Loading...
Agenda 07/07/2015 Item #16A187/7/2015 16.A.18. EXECUTIVE SUMMARY This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Artesia Naples, Phase 4, (Application Number PL20140002472) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the final plat of Artesia Naples, Phase 4, a subdivision of lands located in Sections 4 & 5, Township 51 South, Range 26 East, Collier County, Florida, following the alternative procedure for approval of subdivision plats pursuant to Resolution 99 -199. This procedure allows for the Board to approve the plat and associated construction documents for construction purposes and recording purposes concurrently. CONSIDERATIONS: The Development Review Division of the Growth Management Department has completed the review of the construction drawings, specifications, and final plat of Artesia Naples, Phase 4. These documents are in compliance with the County Land Development Code and Chapter 177, Florida Statutes. This project is within the Lands End Preserve PUD, Ord. 03 -04, as amended. All fees have been paid. Security in the amount of 10% of the total cost of the required improvements, and 100% of the cost of any remaining improvements, together with a Construction and Maintenance Agreement for Subdivision Improvements, shall be provided and accepted by the County Manager or his designee and the County Attorney's office prior to the recording of the final plat. This procedure is in conformance with Section 10.02.04 F.2 of the Land Development Code. The Development Review Division recommends that the final plat of Artesia Naples, Phase 4 be approved for recording. FISCAL IMPACT: The project cost is $658,930.00 (estimated) to be borne by the developer. The cost breakdown is as follows: a) Water & Sewer $295,272.00 b) Drainage, Paving, Grading $363,658.00 The Security amount, equal to 110% of the project cost, is $724,823.00 The County will realize revenues as follows: Fund: Growth Management Fund 131 Agency: County Manager Cost Center: 138327 -- Land Development Services Revenue generated by this project: Total: $20,977.90 Packet Page -935- 7/7/2015 16.A.18. The Fees are based on a construction estimate of $658,930.00 and were paid in February, 2015. The breakdown is as follows: a) Plat Review Fee ($1,000.00 + $5. /ac) $1,210.00 b) Construction Drawing Review Fee Water & Sewer (.75% const. est.) $2,214.54 C) Drainage, Paving, Grading (.75% const. est.) $2,727.44 d) Construction Inspection Fee Water & Sewer (2.25% const. est.) $6,643.62 e) Drainage, Paving, Grading (2.25% const. est.) $8,182.31 GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public Facilities prior to the issuance of the construction plan final approval letter. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval. - SAS RECOMMENDATION: That the Board of County Commissioners endorses staff's recommendation to approve the final plat of Artesia Naples, Phase 4 (Application Number PL20140002472) for recording with the following stipulations: I . Approve the amount of $724,823.00 as performance security for the required improvements; or such lesser amount based on work completed, and as is approved by the Development Review Department. 