provide the Customer with an estimate of the date when service maybe provided. d) FPL shall invoice the customer for payment ofthe Contribution In Aid or Construction upon completion of the work. 10. This Agreement is subject to FPL's Electric Tariff, including but not limited to the General Rules and Regulations for Electric Service and the Rules ofthe Florida Public Service Commission, as they are now written, or as they may be revised, amended or supplemented. 11. This agreement shall inure to the benefit of, and be binding upon, the successors and assigns ofthe Customer and FPL. The Customer and FPL will coordinate closely in fitlfiITing obligations in order to avoid delays in providing permanent electric service at the title ofthe Customer's receipt of a certificate of occupancy. Accepted:2OQr8 a Co��h� CDmttits5t�ner5 Accepted: Turn Nennir�G �1lQtrmph March 12 (Date) .2014 J For (Date) Witness (Date) Witness (Date) Approved as to form and legality CLERK Scott R. Teach, Deputy County Attome Packet Page -1216- _ 4/8/2014 16.C.1. TRANSFORMER PAD LOCATION AND SPECIFICATION PROJECT: City Gate Wells 5 & 6 DATE: December 18, 2013 ADDRESS: City Crate Dr. CUSTOMER AGREES Tn: WR #5319499 (UG) Provide recorded easement for all FPL facilities on Customer's property. FPL will not start construction until these easements are cleared by the customer of all conflicts preventing construction. Should paving, grass, landscaping or sprinkler systems be installed prior to construction of the underground distribution facilities, the customer will bear the cost of restoring same to their original condition. Provide location and depth information for all underground facilities and fill or cut to within 6 inches of final grade within the easement. (See attached referenced prints.) Notify FPL representative two weeks in advance of paving schedule so that FPL can install ducts if required. Make arrangements for location of FPL pads as shown on location sketch. Provide and install secondary service to padmount transformer. Use a maximum of 8 cables per leg. (See pad detail for entrance space availability for customer service cable) Terminate conduits 3 inches above final gmdc and provide 7 feet of cable per leg beyond the conduit ends for connection to transformer terminals. Compact and level 3 inches below final grade an area sufficient for the concrete pad, Provide clear space of feet at the front and 4 feet at sides and rear of the transformer pad to allow for it safe working area. Keep area above transformer pad clear to allow setting transformer with a crane. If current transformers are required, provide and install 1 U2 inch rigid conduit from CT's to meter location. Maximum horizontal distance from pad to meter is 40 feet. Provide a clear space 36 inches in front of meters. If built up meter centers are to be used, provide FPL representative with shop drawings of centers and layout sketch of meter room for FPL approval prior to purchase FPL AGREES TO: Provide and install pad and padmount transformer. Provide and install primary ducts and/or cable from FPL facilities to the padmounted transformer. Provide and install ground rods at the transformer. Connect customer's service cables to FPL facilities in transformer compartment. Provide meter wiring when current transformers arc required. Provide 277/480V service. I hereby certify that I am authorized to accept these specifications on behalf of the customer and that I have delivered a copy of these specifications to the customer and all affected contractors. NAME: - -. DATE: (signature) NAME: (print or type) TELEPHONE REPRESENTING FPL: I hereby certify that I am t uth ' ed to accept these specifications