Loading...
Agenda 06/23/2015 Item #16A 36/23/2015 16.A.3. EXECUTIVE SUMMARY Recommendation to approve final acceptance of the water and sewer utility facilities for Turnbury Preserve, PL20130002084, and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of 54,000 to the Project Engineer or the Developer's designated agent. OBJECTIVE: To have the Board of Countv Commissioners, as Ex- Officio Governing Board of the Collier County Water -Sewer District, approve final acceptance and unconditional conveyance of these water and sewer facilities and to release the Final Obligation Bond in the total amount of $4,000.00, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004 -31. CONSIDERATIONS: 1) The Developer of Turnbury Preserve has constructed the water and sewer facilities within dedicated easements to serve this development. (See attached location map) 2) Preliminary acceptance of these utility facilities was approved by the Engineering Services staff on February 10th 2014. At that time, the value of these utility facilities (assets) was $22,820.52 for the water facilities and $21,087.83 for the sewer facilities. (See attached Asset Sheets) 3) Staff recorded all preliminary utility conveyance acceptance documents in the public records of Collier County, which were reviewed and approved by the County Attorney's office as to form and legality. 4) The water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Engineering Services staff on March 10th 2015 in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Staff recommends final acceptance of the subject utility facilities and to release the Final Obligation Bond in the total amount $4.000.00. (See attached Exhibit A) 7) This final acceptance is in accordance with Collier County Ordinance No. 2004 -31, as amended. 8) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. Packet Page -567- 6/23/2015 16.A.3. FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. However, approval of this Executive Summary will result in the Collier County Water - Sewer District receiving unconditional title to the utility facilities, which at the time of preliminary acceptance, had a total gross value of $43,908.35 (no depreciation applied). GROWTH MANAGEMENT IMPACT: Approval of this Executive Summary will have no growth management impact. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval - SAS RECOMMENDATION: That the Board of County Commissioners, as Ex- Officio Governing Board of the Collier County Water -Sewer District, authorizes final acceptance of these water and sewer utility facilities for Turnbury Preserve, PL20130002084, and authorizes the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000.00 to the Project Engineer or the Developer's designated agent. Prepared by: Melissa Alvarez, Operations Coordinator, Engineering and Natural Resources Division, Growth Management Department Attachments: 1) Location Map, 2) Asset Sheet and 3) Exhibit A Packet Page -568- 6/23/2015 16.A.3. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.3. Item Summary: Recommendation to approve final acceptance of the water and sewer utility facilities for Turnbury Preserve, PL20130002084, and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer's designated agent. Meeting Date: 6/23/2015 Prepared By Name: AlvarezMelissa Title: Operations Coordinator, Natural Resources 5/6/2015 3:27:34 PM Submitted by Title: Operations Coordinator, Natural Resources Name: AlvarezMelissa 5/6/2015 3:27:35 PM Approved By Name: LorenzWilliam Title: Division Director - CDES Engineering Svc, Natural Resources Date: 5/6/2015 4:01:00 PM Name: