Loading...
Agenda 10/13/2015 Item #16A1210/13/2015 16.A.12. EXECUTIVE SUMMARY This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve the offsite removal of up to 101,000 cubic yards of surplus fill from Isles of Collier Preserve (Commercial Excavation Permit Application PL20150001313) to Treviso Bay. OBJECTIVE: To approve the removal and transport of 101,000 cubic yards of surplus fill from the Isles of Collier Preserve approximately 0.36 miles along US 41 to Treviso Bay. This quantity includes the 20,000 cubic yards which are allowed to be removed pursuant to the Sabal Bay PUD. CONSIDERATIONS: The Isles of Collier Preserve development ( Sabal Bay PUD) allows for 20,000 cubic yards (cy) of surplus fill to be removed from the site, unless the project is issued a commercial excavation permit.. The Sabal Bay PUD, Ord. 05 -59 was approved on November 15, 2005. It covers 2,416 +/- acres. The latest PUD Amendment was Ordinance 12 -12 approved on March 13, 2012. The Code of Laws Chapter 22, Article IV, Section 22 -110 (b) (2) requires petitioners to file for a Commercial Excavation Permit for removal of surplus fill associated with a previously approved Development Excavation Permit. Commercial excavation permits require approval by the Board. Development Permit No 60.080.3 PL20140001035 was previously approved administratively on July 15, 2014. Development Permit No 60.080.3 PL20140001035 allows for excavation up to a maximum depth of 20 ft. The excavation associated with this petition was reduced to 12 feet to limit the amount of excess fill generated while preserving the functional water quality standards of the water management system. The petitioner estimates the total lake excavation onsite of Isles of Collier Preserve is approximately 4,600,000 cy. The petitioner estimates that they need permission to remove up to 101,000 cy of excavated material offsite. For reference, a ten -wheel dump holds the equivalent of roughly 14 cy of compacted fill, so 101,000 cy represents about 7,215 truckloads. At roughly 12 trucks per hour (one every five minutes) working ten -hour days, it would take approximately 66 days to haul 101,000 cy of fill offsite. They excavated less than what was allowed under the permit, yet still ended up with surplus fill. The material under consideration equates to 2.2% of the total lake excavation for Isles of Collier Preserve. The proposed removal of 101,000 cy is minor compared to the total lake excavation quantity of 4,600,000 cy. The proposed haul route is attached for reference and is also considered minor - approximately 0.36 miles each way on US 41. The current and proposed excavation are in substantial conformance with the approved Sabal Bay PUD Master Plan. The attached construction plans are provided for reference. FISCAL IMPACT: The petitioner has paid $5,560.00 to amend the existing Development Excavation permit to a Commercial Excavation permit. The petitioner has also paid the road Packet Page -700- 10/13/2015 16.A.12. impact fee of $8.00 per 1,000 cubic yards for the proposed removal of 101,000 cubic yards of material ($808.00). GROWTH MANAGEMENT PLAN (GMP) IMPACT: There are no growth management impacts associated with this Executive Summary. The proposed haul route will be from Isles of Collier Preserve approximately 0.36 miles on Tamiami