Loading...
Agenda 06/23/2015 Item #16A 16/23/2015 16.A.1. EXECUTIVE SUMMARY Recommendation to approve final acceptance of the water and sewer utility facilities for Cordoba at Lely Resort, PL20110001984 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer's designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex- Officio Governing Board of the Collier County Water -Sewer District, approve final acceptance and unconditional conveyance of these water and sewer facilities and to release the Final Obligation Bond in the total amount of $4,000.00, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004 -31. CONSIDERATIONS: 1) The Developer of Cordoba at Lely Resort has constructed the water and sewer facilities within dedicated easements to serve this development. (See attached location map) 2) Preliminary acceptance of these utility facilities was approved by the Engineering Services staff on March 2" a 2009. At that time, the value of these utility facilities (assets) was $60,560.00 for the water facilities and $129,798.44 for the sewer facilities. (See attached Asset Sheets) 3) Staff recorded all preliminary utility conveyance acceptance documents in the public records of Collier County, which were reviewed and approved by the County Attorney's office as to form and legality. The County acquired its record interest by Utilities Facilities Warranty Deed and Bill of Sale recorded in Official Records Book 4431, at Page 3 77 1, together with that certain Deed of Utility Easement recorded in Official Records Book 4431, Page 3778, all of the Public Records of Collier County, Florida. 4) The water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and w =orkmanship has been conducted by the Engineering and Right -of -way Inspections staff on September 2'a 2010 in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Staff recommends final acceptance of the subject utility facilities and to release the Final Obligation Bond in the total amount $4.000.00. (See attached Exhibit A) 7) This final acceptance is in accordance with Collier County Ordinance No. 2004 -31, as amended. 8) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. Packet Page -545- 6/23/2015 16.A.1. FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. However, approval of this Executive Summary will result in the Collier County Water - Sewer District receiving unconditional title to the utility facilities, which at the time of preliminary acceptance, had a total gross value of $190,358.44 (no depreciation applied). GROWTH MANAGEMENT IMPACT: Approval of this Executive Summary will have no growth management impact. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval -SAS RECOMMENDATION: That the Board of County Commissioners, as Ex- Officio Governing Board of the Collier County Water -Sewer District, authorizes final acceptance of these water and sewer utility facilities for Cordoba at Lely Resort, PL20110001984, and authorizes the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000.00 to the Project Engineer or the Developer's designated agent. Prepared by: Melissa Alvarez, Operations Coordinator, Engineering and Natural Resources Division, Growth Management Department Attachments: 1) Location Map, 2) Asset Sheet and 3) Exhibit A Packet Page -546- 6/23/2015 16.A.1. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.1. Item Summary: Recommendation to approve final acceptance of the water and sewer utility facilities for Cordoba at Lely Resort, PL20110001984 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer's designated agent. Meeting Date: 6/23/2015 Prepared By Name: AlvarezMelissa Title: Operations Coordinator, Natural Resources 5/4/2015 1:27:06 PM Submitted by Title: Operations Coordinator, Natural Resources Name: AlvarezMelissa 5/4/2015 1:27:07 PM Approved By Name: Pam Libby Title: Manager - Distribution, Water Date: 5/4/2015 2:26:43 PM Name: KovenskyKenneth Title: Division Director - Operations Support, Operations & Regulatory Management Date: 5/5/2015 5:51:21 AM Name: JohnssenBeth Title: Division Director - Wastewater, Wastewater Date: 5/5 /2015 6:05:23 AM Name: NagySteve Title: Manager - Wastewater Collection, Wastewater Date: 5/5/2015 1:33:31 PM Packet Page -547- Name: Steve Messner Title: Division Director - Water, Water Date: 5/6/2015 9:12:18 AM 6/23/2015 16.A.1. Name: LorenzWilliam Title: Division Director - CDES Engineering Svc, Natural Resources Date: 5/6/2015 3:57:15 PM Name: McKennaJack Title: Manager - Engineering Review Services, Natural Resources Date: 5/8/2015 10:44:05 AM Name: PuigJudy Title: Operations Analyst, Operations & Regulatory Management Date: 5/8/2015 3:47:51 PM Name: ChmelikTom Title: Division Director - Public Utilities Eng, Public Utilities Department Date: 5/19/2015 8:19:31 AM Name: CasalanguidaNick Title: Deputy County Manager, County Managers Office Date: 6/5/2015 9:41:42 AM Name: StoneScott Title: Assistant County Attorney, CAO Land Use /Transportation Date: 6/8/2015 1:10:30 PM Name: Klatz_kowJeff Title: County Attorney, Date: 6/8/2015 3:38:09 PM Name: IsacksonMark Title: Division Director - Corp Fin & Mgmt Svc, Office of Management & Budget Date: 6/9/2015 9:50:55 AM Name: DurhamTim Title: Executive Manager of Corp Business Ops, Date: 6/10/2015 5:21:11 PM Packet Page -548- 6/23/2015 ]S.A.]. � Q � W, C/) � � � z 0 � Q 0 0 —j \ § j 2 \ \ 0 - & ; § \ (� ES —� ae . ! § � ! � ) Packet PaEe -549- ° � Q � W, C/) � � � z 0 � Q 0 0 —j \ § j 2 \ \ 0 CERT. TION OF CONTRIBUTORY COSTS (� 4) PROJECT NAME: LOCATION: NAME & ADDRESS OF OWNER: TYPE OF UTILITY SYSTEM Cordoba @ Lely Resort Section 27 Township 50 South Range 26 East Collier County, Florida Cordoba Development, LLC 2240 Venetian Court Naples, FL 34109 POTABLE WATER (MATERIALS ONLY) 6/23/2015 16.A.1. Tapping Sleeve & Valve 12" x 8" 1 EA $2,320.00 $2,320.00 C -900 CL 200 8" 200 LF $8.72 $1,744.00 C -900 CL 150 8" 2,000 LF $7.23 $14,460.00 Gate Valve 8" 13 EA $928.00 $12,064.00 Perm Bacterial Sample Point 1 EA $812.00 $812.00 Automatic Flushing Device 5 EA $3,900.00 $19,500.00 Double Water Service 1 1/2" 22 EA $350.00 $7,700.00 Single Water Service 1" 7 EA $280.00 $1,960.00 TOTAL COST $60,560.00 I do hereby certify that the quantities of material described above are true and an accurate representation of the as- installed system. CERTIFYING: NAME & TITLE OF ENGINEER CERTIFYING OF: WALDROP ENGINEERING 28100 Bonita Grande Dr., Suite 305 Bonita Springs, FL 34135 I do hereby certify that the quantities of material described above are true and an accurate representation of the as- installed cost of the system. � CERTIFYING: Kevin Jensdn, P OF: STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) JENSEN UNDERGROUND UTILITIES, INC. 5585 Taylor Road Naples, Florida 34109 The foregoing instrument was signed and acknowledged before me this 8th day of December, 2008 by Kevin Jesnen , who is personally known to me and who did not take an oath. Donna L. Ventre , Notary Public DONNA L. VENTRE a ` • `? Notary Public •State of Florida Cordoba - County- Water2.xls Nt My Commission Expires Jun 1, 2011 Commission # DO 658811 Packet Page -550- CER- 'CATION OF CONTRIBUTORY COSTS (" WER) PROJECT NAME: LOCATION: NAME & ADDRESS OF OWNER: TYPE OF UTILITY SYSTEM: Cordoba @ Lely Resort Section 27 Township 50 South Range 26 East Collier County, Florida Cordoba Development, LLC 2240 Venetian Court Naples, FL 34109 SANITARY SEWER (MATERIALS ONLY) 6/23/2015 16.A.1. Pump Station & Valve Vault 1 EA $77,152.72 $77,152.72 Sanitary Manhole 8 EA $3,384.59 $27,076.72 PVC SDR 26 8" 1,860 LF $4.32 $8,035.20 Single Cleanout Assembly 6" 7 EA $116.00 $812.00 Double Cleanout Assembly 6" 22 EA $139.20 $3,062.40 HDPE SDR 11 Casing 12" 180 LF $41.57 $7,482.60 HDPE SDR 11 Pipe 4" 200 LF $4.04 $808.00 Tapping Sleeve & Valve 10" x 4" 1 EA $1,310.80 $1,310.80 C -900 CL 200 4" 40 LF $2.85 $114.00 Check Valve Assembly 4" 1 EA $1,392.00 $1,392.00 Air Release Valve 1 EA $2,552.00 $2,552.00 TOTAL COST $129,798.44 I do hereby certify that the quantities of material described above are true and an accurate representation of the as- installed system. CERTIFYING: //L3 A ? NAME & TITLE OF ENGINEER CERTIFYING OF: Chn'sfoP%u, �P/� �c WALDROP ENGINEERING ��,�,,.�,r,,t 28100 Bonita Grande Drive, South 305 77 Bonita Springs, FL 34135 I do hereby certify that the quantities of material described above are true and an accurate representation of the as- installed cost of th_e system. CERTIFYING: Kevin Jenser� Presid OF: STATE OF FLORIDA ) SS: COUNTY OF COLLIER ) JENSEN UNDERGROUND UTILITIES, INC. 5585 Taylor Road Naples, Florida 34109 The foregoing instrument was signed and acknowledged before me this 22 day of January, 2009 by Kevin Jesnen who is personally known to me and who did not take an V �:�.� FW PR ?Le DONNA L. VENTRE Notag . State of Florida Donna L. Ventre Notary Public Qc My Commission Ex ires Jun 1, 2011 o - y- we .xls p of F q Commission # DO 658811 Packet Page -551- 6/23/2015 16.A.1. Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond The 10% UPS Bond, if applicable, is based on the total amount of the water and /or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004 -31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment Packet Page -552- Amount Receipt Number 10% UPS Bond with plat n/a Final Obligation Bond $4,000.00 881032 Total Amount $4,000.00 The 10% UPS Bond, if applicable, is based on the total amount of the water and /or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004 -31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment Packet Page -552- 6/23/2015 16.A.1. VElRFICATION OF FINAL COST PROJECT NAME: Cordoba @ Lely Resort - LOCATION: Section 27 Township 50 South Range 26 East Collier County, Florida NAME 8, ADDRESS OF OWNER: Cordoba Development 2240 Venetian Court Naples, FL 34109 TYPE OF UTILITY SYSTEM: POTABLE WATER Tapping Sleeve & Valve 12" x 8" 1 EA $3,820.00 $3,820.00 C -900 CL 200 8" 200 LF $14.12 $2,824.00 C -900 CL 150 8" 2,000 LF $12.37 $24,740.00 Gate Valve 8" 13 EA $1,028.00 $13,364.00 Fire Hydrant 7 EA $2,180.00 $15,260.00 Perm Bacterial Sample Point 1 EA $1,112.00 $1,112.00 Double Water Service 1 1/2" 22 EA $900.00 $19,800.00 Single Water Service 1" 7 EA $600.00 $4,200.00 Automatic Flushing Device 5 EA $4,499.04 $22,495.20 TOTAL COST $107,615.20 . i I do hereby certify that the quantities of material and services described above are true and an accurate representation of the as- installed system. CERTIFYING: Name and Title of Engineer Certifying OF: Waldrop Engineering 28100 Bonita Grande Drive, Suite 305 Bonita Springs, FL 34135 I do hereby certify that the quantities of material and services described above are true and an accurate representation of the as- installed cost of the system. CERTIFYING: Jensen, OF: STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) JENSEN