Agenda 10/27/2015 Item #16C1 10/27/2015 16.C.1 .
EXECUTIVE SUMMARY
Recommendation to approve a 5402,000 work order to Quality Enterprises USA, Inc., under
Request for Quotation 14-6213-45 for Underground Utility Contracting Services for the
Wastewater Pump Station 302.09 Improvement Project,Project Number 70046.
OBJECTIVE: Bring outdated utility infrastructure into compliance with current standards while
meeting the demand for service, protecting public health and safety, providing proactive environmental
protections, and supplying backup pumping capability during power outages.
CONSIDERATIONS: On June 10, 2014, as Agenda Item 11C, the Board of County Commissioners
(Board) approved the Water, Wastewater, Irrigation Quality Water, and Bulk Potable Water User Rate
Study. The proposed scope of work is consistent with Project 70046, "Wastewater Pump Station TSP,"
on page 3-186, line 75 of the user rate study. Funding for Project 70046 is available in and is consistent
with the FY2016 CIP Budget.
Pump Station (PS) 302.09 is a submersible wastewater pumping station located on the property of Saint
Peter the Apostle Catholic Church. The pump station currently receives wastewater flows from two
nearby gravity sewer systems and 16 upstream pump stations. The PS 302.09 discharge force main is 8-
inches in diameter and ties into a 24-inch force main along Rattlesnake Hammock Road. Record drawings
indicate that PS 302.09 was originally designed to pump 200,000 gallons per day. There are
approximately 587 parcels impacted by this project. The surrounding area is fully built-out and no
significant additional wastewater flow is expected in the future.
The scope of work includes the addition of a standby diesel pump as part of the emergency power
program. When any of the following four conditional criteria are met, a permanent generator or standby
diesel pump is required operationally: 1) pump stations that have 25 horsepower or greater motors, 2)
pump stations that are fed by four or more other pump stations, 3) pump stations that pump directly to a
wastewater force main that pumps directly to the treatment plant, or 4) pump stations that are
operationally critical to hospitals, nursing homes, and environmentally sensitive areas. This project meets
criteria numbers 1 and 2. The condition of this asset is defined as "Red: Level 3 —Risked Compliance" as
reported to the Board at the October 1, 2013, Asset Assessment and Management Workshop.
The emergency diesel pump will allow the continued pumping of wastewater flows and increased station
reliability during power outages. The necessary easements have been obtained and the pump station will
be moved eastward on-site to improve accessibility. The confined space valve vault will be eliminated by
moving piping and appurtenances above grade. The existing pumps are appropriate for the capacity of
the pump station; however,the installation of variable frequency drives will allow the station to operate at
reduced speeds,which reduces pump wear and power cost.
The Procurement Services Division electronically distributed Request for Quotation 14-6213-45, Pump
Station 302.09 Improvements, September 16, 2015, to the six vendors under the Fixed-Term
Underground Utilities Contract No. 14-6213. Two vendors submitted quotations by the September 25,
20]5, deadline. The quotations are summarized below.
Packet Page-670-
10/27/2015 16.C.1.
VENDOR QUOTE
Quality Enterprises $402,000
Mitchell & Stark $ 980,000
The engineer's opinion of probable construction cost was $378,330. Staff reviewed the quotations and
determined Quality Enterprises USA, Inc., to be the lowest qualified and responsive bidder at
approximately 6 percent above the engineer's cost estimate. The quote tabulation and graph are
Attachments 1 and 2, respectively. The Procurement Services Division concluded that bidding was
competitive and representative of market conditions. The project design professional, Stantec Consulting
Services, Inc., also recommends award of this work order to Quality Enterprises USA, Inc., per the
attached letter dated September 25, 2015 (Attachment 3).
Quality Enterprises USA, Inc., has a satisfactory performance and warranty record on other similar
county utility-related construction projects. The bid specifications informed the bidders there may be
unforeseen conditions associated with the project. The project cost includes an allowance of$30,000 for
owner-directed work due to unforeseen corrosive or geological conditions that include,but are not limited
to, repairs due to structural deterioration, and/or replacement of defective mechanical equipment and
deficient electrical components. The price for any additional work shall be negotiated prior to the start of
any such work in accord with the county's Purchasing Ordinance and the terms of the agreement.
