Agenda 12/08/2015 Item #16E1212/8/2015 16.E.12. EXECUTIVE SUMMARY Recommendation to approve the administrative reports prepared by the Procurement Services Division for modifications to work orders, change orders, surplus property and other items as identified. ORJFCTTVE: To promote accountability and provide transparency to the public and gain the Board's approval /ratification for various procurement - related transactions. CONSIDERATIONS: In accordance with the Board's Procurement Ordinance 2013 -69 as amended by 2015 -37 and the Procurement Manual (Section 19 Procedures), the Procurement Services Division produces a regular Administrative Report which provides for Board approval of the following transactions: • Administratively approved work order modifications and /or contract change orders /Amendments that do not exceed ten (10 %) of the current Board approved aggregate amount; • Modifications to the current Board approved performance schedule (number of days); • Surplus disposal and revenue disbursement; and, • Other items as determined by the County Manager or designee. The attached reports cover the period of October 20 — November 12, 2015, except for the surplus disposal and revenue disbursement report which covers the period October 20 — November 13, 2015. FISCAL. IMPACT: The net total for 5 changes to contracts is $81.014.23. The total number of days added to contracts is 91. No revenue was received for the disposal of surplus items. LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, is approved as to form and legality, and requires majority vote for approval. -JAK GROWTH MANAGEMENT IMPACT: There is no Growth Management Impact associated with this action. RECOMMENDATION: That the Board of County Commissioners ratifies /approves work order modifications, change orders and/or Contract Amendments ; surplus disposal and revenue disbursement; and other items as detennined by the County Manager or designee in accordance with Procurement Ordinance 2013 -69 as amended by 2015 -37. PREPARED BY: Diana De Leon, CPPB, Contracts Technician, Procurement Services Division ATTACHMENTS: Change Order Report Change Orders (backup) Surplus Disposal and Revenue Report Packet Page -1792- 12/8/2015 16.E.12. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.E.16.E.12. Item Summary: Recommendation to approve the administrative reports prepared by the Procurement Services Division for modifications to work orders, change orders, surplus property and other items as identified. Meeting Date: 12/8/2015 Prepared By Name: DeLeonDiana Title: Contracts Technician, Procurement Services 11/13/2015 3:28:15 PM Submitted by Title: Contracts Technician, Procurement Services Name: DeLeonDiana 11/13/2015 3:28:16 PM Approved By Name: pochopinpat Title: Operations Coordinator, Administrative Services Department Date: 11/13/2015 3:38:11 PM Name: NorthrupAdam Title: Procurement Specialist, Procurement Services Date: 11/13/2015 3:49:26 PM Name: DeLeonDiana Title: Contracts Technician, Procurement Services Date: 11/13/2015 4:02:58 PM Name: MarkiewiczJoanne Title: Division Director - Procurement Services, Procurement Services Date: 11/14/2015 5:07:00 AM Packet Page -1793- 12/8/2015 16.E.12. Name: PriceLen Title: Department Head - Administrative Svc, Administrative Services Department Date: 11/16/2015 3:42:35 PM Name: KlatzkowJeff Title: County Attorney, Date: 11/16/2015 3:50:23 PM Name: WellsLaura Title: Management/Budget Analyst, Senior, Office of Management & Budget Date: 11/17/2015 2:39:34 PM Name: CasalanguidaNick Title: Deputy County Manager, County Managers Office Date: 11/23/2015 4:49:30 PM Packet Page -1794- W Rm �m o c Q d t U a E m a O V w C w m � d m L L E U a O e r V N � O a c E � U Q w d C e O r p E U Q w 0 O O O v N e > 0 C CD a d d C 41 C Z d E n L r °o CD U °w > m C O i1 •q d '> O 'o a` Z y C G E c E to O (7 n Z Z u m e j d C d y O L > d U U O :9 Cl) m m O � 0 CL 0 d Z d O Z 't3 C LL yy d U m d C U) Eat m E o m c 3 'o m a U Q O L Co Z - U d � U O � Ci Z mt c t m t t t u `off 3 i (: f > t Os 0 (V e N Y O 0 uNs N tri of O O t0 ti v A O 0 m 0 m oa C N d W to d S Z O CD o U U >. N � C O U U � > d M m m ° d N m d d M c v C Q tD m c 0 Z - U > N it 0 N m` m ma c c R O L U U `o 2 3 d 0 Q o � Co o — co G � O c d ' � C O 3 CD G O � 0 Ln N � 3 M O W o CD y N O E N r C C d d E ° m a °• n . °w d '; c d d � d m N O N M 0 .L.. n > m E o N d d 'A >E. NN d m N O M d O 'O 1f9 n m N « d fR TL+ t0 C C .m d .c N O N mm w a o a N U m N d W C 0 N CL m d C d LU O 0 L Q d C O C l>0 � w y c a y� U E � d d y C N C � y w Y y C CL > N d y O O- � 0 E j m 2 c a y N m O C h v U E n d4 d U > > C Ill m # N Co U c .2:, d V m o m m E m u d °m �U �� FO- d In N d m m C_ c � E2 w L .E o u `o d m D L U M d y O F- 0 °o O L F- L.. U 3 c d O C ° go 0 N d m °O v N C O °D a adi L Nw £ vm y O d C a m o t m o m o = n � � A N O d •O m v m N m � d p O O C t0 U v C m pcp CD d U N O N O_ w C N Lo o O - ' c t0 C � �2 y C d o o m � � 3 J U N .G w E N m U_ G m � O m N U C m C W 0 a d N � O C G � N d C ~ Y m N d � c C S E i t ¢ r ¢ rnU E m E m p a Q Z Q w f � C C 7 ` n Q C L 5 a E U N z Q `o U � m 0 3 m w E E H a ° d W K C V U � C W ` O c E Q Z c $ p U U w m m a W r E m C O i1 •q d '> O 'o a` Z y C G E c E to O (7 n Z Z u m e j d C d y O L > d U U O :9 Cl) m m O � 0 CL 0 d Z d O Z 't3 C LL yy d U m d C U) Eat m E o m c 3 'o m a U Q O L Co Z - U d � U O � Ci Z mt c t m t t t u `off 3 i (: f > t Os 0 (V e N Y O 0 uNs N tri of O O t0 ti v A O 0 m 0 m oa C N d W to d S Z O CD o U U >. N � C O U U � > d M m m ° d N m d d M c v C Q tD m c 0 Z - U > N it 0 N m` m ma c c R O L U U `o 2 3 d 0 Q o � Co o — co G � O c d ' � C O 3 CD G O � 0 Ln N � 3 M O W o CD y N O E N r C C d d E ° m a °• n . °w d '; c d d � d m N O N M 0 .L.. n > m E o N d d 'A >E. NN d m N O M d O 'O 1f9 n m N « d fR TL+ t0 C C .m d .c N O N mm w a o a N U m N d W C 0 N CL m d C d LU O 0 L Q d C O C l>0 � w y c a y� U E � d d y C N C � y w Y y C CL > N d y O O- � 0 E j m 2 c a y N m O C h v U E n d4 d U > > C Ill m # N Co U c .2:, d V m o m m E m u d °m �U �� FO- d In N d m m C_ c � E2 w L .E o u `o d m D L U M d y O F- 0 °o O L F- L.. U 3 c d O C ° go 0 N d m °O v N C O °D a adi L Nw £ vm y O d C a m o t m o m o = n � � A N O d •O m v m N m � d p O O C t0 U v C m pcp CD d U N O N O_ w C N Lo o O - ' c t0 C � �2 y C d o o m � � 3 J U N .G w E N m U_ G m � O m N U C m C W 0 a d N � O C G � N d C ~ Y m N d � c C S LU e > d O i t ¢ r ¢ rnU E m Z. m p a Q Z Q w f � t Q 1 m C O i1 •q d '> O 'o a` Z y C G E c E to O (7 n Z Z u m e j d C d y O L > d U U O :9 Cl) m m O � 0 CL 0 d Z d O Z 't3 C LL yy d U m d C U) Eat m E o m c 3 'o m a U Q O L Co Z - U d � U O � Ci Z mt c t m t t t u `off 3 i (: f > t Os 0 (V e N Y O 0 uNs N tri of O O t0 ti v A O 0 m 0 m oa C N d W to d S Z O CD o U U >. N � C O U U � > d M m m ° d N m d d M c v C Q tD m c 0 Z - U > N it 0 N m` m ma c c R O L U U `o 2 3 d 0 Q o � Co o — co G � O c d ' � C O 3 CD G O � 0 Ln N � 3 M O W o CD y N O E N r C C d d E ° m a °• n . °w d '; c d d � d m N O N M 0 .L.. n > m E o N d d 'A >E. NN d m N O M d O 'O 1f9 n m N « d fR TL+ t0 C C .m d .c N O N mm w a o a N U m N d W C 0 N CL m d C d LU O 0 L Q d C O C l>0 � w y c a y� U E � d d y C N C � y w Y y C CL > N d y O O- � 0 E j m 2 c a y N m O C h v U E n d4 d U > > C Ill m # N Co U c .2:, d V m o m m E m u d °m �U �� FO- d In N d m m C_ c � E2 w L .E o u `o d m D L U M d y O F- 0 °o O L F- L.. U 3 c d O C ° go 0 N d m °O v N C O °D a adi L Nw £ vm y O d C a m o t m o m o = n � � A N O d •O m v m N m � d p O O C t0 U v C m pcp CD d U N O N O_ w C N Lo o O - ' c t0 C � �2 y C d o o m � � 3 J U N .G w E N m U_ G m � O m N U C m C W 0 a d N � O C G � N d C ~ Y m N d � c C d E N t g` m E 'o o d d vO E a E C d w m c � O n c o d O tD U au ° _ C o m 3 m w E n o y P y O CO Eo"2 ° U � vod E m m c m m m a F d U d in m m m c U c c s = U W U m N `o 2 r d l9 p `o a > d Packet Page -1795- 12/8/2015 16.E.12. e V1 N Y H o m d m w (O a d � U N t>Q O o n U tC N L n C m O [0 U O � d N dL. � � O O fU0 y � � m � v E Y C T _X Ci y W v m m rn j O w y c m m C v y °• a m C � � d M � g w U LO C o d I U C ° C d v v cl m a n M � C� w � � d � w a o > d o a w rn m N Cr � d v N 64 Y9 nc CD U m d v a 0. a m 0 d r0 W O G c a L > L m m d U a d m z m E Q E 2 m m C � m O m L O o m LL ov d w y U U O F U t9 C m m O 0- U � aci aci m.ti N Ol d p 9 U Eoto mH 0. m `° UM�UU FO- O `o U Lo m a n7 m M U d a d v •� m 1 O O N v 0 h U A c U 0 rn L U is H Co ft, county ® Contract Modification ❑ Work Order Modification ❑ Amendment 12/8/2015 16.E.12. Procurement Services Change Order Form Contract #: 14635D Change #: Purchase Order #: NIA Project #: E:::iK:J ContractorlFirtn Name; BC Plumbing Service of SW FL, Inc. Contract/Project: Plumbing Services Project Manager Name: Dennis Linguidi Division Name: Facilities Management Division � g Original Contract/Work Order Amount N/A 11/18/14 16.E.2 Original BCC Approval Date; Agenda Item # Current BCC Approved Amount N/A Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount NIA SAP Contract Expiration Date (Master) Dollar Amount of this Change N/A #VALUE! Total Change from Original Amount Revised Contract(Work Order Total $ 0.00 #VALUE! Change from Current BCC Approved Amount Cumulative Changes I #VALUE! #VALUE! Change from Current Amount Completion Date „Description of the Task (a),Changeand.:Raiionele;forthe Change Notice to Proceed NIA Original N/A Last Approved ( N /A� , PP I Revised Date N!A 1 Date Completion Date Date ii-- (includes this change) �. t # of Days Added NIA Select Tasks ® Add new task(s) ❑ Delete task(s) ❑ Change task(s) ❑ Other (see below) Provide a response to the following: 1.) detailed and specific explanation /rationale of the requested change(s) to the task(s) and / or the additional days added (if requested); 2.) why this change was not included in the original contract; and, 3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and /or Contractor if needed. 