Loading...
Agenda 09/08/2015 Item #16A109/8/2015 16.A.10. EXECUTIVE SUMMARY This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Wing South Airpark Extension, (Application Number PL20150001055) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the final plat of Wing South Airpark Extension, a subdivision of lands located in Section 16, Township 50 South, Range 26 East, Collier County, Florida, following the alternative procedure for approval of subdivision plats pursuant to Resolution 99 -199. This procedure allows for the Board to approve the plat and associated construction documents for construction purposes and recording purposes concurrently. CONSIDERATIONS: The Development Review Division of the Growth Management Department has completed the review of the construction drawings, specifications, and final plat of Wing South Airpark Extension. These documents are in compliance with the County Land Development Code and Chapter 177, Florida Statutes. This project is within the Shadowwood PUD, Ord. 08 -43, as amended. All fees have been paid. Security in the amount of 10% of the total cost of the required improvements, and 100% of the cost of any remaining improvements, together with a Construction and Maintenance Agreement for Subdivision Improvements, shall be provided and accepted by the County Manager or his designee and the County Attorney's office prior to the recording of the final plat. This procedure is in conformance with Section 10.02.04 F.2 of the Land Development Code. The Development Review Division recommends that the final plat of Wing South Airpark Extension be approved for recording. FISCAL IMPACT: The project cost is $63,817.60 (estimated) to be borne by the developer. The cost breakdown is as follows: a) Water & Sewer $35,199.30 b) Drainage, Paving, Grading $28,618.30 The Security amount, equal to 110% of the project cost, is $70,199.36 The County will realize revenues as follows: Fund: Growth Management Fund 131 Agency: County Manager Cost Center: 138327 -- Land Development Services Revenue generated by this project: Total: $2,924.53 Packet Page -554- 9/8/2015 16.A.10. The Fees are based on a construction estimate of $63,817.60 and were paid in May 2015. The breakdown is as follows: a) Plat Review Fee ($1,000.00 + $5. /ac) $1,010.00 b) Construction Drawing Review Fee Water & Sewer (.75% const. est.) $ 263.99 C) Drainage, Paving, Grading (.75% const. est.) $ 214.64 d) Construction Inspection Fee Water & Sewer (2.25% const. est.) $ 791.98 e) Drainage, Paving, Grading (2.25% const. est.) $ 643.91 GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public Facilities prior to the issuance of the construction plan final approval letter. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval. - SAS RECOMMENDATION: That the Board endorse staff's recommendation to approve the final plat of Wing South Airpark Extension (Application Number PL20150001055) for recording with the following stipulations: 1. Approve the amount of $70,199.36 as performance security for the required improvements; or such lesser amount based on work completed, and as is approved by the Growth Management Department. 2. Approve the standard form Construction and Maintenance Agreement and direct the County Manager or his designee: a. To withhold Certificates of Occupancy until the required improvements have received preliminary acceptance. b. To delay recording of the plat until suitable security and an appropriate Construction and Maintenance Agreement is approved and accepted by the County Attorney's office and the Board or the County Manager or his designee on behalf of the Board pursuant to Section 10.02.04 F.2 of the Land Development Code. Prepared by: John Houldsworth, Senior Site Plans Reviewer, Development Review Division, Growth Management Department Attachments: 1) Location Map, 2) Plat Map and 3) Opinion of Probable Cost Packet Page -555- 9/8/2015 16.A.10. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.10. Item Summary: This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Wing South Airpark Extension, (Application Number P1-20150001055) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. Meeting Date: 9/8/2015 Prepared By Name: HouldsworthJohn Title: Site Plans Reviewer, Senior, Growth Management Department 7/13/2015 12:31:22 PM Approved By Name: PuigJudy Title: Operations Analyst, Growth Management Department Date: 7/14/2015 10:51:12 AM Name: PuigJudy Title: Operations Analyst, Growth Management Department Date: 7/14/2015 10:51:51 AM Name: McLeanMatthew Title: Project Manager, Principal, Growth Management Department Date: 7/18/2015 10:06:40 AM Name: StoneScott Title: Assistant County Attorney, CAO Land Use/Transportation Date: 8/5/2015 3:56:14 PM Name: FrenchJames Title: Deputy Department Head - GMD, Growth Management Department Date: 8/18/2015 7:00:40 PM Name: CasalanguidaNick Packet Page -556- 9/8/2015 16.A.10. Title: Deputy County Manager, County Managers Office Date: 8/22/2015 10:12:14 AM Name: KlatzkowJeff Title: County Attorney, Date: 8/24/2015 10:01:17 AM Name: IsacksonMark Title: Division Director - Corp Fin & Mgmt Svc, Office of Management & Budget Date: 8/24/2015 12:16:31 PM Name: Casa] anguidaNick Title: Deputy County Manager, County Managers Office Date: 8/24/2015 1:03:41 PM Packet Page -557- 9/8/2015 16.A.10. LOCA TION MAP STS Packet Page -558- Packet Page -559- 4 9/8/2015 16.A.10. Rix R t ZS Eu k 14 BE L u cc: A, O C) Z �v- 49 Lu F, Cc) 'm z dt , 0 C) E) C\2 E- . ti ice- Z 9Z Ct C:S E-1 EE: O Ln A, � C) E- fi G Z E f zu Packet Page -559- Packet Page -560- 9/8/2015 16.A.10. p CC Wing South Ai 9/8/2015 16.A. 10. PPL Cost Summary i Total M G: \PROD- ENG \W\WS \06DP \03PPL DROuantities.xls Packet Page -561- $ 117.00 Sewer $ 13,905.20 $ 4,430.00 ry Sewer $ 30,769.30 M G: \PROD- ENG \W\WS \06DP \03PPL DROuantities.xls Packet Page -561- 9/8/2015 16.A.10. U Quanfi ies.xis \. Ong South Airpark Item - Earthwork Quantity Unit Price Total 1 Clearing and Grubbing (Heavy) 2 AC $ 2,495.00 $ 4,940.10 2 Excavation, Haul, Spread, Shape & Compacted In Place 4,000 CY $ 1.85 $ 7,400.00 3 Staked Silt Fence 2,256 LF $ 1.00 $ 2,256.00 I+- I Sub-Tot' = S 1 14,596.10 G: \PROJ- ENG \MW.S \06DP \03PPL DP \Quantities.xis Page 4 Packet Page -562- 9/8/2015 16.A.10. Quantities.xls Wing South Airpark Item - Paving Onsite) Quantity Unit Price Total 1 Replacement Sodding 1ft B.O.C. 90 1 SY Fs 1 1.301 $ 117.00 Sub -Total I S 117.00 G: \PROJ- ENG \W\WS \06DP \03PPL DP \Quantities.xls Page 5 Packet Page -563- 9/8/2015 16.A.10. u QuantftS.Xis Wing South Airpark Item - Drainage Quantity Unit Price Total 1 18" RCP 98 LF $ 37.40 $ 3,665.20 2 Type C Inlet 4 each $ 2,560.00 $ 10,240.00 Sub -Total S 13,905.20 GAPRQJ- ENG\MWS106DP103PPL DP1Quantities.xis Page 6 Packet Page -564- 9/8/2015 16.A.10. 1� Quantities.xls N� Wing South Airpark Item - Water Quantity Unit Price Total 1 Single 1 -112" Water Service (complete) 3 each $ 435.00 $ 1,305.00 2 Double 1 -1/2" Water Service complete 1 each $ 605.00 $ 605.00 3 4" Casing for Water Meter Service 240 LF $ 10.50 $ 2,520.00 Sub -Total ILs 1 4,430.00 G: \PROD- ENG \W\WS \06DP \03PPL DP \Quantities.xls • Page 7 Packet Page -565- 4' Item- Sanitary Sewer QuanSties.xls Wing South Airpark Quantl 685 3 685 Sub -Total 9/8/2015 16.A.10. sftwplo Unit Price Total LF $ 24.78 $ 16,974.3C EA $ 4,370.00 $ 13,110.00 LF $ 1.00 $ 685.00 G: \PROD- ENG \W\WS \06DP \03PPL DP \Quantities.xls Packet Page -566- $ 1 30,769.30 Page 8