Pam Libby Title: Manager - Distribution, Water Date: 5/7/2015 8:56:31 AM Name: KovenskyKenneth Title: Division Director - Operations Support, Operations & Regulatory Management Date: 5/7/2015 12:51:17 PM Name: NagySteve Title: Manager - Wastewater Collection, Wastewater Date: 5/7/2015 2:43:24 PM Packet Page -569- 6/23/2015 16.A.3. Name: McKennaJack Title: Manager - Engineering Review Services, Natural Resources Date: 5/8/2015 10:44:46 AM Name: PuiOudy Title: Operations Analyst, Operations & Regulatory Management Date: 5/8/2015 4:17:04 PM Name: JohnssenBeth Title: Division Director - Wastewater, Public Utilities Department Date: 5/10/2015 6:04:28 PM Name: Steve Messner Title: Division Director - Water, Public Utilities Department Date: 5/13/2015 9:06:50 AM Name: ChmelikTom Title: Division Director - Public Utilities Eng, Public Utilities Department Date: 5/19/2015 8:20:51 AM Name: CasalanguidaNick Title: Deputy County Manager, County Managers Office Date: 6/5/2015 9:52:58 AM Name: StoneScott Title: Assistant County Attorney, CAO Land Use /Transportation Date: 6/8/2015 1:15:02 PM Name: KlatzkowJeff Title: County Attorney, Date: 6/8/2015 3:39:17 PM Name: IsacksonMark Title: Division Director - Corp Fin & Mgmt Svc, Office of Management & Budget Date: 6/9/2015 10:05:50 AM Name: DurhamTim Title: Executive Manager of Corp Business Ops, Date: 6/10 /2015 5:35:24 PM Packet Page -570- 6/23/2015 16.A.3. n Q W CO f1 5Q G O U O w w U) w x CL D m z H team saNroane a veaivn3t n � S svaa �1 �,��, � onvnsnoe Nvooi z di a $ s< -ter ca3iul ��� y W -j J g(p 1alwW O .f1p0 S LO()Oa 653ad/.� � � I { 'J ]lt \ , 61VINOSTON a� ^ Fna Y O {CCay o] , n },� in o Avon N0159NYM � , � j p avoa oNmnraaoeary �� o qq _ O rva!, j Ryi _ r5J q3 q2 •; _= k g�j yT o� a� I � I � � ��iS � t�5q'ti m 310009 ara wa �naoo sov aor i �a yNVLi %% [A�+ yy }}55 ey FaP3 5 rui nmwvl PnrkAt Paaa -571- n Q W CO f1 5Q G O U O w w U) w x CL D m z H CERTIFICA' V OF CONTRIBUTORY COSTS WATER PROJECT NAME: TURNBURY PRESERVE LOCATION: Section 24 Township 48S Range 25E Collier County, Florida NAME & ADDRESS OF OWNER: BESSETT PROPERTIES, LLC 19731 MARINO LAKE CIRCLE #901 MIROMAR LAKES, FL 33913 TYPE OF UTILITY SYSTEM: POTABLE WATER (MATERIALS ONLY) Gate Valve 8 8" 1 1 E EA $ $930.76 $ $930.76 Gate Valve 6 6" 3 3 E EA $ $577.15 $ $1,731.45 Fire Hydrant 3 3 E EA $ $1,625.39 $ $4,876.17 C900 DR18 Pipe 8 8" 9 970 L LF $ $8.35 $ $8,099.50 C900 DR14 Pipe 8 8" 1 120 L LF $ $10.56 $ $1,267.20 C900 DR18 Pipe 6 6" 1 15 L LF $ $4.93 $ $73.95 Permanent Sample Point 1 1 E EA $ $921.36 $ $921.36 Air Release 3 3 E EA $ $1,013.39 $ $3,040.17 Single Service V V. 2 2 E EA $ $309.72 $ $619.44 Double Service 1" 4 4 E EA $ $315.13 $ $1,260.52 6/23/2015 16.A.3. I do hereby certify that the quantities of material described. bove are t e nd an accurate representation of the as- installed system. CERTIFYING, NAME & TITLE OF ENGINEER CERTIFYING OF: McAnly Engineering and Design, Inc. 5435 Park Central Court Naples, FL 34109 I do hereby certify that the quantities of material described above are true and an accurate representation of the as- installed cost of the system. CERTIFYING: ,1 Kevin Jetsert,- esident OF: ✓/ JENSEN UNDERGROUND UTILITIES, INC. 5585 Taylor Road Naples, Florida 34109 STATE OF FLORIDA ) SS: COUNTY OF COLLIER The foregoing in tt•ument was signed and acknowledged before me this 12th day of July, 2013 by Kevin Jesnen , who is p rsronally kn wn to me and who did not take an oath. lL *:'FiAt DONNA L. VENTRE o ldotafy Public - State of Florida ina L. Ventre tary Public '- my Comm. Expires Jun 1, 2015 Commission // EE 