Loading...
Agenda 02/27/2018 Item #16A 502/27/2018 EXECUTIVE SUMMARY Recommendation to approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Hacienda Lakes, Phase 2, PL20150002473 and to authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $23,115.80 to the Project Engineer or the Developer’s designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance and unconditional conveyance of these potable water and sewer facilities and to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $23,115.80, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Hacienda Lakes, Phase 2, has constructed the potable water and sewer facilities within dedicated easements to serve this development. (See attached location map). 2) Preliminary acceptance of these utility facilities was approved by the Development Review staff on March 28, 2016. At that time, the value of these potable water and sewer utility facilities (assets) was $58,970 and $30,009.60, respectively. 3) Staff recorded all preliminary acceptance documents associated with the facilities being conveyed to the County in the public records of Collier County, which were reviewed and approved by the County Attorney’s office as to form and legality. The County acquired its record interest by Utility Facilities Warranty Deed and Bill of Sale recorded in Official Records Book 5262, at Page 2245, of the Public Records of Collier County, Florida. 4) The potable water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Development Review staff on January 16, 2018 in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Staff recommends final acceptance of the subject utility facilitie s and to release the Utility Performance Security (UPS) and Final Obligation Bond in the total amount $23,115.80. 7) This final acceptance is in accordance with Collier County Ordinance No. 2004-31, as amended. 8) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. However, approval of this Executive Summary will result in the Collier County Water -Sewer District receiving unconditional title to the utility facilities, which at the time of preliminary acceptance, had a total gross value of $88,979.60 (no depreciation applied). GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this 16.A.5 Packet Pg. 489 02/27/2018 action. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval - SAS RECOMMENDATION: To approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Hacienda Lakes, Phase 2, PL20150002473 and to authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $23,115.80 to the Project Engineer or the Developer’s designated agent. Prepared by: Lucia S. Martin, Technician, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Exhibit A (PDF) 3. Assets Sheet (PDF) 16.A.5 Packet Pg. 490 02/27/2018 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.5 Doc ID: 4604 Item Summary: Recommendation to approve final acceptance and unconditional conveyance of the potable water and sewer utility facilities for Hacienda Lakes, Phase 2, PL20150002473 and to authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $23,115.80 to