1. This change order will add the attached equipment hourly rates to Exhibit B of the contract, as authorized by the contract item #15 ADDITIONAL ITEMS /SERVICES. The equipment is needed by the vendor to appropriately respond to emergency plumbing calls in County owned and leased buildings. 2. These items were not on the original contract because they were inadvertently left out of the specifications. Future solicitations will include these items. 4. f: 3. If this modification is not processed, our contracted plumbing contractor will not be able to adequately respond to emergency plumbing issues that require equipment such as sewer camera, concrete saw orjack hammer. This would leave County buildings without working bathrooms facilities for an extended period of time, which is a health and safety risk. Prepared by: Date: (Project Managg:Name and Division) Acceptance of this Change Order shall constitute a modification to contract /work order identified above and will be subject to all the same terms and conditions as contained in the contract / work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor / Vendor / Consultant / Design Professionar—an-M oof or r to the change set forth herein, including claims for impact and delay costs. p f Accepted by: Date: ( / Vendor / Consultant / Design Professional and Name of Firm, if project applicable) Approved by: Date: sonal n/9 Nam 66f F' if o' icable) Approved byrocV�m4entsPliofessSal) Date: (Divisions who.may require ad "oval natures may include on separate sheet) Revised: 10/28 12014 Packet Page -1796- 12/8/2015 16.E.12. Exhibit E: Construction Change Order Form Contract #: 14 -6320 Change #: = Purchase Order #: 4500155836 Project #: NA Contractor /Firm Name: Danella Utility Construction, Inc. Project Name: [Vanderbilt Beach Utility Conversion Project Manager Name: Harry Sells Division: PTNE Original Contract /Work Order Amount ; $'_2,637,081.00; Unit 10128/14 11 -F Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $, 2,631,081 .00 . 10/28/14.11 -F Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 2;6341755:0! 1/5/2016 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 73, 015.27 2.68% Total Change from Original Amount Revised Contract /Work Order Total $ 2,707,770.31 2.6n$7o Change from Current BCC Approved Amount Cumulative Changes $ 70,689.31 2.77% Change from Current Amount Completion Date, Description of the Task(s) Change, and Rationale for the Change Notice to Proceed Jan 5, 2015 Original 01/05/16 Last Approved 01/05/16 Revised Date 01/05/16 Date Completion Date Date cludes this change) # of Days Added 0 Select Tasks ® Add new task(s) ❑ Delete task(s) ® Change task(s) ❑ Other (see below) Provide a response to the following: 1.) detailed and specific explanationlrationale of the requested change(s) to the task(s) and /'or the additional days added (if requested); 2.) why this change was not included in the original contract; and, 3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and /or Contractor if This change order is to modify line item quantities to address conditions underground. The list below details the changes to each line, The change was not included because the plans for this project was developed using subsurface maps and drawings on file with the County. Once construction began, changes are needed because conditions underground are different than what was portrayed on the maps and drawings. If changes are not completed, we will spend considerable amounts of money on materials and methods which will increase the budget. ITEM DESCRIPTION Unit PLAN UNIT CONTRACT CHANGE ORDERS QUANTIT Y PRICE AMOUNT ADD SUBTRAC T '4 5 Trenching Feet incl. inst. Of conduit, backfill and compaction LF 27,208 $10.62 $288,948.96 $0.00 3000.00 $31,860.00 6 One 2" Conduit under Mangroves into State Park LF 345 1 $6.50 $ 2,242.50 345.00 $2,242.50 0.00 $0.00 8 Two 2" Conduits LF 1 34,000 1 $7.69 $ 261,460.00 $0.00 2500.00 $19,225.00 Packet Page -1798- a CI 12/8/2015 16.E.12. 9 Three 2" Ccondits LF 165 $9.46 $ 1,560.90 7800.00 $73,788.00 $0.00 10 Four 2" Conduits LF 220 $11.23 $ 2,470.60 2600.00 $29,198.00 $0.00 14 One 6" Conduit LF 600 $14.78 $ 8,868.00 11000.0 0 $162,580.0 0 $0.00 16 One 6" and three 2" Conduits LF 12,700 $18.92 $ 240,284.00 8500.00 $0.00 12000.00 $227,040.0 0 18 Two 6" Conduits LF 800 $20.10 $ 16,080.00 0.00 $0.00 238.00 $4,783.80 19 Two 6" and three 2" Conduits LF 950 $26.00 $ 24,700.00 $0.00 950.00 $24,700.00 20 Three 6" Conduits LF 150 $28.38 $ 4,257.00 1 $0.00 150.00 $4,257.00 22 One 4" and one 2" Conduit LF 36,000 $10.64 $ 383,040.00 $0.00 6000.00 $63,840.00 24 One 4" and three 2" Conduit LF 8500 $13.05 $ 110,925.00 $0.00 4000.00 $52,200.00 24 B Two 2" Conduits LF 0 $7.69 $ - 0.00 $0.00 900.00 $6,921.00 24 C One 3" Conduit LF 0 $10.05 $ - 0.00 $0.00 500.00 $5,025.00 24 D Two 3" Condit LF 0 $15.38 $ - 0.00 $0.00 500.00 $7,690.00 24 E Three 3" conduits LF 0 $20.10 $ - 150.00 $3,015.00 $0.00 24 F One 4" Conduit LF 0 $11.25 $ - 500.00 $5,625.00 $0.00 24 G Two 4" Conduit LF 0 $16.56 $ - 250.00 $4,140.00 $0.00 25 Water Line Vanderbilt Drive 3" Welded fittings and pressure tested LF 8500 $11.73 $ 99,705.00 $0.00 8500.00 $99,705.00 26 Remove Concrete Sidewalk 4'x 10' SF 55 $46.80 $ 2,574.00 3500.00 $163,800.0 0 $0.00 27 Remove Concrete Driveway 1.5' x 20' SF 18 $137.4 3 $ 2,473.74 100.00 $13,743.00 $0.00 28 Remove Asphalt 1.5'x 20' SF 37 $36.36 $ 1,345.32 500.00 $18,180.00 $0.00 29 Hand Dig Pit EA 39 $396.0 0 $ 15,444.00 150.00 $59,400.00 $0.00 30 Soft Dig Pit EA 35 $378.0 0 $ 13,230.00 100.00 $37,800.00 $0.00 37 2" schedule 40 PVC Feet FT 26,000 0.75 $ 19,500.00 $0.00 26000.00 $19,500.00 38 4" schedule 40 PVC Feet FT 15,108 2.06 $ 31,122.48 $0.00 15108.00 $31,122.48 39 2" HDPE SDR 11 FT 27,000 1.04 $ 28,080.00 0.00 $0.00 5000.00 $5,200.00 40 3" HDPE SDR 11 FT 8,800 2.89 $ 25,432.00 $0.00 11300.00 $32,657.00 41 4 "HDPE SDR 11 FT 57,765 3.74 $ 216,041.10 $0.00 12000.00 $44,880.00 43 4 "HDPE SDR 13.5 FT 57,765 3.11 $ 179,649.15 $0.00 21765.00 $67,689.15 A2 -13 One 6" Conduit Sub Aeqeous Crossing Charge for actual length with Wire line Pt to Pt 772' LF 0 $94.60 $ - 772.00 $73,031.20 0 $0.00 Items Added 24 H One 4" and One 2" Conduit LF 0 $14.00 $ 200.00 $2,800.00 $0.00 241 One 4 "and Two 2" Conduit LF 0 $17.25 $ - 400.00 $6,900.00 $0.00 241 One 4" and three 2" Conduit LF 0 $17.56 $ - 300.00 $5,268.00 $0.00 25A Water Line Vanderbilt Dr. 1 -3" and 1 -2 " with metal clamp fittings and pressure tested LF $18.80 $ - 8500.00 $159,800.0 0 $0.00 Packet Page -1799- Total $821,310.7 Total $748,295.4 Added 0 Subtracted 3 Total Change $73,015.27 12/8/2015 16.E.12. Prepared by: /_� 4a__ Date: / � / b (H r Sells STU Project Manager Name, PTNE Division, Collier County) Acceptance of this Change Order shall constitute a modification to contract /work order identified above and will be subject to all the same terms and conditions as contained in the contract /work order indicated above, as fully as if the same were. stated in this . acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor / Vendor / Consultant / Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Accepted by: Date: 10f �Z� 157 (DqF0 Util' onstru ion Inc.) Approved by: &— 0& Date: �� /�� (W. Terry tole, P ice President Hole M ntes Inc.) Approved by: Date: / 0- (Mlc elle' mold, Director, Public Transit & Neighborhood Enhancement Division) Approved by: Date: (S a rnell, Admi istrato Kqublic Services Departme t.) Approved by: r I Date: ` a/ ( rocurement Professional) Packet Page -1800- o" 12/8/2015 16.E.12. Ca""ry Procurement Services Change Order Form Contract Modification 0 Work Order Modification ❑ Amendment Contract #: 15 -6403 TChange #: (' �j Purchase Order #: 4500158774 Project #: 60016.19 Contractor /Firm Name: F Quality Enterprises Contract/Project Immokalee Rd @ Veterans Pk Dr /Medical Blvd Project Manager Name: Julio Ordonez Division Name: Transportation Engineering Original Contract/Work Order Amount $ 