Loading...
Agenda 02/11/2014 Item #16A6 2/11/2014 16.A.6. EXECUTIVE SUMMARY Recommendation to approve a proposal with Humiston & Moore Engineers dated January 18, 2014 for Professional Services to develop a conceptual plan for an updated beach profile design on Marco Island under Contract 09-5262-S2 and authorize the County Manager or his designee to execute the work order for a not to exceed amount of $9,890 and make a finding that this expenditure promotes tourism. OBJECTIVE: To provide a conceptual analysis to determine if sand mining from the intertidal zone on Marco Island's north beach's to provide positive drainage can be permitted by the regulatory agencies, is doable from an operational perspective and is affordable to accomplish. CONSIDERATIONS: Humiston & Moore will provide Professional Services to develop a conceptual plan for an updated beach profile design for the public beach on Marco Island between DEP reference monuments R-135 and R-141. The purpose of the updated profile design is to reduce the ponding of water along the upland portion of the beach berm just seaward of the dune area. Staff is recommending that this work order is executed under Contract 09-5262-S2 prior to its expiration (March 8, 2014). No additional tasks or timelines will be added to this work order after March 8, 2014 without prior Board approval. FISCAL IMPACT: Funds in the amount of$9,890 are available in Tourist Development Tax Fund 195,Project 80166. GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management Plan related to this action. ADVISORY COMMITTEE RECOMMENDATIONS: At the November 14, 2013 Coastal Advisory Committee meeting, this item was recommended for approval at $5,000 by a 5 to 0 vote. The Coastal Advisory Committee recommended approval of this conceptual plan with an estimated cost of$5,000. This cost was increased to $9,890 to provide beach surveying which was later determined to be required. The conceptual scope as approved by the Coastal Advisory Committee did not change. At the January 27, 2014 Tourist Development Council meeting, this item was unanimously recommended for approval by a 9 to 0 vote. LEGAL CONSIDERATIONS: This item has been approved as to form and legality and requires majority vote for approval.—CMG RECOMMENDATION: To approve a proposal with Humiston & Moore Engineers dated January 18, 2014 for Professional Services to develop a conceptual plan for an updated beach profile design on Marco Island under Contract 09-5262-S2 and authorize the County Manager or Packet Page -276- 2/11/2014 16.A.6. his designee to execute the work order for a not to exceed amount of$9,890 and make a finding that this expenditure promotes tourism. Prepared By: J. Gary McAlpin,P.E., Coastal Zone Management,Natural Resources Department Attachments: A) H&M Proposal; B) Work Order Packet Page-277- 2/11/2014 16.A.6. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.6. Item Summary: Recommendation to approve a proposal with Humiston & Moore Engineers dated January 18, 2014 for Professional Services to develop a conceptual plan for an updated beach profile design on Marco Island under Contract 09-5262-S2 and authorize the County Manager or his designee to execute the work order for a not to exceed amount of $9,890 and make a finding that this expenditure promotes tourism. Meeting Date: 2/11/2014 Prepared By Name: HambrightGail Title: Accountant,Coastal Zone Management 1/28/2014 9:38:31 AM Submitted by Title: Accountant,Coastal Zone Management Name: HambrightGail 1/28/2014 9:38:33 AM Approved By Name: PuigJudy Title: Operations Analyst, GMD P&R Date: 1/28/2014 2:14:37 PM Name: McAlpinGary Title: Director-Coastal Management Programs,Coastal Zon Date: 1/28/2014 3:13:45 PM Name: LorenzWilliam Title: Director-CDES Engineering Services,Comprehensive Date: 1/28/2014 3:58:07 PM Name: Tara Castillo Title:Fiscal Technician,Transportation Engineering&Con Packet Page-278- 2/11/2014 16.A.6. Date: 1/29/2014 1:05:31 PM Name: MarkiewiczJoanne Title: Director-Purchasing&General Services Date: 1/30/2014 11:47:20 AM Name: WardKelsey Title: Manager-Contracts Administration,Purchasing&Ge Date: 1/30/2014 2:32:24 PM Name: KearnsAllison Date: 1/30/2014 2:38:50 PM Name:NorthrupAdam Title: Procurement Strategist,Purchasing Date: 1/30/2014 3:45:54 PM Name: MarcellaJeanne Title: Executive Secretary,Transportation Planning Date: 1/30/2014 4:32:50 PM Name: GreeneColleen Title: Assistant County Attorney, CAO General Services Date: 1/31/2014 11:16:25 AM Name: KlatzkowJeff Title: County Attorney, Date: 1/31/2014 1:08:5 8 PM Name: FinnEd Title: Management/Budget Analyst, Senior, Transportation Engineering&Construction Management Date: 2/3/2014 10:30:38 AM Name: OchsLeo Title: County Manager, County Managers Office Date: 2/4/2014 10:56:55 AM Packet Page-279- 2/11/2014 16.A.6. - HUMISTON &MOORE ENGINEERS I j COASTAL 5679 STRAND COURT .= i ENGINEERING DESIGN NAPLES,FLORIDA 34110 FAX:239 594 2025 AND PERMITTING PHONE:239 594 2021 January 18, 2014 Gary McAlpin, P.E.,Coastal Zone Management Collier County Public Utilities Engineering Department 2800 North Horseshoe Drive Naples, FL 34104 Re: Proposal for Collier County Contract 09-5262-S2 Request for Work Order Dear Gary: This is in response to your request for Professional Services to develop a conceptual plan for an updated beach profile design for the section of beach on Marco Island between DEP reference monuments R-135 and R-141. The purpose of the updated profile design is to reduce the ponding of water along the upland portion of the beach berm just seaward of the dune area. The purpose of this task will be to: a) Determine if the project is doable and permittable by the Florida DEP. b) Determine how much sand will need to be removed and redistributed along the profile and how much beach width will be reduced at Mean High Water. c) Determine approximately how much the project would cost. It is our understanding that this first phase is intended to develop a conceptual design to be presented to the DEP for initial feedback on permitting feasibility.Then, if deemed acceptable by the City of Marco and the County, we can move into a design and permitting phase. The subsequent permitting phase will likely require state and federal permits and coordination with their respective resource agencies since the work will extend seaward of mean high water. Following feedback from the City of Marco Island and the County, we will provide a detailed scope and costs for the filing and processing of a Joint Coastal Permit and development of final plans and specifications for acceptance by your office to proceed with that design and permitting phase. The following Scope of Work is proposed per Paragraph 1.2.2 of Contract Agreement 09-5262-S2 and is proposed in compliance with the Agreement for this conceptual phase: 1) Obtain updated beach profiles and conduct a site visit during survey data collection from the dune to wading depth detailed as follows: 13 Profiles total: a. 3 profiles(R-134 to R-135.5)from a reasonable distance landward of the vegetation line (approx as shown in red)to wading depth. b. 10 profiles(R-136 to R-141.5)from the monument(or a reasonable distance landward of the vegetation line)to wading depth. F:\H&M-22-000\22-063-Collier-County\Marco Island\Marco-Island-Berm Conceptual Design-Proposal.docx PAPP 1 nf'7 Packet Page -280- 2/11/2014 16.A.6. c. Deliverable from surveyor: xyz file only, noting the vegetation line, no drawing required. d. Per DEP policy: The data shall be collected at intervals not to exceed 25 ft. and at all grade breaks and attributed items along the profile sufficient to accurately describe the topography at the profile locations. 