on behalf of Florida Power and Light Company. NAME: DATE: March 12.2014 G Packet Page -1217- 4/8/2014 16. C .1. - WR #5319499 (UG) FPL Florida Power & Light Company ATTN: Trov Todd 4105 15 " Ave SW Naples, Florida 34116 Re: Installation of Underground Electric Distribution Facilities Project: City Gate Wells 5 & 6 Florida Power & Light Company Work Request # 5319499 Dear Troy Todd: This is to notify you that the site at ttte aforementioned project is ready for the installation of your underground electric distribution facilities: I . The underground cable route has been cleared of trees, stumps and all obstructions. 2. The cable route has been filled or cut to within 6" of final grade. 3. Grade stakes have been set along the cable route marked to indicate final grade. 4. Lot lines and corners have been staked as you requested for reference to locate the cable route. 5. Any grade or reference stakes found missing will be replaced by our surveyors at your request. 6. All flooded areas have been drained. 7. All underground facilities have been staked within 2 feet of their location along the cable route. Stakes are marked with depth, size and type of facility. 8. Re FYlt trensfermer pads, 915hee bmtea, and handholes hine beerk ii-mlied at fi"M Viede, Slat they do net sit in &ttilletr'. M Mile 9. 36" &Bw pas affld I= ffem R-41 other titiji4i8a hm-e been inaWaineti; 8�riitg hag been poiled &em end ke e%A tmd il�beied aeeerdingi . M 10. Customer cwndtdt (secondary) has been installed in the secondary window of the transformer pads. 11. It is agreed that FPL Company will not beheld responsible for the removal from the job site of any excavated rock that cannot be used for backfill during the trench restoration process. It is further agreed that suitable fill will be made available at no cost to FPL Company at the job site for trench restoration should the amount of removed rock require it. 11 1 indscaping is (and will) adhere to the guidelines set by UN -21. 13. The above conditions will be maintained throughout the construction of Florida Power & Light Company's facilities. Signed for Owner /Developer Date Packet Page -1218- (, s 4/8/2014 16.C.1. WR*5319499 (UG) FPL December 18, 2013 Alicia Abbott Project Manager Collier County Government Public Utilities Planning & Proiect Management 3339 Tamiami Trail East Suite 303 Naples, FL 34112 RE:: City Gate Wells 5 & 6 Dear Alicia Abbott: Enclosed is the easement form required by FPL to provide electric service to the above referenced facility. Please complete the instrument according to the following instructions. DESCRIBE, EXECUTE and RECORD the easement and return a recorded copy to me. This easement needs to be returned to FPL prior to energizing your proposed facility. Failure to do so could delay the timely installation of your electric facilities. Parcel I. D. #: Enter Parcel I. D. # in the upper left portion of the easement form. Describe Easement: Use the blank area in the middle of the form to describe the easement. If additional space Is required, an Exhibit "A" attached as a 2 °d sheet to the instrument may be used. Metes & bounds may be used but a center line description is most common. A pictorial view of the easement may also be attached as an Exhibit "A ". Easements are usually 10ft in width. 