Agenda 02/11/2014 Item #16C2 2/11/2014 16.C.2. EXECUTIVE SUMMARY Recommendation to award Request for Quote No. 08-5011-111, "Replacement of Process Air Blowers at South County Water Reclamation Facility," to Quality Enterprises USA, Inc., in the amount of$645,239.15, for project No. 73969 South County Water Reclamation Facility Technical Support Project. OBJECTIVE: Provide and install two process air turbo-blowers, piping, valves, and flow meters in the Blower Building at the South County Water Reclamation Facility (SCWRF). CONSIDERATIONS: On June 24, 2008, as Agenda Item 10G, the Board of County Commissioners (Board) adopted the 2008 Wastewater Master Plan Update that identified the requirement for remaining in compliance at the SCWRF. The proposed scope of work is consistent with the 2010 Wastewater CIP Update (dated October 5, 2010), Project 73969, "SCWRF Technical Support Project," page 2 of 4, line 86, as identified in the 2011 User Fee Rate Study. This project will replace two process air blowers at the SCWRF. These blowers play a critical role in the wastewater treatment process as they are required to aerate wastewater continuously, 24 hours a day, seven days a week. The current blowers are approximately l6 years old and, over the last year, have required extensive repairs and shown signs of decreased reliability and higher power consumption. The proposed process air turbo-blowers utilize reliable, energy-saving technologies such as variable frequency drives, premium efficiency direct current motors, and magnetic bearings. These advancements are expected to dramatically reduce annual blower energy consumption by an estimated $48,000 (27 percent) and reduce annual blower maintenance costs by approximately $30,000, thereby saving an estimated $78,000 annually in operating cost. In addition, the life expectancy of the equipment will be substantially increased. Additionally, the proposed air flow meters will allow the SCWRF operators to set adjustable flow rates to meet the process treatment requirements more precisely, thereby improving the reliability of producing compliant irrigation quality water. Request for Quotation (RFQ) No. 08-5011-111 was posted on November 26, 2013, with all five awarded vendors of the Fixed-term Underground Utilities Contract 08-5011 notified. Three quotes were timely received. The qualified quotes are summarized in the table below and in the quote tabulation information in Attachment 1. Bidder Sub-total Allowance Total Quote Amount Quality Enterprises $582,239.15 $63,000.00 $645,239.15 Mitchell & Stark $659,375.00 $63.000.00 $722,375.00 D.N. Higgins $834.434.00 $63.000.00 $897,434.00 County staff and the local project design engineer, Hole Montes, determined the low quote to be fair and reasonable and recommend awarding the work order to Quality Enterprises USA, Inc., as the lowest responsive and qualified local bidder(reference Attachment 3). The low quote was Packet Page-373- 2/11/2014 16.C.2. eight percent below the design engineer's estimate of $701,000. The Purchasing Department concluded that bidding was competitive, and representative of market conditions. Quality Enterprises USA, Inc., has a satisfactory performance and warranty record on previous wastewater utility-related projects. The quote specifications informed the bidders that there may be unforeseen conditions associated with the project. The total quote amount incorporates an allowance of$63,000 which includes, but is not limited to, replacement of in-slab conduit and cabling. Staff will negotiate a price for any unforeseen conditions prior to start of any additional work. FISCAL IMPACT: Funding is available and is consistent with the FY2014 Capital Budget approved by the Board on September 19, 2013. The source of capital funding is the Wastewater User Fee Fund (414). Funds are available in Project 73969, SCWRF Technical