Agenda 07/07/2015 Item #16A187/7/2015 16.A.18.
EXECUTIVE SUMMARY
This item requires that ex parte disclosure be provided by Commission members. Should a hearing
be held on this item, all participants are required to be sworn in. Recommendation to approve for
recording the final plat of Artesia Naples, Phase 4, (Application Number PL20140002472) approval
of the standard form Construction and Maintenance Agreement and approval of the amount of the
performance security.
OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the
final plat of Artesia Naples, Phase 4, a subdivision of lands located in Sections 4 & 5, Township
51 South, Range 26 East, Collier County, Florida, following the alternative procedure for
approval of subdivision plats pursuant to Resolution 99 -199. This procedure allows for the
Board to approve the plat and associated construction documents for construction purposes and
recording purposes concurrently.
CONSIDERATIONS: The Development Review Division of the Growth Management
Department has completed the review of the construction drawings, specifications, and final plat
of Artesia Naples, Phase 4. These documents are in compliance with the County Land
Development Code and Chapter 177, Florida Statutes. This project is within the Lands End
Preserve PUD, Ord. 03 -04, as amended. All fees have been paid. Security in the amount of 10%
of the total cost of the required improvements, and 100% of the cost of any remaining
improvements, together with a Construction and Maintenance Agreement for Subdivision
Improvements, shall be provided and accepted by the County Manager or his designee and the
County Attorney's office prior to the recording of the final plat. This procedure is in
conformance with Section 10.02.04 F.2 of the Land Development Code.
The Development Review Division recommends that the final plat of Artesia Naples, Phase 4 be
approved for recording.
FISCAL IMPACT: The project cost is $658,930.00 (estimated) to be borne by the
developer. The cost breakdown is as follows:
a) Water & Sewer $295,272.00
b) Drainage, Paving, Grading $363,658.00
The Security amount, equal to 110% of the
project cost, is $724,823.00
The County will realize revenues as follows:
Fund: Growth Management Fund 131
Agency: County Manager
Cost Center: 138327 -- Land Development Services
Revenue generated by this project: Total: $20,977.90
Packet Page -935-
7/7/2015 16.A.18.
The Fees are based on a construction estimate of $658,930.00 and were paid in February, 2015.
The breakdown is as follows:
a)
Plat Review Fee ($1,000.00 + $5. /ac)
$1,210.00
b)
Construction Drawing Review Fee
Water & Sewer (.75% const. est.)
$2,214.54
C)
Drainage, Paving, Grading
(.75% const. est.)
$2,727.44
d)
Construction Inspection Fee
Water & Sewer (2.25% const. est.)
$6,643.62
e)
Drainage, Paving, Grading
(2.25% const. est.)
$8,182.31
GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of
Adequate Public Facilities prior to the issuance of the construction plan final approval letter.
LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and
requires a majority vote for Board approval. - SAS
RECOMMENDATION: That the Board of County Commissioners endorses staff's
recommendation to approve the final plat of Artesia Naples, Phase 4 (Application Number
PL20140002472) for recording with the following stipulations:
I . Approve the amount of $724,823.00 as performance security for the required improvements;
or such lesser amount based on work completed, and as is approved by the Development
Review Department.
2. Approve the standard form Construction and Maintenance Agreement and direct the County
Manager or his designee:
a. To withhold Certificates of Occupancy until the required improvements have received
preliminary acceptance.
b. To delay recording of the plat until suitable security and an appropriate Construction
and Maintenance Agreement is approved and accepted by the County Attorney's
office and the Board of County Commissioners or the County Manager or his
designee on behalf of the Board pursuant to Section 10.02.04 F.2 of the Land
Development Code.
Prepared by: John Houldsworth, Senior Site Plans Reviewer, Development Review, Growth
Management Department
Attachments: 1) Location Map 2) Plat Map 3) Opinion of Probable Cost
Packet Page -936-
7/7/2015 16.A.18.
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.16.A.16.A.18.
Item Summary: This item requires that ex parte disclosure be provided by Commission
members. Should a hearing be held on this item, all participants are required to be sworn in.
Recommendation to approve for recording the final plat of Artesia Naples, Phase 4, (Application
Number PL20140002472) approval of the standard form Construction and Maintenance
Agreement and approval of the amount of the performance security.