5ft on either side of FPL facilities to be installed. Signing and Witnessing: A. For Individuals: All persons shown on the deed must sian the ea ment. Enter date in space provided. Sign on the indicated lines on the right side in the presence of two (2) separate witnesses, who sign on the lines to the left, and a notary public who completes the acknowledgement forms as described below. The notary public may be one of the witnesses and if so must sign at the left in the space provided. B. For Corporations: Enter date in space provided. The President, or Vice - President and the Secretary or an Assistant Secretary sign on lines indicated on the right, filling in their title below, in the presence of two (2) separate witnesses, who sign on the lines to the left, and a notary public who completes the acknowledgement forms as described below. The corporate seal must be affixed adjacent to the officer's signatures. Acknowledgements: The notary public should legibly fill in all blanks, including state and county of execution, names of individuals or officers signing and their titles, state or county where empowered to act, expiration date of commission, fill in date, sign on line provided and affix seal adjacent to the signature of the notary public. Record the Easement: If there are any questions with regards to the easement, please call me prior to recording the easement. Have the easement recorded at the Lee County Recording Department (533 -5000) located on the 2nd floor of the Administration Building, 2115 2nd Street, Fort Myers, FL, 33901, only the unaltered FPL standard easement form (form 3722) will be accepted by FPL. (Collier County Recording Department (774 -8327) located on the 4th floor of the Administration Building (Bldg. F) in the Collier County Government Center, 3301 E. Tamiami Tr., Naples, FL) If you have any questions, please call me at (239) 353 -6070. E Sincer ly Troy Todd Technical Specialist II Packet Page -1219- 4/8/2014 16.C.1. - UN -21 ALL FRONT FIXED BARRIERS BARRIE REMOVABRS ALL REAR LE BARRIERS FIXED MAX, 5 L� o z ¢O 9" MIN. -� aIy f� / I L�J CONCRETE PAD 4" STO. G.I. PIPE WITH THREADED G.I. CAP A*— (THREADS MAY BE SPRAYED WITH M&S #SD4- 10" 4 1 144504) 3'- 6"MIN, e r' PAINT PIPE TO MATCH TRANSFORMER �� / �rS' STD. G.I. PIPE SLEEVE SLOPE CONCRETE FOR WATERSHED 3' Tx O SWITCH dL za L.1J i C a l A ( 1 ppy(T FFj�(11 / \ / � J I ILL 6•h 1 ( i I I / ' INSTALL ADDITIONAL REMOVABLE BARRIERS BARRIERS AS REQUIRED ' DRILL 1 /Y' THRU HOLE FOR LIFTING 4" STO. G.I. PIPE WITH THREADED G.I. CAP A*— (THREADS MAY BE SPRAYED WITH M&S #SD4- 10" 144504) 3'- 6"MIN, e r' PAINT PIPE TO MATCH TRANSFORMER / �rS' STD. G.I. PIPE SLEEVE SLOPE CONCRETE FOR WATERSHED 3' –{ \MACH. BOLT �I \\_ 3/4" x B" GALVANIZED WELL TAMPED EARTH REMOVABLE BARRIER NOTE 1 - PADMOUNTED $ylQjL�� REOUIRE e' MIN. CLEARANCE FRONT AND REAR. 1 ° CONCRETE c PAD 3' •0 "MIN. C (SEE NOME 11 � { a TX L I ( OR 9' -0'MIN i p IS' -O'MIN SWITCH Q FRONT r ` 1 1 1 8' -0 " MIN, 1 s e o OPENING FOR NOi 511a OPERATNXI Packet Page -1220- FILL 4" STD. G.I. PIPE WITH CONCRETE. LEAVE CROWN OF CONCRETE 3'- 6" MIN. -:-: �� PAINT PIPE TO MATCH TRANSFORMER SLOPE CONCRETE FOR WATER SHED 1 12" 2, p„ i fi: WELL TAMPED EARTH FIXED BARRIER UX— 114. 0.11 nFAnco .. ME 4/8/2014 16 . C .1. ' _ 80" (FRONT OF PAD) UX- 114.0.1 1 -1/2" METERING CONDUIT (IF REQUIRED) NOTES: 1. REFERNECE 1- 70.0.1 OF THE DCS 2. PAD M &S 162 - 246 -800 3. ALL CONDUITS TO EXTEND 3" MAX ABOVE GROUND LEVEL. 4. ALL SECONDARY / CUSTOMER CONDUITS MUST FIT WITHIN THE 19"X13" SHADED AREA INDICATED. WILL HOLD 8 -4" CONDUIT MAX. 5. ALL CONDUIT RELATED DIMENSIONS ARE TO BE CENTER OF THE DUCT 6. MAINTAIN 8' CLEARANCE FROM FRONT AND 3' CLEARANCE FROM SIDES AND BACK OF TRANSFORMER PAD. OF P L OR & UG DISTRIBUTION SYSTEM STANDARDS ORKtINATOR: SMS DRAWN BY: �LL /2/09 UPDATE ORAWIN6 NOTE GAP ELS AM 29 02 UPDATE DRAWING NOTE 4 RAP JES JJM VAIL' APPROVED: J.J. UCEVOY NO SCALE DATE SUPERVISOR, OH UG PRODUCT REVISION Oit DRAWN AP- SUPPORT CES Packet Page -1221- UNDERGROUND EASEMENT (BUSINESS) Work Request No. Sec. 25, Twp. 