971179 ;F o: ;;;;•. Packet Page -572- r 6/23/2015 16.A.3. PROJECT NAME: LOCATION: LJ' CERTIF ATIOf`' OF CONTRIBUTORY COSTS tWATER1 TURNSURY PRESERVE Section 24 Township 48S Range 25E Collier County, Florida NAME &ADDRESS OF OWNER: 19731 MARINO LAKE ECIRCLE #901 MIROMAR LAKES, FL 33913 TYPE OF UTILITY SYSTEM: SANITARY SEWER (MATERIALS ONLY) I do hereby certify that the quantities of material described above are tru nd an accurate representation of the as- installed system. t' 7 1 CERTIFYING: ���7./{R• �,���yZ�/� P,oES NAME &TITLE OF ENGINEER CERTIFYING OF: McAnly Engineering and Design, Inc. 5435 Park Central Court Naples, FL 34109 I do hereby certify that the quantities of material described above are true and an accurate representation of the as- installed cost gf - ys n • CERTIFYING,: f, Kevin JetS�en Pres d &it JENSEN UNDERGROUND UTILITIES, INC. OF: 5585 Taylor Road Naples, Florida 34109 STATE OF FLORIDA ) SS: COUNTY OF COLLIER ) The foregoing i stmffient -was signed rLnowledged before me this 12th day of July , 2013 by evin Jesnen who is pers ally known to d who did not take an oath. SEAL: Ota PUbI1C DONNA L. VENIRE 4ol. nna L Ventre rY flotary Public . Slatr of FloritJa fny Comm. Exl.irr.S Jun 1, 2015 comm ssion !i EE 97879 Packet Page -573- 8" 990 LF $5.74 $5,682.60 SDR 26 Pipe 6" 312 LF $3.19 $995.28 SDR 26 Pipe SDR 2 6" 10 EA $158.92 $1,589.20 ut 1 EA $2,487.06 $2,487.06 Manhole 0' 6' 1 EA $3,096.03 $3,096.03 Manhole 6' -8' 2 EA $3,618.83 $7,237.66 Manhole 8' -10' TOTAL COST $21,087.83 I do hereby certify that the quantities of material described above are tru nd an accurate representation of the as- installed system. t' 7 1 CERTIFYING: ���7./{R• �,���yZ�/� P,oES NAME &TITLE OF ENGINEER CERTIFYING OF: McAnly Engineering and Design, Inc. 5435 Park Central Court Naples, FL 34109 I do hereby certify that the quantities of material described above are true and an accurate representation of the as- installed cost gf - ys n • CERTIFYING,: f, Kevin JetS�en Pres d &it JENSEN UNDERGROUND UTILITIES, INC. OF: 5585 Taylor Road Naples, Florida 34109 STATE OF FLORIDA ) SS: COUNTY OF COLLIER ) The foregoing i stmffient -was signed rLnowledged before me this 12th day of July , 2013 by evin Jesnen who is pers ally known to d who did not take an oath. SEAL: Ota PUbI1C DONNA L. VENIRE 4ol. nna L Ventre rY flotary Public . Slatr of FloritJa fny Comm. Exl.irr.S Jun 1, 2015 comm ssion !i EE 97879 Packet Page -573- 6/23/2015 16.A.3. Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond The 10% UPS Bond, if applicable, is based on the total amount of the water and /or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004 -31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment Packet Page -574- Amount Receipt Number 10% UPS Bond with plat n/a Final Obligation Bond $4,000.00 2014153766 Total Amount $4,000.00 The 10% UPS Bond, if applicable, is based on the total amount of the water and /or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004 -31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment Packet Page -574- �!