224.585.3264/14 /15 16A18 Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $ 224,585.3234/14/15 16A18 Last BCC Approval Date; Agenda item # Current Contract/Work Order Amount $ 224,585.32 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 0.00 0.00% Total Change from Original Amount Revised Contract/Work Order Total F_$ 224,585.321 0.00% Change from Current BCC Approved Amount Cumulative Changes $ 0.001 0.00% .Change from Current Amount Completion Date, Description of the Task(s) Change, and Rationale for the Change -1 Notice to Proceed b8/1712015 Original ginal 10/31/15 Last Approved 10/31115 Revised Date 11li 5/15 / Date Completion Date Date (Includes this change) # of Days Added 15 /' Select Tasks ® Add new task(s) ❑ Delete task(s) ❑ Change task(s) [] Other (see below) Provide a response to the following: 1.) detailed and specific explanationlrationale of the requested change(s) to the task(s) and I or the additional days added (if requested); 2.) why this change was not included in the original contract; and, 3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor If needed 1. This change order will add the two pay items below. Originally the contract called for removal of the entire pavement structure, and redo the concrete to install landscaping. This change modifies the original plan by using pavers rather than landscaping so the current pavement structure will be maintained. An additional pavement structure is needed to correctly route vehicles, using concrete curb "D" as oppose to using curb "F", which is listed in current bid schedule. -Add pay item 520 -24 - Concrete curb type "D" @ $15.00 per LF x 184 LF = $2,760.00 -Add pay item 526 -1 -1 - Pavers @ $70.75 per SY x 63 SY = $4,457.25 Because the landscaping in the area is such a small amount, the overruns in the landscaping lines will be reconciled at project close. The payment for these additions will be taken from the $10,000 roadway allowance, remaining funds in allowance $2,782.75. 2. This change was not anticipated in the original contract because the project was designed as a permanent improvement. The Immokalce Rd and Medical Blvd. intersection now has the potential to be signalized in the near future and it's better to minimize disruption of the existing pavement until a signalization plan is complet . 3. If the change is not implemented now, the County will have to spend more money reconstructing the pavement structure within the traffic island at the time the traffic signal is installed in the future. Prepared by: Engineering Division Date: tit _ Z Z — I Acceptance of thig t' ig�shail constitute a modification to contract / work order identified above and will be subject to a0 the same terms and conditions as contained in the contract I work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor / Vendor I Consultant I Design Professional arising out of or related to the change set forth herein, including claims for impact and delay costs. Accepted by: Approved Approved by: Approved Quality Enterprises USA, Inc Project Manager, Traffic Colon, Prdcurement Strategist, Purchasing Division Engineering Divison z— J v t ,.- � , A S. Wilkison, P.E., Department Head, Growth Management Department (Divisions who may require additional signatures may include on separate sheet.) Packet Page -1801- Date: 1 Date: t �� Date: Date: Date: /n% // Revised: 10/28/2014 QUALITY ENTERPRISES .... 4 N c. October 8, 2015 Julio F. Ord6n`ez, P.E. Principal Project Manager Collier County Transportation Engineering Division Traffic Operations Section Re: lmmokalee Rd @ Medical Blvd Change Oder Request Julio: Quality Enterprises request a change order for the following items: D Curb —1841f x $15.00 /If = $2,760.00 Concrete Pavers — 63 sy x $70.75/sy = $4,457.25 Total = $7,217.25 Please let me know if you need any additional information. Sincerely yours, Louis J. Gaudio Vice President z"', 12/8/201516.E.12. E 205 Tintwn Cowrt 3894 Mamix Drive .Suite 216 Chesapeake. VA 23320 Maples; FL 341143406 (75715411-3000 (239) 435 -7200 Fax (757) 549.2600 Fax (239) 435 -7202 I Lks CBCA57231 Packet Page -1802- 15 -6463 (ttlmokalee Road at Medical SoalavardSYY 14921th Parkway and Veterans Park drive Median Improvements COLLIER COUNTY PROJECT No. 60D I6.19 BID SCHEDULE 12/8/2015 16.E.12. COUTRACTOR» Quality Enterprises USA, Inc New Items (Paid from Roadway Allowance) Change - $7,217.25 1 520-2-4 Concrete curb type "D" LF 1 184 1 $15.00 $2,760.00 + $2,760.00 45 526 -1 -1 Pavers SY 1 63 1 $70.75 $4,457.25 +$4,457.25 Packet Page -1803- tTFJItWo. DESCRIPTKLN UNIT QUANTITY UWTPRICE, AMOUNT ROADWAY IMPRrI�,✓V NPNT9 t 101.1 MOBILIZATION LS 1 $16.445.00 $18,445.00 2 102 -1 MAINTENANCEOFTRAFFIC LS 1 $4,521.88 $4.521.88 3 102.99 VARWSLE MESSAGE SIGN (2 SIGN, 30 DAYS, EA} ED 60 118.10 s98B,o0 4 110 -1 -1 STANDARD CLEARING & GRUBBING 11} LS 1 512.075,08 $12,075.00 5 120-1 EXCAVATION CY 215 534.50 $7,417.5 fi 1204 EMBANKMENT CY L34 52.'2.79 $3.053:88 7 1204 STABILIZATION TYPE'8' SY 63D 54.60 MODS -00 6 245 415 OPTIONAL BASE GROUP 15 9" SY $41 557.50 531,107,50 9 327 -70.1 MILLINGS EXISTING PAVEMENT (1 'THICK. 1' WIDE) SY 881 45 -75 S5.06515 10 331-^1.11 SUPERPAVE ASPH. CONC. ,TYPE SP 9.5 (TRAFFIC C, I- THICK) (INC 1' RESURF) (2) TN 88 $231 -00 4201329,00 11 334 -1.12 SUPERPAVE ASPH. CONC. TYPE. SP 12.6 (TRAFFIC C. 2" THICK) TN 80 5218.25 $16,895,00 12 334.1.13 SUPERPAVE ASPH. CONC. TYPE SP 12.5 (TRAFFIC C. 3" AVE. THICK, OVERBUILD) TN 73 Wb7,251 5181779.25 13 528.1.1D CONCRETE CURB & GUTTER TYPE "F" LF 891 s19.53 SWAD1.23 14 528.5.4 CONCRETE TRAFFIC SEPARATOR TYPE IV, OPTION D (2' WIDE) SY 12 $126,091 41,520.28 15 .522.2 CONCRETE JW TMCKy Of SY 21 5135.89 52,853.59 16 326 -1.1 PAVERS (E)OSTING PAVERS, RELOCATE) SY 17 542.95 S730.15 17 57D -1 -2 PERFORMANCE TURF, SOD SY 320 $5.82 $1,862. 18 700.1 -11 SIGN, SINGLE POST AS 6 $338.10 $2,028.60 1$ 70D -3-101 SIGN PANEL, SINGLE POST EA 2 $131 -10 5282.20 20 708.MM SIGN PANEL. (REMOVED) EA 1 2 $1 -15 SL 30 21 705.11.3 DELINEATOR (HIGH VISIBILITY MEDIAN) (GREEWYELLOW) EA 8 $177.10 $1.062. 22 705-3 REFLECTIVE PAVEMENT MAPJ(ERS EA 10D $4.43 5443:00 23 710 -11 -19 REFLECTIVE PAINTED (ISLAND NOSE} ITE) SY 1 $15.53 51523 24 710 -11 -29 REFLECTIVE PAINTED (ISLAND NOSE) (YELLOM SY 5 41153 $77.65 25 ll -11 -121 TRAFFIC STRIPE, SOLID, THERMOPLASTIC (B" WHITE) LF 400 $1 -25 $500.00 28 711 -11 -122 TRAFFIC STRIPe SOLID, THERMOPLASTIC (8" WHITE) LF 343 51.96 $672.28 27 711.11 -124 TRAFFIC STRIPE, SOLID, THERMOPLASTIC (16" WHITE) LF 60 $4.86 $279 -60 29 711 -11 -125 TRAFFIC STRIPS, SOLID, THERMOPLASTIC (24' WHITE) LP 56 $6.15 $338.25 29 711 - 11.170 DIRECTIONAL ARROWS (THERMOPLASTIC) EA 10 $90.85 $9111.50 30 11- 1142f TRAFFIC STRIPS, SOLID, THERMOPLASTIC (6" YELLOW) LF 1509 $1.259 51,998.75 31 11.11. 231 TWFIC S TRIPE, SKIP, THERMOPLASTIC (8" YEL LOM LF tta $1.96 5231.28 32 711 - 11.224 TRAFFIC STRIPE, SOLID, THERMOPLASTIC (18" YELLOW) LF 360 $4.65 $1,677.60 33 71141.251 TRAFFIC STRIPE, SOLID, THERMO. (7-4- DOTTElYGUIDE., W YELLOW) LF 228 51.96 $442.96 34 7t1 -17 REMOVE EXIST, PAVEMENT MARKINGS LS 1 SZ,70ZSO 32,702.50 38 7374'0.1 UTILITY LOCATES, UNDERGR04JND (4) EA 2 $'!.725,00 $3,450.00 SUB -TOTAL • ROADWAY: $160.814.09 LANDSCAPING ERPROVELJIENTS 36 110.1 -1 STANDARD CLEARING & GRUBBING (1) LS 1 S980.D0 $860.00 37 580.1.1 LANDSCAPE COMPLETE•SUALLPLANTS L.S. 1 $5.21:0.00 $3211.00 38 580.1.2 LANDSCAPE COMPLETE -LARGE PLANTS L.S. 1 $0,796.83 $6,798.83 39 513Q -70 IRRIGATION SYSTEM L.S. 1 1 510860.00 $10,980.OD 40 555.1 -1 -HOPE DIRECTIONAL BORE (LESS THAN 8 tN.). RDPE L.F. 463 1.9.20 46.689 -60 41 555 -1 -1 -PVC DIRECTIONAL SORE (LESS THAN 6 W.), PVC L.F. 318 1 $9.80 $3,052.8D SUB - TOTAL - LANDSCAPING* 533,771.23 42 CC 9975 IROADWAY ALLOWANCE FI) 1 $10,003.00 510,000.00 43 1 1 ... _.........._.... PROJ£CTTOTAL: $724,585..32 New Items (Paid from Roadway Allowance) Change - $7,217.25 1 520-2-4 Concrete curb type "D" LF 1 184 1 $15.00 $2,760.00 + $2,760.00 45 526 -1 -1 Pavers SY 1 63 1 $70.75 $4,457.25 +$4,457.25 Packet Page -1803- 12/8/2015 16.E Procurernwd Servicfs Change Order Form ® Contract Modiilcatiorr 0 Work order Mocifficatlon Q Amendment Contract 9: t3 -Bi34 Change #: El Purchase O der# -. 4SM149MI Project# Wile Contractor/Mrm Name: Cornmaarsity Aephatt project Name: Construction for Intersection Improvements (SR F 90) US 41, SR1GR 061 RRR Project Manager Name: Kevin Dugan � Department 1 Transportation Engineering Original Confect W;R- t7rder Amount �4 X6g,OW i2 10 13111k OdginW BCC Approval D 'ate, Agenda ltern # Current OCC Approved Amount ��"9��.203.55781029 ... : 73 Last 33GC Appro4al /?ate; Agenda teem # Current Contract/Work Order Amourd xS 20 551;6".29• l 2v r SAP Contract Expiration gate (Master) Dollar Amount of this Change 00. 