49S, Rge. 26E Parcel l D.: 00289720004 (Maintained by County Appraiser) Form 3722 (Stocked) Rev. 6111 Prepared By: Name: Troy Todd Technical Specialist ll Co. Name: FP &L Co. Address: 4105 S.W. 15t" Avenue Naples, Florida 34116 Page 1 of 2 including Exhibit "A" 4/8/2014 16.C. I. The undersigned, in consideration of the payment of $1.00 and other good and valuable consideration, the adequacy and receipt of which is hereby acknowledged, grant and give to Florida Power & Light Company, its licensees, agents, successors, and assigns ( "FPL"), a non- exclusive easement forever for the construction, operation and maintenance of underground electric utility facilities (including cables, conduits, appurtenant equipment, and appurtenant above ground equipment) to be installed from time to time; with the right to reconstruct, improve, add to, enlarge, change the voltage, as well as, the size of and remove such facilities or any of them within an easement described as follows: See Exhibit "A" ( "Easement Area ") Together with the right to permit FPLto attach wires to any facilities hereunder and lay cable and conduit within the easement and to operate the same for FPL's communications purposes; the right of ingress and egress to the Easement Area at all times; the right to clear the land and keep it cieared of all trees, undergrowth and ether obstructions within the Easement Area; to trim and cut and keep trimmed and cut all dead, weak, leaning or dangerous trees or limbs outside of the easement area which might interfere with or fall upon the lines or systems of communications or power transmission or distribution; and further grants, to the fullest extent the undersigned has the power to grant, if at all, the rights hereinabove granted on the Easement Area heretofore described, over, along, under and across the roads, streets or highways adjoining or through said Easement Area. IN WITNESS WHEREOF, the undersigned has signed and sealed this instrument on this day of 2014. Board of County Commissioners Collier County, Florida By, Tom Henning, Chairman 3299 Tamiami Trail East, Suite 303 Naples, Florida 34112.5746 Attest: Dwight E. Brock, Clerk Print: Deputy Clerk 3299 Tamiami Trail East, 40' Floor Naples, Florida 34112 Approved as to form and legality. Jennifer A. Belpedio, Assistant County Attome Packet Page -1222- 4/8/2014 16.C.1. I 1 ADD177ON TO WELL SITE 4 O.R. 304ti, PG 0533 ° 20' X 40' NW2S'46'W 10,00' ° WELL S/TE 4 N89'33490E 1883.27' 1 PE��Fr£ srQ1 cF 20' UTILITY EASCUENT JG7w7 VI4/TJ II I VVVf�V j I 1 PER O.R. BOOK 2755 5' UT1UTY EASEUENT S00'24400E 10, w PAGE 2556 Not valid w haul the signature and PER O.R. BOOK 3353 h AOOfWN TO WELL SITE 3 PAGE 0459 1D O.R. 3046, PG 053J 20' X 40' -� 20' UTILITY EASEMENT WELL 517E 3 PER 0.R. BOOK 2755 N WELL SITE No, 5 PAGE 2556 PER FIELD .S/GNAGE -WEST OUARTER CORNER GRAPHIC SCALE OF SECTION 25 0 150 300 600 NORTH L/N SW f OF THE NW 114 Or THE SW 1/4 OF SECTION 25 ( IN Fm) I imoh a 300$ SKETCH & DESCRIPTION i NOA portion of Section 25, Township 49 South, Range 26 East Collier County, Florida *J&T- Davidson Engineering Pf;O aT Na P -a80 VA" PAW mm-Resource Recovery Park :Im No: 13 -590 34rr4 p161 = BY $ME 1147E WA~ W. 1-+026 in mmu MAP 1 1 " =300' 1 1212013 SWAT No., 1 of 2 EXHIBIT__ . d� Pao. Packet Page -1223- 1. THIS IS NOT A SURVEY. 2. BEARINGS SHOWN HEREON ARE BASED ON THE Not valid w haul the signature and ift SOUTH UNE OF THE EAST 112 OF SECTION 25, Professional Surveyor and Mapper TOWNSHIP 49 SOUTH, RANGE 25 EAST, COLLIER CerHfieate of Authorization 17705. COUNTY, FLORIDA, BEING N89'51 00'W. J. NO EASEMENT SEARCH OR Ab&MC77NG WAS DONE BY THE SURVEYOR AND NOTE SHOULD BE TAKEN THAT THIS PROPERTY IS SUBJECT TO WELL SITE I ANY FACTS THAT MAY BE REVEALED UNDER A O.R. 2755, PG 2556 40' X 40' FULL AND ACCURATE TITLE SEARCH. 