Meeting Date: 7/7/2015
Prepared By
Name: HouldsworthJohn
Title: Site Plans Reviewer, Senior, Growth Management Department
6/10/2015 1:26:42 PM
Approved By
Name: PuigJudy
Title: Operations Analyst, Growth Management Department
Date: 6/11/2015 10:22:32 AM
Name: PuigJudy
Title: Operations Analyst, Growth Management Department
Date: 6/11/2015 10:23:15 AM
Name: McLeanMatthew
Title: Project Manager, Principal, Growth Management Department
Date: 6/17/2015 12:41:21 PM
Name: Casa] angui daNi ck
Title: Deputy County Manager, County Managers Office
Date: 6/21/2015 10:34:46 AM
Name: StoneScott
Title: Assistant County Attorney, CAO Land Use /Transportation
Date: 6/22/2015 9:33:00 AM
Name: IsacksonMark
Packet Page -937-
7/7/2015 16.A.18.
Title: Division Director - Corp Fin & Mgmt Svc, Office of Management & Budget
Date: 6/22/2015 9:59:51 AM
Name: KlatzkowJeff
Title: County Attorney,
Date: 6/24/2015 1:46:35 PM
Name: CasalanguidaNick
Title: Deputy County Manager, County Managers Office
Date: 6/26/2015 12:50:41 PM
Packet Page -938-
7/7/2015 16.A.18.
—01 01 — / I
now
OL, C:L ragc
z
:5
z
0
F-
U
O
NO) OavA@InOg N911103
tu.
/
u
o, N
F- Z
LL1
OL, C:L ragc
z
:5
z
0
F-
U
O
7/7/2015-1—
Will;
p 5 4
N11 . *1 a j
or
w 2
LLJ
A
Lw) 3
L
X008~
C',
al vi 2
Lu E� �f 21*151 1
z
z 94 OL Cc-,'
— 7
cz, C,
LLJ
CL
IN4;��
CL
lbpl-
5F, ;lJlRg
Cc,
n;
Mug h uk�81
0
N
1 ouo
ts I
12
b�l
Packet Page -940-
a
0
O N
ti
Q) W
�W
Cz.
O �
N q Q
d, aL) os
Lu��W ,
QZLr'zo
wc5w
O U
W oE"Z
O
C,
E U Q
�"�fl1 C7
F-66a
O p
QCZ, °
�1 a°o°ao
0 =wva
E ? Lo
6 H
az�
°zorxi�
E U z
aQw°
Wa�
�o
dWo
P4
I
o
N 15
Ami
IR -
=� l I `ZI x
7/7/2015 16.A.18.
q
x�e �
pis I
�o Lr C5 `K
E Z -
� r_
p 6{ L
� h �
a� 1�
W
I lb
� a
I.
•, - I NlIpS aN � °�
a R j"a�anrxw.�a "u a _
3
ti w
rtLl
Fla
la
RIP
3
Ah
E r.
1" 1,4
W
4o F
2e �tiya
�.at
E �3y yb9
�R
x
��4En
WWII
t,JW
oe
I.x
ATE
aJ de
9J%
e
E_ Em
J �
Fla
la
RIP
1" 1,4
�.at
�R
� .3
WWII
t,JW
?tae
I.x
ATE
I
�
+
al
RfR
a
gala
alb
_a�siaaBal
Packet Page -941-
0
o"
ti
°m u,
~ w wlB Ya sire �h aRRw RIB
4 =
to a RRRal3 °8 8 8 8
8 88$88',
:c R &gg88'
4 g$
7/7/2015 16.A.18.
HN L
Ala E s � e
N � }
s
Lo
W � E
m
•� V
° of
O ,!
- 8 .R U� •'B h _w /p `mod `et,��''' "c3*
Al
5..
---------
' 1� r. x 8 w9' /s':•• ��
C, Z __.
'E U) W ra-i _ "i "so� - osih� �0ya E
g R S�N 0 LU
W U3 5 8
UC7 Q C\2 r r E) a Po ,.- \ ,r \s _ °5?Y ^nx^ 'Qi —M
C,
� � d d 'a S� �'8 a - �d ,•oq��'"� \� - __ �Jt� p�n $MIN � �
(/1z co
O ° &;- .____i8 --- --I` -L Ic g8„.'gRlhB _BryRoti
W l p =
�N we c R^
p
Gr
d d �" `n v%� ti(� 8 asasia^ aoce
ha- a- PR'C'n
F 2 U Z z$ e aaa � a s 53a
R Sin
L) U
�
R� 4
2
66�n�m
^3
iR
p
Lo
W � E
m
•� V
° of
O ,!
- 8 .R U� •'B h _w /p `mod `et,��''' "c3*
Al
5..
---------
' 1� r. x 8 w9' /s':•• ��
C, Z __.