�'1RI1R�lA� fir PROJECT NAME: LOCATION: NAME & ADDRESS OF OWNER: TYPE OF UTILITY SYSTEM: VERIFICATION OF FINAL COST TURNBURY PRESERVE Section 24 Township 48S Collier County, Florida BESSETT PROPERTIES, LLC 19731 MARINO LAKE CIRCLE #901 MIROMAR LAKES, FL 33913 POTABLE WATER Rnge 25E u Item Size uantl units Cost Total Gate Valve 8" 1 EA $1,135.76 $1,135.76 Gate Valve 6" 3 EA $780.15 $2,340.45 Fire Hydrant 3 FA $1,925.39 $5,776.17 C900 DR18 Pipe 8" 970 LF $14.35 $13,919.50 C900 DR14 Pipe V. 120 LF $16.56 $1,987.20 C9D0 DR 18 Pipe 6" 15 LF $10.93 $163.95 Permanent Sample Point 1 EA $1,321.36 $1,321.36 Air Release 3 EA $1,813.38 $5,440.14 Single Service 1" 2 EA $569.72 $1,139.44 Double Service V. 4 EA $625.13 $2,500.52 TOTAL COST $349 I do hereby certify that the quantities of material and services described above are true and an accurate representation of the as- installed system. CERTIFYING: Name and Title of Engineer Certifying OF: McAnly Engineering and Design, Inc. 5435 Park Central Court Naples, FL 34109 I do hereby certify that the quantities of material and services described above are true and an accurate representation of the as- installed cost of the system. CERTIFYING: i Kevin Jensen, President OF: JENSEN UNDERGROUND UTILITIES, INC. 5585 Taylor Road Naples, Florida 34109 6/23/2015 16.A.3. STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing Instrument was signed and acknowledged before me this 12th day of July, 2013 by Aevin Jesnon , who is personally known to me and who did not take an oath. SEAL: Doriiia L. Ventre - Notary Public DONNA L. VENTRE r j2 ,�� Ilotary Public -State of Florida fr {,1 to _ loy Comm. _xpires Jun 1, 2015 Commission JJ EE 97879 (' Packet Page -575- l .i —.d i PROJECT NAME: LOCATION: NAME & ADDRESS OF OWNER TYPE OF UTILITY SYSTEM: VERIFICATI.ON OF FINAL COST TURNBURY PRESERVE Sectio 24 Township 48S Collier County, Florida BESSETT PROPERTIES, LLC 19731 MARINO LAKE CIRCLE 11901 MIROMAR LAKES, FL 33913 SANITARY SEWER Range 25EE Item Size Quant1tv Units Cost Total SDR 26 Pipe 0' -6' SDR 26 Pipe 6' -8' SDR 26 Pipe 8' -10' SDR 26 Pipe Cleanout Manhole 0' -6' Manhole 6' -8' Manhole 8' -10' 8" 395 LF 8" 467 LF 8" 127 LF 6" 312 LF 6" 10 EA 1 EA 1 EA 2 EA TOTAL COST I do hereby certify that the quantities of material and services described representation of the as- installed system. CERTIFYING: $24.54 $9,717.84 $26.54 $12,394.18 $32.74 $4,157.98 $11.19 $3,491.28 $363.92 $3,639.20 $3,487.06 $3,487.06 $4,096.03 $4,096.03 $4,618.83 $9,237.66 $5— g 221 23 are true and an accurate v.�c! Name and Title of Engineer Certifying i/ it IV i v— $E �,r�V1,901 (2. ,V A7V.1 Y ip'qt S OF: McAnly Engineering and Design, Inc. 5435 Park Central Court Naples, FL 34109 I do hereby certify that the quantities of material and services described above are true and an accurate representation of the as- installed cost of the system. i. CERTIFYING: Kevin Jensen, Preshlent i OF: STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) JENSEN UNDERGROUND UTILITIES, INC. 5585 Taylor Road Naples, Florida 34109 6/23/2015 16.A.3. The foregoing instrument was signed and acknowledged before me this 12th day of July, 2013 by Kevin Jesnen who is personally known to me and who did not take an oath. SEAL: oinna L. Ventre Notary'Public .< � rti _��� ,.•._••y.�_ �,; =411A L. VEIITRE j _ ttotary Public - Stale of Florida 1 i fay Comm. Expires Jun 1. 2015 E. Crmmission // EE 97019• Packet Page -576- u 6/23/2015 16.A.3. Growth Management Division �*'-r r^�. �U�,t 2800 Horseshoe Drive N. VC7 y Naples, FL 341V4 239 - 252 -2400 Receipt Number: Transaction Number: Date Paid: Amount Due: Payment Details: Amount Paid: Change / Overage: Contact: FEE DETAILS: Fee Description Refundable Bonds Cashier Name: Batch Number: Entered By: RECEIPT OF PAYMENT 2014153766 2014 - 000885 01/08/2014 $4,000.00 Payment Method Amount Paid Check Number Check $4,000.00 22646800 $4,000.00 $0.00 BESSETTE PROPERTIES LLC 19731 MARINO LAKES CIR # 901 MIROMAR , FL 33913 Reference Number Original Fee PL20130002084 $4,000.00 melissaalvarez 3532 hughes_j Packet Page -577- Amount GL Account Paid $4,000.00 670 - 000000 - 220113