Loading...
Agenda 03/25/2014 Item #16A10 3/25/2014 i.6.A.10. EXECUTIVE SUMMARY Recommendation to approve final acceptance of the private roadway and drainage improvements for the final plat of Veronawalk Phase 4D, (Application Number PL201 10000202)with the roadway and drainage improvements being privately maintained and to authorize the County Manager, or his designee, acceptance of the plat dedications and to release the maintenance security in the amount of 557,774. OBJECTIVE: To have the Board of County Commissioners (BCC) approve final acceptance of the infrastructure improvements associated within the subdivision accept the plat dedications, and to release the maintenance security in the amount of$57,774.00. CONSIDERATIONS: 1) On August 8, 2011, the Engineering Services Department granted preliminary acceptance of the roadway and drainage improvements in Veronawalk Phase 4D. 2) The roadway and drainage improvements will be maintained by the project's homeowners association. 3) The required improvements have been constructed in accordance with the Land Development Code. The Engineering Services Department has inspected the improvements and is recommending final acceptance of the improvements. 4) A resolution for final acceptance has been prepared and approved by the County Attorney's Office. The resolution is a requirement of Section 10.02.05 C.3 of the Land Development Code. A copy of the document is attached. 5) The Winding Cypress PUD, which encompasses the Veronawalk Phase 4D plat has been found to be in substantial compliance. FISCAL IMPACT: The roadway and drainage improvements will be maintained by the project's homeowners association. The existing security in the amount of $57,774.00 will be released upon BCC approval. original security in the amount of $310,238.04 has been reduced to the current amount based on the previous work performed and completed and pursuant to the terms of the Construction and Maintenance Agreement dated March 22, 2011. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Bcac r' on s oval SAS GROWTH MANAGEMENT IMPACT:T: There is no growth management impact associated with this Executive Summary. RECOMMENDATION: To have the BCC accept final approval of the infrastructure improvements associated within °.ire subdivision known as Veronawalk Phase 4D, (Application Number PL20 1 1 0000202) and authorize the County Manager, or his designee, to execute the attached resolution authorizing firs,::1 acceptance of the improvements and acceptance of the plat dedications, and release of the ma penance security in the amount of$57,774.00.. Prepared By: John Idouldsworth, 'senior Site Plans Reviewer, Engineering Services, Growth Management Division, Planning and Regulation Attachments: 1) Location Map 2) Bond Basis 3) Resolution Packet Page -479- 3/25/2014 16.A.10. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.10. Item Summary: Recommendation to approve final acceptance of the private roadway and drainage improvements for the final plat of Veronawalk Phase 4D, (Application Number PL20110000202) with the roadway and drainage improvements being privately maintained and to authorize the County Manager, or his designee, acceptance of the plat dedications and to release the maintenance security in the amount of$57,774. Meeting Date: 3/25/2014 Prepared By Name: HouldsworthJohn Title: Site Plans Reviewer, Senior, Engineering&Environmental Services 2/26/2014 10:38:07 AM Approved By Name: BeardLaurie Title: Planned Unit Development Coordinator,Transportation Planning Date: 2/27/2014 3:36:55 PM Name: PuigJudy Title: Operations Analyst, Community Development&Environmental Services Date: 2/28/2014 11:11:39 AM Name: McKennaJack Title: Manager-Engineering Review Services,Engineering&Environmental Services Date: 3/5/2014 11:53:47 AM Name: MarcellaJeanne Title: Executive Secretary, Transportation Planning Date: 3/11/2014 11:41:38 AM Name: StoneScott Title: Assistant County Attorney, CAO Land Use/Transportation Date: 3/12/2014 8:42:14 AM Name: IsacksonMark Packet Page-480- 3/25/2014 16.A.1 O. Title: Director-Corp Financial and Mngmt Svs, Office of Management&Budget Date: 3/13/2014 3:33:49 PM Name: KlatzkowJeff Title: County Attorney, Date: 3/13/2014 4:26:55 PM Name: OchsLeo Title: County Manager, County Managers Office Date: 3/14/2014 3:26:08 PM Packet Page-481- 3/25/2014 16.A.10. 1 0 ww- ‘',.7 147- 1 ,,, ...1„..... iii.,- /jai= Immo! I� 0, I R ' �'= t:- i � Q 111 i wow 4446 IC / 3le lik.■■ :::.;;. !:;: ;' 1711111111111 �� � ,� � /- A Ii 3/25/2014 16.A.10. RESOLUTION NO. 2014- A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA AUTHORIZING FINAL ACCEPTANCE OF CERTAIN ROADWAY AND DRAINAGE IMPROVEMENTS IN VERONAWALK PHASE 4D, ACCORDING TO THE PLAT THEREOF, RECORDED IN PLAT BOOK 50, PAGES 81 THROUGH 82; RELEASE OF THE MAINTENANCE SECURITY; AND ACCEPTANCE OF THE PLAT DEDICATIONS WHEREAS, the Board of County Commissioners of Collier County, Florida, on March 22, 2011 approved the plat of Veronawalk Phase 4D for recording; and WHEREAS, the Developer has constructed and maintained the roadway and drainage improvements in accordance with the approved plans and specifications as required by the Land Development Code (Collier County Ordinance No. 04-41, as amended); and WHEREAS, the Developer is requesting final acceptance of the roadway and drainage improvements and release of his maintenance security; and WHEREAS, the Engineering Services Section of the Land Development Services Department has inspected the roadway and drainage improvements, and is recommending acceptance of said facilities. NOW. THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that final acceptance is hereby granted for those roadway and drainage improvements in Veronawalk Phase 4D, pursuant to the plat thereof recorded in Plat Book 50, pages 81 through 82, and the Clerk is hereby authorized to release the maintenance security. BE IT FURTHER RESOLVED AND ORDERED that the County accept the plat dedications. The Veronawalk Homeowners Association, Inc. will maintain the roadway and drainage improvements within this project, with Collier County having no responsibility for maintenance of the roadway or drainage improvements. This Resolution adopted after motion, second and majority vote favoring same, this day of , 2014. ATTEST: BOARD OF COUNTY