'E U) W ra-i _ "i "so� - osih� �0ya E
g R S�N 0 LU
W U3 5 8
UC7 Q C\2 r r E) a Po ,.- \ ,r \s _ °5?Y ^nx^ 'Qi —M
C,
� � d d 'a S� �'8 a - �d ,•oq��'"� \� - __ �Jt� p�n $MIN � �
(/1z co
O ° &;- .____i8 --- --I` -L Ic g8„.'gRlhB _BryRoti
W l p =
�N we c R^
p
Gr
d d �" `n v%� ti(� 8 asasia^ aoce
ha- a- PR'C'n
F 2 U Z z$ e aaa � a s 53a
8y
o S'
QN��H
Packet Page -942-
R Sin
L) U
�
R� 4
2
66�n�m
^3
E
^m�C
P
8y
o S'
QN��H
Packet Page -942-
R Sin
Bn
�
R� 4
�ae
66�n�m
^3
'_hl
^m�C
-
�
O
Alaae
^ i"INs,tNN
'At�w
�I,
0.H
ry
h'•
-�hh
hhhhhhl�lh
y_b
b
b�
U�a'm'��n
RRR
'�I�M1ne
nan�nj�i3
„_a�ax��a�
a "
^' "-
-
^aa
^;
sfaas88oa8a8a
a
R
MR
Rm�"'�$Imm�m8n�',tiima�'�Iti�
=
^YR�
Y
N5
t
01
�3
NO
55
.110
�
Q
3
,
la
7677ee17�ee8
^°_
S,
:1�
ls;�
„fi882;
f
8�nzoh%NF
''d
C,
lh
^� F�
-bE
qMZ:
h ^a
=l�.'e
4Nej
:4�i
<� <.
__; ^�
8'
=,137y
RlBn
_
88888818088�°78zS
=8�R
wl�'
=�8.
Rn8
�ti
°i88n
R ;�b',��gIFR
�'_8�
F'n
hr
Fb FFF
«Irryr
Fn'
H�_=
FFI�RF
nIJ�Rry°
bF
b:n_pl
ybbi4
44
Rh�2K$a
..18�ne
�'I ^Iq�
�"a8`
88483
g8?JR
2
8R88881R8g8R
„ga.888
F
= ^=
���
� 4!
Q
d !n
C>~
CQ
°
LLJ E
Qzlr;zo
¢ M — U
F ~% 6
O U
as°
LU °FZE-
O
J� -°'U7w
E"'C7ght
F
Q ¢¢a
v J 0 E--
LljF O °
ass`"
¢ LO
0.a z a
°zC)
F U z
� r4 WjJ O
°
¢ W L)
04
Sy
o �g
�PSR
$
'5'i
♦
$hl$
°O -`nary
5ht$t,
;-ma_.^.^.
•
°R.
o
Lk
.s
P� eg
N t656J" r�
- — — - - - - 24
1 -,P
`;
r
III'
^1ry
1_
@E
:n
=ale
tSP:R
-:P
wt
lon
stt
o'
SSA
R21$$8833R
t
Rh'^RS::
Iwo
°RR
tw
�m
`RR
=,
ww
° -3 R'Q.^V7HN,Nai
�w
w
�_♦
'3_$°"__
^ §RR
°$$
^='R
RRR
4':4•
=R
Z'�o
ymy,-
i�
Bii
♦
D F
=
0 6 RR:
§oos�
6
@R
RrS:$eti
^q�`8;•A'o8R$
w �6ry
♦I^:��Ih
=�=
8888886
°6ti
hkF
♦rvpS6
'�
�g�Rr�i'O•
R
$ �R::sn$
�
I: a�b
�Nb
HI'
:...::����b'b
bb
mac, l".�bMryN
�nh�h��bb
`aa
S
c ^RB,'
^n ^<n8
87'n°:ryo?_�Y0
8„R
&_aan
AR
.R.
e3
gM3$S$R
^84,Ro
^h„
58$
ga
=6=
8ajg88a888
R888888888$
,98,'88�88a8888$88$8$g
l!- 11
I
M�loH �f�,ps av .t,
xC
1�' y vio� "t S oru
m6 3` 9 `• M
p ar N ZT�y"
9h
z
7/7/2015 16.A.18.
..- < -
U
i
EN
b $
C
�6 R,
�E
S94tE tj600 ,� 8 � '!0� lY"C N.Yi iu k
�1e
f c
LL
0
9�a^
•
o
Lk
.s
P� eg
N t656J" r�
- — — - - - - 24
`
r
G8
@E
U
i
EN
b $
C
�6 R,
�E
S94tE tj600 ,� 8 � '!0� lY"C N.Yi iu k
�1e
1 o .-
• JC
SlSyo i°' E
>s ➢�TL
�JpO 14 trap � .