2. Approve the standard form Construction and Maintenance Agreement and direct the County Manager or his designee: a. To withhold Certificates of Occupancy until the required improvements have received preliminary acceptance. b. To delay recording of the plat until suitable security and an appropriate Construction and Maintenance Agreement is approved and accepted by the County Attorney's office and the Board of County Commissioners or the County Manager or his designee on behalf of the Board pursuant to Section 10.02.04 F.2 of the Land Development Code. Prepared by: John Houldsworth, Senior Site Plans Reviewer, Development Review, Growth Management Department Attachments: 1) Location Map 2) Plat Map 3) Opinion of Probable Cost Packet Page -936- 7/7/2015 16.A.18. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.18. Item Summary: This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Artesia Naples, Phase 4, (Application Number PL20140002472) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. Meeting Date: 7/7/2015 Prepared By Name: HouldsworthJohn Title: Site Plans Reviewer, Senior, Growth Management Department 6/10/2015 1:26:42 PM Approved By Name: PuigJudy Title: Operations Analyst, Growth Management Department Date: 6/11/2015 10:22:32 AM Name: PuigJudy Title: Operations Analyst, Growth Management Department Date: 6/11/2015 10:23:15 AM Name: McLeanMatthew Title: Project Manager, Principal, Growth Management Department Date: 6/17/2015 12:41:21 PM Name: Casa] angui daNi ck Title: Deputy County Manager, County Managers Office Date: 6/21/2015 10:34:46 AM Name: StoneScott Title: Assistant County Attorney, CAO Land Use /Transportation Date: 6/22/2015 9:33:00 AM Name: IsacksonMark Packet Page -937- 7/7/2015 16.A.18. Title: Division Director - Corp Fin & Mgmt Svc, Office of Management & Budget Date: 6/22/2015 9:59:51 AM Name: KlatzkowJeff Title: County Attorney, Date: 6/24/2015 1:46:35 PM Name: CasalanguidaNick Title: Deputy County Manager, County Managers Office Date: 6/26/2015 12:50:41 PM Packet Page -938- 7/7/2015 16.A.18. —01 01 — / I now OL, C:L ragc z :5 z 0 F- U O NO) OavA@InOg N911103 tu. / u o, N F- Z LL1 OL, C:L ragc z :5 z 0 F- U O 7/7/2015-1— Will; p 5 4 N11 . *1 a j or w 2 LLJ A Lw) 3 L X008~ C', al vi 2 Lu E� �f 21*151 1 z z 94 OL Cc-,' — 7 cz, C, LLJ CL IN4;�� CL lbpl- 5F, ;lJlRg Cc, n; Mug h uk�81 0 N 1 ouo ts I 12 b�l Packet Page -940- a 0 O N ti Q) W �W Cz. O � N q Q d, aL) os Lu��W , QZLr'zo wc5w O U W oE"Z O C, E U Q �"�fl1 C7 F-66a O p QCZ, ° �1 a°o°ao 0 =wva E ? Lo 6 H az� °zorxi� E U z aQw° Wa� �o dWo P4 I o N 15 Ami IR - =� l I `ZI x 7/7/2015 16.A.18. q x�e � pis I �o Lr C5 `K E Z - � r_ p 6{ L � h � a� 1� W I lb � a I. •, - I NlIpS aN � °� a R j"a�anrxw.�a "u a _ 3 ti w rtLl Fla la RIP 3 Ah E r. 1" 1,4 W 4o F 2e �tiya �.at E �3y yb9 �R x ��4En WWII t,JW oe I.x ATE aJ de 9J% e E_ Em J � Fla la RIP 1" 1,4 �.at �R � .3 WWII t,JW ?tae I.x ATE I � + al RfR a gala alb _a�siaaBal Packet Page -941- 0 o" ti °m u, ~ w wlB Ya sire �h aRRw RIB 4 = to a RRRal3 °8 8 8 8 8 88$88', :c R &gg88' 4 g$ 7/7/2015 16.A.18. HN L Ala E s � e N � } s Lo W � E m •� V ° of O ,! - 8 .R U� •'B h _w /p `mod `et,��''' "c3* Al 5.. --------- ' 1� r. x 8 w9' /s':•• �� C, Z __. 