the Project Engineer or the Developer’s designated agent. Meeting Date: 02/27/2018 Prepared by: Title: Technician – Growth Management Development Review Name: Lucia Martin 01/17/2018 11:39 AM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 01/17/2018 11:39 AM Approved By: Review: Water Pamela Libby Additional Reviewer Completed 01/17/2018 12:58 PM Water Steve Messner Additional Reviewer Completed 01/17/2018 1:00 PM Wastewater Steve Messner Additional Reviewer Completed 01/17/2018 1:01 PM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 01/17/2018 2:17 PM Wastewater Steve Nagy Additional Reviewer Completed 01/18/2018 8:03 AM Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 01/18/2018 9:02 AM Growth Management Department Judy Puig Level 1 Reviewer Completed 01/18/2018 1:35 PM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 01/19/2018 8:49 AM Growth Management Department Matthew McLean Additional Reviewer Completed 01/22/2018 10:14 AM Growth Management Department Thaddeus Cohen Department Head Review Completed 01/22/2018 4:29 PM Growth Management Department James French Deputy Department Head Review Completed 01/23/2018 3:07 PM County Attorney's Office Scott Stone Level 2 Attorney Review Completed 02/12/2018 10:35 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 02/12/2018 11:30 AM Budget and Management Office Mark Isackson Additional Reviewer Completed 02/14/2018 10:30 AM County Attorney's Office Scott Teach Level 3 County Attorney's Office Review Completed 02/19/2018 1:18 PM 16.A.5 Packet Pg. 491 02/27/2018 County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 02/19/2018 1:25 PM Board of County Commissioners MaryJo Brock Meeting Pending 02/27/2018 9:00 AM 16.A.5 Packet Pg. 492 HACIENDA LAKES PHASE 2 LOCATION MAP 16.A.5.a Packet Pg. 493 Attachment: Location Map (4604 : Final Acceptance of Utilities - Hacienda Lakes, Phase 2) Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond Amount Receipt Number 10% UPS Bond $19,115.80 2016303105 Final Obligation Bond $4,000 2016303105 Total Amount $23,115.80 The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment 16.A.5.b Packet Pg. 494 Attachment: Exhibit A (4604 : Final Acceptance of Utilities - Hacienda Lakes, Phase 2) VERIFICATION OF FINAL CONSTRUCTION COS'I'S - COUNTY PROJECT N.AME Hacienda Lakes Phase 2 LOCATION: Rattlesnake Hammock Road NAME & ADDRESS OF OWNER: Hacienda Lakes ofNaples, LLC 7742 Alico Road Ft. Myers, FL 33912 TYPE OF UTILITY SYSTEM: POTABLE WATER (IIIATERIALS AND SERVICES) ll [_]l s I7-tl QUAN. UNIT COST TOTAL 10" PVC Water Main DRIS 10' 10" PVC Water Main DR14 l0' 10" PVC Water Main 45' Fittings 10' 20" steel casing 20" 4" PvC Sleeve 4' l0" Gate Valve 10" Fire Hy&ant Assembly Air Release Valve BSP (permanent) Water Main Auto Flush Device (AFD) Temp. Gap Configuration 1,162.00 340.00 4.00 220.00 485.00 6.00 3.00 1.00 1.00 L00 l 00 LF LF EA LF LF EA EA EA EA EA EA $ 30.00 $ $ 33.00 $ $ 900.00 $ $ 150.00 $ $ 6.00 $ $ 2,200.00 $ $ 3,200.00 $ $ 1,500.00 $ $ 2,200.00 $ $ 5,500.00 $ $ 2,750.00 $ G 3<\L 34,860.00 tt,220.00 3,600.00 33,000.00 2,910.00 