0 jE -
\ St1 p31 v'
50 SMC. C �I6.0� S
It[Q V� N
be9r �a
116 �
u n � irr .50'11 .S6N1
rv1 � r'
a[vJ Welt
u. v� -
I nl 3 -ro�GJA SMDb/u N
H[/1053N!/0MMV33.�7`� U
VNL
ly i
.1-1 W1.1.ms
3 & o $ n
Packet Page -943-
o
h
N t656J" r�
- — — - - - - 24
`
r
1 o .-
• JC
SlSyo i°' E
>s ➢�TL
�JpO 14 trap � .
0 jE -
\ St1 p31 v'
50 SMC. C �I6.0� S
It[Q V� N
be9r �a
116 �
u n � irr .50'11 .S6N1
rv1 � r'
a[vJ Welt
u. v� -
I nl 3 -ro�GJA SMDb/u N
H[/1053N!/0MMV33.�7`� U
VNL
ly i
.1-1 W1.1.ms
3 & o $ n
Packet Page -943-
a
h
mw
41
d N
r-
C)
CQ q q
i V �
a�zs
0
Uj
Q 69403
O W
E � d
O
ohs°
°�
J€•°° 'Co
Q ES�q�
E
O
Lo d
vJ OxE
LU
^� UD
Lr d E
�, .•G�1 zZ- a4
°zoo
I- U z
Q yyW O
Q °
d W L)
Packet Page -944-
7/7/2015 16.A.18.
w
.3p
\ \ ��'Sp�, /day ✓
yg�o
�6
e \
!2
'"
y
67
n or
:� - -
wtia•w
"°
3.00.00.06 N \ x
a
U
Ar
NI
y$gF
i
-
\2
RRS'
tt^w
°
ga
r m
\
s
°
yy
3d
R
R;'
^R�
r
_
_
_`�:
�
;
a'aaaaseag8as8g
.g aasssaa
a-
affl
a ✓_
c,
S
Packet Page -944-
w
.3p
\ \ ��'Sp�, /day ✓
y
67
n or
41�✓iL
"°
3.00.00.06 N \ x
a
U
Ar
NI
y$gF
Packet Page -944-
7/7/2015 16.A.18.
Q. GF:la►]DY II41NO '. P.A.
CIV _ENCiDEHEI:R-S_ AND SUR_VEYC►R.S PI_MQgE:R_S__LI�NDSCAFE .NRC:F[ITECTS
AJ�:TESIA- iV.��PL_E =S F'I - {, /SSE =; 4
EN13INE:ER'S OPINION OF PR.C_)E3A.E,I -.E; C,,C)'-�T' I =(DR. E tivr, BC)NDING
January 29, 201
Water and `dVastewal.Cr Sub -Tol' L ;1;295,2 -?2.00
Earthwork, P;avir►g anct LrainagF; Sub- "I'oial: $363,658.00
G:1 Engineering \PF:0,1- ENG\Vd�WCIP,N�.06DP Ph 4 &51C3PPL DP'd)PCADPC P'n•4 Bond_2D15.012c 1 of Ei
Packet Page -945-
------------- - - - - --
A
--------- - - - - --
Earthwork
55,660.00
I3
----------- - - - - --
Raving
-------------------
--- - - - - -- SZ ?3,735.00
C
Wastewater Collection
163.960.00
---------- - - - - --
D
-------------- - - - - --
----- - - - - --
Potable Water Distibution
------------------------
$I")1,312.00
E
>tcxrm Lhr3i�la.ge - - - - --
E84,263.00
-------------------
-------------- - - - - --
_� --------------------------
iC'(7
$56.58, 930.00
--------------- - - - - --
-------- -- - - - o f � -- ; ----- - - - - --
1'-101% TOT4L
--------------- - - --
$Z24, 823. 00
Water and `dVastewal.Cr Sub -Tol' L ;1;295,2 -?2.00
Earthwork, P;avir►g anct LrainagF; Sub- "I'oial: $363,658.00
G:1 Engineering \PF:0,1- ENG\Vd�WCIP,N�.06DP Ph 4 &51C3PPL DP'd)PCADPC P'n•4 Bond_2D15.012c 1 of Ei
Packet Page -945-
7/7/2015 16.A.18.