Trail East (US 41) to the Treviso Bay development. ENVIRONMENTAL ISSUES: Offsite hauling of excess fill, if done properly, will have no Environmental impact. LEGAL CONSIDERATIONS: Pursuant to Ch. 22, Art. IV, Section 22- 110(d), approval by the Engineering Services Director, or his designee, and the Board, shall be granted only upon competent and substantial evidence submitted by applicant that the applicant has complied with the following: (1) The excavation will not interfere with the natural function of any sanitary, storm or drainage system, or natural flow way, whether public or private, so as to create flooding or public health hazards or jeopardize the functions of the natural resources and environment of Collier County. (2) Dust or noise generated by the excavation will not cause a violation of any applicable provisions of this article. Rock crushing operations or material stockpiles that will be adjacent to any existing residential area may require separate county approval. (3) The excavation will not adversely affect groundwater levels, water quality, hydro period or surface water flow ways. The county manager or designee may require the applicant to monitor the quality of the water in the excavation and adjacent ground and surface waters. Under no circumstances shall the excavation be conducted in such a manner as to violate Collier County or applicable State of Florida water quality standards. (4) The excavation will be constructed so as not to cause an apparent safety hazard to persons or property. (5) The excavation does not conflict with the growth management plan or land development regulations adopted pursuant thereto, nor does it conflict with existing zoning regulations. Special criteria and approval procedures may be necessary for projects within the Big Cypress Area of critical state concern. (6) In cases where a wetland is no longer capable of performing environmental functions or providing environmental values or in cases where it is determined that no reasonable alternative exists other than disrupting a wetland, certain alterations may be allowed, except as otherwise authorized through previous county review processes. (7) Flow of water within and through preserved wetlands shall not be impeded. Packet Page -701- 10/13/2015 16.A.12. n (8) Appropriate sediment control devices (hay bales, silt screens, etc.) shall be employed to prevent sedimentation within the wetland pursuant to the design requirements of Section 10.02.02 of the Land Development Code. Any building site adjacent to a wetland and elevated by filling, must employ the same erosion control devices. Fill must be stabilized using sod, seed, or mulch. This item has been approved as to form and legality, and requires a majority vote for Board approval -- SAS RECOMMENDATIONS: That the Board of County Commissioners (BCC) approves the offsite removal of up to 101,000 cubic yards of fill from the Isles of Collier Preserve to Treviso Bay pursuant to Commercial Excavation permit PL20150001313. Prepared By: Matthew McLean P.E., Principal Project Manager, Development Review Division, Growth Management Department Attachments: 1) Location Map, 2) Proposed Haul Route 3) PUD Master Plan 4)Construction Plans 5) Excavation Permit 60.080.3 Packet Page -702- 1- %" 10/13/2015 16.A.12. COLLIER COUNT' Board