'E U) W ra-i _ "i "so� - osih� �0ya E g R S�N 0 LU W U3 5 8 UC7 Q C\2 r r E) a Po ,.- \ ,r \s _ °5?Y ^nx^ 'Qi —M C, � � d d 'a S� �'8 a - �d ,•oq��'"� \� - __ �Jt� p�n $MIN � � (/1z co O ° &;- .____i8 --- --I` -L Ic g8„.'gRlhB _BryRoti W l p = �N we c R^ p Gr d d �" `n v%� ti(� 8 asasia^ aoce ha- a- PR'C'n F 2 U Z z$ e aaa � a s 53a R Sin L) U � R� 4 2 66�n�m ^3 iR p Lo W � E m •� V ° of O ,! - 8 .R U� •'B h _w /p `mod `et,��''' "c3* Al 5.. --------- ' 1� r. x 8 w9' /s':•• �� C, Z __. 'E U) W ra-i _ "i "so� - osih� �0ya E g R S�N 0 LU W U3 5 8 UC7 Q C\2 r r E) a Po ,.- \ ,r \s _ °5?Y ^nx^ 'Qi —M C, � � d d 'a S� �'8 a - �d ,•oq��'"� \� - __ �Jt� p�n $MIN � � (/1z co O ° &;- .____i8 --- --I` -L Ic g8„.'gRlhB _BryRoti W l p = �N we c R^ p Gr d d �" `n v%� ti(� 8 asasia^ aoce ha- a- PR'C'n F 2 U Z z$ e aaa � a s 53a 8y o S' QN��H Packet Page -942- R Sin L) U � R� 4 2 66�n�m ^3 E ^m�C P 8y o S' QN��H Packet Page -942- R Sin Bn � R� 4 �ae 66�n�m ^3 '_hl ^m�C - � O Alaae ^ i"INs,tNN 'At�w �I, 0.H ry h'• -�hh hhhhhhl�lh y_b b b� U�a'm'��n RRR '�I�M1ne nan�nj�i3 „_a�ax��a� a " ^' "- - ^aa ^; sfaas88oa8a8a a R MR Rm�"'�$Imm�m8n�',tiima�'�Iti� = ^YR� Y N5 t 01 �3 NO 55 .110 � Q 3 , la 7677ee17�ee8 ^°_ S, :1� ls;� „fi882; f 8�nzoh%NF ''d C, lh ^� F� -bE qMZ: h ^a =l�.'e 4Nej :4�i <� <. __; ^� 8' =,137y RlBn _ 88888818088�°78zS =8�R wl�' =�8. Rn8 �ti °i88n R ;�b',��gIFR �'_8� F'n hr Fb FFF «Irryr Fn' H�_= FFI�RF nIJ�Rry° bF b:n_pl ybbi4 44 Rh�2K$a ..18�ne �'I ^Iq� �"a8` 88483 g8?JR 2 8R88881R8g8R „ga.888 F = ^= ��� � 4! Q d !n C>~ CQ ° LLJ E Qzlr;zo ¢ M — U F ~% 6 O U as° LU °FZE- O J� -°'U7w E"'C7ght F Q ¢¢a v J 0 E-- LljF O ° ass`" ¢ LO 0.a z a °zC) F U z � r4 WjJ O ° ¢ W L) 04 Sy o �g �PSR $ '5'i ♦ $hl$ °O -`nary 5ht$t, ;-ma_.^.^. • °R. o Lk .s P� eg N t656J" r� - — — - - - - 24 1 -,P `; r III' ^1ry 1_ @E :n =ale tSP:R -:P wt lon stt o' SSA R21$$8833R t Rh'^RS:: Iwo °RR tw �m `RR =, ww ° -3 R'Q.^V7HN,Nai �w w �_♦ '3_$°"__ ^ §RR °$$ ^='R RRR 4':4• =R Z'�o ymy,- i� Bii ♦ D F = 0 6 RR: §oos� 6 @R RrS:$eti ^q�`8;•A'o8R$ w �6ry ♦I^:��Ih =�= 8888886 °6ti hkF ♦rvpS6 '� �g�Rr�i'O• R $ �R::sn$ � I: a�b �Nb HI' :...::����b'b bb mac, l".�bMryN �nh�h��bb `aa S c ^RB,' ^n ^<n8 87'n°:ryo?_�Y0 8„R &_aan AR .R. e3 gM3$S$R ^84,Ro ^h„ 58$ ga =6= 8ajg88a888 R888888888$ ,98,'88�88a8888$88$8$g l!- 11 I M�loH �f�,ps av .t, xC 1�' y vio� "t S oru m6 3` 9 `• M p ar N ZT�y" 9h z 7/7/2015 16.A.18. ..- < - U i EN b $ C �6 R, �E S94tE tj600 ,� 8 � '!0� lY"C N.Yi iu k �1e f c LL 0 9�a^ • o Lk .s P� eg N t656J" r� - — — - - - - 24 ` r G8 @E U i EN b $ C �6 R, �E S94tE tj600 ,� 8 � '!0� lY"C N.Yi iu k �1e 1 o .- • JC SlSyo i°' E >s ➢�TL �JpO 14 trap � . 0 jE - \ St1 p31 v' 50 SMC. C �I6.0� S It[Q V� N be9r �a 116 � u n � irr .50'11 .S6N1 rv1 � r' a[vJ Welt u. v� - I nl 3 -ro�GJA SMDb/u N H[/1053N!/0MMV33.�7`� U VNL ly i .1-1 W1.1.ms 3 & o $ n Packet Page -943- o h N t656J" r� - — — - - - - 24 ` r 1 o .- • JC SlSyo i°' E >s ➢�TL �JpO 14 trap � . 0 jE - \ St1 p31 v' 50 SMC. C �I6.0� S It[Q V� N be9r �a 116 � u n � irr .50'11 .S6N1 rv1 � r' a[vJ Welt u. v� - I nl 3 -ro�GJA SMDb/u N H[/1053N!/0MMV33.