2) Develop a conceptual design of the new beach profiles from DEP reference monuments R-135.5 through R-141 involving transfer of sand from the seaward portion of the beach profile to the landward portion of the berm and meet with county staff for review. The plan will determine how much sand will need to be removed from the intertidal zone to taper from the berm to the intertidal zone from Sand Dollar Island to just north of the Marco Island Marriott and how much beach width will be removed. Finalize conceptual design will consist of a site plan and beach profiles at each station. 3) Develop initial preliminary opinion of probable costs. 4) Upon completion of the conceptual design, meet with the State of Florida Department of Environmental Protection (DEP)for their opinion if the project can be permitted by their agency. Deliverable:Conceptual Plans, Preliminary Opinion of Probable Cost, and summary of meeting with DEP. We proposed to provide these services on a time and materials basis at a not to exceed amount of$9,890 and complete this work within 30 days of our notice to proceed. Upon acceptance of this proposal, please issue a Work Order to incorporate these services. If county requests that H&M provide additional services, such services would be provided as Additional Services to be billed on a time and materials basis in accordance with the fee schedule that is included as part of the existing referenced Agreement, or the budget for any Additional Services tasks will be negotiated separately as deemed necessary, and a budget amendment will be requested. Sincerely yours, HUMISTON & MOORE ENGINEERS (?rz4A7:- Brett D. Moore, P.E. President F:\H&M-22-000\22-063-Collier-County\Marco Island\Marco-Island-Berm Conceptual Design-Proposal.docx Page 2 of 2 Packet Page -281- Marco Island Berm Design 2/11/2014 16.A.6. Humiston and Moore Engineers Contract 09-5262-S2 t'Date:January 18,2014 IMarco Island Berm Design 1 I I.Updated beach profile data III.Conceptual design 1 III. Preliminary Opinion of Probable Costs I IV.State and FWC meetings,provide summary I.Updated beach profile data ' I (Collect 13 updated profiles to wading depth Site visit for conceptual design and upland survey limits I RATE/UNIT I HOURS!QTYI COST MARKUP AMOUNT Principle Engineer 175 4 $700.00 Senior Engineer r 145 0 ! $0.001 (Analyst I 125 0 $0.001 _ IEngineer III ' 105 4 $420.00! l Engineer II 95 0 $0.001 _ Engineer IT — 90, 0 $0.00 Senior Technician 85 4 I $340.00 Env-Sci/field observa4 75 0 J $0.00 Jr.technician 70 0 $0.00 Micro-soft proj tech 0 $0.00 I Admin/clerical 40 0 ! $0.00 PLOTTING, BOND 25.00 $0.00 PLOTTING,VELLUM 10.00 0 $0.00 IEXPENSEisurvey Dagostino&Wood , 1715 I $1,715.00 'EXPENSE $0.00'( T I ---I — I _$3,175.00 I I Total Task I $3,175.00 1 i Packet Page -282- Marco Island Berm Design 2/11/2014 16.A.6. Humiston and Moore Engineers Contract 09-5262-S2 1 1 Date:January 18,2014 (Marco Island Berm Design 11. Updated beach profile data II.Conceptual design_ ! 