0 : 4.63% Total Change from Origin Anlotmt Revised ContrsctWork Order Total I S 21657.810 `.29 0.0096 Change from Current SCC Approved Amount Ct ulative S 1319f�.63 0.0096 Chapige horn CurrardAmount Gotnptatfon Deb, [iiaoripNon of efts Tasks) Cf>a, ind RatlanatF ior;Ihe Cftanp� ... _... Notice to Proca 1/2112014 Original �VZ =15 �L Approved 1U1f3pttt aft Data 11,'�b/21t1b Data Completion Date Late okrdss a6 eggs) 9 of Days Added (Sizieen)18 Select Tasks ® Add now task(s) ❑ Delete tasks) ❑ Change task(s) ❑ Other (tare below) Provide a response to the following: 1.) detailed and specific exptanationirationale of the requested change(&) to the task(s) and / or the additional days added (if requested); 2.) why this change was not included In the original contract; and, 3.) describe the Impact if this changa is not processed. AfLech additional information from the Design Prohssionai and/or contractor I needed. The purpose of Change Orderaf 6 (a zero (0) dour change to the contract), Is to etfacduata six rianges (described below In dataell) as the Contractor moues toward completion of this prof ed. i) This change Is to pay line mnlrador to install bops`detasctors in the signal cabinet assembly as per the plans. These sperm pay urns were added after the pro}&, t went lo bid. The bops are critical components and I not krsteHed there would be detedion Issues. 2) increase eWsdng pay Items 639.2 -1 EWch* Service Wore - Contract asaoarnt was 200 LF however in per NEC code diiscoatnacls need to be located to doset point of parxer servba. Due to FPL conflft power location had b change for an additional 480 LF, 639.34 1 Electrical Service Diccahned (FSI) - Contract amount was one (1) EA and the contractor needed to add we (1) per NEC Code to have 5V praftty m control system due to the additional wire above, an sddEtional Disowned Is raWtrasd., and 641.2.12 Prestressed Can Pole (F61) (P -11 SVC Pole) — Contract amount was one (1) and the Contractor needed b add one due FPL relocation atrforts adaarsgirhg the bcallon of thatr drops. If this work is not axnpieted the control c sbhnet would not be in cornphrice with the Natirnd uric Code. 3} Tbis change is to increase eaase sly quantities on eadstbg line Items. The increase is due b plan revision 5 ad ft additional guide signs to Griprove tratfac control. If Masse signs axe not installed the roadway would not be as safe 4) This change is to pay the cmira3dor to Install Five (5) 11 ftrrnopiaaiic Guide 5hisids that have been added to tie pmt by plan revWon I Five. This revision was requested by Collier County to improve to aFiac aonbd witty a ddif n0i guide OWL If these shields are not Instaaalled the roadway would not be as safe 5) Tbis change Is b pay the contractor to store and r - lra,dali four (4) wdsting light proles that had been In direct cached wH h the temporary Mainhnanm of Taaffc Flan in the media at stgon 107+96 N9. These poles caeca not indusisd In the oroW scope of work br the kghkq on the project as they are bayond to project kmib shown but were needed to be removed lo aoorrstruct the lampaary pavai if this dteingD is not approved the projed would tuave been un- cor�ble wb the deslg~aed and approved maintsname of trams place. 6) Sbdm (16) days have been addiW to the owtrad for weather and Holidays. Prepared b Date, _ r! (Kevin Dugan,rfsgar, Transportation Engineering division) Acceptance of this Change Order shall constriute a modification to contract / work order identified above and will be subject to all the sum 19fms and conditimm as contained in the contract / work order Indicated above, as fully as K the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor / Vendor / Consultant / Design Professional arising out of or related to the change set forth herein, lsrc udbg claims for impact and delay casts. [[ Jj Accepted by: Data, 1 a- Z? h . (Robert flelarsoa. Arai Macrnager, Community Asphalt) 1OPaga Packet Page -1804- 12.I i Approved (Stave Rftsr, Road Construction Manager, Transporlatloi Approved by, Engineering DMdon) 446y Afirmnataid. P.E. Divitedon Dir�* Transportation Engineering Wslorl) Approved (David P.E., Depsrinert)'4pad, Growth Management Departrr Approved by- f P a g e Packet Page -1805- 12/8/2015 16.E Procurement Servium Change Order Form Dste:-A� Date: DOW 12. 12/8/2015 16.E 12. Ca►� -r County GROWTH MANAGEMENT DEPARTMENT INTEROFFICE MEMORANDUM DATE: October 20, 2015 TO: David S. Wilkison, P.E FROM: Kevin Dugan SUBJECT: Summary of Change Order #6 Intersection Capacity Improvements (US 41/ SR 951) The purpose of Change Order # 6 (a zero (0) dollar change to the contract), is to effectuate six changes (described below in detail) as the Contractor moves toward completion of this project. • This change is to pay the contractor to install loops detectors in the signal cabinet assembly as per the plans. The loops are critical components and if not installed there would be detection issues. These specific pay items were added after the project went to bid. This work will performed at a lump sum cost of $3,612.55 which is available in the signalization allowance. This change is to increase sign quantities on existing line items. Also add pay item 999 - 013 Preformed Thermoplastic Guide Shields added by plan revision 5. The increase is due to plan revision 5 adding additional guide signs to improve traffic control. If these signs are not installed the roadway would not be as safe. This work will be performed at a cost of $45,333.98 which is available in the signing & pavement markings allowance. • This change is to pay the contractor to store and re- install four (4) existing light poles that had been in direct conflict with the temporary Maintenance of Traffic Plan in the median at station 1057+ 96 NB. These poles were not included in the original scope of work for the lighting on the project as they are beyond the project limits shown but were need to be removed to construct the temporary pavement. If this change is not approved, than pre existing lights would not be reinstalled. This work is to be performed for a cost of $12,422.64 which is available in the Lighting Allowance. • 639 -2 -1 Electrical Service Wire - Contract amount was 200 LF however as per NEC code disconnects need to be located to closest point of power service. Due to FPL conflicts Packet Page - 1806- -- -- -- 12/8/2015 16.E.12. power location had to change for an additional 480 LF. If this change is not approved the controls would be out of compliance with the National Electric Code. This work will increase this line item by $1,665.60 which is available in the signalization allowance. 639 -3 -11 Electrical Service Disconnect (F &I) - Contract amount was one (1) EA and the contractor needed to add one (1) per NEC code to have 50 LF proximity to the control system due to the additional wire above, an additional Disconnect is required. If this change is not approved the controls would be out of compliance with the National Electric Code. This work will increase this line item by $538.33 which is available in the Signalization Allowance. 641 -2 -12 Prestressed Con Pole (F &I) (P -11 SVC Pole) — Contract amount was one (1) and the Contractor needed to add one due to conflict with FPL. If this change is not approved the controls would be out of compliance with the National Electric Code. This work will increase this line item by $880.21 which is available in the Signalization Allowance. Packet Page -1807- cotes- cov.�r.�y Adrmish" Sens Division Procurement savior ® Contract Modification ❑ Work Order Modification ❑ Amendment 12/8/201516.E.12. Procurement Services Change Order Form Contract #: 146224 Change #: = Purchase Order #: 4500151561 Project #: 35027 Contractor /Firm Name: Compass Construction Project Name: CAT Passenger Transfer Facility Improvements Project Manager Name: Bryan Vehovec Department Public Transit & Neighborhood Enhancement Original Contract/Work Order Amount _4 k 72199 41 -0 3�Z5�jr! *'[13; Original BCC Approval Date; Agenda Item # Current BCC Approved Amount _$- �'1'tx °`3R1 "B Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount '2 „!1�a8 Q3' 11127/2015 SAP Contract Expiration Date (Master) Dollar Amount of this Change 'r$€ r: a :T,998"96 1.56%1 Total Change from Original Amount Revised Contract/Work Order Total 1 $ 3,780,152.0111 0.21% Change from Current BCC Approved Amount Cumulative Chanoes I S 58.158.01 0.21 % Change from Current Amount Completion. Date, Descri ption of the Tasks) Change and' Rationale for tfie Change Notice to Proceed 8/26/14 Original 9120/15 Last Approved 11/27/2015 evised Date 1/26/2016 Date Completion Date Date Includes this change) # of Days Added 60 Select Tasks ❑ Add new task(s) ❑ Delete task(s) ❑ Change task(s) ® Other (see below) Provide a response to the following: 1.) detailed and specific explanation/ratiomle of the requested change(s) to the task(s) and / or the additional days added (if requested); 2.) why this change was not included in the original contract; and, 3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. Question 1 and 2: This change addresses several issues as listed below. • Add line 770 - Electrical circuits for