FISCAL IMPACT: Funding is available in, and is consistent with, the FY2016 Capital Budget approved
by the Board on September 24, 2015. The source of funding is the Wastewater User Fee Fund(414).
This asset has components with life expectancies ranging from 12 to 50 years. The project is expected to
be completed by March 2016. The operating budget impact of the completed project is reflected in the
table below. The total capital cost to implement Project 70046 Pump Station Rehabilitation is
$402,000. While this asset is being replaced due to its condition and criticality, an additional benefit is
the resulting annual cost savings of approximately $414 based on an approximate 15 percent reduction in
power required. There will be an increase in maintenance cost for the standby pump of approximately
$1,060. The resultant operating cost increase is $646 annually.
Elements FY2016 FY2017 FY2018-FY2037
Capital Outlay $402,000 $0 $0
Operating Cost Change * $0 $646 $12,920
*Approximate cost change in the annual operating budget for each fiscal year over the life of the asset.
LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote
for Board approval.—SRT
GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan
standards to ensure the adequacy and availability of viable public facilities.
RECOMMENDATION: That the Board of County Commissioners, Ex-officio the Governing Board of
the Collier County Water-Sewer District, approves a $402,000 work order under Request For Quotation
14-6213-45 to Quality Enterprises USA, Inc.; and, authorizes the Chairman to sign and execute the work
order after final review by the County Attorney's Office.
Packet Page-671-
10/27/2015 16.C.1.
Prepared By: Corinne Trtan, Project Manager, Public Utilities Planning and Project Management
Division
Attachments:
Attachment 1-Quote tabulation
Attachment 2-PPMD Quote Analysis
Attachment 3-Recommendation Letter
Attachment 4-Work Order
Packet Page-672-
10/27/2015 16.C.1 .
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.16.C.16.C.1.
Item Summary: Recommendation to approve a $402,000 work order to Quality
Enterprises USA, Inc., under Request for Quotation 14-6213-45 for Underground Utility
Contracting Services for the Wastewater Pump Station 302.09 Improvement Project, Project
Number 70046.
Meeting Date: 10/27/2015
Prepared By
Name: TrtanCorinne
Title: Project Manager,Public Utilities Department
9/25/2015 3:50:16 PM
Submitted by
Title: Project Manager, Public Utilities Department
Name: TrtanCorinne
9/25/2015 3:50:17 PM
Approved By
Name: PajerCraig
Title: Project Manager, Principal,Public Utilities Department
Date: 9/28/2015 11:34:56 AM
Name:NagySteve
Title: Manager-Wastewater Collection, Public Utilities Department
Date: 9/28/2015 1:30:54 PM
Name: ChmelikTom
Title: Division Director-Public Utilities Eng,Public Utilities Department
Date: 9/29/2015 1:08:26 PM
Name: JohnssenBeth
Title: Division Director-Wastewater,Public Utilities Department
Date: 9/29/2015 3:11:02 PM
Packet Page-673-
10/27/2015 16.C.1 .
Name: HapkeMargie
Title:Recycling Coordinator,Public Utilities Department
Date: 9/30/2015 1:44:38 PM
Name: Joseph Bellone
Title: Division Director-Operations Support,Public Utilities Department
Date: 10/1/2015 1:23:42 PM
Name: JohnsonScott
Title: Manager-Procurement, Administrative Services Department
Date: 10/1/2015 1:40:52 PM
Name: HallSwainson
Title: Procurement Specialist,Administrative Services Department
Date: 10/2/2015 10:13:13 AM
Name: MarkiewiczJoanne
Title: Division Director-Procurement Services, Administrative Services Department
Date: 10/2/2015 11:32:00 AM
Name: TeachScott
Title: Deputy County Attorney, County Attorney
Date: 10/5/2015 10:14:57 AM
Name: YilmazGeorge
Title: Department Head-Public Utilities,Public Utilities Department
Date: 10/9/2015 2:04:37 PM
Name: KlatzkowJeff
Title: County Attorney,
Date: 10/9/2015 4:02:41 PM
Name: IsacksonMark
Title: Division Director-Corp Fin &Mgmt Svc, Office of Management&Budget
Date: 10/12/2015 10:20:20 AM
Name: CasalanguidaNick
Title: Deputy County Manager, County Managers Office
Date: 10/15/2015 1:56:18 PM
Packet Page-674-
0 0 0 0 0 0 10/27/201516.C.1 .