of County Commissioners Item Number: 16.16.A.16.A.12. Item Summary: This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve the offsite removal of up to 101,000 cubic yards of surplus fill from Isles of Collier Preserve (Commercial Excavation Permit Application PI-20150001313) to Treviso Bay. Meeting Date: 10/13/2015 Prepared By Name: HouldsworthJohn Title: Site Plans Reviewer, Senior, Growth Management Department 9/15/2015 7:06:34 AM Approved By Name: PuigJudy Title: Operations Analyst, Growth Management Department Date: 9/15/2015 11:21:17 AM Name: PuigJudy Title: Operations Analyst, Growth Management Department Date: 9/15/2015 11:21:56 AM Name: FrenchJames Title: Deputy Department Head - GMD, Growth Management Department Date: 9/1 5/2015 1:39:48 PM Name: McLeanMatthew Title: Project Manager, Principal, Growth Management Department Date: 9/17/2015 5:38:47 PM Name: MarcellaJeanne Title: Executive Secretary, Growth Management Department Date: 9/21/2015 9:08:47 AM Name: StoneScott Packet Page -703- 10/13/2015 16.A.12. Title: Assistant County Attorney, CAO Land Use /Transportation Date: 9/29/2015 9:55:57 AM Name: IsacksonMark Title: Division Director - Corp Fin & Mgmt Svc, Office of Management & Budget Date: 9/29/2015 12:31:16 PM Name: KlatzkowJeff Title: County Attorney, Date: 9/29/2015 1:17:22 PM Name: CasalanguidaNick Title: Deputy County Manager, County Managers Office Date: 10/1/2015 11:41:17 AM Packet Page -704- 10/13/2015 16.A.12. gg— fn cc � � i M1r =:Lip �2,""'•s.. r � � Ci �%` 1 T i:ir �a1�.a. �a'�"; -:M a. f�'.f �4�`t�: t_'• _ 1 HOMASSCN DR - --�* RATTLESNAKE HAMMOCK RD F `( 61Y }r Jill ._ f LOCATTONIviAP Fn. KNOWWHAT3M3Dw RIEW096 i Packet Page -705- N W E S 0 2000 4000 SCALE IN FEET -ru ISLES OF COLLIER PRESERVE LEGEND HAUL ROUTE ( ±0.36 MI.) 100 ° /G TRIP DISTRIBUTION yarraco and Associates, Inc. FLORIDA CERTIFICATES OFAUIH 1-TION ENGINEERING - - SURVEYNG � TREVISO BAY ROUTE DISTRIBUTION TREVISO BAY Packet Page -706- 10/13/2015 16.A.12. 0 m z 4 I� FILE I-IE 23239 TIS FIG.I SXII - REV.DWG LAYOUT LAVOUT1 LOCATION J12323M1 G1EXHIUMTLRI PLOT DATE FRI. 9 -11- 2°15 -5IA PM PLOT W AMBER WILIlBtSON DESIGI SW o g 3 CJO 10/13/2015 16.A.1 esg�n 3 g 'ilr r� r� W £z s # &i n€ E s vWii Cz Z z4 �. �' _ g•6 q S 4 Y W ug p og & E..'4 w FBI xo S0 7 a° f N 9 IR z E A E w b S 8 A 9 8 w moao IL w4 iio��f „r m” m gqq�4 _ 0 4O�x zz o jg w �s =ow NS� F gioN�3 M o 4WWL � g� t N w of , k w � � �+ a W PLO as aaoasAVe�o s • � a � o r � z w 1 w � a O U o o § 7 g 04 K �o rc @ ? H z a $ w wo K o; y U m w eM-2 a��g aw z fit € FW W [ = N gay _ VI I w w z LLI iz,S�sta� mo A W wW �i' a QZ O ww 4 �.g- sie w x W r: xo J W p p'd�x �°0hL - --z o - -K!� w w $ Qw Q Q �^' G gPg.R� Z4�W €wn 6• W$iW ;Q c�i=i fm °wC N O i A ° S U' 33W gf Z, m 8g ? W15g$ a Cd ;gpg w'a rc i m o `a x y`s °3 i{�e�eiie od�a W e o a a w Packet Page -707- a 0 A 26 $ -6 eb 10/13/2015 16.A.1 �1 i oz < g z 9, on X z > w LU zwm U) ■ 00 a W.- ED FRo EM; D- DEB It H ms� pia > @t t 'glytyt p r I L �H�Kni g' J�Iiq t. 9 HM U I 1 . a 5.y h 2 ! Al MUN.01 IU N HI M ILA M 5 t ...... i. 91M *Hs m 6 in Ho 10 Eli 1H M 861 tl t h 1 s3;s3$9 X4:$5 h -VlWi HZI. I gi m g Hi H I I IN 16,11 1 1 3, N pj 'It' FM 4N io iE >t ffi dy Oy z w 10 CL W 0 10 Co O w 1- 10 0 C, z ' < uj 'r Z UJ W 7, 0- "'L' 0 LU m w z 0 Om 'A FUH66 ffl Lis �' 2 ? Fly-, R H "y I-JE M NEU 0 b t;.' H!Hvi jl� lip ul j wo �gl ml In I it �!Y F jj tp 14� F 0q, H p6 6 P! Hj R, I'm 1- 0 A P, , im H H w I'M Hn H11 RH 7i 'M rd - ., ' i r. 5 ill 0 6 1. B11h Pi '40 �ggl 6, � lg'P�. - I I p W 14, R IgI21 1h , N " ROM I jh i, iiIINI itg-Hp It big .11 F; ' I . w - " 'Hol. . 