�7`� U VNL ly i .1-1 W1.1.ms 3 & o $ n Packet Page -943- a h mw 41 d N r- C) CQ q q i V � a�zs 0 Uj Q 69403 O W E � d O ohs° °� J€•°° 'Co Q ES�q� E O Lo d vJ OxE LU ^� UD Lr d E �, .•G�1 zZ- a4 °zoo I- U z Q yyW O Q ° d W L) Packet Page -944- 7/7/2015 16.A.18. w .3p \ \ ��'Sp�, /day ✓ yg�o �6 e \ !2 '" y 67 n or :� - - wtia•w "° 3.00.00.06 N \ x a U Ar NI y$gF i - \2 RRS' tt^w ° ga r m \ s ° yy 3d R R;' ^R� r _ _ _`�: � ; a'aaaaseag8as8g .g aasssaa a- affl a ✓_ c, S Packet Page -944- w .3p \ \ ��'Sp�, /day ✓ y 67 n or 41�✓iL "° 3.00.00.06 N \ x a U Ar NI y$gF Packet Page -944- 7/7/2015 16.A.18. Q. GF:la►]DY II41NO '. P.A. CIV _ENCiDEHEI:R-S_ AND SUR_VEYC►R.S PI_MQgE:R_S__LI�NDSCAFE .NRC:F[ITECTS AJ�:TESIA- iV.��PL_E =S F'I - {, /SSE =; 4 EN13INE:ER'S OPINION OF PR.C_)E3A.E,I -.E; C,,C)'-�T' I =(DR. E tivr, BC)NDING January 29, 201 Water and `dVastewal.Cr Sub -Tol' L ;1;295,2 -?2.00 Earthwork, P;avir►g anct LrainagF; Sub- "I'oial: $363,658.00 G:1 Engineering \PF:0,1- ENG\Vd�WCIP,N�.06DP Ph 4 &51C3PPL DP'd)PCADPC P'n•4 Bond_2D15.012c 1 of Ei Packet Page -945- ------------- - - - - -- A --------- - - - - -- Earthwork 55,660.00 I3 ----------- - - - - -- Raving ------------------- --- - - - - -- SZ ?3,735.00 C Wastewater Collection 163.960.00 ---------- - - - - -- D -------------- - - - - -- ----- - - - - -- Potable Water Distibution ------------------------ $I")1,312.00 E >tcxrm Lhr3i�la.ge - - - - -- E84,263.00 ------------------- -------------- - - - - -- _� -------------------------- iC'(7 $56.58, 930.00 --------------- - - - - -- -------- -- - - - o f � -- ; ----- - - - - -- 1'-101% TOT4L --------------- - - -- $Z24, 823. 00 Water and `dVastewal.Cr Sub -Tol' L ;1;295,2 -?2.00 Earthwork, P;avir►g anct LrainagF; Sub- "I'oial: $363,658.00 G:1 Engineering \PF:0,1- ENG\Vd�WCIP,N�.06DP Ph 4 &51C3PPL DP'd)PCADPC P'n•4 Bond_2D15.012c 1 of Ei Packet Page -945- 7/7/2015 16.A.18. AIRTE :CIA- NAPLEES 4 ENGINE:E:F < "S OPINION OF PROBABLE tC:COIST 1 =(DF: F'l_AT BONDING 1 /2 9110 i :5 SCHEDULE EAR:i'l3[WORK & SITE :P']R:]EP Clearing, grubbing and preparation of the construction site and 'bringing, tae site, :including; rmclway rights -of- way, easements, building sites and open areas to the lines and ;;rides shown 011 the drawings or as designated by the Engineer in the field including chapping ar.d grinchn„ of all matca ials on. fne D,vvne-'s _property and then disposal of all residue offthe Clwn.er's property, all as speri :fied., per acre-, complete. All work: in right -of -way is subject to inspection by the ov✓tzer, City, County :LOOT and /or FDOT contingent on final acceptance of improvements as sh.oWn and specified on the, contract. docum .-nts. The co:nst:nrction area shall !:)e enclosed with FD1:P approved siltation fencing prior to cornmencerr)ent of work. The unit price of the erosion control fence shall include mainrenance of *die fence for the duration of constn.rct:ion. — -------------------- - - - -- -- - - - - -- - - - - -- ------ - - - - -- - 67VIT TOTAL IT�Tm — -- - - - - -- DESCRIPTION___ —_ —_ -- - Lri\'Iil J - -___ G!I�APJ2'l;Pi' PleICE_ -- _ PRICE A -1 Cleaning and Gnibbi:ng * iA.C- _ —__ —'� $0_00 - $0.00 ___----- -_ —_ —_ A -2 E.msion Control -Silt Fence LF 4,020 $1.00 $4,020.00 — A-3 ---------------------------- - - - - -- Doub e Row Fsrosior, ConlTol -Silt Fence - - - - -- LF 820 $2.0C $1,640.00 — A-4 -------------------- - - - - -- - - - -- Lake Excavation (18 -au1, Place 8: Compact) * - -- CY — 0 $0.0C $0.00 — A-5 ---------------------- - - - - -- Sod. L.a.ke Banks (20''KicltY.)