AIRTE :CIA- NAPLEES 4
ENGINE:E:F < "S OPINION OF PROBABLE tC:COIST 1 =(DF: F'l_AT BONDING
1 /2 9110 i :5
SCHEDULE
EAR:i'l3[WORK & SITE :P']R:]EP
Clearing, grubbing and preparation of the construction site and 'bringing, tae site, :including; rmclway rights -of-
way, easements, building sites and open areas to the lines and ;;rides shown 011 the drawings or as designated
by the Engineer in the field including chapping ar.d grinchn„ of all matca ials on. fne D,vvne-'s _property and then
disposal of all residue offthe Clwn.er's property, all as speri :fied., per acre-, complete. All work: in right -of -way is
subject to inspection by the ov✓tzer, City, County :LOOT and /or FDOT contingent on final acceptance of
improvements as sh.oWn and specified on the, contract. docum .-nts. The co:nst:nrction area shall !:)e enclosed with
FD1:P approved siltation fencing prior to cornmencerr)ent of work. The unit price of the erosion control fence
shall include mainrenance of *die fence for the duration of constn.rct:ion.
—
-------------------- - - - -- --
- - - - --
- - - - --
------ - - - - --
-
67VIT
TOTAL
IT�Tm
—
-- - - - - -- DESCRIPTION___ —_ —_ --
-
Lri\'Iil J
- -___
G!I�APJ2'l;Pi'
PleICE_ --
_ PRICE
A -1
Cleaning and Gnibbi:ng *
iA.C-
_ —__ —'�
$0_00
- $0.00
___----- -_ —_ —_
A -2
E.msion Control -Silt Fence
LF
4,020
$1.00
$4,020.00
—
A-3
---------------------------- - - - - --
Doub e Row Fsrosior, ConlTol -Silt Fence
- - - - --
LF
820
$2.0C
$1,640.00
—
A-4
-------------------- - - - - -- - - - --
Lake Excavation (18 -au1, Place 8: Compact) *
- --
CY
—
0
$0.0C
$0.00
—
A-5
---------------------- - - - - --
Sod. L.a.ke Banks (20''KicltY.)*
- - --
SS'
0
$0.00
$0.00
— --------------------------- - - - - -- - --
A -6 Exocit Clewing; fiver Preser ✓es AC 0 $0.0C
— ------------------------------ - - - - -- - - - - - -- ---- - - - - --
$0.00
TOTAL
$5,660.00
* Site has been cleared and filled, lakes have been excavated and sodded arc] the exotics have ceen
cleared from the Presences, all under previous phase acproVals.
Q. Grady Minor & E\ssociates
G_\ EngineeringlPF ;C)J- ENIG1VV',�VCdAN106DP Ph H,5 \03PPL DPIOPCd)PC Ph4 Bond - 2015.01 25
Packet Page -946-
2ofE
7/7/2015 16.A.18.
ARTE :- '{A- NfNPLES PHA :51 = :4
E= PJGGIUI. F_� ;';� OPINION OF PROBABLE C :C)��1" F'C)R PLAT BONDING
112:' 15
.SCHEDULE " B "'
PA'C'ING)
Ro,ldway constaicti.on colraplete; per the plans. and County specifications including; stabilized subgrade,
stabilized shoulder, lirne.rock base;., tack coat, asplialtic concrete, required test.in €; by an :Independent laboratory,
roadside fill and grading For full width of right-of-way and easements, finish grading, see- ai:ag; and mulch and/or
sod.
Q. Grady Minor & AssoClatE!S
G :\ Engineering \PF:C),I-= NG \VV!VV --IAN',C,6DF' Ph 4- E,503PPL C)MCIFIVOPC Ph4 Bind- 2015.01.29
Packet Page -947-
3 of 6
l N17'
TOTAL
IT. EM
uEsgurn'(w
Lr \E';[
ou/twj';!'i'
JORICE3
PRICE
—
E: -1
------------------------
12" Stabilized 'Su.bgra.de
S)'
6,(i 10
$2.50
$16.525.00
—
B -2
-------------------------
C' ;Lirnerock Base (Compacted and I'iitned)
SY
5,'i30
$8.00
$44,240.00
-3
3/4" Apltaltic Concrete_T'ype S -.II[ (1st Lift)
SY
- _5,530 - --
$4.50
$24,885.00
_B
B -4
3/4" Aphaltic Concrete I' }3)e S411 (2nd Lift �
S)r
5.,530
$5.50
$30,415.00
—
E -5
- --
Valle y Gtitte:r - --
L,F
4,8,'5 0
59.00
$43,650.00
E6
5' Concruw Sidewall _ 4" 'Pluck:
SY
2.940
$27.00
$79,380.00
E -7
Handicap Curb Rarrnps - PM T- Y pes
EA
5
S600.00
- - - - - - --
$3,000.00
—
E-8
------------------------- - - - - --
Sodding (I'o 4' Back of C'u:rb)
- - - - --
SY
-------- - - - - --
: ?.()70
-- -
$2.00
$4,140.00
E -9 Signing &: Pavement ]Vtarldngs
B
t $3,000.00
$3,000.00
B 10 SneetLiihts - FPLF'rovicle :andiustall
]�A
iS' $1,000.00
$19,000.00
B-1 l Set PRDA's
L.S
1 $2,500.00
$2,500.00
— ------------------------------ - - - - --
- - - - --
--------- - - - - -� ------- - - - - --
-
13 12 Set F'CF"s__ _
L��
a $3,000.00
$3,000.00
TOTAL
5273,735.00
Q. Grady Minor & AssoClatE!S
G :\ Engineering \PF:C),I-= NG \VV!VV --IAN',C,6DF' Ph 4- E,503PPL C)MCIFIVOPC Ph4 Bind- 2015.01.29
Packet Page -947-
3 of 6
7/7/2015 16.A.18.