313 E 6 lmo I �1-1 Wili �; ­4 p M i; 5 30 11, q, B. N M -M if IN 11 V. 8, P" RiNu ii ag 5: §b ;P ; IE 'A i !g €4 glg N p6.. 9 I ILPI Re Ho" 19i 5 5 . - P� W - - 2 . , Ij gi ". M §: IM 111 , 1. r 40. 11 4 h Packet Page -708- 2. /0"**N ow 10/13/2015 16.A.1 o ;Rm, d Wr—+ R gar Ni WU I � h n JI0 3 ^ 1a - �/ v I uj LLI IV \ JI h- I /`yO� H r� , :_ � Doti • �' �,�' ,,$,.� 3i1� !� \ \� \F � • A� IF F-I — - -- -mac -�-r - - --. - • \ `:� � , - 4 _ .t • I ..NFL. ". r t• � ��. �' < `;,. _ t _ I i r � " u _ E C r I Packet Page -709- 2. Packet Page -710- 2. ase 0 3 w mR�p$? 10/13/2015 16.A.1 Ig m� rr•, 1 4r_4W €t ro 3 ? £ ego .wa s r an °e tG ' O €e $ W $ sa �a o Q< w p�ga aG, .� '< F W U/ C yew �4�( 6$ gg� G a �7 7 N 89 w w F+w ��pSb /($/$yy 6 ga5 5o5 S W N dw 5Otl ? °- f k 11 1 S w F t° 7 min H ° e mv @9a m 1P 6 AVB M.iml b e o� b h m � LL O N Z Z.; y (/1 � m Q m u, z_ II III a rt la II: z II z I ' (L J � I m EEE J S S I Packet Page -711- 2. o A ¢a_ 10/13/2015 16.A.1 EL Q p all Ow II e Y \ 1 g 88 3tl9W f8$$C Packet Page -712- 2. o A 10/13/2015 16.A.12. 5 5 1 r g €P e � � 4 W d �� b WS? f (� W S$ ?001 Packet Page -713- a 0 x 0 z 0 m Bi i a i i i O i i o ' w � � Y 10/13/2015 16.A.12. Sin* C e e C/) L3.i dn Noy 3 00 jr�1(�j d tt i+r 5 G €mil 6 5 d N 9 e W of w w Cr CL 0 g CL 0 1 w Y 3 ,I v I I � I t n I f I 1 8I 8 I t II 1 Ir l II 1 II1 1 II I l ,I 1 , 1 i , I i r 1 1 r I 1 , I I , I 1 , ( 1 , I r , I i I � I I I P I I I 1 I i I 1 I I I 1 Packet Page -714- ■ I I I r, I I I' I 1 I I I I , I I , I I I I I I I I I � I II I II I rl I III I, I I I ,I I" rl Ill III tl I 11 I u I u I Y I I I .I I �I I ,I I ,I I r I I r I I 1 i I r i I r I I I I Ir.J I i I =J I I F O Z S W 0 W U 0 F- 0 z O Z X W I p 8 3 w _1 gig 10/13/2015 16.A.1 . . a g "' ss i -.:,� €a W W z W w W a6g a Wg 4 a s N eW® Y$yr ea^ L s s a� Y ti gg¢p S $ a� m W Br�, €L Co g3 w a 3 q [ g w Z R p 8 Q CL Z LLI g W ^x C F Ory£ a L a: m LL #• W � J LL ° Q R e J gg I e5 I�l I q y ,I II I I I I :.I I F r I q e a aW £ '• 't I � I � s ILA 1 W bye? LU Z I A pl 67 € W P I 3 Y Q Cr J W p 13 UZ p9 K i KW W \ ! ? uj ff J IL J `� LL y _ U W LL r Z (n Q I,I. wf U I Il w w $ > W § 6 § j 1.1 W x d33 I .I I I I 33 I \I I I I I I S II 3 °L } " Packet Page -715- 8 s w 10/13/2015 16.A.1 Q s Mq a �I�a AgJ ^s� CAM S° yG rO d ao Via€ 3$S a @ e Ir € U €3 w ° e x[ '� �s� al, �r gg@ g S @�g $5i a €� s v 6 G11 Rill H, : I Cp a1, if a g6g p 6 X 411 p I qq 1 II la� �i z = EGG :gi ase xec6 G 4.$ n Cs S ES` r eS pasC ® T5 d Rio ,sgi F fl 8 I€ o 11 g• xee pp@'e C p[ ss a� v 1:, PH aWH sxi e o 'Pig i CS a. 8 eB S Cp i S a° ° -w pa axis. S " -� @� xr €qt@ 8� @E S€ ®ia fig. 4 #� @ S a'€ pap is � s� °�oF I c R - - - -- c @t @ a e6. a uj :f L9 Y ££ Q$ W x C G I CC V h 4sa Z S W T °C I we 7P 7 @ Q, pxp z z $ Q 1T U z a w ! i e =o \\ W WNW N R O NJ I p I . Z e W a V " H Q `� O DJ i ® 9 8 z ZQn � gg al( l o a m o p 3 K i p=} LU Y S z p _ S i $ y I papEpp F 0 W Q all z If S i® eb w arc °ia a ag$ 9--I 'gal a€ ml ail esag @ �a+ @s00 Wg "s gs I g a d o € 9Y Sai a ToYi' W3' t tl 9 g gg k