Support Project. Using today's dollars, the total cost to replace the asset is $645,239.15, which has a life expectancy of 30 years. The project is expected to be completed in March 2015. The operating budget impact of the completed project is reflected in the table below. The source for future operating expenses will be user fees. Elements FY 2014 FY 2015 FY 2016 - FY2045 Capital Outlay $645,239.15 0 0 Cost Savings * 0 $39,000 $78.000 *This reflects the approximate cost savings in the annual operating budget for each fiscal year over the life of the asset (assuming an inflation rate of 2.4 percent, per Consumer Price Index forecasts). The annual savings consists of approximately $48,000 in power consumption savings and $30,000 of maintenance savings. Since the new turbo-blowers will not go into service until March 2015, the cost savings for FY2015 is prorated. While this project is required for replacement alone, the resulting internal rate of return for the project is 11 percent (reference Attachment 4). LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote for Board approval.—SRT GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: That the Board of County Commissioners, Ex-officio the Governing Board of the Collier County Water-Sewer District, award RFQ No. 08-5011-111 for Project No. 73969, SCWRF Technical Support Project, to Quality Enterprises USA. Inc., in the amount of $645,239.15, and authorize the Chairman to sign the County Attorney approved work order. Prepared By: Oscar P. Martinez,P.E., PMP, Senior Project Manager, Public Utilities PPMD Attachments: 1. Purchasing Bid Tabulation Information 2. PPMD Quote Analysis 3. Engineer's Recommendation Letter 4. Internal Rate of Return Calculation 5. Work Order Packet Page-374- 2/11/2014 16.C.2. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.C.16.C.2. Item Summary: Recommendation to award Request for Quote No. 08-5011-111, "Replacement of Process Air Blowers at South County Water Reclamation Facility,"to Quality Enterprises USA, Inc., in the amount of$645,239.15, for project No. 73969 South County Water Reclamation Facility Technical Support Project. Meeting Date: 2/11/2014 Prepared By Name: Oscar Martinez Title: Project Manager, Senior,Public Utilities Engineeri 1/16/2014 10:18:43 AM Approved By Name: HapkeMargie Title: Operations Analyst,Public Utilities Date: 1/16/2014 11:03:38 AM Name: WallerDale Title: Plant Manager,Wastewater Date: 1/16/2014 11:11:12 AM Name: Joseph Bellone Title: Manager-Utility Billing&Cust Serv.,Utilities F Date: 1/16/2014 1:35:19 PM Name: JohnsonScott Title: Purchasing Agent.Purchasing&General Services Date: 1/17/2014 8:32:36 AM Name: YilmazGeorge Title: Administrator, Public Utilities Date: 1/17/2014 4:32:09 PM Name: PajerCraig Title: Project Manager, Senior,Public Utilities Engineeri Packet Page-375- 2/11/2014 16.C.2. Date: 1/17/2014 4:41:35 PM Name: BrilhartBrenda Title: Purchasing Agent,Purchasing&General Services Date: 1/21/2014 2:09:09 PM Name: ChmelikTom Title: Director,Public Utilities Engineering Date: 1/22/2014 8:50:41 AM Name: MarkiewiczToanne Title: Manager-Purchasing Acquisition,Purchasing&Gene Date: 1/23/2014 8:30:54 AM Name: JohnssenBeth Date: 1/23/2014 9:41:27 AM Name: YilmazGeorge Title: Administrator,Public Utilities Date: 1/23/2014 12:32:20 PM Name: TeachScott Title: Deputy County Attorney,County Attorney Date: 1/24/2014 2:07:40 PM Name: KlatzkowJeff Title: County Attorney Date: 1/29/2014 1:05:08 PM Name: UsherSusan Title: Management/Budget Analyst, Senior, Office of Management&Budget Date: 2/3/2014 3:45:33 PM Name: OchsLeo Title: County Manager, County Managers Office Date: 2/4/2014 11:36:59 AM Packet Page-376- 2/11/2014 16.C.2. Attachment 1 COLLIER COUNTY QUOTE NO.RFQ 08-5011-111 REPLACEMENT OF PROCESS AIR BLOWERS-QUOTATION FOR PROJECT PHASE 1 SOUTH COUNTY WATER RECLAMATION FACILITY COLLIER COUNTY