4. ALL DIMENSIONS ARE IN FEET AND DECIMALS AD01T70N TO WELL SITE 1 THEREOF, UNLESS OTHERWISE NOTED. O.R. 3046, PG 0533 5. SUBJECT TO EASEMENTS. RESERVATIONS, AND 20' x 40' RESTRICTIONS OF RECORD. 6. THIS SHEET IS PART OF' AN 2 SHEET SET. SKETCH & DESCRIPTION i NOA portion of Section 25, Township 49 South, Range 26 East Collier County, Florida *J&T- Davidson Engineering Pf;O aT Na P -a80 VA" PAW mm-Resource Recovery Park :Im No: 13 -590 34rr4 p161 = BY $ME 1147E WA~ W. 1-+026 in mmu MAP 1 1 " =300' 1 1212013 SWAT No., 1 of 2 EXHIBIT__ . d� Pao. Packet Page -1223- David Florida Lice Nn. 5834 Not valid w haul the signature and ift original seal of the Florida Lieenmd Professional Surveyor and Mapper CerHfieate of Authorization 17705. SKETCH & DESCRIPTION i NOA portion of Section 25, Township 49 South, Range 26 East Collier County, Florida *J&T- Davidson Engineering Pf;O aT Na P -a80 VA" PAW mm-Resource Recovery Park :Im No: 13 -590 34rr4 p161 = BY $ME 1147E WA~ W. 1-+026 in mmu MAP 1 1 " =300' 1 1212013 SWAT No., 1 of 2 EXHIBIT__ . d� Pao. Packet Page -1223- 4/8/2014 16.C.1. Description Parcel M West Being a portion ofSection 25, Township 49 South, Range 26 F..ast, Collier County, Florida be ng, moreparticularlydescrriedasfollows; COA MENCING at the Southwest corner of Section 25, Township 49 South, Range 26Eas4 Collier County, Florida; thence run North W2656" West; along the West line of the Southwest 114 of said Section 25, far a distance of2687.29 feet to the West 114 corner of said Section 25; thence run North 00 °2849" West along the West line of the Northwest 114 of said Section 25, for a distance of 672. l5 feet to the Northwest corner of the Southwest 114 of the Southwest 114 of the Northwest 114 of said Section 25, thence run North 89 °3349" FAs% along the North line of South 112 of the South 112 of the North 1/2 ofsaxd Section 25, for a distance of 40.02 feet to the Northeast corner of those lands desc nbed as Well Site 3 in Official Records Book 2755 at Pages 2556 #bmugh 2567 of the Public Records of Collier County, Florida and the POINT OFBEGB+iI' WG. From the POINT OFBECYINNBVG; thence run North 89 033149 "Beg along the North ,line of the South 112 of the South 112 of the North 112 of said Section 25, for a distance of 1883.27 fret to the Northwest comer of those lands described as Well Site 4 in Official Records Book 2755 at Pages 2556 through 2567 of the Public Records of Collier County, Florida; thenoe= South 00 °24'40" East; along the West line of said Well Site 4, for a distance of 10.00 feet; thence run South =89133'49" West; for a distance of 1883.26 feet to it's intersection with the East line of said Well Site 3; thence run North 00 *2646" West, along the East Line ofsaid Well Site 3, for a distance of 10.00 feet to the point of beginning. Containing 18,832.629 square feet or 0.43 aches more or less. .SKETCH & DESCRIPPON A portion of Section 25, Township 49 South, Range 26 East Collier County, Florida &;Lcmv :alovjasvn r-nyinearinq c,Acu, roue r- rr u. MWE Resource Recovery Park W M& 13 -590 0WM BY SCALE I DATE is *M -NO: -1 -t AMP I No :Scale 1 1212013 MEET Na 2 _of Pa-- .0 of L -- - -- - -- Packet Page -1224- 4/8/2014 16.C.1. —WELL SITE 3 I O.R. 2755, PG 2556 NO. 5 PER FIELD SIGNACE p s POINT OF `. W8733'49"E 19572' 8.. Sa0'35'561' 10.t3D' s•� — — 44Q'W iO,OG' _ 9' 33'49 1958.75' 2a' UTILITY Earlw Nf PER O.R. 9W 2755 'ADDITION 70 ON TO WELL SITE 4 T7O,�P. PAGE 255E WELL SITE 3 3046, PG 0533 ADDITION TO WELL SITE 5 Q.R. 3046, ' X 40' O.R. 3046, PG 0533 0533 LL SITE 4 40' X 40' WELL SITE NO, 5 O.R. 2755, PC 2556 WELL SITE 5 PER FIELD WELL SITE N0, 6 PER O.R. 2755, PC2556 SIGNAGE FIELD SIGNAGE WELL SITE N0. 