1111.Preliminary Opinion of Probable Costs IV.State and FWC meetings,provide summary _ II.Conceptual design 11 Prepare plans and coordiante with county 'Compare with FWC Guidelines C RATE/UNIT HOURS/QT COST (MARKUP AMOUNT Principle Engineer 175 6 $1,050.00 (Senior Engineer 145 1 $145.00 Analyst { J 125 0 $0.001 Engineer III 105 16 $1,680.001 Engineer II I 95 0' $0.00' Engineer I 90 0 $0.00 Senior Technician 85 12 $1,020.00 Env-Scifield observat 75 0 $0.00 Jr.technician 70 0 $0.00 (Micro-soft proj tech 55 0 $0.00 Admin/clerical 40 $0.00 PLOTTING,BOND 25.00 $0.00 PLOTTING,VELLUM 10.001 $0.00 I EXPENSE-mailings,copying 1 $0.00 EXPENSE _ $0.00 $3,895.00 Total Task II; f; Packet Page-283- Marco Island Berm Design 2/11/2014 16.A.6. Humiston and Moore Engineers Contract 09-5262-S2 1 j Date:January 18,2014 jMarco Island Berm Design I. Updated beach profile data IL Conceptual design _ III.Preliminary Opinion of Probable Costs -1IV.State and FWC meetings,provide summary I _ Ill.Preliminary Opinion of Probable Costs III Develop preliminary opion of construction costs iRATE!UNIT HOURS/0 COST MARKUP AMOUNT Principle Engineer 175 2 $350.00 !Senior Engineer 145 0 $0.00 — Analyst 1 1251 0 _ $0.00 Engineer III — 105 4 1 $420.00 Engineer II 95 0 $0.00 Engineer II 90 0 l $0.00 {Senior Technician I 85 2, 1 $170.00 1 Env-Sci/field observa( 75 01 $0.00 Jr.technician 70 01 $0.00 Micro-soft proj tech 55, 0 $0.00 Admin/clerical 40 $0.00 PLOTTING, BOND 25.00 $0.00 PLOTTING,VELLUM( 10.00 $0.00 I EXPENSE-mailings,copying $0.00 'EXPENSE 1 $0.00 $940.00 C Total Task II $940 • Packet Page-284- Marco Island Berm Design 2/11/2014 16.A.6. Humiston and Moore Engineers Contract 09-5262-S2 1 I 1 I Date:January 18,2014 (Marco Island Berm Design i I I.Updated beach profile data I II.Conceptual design III.Preliminary Opinion of Probable Costs IV.State and FWC meetings,provide summary I IV.State and FWC meetings,provide summary IV Meet with DEP and FWC and prepare summary RATE/UNIT HOURS/QT COST MARKUP AMOUNT Principle Engineer 175 4 $700.00 Senior Engineer 145__ 0 $0.00 Analyst j 125 0 $0.00 l Engineer III 105 8 $840.00 l Engineer II 95 0 $0.001 Engineer I 90 0 — $0.00 Senior Technician _ 85 4 $340.00 Env-Sci/field observat 75 0 ; $0.00 Jr.technician 701 0 $0.00 Micro-soft proj tech 55 0 $0.001 !Admin/clerical 40 $0.00 PLOTTING,BOND : 25.00 $0.00 'PLOTTING,VELLUM 10.00 $0.00 EXPENSE mailings,copying -- $0.00 EXPENSE $0.00 1 $1,880.00 ;Total Task IV1 $1,880.00 Packet Page -285- 11 f 2/11y2014 16.A.6. Marco Island Berm Design Humiston and Moore Engineers Contract 09-5262-S2 1 | d Berm Design | |Do�:Jan 18,2014 - - �---- | i Task 1 | ! | / | I. Updated beach profile data Task | | $3,175.00 II.Conceptual design Task II | | III. Preliminary Opinion of Probable Costs |Tota|Task III $940.00 IV.State and FVVC meetings,provide summary Total Task IV | $1,88000 '__ � | | i To�|�nTosuo/�m|V , -�- -- ^------ ! _— __� Summa Breakdown of Costs i ! | | | ! ! COST MARKUP. 1751 | $2,800.00 / Principle --' 145| | Senior Enginee | --- Analyst i i 125 0'O� ) oO�O Engineer U| | 105 32 | $3,360.001 _ Engineer II � 95 n ' s0.001 � Engineer I i 90 oL moOl Senior Technician 85 22� � $1,870.00 Env-Goi/finNobnemo 75 O| $0.00 Jr.technician ___ 7O1 0 $�OD� | ! Micro-soft tech r 551 0 xu wo 0 $0.001 L_____ PLOTTING,PLOTTING,VELLUM 10.001 ^.. ^ I ..'^, ~.- - EXPENSE u $0.00, 1 i Total: $9,8 | � / 1 i | . , | | 1 � , � -�- ! � � � . , — ' --- | T� | � � � ! | | , , | . Packet Page -286- 2/11/2014 16.A.6. WORK ORDER/PURCHASE ORDER Agreement for"Humiston&Moore Engineers" ., + Dated:March 12.2013 (Contract 09-5262-S2) This Work Order is for professional engineering services for work known as: Conceptual Plan for an updated beach profile design for the section of beach on Marco Island. Project Name:Marco Renourishment Design Project No: 195-80166 The work is specified in the proposal dated January 18,2014 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above. Work