Agenda 12/08/2015 Item #11B12/8/2015 11. B. EXECUTIVE SUMMARY Recommendation to award Contract No. 15 -6519 — Lely Area Stormwater Improvement Project ( LASIP), Wingsouth Stormwater Improvements and Sandy Lane Interconnect Stormwater Improvements, to D.N. Higgins, Inc., in the amount of $ 3,513,224.50, Project No. 51101. OBJECTIVE: To continue with the construction of the Lely Area Stormwater Improvement Project ( LASIP) by awarding contract No. 15 -6519, for Wingsouth Stormwater Improvements (the base bid) and Sandy Lane Interconnect (alternate bid), to D.N. Higgins, Inc., the lowest, responsive and qualified bidder. CONSIDERATIONS: This is the final large LASIP construction activity to take place. It is made up of two parts: (1) The Wingsouth Improvements, consisting of two channels and three new weirs lying in the vicinity of the Wingsouth Airpark runway, and (2) the Sandy Lane Interconnect, a ditch that connects the Wingsouth stormwater system to the system along Santa Barbara Blvd. These two parts of the project were designed by different firms, and were combined for this construction effort because of their contiguous nature to achieve simplicity and efficiency. LASIP construction began approximately ten years ago and consists of twenty -nine portions (see phasing map, attached). After Wingsouth and Sandy Lane are constructed, only two small portions will remain consisting mainly of ditchwork, a few structures, and minimal piping. These are the Cope Lane and Crews Road portions. The "Invitation to Bid" advertisement for the LASIP/Wingsouth and Sandy Lane Interconnect Stormwater Improvement construction was posted on September 15, 2015, in the Naples Daily News. Also, 2,373 notices were emailed to subscribers and 131 vendors downloaded the specifications. The following seven (7) bids were received by the October 22, 2015 due date: The Purchasing Division tabulated and verified the bids. D.N. Higgins, Inc., is the apparent low bidder. Staff and the design consultants performed a bid analysis to determine if there were any anomalies in the bids, and noted no discrepancies. These bids compare well with the total Engineer's Estimate of $3,845,354.75. D.N. Higgins's bid was 8.6% below the Engineer's Estimate. Packet Page -344- Contractor Bid 1 D.N. Higgins, Inc. $ 3,513,224.50 2 Quality Enterprises, Inc. $ 3,594,001.20 3 Public Works Constructors $ 4,055,595.26 4 Mitchell & Stark Construction Company Inc $ 4,472,206.39 5 Haskins Inc $ 4,584,960.80 6 Coastal Concrete Products, LLC $ 5,386,515.95 7 Kelly Brothers Inc $ 6,201,114.80 The Purchasing Division tabulated and verified the bids. D.N. Higgins, Inc., is the apparent low bidder. Staff and the design consultants performed a bid analysis to determine if there were any anomalies in the bids, and noted no discrepancies. These bids compare well with the total Engineer's Estimate of $3,845,354.75. D.N. Higgins's bid was 8.6% below the Engineer's Estimate. Packet Page -344- 12/8/2015 11. B. Therefore, staff recommends awarding the construction contract to D.N. Higgins, Inc., the lowest responsive and qualified bidder. FISCAL IMPACT: Total funding needed is $ 3,513,224.50. The project was approved by the Board of County Commissioners (BCC) in the FY 2016 budget. Source of funds will be grant funding and ad valorem. Additionally, South Florida Water Management District (SFWMD) Agreement #4600003312 was approved by the BCC on 10/13/2015 to provide Stormwater grant assisted funding for this project. A summary of all funding sources is as follows: Fund Type Amount Project 711 GMD Grant Fund $ 937,500 51101 712 GMD Match Grant Fund $ 1,643,500 51101 325 Stormwater Management Fund $ 932,224.50 51101 TOTAL 1 $3,513,224.50 With the aforementioned improvements being done to these facilities, the Road Maintenance Division will now add these additional channels, adjacent banks, and access pathways to its maintenance schedule. Maintenance costs for aquatic weed spraying related to the improvements are estimated to be $6,500 annually. Additional right -of -way acquisitions have been acquired that will add acreage to the mowing and garbage removal maintenance at an estimated cost of $3,500 per year. GROWTH MANAGEMENT IMPACT: The project is in accordance with the goals and objectives of the Drainage Sub - element of the Growth Management Plan for Collier County Stormwater Management. LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote for Board approval. —SRT RECOMMENDATION: To award Contract No. 15 -6519 to D.N. Higgins, Inc., in the amount of $3,513,224.50 for the construction of the LASIP - Wingsouth Stormwater Improvements and Sandy Lane Interconnect LASIP project and authorize the Chairman to sign the attached contract after final review by the Office of the County Attorney. Prepared By: Shane Cox P.E., Sr. Project Manager, Capital Project Planning, Impact Fees, and Program Management Division, Growth Management Department Attachments: (1) Bid Tabulation Sheet (2) Construction Contract [link: httD: / /www.colliergov. net/ ftp/ 2015BCCMeetings /AgendaDec0815 /GrowthMgmt /15- 6519 Agreement Higgins CAO Approved 11- 3- 15.pdf (3) LASIP Construction Phasing Map Packet Page -345- COLLIER COUNTY Board of County Commissioners Item Number: 11.11.6. 