gg it d V ugt S3 11 v a@ @ 1 g 4 8 3e it 1 Packet Page -716- 2. w ll� 0 A g6 i 9 ;l 10/13/2015 16.A.1 W X� 2 9' POW wuw 14 M. 0 v R q A da yQ Packet Page -717- 10/13/2015 16.A.12. COLLIER July 15, 2014 Stephen Coleman Barraco and Associates, Inc. 2271 McGregor Blvd, Ste 100 Ft. Myers, FL 33902 Re: Development Excavation Permit No. 60.080 -3, PL20140001035 Isles of Collier Preserve Phase 3 Section(s) 24 & 25, Township 50 South, Range 25 East Collier County, Florida Dear Mr. Coleman: THIS IS YOUR PERMIT AND MUST BE POSTED ON SITE In accordance with the authority given in County Ordinance No. 04 -55, Section 2.E., Article IV, Sections 22- 106 -22 -119, as amended, your application for a Development Excavation is hereby approved subject to the following stipulations: 1. The excavation shall be limited to a bottom elevation of -17.3 ft. NAVD. All disturbed areas proposed for lake excavation shall be excavated to a minimum elevation of -6.3 ft. NAVD. 2. No excavated material shall be removed from the project site. 3. The lake littoral zone shall be created and planted as indicated on the Plan of Record and in accordance with County Ordinance 91 -102 Section 3.05 -10 as amended. 4. All provisions of Collier County Ordinance No. 04 -55, Section 2.E. shall be adhered to. 5. Where groundwater is proposed to be pumped during the excavating operation, A Dewatering Permit shall be obtained from the South Florida Water Management District, and a copy provided to Engineering Review Services for approval prior to the commencement of any dewatering activity on the site. 6. No blasting will be permitted unless issued a separate permit by Collier County Engineering Services Department. 7. If trees are to be removed as a result of the excavating operation, a Vegetation Removal Permit, required by Land Development Code, Division 3.05 as amended shall be obtained from Collier County Environmental Services Department before work shall commence. 8. A 20 ft. maintenance easement shall be provided around the perimeter of the lake and a 20 ft. access easement to it shall be provided from a right -of -way. The easement shall be accessible to all maintenance vehicles. 9. Stockpile side slope shall be at a maximum of 4:1 unless fencing is installed around the entire perimeter of the stockpile area Packet Page -718- 10/13/2015 16.A.12. /0-N 10. Any stockpile in place for a period exceeding 60 days shall be seeded and mulched and erosion control devices installed. Since we are in receipt of the excavation performance guarantee in the amount of $222,180.80 and the permit/ review fee in the amount of $3,180.46, this letter is your authorization to proceed with the excavation project in accordance with your plans and the above - mentioned stipulations. This permit is valid for (1) year and must be renewed on the anniversary date of permit issuance. The Plan of Record for this excavation is titled "The Isles of Collier Preserve Phase 3" Sheets 1.0 - 4.0, 8.1, 11.0 - 11.3, 14.0, 15.0 prepared by Barraco and Associates, Inc., signed and sealed by Timothy B. Gavin, P.E. dated June 30, 2014. Should you have any further questions regarding this matter, please feel free to contact me at (239) 252 -8279. Sincerely, Matthew McLean, P.E. Principal Project Manager cc: EX 60.080 -3, PL20140001035 File Packet Page -719-