* - - -- SS' 0 $0.00 $0.00 — --------------------------- - - - - -- - -- A -6 Exocit Clewing; fiver Preser ✓es AC 0 $0.0C — ------------------------------ - - - - -- - - - - - -- ---- - - - - -- $0.00 TOTAL $5,660.00 * Site has been cleared and filled, lakes have been excavated and sodded arc] the exotics have ceen cleared from the Presences, all under previous phase acproVals. Q. Grady Minor & E\ssociates G_\ EngineeringlPF ;C)J- ENIG1VV',�VCdAN106DP Ph H,5 \03PPL DPIOPCd)PC Ph4 Bond - 2015.01 25 Packet Page -946- 2ofE 7/7/2015 16.A.18. ARTE :- '{A- NfNPLES PHA :51 = :4 E= PJGGIUI. F_� ;';� OPINION OF PROBABLE C :C)��1" F'C)R PLAT BONDING 112:' 15 .SCHEDULE " B "' PA'C'ING) Ro,ldway constaicti.on colraplete; per the plans. and County specifications including; stabilized subgrade, stabilized shoulder, lirne.rock base;., tack coat, asplialtic concrete, required test.in €; by an :Independent laboratory, roadside fill and grading For full width of right-of-way and easements, finish grading, see- ai:ag; and mulch and/or sod. Q. Grady Minor & AssoClatE!S G :\ Engineering \PF:C),I-= NG \VV!VV --IAN',C,6DF' Ph 4- E,503PPL C)MCIFIVOPC Ph4 Bind- 2015.01.29 Packet Page -947- 3 of 6 l N17' TOTAL IT. EM uEsgurn'(w Lr \E';[ ou/twj';!'i' JORICE3 PRICE — E: -1 ------------------------ 12" Stabilized 'Su.bgra.de S)' 6,(i 10 $2.50 $16.525.00 — B -2 ------------------------- C' ;Lirnerock Base (Compacted and I'iitned) SY 5,'i30 $8.00 $44,240.00 -3 3/4" Apltaltic Concrete_T'ype S -.II[ (1st Lift) SY - _5,530 - -- $4.50 $24,885.00 _B B -4 3/4" Aphaltic Concrete I' }3)e S411 (2nd Lift � S)r 5.,530 $5.50 $30,415.00 — E -5 - -- Valle y Gtitte:r - -- L,F 4,8,'5 0 59.00 $43,650.00 E­6 5' Concruw Sidewall _ 4" 'Pluck: SY 2.940 $27.00 $79,380.00 E -7 Handicap Curb Rarrnps - PM T- Y pes EA 5 S600.00 - - - - - - -- $3,000.00 — E-8 ------------------------- - - - - -- Sodding (I'o 4' Back of C'u:rb) - - - - -- SY -------- - - - - -- : ?.()70 -- - $2.00 $4,140.00 E -9 Signing &: Pavement ]Vtarldngs B t $3,000.00 $3,000.00 B 10 SneetLiihts - FPLF'rovicle :andiustall ]�A iS' $1,000.00 $19,000.00 B-1 l Set PRDA's L.S 1 $2,500.00 $2,500.00 — ------------------------------ - - - - -- - - - - -- --------- - - - - -� ------- - - - - -- - 13 ­12 Set F'CF"s__ _ L�� a $3,000.00 $3,000.00 TOTAL 5273,735.00 Q. Grady Minor & AssoClatE!S G :\ Engineering \PF:C),I-= NG \VV!VV --IAN',C,6DF' Ph 4- E,503PPL C)MCIFIVOPC Ph4 Bind- 2015.01.29 Packet Page -947- 3 of 6 7/7/2015 16.A.18. i %F,,- fES1A- NAPL- E.:5 RHA:'-E. 4 ENGINEER,'S C)PINIC)N OF PROBABLE (--:C)S'T- f :( ")[R PLAT- BONDING 1,29/201 1) SCHEDULF, "C;" WASTEWATER 'COLLECT JON Includes furnisihing- and handling of at] required ::materials, joint: restraint, thrust blocks, connections to other pipelines, all excavation (including rocl, and over - excavation if necessary), dewaterin g., bedding material (if necessary), pipeline installation, back filb.fig (imported E1 if neces sal li i, compaction, compaction testing in roadway areas,, pressure; testing, flushing, clean - -up ;Including; resoddilig areas previ oils Iy sodded, seeding all areas disturbed by construction, providing, complete as- built drav✓inus and other items neCessai,i to complete the system and provide the Ow7ier, F'DE :P and County with a -omplete working; wastewater collection system as shovczr on the drawings and specified in these contract documents. C'ut ranges are measured from profile grade line to invert of the pipe or manhole. — ----------------------- - - - - -- -- - - - -- --- - - - - -- ------- - - - - -- TOTAL ITEM D'E"S CCRIVRO.TT Ui \r1 :� _ ►�U v l P -=---- - - - - -- uiva, mu( F' -------- - - - - -- PRICE C -1 ________ 8" Gravity PVC-S:CIR 26 (C -6 Cut) 477 _________328_00 $13,356.00 — C-2 — --------------------------- --- - -- -__ -- 8" Gravii�r P`JC --S1CR 26 (6 -8' Cut) ---------------------------- - - - - -- —_LF -- L,F - - - - -- - - - - - -- 7.15 ------- - - - - -- ___ -___- $33_00 $24,585.00 C-3 8" Gravity F'VC : -Sl' R 26 (8 -10' Cull L,I - -_ -_> 12 - - - -- - - - - -- __$45_00 $23,040.00 — C-4 ------------------------------ -- 8" Gravity PVC:-SDR 26 (10 -12' Cut) — - -- L,F "159 - ------ _ -- _$60.00 $9.540.00 — ---------------------------- - - - - -- - - - - - -- -- C-5 — 8" Gravity PVC -S1CR 26 (% 12' CLit) -------------------------------- --- - -- L,F - - - - -- 120 - - - - -- -- _- ___- _;;80_DC _ $9,600.00 C-6 Television Inspection --------------- - - - - -- - - - - L,F -- - - - -- 2., (:3 - -- ---------- $3_00 56.039.00 — C -7 — ----------------- Manhole 4' Diameter (0• -60 -------------------------------- - - - - -- EA - - - - -- - - --2 - - - - -- ------- $4, D0_OC - $8,200.00 C-8 — Manhole 4' ]Dlame :er (6 8') — ___ —_ -- ----------------------- - - - - -- - =CJr -- _ —__ —� ----- — - ----- _�?J)00_00 $5,000.00 C -? Manhole 4' Dliarnceter (8 - -W) - - - - -- 13A -- - - - - -- ?__ - - -- -- - - - - -- ----- _$60D0_00 - $12,000.00 — C -10 ---------------------------------- Manhole 4' D'amei-er (10 -IT) 1-A :3 :;7.000.00 $21.000.00 C -1 i Manhole 4' Diamerer ( >12' Cut) ------------------------------- - - - - -- 1:-A -- - - - - -- 1 -- - - - - -- - S 10,000.00 $10,000.00 — C -12 6" Single Sever Service FA 1 S600.00 $600.00 C-13 6" Double Sewer Service _____ _ - - - - -- -- ] -A - - - - - -- 30 -------- - - - - -- 5700.00 ----- - - - - -- 521.000.00 — ------------------- TOTAI. $163,960.00 Q. Grady Minor 8& Associates G:\ Engineering %PF;0.1- ENIG \VJ',VVCIAN C,CDP Ph L'- €,Sb73PPL DP\C1P0,0PC Ph4 3ond- _20'15.01.29 Packet Page -948- 4 of 6 7/7/2015 16.A.18. ,AIF;TE :E,EA- NI,a,Pt_ES 1= i1- I,��� >E: � ENIGINE:E:F,'S OPINION OI= PRC11BA LE: C,0ST FOR, PLAT EIC)NDING 1 /29 /201 "CIIEDUI E "D" POTABLE WATER DIy'T- RIBUTI<)N Includes fumisizing and handling of all required materials, joint re;strz.int, av-1131: blocks, connections to other pipelines, all ex.cava'tiColl (irrr.'luding rock and over - excavat=ion if necessary), dewaterizg, bedding material (if