d o 0 0 0 0 0
• 0 0 0 0 0 0
0 0 0 0 0 0
,; o o o 0 0 0
co• 0 o e Lc) co co
o. a) cm cm a)
E
0
U
a
0
= EA EA EA EA EA EA
o
N'
0 0
C 0
o O O O
U o 0 0
Y O o 0
..+• •O Tr M
Cl) a)
at!
d
L
u
w
• to EA Efl
0 0 0 O 0 O
O O O O O O
o
o o 0 0 0
1.6 {E7 h N O N co
✓ co co . M co
et
C
Q
co
co
e)
N EA EA EA d! EA EA
,`
G O O O
ri 0 O O O
'It C O O 0
e W o O o
O in,- M
O C n = co
p ak a
C _O ja V
O
47. LL O O
a) 0 U, EA• EA
° —
v • a
13 IN
>- r cu
w 0
pa 3
U o H 2
U Z
—1 ces
En`
O d
U Y
d
c
d
`o
c
d
0
c
c
m
E
a
Z m a n,
Q 0 i;2
N C w N
a
Fe O m 9 N m•
O CV e r�. d d
CO 0 v « o) d
W co ,G ti o
0 C• m C o m 'a`
O d d °
f6 N fa N C ` d c =%
CO N CO c _z• U
co m 06 3 g 7 7 C
a.• E E m --aa Eu d =Lx" ym
Y 0 — a+ () d p 7 tN d O
Z
C m C m U a do OInSY ° m
0 d : d A '- N M V u y
ca _
o o o d
o a :a a C m
Tu CC u) 2 Cl) 0 1-
- W N co
Packet Page -675-
10/27/2015 16.C.1.
= o
�,
V" W 4 "a `1 O v Y u
0 - - -6 o c =
as cu
scc _c ,- °>° y' o E .�
ut w v to + 0 C
4-0 Y 0 4 + o + y r °u
a
0
L
a
C
QJ
E
`l Y
O
L
0.
s
G1
Q I 1
N 1 I I
Q I I
M i I
C 1 I
C I I
'�r
■ I •
a
cif I 1
ai
!Z
v I
I i
O. w
L
d)
i 1 1
cts
•
H i j
as
1
L
I
I
1
`O 1 I
N I
3
N
I 0)
1 C
w
•-.
1 0 1 j I
CI 1
1
0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
o0 00 °� NJ
0
ri ill-
14 in in in
Packet Page-676-
10/27/2015 16.C.1 .
„ Stantec Consulting Services Inc.
YwN �e\,r 6,r 3200 Bailey Lane, #200, Naples, Florida 34105
September 25, 2015
File: 177310607/177310589
Attention: Ms. Corinne Trtan
Project Manager
Collier County PPMD
3339 Tamiami Trail East, Suite 301
Naples, FL 34112
Dear Ms. Trtan,
Reference: PS 302.09 Relocation (Collier County PPMD Project# 70046.43.1)
Quotes for the referenced project were opened at 3:00 pm on September 25, 2015. Two (2) bids
were received and subsequently tabulated by Stantec. The apparent responsive,
responsible, and qualified, low bidder was Quality Enterprises USA, Inc. with a bid of
$402,000.00. This amount is within six percent of The Engineer's Opinion of Probable Cost for the
project at $378,330.00. The bids have been tabulated, along with the engineer's estimate, and
are being provided as an attachment to this letter.
Please let us know if we can be of further assistance in concluding the Bidding Phase for this
project.
Regards,
STANTEC C. 'LTIN, SERVICES INC.
4\4"
1
-7e ly K. Blake, PE
Senior Associate
Phone: (239) 649-4040 Ext. 6403
Fax: (239) 643-5716
Kelly.Blake @stantec.com
Attachment: Bid Tabulation
c. Craig Pajer, PE-Collier County
Marc Lean, PE-Stantec
Alex Dunko, El -Stantec
da u:\177310607\bidding\Itr_bid tabulation ps 302.09 20150925.docx
D ..1,-; .y::^.L7 1 °`r. :`t€rid
Packet Page -677-
0 d a o 0 0 0
10 /27/ 2015 16.C.1 ,
C O O O O O O
0 0 0 0 0 0 ci 0. a• 0) 00) co O co
E
0
U
c
0
w
7 0• Efl 40 Ea 4.9 69 ER
r.