13,200.00 9,600.00 1,500.00 2,200.00 5,500.00 2,750.00 $120,340.00 TOTAL COST CERTIF}'i\G: I do hrreb) .ertify that the qu.trtities of m.terial and services described above are true and an accu represeotatioI! of the as-installed system. I C.D , P.8., FL Regt. f .1E649 Hagan Etrgineering, LLC Authorized Signature STATE OF FLORIDA ) ) SS: Address of Undergroun d Contractor grneer actor couNTY OF COLLIER ) The foregoiug instrument was sigled rnd ac m"E@-'rrho is Persotrally known to knowledged before m " tt'is 8? a^y ot J me and who did not take an oath' Notary PuDlic Stet' ol Marua Aguiar Ff 071MycsJiErprri! 12i0U2 017 I tb OF: 16.A.5.b Packet Pg. 495 Attachment: Exhibit A (4604 : Final Acceptance of Utilities - Hacienda Lakes, Phase 2) VERTFICATION OF FINAL CONSTRUCTION COSTS . COUNTY I'ROJEC-I'NAME: Hacrenda Lakes Phase 2 LOCAI-ION: Ranl.snar. H'mmet R@d NAME&ADDRESSOFOWNER: H]"I1I}'ffi!i"fl;:*IIf ,,,,, 'I.YPE OF. UTILI.I.Y SYSTEM: SANITARY SEWER (MATERIALS AND SERVICES) 6" PVC FM DRI8 6" PVC []lt DR t,l 6" PvC t_Nl 45" FitnnSs 4" PVC TM DRI4 4" PVC FM.{5'Furings t16.00 $1E.00 $750.00 $t8.00 t8J000 st05 00 sl lJ 00 t2,000.00 $1,750.00 $4.500.00 6" 4" I.l" l6' 6" t2t4 150 4 138 100 94 l 2 2 LF LT EA LT EA LF LF EA EA EA s19,.124 00 s2,70000 s1,00000 t2.484.00 s1.400 00 sr0.500.00 ll0.8 t0 00 s6,000 00 s3,t00 00 s9.00000 't'() tAt, ('()st' (ll $70,s1E.00 I do hcrcby cerlily thal the quanlitics ofmalerial nnd scrvtces as described above arc true and accurate rcprcsentalion ofthe as-inslalled cost oflhc system bcing contributed to Collier County (lrili(ies- lnc.. : - (. lr lkg$., P.8., Proie.! U.ejn.cr t'I, Rcfr. # 386{9 Or: H,{an [nBin.cring, Ll.C tz-t-t5 ,l d(rsrontrd ( 0ntrlrn,r 7)'/z 7t /^ 'lerqr,{'nJ(onrracri,r ^rtt;., l? Y'{5 FL 331tL €-Grrc9 l!*^{/,(oo,kl Sile U-.-6f,"f ind tuknowr.ds.tr b.ror.n.,n,.T*, "r!Q. r,. o, st \' i tlt. tLoR )\ I l\5: ( ()r !t \ ()t. ( (,1.t_tt.R I l6irn to m..nd *hodid not r.k..tr orrh- #:Notary Puuic St.E of Flonda Maritza Aguisr My CommEeon FF 0761E1!rr[. r?Dtr?017 (- st_.\l_: li'1 16.A.5.b Packet Pg. 496 Attachment: Exhibit A (4604 : Final Acceptance of Utilities - Hacienda Lakes, Phase 2) Collier County Growth Management Division 2800 Horseshoe Drive N. Naples, FL 34104 239-252-2400 RECEIPT OF PAYMENT Receipt Number:2016303105 Transaction Number:2016-009743 Date Paid:02/22/2016 Amount Due:$23,115.80 Payment Details:Payment Method Amount Paid Check Number Check $23,115.80 1046 Amount Paid:$23,115.80 Change / Overage:$0.00 Contact:Hacienda Lakes of Naples, LLC 7742 Alico Road Fort Myers, FL 33912 FEE DETAILS: Fee Description Reference Number Original Fee Amount Paid GL Account Refundable Bonds PL20150002473 $4,000.00 $4,000.00 670-000000-220113 Refundable Bonds PL20150002473 $19,115.80 $19,115.80 670-000000-220113 Cashier Name:LeaDerence Batch Number:5087 Entered By: melissaalvarez 16.A.5.b Packet Pg. 497 Attachment: Exhibit A (4604 : Final Acceptance of Utilities - Hacienda Lakes, Phase 2) CERTIFICATION OF CONTRIBUTORY ASSETS - COUI\ITY PROJECT NAME: Hacienda l.akes Phase 2 LOCATION: Rattlesnake