exhaust fans - $ 677.85 - This was not included in the original contract because the plans did not provide electrical provisions for these fans. This was discovered during installation of fans. • Add line 440 - HVAC Elevator Dampers - $672.00 - Original plans called for 1 hour rated firewalls in the elevator. To conform with firecode, we are required to also install a 1.5 hour fire damper. This damper was not included in the original plans. • Add line 690 - Fuel Building Concrete - $2,502.15 - Original plans called for 3 feet between the fuel tanks. The manufacturer of the tanks requires a minimum of 5 feet. This change extends the concrete slab by approximately 5 feet to accommodate manufacturer requirements. • Add line 1000 - Asphault Paving and Base - $7,125.20 - Original plans called for gravel fire access road to Davis Blvd. during construction. Fire inspector required this access road to be asphault. • Decrease line 730 - Equipment - (- $2,978.24) - Change order 1 included two air /vacuum machines to be installed at the fuel building. These machines were determined to not be needed, and were sent back. This change reflects a credit for those items. • 60 days are being added to the contract to complete the tasks, Total dollar amount change, $7,998.96. Question 3: Some of these tasks need to be completed in order to get the certificate of Occupancy. If these changes are not processed the County will need to hire other contractors to complete these tasks, at greater additional cost and delay. Prepared by: Date: IIA471 / Bryan Vehovec, Project Manager - Public Transit & Neighborhood Enhancement Acceptance of this Change Order shall constitute a modification to contract / work order identified above and will be subject to all the same terms and conditions as contained in the contract / work order indicated above, as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor / Vendor / Consultant / Design Professional arising out of or related to the change set forth herein, Inducting claims for impact and delay costs. Accepted by: /-' Date: 11/10/15 Compass Construction •. - A Approved by: Audie Robinson, Project Manager Approved by: _ P (Divisions who may require additional signatures may Include on separate sheet) Packet Page -1808- Date: 11/10115 Date: Approved by: Approved by: Approved by: _4 Steve Manager — Public Transit & Neighborhood — Public Transit & Neighborhood Enhancement ead — Public Services (Divisions who may require additional signatures may Include on separate sheet.) Packet Page -1809- 12/8/2015 16.E.12. Date: / 1 Date: // `/ 2 -Ir Date: Revised: 11/3/2015 0 impass Construction, Inc. 9/� aro o0'cxce &lzce., Bryan: 12/8/2015 16.E.12. November 10, 2015 Collier County Public Transit & Neighborhood Enhancement 3299 Tamia -d Trail East Naples, FL 34112 -4901 Attention: Bryan Vehovec RE: Facility Improvements 8300 Radio Road Time Extension In response to the numerous inspection and closeout issues that are affecting our ability to final the permits for the above referenced project, we will be extending past the current completion date. This letter serves as our formal request that an additional sixty (60) calendar days be added to the contract time for these related delays. These issues include additional permits and work associated with existing conditions in the Maintenance and Administration buildings. Some of these may be resolved by transferring responsibility from Compass to Collier County, but this will still take time to finalize through the building department and Greater Naples Fire District. There are ongoing coordination issues between Johnson Controls, Collier County Facilities and Collier County IT with regards to system integration. There is additional coordination between the site fire line and hydrants as it relates to our current Phase I contract and the future Phase II contract by others. This issue is being addressed the Fire District but again will take time to be resolved. The Fire District is consistently 10 business days out on all inspections, and as of this afternoon we were notified that they are currently 14 business days out on inspections. We have requested and paid for numerous after hours inspections to date, but even those are between 1 to 2 weeks out at this time. As always, it is our desire to move as quickly as possible to resolve all open issues and close this project out as expeditiously as possible. We will work to expedite any and all issues as they become known to us during the final stages of this project. Sincerely, COMPASS CONSTRUCTION, INC. Doug Oliver Vice President 824 Lafayette St. * Cape Coral, FL 33904 -9031 * Phone: 239 - 542 -7118 * Fax: 239 -542 -8648 wvvw.comr)assconsfruction.com * State - Certified General Contractor * License Number CG CO25919 Packet Page -1810- 12/8/2015 16.E.12. CHANGE ORDER REQUEST PROJECT: Collier Area Transit - Passenger Transit Facility Improvements COR No. 26 CTN No. 061 OWNER: Collier County Public Transit & Neighborhood Enhancement DATE: October23, 2015 CONTRACTOR: Compass Construction 824 Lafayette Street Cape Coral, Florida 33904 ARCHITECT: ATKINS North America 4030 West Boy Scout Blvd., Suite 700 Tampa FL 33607 Change Description This change order request is for the added power circuits to the exhaust fans In the fuel building in accordance with RFI #058 TOTAL ADJUSTMENT $677.85 When signed by the CM and Owner's Representatives, this document becomes effective and upon receipt the Construction Manager shall proceed with the changes described above: Compass Construction Packet Page -1811- Owner's Representative Date Revised Value d. ed circuits for exhaust fans) r: r TOTAL ADJUSTMENT $677.85 When signed by the CM and Owner's Representatives, this document becomes effective and upon receipt the Construction Manager shall proceed with the changes described above: Compass Construction Packet Page -1811- Owner's Representative Date 4MP nstr un, Inc. 12/8/2015 16. E.12. REQUEST FOR INFORMATION ( "RFI ") Project Name: (CAT) - Passenger Transit Facility RFI No.: 058 Improvements Title: Fuel Bldg Exhaust Fan Power Compass Project No.: 14 -1265 Reference: E -301, MP -101 Issue Date: 08/08/2015 Requested by: 08/11/2015 Issued To: Issued By: ATKINS North America Attn: Audie Robinson Compass Construction, Inc. 4030 West Boy Scout Blvd. Doug Oliver Suite 700 824 Lafayette Street Tampa, FL 33607 Cape Coral, Florida 33904 RFI Question: Drawing MP -101 shows exhaust fans EF -1 and EF -2 (Note EF -3 was deleted). However, Electrical Drawing E -301 does not provide electrical provisions for these fans. Please provide direction and electrical design for power to EF -1 and EF -2. Receiver's Reply: Provide (2) 120V, toggle switches (1)for EF -1 & (1) for EF -2 and circuit each one to a dedicated 20AMP spare breaker in panel LA2 -2 located in room 103. Reply Date: 08/18/2015 References: Spec Section Codes: N/A Attachments: Note: This reply is not an authorization to proceed with work involving additional cost, time or both. If any reply requires a change to the Contract Documents, a Change Order, Construction Change Directive or a Minor Change in the work must be executed in accordance with the Contract Documents. Packet Page -1812- 12/8/2015 16.E.12. Page 1 of 1 ,,raven Teehno/o 1'reiiabl pr fe t1a1s GULF COAST POWER & LIGHT / EC# 13 004060 DATE PROPOSAL# August 27, 2015 CAT022 CLIENT NAME SITE ADDRESS Compass Construction, Inc. Collier Area Transit Facility 824 Lafayette Street 8300 Radio Road Cape Coral, FL 33904 Naples, FL 34014 Project #1265 Pay Item Description Labor Material Total Cost 001 Furnish and install (1) dedicated 20 amp circuit for EF -I and EF -2. The circuit brought to (1) dedicated 20amp spare breaker within Panel LA2 -2 located in room 103 as found on drawing E -301. Includes (2)-120 volt toggle switches - 1 for EF -1 and 1) for EF -2. $420,00 $225.57 $645.57 Notes: 1. All labor and material as indicated. TOTAL CONTRACT : ................ ............................... ........................