UNDERGROUND UTILITIES, INC. 5585 Taylor Road Naples, Florida 34109 The foregoing instrument was signed and acknowledged before me this 8th day of December, 2008 by Kevin Jensen , who is personally known to me and who did not take an oath. y ""all DONNA L. VENTRE Notary Public - State of Florida Donna L. Ventre Notary Public ` My Commission Expires Jun 1, 2011 Packet Page -553- ��'�F�°"' Commission # DD 658871 CERTIFYING: Kevin Jensen, Pres' t OF: JENSEN UNDERGROUND UTILITIES, INC. 5585 Taylor Road Naples, Florida 34109 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 8th day of December, 2008 by Kevin Jensen . who Is personally known tome and who did not take an oath. Donna L. Ventre . Notary Public 0.Y PV DONNA L. VENTRE +* a,, •2 °+ ° = Notary Public - State of Florida " _M y Commission Expires Jun 1, 2011 ±,��f�°?,• Commission it DD fi58871 Packet Page -554- 6/23/2015 16.A.1. �ICATION OF FINAL COST � -;�'`; �'� e PROJECT NAME: Cordoba @ Lely Resort s LOCATION: Section 27 Township 50 South Range 26 East Collier County, Florida NAME & ADDRESS OF OWNER: Cordoba Development, LLC 2240 Venetian Court Naples, FL 34109 TYPE OF UTILITY SYSTEM: SANITARY SEWER sar Pump Station & Valve Vault 1 EA $106,552.76 $106,552.76 Sanitary Manhole 8 EA $4,559.84 $36,478.72 PVC SDR 26 8" 1,860 LF $30.90 $57,474.00 Single Cleanout Assembly 6" 7 EA $216.00 $1,512.00 Double Cleanout Assembly 6" 22 EA $23920 $5,262.40 HDPE SDR 11 Casing 12" 180 LF $45.57 $8,202.60 HDPE SDR 11 Pipe 4" 200 LF $8.04 $1,608.00 Tapping Sleeve & Valve 10" x 4" 1 EA $4,810.80 $4,810.80 C -900 CL 200 4" 40 LF $8.85 $354.00 Check Valve Assembly 4" 1 EA $2,142.00 $2,142.00 Air Release Valve 1 EA $3,302.00 $39302.00 TOTAL COST $227,699.28 ✓ 1 do hereby certify 11 lat the quantities of material and services described above are true and an accurate representation of the as- installed system. CERTIFYING: Name and Title of Engineer Certifying OF: Waldrop Engineering 28100 Bonita Grande Drive, Suite 305 Bonita Springs, FL 34135 1 do hereby certify that the quantities of material and services described above are true and an accurate representation of the as- installed cost of the system. CERTIFYING: Kevin Jensen, Pres' t OF: JENSEN UNDERGROUND UTILITIES, INC. 5585 Taylor Road Naples, Florida 34109 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 8th day of December, 2008 by Kevin Jensen . who Is personally known tome and who did not take an oath. Donna L. Ventre . Notary Public 0.Y PV DONNA L. VENTRE +* a,, •2 °+ ° = Notary Public - State of Florida " _M y Commission Expires Jun 1, 2011 ±,��f�°?,• Commission it DD fi58871 Packet Page -554- 6/23/2015 16.A.1. Official Receipt - Collier County Board of County Commissioners CDPR1103 - Official Receipt Trans Number Date I Post Date Payment Slip Nbr 881032 2/24/2009 1:59:39 PM 2/24/2009 AR 14127 Appl Name: WALDROP ENGINEERING Appl Stage /Status: REVIEW STAGE NO. 1 /PENDING Address: CHRISTOPHER MITCHELL, P.E. 28100 BONITA GRANDE DR, SUITE BONITA SPRINGS FL 34135 Proj Name: CORDOBA AT LELY RESORT Type: MXD TAZ: Subdiv Nbr: 100 Project Nbr: 2007100005 Payor : CORDOBA DEV Fee Information Fee Code I Description I GL Account Amount Waived 12BOND I DEPOSITS -COMM DEV CASH BOND 67000000022011300000 $4000.00 Total $4000.00 Payments Payment Code Account/Check Number Amount CHECK 11157 $4000.00 Total Cash $0.00 Total Non -Cash 1 $4000.00 Total Paid 1 $4000.00 Memo: Cashier /location: MURPHYLINDA / 1 User: PANNULLO J Collier County Board of County Commissioners Printed:2 /24/2009 2:00:04 PM CD -Plus for Windows 95 /NT Packet Page -555-