i %F,,- fES1A- NAPL- E.:5 RHA:'-E. 4
ENGINEER,'S C)PINIC)N OF PROBABLE (--:C)S'T- f :( ")[R PLAT- BONDING
1,29/201 1)
SCHEDULF, "C;"
WASTEWATER 'COLLECT JON
Includes furnisihing- and handling of at] required ::materials, joint: restraint, thrust blocks, connections to other
pipelines, all excavation (including rocl, and over - excavation if necessary), dewaterin g., bedding material (if
necessary), pipeline installation, back filb.fig (imported E1 if neces sal li i, compaction, compaction testing in
roadway areas,, pressure; testing, flushing, clean - -up ;Including; resoddilig areas previ oils Iy sodded, seeding all areas
disturbed by construction, providing, complete as- built drav✓inus and other items neCessai,i to complete the
system and provide the Ow7ier, F'DE :P and County with a -omplete working; wastewater collection system as
shovczr on the drawings and specified in these contract documents. C'ut ranges are measured from profile grade
line to invert of the pipe or manhole.
—
----------------------- - - - - -- --
- - - --
--- - - - - --
------- - - - - --
TOTAL
ITEM
D'E"S CCRIVRO.TT
Ui \r1 :� _
►�U v l P
-=---- - - - - --
uiva, mu( F'
-------- - - - - --
PRICE
C -1
________
8" Gravity PVC-S:CIR 26 (C -6 Cut)
477
_________328_00
$13,356.00
—
C-2
—
--------------------------- --- - -- -__ --
8" Gravii�r P`JC --S1CR 26 (6 -8' Cut)
---------------------------- - - - - --
—_LF
--
L,F
- - - - --
- - - - - --
7.15
------- - - - - --
___ -___- $33_00
$24,585.00
C-3
8" Gravity F'VC : -Sl' R 26 (8 -10' Cull
L,I
- -_ -_> 12 - - - --
- - - - -- __$45_00
$23,040.00
—
C-4
------------------------------ --
8" Gravity PVC:-SDR 26 (10 -12' Cut)
— - --
L,F
"159
-
------ _ -- _$60.00
$9.540.00
—
---------------------------- - - - - --
- - - - - --
--
C-5
—
8" Gravity PVC -S1CR 26 (% 12' CLit)
-------------------------------- --- - --
L,F
- - - - --
120
- - - - --
-- _- ___- _;;80_DC
_ $9,600.00
C-6
Television Inspection --------------- - - - - --
- - - - L,F
--
- - - -- 2., (:3 - --
---------- $3_00
56.039.00
—
C -7
—
-----------------
Manhole 4' Diameter (0• -60
-------------------------------- - - - - --
EA
- - - - --
- - --2 - - - - --
------- $4, D0_OC
- $8,200.00
C-8
—
Manhole 4' ]Dlame :er (6 8') — ___ —_ --
----------------------- - - - - --
- =CJr --
_ —__ —� ----- —
-
----- _�?J)00_00
$5,000.00
C -?
Manhole 4' Dliarnceter (8 - -W) - - - - --
13A
-- - - - - --
?__ - - --
-- - - - - --
----- _$60D0_00
- $12,000.00
—
C -10
----------------------------------
Manhole 4' D'amei-er (10 -IT)
1-A
:3
:;7.000.00
$21.000.00
C -1 i
Manhole 4' Diamerer ( >12' Cut)
------------------------------- - - - - --
1:-A
-- - - - - --
1
-- - - - - -- -
S 10,000.00
$10,000.00
—
C -12
6" Single Sever Service
FA
1
S600.00
$600.00
C-13
6" Double Sewer Service _____ _
- - - - -- --
] -A
- - - - - --
30
-------- - - - - --
5700.00
----- - - - - --
521.000.00
—
-------------------
TOTAI.