Hanmock Road NAMF & ADDRFSS OF OWNFR TYPE OF UTILITY SYSTEM: POTABLE WATER (MATERIALS ONLY) Hacienda Lakes ofNaples, LLC 7742 Aliao Road Ft. Myers, FL 33912 ITE}I SIZE QUAN. UNIT COST TOTAL 10" PVC Water Main DRI8 10" PVC Water Main DRl4 l0" PVC Water Main 45" Fittings 20" steel casing 4" PVC Sleeve l0'Gate Valve Fire Hydrant Assembly Air Release Valve BSP (permanent) Water Main Auto Rush Device (AFD) Temp. Cap Configuration l0' r0" 10" 20' l0' r,t62.00 340.00 4.00 220.00 485.00 6.00 3.00 1.00 1.00 L00 1.00 $ 12.50 $ $ 1s.50 $ $ 130.00 $ $ 65.00 $ $ 3.00 $ $ t,350.00 $ $ 2,600.00 $$ 700.00 $ $ 1,100.00 $ s 3,600.00 s s r,600.00 $ 14,525.00 5,270.00 520.00 14,300.00 1,455.00 8,r00.00 7,E00.00 700.00 I,100.00 3,600.00 t,600.00 $58,9?0.00 LF LF EA LF LF EA EA EA EA EA EA TOTAL COST CERTIFYING: I do hcreh) ccrtif) tlat rhe quantitics ofma(erial des(ribcd abovc arc true and an accurate reprcsentation of lhr syst€m. t.tz.lL ect Engineer FI- OF Hagan Erg.incering, LLC \-.U 6'f-rceS Authorircd Signaturc of Lndcrgrou ndC OF:Address of U ,D"*,4"^*r3 H- ==^t Contr|Ctor ly known to me .nd nho did not t.ke .n o.th t}.tz@. *L'cofr"I e-/-'- STATEOF FLORIDA ) ) ss: COUNTY OF COLLIER ) srgned rnd lckrowr€dsc a*rore netms @tu *.hn ,106, SEAL: rL P,E., Notiry Pudic St i. ol Florl(b "f-# Mertl2a Aouar Mv Comml!1on FF 075151 E;pfl.12/0U2017 6L 16.A.5.c Packet Pg. 498 Attachment: Assets Sheet (4604 : Final Acceptance of Utilities - Hacienda Lakes, Phase 2) PROJECT NAME LOCATION: CI'R'I'II'ICAl]ON 0I CON'I'RIBT]'I'ORY ASSEI'S. COIINTY Ilacicnda Lakes l>hase 2 Ralllesnske Hanlmork Road NA]\1Ii & AI)I)RESS oF OWNER TYPI] OIJ IJTILITY SYSTEM llacienda l-akcs ofNaples. LLC 7742 Alico Road Ft Mt-crs, FL 33912 s \).'t't \RY slt\luR (\t\t tiRItLs olL\') Itent 6' PVC FM DRI8 6' PVC FM DRI4 6" PVC fM 45'Fittings .I" PVC FM I)R 14 4" PVC FM 45'Fittings l.l" slccl casing I6" stcel casing 6" Plug Valve .l" PIug Valve Air Relcase Valve 12t4 r50 1 138 4 t00 94 3 2 2 6 6 6 4 4 t4 t6 6 I LF t.f Ltj EA $5.00 $6.00 $220.00 s4.20 $2 r0.00 $50.00 $60.00 $1.050.00 $875.00 $2.600.00 $6.070 00 $900.00 $E80 00 $579.60 $840.00 s5.000 00 $5.640.00 $3.150.00 $r.750.00 $5.200.00 EA LF I-IT EA EA EA I(Ir \1. (o\ I I do hcrcb), canil), tha!theguantities ofmaterial its describcd above arc true and accuratc rcprescnt.aon L'flbe as-instaii:d-cost ofthe ststem being contributed 1() Collier County Utiliric.-. {nc . (!l | \(;:i:r s30.009.(nr s t:.\ L: z'E-ls ('. t)1:.,I'rttird laflginoer l:L Rc8l # 38619 OF: llsgrIl []llgineering, LLC .\ulh si lndcrground Contractor s t.\l l,t oF I t.oRIt),\ ) ) ss: ( ()( \'r ) ot ( ot,t,tl;R ) D,.'l E G,..,,N*^y, G^rh.l ert<' 9-J'r^'-3 I /\ddres\ of t Id(rgr'ruDd C'ortr$ctQrfr,+z 4a^a 29 F+ .f*1e.=,V- 3S<rZ ss signed end acknon t.,lg.o t"1o.. .. tt i.-)Odsy olD?1-!,201s bl,:rtrurrrtl , }}ho is pers s# Nol,ary Pu ic St.t ot Floflds Marilza Agurar My Commlllbn FF 076151 lrpioa I2lot/2017 lhr lorcgoifl nallr knoRn l(, l|tr and rrfto did no( lrkr an oath. 16.A.5.c Packet Pg. 499 Attachment: Assets Sheet (4604 : Final Acceptance of Utilities - Hacienda Lakes, Phase 2)