COMMISSIONERS DWIGHT E. BROCK, CLERK COLLIER COUNTY, FLORIDA By: Deputy Clerk TOM HENNING, Chairman lof2 Packet Page-483- 3/25/2014 16.A.10. Approved as to form and legality: Scott A. Stone Assistant Collier County Attorney CP\l 4-EI S-02648\2 2of2 Packet Page-484- 3/25/2014 16A.10. VER€DNAWALK PHASE 4D OPINION OF PROBABLE COST Sanitary Collection System $ 210,382.91 Potable Water $ 115,70.13 Dranage $ 28,901.12 Paving $ 144,119.05 Lighting $ 17,250.00 Landscaping (Code Minimum) $ 35,933.45 Irrigation (Code Minimum) $ 52.4 0.52 Total Probable Cost $ 604,750.18 110% of Total Probable Cost $ 165.22:5.20 Proposed Bond Amount $ 310,238.04 (Excludes 100% probable costs for con:itr :tad potable water, salitary ccliectien system, and drainage as these facilies have been substantially completed.) Davit J Hurst, P.E. • FL.Regist-ation#60727 Wilsontkri Ter, lnt_-FL.Lic.-#L.C-,000'170 Wiiscynioi e'r. Inn-Ce!t f,,:rts •1l:Authorization 7:.°43 V,121!i61ae6ve{2151i0,58281;.h ar;dldacu nenta,SPIZG_VaronaiNall._>ha n_,tC,_JI'C_For.9ondtkrnount XL£ Packet Page-485- 3/25/2014 16.A.10. SANITARY COLLECTION SYSTEM PHASE 4D DESCRIPTION I QUANTITY UNIT TYPE UNIT PRICE I TOTAL PRICE TV sewer w/manclrel treliminaryL I 2,101 LF $ 2.00 I $ 4,202.00 TV sewer(final 2,101 LF $ _—_— 2.98 I $ 6,260.98 8"P'VC Gravity Main 1'E6-8'cut _7801 LF _ $ _ _32.56 j $ 25,396.80 88"PVC Gravity Main(8••110' cut) _� 333 LF $ 39.56 $ 13,173.48 VC: 8"P' Gravity Mai nl 0--12'cuts 310 LF---- $ 46.56 $ 14,433.60 8"P'VC:Gravity Main 1;12-14'cu1L I 464 LF $ 53.56 $ 24,851.84 8"PVC Gravity Main i 14-16'cull_ I 214 LF $ 60.56 , $ 12,959.84 Manhole 4' Diameter(6-8' cut) — I 4 EA $ 5,709.32 1 $ 22,837.28 4 Manhole 'Diarneter L8-.10.cut 2 EA $ 6,628.54 I $ 13,257.08 Manhole 4' Diameter/12-14'cul _ 27 EA $ 8_466.98 I $ 16,933.96 Core existing manhole(i5), 15" I 1 _ EA $ 6,973.00 I $ 6,973.00 Single sanitary sewer service: 10 E:AA $ 681178 I 6,817.80 Double esanitary sewerseivice 20 EA $ 742.20 I $ 14,844.00 SUB-TOTAL SANITARY= $ 182,941.66 15%CONTINGENCY= $ 27,441.25 TOTAL SANITARY= $ 210,382.91 VA21561active:12 1 56 00 82 aharethclocuments\SPRD VeronaWalk Phase •4D 013C For BondAmoun4.XLS Packet Page-486- 3/25/2014 16.A.10. POTABLE WATER PHASE 4D! DESCRIPTION QUANTITY UNIT TYPE UNIT PRICE TOTAL PRICE Remove Temp. Flushing Hydrant and connect to -- --- existing 12"main with gap configuration 1 EA $__ 1,500.00_ $ 1,500.00 1 1/2" Double Service 25 EA $ 779.74 $ 19,493.50 6" PVC Water MainAC••90O_CL-1501__— — _— 218 LF $ 18.32 $ 3,993.76 6" PVC Water Main (C-705,7K72-0.01 43 LF $ 19.69 $ 846.67 8" PVC Water Main(C..900_CL-150 -- 210 LF $ L23.28 $ 4,888.80 7"PVC Water Main i C-900 CL-150) 733 LF $ 2921 $ 21,410.93 12"PVC Water Main(C-900, CL-150) _ 480 LF_ $ 33.45 $ 16,056.00 12" PVC Water Main (C-900, CL-2001 36 LF $ 38.22 $ 1,375.92 Fire Hydrant Assem biz__ 3 EA •$ 3,8.55.50 $ 11,566.50 6"Gate Valve w/ Box 1 EA $ 1,557.00 $ 1,567.00 8"Gate Valve w/ Box — _-_---- -_—_— 1 EA $ 1,751.00 $ 1,751.00 1C"Gate Valve wl Box — — _ 2 EA $ 1,918.20 $ 3,836.40 12"Gate Valve w/Box 2 EA $ 2,318.18 $ 4,636.36 Automatic Flushing Device — — 2 EFL— $ —2,575.00 $ 5,150.00 Temporary Bacterial Sample