$163,960.00
Q. Grady Minor 8& Associates
G:\ Engineering %PF;0.1- ENIG \VJ',VVCIAN C,CDP Ph L'- €,Sb73PPL DP\C1P0,0PC Ph4 3ond- _20'15.01.29
Packet Page -948-
4 of 6
7/7/2015 16.A.18.
,AIF;TE :E,EA- NI,a,Pt_ES 1= i1- I,��� >E: �
ENIGINE:E:F,'S OPINION OI= PRC11BA LE: C,0ST FOR, PLAT EIC)NDING
1 /29 /201
"CIIEDUI E "D"
POTABLE WATER DIy'T- RIBUTI<)N
Includes fumisizing and handling of all required materials, joint re;strz.int, av-1131: blocks, connections to other
pipelines, all ex.cava'tiColl (irrr.'luding rock and over - excavat=ion if necessary), dewaterizg, bedding material (if
ne;cessary), pipelilre installation, back filling (imported. fill if' necessary), compaction, compaction testing in
rcadivay areas, pressurne testing, disinfect=ing pipelines, flushing, clean -up including resodd.ing areas previously
sodd,,d, seeding, all areas disturbed by constructiorL, providing cw plete as- builr, drawing's and other items
ne=cessary to complete dhe system tmd provide; the Owner, F'DE? arui'or Health Department and County with a
complete worki=ng water distribution system as shown on the drawings a.nd speci)Se -d in these cor_tract documents.
Lineal foot price of the pipe is to i=nclude the cost of all required fittings.
Q. Grady Minor & Associal :es
G:\ Engineering \PFt0.1- ENGNV',WCIAN'�C -EDP Ph 4 &E193PPL DP\OPCOPC Ph4 Bond -20' 5.01.29 5 of 6
Packet Page -949-
TOTAL
ITEM
UESCILTt''i!TTON
LIM—T
16' '7171'
UVII FiUCP
'I PRICE
D -i
10" i ?G'C lvlain (12_900, DR 18)
LI'
2.440
$.!5.00
$61,000.00
-
D -2
-- - --
10" PVC, Main (C'- 900,1DR 14)
LF
54
$28.00
S1.512.00
D -3
10" Gate Valve with Box
]�A
4
$'. .000.00
$8.000.00
_
D -1
Fire :E ant: Fsse:mbly e- ornplete
]_FA
b
S4.000.00
$24.000.00
-- ---=---------------------------------- - - - -- - - - -- - ---
D-5 Sinal.e: Water Service _- 11 - - - -- -- - - - - -- $800.00
-- ------------------------------- - - - - -- P--- - -
$8.800.00
�--
D -6 Double Water Service L hP, -- - - -_28 $1,000.00
-- ----------- - - - - --
$28,000.00
TOTAL
$131.,312.00
Q. Grady Minor & Associal :es
G:\ Engineering \PFt0.1- ENGNV',WCIAN'�C -EDP Ph 4 &E193PPL DP\OPCOPC Ph4 Bond -20' 5.01.29 5 of 6
Packet Page -949-
7/7/2015 16.A.18.
AI =;TES IA— NAPLES 1= 'i— IA ;S : 4
E= PJGI'NI�l =:� "�� OPI�dION OF PROBABLE COST FOR, P'LAZ" BONDING
1/2912015
`CBE I)UI E ":E"
,37C(? Al DRAINAGE
Includes furnishing and handling of all requ.ired materials, deavatering, bedding material (if' necessary), rock
removal a;ad. disposal off -siite (if rlecessa��), installation, ba.cl:f)llinl;,, co rnpaction, compaction testing in road -
way areas, final grading, coordinating wilt) other contractors and utility cornpanies, f7us1i.n;3r, clean -up, seeding,
sodding o:F all .areas distw•bed by construction, repair of any cLiniage caused by cons:ructicrL and other items
necessary to coml).lete the ; >ysielrc and. provide the Owner, (":ounty and10x FDO'I witlt a complete working
drainage system as sh.ourr on the diravvin €s arA specified on these contract docum -.nts. Pipe: measurement is to
the center of't:he structures.