C(I) —
0 O 0 O
U o0 00 00
Y O O O
w; O Tr co
Cl) a)
ad
0)
.c
V
w
EA Efl EA
O O O O o O
o O O O O O in
C M co M co
c
4
m
en
a)
47 Efl CO EA ER EA 41,
C —
t- 0. o 0 0
eh
a) 0 0 0
coo J j 0 00 00
0 0 0
Tr 00 L N- CO
a7 )" a M
.a 0
c o LL i0 V
O O
m �,oa
= � C Ea Eft e9
I- 0 CD —
a
m y M a H
o a c- —
U U U c
J J I—
•a) _
O y
U «
ID
c
m
`o
c
m
0
c-
c
E
a
O CA
2 CO = rn
O a)
a R
° o
R O m Es ym
U N ° « OI co E
W co CI 'O - w c o
M c m c y o d oa
.a N N, N C ` o a`
U
m m
co as
N a15 3 0 0 ` c m
0. II "- O 0 ' w 5 o f
E o a) cm '4' 17'Q (a a CO a o 3'
d E aa)) a) . d m t• =LY0 ym
m = a) U mo Z§ mm
a
o a c p « fa oini mN 2 a. d »
o m O m t . —N M • d«
is To m 2 03
Cti a)
• O N O
0 m
o :5 o a
c is
rt v) E v) 0 1-
m W ,- N M
Packet Page -678-
10/27/2015 16.C.1 .
\\ORK ORDE1'UPI.R(`I I ASE ORDER
l om:Tact I-1-6'13-45 '.Annual Contract for I nderorouni„t (_n ner;ii ( ontr;tctors
Contract Expiration Date: Jul: 7, 2016
Ihis Work Order is for professional Construction services for work known as:
Project Name: Pump Station (PS) 302,09 Impro''ements
Project No: 70046.43.1
the work is specified in the proposal dated September 25. 201 »hich is attached hereto and made a
part ot this Work Order. In accordance with l'crnns and Conditions of the :Aereement referenced
abo\e. this Work Order Purchase Order is assigned to: Quality Enterprises 1'SA, Inc.
Scope of Work: As detailed in the attached proposal and the following:
Mask I Relocation of Pump Station 302.09
Task 11 NlobilizationDemobilization
I ask 111 Owner Directed Allowance
Schedule of Work.: Complete work substantially h,ithin 70 days and final within 60 day s a total of
130 da■s from the date of the Notice to Proceed which is accompany ine this Work Order. the
ends'r agrees that any Work Order that extends hey and the expiration date of A reerncnt := 14-6213
will survire and remain subject to the terms and conditions of that Agreement until the completion or
termination of this \\ ork Order.
t omnensation: In accordance vyith the :Agreement referenced aboN e. the Count' v+ill compensate the
Vendor in accordance \vitli methodts): ENeiaotiated Lump Sum INI.S) Lurnp Sum Plus
Reimbursable Costs 11.5- RC) j f ime Alaterial t I&NI I (established howl\ rate - Schedule :1) H
Cast Plus I fixed Fee (CPH=). (define which method will be used for which tasks) as prov ided in the
;attached proposal.
Iask I S355.000.00 NI.S.
I ask II S 17.000.00 NLS
I ask Ill S ;(),II00.0)) 1 &\I
101 Al. FEE .$40-'.000.00
PRI P \RI_1)
Corinne Irian, Project NIarta�ger I)ate
\PPRUWH) ,
C'raf' Pajer'Principal Project liana ecr Date
Page I of 3
Packet Page -679-
10/27/2015 16.C.1 .
.APPRO1"E1) BY:
1 Slm PPNID Dire tor Date
Beth Joihnssen. \Vaste\sater Director I)ate
�� `:,PPROV`I I) 13Y:
Georee dram. Dix i,iOn Administrator Nate
I3■ the siEunature bLIO\\. the Firm (includinte employees. officers and-'or a4. ents) certifies. and hereb'
discloses. that. to the best of their knoN\ledge and belief. all relevant fact s concerning past. present. or
currently planned interest or activ its t financial_ contractual. organizational, or otherti+isel «hick
relates to the proposed Murk; and bear on kshether the Firm has a potential conflict have been full
disclosed.