PUBLIC UTILITIES DIVISION QUALITY MITCHELL& D.N.HIGGINS STARK Item Est No. Item Description 'Units Quantity Total Total Total BASE PRICE-TURBO BLOWER NO.8 WITH ALL SUPPORTING FEATURES AND SCADA CONTROL 1 Perform all Contract Work described for Contract Phase 1 in the Contract Documents as limited to One New Turbo Blower(No.8, Stage A of Contract Phase 1 as described in Specification Section 01120), Work includes new Master Control Unit and all SCADA work LS 1 $ 354,252.10 $ 401,912.00 $ 511,641.00 and spare parts and excludes Work covered in Quotation Item 2. This Quotation Item includes Installation of Owner Furnished Materials as described in the Contract Documents. 2 Provide field technician and support from Turbo Blower Manufacturer for inspection,startup.testing and training. Security badge DAYS 6 $ 9,901.50 $ 12,000.00 $ 9,498.00 procurement to be considered part of Quote Item 1. 3 Allowance Fund for Owners Use as Directed. This fund will be used only at the Owner's direction to accomplish work due to unforeseen conditions(Refer to Specification Section 01135 for more detail). Inclusion of the Allowance Fund as part of the Contract Price is not a LS 1 $37,000.00 $37,000.00 $37,000.00 guarantee that the Contractor will be paid any portion or the full amount of the Allowance Fund, QUOTATION TOTAL-BASE PRICE $ 401,153.60 $ 450,912.00 $ 558,139.00 ADDITIVE ALTERNATE-TURBO BLOWER NO.7 AA-1 Perform all Contract Work described for Contract Phase 1 in the Contract Documents as limited to One New Turbo Blower(No.7, Stage B of Contract Phase 1 as described in Specification Section 01 120)except Work covered in the Base Price and in Additive Quote LS 1 $ 209,834.30 $ 235,463.00 $ 303,795.00 Item AA-2. This Item includes Installation of Owner Furnished Materials as described in the Contract Documents. AA-2 Provide field technician and support from Turbo Blower Manufacturer DAYS 5 for inspection,startup,testing and training. $ 8,251.25 $ 10,000.00 $ 9,500.00 AA-3 Allowance Fund for Owners Use as Directed. This fund will be used only at the Owner's direction to accomplish work due to unforeseen conditions(Refer to Specification Section 01135 for more detail). Inclusion of the Allowance Fund as part of the Contract Price is not a LS 1 $ 26,000.00 $ 26,000.00 S 26,000.00 guarantee that the Contractor will be paid any portion or the full amount of the Allowance Fund. QUOTATION TOTAL-PRICE FOR ADDITIVE ALTERNATE ITEMS AA-1 THRU AA-3 $ 244,085.55 $ 271.463.00 • 339,295.00 QUOTATION TOTAL-PRICE FOR ALL ITEMS INCLUDING ADDITIVE ALTERNATE ITEMS $ 645,239.15 $ 722,375.00 $ 897,434.00 Packet Page-377- 2/11/2014 16.C.2. Attachment 2 Quote Results of RFQ # 08-5011-111 (Replacement of Process Air Blowers) $1,000,000 KEY: $900,000 . - Dashed Green- $800,000 AVERAGE BID $700,000 Dashed black- _ I 1111111.' IIIII 1111 - +/- 1 std dev of avg bid $500,000 _ - , -- $400,000 ' Ell •1 —1.-- - Dotted red- $300,000 * estimate for mil +i-l'ol-r2iz0o9ntoafi e ng 5200,000 • 11111 - construction $100,000 • ' 1 _iM, i Eng Est Quality Mitchell DN Ent. & Stark Higgins Packet Page-378- Attachment 3 2/11/2014 16.C.2. s � a HOLE IVIONTES 95:rn_. r V'v'a, •t; ✓i{ `I ltd `('l! Fuon 23S"254 20%?t.'Pax:23;,2.:4 2099 January 14,2014 Oscar Martinez, Senior Project Manager Collier County Public Utilities 3339 Tamiami Trail East Suite 303 Naples FL 34112 RE: EVALUATION OF QUOTATIONS SCWRF PROCESS AIR BLOWERS HM File No. 2013.094 Dear Oscar, We have reviewed the three bids received by the County on Process Air Blowers Replacement for the SCWRF, County Quote No. 08-5011-111. The three bidders and their quoted price are identified below as provided by the County Purchasing Department. The apparent low quote is from Quality Enterprises in the amount of$645,239.15,which includes Additive Alternate 1. Bidder Bid 1 Quality Enterprises USA,Inc. $645,239.15 2 Mitchell&Stark