$645.57 Proposal based on prints and specifications listed below: Prints: No Pages:none Specs: none Addendums: none Permits: n/a Maintenance of Traffic: By others Please sign and return one copy if all terms are accepted. Thank You. Signature. Gulf Coast Power & Light 200 Waldo Ave. North #1 Lehigh Acres, FL 33971 Ph: (239) 344 -7202 cpi(@.izu Ifcoastnowerandlieht.com www.izulfcoastpowerandii2lit.com Packet Page -1813- So 32,38 $677.85 Date 12/8/2015 16.E.12. CHANGE ORDER REQUEST PROJECT: Collier Area Transit - Passenger Transit Facility Improvements COR No. 27 CTN No. 062 OWNER: Collier County Public Transit & Neighborhood Enhancement DATE: October 23, 2015 CONTRACTOR: Compass Construction 824 Lafayette Street Cape Coral, Florida 33904 ARCHITECT: ATKINS North America 4030 West Boy Scout Blvd., Suite 700 Tampa FL 33607 Change Description This change order request Is for the added Tire dampers in the administration building elevator equipment room, in accordance with RFI #059 Line Item B Description SS Value Revised Value Adjustment 430 HVAC - Elevator added dampers) 5 040A0 5 712.00 $672.00 I U I AL AUJUO I MtN 1 $672.00 When signed by the CM and Owner's Representatives, this document becomes effective and upon receipt the Construction Manager shall proceed with the changes described above: Compass Construction Owner's Representative Dale Date Packet Page -1814- 0 12/8/2015 16.E.12. OtYi�dSS consiructlon, lnc. REQUEST FOR INFORMATION ( "RFI") Project Name: (CAT) - Passenger Transit Facility RFI No.: 059 Improvements Compass Project No.: 14 -1265 Title: Elevator Machine Room Dampers Reference: G- 010 -AI, M- 101 -AI Issue Date: 08/08/2015 Requested by: 08/11/2015 Issued To: Issued By: ATXINS North America Attn: Audie Robinson Compass Construction, Inc. 4030 West Boy Scout Blvd. Doug Oliver Suite 700 824 Lafayette Street Tampa, FL 33607 Cape Coral, Florida 33904 RFI Question: Drawing G- 010 -A1 and other architectural drawings show the elevator equipment room walls as 1 -hour rated walls. However, M- 101 -A1 does not call for fire dampers on the supply or return ductwork. Please advise if dampers are required at these locations and if so provide details for the type of dampers required. Receiver's Reply: Provide 1 112 hour vertical fire dampers and access doors on 10x6 supply duct and 12x6 return duct per specification section 23 33 00 - Air Duct Accessories and detail attached. Coordinate with other disciplines and General Contractor. - Kellie Ramos Reply Date: 8 -11 -2015 References: Spec Section Codes: N/A Attachments: 1, Fire Damper Installation Detail 1 2. Specification section 23 33 00 - Air Duct Accessories Note: This reply is not an authorization to proceed with work involving additional cost, time or both. lfany reply requires a change to the Contract Documents, a Change Order, Construction Change Directive or a Minor Change in the work must be executed in accordance with the Contract Documents. Packet Page -1815- MECHANICAL CONTRACTOR To: Compass Construction Attn: Carlo Date: 8 -4 -15 Phone: Job Name: CAT Facility Location: Naples Job Number: M4270 C R #: 03 12/8/2015 16.E.12. Change Request Florida Hydronic Solutions, Inc, is pleased to submit a proposal for labor and materials to perform the additional HVAC work for the project listed above per request or revised documents and the stipulations of this proposal. Inclusions: • Install fire damper on supply and return duct into Elevator Machine Room. Exclusions: • Permit fees. • All interlock wiring for equipment to fire alarm system. • Access Panels other than duct doors. • We do not include coordinated or scaled shop drawings for duct or piping. General Conditions: • Concrete bases, roofing and roofing insulation, structural supports, ceiling removal or replacement, cutting, core drilling, patching, painting, framing of openings for floors, walls and ceilings are excluded from this proposal unless specifically mentioned above. • We do not include coordinated or scaled shop drawings for duct or piping. • Conduit, line voltage wiring, disconnect switches, starters which are not an integral part of the equipment, line- voltage thermostats, and power connections to all mechanical equipment. • Price is based on installation prior to framing work. If framing is installed prior to ductwork, than additional charges will apply beyond this estimate. • Rectangular ductwork sized 100sgin or less may be converted to round duct. • All work is priced to be performed during normal working hours. • FHSi complies with all applicable codes, standards and safety requirements. • Payment terms are net 30 days from date of invoice. • Due to possible price escalation beyond our control, this proposal and price is based on acceptance within 90 days of proposal date. Allow us the opportunity to plan and prevent price increases by contacting us within base period. Acceptance after 90 days may be subject to equitable adjustments. • Specifications adhere to that of the executed project contract between FHSi and Cray Construction Total price as outlined above: $ 640.00 Respectively Submitted Florida Hydronic Solutions, Inc. David West P: 239 - 599 -8371 E: david(a,,fihydro.com Accepted By: (signature) Printed Date Accepted: 7951 MERCANTILE ST, NORTH FORT MYERS, FL, 33917 PH 239.5998371 FAX 239.5998441 WWW.FLHYDRO.COM CMC1249681 CAC1815126 Packet Page -1816- 12/8/2015 16.E.12. From: Robinson. Audle To: VehovecBryan; Doug Dilver Cc: Carlo Isola Subject: RE: Damper Sleeves RFI #058 Date: Friday, September 18, 2015 12:18:57 PM Doug, This is acceptable. Please coordinate with the AHJ as needed. Regards, Audie Robinson, AIA, LEED® AP Senior Architect/Project Manager, TPO Architecture ATKINS North America COA AAC000723 4030 West Boy Scout BI, Suite 700 Tampa FL 336071 Tel: +1 (813) 281 7686 1 Cell: +1 (813) 313 7707 Email: audie . rob! nson(o]atkinsalobal.com I http: / /atkinsdesign.com I http: / /www.atkinsglobal.com From: VehovecBryan [ mailto :BryanVehovec @colliergov.net] Sent: Friday, September 18, 2015 11:40 AM To: Robinson, Audie; Doug Oliver Cc: Carlo Isola Subject: RE: Damper Sleeves RFI #058 Sorry, it was actually #59, the damper sleeves. I think there's been a mixup with the RFI numbers on Compass' end. Remember, Atkins was to confirm whether 20 gauge metal was acceptable... Bryan Vehovec, Project Manager Collier County Public Transit & Neighborhood Enhancement B ;yanVehovecaa collier- ov.n t (239) 537 -0716 mobile (239) 252 -4994 office From: Robinson, Audie [ mailto: Audie .Robinson(&atkinsolobal.com] Sent: Friday, September 18, 2015 11:36 AM To: VehovecBryan; Doug Oliver Cc: Carlo Isola Subject: RE: Damper Sleeves RFI #058 Bryan, May be this was a Newforma issue why the formal reply may not have been received or downloaded. This should have been received 8/18. Regards, Packet Page -1817- 12/8/2015 16.E.12. Audie Robinson, AIA, LEED® AP Senior Architect/Project Manager, TPO Architecture ATKINS North America COA AAC000723 4030 West Boy Scout BI, Suite 700 Tampa FL 33607 1 Tel: +1 (813) 281 7686 1 Cell: +1 (813) 313 7707 Email: audie .robinsona0atkinsglobai.com I httDI /atkinsdesian.com I httn: //www.atkinsolobal.com From: VehovecBryan [ mailto :BryanVehovec(@coliiergov.netj Sent: Friday, September 18, 2015 11:23 AM To: Robinson, Audie; Doug Oliver Cc: Carlo Isola Subject: RE: Damper Sleeves RFI #058 Did we ever get an answer to this? Bryan Vehovec, Project Manager Collier County Public Transit & Neighborhood Enhancement Bryan Vehoyec0collieigov.net (239) 537 -0716 mobile (239) 252 -4994 office _ ..._.. _. _ . _. __.__. .............. _..._... _ From: Robinson, Audie [mailto: Audie .Robinson(&atkinsglobal.com] Sent: Wednesday, September 09, 2015 9:22 AM To: Doug Oliver, VehovecBryan Cc: Carlo Isola Subject: RE: Damper Sleeves RFI #058 We called our engineer and are waiting to hear from them. Regards, Audie Robinson, AIA, LEED® AP Senior Architect/Project Manager, TPO Architecture ATKINS North America COA AAC000723 4030 West Boy Scout BI, Suite 700 Tampa FL 33607 1 Tel: +1 (813) 281 7686 1 Cell: +1 (813) 313 7707 Email: Aud le. robinsonOatkinsglobal.com I htID: / /atkinsdesign.com I httn: / /www.atkinsolobal.com From: Doug Oliver fmaiIto:doliver(@compassconstruction.com Sent: Wednesday, September 09, 2015 8:56 AM To: VehovecBryan; Robinson, Audie Cc: Carlo Isola Subject: RE: Damper Sleeves RFI #058 Packet Page -1818- 12/8/2015 16.E.12. I haven't seen anything Doug Oliver Vice President Oompass conshuction, Inc. 824 Lafayette St Cape Coral, FL 33904 Ph: (239) 542 -7118 Fax: (239) 542 -8648 www.compassconstruction.com APlease considerlhe environment before printing this e-mail _ _ . ..... _......_ From: VehovecBryan [mal Ito: Bryan Vehovec(d colliergov.net] Sent: Wednesday; September 09, 2015 8:55 AM To: Doug Oliver; Robinson, Audie ( Audie .Robinson(a�atkinsalobal.com) Cc: Carlo Isola Subject: RE: Damper Sleeves RFI #058 Have we received an answer to this? ....... - From: Doug Oliver [ matlto: doliver (a)compassconstruction.com] Sent: Thursday, September 03, 2015 11 :26 AM To: Robinson, Audie ( Audie .Robinson@atkinsgiobal.com) Cc: VehovecBryan; Carlo Isola Subject: Damper Sleeves RFI #058 Audie, In follow up to our discussion during Tuesday's construction meeting, I am providing you with a copy of the proposed Fire Dampers including information showing that the standard sleeve are provided at 20 gauge material. Please confirm that this is acceptable. Thank you, Doug Oliver Vice President ey 8mpos5 Conslructlon, Inc. 824 Lafayette St Cape Coral, FL 33904 Ph: (239) 542 -7118 Fax: (239) 542 -8648 www.compassconstruction.com FWA Please consider the environment before printing this e-mail Packet Page -1819- 12/8/2015 16.E.12. Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. The IS team in Atkins has scanned this email and any attachments for viruses and other threats; however no technology can be guaranteed to detect all threats. Always exercise caution before acting on the content of an email and before opening attachments or following links contained within the email. This email and any attached files are confidential and copyright protected. If you are not the addressee, any dissemination of this communication is strictly prohibited. Unless otherwise expressly agreed in writing, nothing slated in this communication shall be legally binding. The ultimate parent company of the Atkins Group is WS Atkins pla Registered in England No. 1885586. Registered Office Woodcote Grove,'Ashley Road, Epsom, Surrey KT18 5BW. A list of wholly owned Atkins Group companies registered in the United Kingdom and locations around the world can be found at htto' / /www atkinsolobal com /site- services /arouo- comoanv registration- details Consider the environment. Please don't print this e-mail unless you really need to The IS team in Atkins has scanned this email and any attachments for viruses and other threats; however no technology can be guaranteed to detect all threats. Always exercise caution before acting on the content of an email and before opening attachments or following links contained within the email. The 1S team in Atkins has scanned this email and any attachments for viruses and other threats; however no technology can be guaranteed to detect all threats. Always exercise caution before acting on the content of an email and before opening attachments or following links contained within the email. Packet Page -1820- 12/8/2015 16.E.12. CHANGE ORDER REQUEST PROJECT: Collier Area Transit - Passenger Transit Facility Improvements COR No. 30 CTN No, 085 OWNER: Collier County Public Transit & Neighborhood Enhancement DATE: October 23, 2015 CONTRACTOR: Compass Construction 824 Lafayette Street Cape Coral, Florida 33904 ARCHITECT: ATKINS North America 4030 West Boy Scout Blvd., Suite 700 Tampa FL 33607 Change Description This change order request Is for the costs to rework the formwork for the fuel tank pads and extend the fuel building slab in order to accommodate the spacing required by code as Interpreted by Phil Snyderburn pursuant to RFI #055 TOTAL ADJUSTMENT $2,502.15 When signed by the CM and Owner's Representatives, this document becomes effective and upon receipt the Construction Manager shall proceed with the changes described above: Compass Construction Packet Page -1821- Owner's Representative Date Description Fuel Building - Concrete TOTAL ADJUSTMENT $2,502.15 When signed by the CM and Owner's Representatives, this document becomes effective and upon receipt the Construction Manager shall proceed with the changes described above: Compass Construction Packet Page -1821- Owner's Representative Date ®t'1'i�ASS Construction, Inc. 12/8/2015 16.E.12. REQUEST FOR INFORMATION ("RFI ") Project Name: (CAT) - Passenger Transit Facility RFI No.: 055 Improvements Title: Separation between Fuel Tank Slab Compass Project No.: 14 -1265 Reference: Stillwater PE102 Issue Date: 04 /30/2015 Requested by: 05/04/2015 Issued To: Issued By: ATKINS North America Attn: Audie Robinson Compass Construction, Inc. 4030 West Boy Scout Blvd, Doug Oliver Suite 700 824 Lafayette Street Tampa, FL 33607 Cape Coral, Florida 33904 RFI Question: Guardian Fueling Technologies is asking for 5' between the tanks, which means we would need 5' -10" between the fuel slabs, as laid out right now we have 3', if we move the south tank to where it needs to be we push out all of the bollards and extend the slab on that side approx 3'. Refer to page to Stillwater drawing PE 102. Please advise. Receiver's Reply: This RFI is now closed since the Contractor has provided the following solution which has been approved by County Environmental: The Contractor "ended up having to extend the slab and the bollards towards the back of the building as originally anticipated. Phil Snyderburn, who reviews and inspects all of the petroleum projects for Collier County reviewed the situation and advised on the required spacing which required extending the slab." Reply Date: References: Stillwater PE102 Spec Section Codes: N/A Attachments: Stillwater Tank layout Note: This reply is not an authorization to proceed with work involving additional cost, time or both. If any reply requires a cbange to the Contract Documents, a Change Order, Construction Change Directive or a Minor Change in the work must be executed in accordance with the Contract Documents, Packet Page -1822- r „ 12/8/2015 16.E.12. sY�sr�Pif __ _ _ C0� -- FILTRATION UNIT (TYPICAL OF 2) Note: This reply is lot an authorization to proceed with work involving additional cost, time or both. If any reply requires a change to the Contract Documents, a Change Order, Construction Change Directive or a Minor Change in the work must be executed in accordance with the Contract Documents. Packet Page -1823- ompass construction, Inc. REQUEST FOR INFORMATION ("RFI ") FILL WITH POSITIVE SHUT OFF DROP TUBE (TYPICAL OF 2) • ' CLOCK GAUGE (TYPICAL OF 2) r _ _� - -ALTER SUPPLY (TYPICAL OF 2) B' SECONDARY EMERGENCY VENT (TYPICAL I i O 1 1 O��~ I ( • —18' MANWAY (TYPICAL OF 2) R' PRIMARY EMERGENCY VENT (TYPICAL OF tom — LEYEL PROBE (TYPICAL of 2) 0 I I Off—" L— __ -- ---FILTER RETURN (TYPICAL OF 2) . I G i °'" . This area of the slab and bollards would be pushed wL ___ ___� L ___ _�• Out. sY�sr�Pif __ _ _ C0� -- FILTRATION UNIT (TYPICAL OF 2) Note: This reply is lot an authorization to proceed with work involving additional cost, time or both. If any reply requires a change to the Contract Documents, a Change Order, Construction Change Directive or a Minor Change in the work must be executed in accordance with the Contract Documents. Packet Page -1823- 12/8/2015 16.E.12. June 26, 2015 Doug Oliver Compass Construction, Inc. 824 Lafayette St Cape Coral, FL 33904 Ph: (239) 542 -7118 Fax: (239) 542 -8648 RE: CAT Fuel Station Building — Radio Road, Naples We are pleased to offer the following proposal for the above referenced project including the following scopes of work: ➢ Clean-up and re -prep building pad /foundation; relocate two fuel tank pads. Our proposal includes labor, material, equipment, applicable taxes and insurance. This proposal is based on instructions from Carlo, Total Change Order request: $1,350.00 67.50 1.417.50 Qualifications & Clarifications: ➢ SGC will take layout and grading from +/- 1 /10a' of a foot, done by others, prior to commencement of work. All building corners to be pinned by others. All final grades, elevations and benchmarks for work to be set by others The following items are EXCLUDED unless specifically listed above: ➢ Any and all demolition ➢ Any other concrete work ➢ Soil treatment ➢ WWM slab reinforcing ➢ Testing ➢ Curb and gutter ➢ Dumpster Enclosure 1 Packet Page -1824- 12/8/2015 16.E.12. ➢ Pavers ➢ Initial excavation, excavation, backfill and compaction for other trades work. ➢ Caulking of any construction joints or paving joints or sealants ➢ Stainless steel fasteners or accessories ➢ Furnishing and/or setting of door and /or window frames, sub - frames, or door /window bucks. ➢ Supply of embedded items, i.e. anchor bolts, weld plates, bearing plates, angles, truss straps, reglets, wedge anchors, ledgers, steel lintels, etc. ➢ Any other work not specifically listed above ➢ Permit or inspection fees ➢ Safety, other than as it relates to our scope of work ➢ Premium time for accelerated schedule ➢ Southern Gulf Construction, Inc. will not be responsible for the placement or location of sleeves and penetrations for other trades, but will assist in the coordination thereof. General Contractor Requirements: ➢ General Contractor is responsible for permits and fees. ➢ General Contractor is responsible for dewatering and /or gravel if necessary. ➢ General Contractor to provide power and potable water. ➢ General Contractor to provide adequate benchmark and all building corners. ➢ General Contractor to provide reasonable access for the delivery of materials and equipment. ➢ General Contractor to provide washout area for concrete trucks. ** Back charges will not be accepted without prior written notification and due process * ** PAYMENT TO BE RECEIVED BY SOUTHERN GULF CONSTRUCTION: Within agreed contract terms All material is guaranteed to be as specified. All work to be completed in a professional manner according to standard practices. Any alteration or deviation from above specifications may result in additional charges. Venue shall be Leo County, Florida. This-proposal is subject to acceptance within 30 days and is void thereafter at the option of the undersigned. Terms: Net 10 days. Accounts past due are subject to finance charge of 1 'r4% per month, 18% per annum, and any attorney's fees. SGC is not responsible for damage due to natural disasters, Prices are subject to change without notice due to material price increases. 