.Additionall■. the Firm aurees to notify the Procurement Director. in writing, '. ithin 48 hours of
learning of an' actual or potential conflict of interest that arises durin4} the Work Order and`or project
duration.
,ACC IP-1I I) BY: Quality Enterprises I SA. Inc.
` anac I itie of .Aw honied (:)tf ieer Date
(RC/nal/Rtel' 01 pci':,'c I17tc17tionctlit ic`i/ Plank)
Pace 2 of 3
Packet Page -680-
10/27/2015 16.C.1.
i WITNESS V+HEREOF. the parties hereto. ht\e hs: an Laub:II-lied person or
au:mt. ha' e executed this Work Order on the date and year first N.\ritten beim\
All F.S.1 : 130A1:I) OF COUNTY C'ONINIISSKYNI.RS
ieht L. Brock. Clerk of Courts coLLIER COUNTY. FLORIDA
B\ : B\:
'lint Nance. Chairman
Dated:
SLAIi
Quality Enterprises USA. Inc.
I IrSt itncss Si:mature
I pc print sign:mire title
,
pc': print v\itness name
Seeond Witness
Print \\itnes
\rimy\ed as to Form and I Lalalit\ :
)11 R I each, 1)eput■• C ount. \ttorne\
Print Name
Pae (5)A7
3 01`3
Packet Page -681-
• 10/27/2015 16.C.1 .
767'
Cafttrty
Administrative Sen♦koes Department
Procurement Sew Division
REQUEST FOR QUOTATIONS FOR MULTIPLE PROJECTS UNDER CONTRACT
#14-6213
"Annual Contract for Underground Utilities &General Contractors"
Date: September 16, 2015
From: Swainson Hall, Procurement Strategist
239-252-8935, Telephone Number
239-252-6334, Fax Number
swainsonh&k collIerpov.net
To: Potential Proposers
Subject: JtFQ 14-6213-45 Pump Station 302,09
As provided In the referenced contract, the Collier County Purchasing Department is solidting
quotes for the referenced project.
RFQ Due Date: 3:00 PM 9/25/2015
Q&A Deadline: 5:00 PM 9/23/2015
Mandatory 11:00 AM 9/18/2015
Pre-Quote Meeting Procurement Services Department Conference Room
Number of Days to Final Completion: 70 Substantial+60 Final= 130 Total
Scope Provided Yes
Estimated Value $378,330.00
Liquidated Damages: $1,501.00 per day
Payment& Performance Bonds Yes,if project value exceeds$200,000
Your quotation response for this project is due no later than the date and lime specified above.We
will not accept any quotation responses later than the noted time and date. If your firm is unable to
respond electronically, your quotation must be received in the office of the Purchasing Department at
the above referenced address no later than the time and date specified. We look forward to your
participation in this request for information/quotation process.
Quality Enterprises USA, Inc.
Firm's Complete Legal Name
2,94-43S-7200 239-435-7202
eidepb .trnber!Fax Number
V cee President
Title
Louis J. Gaudio 9/25/15
Print Name Date
C:Corinne Trtan/Project Manager
RR)34-6213-45 Packet Page -682-
10/27/2015 16.0.1 .
Bid Form
Collier County,Florida
Pe 302.00 Relocation
Collier County PPMD ProJectB 7004143.1
' DESCRIPTION UNIT QTY UNIT PRICE • EICTENSIOW
•mu : • . • : • ' • • •
$ 365,000.00 355,00000
1 Relocation of Pump Simeon 302.00 LS 1
Subtotal led Rim 1(Bess Bid) $ 355000.00
2 Moblezelionillemobetration(6%ease WO I LS 1 I $ 17,003.00 $ 17,000.00
Subtotal led Items 112 $ 372,000.00
I TIM 1 I $ 30,000.00 $ 30,000.00
3 Owner Directed Direed Allowence
Total Bid Moe I I 402,1100.00
TOTAL BID PRICE 114/2040-11°
TOTAL 1310 PRICE(WRITTEN IN WORDS:) For Hundred Two Thousand Mews and Zero Cents
THIS BM MADE BY AND ON BEHALF OF:
company;Qua*EnwPgi***VS4 c.