ne;cessary), pipelilre installation, back filling (imported. fill if' necessary), compaction, compaction testing in rcadivay areas, pressurne testing, disinfect=ing pipelines, flushing, clean -up including resodd.ing areas previously sodd,,d, seeding, all areas disturbed by constructiorL, providing cw plete as- builr, drawing's and other items ne=cessary to complete dhe system tmd provide; the Owner, F'DE? arui'or Health Department and County with a complete worki=ng water distribution system as shown on the drawings a.nd speci)Se -d in these cor_tract documents. Lineal foot price of the pipe is to i=nclude the cost of all required fittings. Q. Grady Minor & Associal :es G:\ Engineering \PFt0.1- ENGNV',WCIAN'�C -EDP Ph 4 &E193PPL DP\OPCOPC Ph4 Bond -20' 5.01.29 5 of 6 Packet Page -949- TOTAL ITEM UESCILTt''i!TTON LIM—T 16' '7171' UVII FiUCP 'I PRICE D -i 10" i ?G'C lvlain (12_900, DR 18) LI' 2.440 $.!5.00 $61,000.00 - D -2 -- - -- 10" PVC, Main (C'- 900,1DR 14) LF 54 $28.00 S1.512.00 D -3 10" Gate Valve with Box ]�A 4 $'. .000.00 $8.000.00 _ D -1 Fire :E ant: Fsse:mbly e- ornplete ]_FA b S4.000.00 $24.000.00 -- ---=---------------------------------- - - - -- - - - -- - --- D-5 Sinal.e: Water Service _- 11 - - - -- -- - - - - -- $800.00 -- ------------------------------- - - - - -- P--- - - $8.800.00 �-- D -6 Double Water Service L hP, -- - - -_28 $1,000.00 -- ----------- - - - - -- $28,000.00 TOTAL $131.,312.00 Q. Grady Minor & Associal :es G:\ Engineering \PFt0.1- ENGNV',WCIAN'�C -EDP Ph 4 &E193PPL DP\OPCOPC Ph4 Bond -20' 5.01.29 5 of 6 Packet Page -949- 7/7/2015 16.A.18. AI =;TES IA— NAPLES 1= 'i— IA ;S : 4 E= PJGI'NI�l =:� "�� OPI�dION OF PROBABLE COST FOR, P'LAZ" BONDING 1/2912015 `CBE I)UI E ":E" ,37C(? Al DRAINAGE Includes furnishing and handling of all requ.ired materials, deavatering, bedding material (if' necessary), rock removal a;ad. disposal off -siite (if rlecessa��), installation, ba.cl:f)llinl;,, co rnpaction, compaction testing in road - way areas, final grading, coordinating wilt) other contractors and utility cornpanies, f7us1i.n;3r, clean -up, seeding, sodding o:F all .areas distw•bed by construction, repair of any cLiniage caused by cons:ructicrL and other items necessary to coml).lete the ; >ysielrc and. provide the Owner, (":ounty and10x FDO'I witlt a complete working drainage system as sh.ourr on the diravvin €s arA specified on these contract docum -.nts. Pipe: measurement is to the center of't:he structures. — -------------------------------- - - - - -- - - - - - -- ------- - - - - -- ------ - - - - -- i' -- TOTAL ITEM — ___-- __— DESCRI1,1101W _ ETATT ;, ►G NTITY PRICE -- _ PRICE E -1 — -R.Cp 15" ---- ------ — --------- — --- ------- L -- - - - - -- --J ------ ------ - - - - -- $9,348.00 - E -2 18" RCP $41.00 $968.00 — E-3 ----------------------------- - - - - -- 24" RCP - - - - - -- L.I' `i7.4 555 (10 $31,570.00 — E-4 - - -- ---------------------- - - - - -- 19"x 30" E:RC2 ----------------------------- --- - -- - - - - -- T - - - - -- 2`� ---- - - - - -- 5;65 00 $1,625.00 — E-5 Valley Gutter Inlet EA 6 — $3,200.00 $19.200.00 — E- 6 -------------------------- -- - - - - -- - Type C Inlet - - - - -- LA -_- t - -- - -- 1;2,000.00 - $2,000.00 — E-7 ---------------------------- - - - - -- 15" FE.S - - - - -- - - -- EA - - - - -- 1 ------ - - - - -- $1,OOO.A $1,000.00 — E-8 -------------------------------- 24" FES - - - ------ EA ---- :S -------- - - - - -- $1,:100.00 — $4,500.00 — E -9 --------------------------------- Yard. Drain Iri].et ----- --- -------- — ------- — ----- --- FA -- - - - - - -? ----- - -- .6 i 0000 -- _ $2,100.00 — E -10 -------- 8" HEWE Yard Dra:,n Pipe _ ------------------------------ - - - - -- Lf - - -- - -- -- �_ ?0 - - -- - -g 1100 - -- - $5- 460.00 — E-1 l 10" ]JIVE Yard Drain Pipe=--------- - - - -__ -- LF_ -- —__ - =:�>_4 _- 16.00 _ -- _ $3.904.00 — E -12 ---------------------- 1.2" HD.PE Yard Drain Pipe LF - - - -1_ 6 -- — _518.00 - -- _ $2,088.00 — -------------------------------- - - - - -- - _ E -13 8 "' HDPE: FES witli Rip Rap hA � i S500.00 $500.00 7[ C1TAL $84,263.00 Q. Grady Minor & Associates G:\ Engineedng \PF:CIJ-= NG \N / \VJClfkN1,C6DP Ph 4.8,E103PPL C)P \CIPCIC)PC Ph4 Bond - 2015.0'.29 Packet Page -950- .. . 7/7/2015 16.A.18. ?IRTESIA- NAPLE�> ENGINE:E:E;';i OPINKON OF PROBABLE C',C)IiT FOR, FLAT BONDING 1/29/2015 . >CHEDIJLE "�r" EAR.TIM'ORK du: c >:[TE :P IRIT Clearing, 1,-tibbing acrd preparation of'the construction site and bringing. tae site, including, roadway rights -of- way; easements, building sates and open areas to t:he lines and grades shown on the ch-alving or as designated by the Engineer in the field including chipping and 1pindi'.rrg of all materials or.. t:ae 0,A,ne: ~'s property and then disposal ot" all residue off the Owner's properh�, all as specified., per acre complete:. All �kor•k in right -of -way is subject to inspections by the ov✓ner, City, County DOT and. /or FIDOT contingent on final acceptance of improvements as shcnnzi and specified on the contract. documents. The constmction area shall be enclosed with FDBP approved siltation fencing; prior to coramencccment of work. The tmia price of` tl.e erosion control fence shall include maintenance of the fence for the duration of constriction. Site has been cleared and filled, lakes have been excavated and sodded and tha exotics have been cleared from the Preserves, all under previous phase approvals. Q. Grady Minor & Associates GAEigirn; eying \PFt0.1- ENGINTOCIAN \060P Ft 4UMPPL DF',OPG; OPC Ph5 Bond - 2015.01.29 Packet Page -951- 2 of E3 &NIT TOTAL IT�FM --------- `_t ►,EtiCaell''TI(Lnl_- -_ —_ -- LTATII ! ►IGAIVITTI' 'P'RICE PRICE A -1 Clearing and Grubbing_ * - -- AC - - - -0 - - - - -- -$0_00 - $0.00 A -2 Erosion Control -Stilt Fence LF 6,300 $1.00 $6.300.00 A -3 Double; Rove Erosion Control -Silt Fence LF 2,640 $2.00 $5.280.00 A4 Lake 'Excavation (Haul, Place 8: Compact ) * CX 0 $0.00 $0.00 A -5 Sod Lake Elanks (20 "X idth) '* SY 0 $0.00 $0.00 A xoc;it Cleaning; fi-orn Preserves AC ) $0.00 $0.00 TOTAL $11,580.00 Site has been cleared and filled, lakes have been excavated and sodded and tha exotics have been cleared from the Preserves, all under previous phase approvals. Q. Grady Minor & Associates GAEigirn; eying \PFt0.1- ENGINTOCIAN \060P Ft 4UMPPL DF',OPG; OPC Ph5 Bond - 2015.01.29 Packet Page -951- 2 of E3