Company,Inc. $722,375.00 3 Douglas N Higgins, Inc. $897,434.00 Quality Enterprises has successfully completed other construction projects for Collier County and is on the County's list of approved utility contractors. The engineer's estimate is $701,000. Therefore, we recommend award of this construction contract, including Additive Alternate 1, to Quality Enterprises. Please contact us if there are any questions about this quote evaluation. Thank you, HOLE M TT)S,INC. H. iffor epper III,P.E. Director of Project Management/Associate HCP:dlh H12013';2013094\MC Correspondence\C1 Client Corrspondencc\201401 t4 OM Air Blowers Award Recommendation Itr I(CP.doc Packet Page-379- 2/11/2014 16.C.2. Attachment 4 Calculating Internal Rate of Return (IRR) -Replacement of Process Air Blowers (Assume annual power&mtce.savings of$48.000&$30.000 respectively,30 yr.life) 1/13/2014 Year Revenue 0 -$645.239 I £39,000 2 £78,000 3 $78,000 4 $78,000 5 $78,000 6 $78,000 7 $78,000 8 $78,000 9 $78,000 10 $78,000 11 $78.000 12 $78.000 13 $78,000 14 $78.000 15 $78.000 16 $78,000 17 $78.000 18 $78.000 19 $78,000 20 $78.000 21 $78,000 22 $78,000 23 $78,000 24 $78,000 25 $78,000 26 $78,000 27 $78,000 28 $78,000 29 $78,000 30 $78,000 IRR= 11% Packet Page-380- 2/11/2014 16.C.2. Attachment 5 WORN ORDER Page 1 of 2 Agreentettt for Fixed'Icon Annual Underground Utilities Contractors Dated:March 11.2005(Rfl BBId 0S-5011-III) This Work Order is for professional underground utility services for work known as: Project Name: Replacement of Process Air Blowers at SC\VRF Project No: 7396936.6 The work is specified in the proposal dated January 13,2014 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above, this Work Order is assigned to: Quality Enterprises USA,Inc. Scope of Work: As detailed in the attached proposal and the following: • Task I -Perform all contract work described for base contract « Task IT -Provide field technician and support from equipment manufacturer for base contract « Task III -Allowance fund for be contract • 1 ask IV -Perform all contract work described for additive alternate « Task V -Provide field technician and support from equipment manufacturer for additive alternate * Task VI -Allowance fund for additive alternate Scheduleof of Complete work within 420 days from the date of the Notice to Proceed which is accompanying this Work Order. Compensation: in accordance with the Agreement referenced above, the County will compensate the Firm in accordance with following method(s): LEI Negotiated Lump Sum(NLS); ❑Lump Sum Plus Reimbursable Costs(LS-FRC), ❑Time 5: Material(T&M)(established hourly rate—Schedule A);[Cost Plus Fixed Fee(CPFF),(define which compensation method will he used for which tasks)as provided in the attached proposal. Task I 5354,252.10 Lump Sum Task II 5 9,901.50 Lump Sum Task 111 S 37,000.00 T&M Task IV 5209,83430 Lump Sum Task V S 8,251.25 I amp Sum Task VI $ 26.000.00 T&M TOTAL FEE S 645,239.15 PREPARED 1-t5': 1 Use r-R Marljlrie E PM1.4 Senior Project Manager Date > r r p if ui/ vr`1 ! 4 AIIROVEDBY:___ '' 1 't l (Public Utilities,PPMD)Tom Chmelik Date APPROVED BY: 4u` � 19.2.,rut (Public Utilities)George Yilmaz Date ATTEST: BOARD OF COUNTY COMMISSIONERS Dwight C.Brock,Clerk Collier County,Florida By: Deputy Clerk Tom Henning, BCC Chairman 11', • Enterprises USA,Inc. ,` -- Susan i t Witness One Ndme/Titte) Louis-3. Gaudio, Vice..PresitienL_. (Name and Title) Packet Page -381- 2/11/2014 16.C.2. Attachment 5 WORK ORDER Page 2 of 2 I3y: fl Cohan (Witness Two Namerlitte) Approved as to Form and Legality Assistant County Attorney Packet Page-382- 2/11/2014 16.C.2. COWY County kiniiinisinThe SeNices Division Purchssin REQUEST FOR QUOTATIONS FOR MULTIPLE PROECTS UNDER CONTRACT##08-5011 "Annual Contract for Underground Utilities" Date: November 26, 2013 From: Brenda Briihart, Procurement Strategist 239-252-8446,Telephone