7 PER 17ELD SIGNAGE a WEST QUARTER CORNER SECTION 25 NORTH UNE SW 1/4 OF THE NW 114 OF THE SW 114 OF SECTION 25 WELL SITE 1 O.R, 2755, PG 2556 40' X 40' r ADDITION TO WELL SITE 1 O.R. 3046, PG 0533 ` - ! / — Florida Liee No 5834 Not valid w hot the signature and original seal of the % ida Licensed Professional Surveyor and Wpper Certifcate of Authorization X7705, GRAPHIC SCALE 0 175 350 700 (IN S) I inch - 350 tL NOTES 1. THIS IS NOT A SURVEY. 2. BEARINGS .SHOWN HEREON ARE BASED ON THE SOUTH LINE :OF THE FAST 112 OF SEC77ON 25, TOWNSHIP 49 SOUTH, RANGE 26 EAST, COLLIER COUNTY, FLORIDA, BEING N89'51'00`W, 3. NO EASEMENT SEARCH OR ABSTRACTING WAS DONE BY 774E SURVEYOR AND NOTE' SHOULD BE TAKEN THAT THIS PROPERTY 1S SUBJECT TO ANY FACTS TWAT MAY BE REVEALED UNDER A FULL AND - ACCURATE T17LE SEARCH. 4. ALL DtMENSViS ARE IN FEET AND DECIMALS THEREOF, UNLESS OTHERWISE NOTED. 5. SUBJECT TO EASEMENTS, RESERVATIONS, AND RESTRICTIONS OF RECORD. 6. THIS SHEET IS PART OF A 2 SHEET SET. SKETCH & DESCRIPTION A portion of Section 25, Township 49 South, Range 26 East Collier County, Florida E `'vW rRGJ NeSoUrce NeCoverY Pork IOU Na: 73 -590 OAW 347 r4 DA4F PL .8Y SCALE Ei1TE a wtw NO: .1 -025 oav MDP 1--'350' 12 O 13 slxr Ira: 1 OF 2 ; HIBIT A. P _5 Packet Page -1225- I""" 4/8/2014 16. C.1. Description Parcel M East Being a portion of Section 25, Township 49 ,South, Rmp 26 CoMer County, Florida being more particularly described as follows; COAfIVlE''NCINGat the the Southwest corner of Section 25, Township 49 South, Range 26Ew4 Collier County, Florida; thence rim North 00° 26'56" R%es4 along the West line of the Southwest 114 of said Section 25, fora distance of2697.29 feet to the West 114 corner ofsa d Section 25; thence run North 00°28'49" West, along the Nest line of the Northwest 114 of said Section 25, fora distance of 672.15 feet to the Northwest comer of the Southwest 114 of the Southwest 114 of the Northwest 114 ofsaid Section 25; thence run North 89 °33'49" East; along the North line of the South 112 of the South 112 of the North 112 of said Section 25, for a distance of 1963.29 feet; to the Northeast corner of those lands described as Well Site 4 in Official Records Book 2755 at Pages 2556 thrlough 2567 of the Public Records of Collier County, Florida and the POINT OF BEGINNING. Firm the POEVT OF BEGEVAMVG thence run North 89 °33'49" East; along the North line of the South 112 of the South 1/2 of the North 112 of said Section 25, for a distance of 1958.72 feet to the Northwest corner of those lands described as Well Site 5 in Official Rocords Book 2755 at Pages 2556 through 2567 of the Public Records of Collier County, Florida; thence run South 00 °35'56" East: along the West line of said Well Site 5, for a distance of 10.00 feet; thence run South 8933 West, for a distance of 1958.75 feet to its intersection with the East lime of Lose lands described as Well Site 4 in Official Records Book 2755 st Pages 2556 through 2567 of the Public Records of Collier County, Florida; thence run North 00 °24 40" Nest; along the East lure of said Well Site 4, for a distance of 10.00 feet to the point of begs mhW. Containing 19,587.35 square feet or 0.450 acres more or less. 'A# SKETCH & DESCRIPTION y ;as A portion of Section 25, Township 49 South, Range 26 East P 9 Collier County Florida cc�r Davidson En ineerin aRaIECr Na � P -080 nvaco scwa+c 3, near MOULEWM PRW XwE Resource Reccye park wo Na 13 -590 rsa ANPGES iANW J#114 UUMED EYE MLE DAT BRlWW NCt 1 -025 sun rr a i+au MDP NO SCALE 1212013 Dr No: 2 of 2 :HIB i1, LI p�J Packet Page -1226-