—
-------------------------------- - - - - --
- - - - - -- ------- - - - - --
------ - - - - --
i'
--
TOTAL
ITEM
— ___-- __— DESCRI1,1101W _
ETATT ;, ►G NTITY
PRICE --
_ PRICE
E -1
—
-R.Cp
15"
---- ------ — --------- — --- -------
L -- - - - - --
--J ------
------ - - - - --
$9,348.00
-
E -2
18" RCP
$41.00
$968.00
—
E-3
----------------------------- - - - - --
24" RCP
- - - - - --
L.I'
`i7.4
555 (10
$31,570.00
—
E-4
- - -- ---------------------- - - - - --
19"x 30" E:RC2
----------------------------- --- - --
- - - - --
T
- - - - --
2`�
---- - - - - --
5;65 00
$1,625.00
—
E-5
Valley Gutter Inlet
EA
6
—
$3,200.00
$19.200.00
—
E- 6
-------------------------- -- - - - - -- -
Type C Inlet
- - - - --
LA
-_- t
- -- - --
1;2,000.00
- $2,000.00
—
E-7
---------------------------- - - - - --
15" FE.S - - - - --
- - --
EA
- - - - --
1
------ - - - - --
$1,OOO.A
$1,000.00
—
E-8
--------------------------------
24" FES - - - ------
EA
----
:S
-------- - - - - --
$1,:100.00
—
$4,500.00
—
E -9
---------------------------------
Yard. Drain Iri].et ----- --- --------
— ------- — ----- ---
FA --
- - - - - -? ----- -
-- .6 i 0000 --
_ $2,100.00
—
E -10
--------
8" HEWE Yard Dra:,n Pipe _
------------------------------ - - - - --
Lf
- - --
- -- -- �_ ?0 - - --
- -g 1100 - --
- $5- 460.00
—
E-1 l
10" ]JIVE Yard Drain Pipe=--------- - - - -__ --
LF_ --
—__ - =:�>_4
_- 16.00 _ --
_ $3.904.00
—
E -12
----------------------
1.2" HD.PE Yard Drain Pipe
LF
- - - -1_ 6 --
— _518.00 - --
_ $2,088.00
— -------------------------------- - - - - -- - _
E -13 8 "' HDPE: FES witli Rip Rap hA � i S500.00
$500.00
7[ C1TAL
$84,263.00
Q. Grady Minor & Associates
G:\ Engineedng \PF:CIJ-= NG \N / \VJClfkN1,C6DP Ph 4.8,E103PPL C)P \CIPCIC)PC Ph4 Bond - 2015.0'.29
Packet Page -950-
.. .
7/7/2015 16.A.18.
?IRTESIA- NAPLE�>
ENGINE:E:E;';i OPINKON OF PROBABLE C',C)IiT FOR, FLAT BONDING
1/29/2015
. >CHEDIJLE "�r"
EAR.TIM'ORK du: c >:[TE :P IRIT
Clearing, 1,-tibbing acrd preparation of'the construction site and bringing. tae site, including, roadway rights -of-
way; easements, building sates and open areas to t:he lines and grades shown on the ch-alving or as designated
by the Engineer in the field including chipping and 1pindi'.rrg of all materials or.. t:ae 0,A,ne: ~'s property and then
disposal ot" all residue off the Owner's properh�, all as specified., per acre complete:. All �kor•k in right -of -way is
subject to inspections by the ov✓ner, City, County DOT and. /or FIDOT contingent on final acceptance of
improvements as shcnnzi and specified on the contract. documents. The constmction area shall be enclosed with
FDBP approved siltation fencing; prior to coramencccment of work. The tmia price of` tl.e erosion control fence
shall include maintenance of the fence for the duration of constriction.
Site has been cleared and filled, lakes have been excavated and sodded and tha exotics have been
cleared from the Preserves, all under previous phase approvals.
Q. Grady Minor & Associates
GAEigirn; eying \PFt0.1- ENGINTOCIAN \060P Ft 4UMPPL DF',OPG; OPC Ph5 Bond - 2015.01.29
Packet Page -951-
2 of E3
&NIT
TOTAL
IT�FM
--------- `_t ►,EtiCaell''TI(Lnl_- -_ —_ --
LTATII
! ►IGAIVITTI'
'P'RICE
PRICE
A -1
Clearing and Grubbing_ * - --
AC
- - - -0
- - - - -- -$0_00
- $0.00
A -2
Erosion Control -Stilt Fence
LF
6,300
$1.00
$6.300.00
A -3
Double; Rove Erosion Control -Silt Fence
LF
2,640
$2.00
$5.280.00
A4
Lake 'Excavation (Haul, Place 8: Compact ) *
CX
0
$0.00
$0.00
A -5
Sod Lake Elanks (20 "X idth) '*
SY
0
$0.00
$0.00
A xoc;it Cleaning; fi-orn Preserves AC ) $0.00
$0.00
TOTAL
$11,580.00
Site has been cleared and filled, lakes have been excavated and sodded and tha exotics have been
cleared from the Preserves, all under previous phase approvals.