Order/Purchase Order# (please fill out once received)is assigned to:Humiston&Moore Engineers. Scope of Work: As detailed in the attached proposal and the following: * Task 1 Updated Beach Profile Data ✓ * Task II Conceptual Design I/ * Task III Preliminary Opinion of Probable Costs./ * Task IV State and FWC meetings.Provide Summary Schedule of Work: Complete work within 120 days from the date of the Notice to Proceed which is accompanying this Work Order. Compensation: In accordance with Article Five of the Agreement, the County will compensate the Firm in accordance with following method(s): Negotiated Lump Sum OLump Sum Plus Reimbursable Costs Time&Material (established hourly rate—Schedule A) ❑Cost Plus Fixed Fee,(define which method will be used for which tasks)as provided in the attached proposal. Task I S 3,175.00 Task II $ 3,895.00 v'� Task HI S 940.00 '` Task IV $ 1.880.00 V TOTAL FEE $ 9.890.00 PREPARED BY: r' `"'{Y�' • ('t J. s&,y M�,P E. Date APPROVED BY: ff } p{ Zl-2o/f illiam Lorenz,Dep., ent Director Date 1 ) APPROVED BY 4,41111r / 1 d s (' ie'Casal.- Yuida,Division Administrator Date ACCEPTED BY: Humiston&Moore Engineering January 24.2014 Brett D.Moore,P.E.,President Date Packet Page -287- 2/11/2014 16.A.6. MUCH-41111=11 o HUMISTON &M©ORE , ; ENGINEERS 4,71 5679 STRAND COURT l COASTAL NAPLES,FLORIDA34110 i R ENGINEERING DESIGN FAX:239 594 2025 AND PERMITTING PHONE'.239594,2021 January 18,2014 Gary McAlpin,P.E.,Coastal Zone Management Collier County Public Utilities Engineering Department 2800 North Horseshoe Drive Naples, FL 34104 Re: Proposal for Collier County Contract 09-5262-S2 Request for Work Order Dear Gary: This is in response to your request for Professional Services to develop a conceptual plan for an updated beach profile design for the section of beach on Marco Island between DEP reference monuments R-135 and R-141. The purpose of the updated profile design is to reduce the ponding of water along the upland portion of the beach berm just seaward of the dune area. The purpose of this task will be to: a) Determine if the project is doable and permittable by the Florida DEP. b) Determine how much sand will need to be removed and redistributed along the profile and how much beach width will be reduced at Mean High Water, c) Determine approximately how much the project would cost. it is our understanding that this first phase is intended to develop a conceptual design to be presented to the DEP for initial feedback on permitting feasibility.Then, if deemed acceptable by the City of Marco and the County, we can move into a design and permitting phase. The subsequent permitting phase will likely require state and federal permits and coordination with their respective resource agencies since the work will extend seaward of mean high water. Following feedback from the City of Marco Island and the County, we will provide a detailed scope and costs for the filing and processing of a Joint Coastal Permit and development of final plans and specifications for acceptance by your office to proceed with that design and permitting phase. The following Scope of Work is proposed per Paragraph 1.2.2 of Contract Agreement 09-5262-S2 and is proposed in compliance with the Agreement for this conceptual phase: 1) Obtain updated beach profiles and conduct a site visit during survey data collection from the dune to wading depth detailed as follows: 13 Profiles total: a. 3 profiles(R-134 to R-135.5)from a reasonable distance landward of the vegetation line (approx as shown in red)to wading depth. b. 10 profiles(R-136 to R-1415)from the monument{ora reasonable distance landward of the vegetation line)to wading depth. F:\H&M 22-000\22-063-Collier-County\Marco Island\Marco•IsIand-Berm Conceptual Design-Proposal.docx Page 1 of 2 Packet Page -288- 2/11/2014 16.A.6. /1LLOl4 111101 LL U c. Deliverable from surveyor: xyz file only, noting the vegetation line,no drawing required. d. Per DEP policy: The data shall,be collected at intervals not to exceed 25 ft. and at all grade breaks and attributed items along the profile sufficient to accurately describe the topography at the profile locations. 