12/8/2015 11. B. Item Summary: Recommendation to award Contract No. 15 -6519 - Lely Area Stormwater Improvement Project (LASIP), Wingsouth Stormwater Improvements and Sandy Lane Interconnect Stormwater Improvements, to D.N. Higgins, Inc., in the amount of $ 3,513,224.50, Project No. 51101. Meeting Date: 12/8/2015 Prepared By Name: CoxShane Title: Project Manager, Senior, Capital Project Planning, Impact Fees and Program Management 11/6/2015 2:53:42 PM Submitted by Title: Project Manager, Senior, Capital Project Planning, Impact Fees and Program Management Name: CoxShane 11/6/2015 2:53:43 PM Approved By Name: PuigJudy Title: Operations Analyst, Operations & Regulatory Management Date: 11/9/2015 11:43:18 AM Name: KurtzGerald Title: Project Manager, Principal, Capital Project Planning, Impact Fees and Program Management Date: 11/9/2015 2:02:21 PM Name: TaylorLisa Title: Management/Budget Analyst, Senior, Capital Construction & Maintenance Budget/Fiscal Date: 11/10/2015 7:32:58 AM Name: BrilhartBrenda Title: Procurement Specialist, Procurement Services Date: 11/10/2015 11:39:10 AM Packet Page -346- 12/8/2015 11. B. Name: MarkiewiczJoanne Title: Division Director - Procurement Services, Procurement Services Date: I l /11/2015 6:34:16 AM Name: ShueGene Title: Division Director - Operations Support, Growth Management Department Date: 11/12/2015 6:32:35 PM Name: PattersonAmy Title: Division Director - IF, CPP & PM, Capital Project Planning, Impact Fees and Program Management Date: 11/13/2015 10:15:33 AM Name: JohnsonScott Title: Manager - Procurement, Procurement Services Date: 11/13/2015 11:22:47 AM Name: KearnsAllison Title: Manager - Financial & Operational Sprt, Capital Construction & Maintenance Budget/Fiscal Date: 11/17/2015 3:41:47 PM Name: TeachScott Title: Deputy County Attorney, County Attorney Date: 11/18/2015 11:49:45 AM Name: MarcellaJeanne Title: Executive Secretary, Transportation Administration Date: 11/18/2015 4:22:28 PM Name: OberrathKaren Title: Accountant, Senior, Grants Management Office Date: 11/19/2015 6:31:42 AM Name: KlatzkowJeff Title: County Attorney, Date: 11/19/2015 11:56:29 AM Name: UsherSusan Title: Management/Budget Analyst, Senior, Office of Management & Budget Date: 11/19/2015 3:05:42 PM Name: StanleyTherese Title: Manager - Grants Compliance, Grants Management Office Packet Page -347- Date: 11/20/2015 2:16:59 PM Name: CasalanguidaNick Title: Deputy County Manager, County Managers Office Date: 11/22/2015 11:54:30 AM Packet Page -348- 12/8/2015 1 1. B. rt mr ms nn rdLKUL rdrt:: -0-+7- [a . . . . . . . . . . 9 9 8 p 11 8 . . . . . . . . . . . . . . . . . . . . . . p 8 8 F 8 8 8 a 8 8 8 8 8 8 9 2 8 8 9 8 8 8 8 8 a p p 8 8 8 9 A R I IS R RN o- 'o 9 A 2 A V - - - - - - - - - - - - . . . . . . . . . . . . . . . . . O 8 8 8 8 8 8 8 8 8 2 9 8 8 8 8 8 8 . . . . . 9 0 3 . . . . . . . . ., . . . . . . 8° 8 8 x z �z W 19 10 12 A 31 31: 3: 3,: 0- 6 zw z u u 63- z �HLZS? z 0 -Z z z A^ rdLKUL rdrt:: -0-+7- [a sum Sn PaCKer Page -zs--)u- [a 9 i 22 1 !2 2 v 8 G . . . . . . . . . . . . . . s s s g 51 A g 9 -I w 6 9 . . . . . . . . . . . . . . . . . 6 2 8 s S 8» S 8° . S. $$° 8 s I 1 5g 9 M 0 1 p tlY v 2 2 a A U S-1 El . . . . . . . . . . . . . . . . . . . . LID All . . . . . . . . . . . . . 8 5 8 8 2 8 8 8 8 8 8 . . . . . . . . . . . . . . . . . . . 9 p 8 8 2 2 R p te E E E coo-. F. z 3t 1: 3: 0 3 9 PaCKer Page -zs--)u- [a 9 i 22 1 52 . . . . . . . . . . . . . . 6 9 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . LID . . . . . . . . . . . . . 8 8 8 8 8 2 8 8 8 8 8 8 . . . . . . . . . . . . . . . . . . . te E E E PaCKer Page -zs--)u- [a mg as lziu S.H., Packet Page -351- 12/8/2015 1 1.B. ego mm��o$m mpg m€ w - - - - - - - - - - - 18� 8 8 8 Yb 8 8q 8 8 8 8 8 q Ra 8 R8 8 8 E 8 8 9 O s g 8 8 8 8 8 8 8 8 8 8 8 8 E 8 8 - - - - - - - - - - - - - - - - - - 63 n 6 lziu S.H., Packet Page -351- 12/8/2015 1 1.B. E � k k/® k k�/ .! ® \ B CS � �� $f !e § /a \I «CL �Q =f�£ �: [ \77 IL d \r D f- / +�+ jr - f; t - M %£$ 222 w 0 m $fm 7koo 2; 23 k)3 7 } %319LU k\� ` k�� ■ '- //( ■— @ \f // 2 -- $^ f(# a ��m�� f E f 7i� C.) 72 ®]| « |� oo I �|iv3 - @� �'\ +�J 0.02 § k 5 . k k!2 7 o §,a I a |i@ k 2 o, cl§ § , 8 k.2 ■'2 | 2 I'3 u k m 5.5 a . }_ �'a / \,• //� :® $'�� ;, 2222 -6 !,I d� �� 7 f 'a a *331 $ kkk :t I (S 919 .sue «ems- ® ___ - - -� tee■ _ �_ / $'•- ®_ j - m�■a�. ® z" -| go § . Z |; a n a a m m;