Number 239-252-6697, Fax Number brendabrilharttacolliergov.net To: Prospective Vendors Subject: RFQ#08-5011-111 -Replacement of Process Air Blowers SCWRF As provided in the referenced contract, the Collier County Purchasing Department is soliciting quotes for the referenced project. RFQ Due Date: 4:00 PM 1/8/14 Non-Mandatory Pre-Quote Meeting j 9:00 AM 12/19/13 SCWRF Pre-Quote Meeting Location: 5600 WarrenStreet . Naples Q&A Deadline: 1/6/14 Substantial Final Phasel 390 days 420 days Phase 2 360 days 390 days Number of Days to Final Completion: Phase 3 360 days 390 days Plans and Specs: Attached Liquidated Damages: $750.00/Day Direct Material Purchase No Your quotation response for this project is due no later than the date and time specified above.We will not accept any quotation responses later than the noted time and date. If your firm is unable to respond electronically, your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specified. We look forward to your participation in this request for information/quotation process. Ouality Enterprises USA, Inc, Firm's Complete Legal Name 239-435-7200 / 239-435-7202 (..eitS Ta r•zewe. .a , u'.-r Vice' #ttr President Title Louis J. Gaudio 1/13/14 Print Name Date . C: Oscar Martinez, Sr. Project Manager • RFQ 08-5011-111 t Packet Page-383- 2/11/2014 16.C.2. COLLIER COUNTY QUOTE NO. RFQ 08-5011-111 REPLACEMENT OF PROCESS AIR BLOWERS -QUOTATION FOR PROJECT PHASE 1 SOUTH COUNTY WATER RECLAMATION FACILITY COLLIER COUNTY PUBLIC UTILITIES DIVISION Item Unit Est No. Item Description Units Price Quantity Total BASE PRICE-TURBO BLOWER NO. 8 WITH ALL SUPPORTING FEATURES AND SCADA CONTROL 1 Perform all Contract Work described for Contract Phase 1 in the Contract Documents as limited to One New Turbo Blower(No. 8, Stage A of Contract Phase 1 as described in Specification Section 01120). Work includes new Master Control Unit and all SCADA work — — Lump Sum and spare parts and excludes Work covered in Quotation Item 2. This Quotation Item includes Installation of Owner Furnished Materials as described in the Contract Documents. $354,252.10 2 Provide field technician and support from Turbo Blower Manufacturer for inspection, startup,testing and training. Security badge DAYS 6 procurement to be considered part of Quote Item 1. $1,65025 $9.901.50 3 Allowance Fund for Owners Use as Directed. This fund will be used only at the Owner's direction to accomplish work due to unforeseen conditions (Refer to Specification Section 01135 for more detail). Inclusion of the Allowance Fund as part of the Contract Price is not a — — guarantee that the Contractor will be paid any portion or the full amount of the Allowance Fund. $37,000.00 QUOTATION TOTAL-BASE PRICE_ $401,153.60 ADDITIVE ALTERNATE-TURBO BLOWER NO.7 AA-1 Perform all Contract Work described for Contract Phase 1 in the Contract Documents as limited to One New Turbo Blower(No. 7, Stage B of Contract Phase 1 as described in Specification Section 01120)except Work covered in the Base Price and in Additive Quote — _ Lump Sum Item AA-2. This Item includes Installation of Owner Furnished Materials as described in the Contract Documents. $209,834.30 AA-2 Provide field technician and support from Turbo Blower Manufacturer for inspection,startup,testing and training. DAYS $1,650.25 5 $8,251.25 AA-3 Allowance Fund for Owners Use as Directed. This fund will be used only at the Owner's direction to accomplish work due to unforeseen conditions(Refer to Specification Section 01135 for more detail). Inclusion of the Allowance Fund as part of the Contract Price is not a — — — guarantee that the Contractor will be paid any portion or the full amount of the Allowance Fund. $26,000.00 QUOTATION TOTAL-PRICE FOR ADDITIVE ALTERNATE ITEMS AA-1 THRU AA-3 $244,085.55 QUOTATION TOTAL-PRICE FOR ALL ITEMS INCLUDING ADDITIVE ALTERNATE ITEMS $645.239.15 Packet Page-384-