2) Develop a conceptual design of the new beach profiles from DEP reference monuments R-135.5 through R-141 involving transfer of sand from the seaward portion of the beach profile to the landward portion of the berm and meet with county staff for review. The plan will determine how much sand will need to be removed from the intertidal zone to taper from the berm to the intertidal zone from Sand Dollar Island to just north of the Marco island Marriott and how much beach width will be removed. Finalize conceptual design will consist of a site plan and beach profiles at each station. 3) Develop initial preliminary opinion of probable costs. 4) Upon completion of the conceptual design, meet with the State of Florida Department of Environmental Protection (DEP)for their opinion If the project can be permitted by their agency. Deliverable: Conceptual Plans, Preliminary Opinion of Probable Cost,and summary of meeting with DEP. We proposed to provide these services on a time and materials basis at a not to exceed amount of$9,890 and complete this work within 30 days of our notice to proceed. Upon acceptance of this proposal, please issue a Work Order to incorporate these services. if county requests that H&M provide additional services, such services would be provided as Additional Services to be billed on a time and materials basis in accordance with the fee schedule that is included as part of the existing referenced Agreement, or the budget for any Additional Services tasks will be negotiated separately as deemed necessary,and a budget amendment will be requested. Sincerely yours, HUMISTON&MOORE ENGINEERS y Brett D.Moore, P.E. President F:\H&M-22-030\22-063-collier-county\Marco tsiand\Marco-island-Berm Conceptual Design-ProposaLdocx Page 2 of 2 Packet Page-289- 2/11/2014 16.A.6. MUQtd III ICI it D Marco Island Berm Design Humiston and Moore Engineers Contract 09-5262-S2 I — Date:January 18,2014 Marco Island Berm Design {_ I:Updated beach profile data II.Conceptual design I r. ill.Preliminary Opinion of Probable Costs I IV.State and FWC meetings,provide summary i I ■ I l_ I I- L Updated beach profile data I Collect 13 updated profiles to wading depth J Site visit for conceptual desi n T upland survey limits j _ IRATE/UNIT ! HO JRStQTYI COST IMARKUP AMOUNT I Principle En inesr — 175 V 4 .! $700.00 -- __________ Senior Engineer 145 01 $0.00 — Analyst 125 01 I $0.00 ' Engineer III 105'i✓' 4 $420.00 F Engineer it 95 0 50.001 _ Engineer II 90 0 $0.00; 'Senior Technician 85 ,,✓- 4_7 $340.00 if m Env-Sciffield observe t 75 0 $0.001 Jr.technician 70 0 _ '_ $0.001 I Micro-soft proj tech ; 55 01 ! $0.00 IAdminlclerical 40; 01 $0.00 PPLOTTING,BOND 25.00' t 1 ; $0.00_ PLOTTING,VELLUM 10.00' 0 l $0.00; 1EXPENSBsurvey Dagostino&Wood 1715 $1,715.001 EXPENSE 1 $0.00! }� } 1 ._ $3,175.00 V —_.. ! -1----- I ! { Total Task I i $3.175,04 �j j Packet Page -290- 2/11/2014 16.A.6. ryudL.nnICI D i Marco Island Berm Design Humiston and Moore Engineers Contract 09-5262-82 L ( I 'Date:Janu 18,2014 Marco Island Berm Design I.Updated beach profile data ii.Conceptual design __._______ T III.Preliminary Opinion of Probable Costs j I j IV.State and FWC meetings,provide summary II.Conceptual design i 1 1 II ,Prepare plans and coordiante with county !Compare with FWC guidelines ! ( I _J l_ i i RATE/UNIT HOURS/OT COST MARKUP AMOUNT Principle Engineer __. 