130-ly S-fO� Bob Stone Vice President Fa Packet Page -1825- Acceptance / date 11 21812015 16. E. M"PIRM Construction Ince ntractors Structural Con eta' Cox -F 367 Pine island Road North Fort Myers, FL 33903 (P) 239-656-4533 (F; 239-656-3066 CBM 119FIJI, 0 july 8, 201-5 Doug Ohi•"rer Comnu S": Construction, JPc Q ��' I'L K. '. n Fl IM4 ,-ap,- Cn,al, t(23`9) 54-2-71118Fax: (239,1542-8648 -. _. CAT Duel Station BuEffirg — aptes We a;.-,-- �o 4 pleased to offer the. folljovvi-ng propc,&�l -' r the abovc re-fr-fell-1-31C !311"T�cl inchadiing the -ov"!2" scenes of vvoi�': R evi- se Fuel Buildlir'g S12-I-) cn, GraJ:E. Our proposal includes labor, material, equipment, applicable taxes and insurance. n -a Ce, otal Change Order reali-est: $1.033.00 U I , Lill Q - A uaiffications & Clarificatio-as: SGC will take layout and grading from 0 Cif WGd L _ I of a foot, done by oth(',rs, pnor to C K. A-11 revisions per f,,'��'d iuslructjcrlbl. . I.- : i I I � I ��' fallow`ng ft2mE are.2-yCT- UT)E`� -:U So;'. treatinent Supply of embcd-.1,2d iten-is, i,,-. anchorbolis, an�j— L-1 reglets, wedge anchors, ledgers, st--,-,l lintels, etc. Any other work not specifically listed abov;e Permit or inspection fees > Safety, other than as it relates to our scope of work Premium time for acce'Ierat.td, sc.,heJloj- SOT-It-heY!I G-alf C-01-18117,1c'.,-or, 1rac, n— -."or Y". L U d pentlrat'o;-s for othr-'r 'flao'c", 'o u( flry Packet Page -1826- 12-02015 16.E.12. on, , ers] Contractor Requirem),ents: Gcntral 'Contractor for per uits and fees, C --fal Contraci.or res-,ponsi-,iC for devv ate !-Mg and./or rmsve! ff ncc ssaq, Contractor to p7 crvidt- power and potabl-- water. ➢ General Contractor to provide adequate benchmark and all building comers, Gjcmerat Contractor to provide .-�-_qsn_nable access for tht-, dtlivtny Of mater a',s nd r-- n', �cncral Contractor to provide washout area for concrei'3 trucks. 1-,ack ch-axacs will not 15z; accep�ed 1?vOInout pTior wriit-m no - -Y 0 C I r� I ati :- a d 'UUe ID170cesS FIE RE r, I J -Fuf"; (3 1.7-F, 7"0. `-'E'�T-F' o �s P M Mi. o F; Ch E-Zf-S. V Lo .l ty, F a. s PjLi��C.' Wft it r_ 30 days z.-, o;d, at nnt:c)T: of j 2., -'C= _ N !0 dpys kccount, pL' - ' s. fb-mnct charge of 1 !•Ar, pc,- al�lnth' LTLnU)m, anj any attmuty's R=. S'-IC i,' 110[ responsible for damage due to natural d;'sasrers. Prices are subject to chang,- v,�thout notice du-, to material Ex-,ce, 'Packe'' Page 12/8/2015 16. E.12. CHANGE ORDER REQUEST PROJECT: Collier Area Transit - Passenger Transit Facility Improvements COR No. 28 CTNI No. 063 OWNER: Collier County Public Transit & Neighborhood Enhancemeni DATE: October 23, 2015 CONTRACTOR: Compass Construction 824 Lafayette Street Cape Coral, Florida 33904 ARCHITECT: ATKINS North America 4030 West Boy Scout Blvd., Suite 700 Tampa FL 33607 Change Description This change order request is for the added cost to provide the 1" construction asphalt course at the rear entry road off of Davis as required by Collier County for Bus Access. TOTAL ADJUSTMENT $7,125.20 When signed by the CM and Owner's Representatives, this document becomes effective and upon receipt the Construction Manager shall proceed with the changes described above: Compass Construction Packet Page -1828- Owners Representative Date i i ME Asphalt Paving and Base c. r _Mllrri TOTAL ADJUSTMENT $7,125.20 When signed by the CM and Owner's Representatives, this document becomes effective and upon receipt the Construction Manager shall proceed with the changes described above: Compass Construction Packet Page -1828- Owners Representative Date i i ME 12/8/2015 16.E.12., FoFZT MYERS, FL 33913 P is ?39. 246 -13 E 0 F ,&x: 239 -332 -i 329 Fequast,'bir C'f','ange Orr-l-or H Q P,(: P?v� Con aiructiz is Ci AsPhah on Exitt Road to Nevis Blvd, Compass Construction, Inc. Ll 71�7;� G;lwc, 1 C- (a !A .2n' 3„ 2 - 5 4 2 - (1'c ii� asp poi vr-n�r,,:,comDp,,ssconqtructic)n.co,,n rt 1,'07.00 71:--1 7"l 11 TOTAL 6., 7 1 339,29 7, `25 . 20 erg 71 r: v i 1,4 !'� M, E 7"U G R �.D FE D Fl P R 0 V A C s iv, TV� D�,-*clr:� Bv: '12'iS120 15 16.E.12. CHANGE ORIDER REQUEST PROJECT: Co!;'Ier Area Transit - Passenger T ransit Facility Improvements CCR No. 29 Ss Vain- j i et lecd Value Adjwstrriant =N No. 064 UvJ ER: Collier Ccuri v Pubii-. Ne!nbc,rhood --n-arizernzn! jAT E; rU',---,Dcr 23, 2015 CONTRACTOR: Compass Construction _L2L7 824 Lafayette Street Cape Coral, Florida 33904 ARCHITECT: ATKi N S Noi-Lh Arncr;ca 4030 West Boy Scout Blvd., Suite 700 Tamp, Ft- 33607 Ch,�n,,)Ee Dc�cnpflfjr is to c L!11 l'ie ccst c" the i. v air,NFc -0 7nc:T:-+' •i u"l- ._ :.J' '� fc! 1, "-!F! ✓'-;!:jmG ;c: OTAL ADjUST ENT - $2,176:24 Wheii signed by 'he CM and Owner's Representatives, this documen', bec-cmes effective and upon receipt the Construcilon Manager shall Proceedwith ths- changes desc.;�-'Zd anv�: P a c k a -L- Pa g e - 18 3 0- IM LlnItem fi, Description Ss Vain- j i et lecd Value Adjwstrriant 730 IEovipmerit S24nJ70.00 T 19171. (52.978.24 L _L2L7 OTAL ADjUST ENT - $2,176:24 Wheii signed by 'he CM and Owner's Representatives, this documen', bec-cmes effective and upon receipt the Construcilon Manager shall Proceedwith ths- changes desc.;�-'Zd anv�: P a c k a -L- Pa g e - 18 3 0- IM 12/8/2015 16.E.12. DoLm-Oliver From: Frank H`;LIb'C,3M'J <; ui�7ard�gUarGianTUEI?cCi1 ,CDii1> sc—t: F: - i _� a Y, u� u S IL 21, 2 %i_. 10: 0 4- A M To: Doug Oliver; Ohris Collura Cc: Carlo Tsola; Nancy A. Wood; Richard Ashton Subiect: RE: Delete (2) air/ vacuurn combo stationtz. Doug, L)!­_ t,.._ v Of bo� vv, 7' r 0 10, a ;v:: tz,l r- edit So, ry fir the m1fusion, Frank Hub!-ard Cc, Carlo Isola; N;anc, A. Wood; A hton Subject: RE: Delete (2) air /vacuum combo stations t 1,1U, T11' �-c, hol;,,7 tj]l' r.OUnf,,� vvants to 11 a cmfm�l J $3�992.2-'1, C,017reCt? DOag C) ,'r Vice Pr,4s�denll Ph: (2' )9) 542-71.1 Fax; (2 9) 542 -z,_"`)'4S) L P�. r :Cka Page r 12/812015 16.E.12. Freon: Franc Hubbard [ mailto: FI- 3ubbard@guardianfueltech.coml Seat: Friday, August 21, 2015 8:54- AM To: Doug Oliver; Chuffs Collura Cc: Carlo Isola; Nancy A. 'Wood; Richard Ashton. Subject: RE: Delete (2) air /vacuum combo stations Doug, Vr:, t.aV e CA i? .. .i) thc ilalU'_:1 tuter and t 1:.Y \NFL [di:e Ll.. U.;:l.t; ;1[cC,i 'vided f ._:;Y 1 G ;.1' Ch at the factory without any damage. Per tlhe contract there is a 25 % restocking fee and freight charged each way which tota.is °,700.00. Please Itt nac ! nmv how you w0uld like to 2; OCeC'd, l grant;.. :ft?�;� _•.;.�., -1 ) _ {I CT1: I' ? lliCt70Ii.COni Sent: '`We1rPs;'ay. Aul-,1 19, 2015 12:04 FM To: Clris Cailli? Cc. Frank _ .bUard; ��c so, ta, Nancy A.. Wood; tZic an, AsiCVi: Subject: 1?e: Delete (2) air /vacuum combo stations Any update an retiirmng thcs;e u;,.its? Rl'cs.' dent 12 Lafa,,' ,te Cod.' .LEI Q04 2 Packet Page -'l 332- i i 121W20115 16.E.12. Ph: (239) 542-7118 Fax: QY 53 j�42-8648 _ coni Jrcl C-1.1 on'col 0-2 Aug I 7, 2015, at 7:35 .k'rv', Chris Collura <Qf _Ay1ruf uardianf u e 1tech.cony wrote: Our purchasing manager has inquired about returning the un=its. We have already purchased rile 7 iill Men vo It an answer on Mocking. if they MR ns rcstocj.,-. thcI-_n,, then M County SH have to nA of thern since the changc _�_uti has lth-_ti-i aapprov d. Chris Collura Diir°ctor of G-.,.arJian 7tcl_nol -!gics " CO) S13-918-2177 ('C) c�c m �]Lura!�_ �U1rjiaanft1('1tcch.c'_)rr GU[ Plmse consider the priinting this e-mail, This rnussagz contains i:)R-,,nz.ation,, and 15 inte;pdJ,d only -LJ-.'C 1 ,-1d1vijual- z_"nilc. , i-" VOID are no the named adlussEL you sihould not disse]--riinate, distribute, oj: copy this c-17nail. Please notify -."'he in,_rwd"­_�Lely by c-nidl if you have received this jj by n-ii-stake your S; :. -;7, MY] 1Ln_,nsrn­iss20n cani-jot 1-c- guai.-r;n-,ecd ,,o 'bo Stcure cr los" not ccce"p", for any ")r gc' C. From]: noug [i� " 12r_,'Aay: j �'�:20 Al-A Tc: TOO 1115301 Packet Page -1833- CL 1-is Collura; Carlo lsola Subject: RE: Delete (2) air/vacuu-in combo stations if th talle Ifficimi bac« Wag, Oliver TO: Thesides Ow Cxza% IFL 904 «/221 -118 Rn 039) 5408648 P -F`Jea.sC consider tht environm-cnt before, printing -L.hJs P--mail From: MIC Fwb".ard [qLaiI,Lo-.I-'Hubbard @ AugSt I % 2015 1,0:-6 A-N.L Cc \CGCLo26= RE: Dcdot= (2) - /v :am conobo srql ins 2 "12/8/2015 16.E.12. � 2s WT Wdy bwn &A ard Appod. 11"w"D options ?'--c :dg OnG ACM to It --�,tin"y a-, in \- s: orc`m "-C - 3x613 2 "htm- Twarni, Packet Rage -1834- '1"2-18/2015 16.E.12. mm: Doug Oliver f!! 5»o :6o2v r@com ass oast cloll.co Sent: Friday, August 114, 2015 8:57 & -1 ,Frank Hubbard CG CbriaColl7K CJIo\da Subject: DJ «r (2) /vacuumj coml L bo m £31»e G delete Chet o aii&a ,»m *etas that were previously added as can order ryl y ±= a=te; of$4, 2',Af R ±dew t : ± coon, d o ,A not :- ix« AeId2�i. ~ Dou- Oliver Vice PSd f dm c 0®; 8241,a-fayetfe y Uapc Cu dL.J39 ! 23 3 2 542-7118 y Q23 542-8 6-11.8 rs ' y yam q y m ttay'J pack'et Page a G3 L, t� o a N v � m c a � .a 1 c IV E � oc > o -p o U C Z ea M N Q N N L a� o � U N O 3 12/8/2015 16.E.12.