Poinil-- — 1 EA $ 142.70 $ 142.70 Permanent Bacterial Sample Point 2 EA $ 1,197.94 $ 2,395.88 SUB-TOTAL POTABLE WATER= $ 100,611.42 15%CONTINGENCY= $ 15,091.71 TOTAL POTABLE WATER= $ 115,703.13 V:\2156\adive\215600828'shared\documents\SF'ftD_VeronaWalk_Phase_4D_OF'C:_For_BondAmount.XLS Packet Page -487- 3/25/2014 16.A.10. STORM SEWER PHASE 4D DE'.SCRIIPTION QUANTITY UNIT TYPE _ UNIT PRICE TOTAL PRICE 15"R615 �, 4f3 I_F _$ 28.25 $ 1,299.50 18"RCP 73 I_F $ 36.74 $ 2,682.02 24"RCP 183 I_F $ 44.39 $ 8,214.87 Double Valley Gutter Inlet rrop and Bottom) 2 EA _$ _ 2,585.70 $ 5,171.40 Valley Gutter Inlet�Top and Bcttoml _ 2 EA $ 1,723.30 $ 3,447.60 18"Flared End 1 EA $ 1,916.02 $ 1,916.02 24"Flared End ---~-1 EA $ 2,400.00 $ 2,400.00 SUB-TOTAL DRAINAGE:= $ 25,131.41 15%CONTINGENCY= $ 3,769.71 TOTAL DRAINAGE= $ 28,901.12 V:',21 active1215600828\shared\documents1S,PRD VeronaWalk Phase 4C UPC: For BondAmount.XL.S Packet Page-488- 3/25/2014 16.A.10. PAVING PHASE 4D _ DESCRIPTION QUANTITY UNIT TYPE UNIT PRICE TOTAL PRICE Remaverr __ ---__-- _aave -- _�+--1.096 S`f $__ _ - :6 - 3/4"Al>phaltic Concrete IT e, S-IIILIst lift) 5.324 S`( _ $ 4.8:5 $ 25,821.40 3/4"Asphaltic Concrete(Type S_III)(2nd lift) 5.324 SY S 5.00 $ 26,620.00 12"Stabilized Sunzadle _ 6.340 S`( $ 1.70 $ 10,778.00 6" Limerock Base 2.867 �SY� $ 4.00 $ 11,468.00 8"Lirnerock: Base —_�_—_--_--_--� 2.457 SY $ 4.25 $ 10,442.25 1' Strip Sodding i(Bahia)__ _ 3.200 L.F S 1.85 $ 5,920.00 24"ValleyGutter__ __ �____ 3.060 L.F $ 8.53 $ 26,101.80 Curb& i utter(Moc ifi,ed'T��2 "F"Z_—__ — 140 L.F _ S '13.48 $ 1,887.20 12"Concrete Ribbon � 310 L.F= $ 12.93 $ 4,008.30 4'VaIIe Crassinq - - _61 L.F $ 25.313 :6 1,543.30 stripe 12"Solid thermoplastic _—_ 45 L.F S _y 2.00 $ 90.00 24"Solid thermoplastic —__ 10 L.F 5 4.02 $ 40.20 Blue R.etiective pavement marker ______ 3 EA $ 5.9:3 $ 17.97 Stop Sin 1 EA $ _140.50 $ 140.50 Street Sign _�______—�� 1 EA _ $ 92.01 $ 92.01 Speed Limit Sign 2 EA $ 174.99 $ 349.98 SUB-TOTAL PAVING:: $ 125,320.91 15% CONTINGENCY:: $ 18,798.14 TOTAL PAVING $ 144,119.05 Packet Page-489- 3/25/2014 16.A.10. IR.R'IGATION PHASE 4D DESCRIPTION _QUANTITY UNIT TYPE UNIT PRICE TOTAL PRICE d" Irrigation Main Q3_900„ CL 150) 2,395 LF $ 11.92 $ 28,548.40 4" Irriation Main Q2-900., CL 200) 4CI LF $ 13.00 $ 520.00 8" Irrigation Main C-900., CL 150) _150 Lim S _ 19.68 $ 8,856.00 !3" I TigationMiain -9j00, CL 200) 57 LIB S - 25.04 $ 1,427.28 4"Gate Valve wI Box 2 _ EA $ 893.08 $ 1,786.16 ARV --�--- 2 EA $ 2,240.00 $ 4,480.00 SUB-TOTAL IRRIGATION= $' 45,617.84 15% CONTINGENCY= $' 6,842.68 TOTAL IRRIGATION= $' 52,460.52 Packet Page-490- 3/25/2014 16.A.10. STREET LIGHTING PHASE 40 E DESCRIPTION QUANTITY UNIT TYPE UNIT PRICE TOTAL PRICE Lightircl �---- --"1 LS $ 15,000.00 e $ 15,000.00 SUB-TOTAL LIGHTING= $ 15,000.00 15% CONTINGENCY= $ 2,250.00 TOTAL LIGHTING;= $ 17,250.00 • • Packet Page -491- 3/25/2014 16.A.10. LANDSCAPING PHASE 4D DESCRIPTION _ QUANTITY _UNIT TYPE UNIT PRICE TOTAL PRICE Codeminimum lardsca pinq 1 LS $�_ 25,000.00 $ 25,000.00 Silt Fence 4,593 LF $ 1.36 $ 6,246.48 SUB-TOTAL LANDSCAPING = 31,246.48 15% CONTINGENCY=: $: 4,686.97 TOTAL LANDSCAPING 35,933.45 Packet Page-492-