175 •"'6 $1,050.00 Senior Engineer 145 -.." 1 $145.00 Ana =t 125' 0 1 j $0.00 Engineer III 105 16 $1,880.00 ..r Engineer H 95 0 $0.00 Engineers'; 90i 0 $0.00 Senior Technician 85 —,-- 12 $1,020.001 > * Env-Sci/fietd observe 75 0 $0.00, Jr.technician 70 0 $0.001 Micro-soft proj tech ? 55 0 $0.008 Adminiclerical 1 40 $0.00 —1 PLOTTING,BOND 25.00 y $0.001 PLOTTING.VELLUM 10.00 1 $0.00 EXPENSE-mailings,copying , j $0.00 EXPENSE 1 ( $0.00 $3.896.00..e j [Total Task II p3.895.00 ..-- f - 1 Packet Page-291- 1 2/11/2014 16.A.6. P\LLGU II I ICI Il D Marco Island Berm Design Humiston and Moore Engineers Contract 09-5262-S2 1 1 1 i IDate:January 18,2014 Marco Island Berm Design I I — I.Updated beach profile data i r --- II.Conceptual design I ' _ Ili.Preliminary Opinion>of Probable Costs ✓' 1 IV,State and FWC meetings,provide summary 1 I III.Preliminary Opinion j 1 i ry p of Probable Costs , — 4 1 III 1 Develop preliminary opion oflconstruction costs 1 RATE/UNIT HOURS/QT COST MARKUP !AMOUNT I Principle Engineer 175 °r' 21 I $350.001 kr I Senior En ineer 145 0' $0.00 Analyst 125 0 $0.00 A Engineer II l 1051 4 $420,00 1 Engineer II 95' 0 $0.00 Engineer 11_ 901 Of i $0.00 /- Senior Technician 85 °' 2 $170.00. Env-Sci/field observe t 75 0 $0.00 . 1 ■ 1Jr.technician I 70 0 $0.00 _ Micro-soft proj tech 55 0 I 50.00 Admin/cierical 40 1 $0.00 :PLOTTING,BOND I 25.00 $0.00 !PLOTTING,VELLUM] 10.00 1 I $0.00 i EXPENSE-mailings,copying $0.00; 1EXPENSE I $0.001 $ 0 Task, Total k III ;+ t I ' f i Packet Page-292 2/11/2014 16.A.6. MI.tel d I111G,11 U Marco Island Berm Design l-lumiston and Moore Engineers Contract 09-5262-S2 I ' ;Date:January 18,2014 Marco Island Berm Design I '"` ,' L Updated beach profile data It.Conceptual design ,III.Preliminary Opinion of Probable Costs 1 ,. IV.State and FWC meetings,provide summary I I 1 1 _.—rt IV.State and FWC meetings,provide summary 1 IV Meet with DEP and FWC and prepare summary T 1 RATEJUNIT I-IOV tSJOTI COST MARKUP !AMOUNT Principle Engineer 1751 .'' 4 $700.00 _ Senior Engineer - 145! 0 $0.00 _ iAnalyst I 125 }. 0, I I $0.00 �,....._ _ I Engineer III , 105 " 81 _ I $840.00 ' I En•ineer I I 95 0 i { $0.00 En,.ineer I 90 0 I $0.001 ,,- I Senior Technician 85 4 4 $340.00 Env-Sol/field ld observe 75 0 $0.00 Jr.technician 701 0 $0.00 Micro-soft proj tech 55' 0 $0.00 Admin/clerical 40 $0.00, IPLOTTING,BOND 25.00 $0.00 PLOTTING,VELLUM 10.00 _-- ` _ $a00 1 EXPENSE-mailings,copying - _ $0.00. !EXPENSE I $0.001 .../" -- i 8/$1,...,1191 i i ;Total Task IV 11180.00, I I • 1 Packet Page-293- | r , �/11��O1^41��./\���. ! - -- - - | , Marco Island Berm Desig - - | Rumiston and Moore Engineers Contract 09-5262-S2 ____ I Marco Island Berm DesiØa __ mum �nnw� � o4 / | -- � | ---1 i 1 ----- I.Updited beach prchle Total Task V II.Conceptual design[— $3,895.0V/ ' Opinion of Probable Costs | | i Task ml +/ IV.State and FWC meetings,provide summary | | -- T��Tuok�| | $[880]00 r~ | Total V - i -- / | ' _, -_L__ | ,Surnmart_g_treakdown of Costs 1 RATE/UNIT HOURS/071 COST MARKUP AIVOUNT Senior Engineer *45Lt' 11 ^ _-_� | � Analyst | | 125' 0 *0.001 Engineer III 105 ,i .^ . Engineer Engineer Senior Technician Env-Sciffield observe - '| ' � Micro-soft pro) tech o | ~~. .~~.~ i .~ . PLOTTING,VELLUM 10.00 o $0.00 EXPENSE SurvwyO&VV | Di 1715 $1nsoo �, EXPENSE \ | | . ' .__ | | ■ I � | ' ! ! | | �— ! - � -- | | --� i | -'-- / ! �-- |- | � ----- --- -- -------- | 1 ��� � | � | -- ` . / i . | / ; \ ! | Packet Page -294-