31N laestetz Ode%Sub 211
Addresv
. •
_ • Naples,FL 3411444W
•.
(SEAL)
a ..
F zne-436-7200
ug:
-
Bassi Midwarm
•
' Audiorkad illeselure
PRINT:Louie J.Gaudio
711LE:Vies President
Packet Page -683-
10/27/2015 16.0.1 .
ier County Email: DianaDeLeont�caUiergov.nec
Telephone: (239)252-8935
Administrative Services Department FA : (239)252-6597
Procurement Services D+vi.sion
ADDENDUM#1
Date: September 24, 2015
From: Swainson Hall, Procurement Strategist
To: Potential Proposers
Subject: Addendum #1 — E.FQ 146213-45 Pump Station 302.09
The following clarifications are issued as an addendum identifying the following changes for the
referenced solicitation:
CHANGE:
Posting Questions and Answer, Permits,and clarifications from engineer
If you require additional information please post a question on the Online Bidding site or contact me
using the above contact information.
C: Corinne Trtan, Project Manager
RFQ 14-6213-45
Packet Page -684- 1
, i 1
, .
10/27/2015 16 0 1
.—...._
— _
-I (J) , 3 .„. cn . 73
! = ' 0
_
0
to . i 6 . F....--. '. o .
:0.1
":■_' 0 C * , ._ ,0 , i ID
■ -..-. ' ;LIJ , ..., , n•
.n
3 C°. 1,
.3
'CD ! '7; I !,c, I =
I'D !
M ;eD . ID I .I)
:0
I> 1, 3 1 ,3
H• 3 ,.-.2: „..-.- HI ,3, r..e.' ...E
i " 1, *0
i.-.: '5,', .--- ' .- . D.' 0
=". i "'''''' .
* ... F. . :=...- *(5. — , 03 I ..w
N ...,. D) 1
..-, .......-': ... 0. ,at !u3
Et. = ,2 ..7".• :11 ;
..........
i n ,
D
c,7' i ■-■ , ,....... , ,(...) m
12' = t al
1 a !
I --- i ,0 Cl)
0
T.)
; a I tU/) i .-..i
I CD
:
CO 5
,
.6 Z
- u, —. ,
' c ;
g .
0.' 1
DI 1
46
I
-
a ..
= I(C
CD
= 1
3.
1
a
! 0
,
' I
! CD
....., ' C .0
C/ C)
°I '-----1
i ,---1
!
i 7------,
. ,
„...J. _
s, ca iii.' co
i , , ' co 40
4..,e) t./.. '
U)
t ,
3 57- ,
2 s".
. ;
. ,
, ■ ,
. ,
• . * a a
=
. -
,......, , ...... = .00
0 o
0 D ! '--)
,
I
. i ! ! 1 : ,-)
., ......, ,
:-..-:,
! --7-," = .4...
' ,
.-....-_, -, .-s.
— ..
1 ,
ton , i (yr!,
ID
0. ,
C
... , ;
to
1 , i
, .
. ,
.4. ' . Lj . L.) : ....) 0
0 4 '; ...1 . C.0
CP
0; 1 C., :
: c:, : ; C) ' 0 ',
0 I 0 : : 0 : , 0 .
C)I . - , ! ; 0 1 C) 0 ; .c..',
. 1 , • ,
0. ' a '.. i CI ' 0) , co . a
C)' ' 0) ; . 0 . ; C) , ; 0 ' CI-.
, ,....-- -..—......_
(-(1
, " 0
: !
■ .
CD
9'4
(r, C).)
! ? 5'
. . ....„0 , . .p..
. ,
, —
o . '. 0 ' , : 0 x-
i „„..
, 0
1 ,..... 0
, .
. ,.
.i
, —
..........._., - i , ..„....,
- .
4.7. ; (,0* . ; (*I '
i i 1
. !
: n
-•_,
i I ■ . 1 0
i . , • .
. . 0
I .
3
I , .
tc.i . I ,,,.0 , ,.,0
co t, .
, .........., : 1 (A .r... : 0 i o al
0, ,-, -C)I
0 ! ; a a <
r. 1
, . ,
,, — . 1 -b ,
, - , ■ => i "'..
O 5 , ', cp
! CD ' 0 ' 0 .....
, .
. i
Packet Page -685- i i c o, i .1 ---,